Loading...
HomeMy WebLinkAbout2023-12-15_Wetlands_Submission_Wed_Dec_20_2023_08-13-23CCCC CCSASATT SA T C SA TTTTTTTTTTSASASASASASASASASACCCCCCCCCCC SITE PLAN LEGEND CHAIN LINK FENCE STORM PIPE WALL PROPOSED CONTOUR SYNTHETIC TURF FIELD ASPHALT STONE PATHWAY SCREENING TREE ATHLETIC FIELD LIGHT POLE SPOT GRADE CONCRETE 312 54 (78 SEATS) Tennis Courts Basketball Court Paved Parking Lot 100 ' U P L A N D R E V I E W A R E A PROJECT VICINITY MAP: APPLICANT SOUTH WINDSOR PUBLIC SCHOOLS 1737 MAIN STREET SOUTH WINDSOR, CONNECTICUT 06074 NAME TITLE TITLE SHEET EX SITE PLAN - EXISTING CONDITIONS SP 1-2 SITE DEVELOPMENT PLAN D-1 - D-4 SITE DETAILS 0'100'200' SCALE 1" =200' 0 1/2"1" Know what's below. before you dig.Call R www.cbyd.com LOCATION MAP SCALE: 1"=1000' PREPARED BY: NOTES CONSTRUCTION SEQUENCE SOUTH WINDSOR, CONNECTICUT SOUTH WINDSOR HIGH SCHOOL SYNTHETIC TURF FIELD AND 161 NEVERS ROAD DECEMBER 15, 2023 903 N OPDYKE ROAD SUITE A1 AUBURN HILLS, MI 482326 248-977-4388 CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 SYNTHETIC TURF FIELD SITE TENNIS COURTS SITE TENNIS COURT DEVELOPMENT SOUTH WINDSOR HIGH SCHOOL GENERAL CONTRACTOR: OWNER: TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONNECTICUT 06074 TP 3 TP 1 TP 2 TP 5 TP 4 12 " D I 8" CI TF=169.37 INV.=160.49 TF=181.81 INV.=174.71 (IN) INV.=171.70 (OUT) 8" DIA. S=3.50% 180 W W W W W W E E E W E E E E AS P H A L T C U R B U P S N E T # 1 1 7 U P F R N T # 1 1 8 U P F R N T # 1 1 9 U P S N E T # 1 2 0 U P S N E T # 5 0 6 8 PLAYGROUND TENNIS COURTS BASKETBALL COURT LA W N ASPHALTPARKING N.F. SHIMJITH ALIKOYA #36 GRAHAM ROAD Deed Vol. 2565, Pg. 292 S.W.L.R. TENNIS COURTS A Y E R S R O A D N.F. BRIAN M. & DANIELLE E. BENTLEY #14 GRAHAM ROAD Deed Vol. 2474, Pg. 346 S.W.L.R. N.F. KIM HAMM #6 GRAHAM ROAD Deed Vol. 2874, Pg. 342 S.W.L.R. N.F. SHANNON B. & HEATH A. CARLSON #63 MOUNTAIN VIEW ROAD Deed Vol. 2945, Pg. 193 S.W.L.R. N.F. ERIK HILL #64 MOUNTAIN VIEW ROAD Deed Vol. 2084, Pg. 277 S.W.L.R. FH DUGOUT D U G O U T PL A T E PL A T E CHAIN LINK FENCE CHAIN LINK FENCE W I R E F E N C E C O N C R E T E W A L L W / F E N C E A T O P C H A I N L I N K F E N C E C H A I N L I N K F E N C E ASPHALT W A L K W A Y ASPHALT W A L K AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B SA N D HO O P HO O P LP LP LP 1 2 " P V C I N V = 1 6 4 . 8 4 LP LP LP LP LP LP M H R I M = 1 9 1 . 4 5 M H R I M = 1 6 5 . 9 6 M H R I M = 1 9 2 . 9 2 WV WV WV GV WA T E R L I N E ME T A L CO N T A I N E R G R A S S WIR E F E N C E SHED SHED C H A I N L I N K F E N C E A C T R A N S GM AS P H A L T C U R B ASPHALT CURB LAND SHED RA M P " D W S " A Y E R S R O A D SUNSET TER. G U Y P O L E ASPHA L T S W A L E V E N T S CO N C . BRICK BUILDING BRICK BUILDING TENNIS COURTS STAIRWELL EDGE OF ASPHALT EDGE OF ASPHALT ASPHALTPARKING ASPHALT A S P H A L T W A L K A S P H A L T W A L K ASPHALT AS P H A L T C U R B ASPHALT CURBASPHALT CURB ASPHALTPARKING ASP H A L T C U R B CONC. WALK BRICK WALKFP MOUNTAIN VIEW RD LAWN LAWN LAWN LAWN EXISTING CONDITIONS LEGEND PROPERTY LINE TREE LINE CHAIN LINK FENCE EXISTING CONTOUR WATER LINE GAS LINE SEWER LINE UTILITY POLE TEST PIT TP 172 EXISTING CONDITIONS NOTES 1.ALL INFORMATION SHOWN IS BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. REMOVALS LEGEND REMOVE AND DISPOSE OF SITE FEATURE ALTER EXISTING SITE FEATURE TO REMAIN ALL TOPSOIL TO BE REMAIN ON SITE. NOTES: STRIP TOPSOIL TO REMAIN ONSITE MILL EXISTING PAVEMENT AND STOCKPILE TO REUSE AS BASE MATERIAL ON SITE STRIP AND REMOVE TOPSOIL. STOCKPILE ON SITE MILL EXISTING PAVEMENT AND STOCKPILE ON SITE FOR REUSE MILL EXISTING PAVEMENT AND STOCKPILE ON SITE FOR REUSE REMOVE AND DISPOSE OF ALL EXISTING FENCING REMOVE AND DISPOSE OF EXISTING LEAK OFF REMOVE AND DISPOSE OF EXISTING LEAK OFF INSTALL INLET PROTECTION REMOVE AND DISPOSE OF ALL EXISTING FENCING -REMOVE AND DISPOSE OF ALL LIGHT POLES -SALVAGE EXISTING FIXTURES AND DELIVER TO OWNER SHEET DATE EX-1 DESIGNED CEH SCALE DRAWN JDH S W N E DECEMBER 15, 2023 1"=30' SI T E P L A N - E X I S T I N G C O N D I T I O N S A N D R E M O V A L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D 0'15'30' 0 1/2"1" DE S C R I P T I O N BY DA T E SAWCUT CLEAN EDGE AT ALL PAVEMENT INTERSECTIONS WITH PROPOSED IMPROVEMENTS REMOVE CLAY AND STOCKPILE IN PROPOSED STOCKPILE CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 PLUM GULLEY BROOK AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B ASPHALT CURB ASPHALT CURB ASP H A L T C U R B ASPHALT CURB A S P H A L T C U R B A S P H A L T C U R B C O N C . W A L K ASPHAL T C U R B ASPHALT CURB ASPHALT CURB AS P H A L T C U R B C O L L I N S C R O S S I N G G U A R D R A I L LP MHRIM=168.97 MHRIM=168.83 MHRIM=168.35 MH RIM=169.24 MH RIM=165.09 MHRIM=163.74 MHRIM=163.60 MHRIM=168.21 MHRIM=165.34 FH CBGR=166.66 CBGR=161.57INV=158.97(E)OUT=158.97(W) CBGR=164.64 CBGR=164.48 CBGR=162.85 CBGR=162.58 CBGR=162.95 CBGR=165.83 CBGR=166.84 CBGR=169.04 CBGR=170.82 CB GR=170.55 "DWS" "DWS" UPFRNT #3059 MH RIM=173.25 MHRIM=170.68 MHRIM=171.08 LP WV CBGR=164.72 CBGR=162.52 12"RCPINV=157.80 24"RCPINV=161.40 ASPHA L T W A L K CONCRETE WALK LAWN LAWN LA W N CONC. 72"RCPINV=159.48 12"RCPINV=161.59 12"RCPINV=161.82 BOT. CULV. =154.76 BR I C K BU I L D I N G BR I C K BU I L D I N G N.F. LESLIE M. COLLINS PLUM GULLEY BROOK TP 7 TP 6 ASPHALT CURB ASPHALT CURB ASPHALT CURB AS P H A L T C U R B AS P H A L T C U R B CH A I N L I N K F E N C E C H A I N L I N K F E N C E CHAIN LINK FENCE NEVERS ROAD CHAIN L I N K F E N C E MHRIM=167.00 WV WV WV WV CBGR=167.13 CBGR=166.55 C H A I N L I N K F E N C E SHED SHE D UP SHED LP LP LP CONCRETE WALK A S P H A L T W A L K LAWN CONC. ASPHALT CURB 10 0 ' U P L A N D R E V I E W A R E A 10 0 ' U P L A N D R E V I E W A R E A EXISTING CONDITIONS LEGEND PROPERTY LINE TREE LINE CHAIN LINK FENCE EXISTING CONTOUR WATER LINE GAS LINE SEWER LINE UTILITY POLE TEST PIT TP 172 EXISTING CONDITIONS NOTES 1.ALL INFORMATION SHOWN IS BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. S W N E 0'15'30' 0 1/2"1" 1.ALL INFORMATION SHOWN IS BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. NOTES: SHEET DATE EX-2 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 1"=30' SI T E P L A N - E X I S T I N G C O N D I T I O N S A N D R E M O V A L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D REMOVALS LEGEND REMOVE AND DISPOSE OF SITE FEATURE ALTER EXISTING SITE FEATURE TO REMAIN ALL TOPSOIL TO BE REMAIN ON SITE. NOTES: STRIP TOPSOIL TO REMAIN ONSITE MILL EXISTING PAVEMENT AND STOCKPILE TO REUSE AS BASE MATERIAL ON SITE STRIP AND REMOVE TOPSOIL. STOCKPILE ON SITE REMOVE AND DISPOSE OF EXISTING FENCING AND CONCRETE PADS STRIP AND REMOVE TOPSOIL. STOCKPILE ON SITE REMOVE AND DISPOSE OF EXISTING FENCING AND CONCRETE PADS REMOVE AND DISPOSE OF EXISTING FENCING AND CONCRETE PADS REMOVE AND DISPOSE OF EXISTING FENCING AND CONCRETE PADS INLET PROTECTION (TYPICAL) APPROXIMATE LOCATION OF EXISTING WATERCOURSE APPROXIMATE LOCATION OF100' UPLAND REVIEW AREA FOR EXISTING WATER COURSE DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 CCCC CCSASATT SA T C SA TTTTTTTTTTSASASASASASASASASACCCCCCCCCCC 192.50 191.50 187.20 188.20 191.20 188.00 188.00 188.00 188.20 188.00 188.20188.20 188.70 188.20 188.80 189.50 189.60 190.60190.50 190.30190.00 189.30 189.00 185.00 E E 182.20 182.50 180.00 177.50 175.00 E E TP 3 TP 1 TP 2 TP 5 TP 4 12 " D I 8" CI TF=169.37 INV.=160.49 TF=181.81 INV.=174.71 (IN) INV.=171.70 (OUT) 8" DIA. S=3.50% 180 W W W W W W E E E W E E E E U P S N E T # 1 1 7 U P F R N T # 1 1 8 U P F R N T # 1 1 9 U P S N E T # 1 2 0 U P S N E T # 5 0 6 8 A Y E R S R O A D N.F. SHANNON B. & HEATH A. CARLSON #63 MOUNTAIN VIEW ROAD Deed Vol. 2945, Pg. 193 S.W.L.R. N.F. ERIK HILL #64 MOUNTAIN VIEW ROAD Deed Vol. 2084, Pg. 277 S.W.L.R. FH LP LP LP 1 2 " P V C I N V = 1 6 4 . 8 4 LP LP LP LP LP LP M H R I M = 1 9 1 . 4 5 M H R I M = 1 6 5 . 9 6 M H R I M = 1 9 2 . 9 2 WV WV WV GV WA T E R L I N E A C T R A N S GM " D W S " A Y E R S R O A D SUNSET TER. G U Y P O L E ASPHA L T S W A L E V E N T SCONC.FP MOUNTAIN VIEW RD 6' 6' 24 ' 18 ' 9' 12 ' ±1 0 7 ' 24 0 ' 174 178 180 182 186 188 190 192 190 188 188 18 8 186 184 182 18 0 178 176 174 1 7 0 170 17 0 170 174 188 190 S= 0 . 5 0 % S= 0 . 5 0 % 5' 7' 7' 16 0 ' - 2 0 ' T A L L B A L L S A F E T Y N E T T I N G 16 0 ' - 2 0 ' T A L L B A L L S A F E T Y N E T T I N G SYNTHETIC TURF AREA: ±94,000 S.F. -STRIPING FOR FOOTBALL, SOCCER, FIELD HOCKEY, AND LACROSSE EMERGENCY ACCESS PATH AND ACCESSIBLE PARKING SPACES FULLY PROGRAMMABLE SCOREBOARD FUTURE ±300-350 SEAT VISITOR BLEACHER -SET ON CONCRETE PAD PAVED ACCESS TOPSOIL FILL BERM WITH SCREENING TREES (TYPICAL OF 9) ±1,000 SEAT BLEACHER WITH PRESS BOX GRAVEL BELOW BLEACHERS UPPER CONCRETE PLAZA AREA WITH ADA SEATING PAVED DRIVEWAY WITH PARKING AND CURBING ADA ACCESS PATH TO FIELD RIP RAP OVERFLOW SPILLWAY PROPERTY LINE BEGIN GRAVITY BLOCK RETAINING WALL REALIGN INTERSECTION, ADD NEW ISLANDS, & RESTRIPE PARKING LOT NEW PRESS BOX 12" PERFORATED HDPE COLLECTOR PIPE S=0.50% MIN. TIE INTO EXISTING STORM STRUCTURE MAXIMUM 3:1 SLOPE ATHLETIC FIELD LIGHTING. MAINTAIN MINIMUM 100' FROM PROPERTY LINE (TYP. OF 4) GRAVITY BLOCK RETAINING WALL -OUTLET DRAIN PIPE TO DAYLIGHT END GRAVITY BLOCK RETAINING WALL FLARED END SECTION WITH RIP RAP SPLASH PAD CLCB - DRYWELL T.G.=183.0 INV=181.0 CLCB - DRYWELL T.G.=188.5 INV=184.5 CLCB T.G.=189.5 INV=185.5 150' - 12" HDPE S=0.50% MIN. 280' - 12" HDPE S=1.00% MIN. 35' - 15" HDPE S=1.00% MIN. MAINTAIN / REBUILD EXISTING CURB CUT 30' - 12" HDPE S=0.50% MIN. CLCB T.F.=164.0 INV.=160.0 100' - 12" HDPE S=0.50% MIN. 8' GOOSE NECK FOOTBALL GOAL POST TYPICAL OF 2 INFILTRATION BASIN WITH STONE LINED BOTTOM STORM WATER DETENTION BASIN CLCB - DRYWELL T.G.=187.2 INV=184.2 SAWCUT CLEAN EDGE -TYPICAL GRASSED SWALE WITH STONE INFILTRATION TRENCH FUTURE CONCESSION BUILDING TOPSOIL AND SEED TENNIS COURTS TRANSITION FROM PERFORATED PIPE TO SOLID PROPOSED WALKWAY TO SCHOOL SPEED HUMP WITH RAISED CROSS WALK (TYPICAL ) RAISED CROSSWALK PAVED ACCESS PATH TO BUILDING 'CERCIS CANADENISIS ' EASTERN REDBUD' 2" CALIPER BALLED AND BURLAP (TYPICAL OF 9) 4' HT. BLACK VINYL CHAIN LINK FENCE WITH GATES SURROUNDING FIELD TURF BOX FOR ELECTRICAL TURF BOX FOR ELECTRICAL SITE LIGHT (TYP.OF 7) BIKE RACK ACCESSIBLE PARKING SPACES WITH SIGNSWATER SERVICE LINE WITH BOTTLE AND JUG FILLER RESTRIPE DRIVEWAY FOR PICK UP AN DROP OFF LANES DUMPSTER AREA -CONCRETE PAD WITH 6' HT. PRIVACY FENCING FINAL LOCATION FOR WATER SERVICE TO BE COORDINATED WITH SCHOOL FACILITIES END PROPOSED FENCE LINE FINAL LOCATION TO BE FIELD COORDINATED WITH SCHOOL EXISTING METER LOCATION TO BE UTILIZED FOR NEW POWER SUPPLY 16 4 16 6 166 164 DRAINAGE LEAK OFF SITE PLAN LEGEND CHAIN LINK FENCE STORM PIPE WALL PROPOSED CONTOUR SYNTHETIC TURF FIELD 176 175.00 ASPHALT STONE PATHWAY SCREENING TREE ATHLETIC FIELD LIGHT POLE SPOT GRADE CONCRETE SHEET DATE SP-1 DESIGNED CEH SCALE DRAWN JDH S W N E DECEMBER 15, 2023 1"=30' SI T E D E V E L O P M E N T P L A N SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D 0'15'30' 0 1/2"1" DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 PARKING COUNTS: EXISTING PARKING ON SITE: 547 SPACES PROPOSED PLAN CHANGES: -REDUCTION OF 117 SPACES -ADDITION OF 170 SPACES TOTAL PARKING COUNT FOR PROPOSED CONDITIONS: -600 TOTAL SPACES ON SITE (NET ADDITION OF 53 SPACES) 166.50 166.50 164.80 164.80 162.60 162.60 164.10 164.10 164.90 164.90 162.70 163.90 166.40 166.40 166.40 166.10 166.10 163.90 163.40 163.40 162.70 164 162 GT D GT D GTD GT D 166 PROPOSED POST TENSION CONCRETE TENNIS COURTS PAVED PARKING AND WALKWAY AREAS APPROXIMATE LOCATION OF DRAINAGE SWALE. RELOCATED THROWING EVENTS -INSTALL NEW CONCRETE PAD, FRAME AND SHOT PUT SECTOR -NO EXISTING FIELD ALTERATIONS REQUIRED POST TENSION CONCRETE PICKLE BALL COURTS (4) -4' HT. FENCING ALONG LONG SIDES -8' HT. FENCING ALONG ENDS AND BETWEEN COURTS PROPOSED STORM WATER DETENTION AREA END GRAVITY BLOCK RETAINING WALL BEGIN GRAVITY BLOCK RETAINING WALL ATHLETIC COURT LIGHTING (TYPICAL) APPROXIMATE LOCATION OF EXISTING WATERCOURSE APPROXIMATE LOCATION 100' UPLAND REVIEW AREA OF EXISTING WATERCOURSE GRAVITY BLOCK RETAINING WALL STONE LINED STORM WATER DEPRESSION WITH RIPRAP OVERFLOW EXISTING TREELINE TO REMAIN (TYPICAL) STORM WATER INFILTRATION TRENCH -OUTLET PIPE TO BASIN STORM WATER INFILTRATION TRENCH -OUTLET PIPE TO BASIN STORM WATER INFILTRATION TRENCH -OUTLET PIPE TO DEPRESSION 10' HT. BLACK VINYL CHAIN LINK FENCE AROUND COURTS PAVED ACCESS PAD. -MATCH LINE AND GRADE OF EXISTING PAVED ACCESS PAD. -MATCH LINE AND GRADE OF EXISTING PAVED WALKWAY AREAS REMOVE EXISTING FENCING AND INSTALL NEW LOCKABLE SWING GATE EXISTING FENCING TO BE REMOVED ALONG SCHOOL DRIVEWAY. FENCING ALONG ROADWAY TO REMAIN STRAW WATTLES (TYPICAL) STRAW WATTLES (TYPICAL) PLUM GULLEY BROOK AS P H A L T C U R B AS P H A L T C U R B AS P H A L T C U R B ASPHALT CURB ASPHALT CURB ASP H A L T C U R B ASPHALT CURB A S P H A L T C U R B A S P H A L T C U R B ASPHAL T C U R B ASPHALT CURB ASPHALT CURB AS P H A L T C U R B C O L L I N S C R O S S I N G LP MHRIM=168.97 MHRIM=168.83 MHRIM=168.35 MH RIM=169.24 MH RIM=165.09 MHRIM=163.74 MHRIM=163.60 MHRIM=168.21 MHRIM=165.34 FH CBGR=166.66 CBGR=161.57INV=158.97(E)OUT=158.97(W) CBGR=164.64 CBGR=164.48 CBGR=162.85 CBGR=162.58 CBGR=162.95 CBGR=165.83 CBGR=166.84 CBGR=169.04 CBGR=170.82 CB GR=170.55 "DWS" "DWS" UPFRNT #3059 MH RIM=173.25 MHRIM=170.68 MHRIM=171.08 LP WV CBGR=164.72 CBGR=162.52 12"RCPINV=157.80 24"RCPINV=161.40 LAWN LAWN LA W N CONC. 72"RCPINV=159.48 12"RCPINV=161.59 12"RCPINV=161.82 BOT. CULV. =154.76 BR I C K BU I L D I N G BR I C K BU I L D I N G N.F. LESLIE M. COLLINS PLUM GULLEY BROOK TP 7 TP 6 ASPHALT CURB ASPHALT CURB ASPHALT CURB AS P H A L T C U R B AS P H A L T C U R B NEVERS ROAD MHRIM=167.00 WV WV WV WV CBGR=167.13 CBGR=166.55 SHED SHE D UP SHED LP LP LP LAWN CONC. ASPHALT CURB 10 0 ' U P L A N D R E V I E W A R E A 10 0 ' U P L A N D R E V I E W A R E A 164 162 160 158 1.ALL INFORMATION SHOWN IS BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. NOTES: S W N E 0'15'30' 0 1/2"1" SHEET DATE SP-2 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 1"=30' SI T E D E V E L O P M E N T P L A N SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 TYPICAL FENCE POST (5' O.C. TYP.) STRAW WATTLE EXISTING GRADE MI N . 24 " 6" ± FLOW OPTIONAL METAL HANGING FRAME FOR TRAFFIC CONDITIONS 2 EACH DUMNP STRAPS EXPANSION RESTRAINT (1/4" NYLON ROPE, 2" FLAT WASHERS) INSTALLATION DETAIL BAG DETAIL DUMP STRAP 1" REBAR FOR BAG REMOVAL FROM INLET SILTSACK DUMP STRAP 2" DEEP TRENCH PLAN VIEW 2" SETTLED LAYER OF MULCH 1/ 3 T R E E HE I G H T TILLED OR BROKEN UP SOIL MIN 12" DEEP FINISH GRADE 2"x2" WOOD STAKE AT OR BELOW GRADE ROOT CROWN TO BE AT FINISH GRADE OR 1-2" ABOVE GRADE WIDE NYLON WEBBING TREE TRUNK GUY WIRE STAKE 120° 2X WIDTH OF ROOTBALL ±2" CAL. NOT TO SCALE Leveling pad (As specified by Engineer) Drain (As specified by Engineer) Drainstone (AASHTO No. 57 or equivalent) to extend at least 12" (305 mm) behind blocks Non-woven geotextile fabric (If specified by Engineer based on site soil conditions) Fill wedge between adjacent blocks with drainstone (all blocks) Fill vertical core slot with drainstone (PC blocks) Solid bottom block Block widths vary with design Middle block (Typical) Block widths vary with design Top block Exposed wall (Height varies with design) Move blocks forward during installation to engage shear knobs (Typical) Grade to drain surface water away from wall RETAINED SOIL Bury depth Setback = 1 58" (41 mm) (5° batter angle on wall) NOT TO SCALE Flange base plate attached to top block with adhesive set anchor bolts Flange Bolted Connection ANCHOR CURB ±4"X8" ANCHOR CURB SHEET DATE D-1 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 NOT TO SCALE SI T E D E T A I L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 CAST-IN-PLACE CLASS C CONCRETE CURB, 3,000 PSI AND 5%-7% AIR ENTRAINED ROUND EDGE TOP OF CONCRETE CURB SHALL BE FLUSH WITH SAND/RUBBER INFILL MIX. (FINISHED GRADE = TOP OF INFILL) SYNTHETIC TURF -SEE DETAIL ±3"-4" 12" 4" PROCESSED AGGREGATE BASE NOTES: 1. TOP OF CONCRETE TO HAVE STIFF BROOM FINISH PARALLEL TO CURB LINE 2. PROVIDE EXPANSION JOINTS IN CURB @ 20' MAXIMUM. 3. ANCHORING OF TURF PER FIELDTURF SPECIFICATIONS. INSTALL EXPANSION JOINT MATERIAL WHEN ABUTTING EX. CONCRETE NOT TO SCALE (2)#4 REBAR (TYP.) N.T.S. CONTROL JOINT N.T.S. GATE POSTS SQ & RND SIZES 2.875" OD 2 7/8" DOUBLE LEAF GATES FACE TO FACE OPENING POST TO UPRIGHT HINGE SPACE (S) ROUND GATE POSTS: 2 7/8" FOR SQUARE & NOTES: 1.MATERIALS AND METHOD OF CONSTRUCTION SHALL CONFORM TO CHAIN LINK FENCE DETAIL ON THIS SHEET. 2.CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR REVIEW AND APPROVAL 2" M A X . VARIES VARIES VARIES 3" VA R I E S BA R L E N G T H DOME CAP GATE POST CHAIN LINK FABRIC LOCKABLE LATCH W/ STRIKE STRAP DROP-BAR ASSEMBLY -SET KEEPER IN CONCRETE SEE CHAIN LINK FENCE DETAIL NOT TO SCALE GATE PLAN NOT TO SCALE NOTES: 1.MATERIALS AND METHOD OF CONSTRUCTION SHALL CONFORM TO CHAIN LINK FENCE DETAIL ON THIS SHEET 2.CONTRACTOR TO SUBMIT SHOP DRAWINGS 3.GATE SWINGING DIRECTION: 3.1.ALL SWING GATES ADJACENT TO SYNTHETIC TURF SHALL ONLY BE ALLOWED TO SWING AWAY FROM THE SYNTHETIC TURF WHERE POSSIBLE. 3.2.PROVIDE STOP AS REQUIRED TO PREVENT SWINGING OF GATE TOWARDS THE SYNTHETIC SURFACE. VARIES SEE PLAN 3" VA R I E S CHAIN LINK FABRIC LOCKABLE LATCH W/ STRIKE STRAP GATE POST DOME CAP SEE CHAIN LINK FENCE DETAIL 2 12" 2" RE V E A L 4' OF 6' FENCE HT. CHAIN LINK FENCE POST FULL INSTALLED OR SET IN GALVANIZED OR SDR -35 PVC SLEEVE W/ HIGH STRENGTH GROUT CONCRETE ANCHOR LEDGE/FENCE FOOTING 3,000 PSI CLASS C FINISHED GRADE OR STONE DUST MOW STRIP WHERE NOTED. MAX OF 6" CURB REVEAL ALLOWED INSTALL FULL GATE POST OR PVC SLEEVE UP TO TOP OF CONCRETE TURF ANCHOR CURB -SLEEVE TO BE MIN. 1" LARGER DIAMETER THAN FENCE POST -HIGH STRENGTH GROUT AT INSTALLATION OF FENCE POST EASE EDGE NOT TO SCALE 3' 16"Ø 8"3"-4" 4"4" 1' IN F I L L D E P T H -V A R I E S 2" 4" MI N . NOTE: SLOPE BOTTOM DYNAMIC STONE LAYER AND SUBGRADE AS SHOWN ON THE GRADING PLAN TOWARDS COLLECTOR PIPES. SYNTHETIC TURF FIBERS FINISHED GRADE = TOP OF INFILL MIX INFILL LAYER DYNAMIC STONE BASE -TOP LAYER DYNAMIC STONE BASE OR CLEAN CRUSHED OR BROKEN NO. 57 STONE -BOTTOM LAYER GEOTEXTILE FABRIC COMPACTED SUBGRADE NOT TO SCALE IMPORT/EXPORT SUBBASE MATERIAL -AS REQUIRED TO MEET GRADE VA R I E S ±3" ±6" ±5" CAST-IN-PLACE CLASS C CONCRETE CURB, 3,000 PSI AND 5%-7% AIR ENTRAINED ROUND EDGE TOP OF CONCRETE CURB SHALL BE FLUSH WITH SAND/RUBBER INFILL MIX. (FINISHED GRADE = TOP OF INFILL) SYNTHETIC TURF -SEE DETAIL ±3"-4"8" 12" 4" PROCESSED AGGREGATE BASE NOTES: 1. TOP OF CONCRETE TO HAVE STIFF BROOM FINISH PARALLEL TO CURB LINE 2. PROVIDE EXPANSION JOINTS IN CURB @ 20' MAXIMUM. 3. ANCHORING OF TURF PER FIELDTURF SPECIFICATIONS. INSTALL EXPANSION JOINT MATERIAL WHEN ABUTTING EX. CONCRETE -MAX OF 6" CURB REVEAL ALLOWED NOT TO SCALE (2)#4 REBAR (TYP.) ±3" ±6" ±5" 4"4"CORE DRILL FENCE POST WITH MINIMUM 1" LARGER DIAMETER CORE THAN FENCE POST. FILL WITH HIGH STRENGTH GROUT. MIN 6" CORE CHAIN LINK FENCE POST AND RAIL SIZING POST OR RAIL TYPE TERMINAL OR COMMON LINE POST TOP RAIL INTERMEDIATE RAIL BOTTOM RAIL GATE POST GATE FRAME NOTE: 1.ALL CHAIN LINK POSTS, RAILS, FABRIC AND HARDWARE TO BE BLACK VINYL 2.4' AND 6' HEIGHT FENCE POSTS MAY BE CORE DRILLED INTO CURBING. 3.ALL GATE POSTS TO HAVE FULL DEPTH FOUNDATIONS. 4.FENCE HEIGHTS ABOVE 6' ARE PROVIDED ON SEPARATE DETAIL NOT TO SCALE 1'-6" VA R I E S 10' MAX. COUPLING AS REQUIRED POST CAP LINE POST 10' O.C. STEEL RAIL TIE WIRE (18" O.C.) TOP RAIL CHAIN LINK FABRIC, 2" MESH SIZE, 6 GAUGE DOME POST CAP TERMINAL POST O.D. BOTTOM RAIL TENSION BAND AS REQUIRED CONCRETE FOOTING 3,000 PSI COMPACTED SUBGRADE, TYP. 3' - 0 " (U P T O 6 ' H T . F E N C E ) 4' (U P T O 6 ' H T . F E N C E ) 1' MIN. EQ.EQ. 2-7/8" 1-5/8" 1-5/8" 2-7/8" 1-7/8" 4' & 6' HT. FENCE 2-7/8" AS NOTED 1-5/8" LIMIT OF FOUNDATION / CONCRETE TURF ANCHOR CURB. INSTALL SLEEVE IN FOUNDATION AND POUR CONCRETE TURF ANCHOR CURB ABOVE UPON SETTING OF FOUNDATION NOTES: 1. TOP OF CONCRETE TO HAVE STIFF BROOM FINISH PARALLEL TO CURB LINE 2. PROVIDE EXPANSION JOINTS IN CURB @ 20' MAXIMUM. 3. ANCHORING OF TURF PER FIELDTURF SPECIFICATIONS. SHEET DATE D-2 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 NOT TO SCALE SI T E D E T A I L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 2" 4" MI N . NOTE: SLOPE TO DRAIN. NOT TO EXCEED 2% CROSS PITCH CRUSHED BLUE STONE OR SCREENINGS PROCESSED AGGREGATE BASE OR MILLINGS GEOTEXTILE FABRIC COMPACTED SUBGRADE NOT TO SCALE BITUMINOUS LIP CURBING NOT TO SCALE 2" RE V E A L BALL SAFETY NETTING POST CONCRETE ANCHOR LEDGE/FENCE FOOTING 3,000 PSI CLASS C FINISHED GRADE OR STONE DUST MOW STRIP WHERE NOTED. MAX OF 6" CURB REVEAL ALLOWED SLEEVE PER MANUFACTURER EASE EDGE INTEGRAL BALL SAFETY NETTING FOUNDATION ABOVE FENCE NOT TO SCALE 2' - 6 " 18"Ø 8"3"-4" 4"4" 2' LIMIT OF FOUNDATION / CONCRETE TURF ANCHOR CURB. INSTALL SLEEVE IN FOUNDATION AND POUR CONCRETE TURF ANCHOR CURB ABOVE UPON SETTING OF FOUNDATION NOTES: 1. TOP OF CONCRETE TO HAVE STIFF BROOM FINISH PARALLEL TO CURB LINE 2. PROVIDE EXPANSION JOINTS IN CURB @ 20' MAXIMUM. 3. ANCHORING OF TURF PER FIELDTURF SPECIFICATIONS. 18" DIA. FOOTING #3 TIES AT 12" O.C. 8 - #4 VERTICAL BARS NOT TO SCALE NOT TO SCALE WIDTH VARIES SEE LAYOUT 6"3"3"CLASS 2 BITUMINOUS CONCRETE WEARING COURSE CLASS 1 BITUMINOUS CONCRETE BINDER COURSE PROCESSED AGGREGATE BASE COMPACTED GRAVEL SUBBASE OR MILLINGS COMPACTED SUBGRADE 1 1/2" 1 1/2" 3" 6" NOT TO SCALE WIDTH VARIES SEE LAYOUT PLAN 1.5" BITUMINOUS CONCRETE FINISH COURSE (CT DOT SECTION 4.06 & M.04, CLASS 2) BITUMINOUS CONCRETE BINDER COURSE (CT DOT SECTION 4.06 & M.O4, CLASS 1) PROCESSED AGGREGATE BASE COURSE (CT DOT SECTION M.05.01) GRAVEL SUB-BASE (CT DOT SECTION 2.12 & M.02.02/06 GRADING B) COMPACTED SUBGRADE 1.5" 6" 6" BALL NETTING POST CHAIN LINK FENCE POST ALIGN FACE OF POSTS ON FIELD SIDE POST ALIGNMENT N.T.S. 20' TO 16 ' N E T T I N G NOTES: 1.20' HT. BALL SAFETY SYSTEM, MODEL: TFBSS420-SG-20' HT. WITH CUSTOM NET AS MANUFACTURED BY SPORTSFIELD SPECIALTIES, INC. NEW DELHI, NY TEL: 888-975-3343, OR APPROVED EQUAL. 2.NETTING SHALL OVERLAP CHAIN LINK FENCE IF SELECTED WITH A MINIMUM OF 1-FOOT AND SHALL BE SECURED TO THE FENCING FABRIC WITH QUICK CLIP SPRING HOOKS. 3.NETTING SHALL OVERLAP THE CHAIN LINK FENCE ON THE PLAYING FIELD SIDE OF THE FENCE FABRIC. INTEGRAL BALL SAFETY NETTING - 20' HT. N.T.S. 4' H T . CH A I N LI N K FE N C E 20 ' 4"Ø ALUMINUM UPRIGHT FINISHED GRADE CONCRETE FOOTING -SEE DETAIL 4' HT. CHAIN LINK FENCE LINE POST SLEEVES PART OF BASE BID END LINE OF FOOTBALL FIELD 8' 10' [188'-3.313"] FROM ℄ OF GOALPOST TO ℄ OF 50 YARD LINE FOOTBALL GOALPOST FOUNDATION FOOTBALL GOAL POST N.T.S. 20' NEW FOOTBALL GOALPOSTS SYNTHETIC TURF -SEE DETAIL SYNTHETIC TURF -SEE DETAIL SEE FOOTBALL GOALPOST FOUNDATION DETAIL FOR DESIGNED FOOTING R5' CL SIDE ELEVATION 8" FOOTBALL GOALPOST ACCESS FRAME N.T.S. CLASS "C" CONCRETE FOOTING ACCESS FRAME TURF ANCHORING LEDGE DIMENSION BASED UPON SELECTED MANUFACTURER TOP OF SHOCK/DRAINAGE PAD ACCESS FRAME PLATE MOUNTED 8' OFFSET GOAL POST SYNTHETIC TURF ACCESS FRAME & COVER PLUG MODEL:4570 ACCESS FRAME KIT + AS MANUFACTURED BY SPORTSFIELD SPECIALTIES 41155 STATE HIGHWAY 10 P.O. BOX 234 DELHI, NY 13753 PHONE: (888) 975-3343 OR APPROVED EQUAL WEEPHOLE (TYP.) SHEET DATE D-3 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 NOT TO SCALE SI T E D E T A I L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514 CONCRETE TURF ANCHOR CURB -SEE DETAIL SYNTHETIC TURF 6" VARIES 2.5' (MIN.) 1' M I N . C O V E R HDPE PERFORATED PERIMETER COLLECTOR PIPE. SEE PLAN FOR SIZE AND INVERTS. NO. 8 CRUSHED STONE NON-WOVEN GEOTEXTILE FILTER FABRIC NOT TO SCALE VARIES 2.0' (MIN.) SEE SITE PLAN FOR SURFACE TREATMENT EDGE OF TRENCHFINISHED GRADE BOTTOM OF TRENCH EXCAVATION PVC SCHEDULE 40 CONDUIT TEMPORARY SUPPORT SYSTEM (AS REQUIRED) UTILITY DETECTOR WARNING TAPE 18" 4" M I N . SEE PLAN FOR SIZES 12 " 36 " NOT TO SCALE SAND SEE SITE PLAN FOR SURFACE TREATMENT EDGE OF TRENCHFINISHED GRADE BOTTOM OF TRENCH EXCAVATION SPRING LINE HDPE PIPE TEMPORARY SUPPORT SYSTEM (AS REQUIRED) UTILITY DETECTOR TAPE DIA. TRENCH WIDTH I.D. OF PIPE +2.0' 0. 3 3 ' NOT TO SCALE FLARED END WITH RIP RAP SPLASH PAD NOT TO SCALE OUTLET PROTECTION ID TYPE SP (FT)RP (FT)LA (FT)W1 (FT)W2 (FT)D (IN) LA 12" CROSS SLOPE AS SHOWN ON PLAN LA 12" FLOWW2 W1 SP RP D ELEVATION PLAN FES ANALYSIS POINT C 10.01.251.25 4.0 7.0 12 TYPE B INTER- MEDIATE 24" MIN. *SEE SITE PLAN FOR INVERTS, CONNECTIONS, AND CLEANOUT LOCATIONS 2' M I N FINISHED GRADE CRUSHED OR BROKEN STONE NON-WOVEN FILTER FABRIC 4" PERFORATED HDPE STONE TRENCH IN BASIN NOT TO SCALE 6" A A B B 5' 4" 4' 4" TYPICAL OUTLET CONTROL STRUCTURE NOT TO SCALE SECTION B-BSECTION A-A BRICK, CLASS "A" CONCRETE OR MASONRY CONCRETE UNITS. WHERE BRICK OR MASONRY CONCRETE UNITS ARE USED, CORBELLING WILL BE PERMITTED. MAXIMUM CORBELL TO BE 3". NO PROJECTION SHALL EXTEND INSIDE OF LIMITS NOTED BY *. CLASS "A" ALTERNATE CONCRETE POURED IN PLACE OR PRECAST CONCRETE UNIT NORMAL FINISHED GRADE 8"8" 4' 4" 36" CLASS "A" CONCRETE OR PRECAST UNIT 12"12" 5" 20 3/8"10 13/16"10 13/16" 5" 3" MIN. 20 3/8"* 7 13/16"7 13/16" 8"8"48" 5' 4" PLAN 12" 7 5/8"7 5/8" 6" VARIE S 24" 8" 1/2" MIN. 4 13/16" 8 5/16" 37 3/4"8 5/16" 4 13/16" OVERFLOW OPENING PREFORMED CONCRETE STRUCTURE OR APPROVED EQUAL CONCRETE FOOTING, 3000 PSI(10) - #6 VERTICAL BARS FINISHED GRADE 8' - 6 " 3" 6" 3" COVER (TYP.) 4'Ø 3" COVER (TYP.) (2) -#4 TIES @ TOP #4 TIES @ 12" O.C. (10) - #6 VERTICAL BARS W12x35 STEEL COLUMN PER SCOREBOARD MANUFACTURER #4 TIES @ 12" O.C. 4'Ø 3" COVER (TYP.) W10x39 STEEL COLUMN C FOOTING & COLUMNL PLAN SECTION NOT TO SCALE NOTES 1. TWO CONCRETE FOOTINGS REQUIRED FOR THE SCOREBOARD INSTALLATION CONFIRM SPACING OF FOOTINGS WITH MANUFACTURER 2. BOTTOM OF SCOREBOARD TO BE 10'-0" ABOVE GROUND ELEVATION. 3. SCOREBOARD MANUFACTURER TO PROVIDE PE DESIGNED SHOP DRAWINGS FOR FOUNDATION. NOT TO SCALE SHEET DATE D-4 DESIGNED CEH SCALE DRAWN JDH DECEMBER 15, 2023 NOT TO SCALE SI T E D E T A I L S SO U T H W I N D S O R , C O N N E C T I C U T PR O P O S E D S Y N T H E T I C T U R F F I E L D A N D T E N N I S C O U R T D E V E L O P M E N T SO U T H W I N D S O R H I G H S C H O O L AY E R S R O A D A N D N E V E R S R O A D DE S C R I P T I O N BY DA T E CEH ENGINEERING AND CONSULTING 580 SHEPARD AVENUE HAMDEN, CT 06514