Loading...
HomeMy WebLinkAbout25-36P Ucello Fine HomesPS GSF CE TS TS GSFGSF GSF PS PS PS PS PS CE S:\Acad\2024 Civil 3D\2024-064 Uccello - 1580 Main St\Russo Drawings\2024-064.dwg, 1:1 SPECIFICATIONS Site Preparation Seedbed Preparation Seeding Mulching MAINTENANCE 1. 2. 3. 4. 5. 6. 7. 8. 9. SPECIFICATIONS Materials Geotextile fabric: Supporting posts: Placement For toe of slope: Swales: Catch Basin in Swale on Slopes: Catch Basins in Depressions: Culvert Inlets: Culvert Outlets: Installation Trench excavation: Support Posts: Geotextile Filter Fabric: Backfill & Compaction: MAINTENANCE SPECIFICATIONS Time Of Year Site Preparation Seed Selection and Quantity Seedbed Preparation Seed Application Mulching MAINTENANCE S:\Acad\2024 Civil 3D\2024-064 Uccello - 1580 Main St\Russo Drawings\2024-064.dwg, 1:1 PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: Aug 15, 2025 TO: Michael Maniscalco, Walter Summers, John Henault, Molly Keays, Tory Sidoti, Trishanna Branford, Kevin Cooney, Tony Manfre, Autum Burke, Dave Turkington, Andrea Cofrancesco, Vincent Stetson, David Gesualdi, Marc Melanson, Scott Roberts, Justin Russo FROM: Michele Lipe, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following projects: Appl 25-36P, Ucello Fine Homes Site Plan Modification Location: 1580 Main Street Site Plan Subdivision No. Acres 2+ Zone A-40 Industrial Commercial Residential No. Lots/Units 1 Water: Public Private Well Sewerage: Public Septic System The house location and access for the interior lot is being changed Project Description: Future Town-owned property involved? Yes No new street(s) new detention area new open space/recreation area active passive Planning Department notes: Visit https://www.southwindsor-ct.gov/planning-department/pages/planning-and-zoning- commission-applications to review pending applications Please comment by 9-2-25 and return to the Planning Department. Town of SOUTH WINDSOR Building Department 1540 Sullivan Ave. South Windsor, CT 06074 Tel. (860) 644-2511 Ext 2230 September 2, 2025 PZC Application 25-36P Site Plan Modification 1580 Main St Stephen & Judy LaRocco The application has been reviewed under the 2022 CT State Building Codes. After reviewing this application, I have no issues with the application Be advised that this is a review for the Planning and Zoning application only and not for any other permits. If you have any questions, please feel free to contact me. Marc Melanson Building Official 1540 Sullivan Avenue, South Windsor, CT 06074 phone 860-644-2511, ext. 2229 e-mail justin.russo@southwindsor-ct.gov Memo To: Jay Ussery, Jr., LLS From: Justin F. Russo, PLA, Assistant Planner Date: 9/2/25 Re: Appl #25-36P, Uccello Fine Homes 1580 Main Street Planning Review Comments The following are the Planning Department comments. Building Department comments are attached. Engineering comments will be provided under separate cover. Please make the necessary revisions and submit three COMPLETE sets of full-size revised plans and 10 sets of 11”x17” plans no later than 9/23/25 to be sent out with the agenda (tentatively scheduled for 9/30/25). Site Plan Comments 1. Plot Plan a. The upland review area for regulated wetlands was modified to 100’ as of February 2023, and as a result, some grading and the proposed footing drain are shown within the upland review area. Prior to action from the Planning & Zoning Commission, a minimal impact application shall be prepared for Town staff review. b. Proposed landscaping is shown on the northerly property boundary along the new access area. Based on existing site conditions, it appears that the landscaping would be more beneficial on the opposite side to act as a screen for the existing residence (1576 Main Street). Please relocate accordingly. c. Some of the plant selection in the access area is not appropriate. Rhododendron maximum and Kalmia latifolia are woodland plants that require dappled to full shade. This location will receive full sun for at least 6 hours a day, if not more. Please swap for Juniperus virginiana and Ilex glabra ‘Densa’ (or similar cultivar). For future reference, the specific epithet of binomial names is not capitalized. d. Alternate the placement of Juniperus virginiana, Thuja occidentalis, and Ilex glabra ‘Densa’ to provide variation and visual interest. Ensure all plants will receive adequate sun. e. To remain consistent with the grading & planting plan of the interior lot approval from 2012, the 3:1 slope northeasterly of the proposed house should be planted with a mix of northeastern USA native evergreen and deciduous trees similar to what is found in proximity to the site. If Pinus strobus is to be proposed, ensure there will be enough space for them to grow. f. The future pool shown on the plans shall be removed. After approval of the site plan modification, a separate building permit will be required for the permitting of the pool. g. The plans appear to show tree clearing within the Town right-of-way. This work shall be coordinated with Marco Mucciacciaro, Tree Warden. If you have any questions, please do not hesitate to contact me. South Windsor Planning Department Engineering Department Town Hall, 1540 Sullivan Avenue, South Windsor, CT 06074 | Tel (860) 644-2511 Ext 2245 | Fax (860) 644-7280 Please note that messages to and from the Town of South Windsor may be subject to public release in accordance with applicable laws. MEMO DATE: September 4, 2025 FROM: Tory D. Sidoti, P.E., Town Engineer TO: Jay Ussery, Jr., LLS SUBJECT: Appl #25-36P, Uccello Fine Homes 1580 Main Street Engineering Review Comments The following are the Engineering Department comments: Site Plan Comments 1. Plot Plan a. The proposed 6” PVC SDR 35 connection to the sewer main on Main Street will require municipal officers and flaggers for the maintenance and protection of traffic. Please provide an MPT plan for the work within Main Street and the Town ROW. Standard MPT details can be found under “0971001A – Traffic Control Plans and Typical Materials”, in the link below: https://portal.ct.gov/dot/traffic-engineering/traffic-special- provisions?language=en_US b. A utility coordination meeting should be scheduled for the underground utilities’ connection to Utility Pole SNET 1610S. Please inform the Town when this meeting is scheduled so we may attend. 2. Details a. The following details should be revised to match the current Town Standard details: i. Permanent Pavement Patching Detail ii. Typical Sanitary Sewer Trench Detail Link for Town Details: https://www.southwindsor-ct.gov/engineering/pages/public- improvement-specifications b. Please review Soil Erosion & Sediment Control Notes. i. Currently referring to CTDOT Form 814A, Town Standard is currently Form 816. ii. Note Title is misspelled, revise accordingly. If you have any questions, please feel free to contact me. Thank you, PLANNINE DEPARTMENT September 15.2025 Jay Ussery J.R.Russo &Associates PO Box 938 East Windsor.CT 06088 Dear Mr.Ussery. Re:App].25-36P,Ucello Fine Homes —request for a site plan modification to relocate the house and access drive,for an approved interior lot located at 1580 Main Street,A-40 zone. Please be advised that the Public Meeting ofthe Planning &Zoning Commission for the above referenced matter has been scheduled for Tuesday.September 30:2025. This meeting will be held in the Council Chambers ofthe South Windsor Town Hall.Someone must be present to represent the application One sign advertising the meeting must be posted on the property for ten (10)consecutive days prior to the hearing and must be clearly Visible from a town street.The Sign must be posted onMainStreetfrontagebySaturday,September 20.2025i Signs can be picked up at the Planning office ofthe South Windsor Town Hall.1540 Sullivan Avenue.Please call (860)644-2511 ext.2329 ifyou have any questions.Monday 8:00 a.m.— 7:00 p.m..Tuesday e Thursday 8:00 a.m.w 4:30 p.m.and Friday 8:00 am.—1:00 p.m. Sincerely. f2 L Vs lbshua Stem Administrative Secretary/Land Use Coordinator 154U Sullivan Avenue,Suuth Windsor.CT DEUM i lel (BEU)544-2511 Ext 2329 I Planning@SnuthWlndsm-Blgnv P O B O X 9 3 8 , 1 S H O H A M R D . E A S T W I N D S O R , C T 0 6 0 8 8 . C T 8 6 0 . 6 2 3 . 0 5 6 9 . M A 4 1 3 . 7 8 5 . 1 1 5 8 W W W . J R R U S S O . C O M . S E R V I N G C O N N E C T I C U T & M A S S A C H U S E T T S September 18, 2025 Michele Lipe Director of Planning 1540 Sullivan Avenue South Windsor, CT 06074 Re: Uccello Fine Homes 1580 Main Street Appl #25-36P Dear Michele, I am in receipt of review comments from the Assistant Town Planner dated September 2, 2025 and the Town Engineer dated September 4, 2025 for the proposed development at 1540 Main Street in South Windsor, Connecticut. The attached plans have been revised to address the comments. In addition, a discussion of each of the comments received are provided below: Assistant Planner Comments: a. The upland review area for regulated wetlands was modified to 100’ as of February 2023, and as a result, some grading and the proposed footing drain are shown within the upland review area. Prior to action from the Planning & Zoning Commission, a minimal i mpact application shall be prepared for Town staff review. The wetland regulated area has been modified to reflect the current 100’ requirement. All activity has been removed from the 100’ regulated area. b. Proposed landscaping is shown on the northerly property boundary along the new access area. Based on existing site conditions, it appears that the landscaping would be more beneficial on the opposite side to act as a screen for the existing residence (1576 Main Street). Please relocate accordingly. It is understood that the Assistant Town Planner subsequently met with the property owner on site on September 12, 2025 and agreed to 3 rail vinyl fence in lieu of the plantings on the south side of the access drive. The plan has been revised to eliminate the planting on the north side of the drive and add the fence on the south side of the drive. c. Some of the plant selection in the access area is not appropriate. Rhododendron maximum and Kalmia latifolia are woodland plants that require dappled to full shade. This location will receive full sun for at least 6 hours a day, if not more. Please swap for Juniperus virginiana and Ilex glabra ‘Densa’ (or similar cultivar). For future reference, the specific epithet of binomial names is not capitalized. The proposed plant selections have been modified. Page 2 of 3 d. Alternate the placement of Juniperus virginiana, Thuja occidentalis, and Ilex glabra ‘Densa’ to provide variation and visual interest. Ensure all plants will receive adequate sun. The placement of the plantings have been revised to reflect small groupings to provide variation. e. To remain consistent with the grading & planting plan of the interior lot approval from 2012, the 3:1 slope northeasterly of the proposed house should be planted with a mix of northeastern USA native evergreen and deciduous trees similar to what is found in proximity to the site. If Pinus strobus is to be proposed, ensure there will be enough space for them to grow. The plan has been revised to add back plantings on the slope northeasterly of the house. Pinus Strobus is no longer proposed. f. The future pool shown on the plans shall be removed. After approval of the site plan modification, a separate building permit will be required for the permitting of the pool. The plans have been revised to remove the future pool. g. The plans appear to show tree clearing within the Town right-of-way. This work shall be coordinated with Marco Mucciacciaro, Tree Warden. Understood. Engineering Comment: 1. The proposed 6” PVC SDR 35 connection to the sewer main on Main Street will require municipal officers and flaggers for the maintenance and protection of traffic. Please provide an MPT plan for the work within Main Street and the Town ROW. Standard MPT details can be found under “0971001A – Traffic Control Plans and Typical Materials”, in the link below: https://portal.ct.gov/dot/traffic-engineering/traffic- specialprovisions?language=en_US The means and methods for the completion of the work in R.O.W will be the responsibility of the stie Contractor. A note has been added to the plans requiring the Contractor to provide applicable traffic controls for the maintenance and protection of traffic in accordance with CTDOT standards (Form 819) and special provisions (091001A) for the work in the R.O.W. a. A utility coordination meeting should be scheduled for the underground utilities’ connection to Utility Pole SNET 1610S. Please inform the Town when this meeting is scheduled so we may attend. The call-out for the contractor to coordinate utility connections with the utility companies has been modified to add that the Town should be notified of the coordination meetings so that they can attend. Page 3 of 3 2. Details a. The following details should be revised to match the current Town Standard details: i. Permanent Pavement Patching Detail The detail has been revised to reflect the Town’s standard detail. ii. ii. Typical Sanitary Sewer Trench Detail The detail has been revised to reflect the Town’s standard detail. b. Please review Soil Erosion & Sediment Control Notes. i. Currently referring to CTDOT Form 814A, Town Standard is currently Form 816. The plans have been revised to refer to the current DOT Form 819. ii. Note Title is misspelled, revise accordingly. The misspelling has been corrected. I hope the changes and discussion above satisfactorily address the concerns. If there are any questions, or you require further information, please call our office at (860) 623-0569. Sincerely, Timothy A. Coon, P.E. J.R. Russo & Associates, LLC Attachment cc: Uccello Fine Homes PS GSF CE TS TS GSFGSF GSF PS PS PS PS PS CE S:\Acad\2024 Civil 3D\2024-064 Uccello - 1580 Main St\Russo Drawings\2024-064.dwg, 1:1 PERMANENT PAVEMENT PATCH SPECIFICATIONS Site Preparation Seedbed Preparation Seeding Mulching MAINTENANCE 1. 2. 3. 4. 5. 6. 7. 8. 9. SPECIFICATIONS Materials Geotextile fabric: Supporting posts: Placement For toe of slope: Swales: Catch Basin in Swale on Slopes: Catch Basins in Depressions: Culvert Inlets: Culvert Outlets: Installation Trench excavation: Support Posts: Geotextile Filter Fabric: Backfill & Compaction: MAINTENANCE SPECIFICATIONS Time Of Year Site Preparation Seed Selection and Quantity Seedbed Preparation Seed Application Mulching MAINTENANCE S:\Acad\2024 Civil 3D\2024-064 Uccello - 1580 Main St\Russo Drawings\2024-064.dwg, 1:1 App]#25—36P,Uccello Fine Homes Regular Meeting 9/30/25 Planning Department Report 1.This is a request for a site plan modification to relocate the house and access drive,for anapprovedinteriorlotlocatedat1580MainStreet,A-40 zone. 2.The majority of the existing property is an open lot with scrub vegetation and a mid—successional woodland on the northeast and southeast property lines. 3.This interior lot was originally created by the approval of a resubdivision and specialexceptiongrantedin2008.After that approval,a new site plan was approved in 2010showingthehouseandaccessfurthersouthontheproperty.That approval was the subject aviolationoftreecuttingresultingintreeplantingplanbeingapprovedandimplementedin2011. 4.Today,this site plan modification has adjusted the location ofthe proposed home and accessbacktotheoriginal2008proposalduetoadiscrepancyoverthedifferinglocationoftheaccessareabetweenthedeedsof1576MainStreetandthesubjectproperty.Ourunderstandingisthatthediscrepancyhasbeenresolved. 5.This application appears to comply with our zoning regulations,including our interior lotrequirements:Lot width is over 283’;225’required.Minimum area is over 104,000 SF;80,000 SF required.Lot coverage and yard setbacks all appear to comply. 6.This interior lot will be served by a well and town sewers and subject to WPCA approval. 7.There are regulated wetlands on site,however no work is proposed in the upland review areaandthus,an application to IWA/CC is not required. 8.The Fire Marshal has reviewed the plan and noted that,per our Town public improvementspecs,a turnaround is required for driveways over 300’in length for the maneuvering of fireapparatuses. 9.In my comments to the applicant,I suggested replanting the slope north-northeast of the proposed home.After a site visit,there appeared to be sufficient vegetation that,if preservedduringconstruction,may not warrant replanting.I have recommended that the planscontinuetoshowtheproposedplanting.In the event existing trees can be saved,thedevelopercanapplyforachangeorderattheendofconstruction. 10.The developer shall coordinate with Marco Mucciacciaro,Tree Warden,regarding any treeclearingintheTownright-of-way. 1 1.This property falls within the town Historic District.The applicant shall coordinate with theHistoricDistrictCommissionregardingtheneedforaCertificateofAppropriateness. Engineering comments (if any)will be read into the record.Ifthis application is approved,thePlanningDepartmenthasnoadditionalcomments. STANDARD APPROVAL MODIFICA TIONS FOR SITE PLAN PROJECT Uccello Fine Homes APPL.25-36P ENGINEER/ARCHITECT:J.R.Russo &Associates,LLC PROJ.#2024—064 Submit mylars of sheets:Plot Plan and any sheets that display approval letters. Site plan modification t0 relocate the house and access drive,for an approved interior lot located at 1580 Main Street,A-40 zone. 1.Prior to commencement of any site work,a meeting must be held with Town Staff. 2.No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3.A landscape bond in the amount of $5.000 is required and must be submitted prior to the issuance of a certificate ofoccupancyifworkisnotcompleted. 4.All bonds must be in one of the forms described in the enclosed Bond Policy. 5.An as—built plan is required prior to issuance of a Certificate of Occupancy per Section 9.l .3 of the ZoningRegulations. 6.This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water PollutionControlAuthority. 7.All plans used in the field by the developer must bear the stamp and authorized signature of the Town of SouthWindsor. 8.The building street number must be included on the final plan. 9.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10.All free-standing signs and/or building signs require the issuance of a sign permit before they are erected. 11.Thefinafplans Shall be revised to comply with the Town ofSouth Windsor Public Improvement Specifications,Section l.7.5.2.related t0 design ofRear Lot driveways.Per the South Windsor Fire Marshal,the driveway shall be paved PLANNINE DEPARTMENT CERTIFIED MAIL #7022 2410 0000 6508 9246 October 6,2025 Jay Ussery J.R.Russo &Associates PO Box 938 East Windsor.CT 06088 Dear Mr.Ussery: Re:Appl.25-36P,Ucello Fine Homes —1580 Main Street Site Plan Modification We are pleased to advise you that the Planning &Zoning Commission voted on September 30. 2025 t0 approve with modifications the above referenced application for a Site Plan Modification. This approval is to relocate the house and access drive for an approved interior lot located at 1580 Main Street,A-40 zone,as shown on plans prepared by J.R.Russo &Associates,Job No. 2024-064,dated July l,2025 as revised September 17,2025.This approval is subject to the following modifications: I.Prior to commencement of any site work,a meeting must be held with Town Staff. 2.No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3.A landscape bond in the amount of $5,000 is required and must be submitted prior to the issuance ofa certificate of occupancy if work is not completed. 4.All bonds must be in one ofthe forms described in the enclosed Bond Policv. UI An as—built plan is required prior to issuance ofa Certificate of Occupancy per Section 9.1 .3 of the Zoning Regulations. 6.This approval does not constitute approval ofthe sanitary sewer.which can only be grantedbytheWaterPollutionControlAuthority. 7.All plans used in the field by the developer must bear the stamp and authorized signature of the Town ofSouth Windsor. The building street number must be included on the final plan.w 9.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10.All free-standing signs and/or building signs require the issuance ofa sign permit before they are erected. 1 l.The hnal plans shall be revised to comply with the Town ofSouth Windsor Public Improvement Specifications,Section 1.7.5.2.related to design ofRear Lot driveways.Per the South Windsor Fire Marshal.the driveway shall be paved.l2.Construction fence shall be installed along the northern property line to protect the drip line or critical root zone of existing trees on the neighboring property. Black and white transparent mylars of the Plot Plan and any sheets that display approval letters with the above modifications.together with three print copies and one electronic copy of the entire set of plans with live signatures and raised seals (including architectural elevations and 1540 Sullivan Avenue,Suuth Windsor,CT 06074 l Tel (BSU)E44-2511 Ext 232E i Planning@SnuthWindsor»ET,gov landscaping plans),must be submitted to this Commission to be stamped and signed.The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission and the Water Pollution Control Authority must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be retumed to you for filing in the Office of the Town Clerk.After filing these plans,a copy of the receipt must be submitted to the Planning Department. Sincerely. Stephen Wagner.Chairman Planning and Zoning Commission SW/js Enclosure:Bonding Policy cc:Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal