Loading...
HomeMy WebLinkAbout06-45P_CHINESE BAPTIST CHURCH OF GREATER HARTFORD_KING STREETC a a v C 0 v i 0 0 M � 7 C O IO Ole :> y T a 0 >, u co O V M N 0 a. PREPARED BY: Garg Consulting Services, Inc 2096A Silas Deane Highway Rocky Hill, CT 06043 ARCHITECTURE BY: Clark & Green, Inc. 113 Bridge Street Great Barrington, MA 01230 LANDSCAPE ARCHITECTURE BY: Mark J. Papa & Associates LLC 201 State Street North Haven, CT 06473 ° w N T LOCATION MAP r' E A 5 T ° v PROJECT LOCATION 1 " - 5000, PHASE 1 OF BUILDING 1 PARCEL AREA: 418112 SA / 9.599 AG N/F MARICE AND LIESSE M. BELOIN DEED REF: 168 PAGE 331 ASSESSOR REF: 4 13 S82°75'40"E a� 268.9p• + M 200 N/F GEORGE P. TELESCO, III DEED REF: 1106 PAGE NO.259 ASSESSOR REF: 4 12 N/F NINA L. KEMENT DEED REF: 1106 PAGE NO. 259 ASSESSOR REF: 2 54 /I 100 0 200 Fj + J HERESTOBE ET1 919.59' 5)\B'4G F N/F EUGENE 3. PAGANETTI FOR ALMA BURNHAM DEED REF: 2697 PAGE 118 ASSESSOR REF: MAP 28 LOT 88 0 APPLICANT: CHINE SE BAPTIST CHURCH OF GREATER HARTF"ORD NORTH M ' STREET WEST HARTFORD. CT N/F ALEXANDER RUSSAK 3R. DEED REF: 1159 PAGE NO.028 ASSESSOR REF: 5 68 W r, $N x/0 N/F CYNTHIA SZUKI DEED REF: 277 PAGE 021 ASSESSOR REF: 5 55 SAYLOR DEEDREF: D0 PAGE DEED REF: 130 PAGE 437 ASSESSOR REF: 4-14 nM11MFNTEQTQ un- ��� ,• - 13UPNHAM STREET -TOR'R0- x sC, =;c1 DRAFTER: CHECKED 0Y* Sr;o'd��� s�nhut :I E� DATE CHECKED: J. Scala s c� VA0 2096A snos_DeCLn. Hqy 1 1 1 1 I SHEET NO DESCRIPTION TITLE H / KEY MAP OVER&L SITE 3 SEDIMENTATION CONTROL PLAN 4 DRAJNAGE AND UTILITY PLAN PHASE CONSTRUCTION ILLUMINATION PLAN 7 EXISTING SITE PLAN PLAN15 PROJECT TITLE: Chinese Baptist Church of Greater Hartford King Street, South Windsor, Connecicut TITLE SHEET / KEY MAP CAW f LE COMOP1 r I PLOT TEO 9/1/2006 0223 01 OF 9 Q 0 O ci O C.) Q E- 00 i.. ........ ....... . . -- - --- IN I VIOLATORS R7-1 BACKGROUND WILL BE FINED NO . —1— BLUE I ?. ---) BACKGROUND - WHITE LA Di[ 9/1 k J I %jr %.p r% r- P% i r- r% m P%m i r %j F% u NORTH mAjN STREET DRAFTER, WEST HARTFORD. CT Ir % -A • .. .... .... .... .... . ARE NA -:; SCALE IN FEET CHECKED BY. 40 80 40 0 1 NA DATE CHECKED; 6�� V40 5A Shas 060" Hwy King Stre'et, South Windsor, Connecicut OVERALL SITE PLAN CADO FILE COnC@PldV PLOT TED 9/t/2006 02 OF 9 Sedimentation and Erosion Controls: Filter Fabric Fastener - Min. No. TO Go" Wire 1. The Engineer shall have oversight responsibility for all construction activities Per Past Required. (Typ.) related to protection of the environment. The Engineer shall be Mr. Jeffrey A. Scala, P.E., 10' Mox SCHEDULE OF OPERATIONS - SITE DEVELOPMENT G Chief Engineer, Garg Consulting Services Inc. (860)563-0582 or as mutually agreed by tTyp1 1. Review proposed operations with erosion control officer and engineer the Town of South Windsor and CBCGH. to ensure completeness and conformance with regulations. This shall include 2. The general construction sequence shall be as follows: the filing of any construction permits. a. The contractor shall hold a preliminary construction meeting to discuss 2. Install anti -tracking pad and E&S controls as shown or where his operations and intended schedule. Attendees shall consist of at least the 3 otherwise needed prior to starting construction. Engineer, Town of South Windsor and CBCGH. 3.Follow procedures in E&S control narrative and building site .-• .�: . < b. Accurately delineate the limits of construction and wetland enhancement areas. development above. \13 The limits shall be considered the Sedimentation Control Fence as indicated. AMM 4.Strip topsoil and unsuitable subsoil from driveway and c. Install the perimeter sedimentation and erosion controls including, the anti -tracking _i building site areas. Protect topsoil stockpile from erosion. 5.lnstall bank -run gravel base. Construction equipment ' `' pad, temporary sediment basin and high visibility safety fence. _>' d. Rough grade the entire site except the basin and wetland enhancementareos. ��' N is to travel on gravel surface, not on erodible subsoil. Remove all invasive vegetative species as directed by the Engineer. 6.Cre0te temporary silt pools at low areas and at ROC 2" T K e. Install temporary mulching on slopes or place topsoil and establish turf. location of permanent basin area. Until final grading, . ,\ :. R f. Construct building and install subsurface drainage. ELEVATION swole or stone berm the driveway surface to direct flow to the �� , , (4" MIEN. COVER) g. Sedimentation controls shall be installed around the drainage inlets. silt pools. The pools will have to be cleaned frequently. h. Construct the basin and stabilize slopes with turf, mulch and plantings. 7.Bring areas around building to final grade, replace topsoil, seed and mulch. After heavy equipment has finished, re grade i. Construct the wetland enhancement areas and rain gardens, including seed mixes STEEL POST Filter Fabric yg and plantings. driveway to remove silt pools, install process and pea stone top ` - i. Final oracle porkina areas and place Dovement, back fill curbs, install landscaping course and construct level spreader: / ' ANTI TRACKING R DETAIL_ _ AD - C lnw and clean-up site debris. /` r Direction - 8. Maintain E&S controls until area is stabilized. 9. Remove controls when area is stable. J k. Monitor site for erosion problems. tUrbed Ground Line NOT TO SCALE prohibited,undis i N 3. Encroachment into the wetland areas and setback areas with vehicle shallbe / , X { �....' 4. Sedimentation controls shall be installed as indicated on the plans and in conformance to the " 2002 ........ Connecticut Guidelines for Soil Erosion and Sediment Controls" or as directed by the Engineer. \ :: ;� ' ' TEMPORARY STOCK PILE AREA 5. All sedimentation controls shall be maintained for the duration of the project until permanent cover is established and approved by the Engineer. 6. The Engineer shall periodically monitor the site. In addition, the Engineer shall inspect the site 6' BY 6' following any significant storm event. The Engineer shall keep accurate records for review by the Town. BACKFILLEO TRENCH SED. EROSION CONTROL F CE 7. All soil to be stockpiled for a period of greater than 30 days shall be temporarily seeded and mulched. ; 8. Seeding dates: the following seeding dates are recommended to establish permanent vegetative cover. a. Spring - April 1 thru May 30 FABRIC ANCHOR DETAIL b. Fall - August 15 thru October 15 9. Anv damaged or failing controls shall be repaired within 24 hours. 10. All surfaces shall be treated with at least 4 inches of quality topsoil before seeding unless otherwise SILT FENCE PLAN noted on the plans or as directed. :. 11. All dewatering operations shall be discharged into an approved method. Approval of the method shall not relieve the Contractor of his responsibility to protect the enviroment. EROSION AND SEDIMENTATION CONTROL PLAN NARRATIVE STAPLES ♦ ' In order to prevent damage to nearby sensitive areas, development of this site shall comply with Public Act 83-388. The developer shall comply with the procedures and control measures detailed in the , Connecticut Guidelines for Soil Erosion and Sediment Control. The following general principles are to be followed to provide an effective erosion and sedimentation control procedure: �,_ , ! ♦ �, ; 1. Keep land disturbance to a minimum. Plan the phases of development so that only the areas, j ,� 1► which are actively being developed, ore exposed. All other areas should have natural vegetation preserved, or be heavily mulched m m 2. Stabilize disturbed areas with temporary or permanent measures as quickly as possible after the land is disturbed. ' 3. Keep runoff velocities low by keeping slope lengths short, gradients gentle, and preserving intermittent areas of vegetative cover. WIDTH ' 4. Protect disturbed areas by preventing runoff from draining through them. Use uphill diversions t! , wh,are practical. SECTION A -A s! ' 5. Install perimeter control measures (silt fences/hay bales). This practice most effectively Isolates the disturbed area from adjacent areas to be protected. Extensive use of silt fencing is recommended both to detain runoff at expected discharge areas and as insurance to minimize damage should the preceding measures fail. 3' TO 6's. 6. Periodically check and maintain the E&S control measures during the construction period !, TRENCH i especially prior to expected storms. STAPLES 7. Assign the responsibility for implementation and maintenance of E&S control measures to one GEOTExTILE APRON BACKFILL TRENC person at the construction site. Provide the town with that person's work and home phone numbers In case of an emergency. .•••• 8. The Contractor shall not store any materials, vehicles within any regulated areas (Wetlands or "' ,' �� `•-� wetland enhancement areas) or beyond the limits of proposed disturbance. The limits of disturbance shall be the perimeter sedimentation control fence. SED. ER SLON CONTROL FENCE , SITE DEVELOPMENT STAPLES DETAIL A ,� ' - �� The following procedures for parcel development are recommended: SEE DETAIL DAM TOE , i �" � � � � 1. All driveway and driveway shoulders should be stabilized immediately upon completion of rough F w DAM CREST grading. Shoulder seed bed preparation should follow the general notes provided. Hay bales or , filter fabric should be used to entrap any sediment EOUAL ELEVATION ' ,� 48.5 generated from exposed soil surfaces. Driveway roadbeds shall be stabilized with compacted road :�----------- ----------- ' X aggregate as soon as possible. 2. Topsoil and excavated subsoil from the foundation area should be stockpiled within the area of BOTTOM OF disturbance if not used for on -site re grading. Each stockpile must be adequately ringed with ITCH sediment control material (i.e., hay bales and/or fabric fence). PROFILE W i ' 3. Any additional stockpiling of lumber or building materials should also be confined to the area , ,y / of disturbance. Similarly, vehicular movement should be directed to established parking areas. 4. Upon 50% completion of building construction, all row soil areas surrounding the site should be , fine graded and mulched. Installation of groundwater control systems, curtain drains with level r spreader/filtration trenches and/or energy dissipater, shall be completed at this stage. SEED BED SITE PREPARATION ' EROS'IO ONTROL FENCE- SED.r r r ��7. Fine grade and rake soil surface to remove stones larger than 1 1/2" In diameter. Install seeded erosion control devices such as surface water diversions. Apply limestone at a rate of , r 2 ton/AC or 90 Ibs/1000 sq ft. Fertilize with 10-10-10 at a rate of 300 Ibs/AC or 11 Ibs per 1000 sq f t. Work lime and fertilizer into soil uniformly to a depth of 4" with a wish, spring 48.5 r r , tooth harrow or other suitable equipment following the contour lines. �' X r �� SEED APPLICATION r Apply seed mixture (CTDOT or approved equal) by hand, cyclone seeders or hydro seeder. r r Increase seed mixture by 10% if hydro seeder is used. Lightly drog or roll the seeded r rr surface to cover seed. Seeding should be done between April 1st and June 15 or between . r August 15th and October 15th. If seeding cannot be done during these times, repeat mulching procedure below until seeding can take place. r , 48.5 r ; MULCHING ' X Immediately following seeding, mulching the seeded surface with straw or hay at a rate of 1.5 r to 2 tons/AC. Spread mulch by hand or mulch blower. Punch, mulch into soil surface with track ' machine or disk harrow set straight up. Mulch material should k approximately 2-Y into the soil surface. be tuc ed a LEGEND i PP Y WATER ADDITIONAL BALES PLACED TO LIMIT DRAINAGE AREA (SEE NOTE 81 _ _ AND LIMIT IIAXNIaI SLOPE LENGTH (SEE NOTE 91 6 FT MIN, (SEE NOTE 1) TELEPHONE/COMM. _ _ _ _ _ '� 8 FT PREFERRED L)( (SEE NOTE 9) SEDIMENT CONTAINMENT AREA ELECTRIC - - _ - - - - - - - - - - - - - ►I TREE LINE B FT MIN 18 FT PREFERRED iC 7{t I I : ..:.:......... :.. .... NFF NDTF t) --- -- --- -- -- :: a m C 0 "'.0im 1 C-a C � O y a V V » C W O U V M V1 N 14- (7YP.) POST CENTERED IN 70E OF SLOPE ��� AND DRIVEN FLU. 4 (/ te- (rrP) IF STING VEGETATION, 12" MIN SECTION HAYBALE/STRAWBALE DIKE - TEMPORARY PREV ABOVE MAX. 7- a C11) 00 0 0 ,� 'Co) O 0 O o c:� O � �7t a 0 ODDS o 0 o DO p 2:1 SL DOWN H t 4n. n.. &Itdl G. ^.. . r •. A-rv. ELE VAI IUN CONCRETE CURBING B CENTERLINE TOP OF GRATE MEOTAN STRFP --=;L -5' - 4' PLAN '- 0' LONG SECTION A -A z TYPE 'C-Gm CATCH BASIN �FT�HE TYPICAL SECTION NOT TO SCALE � � 2 OUTLET WIDTH -' SP I LL11AY ELE. ELEVATION NOT TO SCALE 2-Y4.. R 2 /811 Ile RADIUS e- 4 4 PAV'T. d .p d r. 4 m NORMAL CURB LINE PITCH V PER FT. 1' 10 R1, •J 6' ► v �a Q 4' ► 94 B '- 0' LONG L , �•a• V a a p DETAIL OF CURB TYPE INLET CLASS 'A' CONCRETE POURED IN PLACE OR -- - - - - -- / PRECASt-CONCRETE UNITS. SECTION B-B 4' TOP SOIL TOP ELEV. MINIMUM DEPTH UNLESS SPECIFICALLY OROEyREO QTHERVISE: UNDER TRAVEL - WAY 1 - T,2% UNDER UNTRAVELED AREAS 0' - 3'. DRAINAGE OPENINGS IN 4 i WALLS AT OR IMMEDIATELY ABOVE THIS ELEVATION. BRICK. CLASS 'A' CONCRETE. CONCRETE UNITS. WHERE SRI ESTABLISH TURF 11 TTED. 1EO NO **. I nwrA 6/11 /2006 Percolation test Hole no. 2 6/11/2006 Site conditions: soils are moist from heavy rains over previous two Percolation test Hole no. 1 weeks. No standing water anywhere on site Site conditions: soils are moist from heavy rains over previous two Soils are very sandy with little silt present. weeks. No standing water anywhere on site Presoak = 15 minutes hole is empty Soils are very sandy with little silt present. 10 POLY IL Average Presoak = 15 minutes hole is empty _ M TIME delta time ACCUM. TIME READING MIN/IN AverageIt 4:45 0 0 TIME delta time ACCUM. TIME READING MIN/IN CRUSHED STONE tDU ::. 4:48 2 2.0 14 0.14 3:45 0 0 FILTER FABRIC 4:50 2 4.0 17.75 0.53 3:48 3 3.0 11 0.27 4:52 2 6.0 20.25 0.80 3:50 2 5.0 15 0.50 ........... 4" PERFORATED PVC 4:54 2 8.0 22.5 0.89 3:52 2 7.0 16.75 1.14 4:56 2 10.0 25 0.80 3:54 2 9.0 18 1.60 3:56 2 11.0 20 1.00 / 4:58 2 12.0 26 2.00 3:58 2 13.0 22 1.00 5:00 2 14.0 27 2.00 ... - 5:26 26 40.0 36 2.89 hole empty 4:00 2 15.0 23 2.00 , 4:35 35 50.0 36 2.69 hole em It p 1 : g Use 3 min/inch for design purposes ' Use 3 min/inch for design purposes p p / ` r ftl INI10 T i f1N I'1R0 i N .:7 `... If 50.0 / X / ` IF eeAQ ii G OUTLET WEIR '/.. / PHAfEN2 LIMITS PAYMENT ELEV. 51. @ / LIMITS FOR TRENCH EXCAVATION - ►{ -�c�` ' ` I •un acnnimn UATE.°.IAT I ( 2) RAIN y , . •. . •. . •. . •. . •. . •.'. ! 1pf .. ' t RpD 77 i •� TYP�C DRt?IN IF TYP II , O�IA CIRCULAR PIPE •O / �,- ♦ / H :• ::: b PIPE ARCH OF :::: Y I j' , EQUIVALENT HORIZONTAL : 'o A K LL ■ H N MA .:• :. SPAN !' , Of PRESHAPE BEDDING MATE AL TO 0.10 H /' • PRIOR TO INSTALLING PIPE / / / ♦/ , IF R V Ri A PAYME MIT / BEDDING MATERIAL MAT M N MUMf ,N ARTH , // / ' '♦ / INSTALLATION WHERE GRAVEL FILL 1S NOT USED / >_/ /�/� ♦♦ .0` If PAYMENT , / LIMITS FOR TRENCH EXCAVATION ,/ / /� / AND BEDDING MATERIAL / TYPE C 53C.B. : , �/ INV. 50.404, ..�a,..�0 ,..-o...e. GRADE TO DRAIN .::... 0' WIDE .: 1 e .:• :° •0 �• TYP II / / W , K N A • `•- : `• A LL ■ H MIA L - -_:° I1.i111 CIRCULAR ,° , d PIPE ARCH OF Y I / �� 'tom .. s;►..4 H �..: EOUIVALENSP�ORIZONTAL .•.o A K LL ■ H N MA AL o!•';o' IN' HOPE CULVERT END 1 .....- .... ,.• ..... V t / H RETAINING 0.25 / / RET ALL .:• ' °.:• MODIFIED JP RAP SPLASH PAD / PRESHAPE BEDDING MATE AL TO 0.10 H , Q QJCAP RAIN PRIOR TO INSTALLING PIPE / ♦ ♦ ` +' R / ♦♦ TYPE C'61C75. 4" BEDDING MATERIAL OUTLET WEIR , Ed.EV• 52.2 INV. • 56.75 � 48.5 ; A T MINED N H X AVA T // / X ► ♦ SAN., SEWER MH ' 63.0 T ss / PERC. T�ST 2 I 60.40 / INSTALLATION ! / ' ' YPE •L C.B. WHERE GRAVEL FILL IS USED F. s 5e INV 5.�0 / / , 0 / /, BEGGING FOR CULVERTS RIP RAP SPLASH PAO [MOOIFIEO) OUTLET WIDTH SPILLWAY ELEV. TOP ELEV. BOTTOM ELEV VOLUME SPILLWAY ELEV BOTTOM AREA BASIN 1 25.0' 52.25 53.0 48.5 0.934Ac.-ft 11184 S.F. __7 BASIN 2 17.0' 51.0 52.0 50.0 0.374Ac.-ft 10692 S.F. SCALE IN FEET 80 40 0 SCALE: 1''= 40' APPLICANT: OF' cog CHINESE BAPTIST CHURCH V A.•s••G'A OF GREATER HARTFORD NORTH MAIN STREET WEST HARTFORD, CT80 I, rILLK= J. Scala PROJECT TITLE: Chinese Baptist Church of Greater Hartford TER: King Street, South Windsor, Connecicut ECKED 8Y: �vDRAINAGE AND UTILITY PLAN 2096R Shoe i. CT Hwy CHECKED: CADD FILE ConC4014V PLOTTED 9/UZ006 e60k M 6•10662 0223 04 OF 9 MULTIPURPOSE ROOM, FOYER AND CLASS ROOMS 00 c�. O 0 O >a as SANCTUARY e= 0 CD Z�0 0 ma sc4� r. rat � N •• • N :1 PHASE PHASE 4 i CLASS ROOMS AND OFFICES schA w tag N A• • N PHASE 1 THE FOLLOWING SHALL BE COMPLETED UNDER THIS PHASE: 1. CONSTRUCT THE ENTIRE DRAINAGE SYSTEM, INCLUDING ALL BASINS. PIPES, STRUCTURES SWALES AND BASIN. 2. CONSTRUCT PARKING AREAS INDICATED INCLUDING ALL OF THE HANDICAPPED PARKING STALLS. 3. CONSTRUCT SIDEWALKES AS SHOWN. 4. PROVIDE UTILITIES INCLUCING: WATER, SANITARY SEWER, TELEPHONE CABLE TELEVISION, ELECTRICITY AND ANY OTHER UTILITIES AVAILABLE. 5. CONSTRUCT ENTIRE LENGTH OF BERM ON SOUTH SIDE OF PROPERTY. G. ROUGH GRADE ENTIRE SITE AS SHOWN ON THE OVERALL SITE PLAN. 7. PLACE TOPSOIL ON ALL DISTURBED AREAS. 8. ESTABLISH TURF OR PLACE LANDSCAPING MULCH ON ALL DISTURBED AREAS. 9. INSTALL SITE SIGNAGE INCLUDING, STOP SIGN, NO PARKING SIGNS, HANDICAPPED PARKING SIGNES AND OTHER SITE SIIGNS. 10. INSTALL PAVEMENT MARKINGS INCLUDING MARKINGS FOR PARKING STALLS, FIRE LANE IDENTIFICATION. 11. INSTALL TREES, SHRUB AND OTHER LANDSCAPING PLANTS AS INDICATED IN THE PHASE 1 LANDSCAPING PLANS. 12. CONSTRUCT SECTION OF BUILDING INDICATED. 13. INSTALL RETAINING WALLS. PHASE I I I"JL_ PHASE PHASE 3 2 3 THE FOLLOWING SHALL BE COMPLETED UNDER THIS PHASE: I.. CLEAN THE ENTIRE DRAINAGE SYSTEM, INCLUDING ALL BASINS. PIPES, STRUCTURES SWALES AND BASIN. 2. CONSTRUCT PARKING AREAS INDICATED. 3. REMOVE SIDEWALKS AND CONSTRUCT SIDEWALKES AS SHOWN. 4. REPLACE TOPSOIL ON ALL DISTURBED AREAS. 5. ESTABLISH TURF OR PLACE LANDSCAPING MULCH ON ALL DISTURBED AREAS. 6. INSTALL PAVEMENT MARKINGS INCLUDING MARKINGS FOR PARKING STALLS, FIRE LANE IDENTIFICATION. 7. INSTALL TREES, SHRUB AND OTHER LANDSCAPING PLANTS AS INDICATED IN THE PHASE 3 LANDSCAPING PLANS. B. CONSTRUCT SECTION OF BUILDING INDICATED. PHASE 4 THE FOLLOWING SHALL BE COMPLETED UNDER THIS PHASE, 1. CLEAN THE ENTIRE DRAINAGE SYSTEM, INCLUDING ALL BASINS, PIPES, STRUCTURES SWALES AND BASIN. 2. REMOVE SIDEWALKS AND CONSTRUCT SIDEWALKES AS SHOWN. 3. REPLACE TOPSOIL ON ALL DISTURBED AREAS. 4. ESTABLISH TURF OR PLACE LANDSCAPING MULCH ON ALL DISTURBED AREAS. 5. INSTALL TREES, SHRUB AND OTHER LANDSCAPING PLANTS AS INDICATED IN THE PHASE 4 LANDSCAPING PLANS. 6. CONSTRUCT SECTION OF BUILDING INDICATED. 2 C`ENERAL THE FOLLOWING SHALL BE COMPLETED UNDER THIS PHASEe 1. CLEAN THE ENTIRE DRAINAGE SYSTEM, INCLUDING ALL BASINS, PIPES, STRUCTURES SWALES AND BASIN. 2. CONSTRUCT PARKING AREAS INDICATED. 3. REMOVE SIDEWALKS AND CONSTRUCT SIDEWALKES AS SHOWN. 4. REPLACE TOPSOIL ON ALL DISTURBED AREAS. 5. ESTABLISH TURF OR PLACE LANDSCAPING MULCH ON ALL DISTURBED AREAS. G. INSTALL PAVEMENT MARKINGS INCLUDING MARKINGS FOR PARKING STALLS, FIRE LANE IDENTIFICATION. 7. INSTALL TREES, SHRUB AND OTHER LANDSCAPING PLANTS AS INDICATED IN THE PHASE 2 LANDSCAPING PLANS. 8. CONSTRUCT SECTION OF BUILDING INDICATED. Revised 08/30/03 PHASE NOTESU 1. ALL TEMPORARY SIDEWALKS SHALL BE CONSTRUCTED 5' WIDE OF 1.5" THICK CLASS 2 BITUMINOUS CONCRETE ON 6' BASE. 2. ALL DISTURBED AREAS SHALL RECIEVE AT LEAST 4' OF TOPSOIL AND BE SEEDED IN ACCORCANCE WITH THE SEDIMENTAION CONTROL PLAN. APPLICANT: CHINESE BAPTIST CHIJRCH OF GREATER HARTF'ORD NORTH MAIN STREET WEST HARTFORD, CT L ■�Vu�L ti.� � c "NF J. Scala ��•�PEY A. S'e�i COO �, �► DRAFTER; `t a off, tip•.CHECKED BY; a S/pNAL.l �v 209Asnoys own. DATE CHECKED: Rsokx6 OM2 PROJECT TITLE: Chinese Baptist Church of Greater Hartford King Street, South Windsor, Connecic it PHASE i Hqry CA00 FLE COeC601.41V CONSTRUCTION PLOT TEO W1412006 0223 05 OF 9 Round Tapered Aluminum Poles 8 To 20 Foot Mounting Heights 3 bolt Pedestal Base TOP POLE - 3"O.D. X 6" LONG DIAMETER I I STRAIGHTTOP BOTTOM POLE DIAMETER CONE TAPERED ALUMINUM SHAFT 6063-T6 ALLOY TAPPED 3/8" FOR GROUND CONNECTOR CASTALUMINUM PEDESTAL BASE A356-T6 ALLOY 24" POLE TENON FITTER (3- TENON) ALUMINUM CANOPY ASSEMBLY 9-1/4" CASTALUMINUM FINIAL PRISMATIC GLASS REFRACTOR PRISMATIC BALLASTAND REFRACTOR SOCKETASEMBLY SECTION OF BALLAST HOUSING AT MOUNTING POINT ight Pole and Luminoire Mail, Not to Scale 1/4" 17- CASTALUMINUM HINGED TOP COVER WITH INTERNAL REFLECTOR CASTALUMINUM RIBS CASTALUMINUM BALLAST HOUSING W1 INTEGRAL BALLAST ASSEMBLY CASTALUMINUM BASE FOR MOUNTING TOA7'POST CAPITAL +0.0 0.3 *0.5 0.2 A14 *0.2 V 6 3 0. *0..6 *0.8 IM '0.7 LIGHTING PATTERN (# = FT- CDL) 0.2\�*0.3 0.7 *0.8 0.8 /0.5 0.2 \Z�� 0.2 *0. *0.5 *0.5 *0.5 *0.2 CEILING MOUNT LIGHT (HOLOPHANE L U11INAIRE OR APPROVED EQUAL) +0.0 4-- 4- 4- -4-- 4-- 4-- 4-- -U.1 U.1 -UA 11.0 U.0 'U.0 U.10 +0.2 +0.1 +0.1 +0.1 +0.0 +0.0 +0.0 +0-10 +0-0 +0-0 +0-0 +0-0 �.2 .2 +0.1 +0.1 +0.1 +0.1 +0.0 +0.0 +0.'0 +0.0 +0.0 +0.0 +0.1 A. 0.3 + 0.5 + 0 0.2 +0.1 +0.1 +0.1 +0.1 +0.0 +0.o +0.0 +0.1 +0.1 0. .5 4 0.5 +0.3 0.2 0.3 0. +0.1 +0.1 +0.1 +0.1 +0.1 +0.1 +0.1 +0.1 +0.. .3 0.5 A. - 2 +0.1 .1 +0.1 +0.1 0. SA1 +0 +0.3 +0.4 0 0. . . . . . . 01 0.3 0.5 +0.5 0.2 +01 +0.1 +0.1 A. 1 +0. 1 +0.0 +0.0 F. 2 0.2 A 0.1 0.1 01 0.1 0.1 0.1 0 +0.1 + -4- - .2 0.3 +04 .5 +0.3 0 02 .1 +0.1 +0.1 +0.1 +0.1 .1 +0.2 +0.1 0. 0.3 0. +0.2 +0.1 +0.1 +0.0 +0.0 +0.0 +0.0 0.1 -+61 .2 +0.3 6 5 +03 .2 .2 +0 +0.2 +0.1 .1 +0.1 0 + + .3 +0.. +0.5 0.4 .2 +0.1 A. 1 +0.0 A. 0 +0.0 +0.0 +0.0 A. 1 '0 .25 + +0 +0., +0�: .2.2 .4 +0.3 .2 .2 .2 +0..1 0. .0 0.. 0.4 0.4 +0.4 +0.2 +0.1 +0.0 +0.0 +0.0 +0.0,.+0-0 0 0.3 0.8 .0 + + + +0. 0.2 +0.. +0.1 +0.1 +0.1 5 G.5 .3 +0.1 +0.0 +0.0 +Q.G.. 0.0 .2 3 0. 0.6 .6 +0.6 0. 0. +04 0.4 0. 15 0.0.: +0.8+ 0 0 0 0. +C.4 +0. 0.6 _LO. 0 .6 0. +0.5 +0.3 +03 0. 0.2 +0.2 +01 +0.1 +0.1 .0 0.5 OA +0.1 +0.1 . tp�q.' ; 0-40.0 +0.0 +0.0 _T0.7 -- +0 3.3 U A0.3 +0.4 5 7 0 0.5 +n -i n +01 +0.2 A. 1 +0.1 A. 1 +0.4 A. +0.6 +0.0 +.0 "+G.9"+0.0 +0.1 +0.0 +0.0 02 00 +0. 0 +10.2 +0 0.1 +0.0 +0.1 +n 1 +0. 1 1 0. +0 !k4 0. 0 .1 + +0. 7 . 0 0. -rO.3 0:3 +0.4 .22 ...... % 1 0. 0.2 0.1 0 0.1 fO.4 .5 0. 0.5 .0 +0 0.3 0.2 +0.1 +0.0 +0.0 0.1 + .7, .2 +0.2 0.2 +ON t� 1 Z .3 /+ 0.4 +0.5 +.1 +0.1 +0.1 +0.1 1 1 A -M -rn +0. tA 3 -t-01 -tO-. I -rO.O 0 0.2 0. 0�: ++0.2 +0 +0 0.. 4 +0.4 .3 .2 +0..1 .1 0. +0. 0.5 25 +0.1 +0.1 +0.0 +0.0 +0.1 +0.2 0.3 .3 +0.3 +0.4 +0.2 A. 10.2 .2 .2 +0.5 0.2 +0.1 +0.0 +0.0 +0 D OI 0 + q 31n +n q n In +0 .5 A. +0.2 +1.1 +0. **"-.,ro.o .0.- X+. 1, + I n q q +n tt ... ... .01 - " I 3 A.. .0 11' �Apki +0.1 A0.2 9 0 +0 3 0.3 +03 +03 0. .4 0.3 0. +0.2 .0 0.2 A0.1 +0.0 +0-0 +0 0 10.1 J� 0 <v'0-v +0.1 0. +0.1 0. .3 .3 .4 +04 +0.3 0.2 +0.2 0 n 0.2 +0.2 +0.1 +0.0 +0.0 +0.0 +0-0 +0-0 0.0 0.4 .4 +0.4 .4 +0.4 0. +0.4 +0.4 +0.3 0.2 +0.2 0. A. I A. 1 +0. 1 A. 0 A. 0 +0. 0 A. 0 A. 0 +0.0 0.2 .3 +0.4 +0.6 +0.7 0. 1k .5 0 +0.4 .4 +0.3 0.2 +0.2 +0.2 0. .0 +0. +0.2 +0.1 +0.1 +0-0 +0-0 +0-0 +0-0 +0-0 +0-0 +0-0 4% +0 0. +0.7 A0.9 +0.8 +0.8 0. 0 . 4 +0.3 +0.3 .2 0.3 3 +0.1 0. .5 +0.1 +0.1 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 3 + + +j + 0.6 .6 0.0 + + 0.8 0.7 0., .2 0.6 +0.9 3 +0.1 +0.1 .0 0. 0 0.5 +0.4 0.2 +0.1 +0.0 A0.0 +0-0 +0-0 +0-0 +0-0 +0-0 +0-0 +0-0 03 0.5 A. 0. W5 7 +0.4 .3 0.3 9 11) 7 +1.0 0. 0 0.2 +0.2 .3 0.4 +0.4 0.3 A0.1 +0.1 A. 0 A. 0 A. 0 +0. 0 0.0 +0.0 +0.0 +0-0 +0-0 +0-0 +0. +0.6 .8 +0.8 +0.8 +0.4 +03 +0.2 .6 +0.9 5 .2 0.3 +0.4 2 1 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 .3 A +0.4 +0.7 .8 -0.5 0.7 +0.7 0A +0 1,0 1 +0.2 +0.2 0.3 +0.3 +0.3 .0 .5 3 . 0.0 . . 0.0 0.0 . 0.0 . 0.0 +0.0 +0.0 +0.0 +0.0 .8.3 +0.3 0.5 +0 5 5 +0.2 +0.2 0. 0.3 0..3 A- 0.7 0.0 A. 0 A. 0 +.0 A. 0 +.0 +.0 +0.0 +0.3 3 ,4+0.2 4 +0.3 0.2 .2 +0.2 +0.2 +0.2 02 +0.2 1 A 1.0 0. 0 .0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 2 +0.2 0�3 0.2 5 0.2 0. +0.4 +0.2 +0.1 +0.1 +0.1 +0.2 0.9 0.9 0. 0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +O.o +0.0 '+0.2 +0.2 0.2 .2 0. .4 n +04 .3 0.3 .2 Z06 +0.2 +0.2 +0.1 +0.1 .1 A. 0. -1 9 6 .0 0. 0 +0.0 +0.0 +0.0 +0.0 +0.0 !+0.2 +0.2 :0 2 .2 0.2 .3 +0.3 0.3 0.2 +0.2 +0.2 +0.1 +.1 +0.1 +0.2 0. 2 0.4 .5 .5 0.8 +0.0 +0.0 +0.9.. ..to. 0 +0.0 1+0.2 +0.2 0.2 � 0.2 +0. +0.2 .3 + + +0.3 +0.3 0.1 9 .2 +0,2 .2 .2 1 +0.. u.2 +0.3 +0.4 +0.4-" 1 0.0 +0.0 +0. 0 A. 0:: +.0 A0.3 0.2 1.2 +0.2 �.2 0.2 13 +0.3 +01' 2 2 -t-O.. 0.2 10.2 -rO. 0.2 +0.3 0.3 6.3 .3 +0 -�O'. 1 +0.0 +0.0 +0.0 +0.0 A0.3 0.3 0.2 1.2 0.3 +0.3 0.4 3 .3 +0.4 +0 0 -2 0.0 0.3 +0.4 0.0 1. +0.2 +0.1 +U.1 0. +0.0 0 0 0. 0 +0.0 0 0 +0.0 +0.0 +0.0 +0.0 +0.0 +03 +04 0.3 0.3 0.3 0.4 0.4 .3 3 Z 0.4 0. 3 +0.30 D. 0.40.4 0.1 0.1 0.1 0.0 0.0 0.0 0.0 +0.0 0. .0 0.0 +0.0 +0.0 +0.0 +0.0 0.3 +0.4 0.4 0 5 +0-5 3 0.4 A. 10.7 �.' +..2 A. 1 +0. 1 A. 1 A. 1 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.4 0.6 0.5 +0.7 0.7 +0.4 2 +0... 0.8 0. 0. 0.8 .5 .2 +0.1 +0.1 +0.0 +0.0 A. 1 A. 1 A. 1 +0. 1 A. 1 +0.0 +0.0 +0.0 +0.0 +0.4 6 0% +0.4 +0�4 +- 18 .5 1 . +1.7 1.7 -1`1 +0.7 0.5 0. 0.7 71.0 -TO. 3 A. i A. i A. 1 +0.1 +0.0 +0.0 +0.0 % "N 5. +0 +0.3 .8 .7 As 0.8 0. +0.4 .2 .2 .3 +0. -+1. 1 41t '5 .8 1.. +0.4 03 +0.9 +0.8 0. A. I A0. 1 +0. 1 -.9 �0.7 10.9 .J5 +0.1 Q�q t .0 .2 +0.4 .7 1.6 .6 n •+0.4 .2 +0.4 0 +1.5 +1-6 +1-8 +1.. 0.7 .5 0 (Al +0.8 +0.1 . k k-11, .3 +0.4 +5 1 n +04 .3 0.2 2 .3 +0 +01.6 +0.9 +0.8 5 +0.4 0.3 0 • 0.2 A. 1 A. 1 A. 1 0.9 0.9 0.2 +n A0.4 +0.5 +0.4 A0.4 +0.4 +0.4 0,5 +0.4 +0.3 0. A-0.2 +0.2 .2 0.3 -5 +G1.7 +0 0.6 +0.7 +0.6 +0.4 .3 2 0.2 +0.1 +0.1 A. i A. 0 A. 1 0.1 0.. 0.2 A. .0 +0.3 +0.3 0.2 0. + + + +0.3 0.4 0.3 n A .4 .3 .2 1 1 1 .0 .0 .0 0 .0 +0.1 +0.1 n 0.2 0.2 0.2 0.2 2 n 0.3 0.3 i n 0.2 0 .4 0.4 .3 .2 .2 .3 .3 .2 .1 .1 .1 .......... :0 A-.-o +o*.,o ......... . . . . .................. .2 .2 .2 .2 .1 .1 2 .2 . . u.2 0.2 0.2 . 0.2 . . 0.1 0.1 . 0.1 . 0.0 . 0.0 . 0.0 . 0.0 A 0.0 0.01 ..... .0 . . ..... . .................... .................. ...... ................ .............. .. ................ ...... . .. .. ........ 0.2 0.1 01 0.1 +0.1 +0.1 +01 +0.1 +0.2 +0.2 +0.2 +0.2 +0.2 +0.2 +0.2 +0.2 +0.2 +0.1 +0.1 +0.1 +0.1 +0.1 +01 +0.1 +0.1 +0.1 +0.1 +0.1 +0.0 . . ............. I . .... . . .......... ................. . ........ .............. ........ ..... . .. R........... UK;,," .............. R A RU APPLICANT; 0 - CUN0** - 00* CHINESE BAPTIST CHURCH V A. - OF GREATER HARTFORD NORTH MAIN STREET W 14 WEST HARTFORD. CT -1) SCALE IN IFEE T so 40 0 so �-6-o& ECKED BY; TE CHECKED; J. Scala WWI MCI&S 6A Shas Doane HWy PROJECT TITLE: Chinese Baptist Church of Greater Hartford King Street, South Windsor, Connecicut ILLUMINATION PLAN CAOO FLE UnCSPIAP I PLOTTEO 9-11112006 0223 06 OF 9 X 29.51 MAP REFERENCES: PROPERTY SURVEY PREPARED FOR NINA L. KEMENT, MAIN STREET SOUTH WINDSOR AND EAST HARTFORD, CONNECTICUT. PREPARED BY SANDERSON AND WASHBURN, SCALE 1"=60', DATED MARCH 25,2005 PLOT PLAN, PROPERTY VF RUSSAK BRI/5.,11V1^.. , 'MIMU J 1 REC ,I JI/U 1 rl WINDSOR, CT. PREPARED BY LUCEK ENGINEERING ASSOC. INC. SCALE 1"=40', LAST REVISED 5-5-88. CONNECTICUT STATE HIGHWAY DEPT. RIGHT OF WAY MAP, TOWN OF SOUTH WINDSOR, HARTFORD-SPRING FIELD RE. - E. SIDE FROM THE TOWN OF EAST HARTFORD TOWN LINE NORTHERLY ABOUTE 2300 FEET. ROUTE U.S. 5, SCALE 1"=40', DATED MAY 29,1930. WATER BUREAU, THE METROPOITAN DISTRICT, HARTFORD COUNTY, DATED FEBRUARY 1950; SCALE 1" = 40'; SERTAL NO 1888 SHT. 28-1 THE METROPOLITAN DISTRICT, ENGINEERING AND PLANNING, HARTFORD CONNECTICUT, TOWN: EAST HARTFORD, STREET: KING ST., HO RANGE 273-347, SCALE 1" = 40' HOR. 1"=10' VERT, DATED DEC 20,1985 SERIAL NO. 1819. SHEET 117-159. WATER BUREAU, THE METROPOITAN DISTRICT, HARTFORD COUNTY, DATED FEBRUARY 1950, SCALE 1" = 40', SERIAL NO 1888 SHT. 22-83 PARCEL AREA: 418112 S.F. / 9.599 AC. J�- Q3 MERESTONE FOUND . _%S 60.52_ X26.21 X'Si`.g6_ >C56.76 N/F ALEXANDER RUSSAK JR. - - - ' DEED REF: 1159 PAGE NO. 028 " IF�' X"55.79.55 _ - - - - - - - - , , ASSESSOR REF: 5 68 %C54.32--- - - -- 22,45 x�9 58 TREE LINE (TYPE -X 57.25 X68.21 ' /' // �, ,, `\ - `_------- 90 IV/F GEVKGE f: I ELESC V, lII r �:.` i ' ' ,' /� ,�' X53. \` '' DEED REF: 1106 PAGE NO. 259 r ; ' , � -'' , - ' / ASSESSOR REF: 4 12 %C52.43 ,�'' �'•.�,_ �.�V Irr Irl, 5' , 1 I 54.58 r I °ry X52.58 ' ! /y°) ►'I'r 'rrrl �__�% .' X52.19 1 X 55.52 X 56.15 O W N _ i ► i �,,:..' - , ♦ ' iss r I r LOCATION MAFX67.42 X ► / I 53.35 ESTONE� I 1 ' IFO ND! `♦ ♦, 64.08 ► I 1 ♦ `. \ ` . ' ' - . - - - ` x 52.30 _ ' y r' ' X 54.69 �, tl PIN TO 1 , ` 1` �``\ `` ```♦ �; ♦ - v // , / ' / , - - �` ` ♦ t 1 X 52.89 , - ' ' ,' _ _ - ,! 1 ! ♦ `� X 1 \27 ! BE SET 9.46 441 - --___--_=_I ,' -�.``� ��' X52.85 X59.2h I X�1.30/ -. _-_--_-_-__ X49.8� _'•05' r , X53.35 ' / '- I 7� ♦ , . . . , "'•.uq`/e,•o• / / / /4 ` ` \ - \ - .. ,' , , X 51.19 (Y' XPRU 52.88 TBCEC� , ,' �/ N/F MARICE AND LIESSE M. BELOIN -h�" °�� ` " ` ` ` - - ' - - - ` . X '7 , MLA-0/, i ► 0 DEED REF: 168 PAGE 331 CO , OPEN FIELD /// x58 02 ,'' - _ - ' ' /� ► ASSESSOR REF: 4 13 ,zo . \ , - ' ; , ` \ \ - '' 74.19 52. / , .-1VlAP� �E'1ZE�1� - \ X 53.58 / I / / r �C 58.33 / 69.77 r� I 1 %�5P.89 / ► I , ,,' ,' ,' ,' •' '63 gg' •' • EXISTING EXISTING /53-82 ' � 1 %K 53.45 ' r ! i ' /' , /' , , = , , ` , , ' ' , ' ' _ _ OUT -BUILDING HOuSE 41j 53.72 eAgZA x53.13 ! X51.4'4 ^i 7 ` I ` 1 I ; , 60♦62 is 65 40 ` X52.t37 1 .'� ► ► I ! ` ` ` / / i� E A S - Site Location GAG N/F CYNTHIA SZUKI DEED REF: 277 PAGE 021 ASSESSOR REF: 5 55 N/F RICHARD SAYLOR DEED REF::130 PAGE 437 ASSESSOR REF: 4-14 N/F NINA L. KEMENT 1, X51.07 X54.43 `` `�� '' ,' I' X?Z-94 _ li 70.�76948 , DEED REF: 1106 PAGE NO. 259 _ - `ems, iX53.97 i , ! 1 , , 11 , �, ,' ,' r X Z�. 8,' / _� i ! - 1 S ` X6 ' ' ' 11 /' ,'x'j5.20r ' // ASStSSUK KEF: 2 54 ` I IBC 51j4 , ,• r , \ _ - _ �`` 8it22 Ii ! ► , ! XX59 153.19 I X68.68 60.73 _ �/ /• / / .2 r/ / X64/ / X 52.36 / - - , I I / r - ; ` ♦ \�/ os , / , ,P - X59 ♦ ` ` ♦ ♦ ♦ ` 'X78. ' / ' APPL / X52.70 ! / ,'�. .53 �� ♦ ♦��♦ �` „� 68, ,/ , / SNET 1352 VHFGUY(�S) • METERe / / / lop!/--� / `3fi1,,' ,',' : 62.58 X 62X/' X62.2 / - 1 - - - , EXISTINCy ERESTONF ` I / �f 6/4, f�X 5J.76 r \7.8653.38 'G�T , '' 62.18X 713610.51 Ex/ IRO PJf , ' / r %C 53.51 %C 55.71 RZ %C52.14 X52.29 ♦ / , _--- / �` `� \ ,'--_-,'/ i \ 0.1 / , ' /�/ % i ' OP 54.33 _ - 52.63 i , / / , _ _ - -60. ` \ `� ` r , 4`6 \ \ • / / ' r/ �,00 ,' ,' 1 / X 56.38/ ' _ �/ ` �C 65.68 Q� .04 MINO(/ ` ` ` . I ♦ / 66.48 SA �. ` ` ` ` ! x69.6/ I I �f ;/ 'y+SIGN 4�' �• ' ,'X52.88 ! I // �' /' \. AQ(FOR ` ` \` `` \` `` \` \ t / ,!G, %C52!44 r !I ,� , 98- - - `MFR �DG� \849\`I \� \♦ ``♦�\` \�` �� �� .� f%,,, ' `\!�66�24• O � ! X56.28 aC-b6: B \ X 68.23 � 1r I i/��� ` \ / 1 X`64.691 ,' �// 'yh /�P .o9G 167. b� X 57.14 / 1 h a l / ! ' ' '' X58,21_---------- .5/ ! // // /I �� 68.36 ! ! X 58.01 ! r �'X 53.20 ! ' ! '' '' ! ! ' / ! I / , ' ' ' ' \ ' X 68. C.B. 1 ' I / ' X 56'68 ' / _ ; ; ;58.55 - - - - X'S X 00.4 /, / / ! / ¢.'~ __.Q i i ' ' / I ' / / / , $•93; _ - - / / / �� SNETj1360 f� MAILBOX' `� le �! ! I ' / I I , ' Off. ' %t` G ` - X670_ . 7C 6 - ' ' ��i W/ tJY ` ° 1 I r'' Fl �f// /f ' - X68. ADI 71/ Ln 75i I I I !r / /60.42 , ' 4.43' X 69. �` s / I I I I X_ . 0� / f'!, % X 6 / I ' X53.60 ' %(52.52 // I I ,56.13 1 r / ! / ' -�°�-/%;--,-----9E 12 ' __----- X52.88 / I ! I I , , / / / / • ,ii_=__- _-- _-__-- �� I` r r a`� , 0 - - - _ f" / 168.94 X52.16 . , r I ! ' / / ,/ / '/�((��120.- `' 1; ----__ s'7' / � / / - X5445 X 52.7T' till ' - , _-loll OAK `"'.--•-.,....,,,.,,_,,, / � / / /, ' '' csIf , m _�ET I I i o r r , 1 I %� 66.83 ' ' / /' /' I . / :.' / !� r QS' SIGN , X54.`�'8 i I I I i I I ' I ! I I � / I I ! ! / %CT4.�7� - _ � '/ !! ,9, ... .. 5 / / ! / , I ! I I 1 , I I I 1 1 1 I I 1\\\ 1` \_ I ` 5 . ti V1 , %<53.34 / I 1 1 1 I I :'��TOP OAK p / BAR /* 7f�. 7 1001 // .'�Sg j\W.G. ' /' _ 29 EEJ�C �i/.;:'. , 35 ,t / / ,/ i I i / % ► ; i i / 3ta 71f'�0 �` ' „�r, M��EN_ E �N I _ / , / X52. / / ' / 1 i ' ' ! ' ► ' 1 i RAK ` 'PJW / S�� auuuuuu�uu„II+Y`YL+„`I�""uDn,Yti",Om,""Y"uuu,uut't,u -. IGN ERE O �:.. _ .._.._.. _._..._.._._. ..F �t "a,n : / / / , / / / / / I ! ! ' . . G. �IU.G. / _.w. ST�iP BAR _..._./_ _ ... _ .7.. __....._...........__..... :::::. : , , , , , , , , I I I ! ! ! 1 , - ' g RN '�/! ST RE E �, .:.: 9� 9.59 1 ! , ! SOAK/ STING mN (ICEN TOP) s8,53 Q ::: , o 1Q[�°W / / I ► I t I ' 1 1 / N LINE MON ENT / / � 0.... / , R ' / "-- / S86 5 / / , ' , ! I 1 ! I I ! ! 1 ! + ' 1 .•:. � �• •::: OF SOkJTH WINDSO _ - ; _ 5P.7 / 929.90 I r I I 1 1 1 , ,',.' I /` - TOW ;1l�� = 9 ,' I 1 1 1 1 1 1 ' ',', I ,-iX"89.76 / 6 // ,{� n'uuuwua��aaesyon.nin$DIan9�^��"n "n�iuu�wYca,aol EAST ` _ , _ JC 52.7.3 - ' / , / / / ' , / 1 ! I I ! 2 IPOSIT SIGN' 1 /• / 1 I - r' a w�uuw�u•a�n,a �a�muuntmmwtm Ywwwuww�, TOWN OF EA HARTFORD %FSz�-, - - - x3.4P ! I 1 ' WINTER VE , , :f' y ,' , :IX 53.29 ' ' %C 5411 . / / /' /' /' ,, / / ,' /� r ► I , li ! ICL8yPI STOP. BAR ,, RO //�` r. �, 19 , / / , ,/ ,/ ,/ /' , I I I „' ANQGlUYra��%,� 11 �� ~STOP SIGN 53.10 5438 , I N/F EUGENE 3 PAGAOETTI FC}R ALMA)3URNHAM . . , / , I , Is ! 1 IM , � �pINF / , I ,' / / / p/ r ! OAK ti: .'\ % ! f4811 TRFFs�roa , - /, DEEQ�REF: 2697 PAGE 118 , �,� / / ,' ,,• ;•� ;' ,' `, X e.82 ' x�> , ASSESSOR RgF: MAP 28 I OT 88 , , , //. ��Q- ,, �m " 1 ! ; ► - TO CT. ROUTE 5 mmmw'- 1"=40' WALE N FAT on 0 40 80 PROJECT TITLE: APPLICANT: + CON J. Scala r , CHINESE BAPTIST CHURCH +pF,,,,,N Chinese Baptist Church of Greater Hartford OF GREATER HARTFORD 4!&OW �, s y�pNORTH MAIN STREET ,�4 < y,.0 DR TER. King Street, South Windsor, Connecicut WEST HARTFORD, CT .t'.w r G OPEN FIELD ::::.::::::::,... 55.2 = -s �a X EX: BARN ." _ SCALE N FEET yo �Q CHECKED BY: * EXISTING SITE PLAN so •' CE NSE.o* �t� 1 C 2096A Silos Doane Hilly '�D 0 80 LAWN AREA sln:;.�'Et�� to DATE CHECKED-. Rocky Mi.CT CAW FiLE Concepl r PLOTTEiD 91112-m wRe_56-4-e5w2 0223 44 0 5 :ROAN PI-1, ;Y)UNID 1 0 N/F MARICE AND LIESSE M. BELOIN DEED REF: 168 PAGE 331 ASSESSOR REF: 4 13 S82015'40"E 'o SEE • N/F NINA L. KEMENT DEED REF: 1106 RAGE NO. 259 ASSESSOR REF: 2 54 N/F GEORGE P. TELESCO, III DEED REF: 1106 RAGE NO, 259 ASSESSOR REF: 4 12 MERESTONE .................... �IUN D C13 N/F ALEXANDER RUSSAK JR. r DEED REF: 1159 PAGE NO. 028 ASSESSOR REF. 5 68 3 PA AR 90 0, 0 531.00, N/F CYNTHIA SUZUKI DEED REF: 277 PAGE 021 FP AS REF: 5 55 2 PS FOOND AS 8.2.1of NS AS QP TC 3 AZD 3 SLP 3 AZD CF ms 3 H Bi 3 AZD CF ��7 8 AZD--/ 6 AZD 3 RPG 3 VP- 3 HP- 5 ST— CF- 3 ICS -- 3 vc LAWN / OPEN SPACE AS CF—/ 3 ICS-j CF 3 VP CF 10.31' AS CF --- ------ - B[_)R.NHAM STRE:t I �ft-.N LINE MONUMENT N/F EUGENE J. PAGANETTI FOR ALMA BURNHAM DEED REF: 2697 PAGE 118 ASSESSOR REF: MAP 28 LOT 88 THIS DOCUMENT AND COPIES THEREOF ARE VALID ONLY IF THEY BEAR THE ORIGINAL SIGNATURE AND SEAL OF THE LANDSCAPE ARCHITECT. C GuN UN Al J. Q� O co RICHARD SAYLOR D REF: 130 PAGE 437 ;SSOR REF: 4-14 3 pp )p ;23, 0, IRON PM SCALE: 1 "=40' V47.7%, As 919.591 AS S86053104"W MARK J. PAPA, LAq,, LICENSE #: LAR.905 DaHITECT CONNECTICUT PREPARED FOR GARG CONSULTING SERVICES, INC. ROCKY HILL, CONNECTICUT REVISED 9-5-06 REVISED 8-15-06 c c 0 0 L: 0 c CIO U'cl 0 A4 u 0 rA rn cn clys cd U 00 GN 't '"* 00 OR •N o 0000 cl 1-n 4� en Q cq C14 DESIGNED DRAW m3p KCF SCAM 111--401 DATE 7/17/06 M06-20-12 PROJECT NO. DRAWNG 30TE PLAN: a a SHEET NO. r- PLANTING NOTES 1. COORDINATE LANDSCAPE IMPROVEMENTS SHOWN ON THIS PLAN WITH SITE AND CIVIL DRAWINGS PRIOR TO CONSTRUCTION ACTIVITY. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT OR PROJECT ENGINEER FOR RESOLUTION. 2. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATING PLANT PITS. 3. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 6" DEPTH OF TOPSOIL FOR ALL LAWN AREAS. 4. ALL PLANTING BEDS SHALL HAVE 12" MINIMUM DEPTH OF TOPSOIL. 5. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 4" MIN. DEPTH OF SHREDDED MULCH OVER ALL PLANTING BEDS AND TREE PLANTINGS. 6. ALL PLANT MATERIAL IS SUBJECT TO INSPECTION AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO AND AFTER PLANTING. 7. LANDSCAPE CONTRACTOR SHALL PROVIDE NAME BRAND LAWN SEED MIX FOR APPROVAL BY LANDSCAPE ARCHITECT. SEEDING RATE TO BE 5 LBS. PER 1,000 S.F. 8. LOCATION OF PLANTS TO BE ADJUSTED BASED ON FIELD CONDITIONS WITH APPROVAL OF LANDSCAPE ARCHITECT. 9. PLANT SPECIES MAY BE ADJUSTED BASED ON AVAILABILITY AT TIME OF PLANTING. ALL PLANT MATERIAL SUBSTITUTIONS ARE SUBJECT TO REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT. 10. ALL PLANT MATERIALS SHALL CARRY A FULL GUARANTEE FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE, TO INCLUDE PROMPT TREATMENT OR REMOVAL AND REPLACEMENT OF ANY PLANTS FOUND TO BE IN AN UNHEALTHY CONDITION BY THE LANDSCAPE ARCHITECT. ALL REPLACEMENTS SHALL BE OF THE SAME KIND AND SIZE OF PLANTS SPECIFIED IN THE PLANT LIST. 11. CONTRACTOR SHALL VERIFY PLANT QUANTITIES ON PLAN WITH QUANTITIES IN PLANT SCHEDULE. QUANTITIES ON PLAN SHALL BE INSTALLED IF DISCREPANCIES ARE IDENTIFIED. 12. ALL PLANT PITS SHALL BE BACKFILLED WITH A 3:1 SOIL TO PEAT MOSS MIX. 13. ALL TREE MATERIAL SHALL BE PLANTED IN ACCORDANCE WITH TREE PLANTING DETAIL. 14. PROVIDE 6" DEEP TRENCHED PLANTING BEDS EDGES. TYP. SEE DETAIL. TABLE A 2006 NEW ENGLAND EROSION CONTROL f RESTORATION MIX (FOR DETENTION BASINS AND DRY SITES) SPECIES PERCENT Creeping Red Fescue Festuca rubra 30 Annual Rye -Grass Lolium multiflorum 25 Timothy (Phleum pratense) 15 White Clover (Trifolium repens) 10 Red Top (Agrostis) 8 Little Bluestein (schizachyflum sco arium 6 Indian Grass Sor astrum nutans 6 TOTAL 100 APPLICATION RATE: 35 LBS/ACRE DISTRIBUTED BY: NEW ENGLAND WETLAND PLANTS INC. 820 MAIN STREET AMHERST, MA 01002 PHONE (413) 548-8000 FAX (413)548-4000 1245 SO. FT/LB P LANT LI ST ORNAMENTAL TREES QTYSYM BOTANICAL NAME COMMON NAME SIZE COMMENTS 12 AS Acer saccharum 'Green Mountain' Green Mountain Sugar Maple 2-2.5" Cal. B & B 6 AR Acer rubrum 'October Glory' October Glory Red Maple 2-2.5" Cal. B & B 5 BJ I Betu!a 'ac uemontii White Barked Himalayan Birch 10-12' Ht. B & B, Clump 10 CF Cercis reniformis 'Oklahoma' Oklahoma Redbud 2-2.5" Cal. B & B 18 FP Froxinus pennsylvanica 'Patmore' Patmore Green Ash 2-2.5" Cal. B & B 3 LS Li uidambar st rocifluo Sweet um 2-2.5" Cal. B & B 8 MS Ma nolia stellate Star Magnolia 6-8' Ht. B & B 6 NS N yssa s Ivatica Black um/Tupelo 2-2.5" Cal. B& B 13 PA Picea abies Norway Spruce 5-7' Ht. B & B 4 PK Prunus serrulata 'Kwanzan' Kwanzan Flowering Cherry 2-2.5" Cal. B & B 11 PP Picea pun ens 'Glauca' Colorado Blue Spruce 6-7' Ht. B & B 2 PS Pinus strobus Eastern White Pine 6-7' Ht. B & B 12 OP Quercus palustris I Pin Oak 2-2.5" Cal. B & B 2 SR S ringo reticulate 'Ivory Silk' Ivory Silk Japanese Tree Lilac 2-2.5" Cal. B & B 2 TC Tilia cordate 'Greenspire' Greenspire Linden 2-2.5" Cal. B & B SHRUBS QTY SYM BOTANICAL NAME COMMON NA SIZE SIZE COMMENTS 14 AZ Azalea 'Mother's Day' Mother's Day Azalea 18-24" 34 AZD Azalea 'Delaware Valley' Delaware Valley Azalea 18-24" 8 CT Cotoneaster 'Tom Thumb' Tom Thumb Cotoneaster 2 Gal. 6 HDA Hydrangea macro h !!a 'Nikko Blue' Nikko Blue Hydrangea i Gal. 7 Hp Hypericum patulum 'Hidcote' St. Johnswort 2 Gal. 9 ICS Ilex crenata 'Soft Touch' Soft Touch Japanese Holl 18-24" 33 IG Ilex glcbra 'Shamrock' Shamrock Holly 24-30' 2 IMS Ilex x Mesan 'Blue Stallion' Blue Stallion Holly 5-6' Ht. 21 JC Juni Brous conferto 'Blue Pacific' Blue Pacific Juniper 2 Gal. 6 JH Juniperous horizontalis 'Youngstown' Youngstown Creeping Juniper 2 Gal. 8 KL Kalmia latifolia 'Olympic Fire' Olympic Fire Mountain Laurel 24-30" 22 LF Leucothoe fontanesiono 'Rainbow' Rainbow Leucothoe 18-24" 9 MB Microbioto decussate Siberan Cypress .2 Gal. 11 PJ Pieus japonica 'Mountain Fire' Mountain Fire Andromeda 24-30" 9 PJGA Rhododendron 'PJM Elite' PJM Elite Hybrid Rhododendron 30-36" 1 PM I Pinus mu ho 'Niu hus' Mu ho Pine 24-30" 6 PV Philadel hus vir inalis Mockoran e 3 Gal. 15 RPG Rhododendron 'Purple Gem' Purple Gem Hybrid Rhododendron 24-30" 24 RS Rhododendron 'Scintillation' Scintillation Hybrid Rhododendron 30-36" 23 RY Rhododendron yokusimanum 'Prince' Prince Yak Rhododendron 24-30" 14 SLP Spiraea 'Little Princess' Little Princess S iraeo 2 Gal. 2 1 SP 1 S rin a patula 'Miss Kim' Miss Kim Lilac 30-36" 3 VC Viburnum 'Carlesii' Korean Spice Viburnum 30-36" 6 VP Viburnum plicatum tomentosum 'Mariesii' I Maries Doublefile Viburnum 30-36" PERENNIALS GROUND COVER QTY SYM BOTANICAL NAME COMMON NAME SIZE COMMENTS 22 HHR Hemerocallis 'Ha Returns' Ha Returns Da lil 1 Gal. 10 ST Hemerocallis 'Stella D'Oro' Stella D'Oro Daylily 1 Gal. TABLE B BASIN PLANTS BOTANICAL NAME COMMON NAME SIZE COMMENTS Amelanchier canadensis Shadblow 6-8' Ht. B & B Aronia melanocarpa Black Chokeberry 3 GAL B & B Clethra alnifolia Summersweet 3 GAL Full & Dense Cornus alternifolia Alternate —leaf Dogwood 3 GAL Full & Dense Cornus racemoso Gray Dogwood 3 GAL Full & Dense Hamamelis vir inia Witchhazel 2-3' HT. Full & Dense Ilex glabra Inkberry 3 GAL Full & Dense Ilex verticillata Winterberry 3 GAL Full & Dense Myrica pennsylvanicum Northern Bayberry 3 GAL Full & Dense Vaccinium corymbosum Hi hbush Blueberry 3 GAL Full & Dense Viburnum lentago Nannyberry 3 GAL Full & Dense PLANTS INSTALLED AROUND DETENTION BASINS SHALL BE SELECTED FROM TABLE B. ADDITIONS OR SUBSTITUTIONS SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT AND/OR APPROVED BY THE TOWN OF SOUTH WINDSOR, CT. DRIVE POST AT ANGLE AND DRAW VERTICAL -w SUPPORT POST ROOTFLARE 4" DEPTH 1611 1/4 WIDTH z OF MULCH I�ROOTBALL T2" HIGH EARTHEN SAUCER FINISH GRADE \` ROOTEALL / 5 TILLED SLOPED . . SOIL, TYP. SIDES\\ REMOVE TOP PORTION CLEANC\j BACK ILL \ ` OF BURLAP ONLY BEND BACK WIRE BASKET THIS DOCUMENT AND COPIES THEREOF ARE VALID ONLY IF THEY BEAR THE ORIGINAL SIGNATURE AND SEAL OF THE LANDSCAPE ARCHITECT. MARK J. PAPA, LAIC LICENSE #: LAR..905 �oF cem,ldFc a =CT NECTICUT COMPACT SUB GRADE -' UNDISTURBED SUB GRADE TREE PIT LIMIT OF BA,_L_ SECTION PLAN RUBBER HOSE DOUBLE STRAND NO. 12 GAUGE GALVANIZED WIRE TWISTED. DO NOT OVER TIGHTEN WIRE NOTES: 1. SUPPORT STAKES SHALL BE REMOVED BY THE CONTRACTOR ONE YEAR AFTER INSTALLATION TREE PLANTING DETAIL N.T.S. 6" DEEP BED TRENCH PLANTING BED TRENCH DETAIL N.T.S. PREPARED FOR GARG CONSULTING SERVICES, INC. ROCKY HILL, CONNECTICUT REVISED 9-5-06 REVISED 8-15-06 DESIGNED Z Y co tC3 U 0 rA rp F' U yam.. V a U C 0 0 L 0 r� C 0 N 1 A a A olio 0 U F M d� 00 �U0000 00 C1� N N xoo Con ^� N 45 ' ` 0 y Cd aZHPT, M7P I KCF SCALE SEE DETAIL DATE 7/17/06 PROJECT No. M06-20-12 DRAWNG SOME PLAN O00 0 � SHEET Ni,.