Loading...
HomeMy WebLinkAbout05-18P_DEPOT SQUARE, NORTH AND SOUTH LOTS_SULLIVAN AVENUE AND PATRIA ROAD•-�.-�.. � . _ .� 1. r.� �_r •+ �,+�1,��•Nv' � .a '"i:��y. +y +br' Y'' ;' �., to .�,.. .•S s+.,- ai `. rv_ ..�. 'Aa,, c, EA �•T,' ? M. N/F SPERRY WOOD LIMITED PARTNERSHIP N/F HEINZ E. a ROSEMARIE SAUR I I O 7O s N UJ CV M oI� PROPOSED 00 BUILDING ti N a I14J L_ 701 PROPOSED DUMPSTER PAD eo . 1104 LOT 3 ' LOT 2 m V. 396 V. 396 L 0 T I� N P. 140 P. 140 V. 364 I I I +� I I I R 247 260' , d I1 Dt N PRO '0SED BUILDING a a Q ir a 260, 51B.L RAMP SIDEWALK SIDEWALK to HP � Ir 6" IT. CURBING TYP. 505.60� 1,P. N 0 9°— 4 3- 3 5 E --*I-- r EDGE OF PAV E MEfI i PATRIA ROAD EDGE OF P%aVEMENTT- LEGEND -- PROPERTY LINE • I. P. EXISTING IRON PIN O I. R. b/8 i IRON ROD TO BE SET South VVindr-w I `i^n Jr'a s i 5� C4 v s j r fs/j�f a r }i i ' ` A'ra,! + �, I 'i' �', j {. ail.: . y. � "E �. ., T , j���'j�fi,i�}! '���' �"1�{i +''��„ l��l+�'�41P � •� It'. i.. �u "'f.''1g1. r (,i� t o i ;'OWN NOTE,' LOTS I, 2, 3 AND 4 ARE TO BE COMBINED AS ONE LOT TOTAL AREA 215009. 53 S. F, 4.94 AC. �2 � A 61 B 90 I.P 1 WI de W C w a D_ 1L O W w 351 B.L. -26,-0211 MS R = 25.00' L = 38.59' T = 24.33' CMS LETTERS OF APPROVAL `l arun o� S'otdA `l!%r aot ` 1aWn W vim' Ot4& ?lvuizd4a'c _ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SO, -CO NAREA CODE 203 /644.2511 4�hOS0.•CO��'� AREA CODE 203/644.2511 December 20, 1988 11 January 1969 Attorney William Grace 479 Buckland Road Atty. William E. Grace South Windsor, CT 06074 479 Buckland Road South Windsor, CT 06074 REs Application #88-17W - Al Glass & Mirror (Robert Lavey) re: Appl. #88-17P, Robert Lavey/A-1 Glass & Mirror Co., Depot Square Site Plan Dear Sir: Gentlemen: At the December 19, 1988 meeting, the Inland Wetlands We are pleased to advise that the Planning and Zoning Commission Agency/Conservation Commission approved with modifications voted at its January 10, 1989 meeting to approve the captioned Application #88-17W - IWA/CC permit for the construction of an application for a site plan of development in accordance with industrial building located on the south side of Sullivan Avenue, Drawings 1 - 7 of 7 dated 3-3-88, revised through 11-23-88, east of Patria Road, I zone. prepared by Meehan Associates, Project No. 870370, and with the The following modifications must be adhered to for this permit to be following modifications: valid: 1. Prior to commencement of any site work, a meeting must be 1. Black and white transparent mylars of. sheets # 4 of 7 with held with Town Staff. the .above _modifications and this letter reproduce t ereon 2• No building permits will be issued until the final mylars together with two blueprint copies of the entire set o ^� have been filed in the Town Clerk's Office. plans, must be submitted to this Commission to be stamped and signed. This must be completed and reviewed prior to 3. This application is subject to the conditions of approval any construction activity on the site. of the Inland Wetlands Agency/Conservation Commission, 2. Construction activities shall be subject to the approval of including a bond in the amount of $5,000. the Town Engineer. 4. An as -built plan is required prior to issuance of. a Certificate of Occupancy per Section 4.13.10 of the Zoning 3. The application shall indemnify and hold harmless the Town Regulations. of South Windsor against any liability which might result from the proposed operation or use. 5. A landscape bond in the amount of $10,000 is required and 4. The permit is valid for one year and shall expire December must be submitted prior to filing of lnylars. 19, 1989. 6. All plans used in the field by the developer must bear the 5. All approvals required must be obtained and submitted prior stamp and authorized signature of the Town of South PP q P Windsor. to any activity on the site. 7. Concrete pads and screening required for both dumpeters. 6. A contact person shall be identified directly on the plans. 8. Driveway radius for both Patria Drive entrances should be 7. A pre -construction meeting must be held with Town Staff 25'. prior to construction. 9. Address support of detention basin "outlet tee." 8. Erosion and sedimentation measures shall be applied to all 10. Developer to install proportionate share of State storm disturbed areas These areas must be loamed and seeded. drainage system per DOT/Town recommendations (along 9. We recommend a bond in the amount of $5000.00 to be property frontage). submitted to Planning and Zoning Commission to ensure 11. Show limits of construction, especially along Saur compliance with the Erosion and Sedimentation Control property; tight grades as proposed. Measures. 10. Right to work approval from Sperry wood Partnership 12. Land surveyor stamp and seal needed on plot plan. submitted to IWA/CC prior to any activity on the site. 13. Clarification of disposition of existing drainage easem�>nt 11. Antitracking pad as depicted on sheet 4 be incorporated on between Lots 3 & 4 needed; easement onto Sperry Wood sheet 2 of plans. property at detention basin outlet needed. 12. Stockpililtg as agreed to on December 15, 1988 depicted on 14. Lot lines between Lots 1, 2, 3, and 4 must be removed. plans.l 15. Improve landscaping parallel to railroad right-of-way. 13. Silt fencing be added to run boundry, detention basin, Black and white transparent mylars of Sheet #1 with the above Patria Road and before detention basin prior to construction modifications, together with three blueprint copies of the entire activities. set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. Very truly yours, After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days. After filing these plans, a copy of the receipt mul3t be C John M. Moran, Jr., Eiiairman submitted to the Planning Department. Inland Wetlands Agency/ Conservation Commission Very truly yours, PLANNING AND ZONING COMMISSION JMMJr . / pmm Enclosure ymond F. Hallowell, Jr. f�._ cct A.B. Davies, Deputy Town Engineer Chairman Marcia Banach, Director of Planning John R. Collins, Chief Building Official cc: M. Gantick, Director of Public Works Michael Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control Raymond Hallowell, Chairman, Planning & Zoning J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters Inland Wetlands Agency/Conservation Commission PZC File Engineer 'Applicant --� rLERK'S OCEICZE (n DRAWER NO. .\MAP No.O9.`�.`�r 1kec d 3 3O 9, Q+ I I :«�► I� • M - BEING LOTS 1,2,3 & 4 ON A MAP ENTITLED "PATRIA INDUSTRIAL PARK SULIVAN AVENUE SOUTH WINDSOR SCALE 1" = 40' DECEMBER 1967 WILLIAM J. CARRINGTON REG. L.S." I HEREBY DECLARE TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF THAT THE PREMISES SHOWN ON THE PLOT PLAN ARE NOT LOCATED WITHIN A FLOOD HAZARD AREA AS SHOWN ON DEVELOPMENT HUD FEDERAL INSURANCE ADMINISTRATION MAP COMM. NO. 090036 PANEL NO. 0006B THIS MAP IS SUBSTANTIALLY CORRECT. FOUNDATION LOCATED AS SHOWN. NO ZONING VIOLATIONS NOTED WITH RESPECT TO BUILDING LOCATIONS. THE DECLARATION STATED HEREON IS CONSIDERED INVALID UNLESS THE MAP BEARS THE IMPRESSION TYPE SEAL AND ORIGINAL SIGNATURE OF THE SURVEYOR/ENGINEER WHOSE NAME AND REGISTRATION NUMBER APPEAR BELOW. I HEREBY DECLARE TO ROBERT W. LAVEY, BARBARA E. LAVEY AND PAUI_ R. LAVEY THAT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT. THIS MAP AND SURVEY WERE PREPARED IN ACCORDANCE WITH THE STANDARDS OF A CLASS A-2 SURVEY AS DEFINED IN THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS PREPARED AND ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC., ON SEPTEMBER 13, 1984. T•C . 0A REVISION OWNER / DEVELOPER TOWN COMMENTS ROBERT LAVEY P.O. BOX 101 EAST WINDSOR HILL CONNECTICUT, 06028 203 - 289- 3481 tit) P a Z COMMENTS RICHARD MEEHAN L.L.S. 12330 DATE w MEEHAN �� SSOCIATES li- 23- 88 ��s� • _ _ WA Consulting Engineers -- Surveyors, P.C. 2 2 89 397 North Main Street • Manchester, CT 06040 643 - 2520 PLAN PREPARED FOR .�a";-• �, r DEPOT SQUARE, NORTH AND SOUTH LOTS 251 SULLIVAN AVENUE AND PATRIA ROAD SOUTH WINDSOMR� PLOT PLAN ;821 TONAL •RV�''�d SCALE: 1 = 401 DESIGN: FILE NO. SHEET NO DATE: 3- 3 - 8 8 DRAFT: A. V. H. 870370 1 _ OF ► 19- 120