Loading...
HomeMy WebLinkAbout25-31P USA Hauling and Recycling CNG Fueling Station 1 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION FOR SITE PLANS APPLICANT_____________________________________________________________ PROJECT NAME_________________________________________________________ This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. _____ 1. On each sheet for plans or maps, title block with the following information: _____ a. Name, address, email address, and telephone of applicant _____ b. Name, address, email address, and telephone of Land Surveyor or Professional Engineer _____ c. Name of Development _____ d. Date when drawings were made _____ 2. Key Map: An overall map drawn to a scale of 1 inch equaling either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. _____ a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. _____ b. Outline of buildings _____ c. Layout of streets _____ d. Surrounding property boundaries within 500 feet _____ e. Names of abutting property owners _____ f. Proposed open spaces and recreation areas _____ g. Driveway cuts on abutting properties and any properties across from proposed site _____ h. Distance to and name of nearest intersection street MR South Windsor Properties, LLC. USA Hauling & Recycling - CNG Fueling Station x x x x x x x x x x x x n/a x 2 _____ 3. Architectural Elevations: See attached checklist for Architecture and Design Review. _____ 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equaling 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: _____ a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. _____ b. Proposed streets and street lines with center line station, curve data, and parking spaces _____ c. Building lines in accordance with zoning regulations _____ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened) _____ e. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g. below Grantor Grantee Type of Easement Date Filed Vol/Pg _____ f. Names of abutting property owners _____ g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. _____ h. All open space or other common or public land uses shall be indicated. _____ i. A-2 certification; P.E./L.S. Seal _____ 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: _____ a. All existing and proposed buildings _____ b. Curb Lines and pavement width, sidewalks _____ c. Existing and proposed sanitary sewers X X X X X X X X X X n/a n/a X n/a n/a 3 _____ d. Existing and proposed water and all existing utilities _____ e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. _____ f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. _____ g. Regulated wetlands and 100-year floodplain or note that none are present _____ h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches, within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. _____ i. Connections of all springs into proposed storm drainage system as needed _____ j. Location and indications of existing brook channels, and 100-year flood limits _____ k. A-2 & T-2 Certification; P.E & L.S. Seals _____ 6. Landscaping plan _____ 7. Drainage calculations: Zero Runoff Increase per attached guidelines _____ 8. Traffic Report _____ 9. Site Lighting Plan _____ 10. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: _____ a. Layout of streets in sections coordinated by stations with the profile _____ b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes . X X X X X X X n/a n/a n/a n/a n/a n/a n/a n/a 4 _____ c. Sight line at driveway & street intersections _____ d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. _____ e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths, and slopes of pipes. _____ f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. _____ g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. _____ h. Profiles shall show all sanitary sewer lines and manholes, including elevations (inverts, top of frame), sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. _____ 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. _____ 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. ____________________________________ _________________________ PLAN PREPARER (P.E./L.S.) DATE ______________________________________ Print Name W:\Planning Admin\Forms\Check Lists\Site Plan Checklist.doc February 2002; Rev. 4-04 X 7/8/2025 Mark M. Zessin n/a n/a n/a n/a n/a n/a n/a Project Narrative: The project site is an existing recycling facility located on the east side of Nutmeg Road North. The site contains three properties (570, 600 and 602 Nutmeg Road) with a combined 13.01 acres and is in the Industrial Zone. The applicant is proposing to install a natural gas fueling facility along with other site improvements including a new entrance to the facility and the conversion of a stormwater basin to underground storage. The proposed natural gas fueling facility contains a duplex compressor, transformer and dryer along with associated equipment and lighting on concrete pads surrounded by concrete bollards. The fueling site is detailed in the attached CNG Fueling Station plans (by others). Also attached are photos representing the proposed facility and the proposed concrete barrier fueling area along the associated parking spaces. The area of the proposed underground storage will be used for material storage and equipment maneuvering in support of the applicant’s cu rrent business operations. There will be no increase of traffic or parking for the site with this proposal. The number of parking spaces provided is the same total number of spaces as currently exist on the three properties. The vehicles utilizing the site will also remain unchanged with the proposed improvements. Parking calculations were performed using the Town regulations along with the employee counts for the site. A total of 60 spaces are required for the three properties and the total existing (& proposed) spaces are approximately 117 which are provided on the three combined properties. RELEVANT CODES AND STANDARDSABBREVIATIONSACASPHALTIC CONCRETEAFGABOVE FINISHED GRADEAHJAUTHORITYHAVING JURISDICTIONATSAUTOMATIC TRANSFER SWITCHBCWBARE COPPER WIREBLDGBUILDINGCL CENTER LINECNGCOMPRESSED NATURAL GASCOMPCOMPRESSORCONCCONCRETECMUCONCRETE MASONRY UNITCONTCONTINUOUSCU FTCUBIC FEETCRINDCARD READER INSIDE DISPENSERCSCARBON STEELDIA OR ØDIAMETERDEPTDEPARTMENTDWGDRAWING(E)EXISTINGEAEACHELEV OR ELELEVATIONEQEQUALENCLENCLOSUREESDEMERGENCY SHUT DOWNEXISTEXISTING(F)FUTUREFGFINISH GRADEFHFIRE HYDRANTFIGFIGUREFOCFACE OF CURBFPFUEL POST (TIME FILLED)FSSPFUEL SYSTEM SUPPORT PANELFXFIRE EXTINGUISHERGALVGALVANIZEDGNDGROUNDGRCGALVANIZED RIGID CONDUITHCHANDICAPHPHORSE POWERHORIZHORIZONTALMAWPMAXIMUM ALLOWABLE WORKING PRESSUREMAXMAXIMUMMCCMOTOR CONTROL CABINETMCP MASTER CONTROL PANELMINMINIMUMMSAMETER SET ASSEMBLY (GAS UTILITY)MSBMASTER SWITCH BOARDMTRMOTORMTSMANUAL TRANSFER SWITCH(N)NEWN/ANOT APPLICABLENGVNATURAL GAS VEHICLENTSNOT TO SCALENONUMBEROCON CENTERPLPLATEPOCPOINT OF CONNECTIONPBPUSH BUTTONREFREFERENCEREINFREINFORCEMENT(RR)REMOVE AND REPLACESCHSCHEDULESECSECTIONSIMSIMILARSPRSPRINKLEREDSQSQUARESFSQUARE FEETSSSTAINLESS STEELSTDSTANDARDTHKTHICKTHRUTHROUGHTOCTOP OF CURBXFMRTRANSFORMERTYPTYPICALUNOUNLESS NOTED OTHERWISEVERTVERTICALGENERAL NOTESTHE WORK SHALL CONFORM TO THE MOST RECENT EDITION OF THEFOLLOWING CODES AND STANDARDS AS SUPPLEMENTED, AMENDED,OR OTHERWISE MODIFIED BY LOCAL REQUIREMENTS:2021 INTERNATIONAL BUILDING 2021 INTERNATIONAL PLUMBING 2020 NATIONAL ELECTRICAL CODE 2021 INTERNATIONAL MECHANICAL CODE NFPA52 VEHICULAR FUEL SYSTEMS CODE 2023IN THE EVENT OF A CONFLICT BETWEEN DRAWINGS, WRITTENSPECIFICATIONS, AND/OR REFERENCED STANDARDS, THE MOSTSTRINGENT SHALL GOVERN.PROJECT DESCRIPTIONNOTE: THE TERM "CONTRACTOR" OR "CONTRACTORS" AS USED INTHESE GENERAL NOTES SHALL REFER TO THE PRIME CONTRACTOR AND ALL SUB-CONTRACTORS.1. THIS SET OF CONSTRUCTION DOCUMENTS COVERS THE CNGSYSTEM IMPROVEMENTS ONLY AND MAY NOT SHOW ALLEXISTING SITE IMPROVEMENTS FOR THE FACILITY.2. THE CONTRACTORS SHALL PRESERVE AND MAINTAIN ACCESSTO EXISTING EXITS AND MAKE EVERY EFFORT TO MINIMIZEDISRUPTIONS TO EXISTING OPERATIONS AT ALL TIMES DURINGCONSTRUCTION.3. THE CONTRACTORS SHALL BE RESPONSIBLE FOR VERIFYINGTHAT ALL MATERIALS, LABOR, INSTALLATION, FABRICATION,ETC. SHALL CONFORM TO ALL CODES AND REGULATIONS OFAPPLICABLE GOVERNING AGENCIES.4. THE CONTRACTOR SHALL VERIFY DIMENSIONS AND SITECONDITIONS PRIOR TO COMMENCING ANY WORK. THECONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OFANY DISCREPANCY CONTAINED WITHIN THESE CONSTRUCTIONDOCUMENTS WHICH ARE RELATED TO THE CONTRACTOR'SSCOPE OF WORK. SHOULD AN ERROR APPEAR IN THESECONSTRUCTION DOCUMENTS OR RELATED WORK PERFORMEDBY OTHER CONTRACTORS AFFECTING THE CONTRACTOR'SSCOPE OF WORK, THE CONTRACTOR SHALL NOTIFY THEENGINEER AT ONCE FOR INSTRUCTIONS AS TO THEPROCEDURE FOR CONTINUATION OF WORK. SHOULD THECONTRACTOR PROCEED WITH WORK AFTER IDENTIFYINGSUCH A CONFLICT WITHOUT OBTAINING INSTRUCTIONS FROMTHE ENGINEER, THE CONTRACTOR SHALL ASSUME THE FULLRESPONSIBILITY FOR ALL REMEDIAL WORK NECESSARY TOSATISFY THE REQUIREMENTS OF THESE CONSTRUCTIONDOCUMENTS AND THE APPLICABLE BUILDING CODES.5. THE CONTRACTOR SHALL REFER TO THE BID DRAWINGS ANDWRITTEN TECHNICAL SPECIFICATIONS - IF ANY - FORADDITIONAL INFORMATION AND REQUIREMENTS WHICH AREHEREBY INCORPORATED INTO THE PROJECT REQUIREMENTSBY REFERENCE.6. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS WITHTHOSE SHOWN ON THE DRAWINGS AND PROMPTLY REPORTANY DISCREPANCIES TO THE ENGINEER. VERIFY EXISTINGCONDITIONS WITHIN THE WORK AREA AND REVIEWMODIFICATIONS REQUIRED TO SUIT EXISTING CONDITIONSPRIOR TO FABRICATION AND INSTALLATION OF NEW WORK ORMODIFICATIONS TO EXISTING CONDITIONS.7. THE CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN,ORDERLY CONDITION, FREE OF DEBRIS AND LITTER. EACHCONTRACTOR SHALL, IMMEDIATELY UPON COMPLETION OFEACH PHASE OF HIS WORK, REMOVE ALL TRASH AND DEBRISTHAT RESULTS FROM THE PERFORMANCE OF HIS WORK.8. CONSTRUCTION MATERIALS STORED ON THE SITE SHALL BEPROPERLY STACKED AND PROTECTED TO PREVENT DAMAGEAND DETERIORATION UNTIL USED. FAILURE TO PROTECTMATERIALS MAY BE CAUSE FOR REJECTION OF WORK.9. THE CONTRACTOR SHALL PROTECT NEW AND EXISTINGFINISHES AND CONSTRUCTION FROM DAMAGE THAT MAYOCCUR DURING CONSTRUCTION. DAMAGE TO NEW AND/OREXISTING FINISHES AND CONSTRUCTION SHALL BE REPAIREDOR REPLACED (THE OWNER'S DECISION) WITH IDENTICALMATERIAL AT THE CONTRACTOR'S EXPENSE.10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGTHE OWNER WITH ACCURATE "AS-BUILT" RECORD DRAWINGSAT THE COMPLETION OF CONSTRUCTION. RECORDDRAWINGS WILL BE MADE BY "RED-LINING" FORMALCONSTRUCTION DRAWINGS TO IDENTIFY ANY AND ALLCHANGES WHICH MAY HAVE BEEN MADE IN THE FIELD.11. ALL WORK SHOWN ON THESE DRAWINGS SHALL BECONSTRUED AS BEING NEW WORK AND PART OF THISCONTRACT UNLESS NOTED BEING EXISTING OR OTHERWISE.12. CONTRACTOR SHALL COMPLY WITH ALL NATIONAL POLLUTANTDISCHARGE ELIMINATION SYSTEM (NPDES) AND LOCALJURISDICTION STORM WATER POLLUTION PREVENTION (SWPP)RULES AND REGULATIONS PRIOR TO THE COMMENCEMENT OFANY WORK AND DURING ANY CONSTRUCTION ACTIVITIES.13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATIONOF ALL DIMENSIONS, MATERIALS & QUANTITIES AS PART OFTHE CIVIL, STRUCTURAL, MECHANICAL, P&ID AND ELECTRICALPLANS. NO EXCEPTIONS.14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ACOMPLETE SET OF CONSTRUCTION PLANS TO ALLSUB-CONTRACTORS DISCIPLINES FOR REFERENCE AND USE.15.THE CONTRACTOR SHALL BE RESPONSIBLE FORRE-ESTABLISHING ALL DAMAGED OR DISTURBED TEMPORARYAND PERMANENT BENCH MARKS AT THEIR OWN EXPENSE.NOT TO SCALEVICINITY MAPFLOOD MAP:09003C0378F EFFECTIVE: 9/26/2008REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PBPROJECT DESCRIPTION: INSTALLATION OF COMPRESSED NATURAL GAS VEHICLEFUELING STATION WITH ASSOCIATED CONTROLS EQUIPMENT PADS, CONNECTINGPIPING, ELECTRICAL, SAFETY SYSTEMS, AND OTHER MINOR SITE WORK AT THEPROJECT SITE LISTED ABOVE.SITENOT TO SCALENOT TO SCALEFEMA MAPSITEZONE: XNFPA70 NATIONAL ELECTRICAL CODE (NEC) AS ADOPTED BY THELOCAL AUTHORITY HAVING JURISDICTIONASME B31.3 PROCESS PIPING CODE 2020C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\C0.0-COVER SHEET.dwg12/5/202412/6/2024 4:36:54 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 COVER SHEET 21330.00PBMLCS.130% REVIEW SETNOT FOR CONSTRUCTIONCNG FUELING STATIONUSA HAULING & RECYCLING600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074PROJECT TEAMOWNER (S)PROJECT CONTACT(S)USA HAULING & RECYCLING555 TAYLOR RDENFIELD, CT 06082(860)746-3200CLEAN ENERGYTREY CLIMER4675 MACARTHUR COURT SUITE 300NEWPORT BEACH, CA 92660(317)460-1885APN: 65100600 (PID: 5386)ZONING: IPOCCUPANCY: IND/COMMLAND CLASS: ITYPE OF CONSTRUCTION: II-BAUTHORITY HAVING JURISDICTION: TOWN OF SOUTH WINDSOR, CTENGINEER OF RECORDATTN: MATTHEW W LOSER, PE, LEED APVALLEY CIVIL DESIGN GROUP, LLC3333 MICHELSON SUITE 300IRVINE, CA 92612(949) 398-1338Sheet List TableSheet NumberSheet TitleGENERALCS.1COVER SHEETG0.0GENERAL NOTES BUILDINGG0.1CODE COMPLIANCE TABLESC0.1GENERAL ARRANGEMENT & ELEVATIONS FASTFILLCIVILC1.0SITE PLANPIPINGP0.0PIPING NOTESP1.0PIPING & INSTRUMENTATION DIAGRAMP1.1PIPING & INSTRUMENTATION SCHEDULEELECTRICALE0.0ELECTRICAL NOTESE1.0SINGLE LINE DIAGRAM REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PB C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\C0.0-COVER SHEET.dwg12/5/202412/6/2024 4:36:55 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 GENERAL NOTES BUILDING 21330.00PBMLG0.0LOCATION OF CONCRETESTRENGTH, psiTYPE3500*FOOTINGSSLAB ON GRADEMISCELLANEOUS3500*3500*HARD ROCKHARD ROCKHARD ROCKGENERAL NOTES1.1SUMMARYA.THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE COMPRESSEDNATURAL GAS (CNG) FUELING FACILITY AND RELATED STRUCTURES TO BE CONSTRUCTED HEREUNDER ASNECESSARY TO MAKE A COMPLETE AND WORKING INSTALLATION, EXCEPT FOR WORK SPECIFICALLYEXCLUDED.B.ALL PHASES OF THE PROJECT SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THESESPECIFICATIONS AND THE APPROVED CONSTRUCTION DRAWINGS. IF THERE IS ANY CONFLICT BETWEENTHIS DOCUMENT AND THE DRAWINGS, THE DRAWING(S) SHALL GOVERN AND THE ENGINEER SHALL BENOTIFIED.C.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL THE REQUIRED PERMITS (I.E. BLDG. &SAFETY, PLUMBING, ELECTRICAL, PRESSURE VESSEL, FIRE DEPARTMENT FEES, CERTIFICATE OFOPERATION OR PERMIT TO OPERATE), AND SHALL ENSURE THAT CITY LICENSES AND TAXES ARE CURRENTAS REQUIRED FOR THE PROJECT, EXCEPT AS NOTED IN THIS SPECIFICATION AND CONTRACT DOCUMENTS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING FOR ALL REQUIRED INSPECTIONS AT THEAPPROPRIATE STAGES OF CONSTRUCTION. IF ANY OF THE CONTRACTOR'S WORK FAILS ANY INSPECTION,THE CONTRACTOR SHALL TAKE THE APPROPRIATE MEASURES TO CORRECT ANY DEFICIENCY AT NOEXPENSE TO CLEAN ENERGY.E.THE CONTRACTOR'S WORK SHALL CONFORM TO ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONSOF THE STATE, COUNTY, AND CITY INVOLVED. APPROVED DRAWINGS AND PERMITS SHALL NOT BECONSTRUED AS LICENSE TO CONSTRUCT WORK NOT CONFORMING WITH THE GOVERNING CODES ANDSHALL NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE GOVERNING CODES, PLANS, ANDSPECIFICATIONS.F.THE CONTRACTOR SHALL CHECK THE ACCURACY OF ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION.NOTIFY ENGINEER OF ANY DISCREPANCIES OR INCONSISTENCIES.1.2 MATERIALSA.THE CONTRACTOR SHALL HANDLE AND INSTALL ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITHMANUFACTURER'S INSTALLATION INSTRUCTIONS AND THE REQUIREMENTS IN THESE CONSTRUCTIONSPECIFICATIONS.B.CLEAN ENERGY SHALL PROVIDE THE CONTRACTOR WITH MAJOR EQUIPMENT ASSEMBLIES LISTED AS "CLEANENERGY FURNISHED" IN THIS SPECIFICATION OR THE DRAWINGS. CLEAN ENERGY FURNISHED EQUIPMENTAND MATERIAL WILL BE DELIVERED TO THE JOB SITE BY CLEAN ENERGY AND THE CONTRACTOR SHALL BERESPONSIBLE FOR UNLOADING AND PROPERLY STORING THEM ON THE CONSTRUCTION SITE TO ENSURE NODAMAGE IS DONE TO EQUIPMENT OR MATERIAL (I.E. RAIN, VANDALISM, ETC). ON-SITE STORAGE LOCATION(S)SHALL BE COORDINATED WITH CLEAN ENERGY AND/OR THE CLIENT.1.3 MATERIAL HANDLING AND STORAGED.AFTER RECEIPT OF CLEAN ENERGY FURNISHED MATERIALS BY THE CONTRACTOR, ANY SHORTAGES OFAND/OR DAMAGES TO THE MATERIALS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THECONTRACTOR SHALL BE FINANCIALLY ACCOUNTABLE FOR SUCH SHORTAGES, ERRORS, OR DAMAGES.E.THE CONTRACTOR SHALL BE FINANCIALLY ACCOUNTABLE FOR LOST OR STOLEN CLEAN ENERGY FURNISHEDEQUIPMENT.F.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER STORAGE AND HANDLING OF ALL CLEAN ENERGYFURNISHED EQUIPMENT AND MATERIAL UNTIL THE INSTALLATION IS ACCEPTED BY CLEAN ENERGY'SREPRESENTATIVE.G.THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAULING AWAY ALL UNUSED CONTRACTOR SUPPLIEDMATERIALS, WASTE, AND SPOILS. ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE SITE DAILYAND DISPOSED OF IN A LEGAL MANNER.H.ALL UNUSED CLEAN ENERGY SUPPLIED MATERIAL SHALL BE RETURNED TO CLEAN ENERGY UPONCOMPLETION OF CONSTRUCTION.1.4USE OF SITE, TEMPORARY UTILITIES AND INSPECTIONSA.THE CONTRACTOR'S ACTIVITIES SHALL BE RESTRICTED TO THE DESIGNATED CONSTRUCTION SITE ANDSTORAGE AREAS DURING EXECUTION OF THIS WORK.B.PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN APPROVAL FROM CLEAN ENERGY'SREPRESENTATIVE FOR ON-SITE DIRT REMOVAL OR STOCK PILING TO INSURE MINIMUM DISRUPTION OFEXISTING SITE OPERATION.C.THE CONTRACTOR SHALL PROVIDE ALL REQUIRED TEMPORARY FACILITIES INCLUDING SANITARY FACILITIES,HAND WASHING, AND TELEPHONES.D.EVERY REQUEST FOR INSPECTION SHALL REQUIRE A FORTY-EIGHT (48) HOUR ADVANCE NOTICE BEFORESUCH INSPECTION IS DESIRED.1.5START-UP PROCEDURESA.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY TEMPORARY CLEARANCES TO RELEASE GAS ANDELECTRICAL SERVICE FOR START-UP. THIS WILL NOT INCLUDE FINAL INSPECTION BY AGENCIES WHICHREQUIRE A CERTIFICATE TO OPERATE.B.THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY'S PROJECT MANAGER A MINIMUM OF THREE (3) WEEKSBEFORE THE DATE THE SYSTEM CAN BE STARTED SO AS TO COORDINATE START-UP WITH THE EQUIPMENTVENDOR(S) AND/OR APPROVED REPRESENTATIVES.C.THE CONTRACTOR SHALL HAVE QUALIFIED ELECTRICAL AND MECHANICAL REPRESENTATIVES PRESENTDURING START-UP TO MAKE ANY NECESSARY REPAIRS IN THE EVENT OF LEAKS OR FAILURES.D.A PRELIMINARY WALK-THROUGH SHALL BE MADE AFTER START-UP WITH CLEAN ENERGY REPRESENTATIVES.THE ITEMS ON THE PUNCH LIST DEVELOPED DURING THIS WALK-THROUGH SHALL BE COMPLETED WITHINTEN (10) WORKING DAYS.E.FINAL WALK-THROUGH SHALL BE CONDUCTED WITH THE CLEAN ENERGY PROJECT MANAGER, ENGINEER ORTHEIR AUTHORIZED REPRESENTATIVE, AND THE CONTRACTOR TO SIGN OFF THE COMPLETION OF THEPUNCH LIST ITEMS. ALL ITEMS SHALL BE COMPLETED AND SIGNED OFF BEFORE RETENTION MONEY WILL BEPAID TO THE CONTRACTOR1.6 INSTALLATIONA.THE CONTRACTOR SHALL CHECK THE ACCURACY OF FOUNDATION LOCATIONS, ELEVATIONSM LOCATIONAND PROJECTION OF ALL ANCHOR BOLTS AND EMBEDDED ITEMS. CLEAN ENERGY WILL REQUIRE 24 HOURSNOTICE FOR INSPECTION OF THE CONTRACTOR'S WORK.1.7 DRAWINGSA.FINAL INTERPRETATION OF ALL DRAWINGS WILL BE BY CLEAN ENERGY, IN CONSULTATION WITH THEENGINEER, AND CLEAN ENERGY'S DECISION WILL BE FINAL.B.TWO COMPLETE SETS OF "APPROVED FOR CONSTRUCTION" DRAWINGS WILL BE PROVIDED TO THE THECONTRACTOR FIVE (5) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION.C. ALL DRAWINGS PREPARED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ENGINEER OF RECORDFOR APPROVAL PRIOR TO ADMITTING DRAWINGS INTO THE CONSTRUCTION DRAWING SET.D.UPON SUBSTANTIAL COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL MARK-UP ONE (1) COPY OF"APPROVED FOR CONSTRUCTION" DRAWINGS TO AS-BUILT CONDITIONS. AS-BUILT DRAWINGS SHALL SHOWALL SIGNIFICANT CHANGES, DIMENSIONS (INCLUDING DEPTH), AND RELATIVE POINTS OF REFERENCE. THESEALTERED DRAWINGS SHALL BE SUBMITTED TO CLEAN ENERGY WITHIN TWO (2) WEEKS (TEN (10) WORKINGDAYS) AFTER COMPLETION OF CONSTRUCTION. RETENTION RELEASE IS CONTINGENT UPON RECEIVINGACCURATE AS-BUILT DRAWINGS.1.8MISCELLANEOUS EQUIPMENTA.THE CONTRACTOR SHALL PROVIDE MASTER LOCK, PADLOCKS, HI VIS, ALUMINUM, PRO SERIES PICKRESISTANT 5 PIN LOCKING MECHANISM WITH 2 KEYS AT LOCATIONS SPECIFIED. ALL GATES, PANELS ANDDOORS SHALL INCLUDE A BLACK MASTER LOCK, GRAINGER #4RD90 THAT IS KEYED TO 10G504. ALL SAFETYRELIEF VALVES SHALL INCLUDE A RED MASTER LOCK, GRAINGER #4RD94 THAT IS KEYED TO 10G502.1.9 DESIGN PARAMETERSA.THIS PROJECT HAS BEEN DESIGNED PER CODES INDICATED ON SHEET C3.0.B.OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS,UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE ENGINEER WHEN DRAWINGS BYOTHERS SHOW OPENINGS, POCKETS, ETC. LARGER THAN 6" NOT SHOWN ON THE DRAWINGS, BUT WHICHARE LOCATED IN STRUCTURAL MEMBERS.C.ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE OF THE LATEST REVISION.D.DESIGN LOADS: SEE STRUCTURAL DETAILS, SHEET C3.0E.WIND ANALYSIS PER ASCE. SEE STRUCTURAL DETAILS SHEET C3.0F.SEISMIC ANALYSIS PER ASCE UTILIZING THE EQUIVALENT LATERAL FORCE ANALYSISSEE STRUCTURAL DETAILS ON SHEET C3.0CONCRETEA. THE CONTRACTOR SHALL NOT MAKE ANY CONCRETE POURS WITHOUT FIRST NOTIFYING CLEAN ENERGY.B. IF FOUNDATION SLABS AND FOOTINGS ARE POURED PRIOR TO TRENCHING FOR PIPING AND ELECTRICAL, SLEEVES ARE REQUIRED UNDER BLOCK WALL FOOTINGS OR EQUIPMENT FOUNDATIONS FOR ALL PROPOSED GAS PIPING OR ELECTRICAL CONDUITS PASSING UNDER FOOTINGS OR FOUNDATIONS.C. CEMENT SHALL MEET IBC STANDARDS FOR PORTLAND CEMENT & BLENDED HYDRAULIC CEMENTS.D. READY MIX CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH REQUIREMENTS OF IBCSTANDARDS. BATCH TICKETS WILL BE RETURNED TO CLEAN ENERGY.E.REINFORCED CONCRETE IS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN METHOD".F.CONCRETE NORMAL WEIGHT IS 150 PCF. UNLESS NOTED OTHERWISE.G.CONCRETE MIXING OPERATION, ETC. SHALL CONFORM TO ASTM C94.H.CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WETSEAL OF A CIVIL ENGINEER, LICENSED IN THE STATE THE PROJECT IS LOCATED, FOR REVIEW BY THEENGINEER. THE MIX DESIGNS SHALL STATE THE PROJECT NAME AND THE INTENDED USAGE OF THECONCRETE.I.SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES:*DESIGN STRENGTH = 3000 psi* PER TABLE 19.3.1.1 ACI-318-14 - CONCRETE MIX SHALL BE DESIGNED FOR EXPOSURE CLASSES F0, S0, P0 AND C0.J.PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE V IN CONTACT WITH SOIL AND TYPE IIELSEWHERE. CEMENT SHALL HAVE AN EQUIVALENT ALKALINE CONTENT LESS THAN 0.6%.K.AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTMC33. AGGREGATE SHALL BE NON-REACTIVEL.FLY ASH OR POZZOLANS, IF USED, SHALL CONFORM WITH ASTM C618. USAGE SHALL NOT EXCEED 15PERCENT BY WEIGHT OF THE TOTAL OF CEMENTITIOUS MATERIALS. POZZOLANS USED TO MITIGATE THEEFFECT OF SULFATE CONTAINING SOILS SHALL BE DETERMINED BY TEST OR SERVICE RECORD.M.PLACEMENT OF CONCRETE SHALL CONFORM TO SECTION 1905 OF THE BUILDING CODE.O.ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE WELL-SECURED INPOSITION PRIOR TO PLACING CONCRETE.P.MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH SLAB ON GRADE, DO NOT REQUIRESLEEVES, UNLESS OTHERWISE NOTED. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE PLACINGCONCRETE. DO NOT CUT ANY REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORINGOPENINGS IN CONCRETE IS NOT PERMITTED. NOTIFY THE ENGINEER IN ADVANCE OF CONDITIONS NOTSHOWN ON THE STRUCTURAL DRAWINGS.Q.CONTRACTOR SHALL SUBMIT MINIMUM OF TWO COPIES OF REBAR SHOP DRAWINGS SHOWING ALL BENDS,LAPS, HOOKS AND CHAINS REQUIRED FOR THE PROPER CONSTRUCTING OF THE REINFORCING ON PLANS.R.ALL CONCRETE SLABS WILL BE A SMOOTH TROWEL FINISH ON ALL CURB FACES AND EDGES WITH BROOMFINISH ON ALL FLAT SURFACES EXCEPT WHEN MATCHING EXISTING CONCRETE SURFACES. ALL SLABFINISHES SHALL BE FREE OF STAINS, DISCOLORATION, VOIDS, CRACKS, OR SURFACE DISCONTINUITIES. IFANY OF THESE CONDITIONS EXIST, CLEAN ENERGY WILL REQUIRE THE CONTRACTOR TO REPLACE THE SLAB.THE CONTRACTOR SHALL VERIFY WITH CLEAN ENERGY WHICH TYPE OF BROOM FINISH WHICH WILL BEACCEPTABLE.REINFORCING STEELA.REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF BUILDING CODE AND ASTM 615 OR ASTMA706 GRADE 60.B.BARS SHALL BE CLEAN OF RUST, GREASE, OR OTHER MATERIALS LIKELY TO IMPAIR BOND. ALL REINFORCINGBAR BENDS SHALL BE MADE COLD.C.REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. LAP ALL HORIZONTAL BARSAT CORNERS AND INTERSECTIONS. STAGGER ALL SPLICES UNLESS NOTED OTHERWISE ON PLANS.D.ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACEINSPECTION IS MADE.E.REBARS IN SLABS SHALL BE SECURELY SUPPORTED ON WELL-CURED CONCRETE BLOCKS OR APPROVEDMETAL CHAIRS, PRIOR TO PLACING CONCRETE.F.REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE ACI 318 AND ACI 530 MANUALS.G.MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO PLACEMENT OF CONCRETE.H.CONCRETE PROTECTION FOR REINFORCEMENTMIN COVER (INCHES)a.CONCRETE CAST AGAINST AND PERMANENTLYEXPOSED TO EARTH:3b.CONCRETE EXPOSED TO EARTH OR WEATHER:#6 THROUGH NO. 18 BARS2#5 BAR, W31 OR D31 WIRE AND SMALLER 112c.CONCRETE NOT EXPOSED TO WEATHER OR INCONTACT WITH GROUND:SLABS, WALLS, JOISTS:#14. AND #18 BARS112#11 BAR AND SMALLER34BEAMS, COLUMNS:PRIMARY REINFORCEMENT, TIES,STIRRUPS, AND SPIRALS112I.DEVELOPMENT AND SPLICES OF REINFORCEMENT SHALL CONFORM TO ACI 318, CHAPTER 12 FOR CONCRETE AND ACI 530 FOR MASONRY. FOR CONCRETE, SEE PLANS AND DETAILS.MASONRYA.MASONRY MATERIALS SHALL BE STORED SO THAT AT THE TIME OF USE THE MATERIALS ARE CLEAN ANDSTRUCTURALLY SUITABLE FOR THE INTENDED USE.B.SURFACES TO BE IN CONTACT WITH MASONRY GROUT OR MORTAR SHALL BE CLEAN AND FREE OFDELETERIOUS MATERIALS.C.MASONRY DESIGN SHALL BE PER ACI 530, LATEST CODE EDITIOND.ALL MASONRY SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH F`M=1500 psi.E.ALL MORTAR SHALL BE TYPE S, PROPORTIONED BY VOLUME ACCORDING TO ASTM C270. MORTAR SHALLHAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH = 1800 psi.F.ALL GROUT SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2000 psi, AND SHALL BEPROPORTIONED BY VOLUME ACCORDING TO ASTM C476.G.ALL MASONRY UNITS SHALL BE MEDIUM WEIGHT ASTM C90, GRADE N, TYPE 1 UNITS, UNLESS NOTEDOTHERWISE.H.CEMENT SHALL BE AS SPECIFIED FOR CONCRETE.I.PROVIDE A MINIMUM OF 1/2" GROUT BETWEEN MAIN REINFORCING AND MASONRY UNITS.J.ALL DEFORMED REINFORCING BAR SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THEREINFORCEMENT SECTION OF THESE GENERAL NOTES.K.ALL HORIZONTAL AND VERTICAL LAP SPLICES SHALL BE IN CONFORMANCE WITH SECTION 2107.5 OF THECURRENT BUILDING CODE, UNLESS NOTED OTHERWISE.L.CELLS SHALL BE IN VERTICAL ALIGNMENT. ALL VERTICAL MASONRY WALL REINFORCING SHALL BECENTERED IN THE WALL, LAPPED WITH BARS DOWELED INTO THE FOOTINGS AND GROUTED SOLID, UNLESSNOTED OTHERWISE.M.ALL MASONRY WALLS SHALL HAVE A CONTINUOUSLY GROUTED BOND BEAM WITH (1) #4 BAR AT THE TOPAND BOTTOM OF THE WALL, UNLESS NOTED OTHERWISE. PROVIDE BENT CORNER BARS AT ALLINTERSECTIONS PER TYPICAL DETAILS.N.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROVIDING LATERAL BRACING ADEQUATE TO RESISTTEMPORARY LOADS, WIND LOADS, AND SEISMIC LOADS DURING CONSTRUCTION.O.SEE TYPICAL DETAILS FOR ADDITIONAL REINFORCING REQUIRED AT WALL PENETRATIONS, TERMINATIONS,OPENINGS, AND CONTROL JOINTS.P.ALL MIX DESIGNS SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WETSEAL OF A LICENSED CIVIL ENGINEER AND SHALL BE SUBMITTED FOR REVIEW BY THE STRUCTURALENGINEER. THE DESIGNS FOR EACH TYPE OF MASONRY STRENGTH SPECIFIED SHALL STATE THE PROJECTNAME AND LOCATION OF USAGE.Q.FOR GROUT LIFT CONSTRUCTION, REFER TO ACI 530.1, PART 3, SECTION 3.5D.R.MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH MASONRY WALLS DO NOT REQUIRESLEEVES, UNLESS OTHERWISE INDICATED IN THE PROJECTS SPECIFICATIONS, MECHANICAL OR ELECTRICALDRAWINGS. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE GROUTING. DO NOT CUT ANYREINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENING IN GROUTED MASONRYIS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS NOT SHOWN ON THESTRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH MASONRY LINTELSUNLESS SPECIFICALLY DETAILED.S.ALL SOLID AND HOLLOW MASONRY UNITS SHALL BE CLEAN AND ALL DUST AND DIRT REMOVED FROM THESURFACE. ALL EXPOSED FACES OF ANY WALL SHOWING GROUT SPOTTING OR JOINT MORTAR PROJECTIONSHALL BE WIRE BRUSHED AND/OR TOOLED CLEANED TO ENSURE A UNIFORM APPEARANCE.EARTHWORK AND FOUNDATION DESIGNA.FOLLOWING EARTHWORK AND FOUNDATION DESIGN SHALL BE PER GEOTECHNICAL ENGINEERING REPORT;SITE PREPARATION, EARTH EXCAVATION, SITE BACKFILL, FOUNDATION BACKFILL, WEATHER EXPOSURECONTROL, FOUNDATION DESIGN, ETC.B. EXCAVATION SHALL BE PERFORMED AT SPECIFIED LOCATIONS AS REQUIRED PER APPROVED DRAWINGS.ALL FOOTINGS SHALL BE PLACED ON UNDISTURBED NATURAL EARTH OR ON PREPARED SUBGRADE, PERTHE GEOTECHNICAL ENGINEERING REPORT OR COMPACTED TO 95% PROCTOR.C. THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY IN WRITING FOR ANY POTENTIAL TRENCHING DEVIATIONFROM APPROVED PLANS OR EXCAVATING PROBLEMS PRIOR TO START OF CONSTRUCTION. NEGLIGENCESHALL NOT CONSTITUTE A CHANGE ORDER.D. ANY MATERIALS USED FOR BACKFILL SHALL BE CLEAN AND FREE OF ALL DEBRIS (WOOD SCRAPS, WELDINGROD, PIPE SCRAPS, OR OTHER DELETERIOUS SUBSTANCES). NO LUMPS OR ROCK LARGER THAN 4 INCHES INDIAMETER ARE ALLOWED WITHIN TWELVE (12) INCHES OF ANY FOUNDATION. BACKFILL MATERIAL SHALL BEAS PER GEOTECHNICAL REPORT.E.ALL BACKFILL UNDER FOUNDATIONS AND SLABS SHALL BE COMPACTED TO A MINIMUM OF 95% MODIFIEDPROCTOR AT THE OPTIMUM MOISTURE CONTENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTOF OBTAINING A COMPACTION REPORT AND SUBMITTING THE RESULT TO THE CLEAN ENERGY.F.ALL TRENCHES FOR GAS PIPES SHALL HAVE A MINIMUM COVER OF EIGHTEEN (18) INCHES ABOVE THE TOPOF PIPE (OR SLEEVE) FROM FINISH GRADE. A MINIMUM OF TWELVE (12) INCHES OF SAND SHALL BEPROVIDED BELOW THE PIPE AND SIX (6) INCHES ABOVE THE PIPE.G.ALL TRENCHES FOR ELECTRICAL CONDUITS SHALL HAVE A MINIMUM COVER OF TWENTY-FOUR (24) INCHESABOVE THE TOP OF CONDUIT FROM FINISH GRADE. BACKFILL SHALL BE CLEAN NATURAL SOIL UNLESSOTHERWISE SPECIFIED.H.EXPANSIVE SOILS SHALL REQUIRE THAT ELECTRICAL CONDUIT(S) TRENCHES BE FILLED WITH SAND AMINIMUM SIX (6) INCHES ABOVE THE TOP OF CONDUIT.I.SLURRY BACKFILL MAY BE USED AT THE CONTRACTOR'S EXPENSE INSTEAD OF SOIL FOR BACKFILL TOEXPEDITE COMPLETION OF TRENCHES WITH CLEAN ENERGY'S PRIOR WRITTEN APPROVAL.J.EXISTING ASPHALT SHALL BE SAWCUT TO ALLOW PLACEMENT OF FOOTINGS AND SLABS. ASPHALT SHALL BEPATCHED TO MATCH THE EXISTING ORIGINAL GRADE. THE CONTRACTOR SHALL ENSURE THAT PATCHEDAREAS DO NOT POND. ALL SURFACES, BOTH VERTICAL AND HORIZONTAL, TO RECEIVE ASPHALT PATCHINGSHALL HAVE AN ACCEPTABLE BONDING AGENT, SUCH AS SS1 OR AR4000, APPLIED PRIOR TO APPLICATIONOF ASPHALT.K.THE CONTRACTOR SHALL PROTECT OPEN TRENCHES OR EXCAVATIONS FROM WATER RUN OFF OR RAIN.THE CONTRACTOR SHALL ANTICIPATE AND BE PREPARED TO AVOID ANY DELAYS DUE TO WATERINFILTRATION OR RAIN.L.THE CONTRACTOR SHALL PROPERLY DISPOSE OF ALL CONTAMINATED SOILS, HAZARDOUS WASTE, AND / OROTHER MATERIALS DUE TO CONTRACTOR'S WORK AT CONTRACTOR'S EXPENSE. PACKAGE AND TRANSPORTALL HAZARDOUS MATERIALS TO AN APPROVAL WASTE FACILITY. THE CONTRACTOR SHALL COMPLY WITHALL FEDERAL, STATE, AND LOCAL RULES, REGULATIONS, AND REQUIREMENTS AND SHALL BE RESPONSIBLEFOR THE HAZARDOUS WASTE MANIFEST SHIPPING FROM THE POINT OF GENERATION, THROUGHTRANSPORTATION, TO THE FINAL APPROVED TREATMENT, STORAGE, AND DISPOSAL FACILITY. M.THE CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EARTHWORK OPERATIONS FORFILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IFANY SUCH STRUCTURES ARE FOUND, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY.N.FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:ALLOWABLE BEARING* = 1,500 PSF*VALUES MAY BE INCREASED BY 1/3 FOR WIND OR SEISMIC LOAD CASES.FOOTINGS SHALL BEAR ON FIRM NATURAL SOILS. MINIMUM DEPTH OF FOOTINGS BELOW LOWEST ADJACENTFINAL GRADE SHALL BE 18"; MINIMUM WIDTH OF FOOTING SHALL BE 18", UNLESS NOTED OTHERWISE ONPLAN OR IN SOILS REPORT.O.CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORINGREQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING,SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES INACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES.P.EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR OR ENGINEER PRIOR TO PLACINGTHE CONCRETE AND REINFORCING. CONTRACTOR TO NOTIFY THE INSPECTOR WHEN INSPECTION OFEXCAVATION IS READY.Q.ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLSBEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTORS SHALL BRACE ORPROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORSARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL PROVIDE FORDESIGN, PERMITS AND INSTALLATION OF SUCH BRACING.R.FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS SHOWN ON DRAWINGS. SHOULDSOIL ENCOUNTERED AT THESE DEPTHS NOT BE APPROVED BY THE INSPECTOR OR ENGINEER, FOUNDATIONELEVATIONS WILL BE ALTERED BY CHANGE ORDER.S.FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN THE BUILDING PERIMETER SHALL BEMECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS REPORT AND APPROVED BY THEENGINEER. FLOODING WILL NOT BE PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BEINSPECTED BY THE ENGINEER REPRESENTATIVE.T.SLABS ON GRADE SHALL BE SUPPORTED ON COMPACTED FILL AS PER THE RECOMMENDATIONS OF THESOILS REPORT.STRUCTURAL STEEL1.STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THEAISC 'SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS' AND 'CODE OF STANDARD PRACTICE FOR STEELBUILDINGS AND BRIDGES'.2.MATERIALS:WIDE FLANGEASTM A992 G50ANGLES, CHANNELS, PLATES AND BARSASTM A36PIPESASTM 53 GR B, Fy=35ksiHSS SECTIONSASTM A500 GR B, Fy=46ksiBOLTSASTM A325NANCHOR BOLTSASTM F1554, UNO.3.STRUCTURAL STEEL SURFACES THAT ARE NOT EXPOSED TO WEATHER SHALL BE LEFT UNPAINTED.4.WELDED JOINTS SHALL CONFORM TO THE PREQUALIFIED JOINT DETAILS AS INDICATED IN THE STRUCTURALWELDING CODE (AWS D1.1) BY THE AMERICAN WELDING SOCIETY. WELDS SHALL BE MADE USING A FILLERMETAL HAVING 70 KSI MINIMUM TENSILE STRENGTH, FILLER METAL SHALL HAVE A MINIMUM CHARPYV-NOTCH TOUGHNESS OF 20 FT-LBS AT 0 DEGREES FAHRENHEIT, UNLESS NOTED OTHERWISE.5.WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WELD SIZE SHALL BEAISC MINIMUM UNLESS A LARGER SIZE IS NOTED.6.WELDING TESTS AND INSPECTIONS, SEE SPECIFICATIONS.7.PAINT PRIME OR GALVANIZE EXPOSED STEEL.POST INSTALLED ANCHORS1.EXPANSION AND SCREW ANCHORS SHALL BE IN CONFORMANCE WITH ACI 318, APPENDIX D AND ICC-ESACCEPTANCE CRITERIA AC 193.2.ANCHORS SHALL BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS.3.HOLES DRILLED INTO REINFORCED CONCRETE SHALL NOT DAMAGE OR CUT EXISTING REINFORCING STEEL.HOLES DRILLED INTO PRE-STRESSED OR POST-TENSIONED CONCRETE SHALL HAVE A CLEARANCE OF 1"MINIMUM FROM TENDONS. LOCATE EXISTING TENDONS USING NON-DESTRUCTIVE METHODS PRIOR TODRILLING.4.EPOXY ADHESIVE USED FOR SETTING DOWELS AND ANCHORS SHALL BE IN CONFORMANCE WITH ACI318APPENDIX D AND ICC-ES ACCEPTANCE CRITERIA AC 308.5.ANCHORS OR DOWELS EMBEDDED IN EPOXY SHALL BE INSTALLED PER THE MANUFACTURER'SINSTRUCTIONS.6.HOLES RECEIVING EPOXIED ANCHORS SHALL BE CLEAN AND FREE OF DUST PRIOR TO APPLYING EPOXYADHESIVE.7.EPOXY ANCHORS SHALL NOT BE INSTALLED IN THE UNDERSIDE OF FLOORS OR ROOFS.8.EXPANSION AND EPOXY ANCHORS SHALL BE AS NOTED ON PLANS.9.APPROVED ANCHORING METHODS ARE TO BE USED FOR ANCHORING EQUIPMENT AS SPECIFIED ONDRAWINGS. CLEAN ENERGY AND ENGINEER SHALL BE NOTIFIED AND CONSULTED FOR ANY REQUIREDCORRECTION METHODS FOR MISPLACED BOLTS OR ANCHORS. TYPEPERIODIC SPECIALINSPECTION1.INSPECTION OF REINFORCINGSTEEL, INCLUDING PRESTRESSINGTENDONS, AND PLACEMENT.2.REINFORCING BAR WELDING:a.VERIFY WELDABILITY OFREINFORCING BARS OTHERTHEN ASTM A 706;b.INSPECT SINGLE-PASS FILLETWELDS, MAXIMUM 516"; ANDc.INSPECT ALL OTHER WELDS.3.INSPECT ANCHORS CAST IN CONCRETE.4.INSPECT ANCHORSPOST-INSTALLED IN HARDENEDCONCRETE MEMBERS.a.ADHESIVE ANCHORSINSTALLED IN HORIZONTALLYOR UPWARDLY INCLINEORIENTATION TO RESISTSUSTAINED TENSION LOADS.b.MECHANICAL ANCHORS ANDADHESIVE ANCHORS NOTDEFINED IN 4.a.5.VERIFYING USE OF REQUIREDDESIGN MIX.6.PRIOR TO CONCRETE PLACEMENT,FABRICATE SPECIMENS FORSTRENGTH TEST, PERFORMSLUMP AND AIR CONTENT TEST,AND DETERMINE THETEMPERATURE OF THECONCRETE.7.INSPECTION OF CONCRETE ANDSHOTCRETE PLACEMENT FORPROPER APPLICATIONTECHNIQUES.8.VERIFY MAINTENANCE OFSPECIFIED CURING TEMPERATUREAND TECHNIQUES.9.INSPECTION OF PRESTRESSEDCONCRETE:a.APPLICATION OFPRESTRESSING FORCES.b.GROUTING OF BONDEDPRESTRESSING TENDONS10.INSPECT ERECTION OF PRECASTCONCRETE MEMBERS.11.VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TOSTRESSING OF TENDONS INPOST-TENSIONED CONCRETE ANDPRIOR TO REMOVAL OF SHORESAND FORMS FROM BEAMS ANDSTRUCTURAL SLABS.12.INSPECT FORMWORK FOR SHAPE,LOCATION AND DIMENSIONS OFTHE CONCRETE MEMBER BEINGFORMED.REFERENCEDSTANDARDNOTE:a.WHERE APPLICABLE, SEE ALSO SECTION 1705.12, SPECIAL INSPECTION FOR SEISMIC RESISTANCE.b.SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH FOR THE ANCHOR ISSUED BY ANAPPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFICREQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGNPROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL TO THE COMMENCEMENT OF THE WORK.IBCREFERENCEaAWS D1.4ACI 318: 26.5.4--ASTM C 172ASTM C 31ACI 318:26.4.5, 26.121908.10ACI 318: 26.4.7-26.4.91908.6, 1908.7,1908.8XACI 318: 26.10.2-XACI 318: CH 19, 26.4.3,26.4.41904.1, 1904.2,1908.2, 1908.3ACI 318: 17.8.2.4XACI 318: 26.9.2.1-XACI 318: CH. 20, 25.2, 25.3,26.5.1-26.5.31908.4ACI 318: 17.8.2CONTINUOUSSPECIAL INSPECTION-XACI 318: 17.8.2TABLE 1705.3 REQUIRED SPECIAL INSPECTION AND TEST OF CONCRETE CONSTRUCTIONXX---X--X-X--XACI 318: 26.4.7-26.4.91908.9---ACI 318: 26.9.2.3X-X-ACI 318: CH. 26.8-ACI 318: 26.10.1(b)-X-VERIFICATION AND INSPECTION TASKCONTINUOUSDURING TASK LISTED1.VERIFY MATERIALS BELOW SHALLOWFOUNDATIONS ARE ADEQUATE TO ACHIEVE THEDESIGN BEARING CAPACITY.2.VERIFY EXCAVATIONS ARE EXTENDED TOPROPER DEPTH AND HAVE REACHED PROPERMATERIAL.3.PERFORM CLASSIFICATION AND TESTING OFCOMPACTED FILL MATERIALS.4.VERIFY USE OF PROPER MATERIALS, DENSITIESAND LIFT THICKNESSES DURING PLACEMENTAND COMPACTION OF COMPACTED FILL.5.PRIOR TO PLACEMENT OF COMPACTED FILL,OBSERVE SUBGRADE AND VERIFY THAT SITEHAS BEEN PREPARED PROPERLY.PERIODICALLYDURING TASK LISTED-X-X-X-X-XTABLE 1705.6 REQUIRED SPECIAL INSPECTION AND TEST OF SOILSVERIFICATION AND INSPECTION TASKCONTINUOUSDURING TASK LISTED1.VERIFY ELEMENT MATERIALS, SIZES AND LENGTHS COMPLYWITH THE REQUIREMENTS.2.DETERMINE CAPACITIES OF TEST ELEMENTS AND CONDUCTADDITIONAL LOAD TESTS, AS REQUIRED.3.OBSERVE DRIVING OPERATIONS AND MAINTAIN COMPLETEAND ACCURATE RECORDS FOR EACH ELEMENT.4.VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRMTYPE AND SIZE OF HAMMER, RECORD NUMBER OF BLOWS PERFOOT OF PENETRATION, DETERMINE REQUIREDPENETRATIONS TO ACHIEVE DESIGN CAPACITY, RECORD TIPAND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TOFOUNDATION ELEMENT.5.FOR STEEL ELEMENTS, PERFORM ADDITIONAL INSPECTIONS INACCORDANCE WITH SECTION 1705.26.FOR CONCRETE ELEMENTS AND CONCRETE-FILLEDELEMENTS, PERFORM ADDITIONAL INSPECTIONS INACCORDANCE WITH SECTION 1705.37.FOR SPECIALTY ELEMENTS, PERFORM ADDITIONALINSPECTIONS AS DETERMINED BY THE REGISTERED DESIGNPROFESSIONAL IN RESPONSIBLE CHARGE.PERIODICALLYDURING TASK LISTEDXXXX----------TABLE 1705.7 REQUIRED SPECIAL INSPECTION AND TEST OF DRIVEN DEEP FOUNDATIONS ELEMENTSIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PBNIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NNNNYYYNNNNNNNYYYYYYYYYNYNC:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\C0.0-COVER SHEET.dwg12/5/202412/6/2024 4:36:57 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 CODE COMPLIANCE TABLES 21330.00PBMLG0.1"IFC SECTION 2308 (IFGC SECTION 413)COMPRESSED NATURAL GAS MOTORFUEL-DISPENSING FACILITIES"SECTIONCODE DESCRIPTIONCOMPLYNOTES2308.3(413.3)LOCATION OF DISPENSING OPERATIONS AND EQUIPMENT.COMPRESSION, STORAGE AND DISPENSING EQUIPMENT SHALL BELOCATED ABOVE GROUND, OUTSIDE. Yes No N/A2308.3.1(413.3.1)"LOCATION ON PROPERTY. COMPRESSION, STORAGE ANDDISPENSING EQUIPMENT SHALL BE INSTALLED AS FOLLOWS:1. NOT BENEATH POWER LINES.2. 10 FT (3048 MM) OR MORE FROM THE NEAREST BUILDING OR LOTLINE THAT COULD BE BUILT ON, PUBLIC STREET, SIDEWALK ORSOURCE OF IGNITION.3. 25 FT (7620 MM) OR MORE FROM THE NEAREST RAIL OF ANYRAILROAD TRACK AND 50 FEET (15 240 MM) OR MORE FROM THENEAREST RAIL OF ANY RAILROAD MAIN TRACK OR ANY RAILROADOR TRANSIT LINE WHERE POWER FOR TRAIN PROPULSION ISPROVIDED BY AN OUTSIDE ELECTRICAL SOURCE, SUCH AS THIRDRAIL OR OVERHEAD CATENARY.4. 50 FT (15,240 MM) OR MORE FROM THE VERTICAL PLANE BELOWTHE NEAREST OVERHEAD WIRE OF A TROLLEY BUS LINE. Yes No N/A2308.4(413.5)PRIVATE FUELING OF MOTOR VEHICLES. SELF-SERVICECNG-DISPENSING SYSTEMS, INCLUDING KEY, CODE AND CARDLOCK DISPENSING SYSTEMS, SHALL BE LIMITED TO THE FILLING OFPERMANENTLY MOUNTED FUEL CONTAINERS ON CNG-POWEREDVEHICLES. Yes No N/A2308.5(413.6)PRESSURE REGULATORS. PRESSURE REGULATORS SHALL BEDESIGNED AND INSTALLED OR PROTECTED SO THAT THEIROPERATION WILL NOT BE AFFECTED BY THE ELEMENTS (FREEZINGRAIN, SLEET, SNOW OR ICE), MUD OR DEBRIS. THE PROTECTION ISALLOWED TO BE AN INTEGRAL PART OF THE REGULATOR. Yes No N/A2308.6(413.7)VALVES. GAS PIPING TO EQUIPMENT SHALL BE PROVIDED WITH AREMOTE, READILY ACCESSIBLE MANUAL SHUTOFF VALVE. Yes No N/AMANUAL BALL VALVE AFTERMETER SET ASSEMBLY2308.7(413.8)EMERGENCY SHUTDOWN CONTROL. AN EMERGENCY SHUTDOWNCONTROL SHALL BE LOCATED WITHIN 75 FEET (22 860 MM) OF, BUTNOT LESS THAN 25 FEET (7620 MM) FROM, DISPENSERS AND SHALLALSO BE PROVIDED IN THE COMPRESSOR AREA. UPON ACTIVATION,THE EMERGENCY SHUTDOWN SYSTEM SHALL AUTOMATICALLYSHUT OFF THE POWER SUPPLY TO THE COMPRESSOR AND CLOSEVALVES BETWEEN THE MAIN GAS SUPPLY AND THE COMPRESSORAND BETWEEN THE STORAGE CONTAINERS AND DISPENSERS. Yes No N/A2308.8.1.1(413.9.1)CLOSED TRANSFER SYSTEM. A DOCUMENTED PROCEDURE THATEXPLAINS THE LOGICAL SEQUENCE FOR DISCHARGINGTHECYLINDER SHALL BE PROVIDED TO THE FIRE CODE OFFICIAL FORREVIEW AND APPROVAL. THE PROCEDURE SHALL INCLUDE WHATACTIONS THE OPERATOR WILL TAKE IN THE EVENT OF ALOW-PRESSURE OR HIGH-PRESSURE NATURAL GAS RELEASEDURING THE DISCHARGING ACTIVITY. A DRAWINGILLUSTRATINGTHE ARRANGEMENT OF PIPING, REGULATORS ANDEQUIPMENT SETTINGS SHALL BE PROVIDED TO THE FIRE CODEOFFICIAL FOR REVIEW AND APPROVAL. THE DRAWING SHALLILLUSTRATE THE PIPING AND REGULATOR ARRANGEMENT ANDSHALL BE SHOWN IN SPATIAL RELATION TO THE LOCATION OF THECOMPRESSOR, STORAGE VESSELS AND EMERGENCY SHUTDOWNDEVICES. Yes No N/ASECTION 2308.3 ONLYAPPLIES TO DEFUELINGOPERATION.2308.8.1.2(413.9.2)ATMOSPHERIC VENTING. ATMOSPHERIC VENTING OF CNG SHALLCOMPLY WITH SECTIONS 2308.8.1.2.1 THROUGH 2308.8.1.2.6. Yes No N/A"2308.8.1.2.1(413.9.2.1)PLANS AND SPECIFICATIONS. A DRAWING ILLUSTRATING THELOCATION OF THE VESSEL SUPPORT, PIPING, THE METHOD OFGROUNDING AND BONDING, AND OTHER REQUIREMENTS SPECIFIEDHEREIN SHALL BE PROVIDED TO THE FIRE CODE OFFICIAL FORREVIEW AND APPROVAL. Yes No N/A"2308.8.1.2.2(413.9.2.2)CYLINDER STABILITY. A METHOD OF RIGIDLY SUPPORTING THEVESSEL DURING THE VENTING OF CNG SHALL BE PROVIDED. THESELECTED METHOD SHALL PROVIDE NOT LESS THAN TWO POINTSOF SUPPORT AND SHALL PREVENT THE HORIZONTAL AND LATERALMOVEMENT OF THE VESSEL. THE SYSTEM SHALL BE DESIGNED TOPREVENT THE MOVEMENT OF THE VESSEL BASED ON THE HIGHESTGASRELEASE VELOCITY THROUGH VALVE ORIFICES AT THEVESSEL’S RATED PRESSURE AND VOLUME. THE STRUCTURE ORAPPURTENANCE SHALL BE CONSTRUCTED OF NONCOMBUSTIBLEMATERIALS. Yes No N/A"2308.8.1.2.3(413.9.2.3) Yes No N/A"2308.8.1.2.4(413.9.2.4)GROUNDING AND BONDING. THE STRUCTURE OR APPURTENANCEUSED FOR SUPPORTING THE CYLINDER SHALL BE GROUNDED INACCORDANCE WITH NFPA 70. THE CYLINDER VALVE SHALL BEBONDED PRIOR TO THE COMMENCEMENT OF VENTINGOPERATIONS. Yes No N/A"2308.8.1.2.5(413.9.2.5)VENT TUBE. A VENT TUBE THAT WILL DIVERT THE GAS FLOW TOATMOSPHERE SHALL BE INSTALLED ON THE CYLINDER PRIOR TOCOMMENCEMENT OF THE VENTING AND PURGING OPERATION. THEVENT TUBE SHALL BE CONSTRUCTED OF PIPE OR TUBINGMATERIALS APPROVED FOR USE WITH CNG IN ACCORDANCE WITHCHAPTER 53. THE VENT TUBE SHALL BE CAPABLE OF DISPERSINGTHE GAS NOT LESS THAN 10 FEET (3048 MM) ABOVE GRADE LEVEL.THE VENT TUBE SHALL NOT BE PROVIDED WITH A RAIN CAP OROTHER FEATURE THAT WOULD LIMIT OR OBSTRUCT THE GAS FLOW.AT THE CONNECTION FITTING OF THE VENT TUBE AND THE CNGCYLINDER, A LISTED BIDIRECTIONAL DETONATION FLAMEARRESTER SHALL BE PROVIDED. Yes No N/A"2308.8.1.2.6(413.9.2.6)SIGNAGE. APPROVED “NO SMOKING” SIGNS COMPLYING WITHSECTION 310 SHALL BE POSTED WITHIN 10 FEET (3048 MM) OF THECYLINDER SUPPORT STRUCTURE OR APPURTENANCE. APPROVEDCYLINDER SHALL BE BONDED SIGNS SHALL BE POSTED ON THECYLINDER SUPPORT STRUCTURE OR APPURTENANCE. Yes No N/A"XXXSEPARATION DISTANCE FOR ATMOSPHERIC VENTING OF CNGTABLE 2308.8.1.2.3151525BuildingsBuilding openingsCNG compressor and storgae vesselsCNG dispensersLot linesPublic waysVehiclesEQUIPMENT OR FEATUREMIN SEPARATION (ft)25252525XXXXXXXXXXX TIME FILL STATION ELEVATIONS (1" = 5')SHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY(N) CALTRANS TYPE KBARRIER RAIL (TYP)(N) ESD POST20'12'(E) LIGHT POLE(N) FIRE EXTINGUISHERSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY60' O.C. TYPSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY60' MAX. O.C. TYPREFER TO PLAN FORREQUIRED BOLLARDPROTECTION(N) ESD POST(N) FIRE EXTINGUISHEREQEQ3'FROM PARKING STRIPINGFROM PARKING STRIPING3'PLAN SOUTH ELEVATION(N) ESD POST(N) FIRE EXTINGUISHERSOUTH ELEVATION (N) COMM PANEL(N) DRYER(N) DUPLEX ANGICOMPRESSOR(N) LIGHT POLE(N) MSA(N) DUPLEX ANGICOMPRESSOR(N) LIGHT POLE(N) MSA(N) MSG(N) DRYERNORTH ELEVATION EAST ELEVATION WEST ELEVATION (N) MSG(N) ANGI MCP(N) LIGHT POLE6' 6' 6' 6'61'61'27(N) MSGNO SMOKINGFLAMMABLE GAS140CNG6'27(N) VENT(N) STORAGE VESSEL12'-6"12'(N) 4" Ø CONCRETEBOLLARDS AT4' O.C., (TYP)(N) TRANSFORMER(N) TRANSFORMER(E) LIGHT POLE3'-6"LUG(N) COM BOX(N) LUG BOXMREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUT HORIZED USE, REPRODUCT ION, PUBLI CATION, DI STRIBUTION OR SAL E IN WHOL E OR I N PART , IS STRICTLY FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PBNTSWSNENOTES1. COLOR IS TO MATCH PANTONE COLOR SYSTEM OR EQUIVALENT 1101 HIGH GLOSS LACQUER ENAMEL OR EQUIVALENT.Feet1050BOLLARD COLOR CHARTPANTONE 3500 CKEY PLANC:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\C0.1-GENERAL ARRANGEMENT AND ELEVATIONS.DWG12/05/202412/6/2024 4:37:08 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 GENERAL ARRANGEMENT & ELEVATIONS FASTFILL 21330.00PBMLC0.1 M(N) MSA(N) FENCE61'27'(N) (2) MAN GATES(N) ANGI DUPLEX 200 HP SKID(N) DOUBLE GATE(N) 23' STORAGE VESSEL(N) PRIORITY PANEL(N) REMOVABLEBOLLARDS(N) BOLLARDS(N) TRANSFORMERBY OTHERS(N) COM BOX(N) 800 A SWITCHGEAR(N) ANGI MOTORCONTROL PANEL(N) 21-6 PSB DRYER(N) LUG BOX(N) DOUBLE GATE13'5'9'9'-9"3'4'-11"8'-6"6'3'3'8'-6"16'-6"9'-9"13'-6"15'-1"25'9'-10"12'10'21'-7"6'6'6'6'-7"3'12'12'-6"3'6'-6"M(N) MSA12'74'61'27'216'(E) LIGHT POLETYPICAL OF 3(E) BLOCK HEATER OUTLET POST TYPICAL OF 8(N) MSA(N) FENCE61'27'(N) (2) MAN GATES(N) ANGI DUPLEX 200 HP SKID(N) DOUBLE GATE(N) 23' STORAGE VESSEL(N) PRIORITY PANEL(N) REMOVABLEBOLLARDS(N) BOLLARDS(N) TRANSFORMERBY OTHERS(N) COM BOX(N) 800 A SWITCHGEAR(N) ANGI MOTORCONTROL PANEL(N) 21-6 PSB DRYER31'39'-7"(N) 800 A SWITCHGEAR(N) LUG BOX(N) DOUBLE GATE(N) BOLLARDS(TYP.)(N) BOLLARDS(TYP.)(N) EQUIPMENT COMPOUND(1)ANGI DUPLEX 200 HP SKID(1) PRIORITY PANEL(1) STORAGE VESSEL(1) PSB 21-6 DRYER(1) SWITCHBOARD(1) COMMUNICATION BOX(N) CHAINLINK FENCE AND GATES(N) BOLLARDS(N) FUELING AREA35 PARKING STALLS17 DUAL-HOSE POSTS1 SINGLE HOSE POST4 ESD POSTS(E)ENTRANCE/EXIT(E)ENTRANCE/EXITPROPOSED LOCATIONOF SCALEOVERALL SITE PLAN (1" = 30')REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PB C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\C1.0-SITE PLAN.dwg12/06/202412/6/2024 4:37:21 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 SITE PLAN 21330.00PBMLC1.01. ALL TRAFFIC CONTROL SIGNS SHALL BE FABRICATED AS SHOWN IN THE NATIONAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS EXCEPT AS NOTED ON THE PLANS.2. ALL CURB RADII ARE SHOWN TO THE FACE OF CURB AND ALL DIMENSIONS ARE TO FACE OF CURB, WHERE APPLICABLE, UNLESS OTHERWISE NOTED.3. ALL 3' GATES SHALL BE SPACED TO OPEN FREELY AND MISS ANY BOLLARDS WHEN OPENED4. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY CORNERS.5. CONTRACTOR SHALL MATCH EXISTING PAVEMENT AND CURB & GUTTER IN GRADE, SIZE, TYPE, ANDALIGNMENT AT ADJACENT ROADWAYS/ DRIVEWAYS.6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO DAMAGE TO ANY EXISTING IMPROVEMENTS DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC.REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS.7. ALL PAVEMENT PAINT SHALL BE SHERWIN WILLIAMS "PROMAR TRAFFIC MARKING", WHITE ON ASPHALT,YELLOW ON CONCRETE. PAINT SHALL BE APPLIED IN TWO (2) COATS TO A CLEAN, DRY SURFACE USINGTEMPLATE OR STRIPING MACHINE. STRIPES SHALL BE 4" WIDE UNLESS OTHERWISE NOTED.GENERAL NOTESWSNE03060901" = 30'15ENLARGED SITE PLAN (1" = 8') PART 3- PIPING AND EQUIPMENT INSTALLATION3.1 GENERALA.THIS SECTION OF THE SPECIFICATIONS, TOGETHER WITH ANY SPECIALCONDITIONS AND THE CONSTRUCTION DRAWINGS, COVER THE WORK OFFABRICATING, INSTALLING, AND TESTING THE PIPING SYSTEMS REQUIRED FORTHIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FORUNDERSTANDING THE INTENT OF THE CONSTRUCTION DRAWINGS ANDPROVIDING A COMPLETE WORKING SYSTEM. ANY OMISSIONS ORDISCREPANCIES AMONG THE DRAWINGS, SPECIFICATIONS, AND OTHERCONTRACT PROVISIONS SHALL BE BROUGHT TO THE ATTENTION OF THEENGINEER FOR CLARIFICATION.B.PIPING SYSTEMS COVERED BY THESE SPECIFICATIONS INCLUDE ALLUNDERGROUND AND ABOVEGROUND PIPING, INCLUDING VENTS AND ALLSTAINLESS STEEL PRESSURE TUBING.C.CONSTRUCTION AND INSTALLATION SHALL CONFORM TO THE FOLLOWING CODESAND STANDARDS AS ADOPTED OR AMENDED BY THE AUTHORITIES HAVINGJURISDICTION.ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE)B31.3 - PROCESS PIPINGB16.5 - STEEL PIPE FITTING AND FLANGESINTERNATIONAL FUEL GAS CODEINTERNATIONAL FIRE CODENFPA (NATIONAL FIRE PROTECTION ASSOCIATION) 52 - VEHICULAR GASEOUS FUEL SYSTEMS CODED.THE CONTRACTOR SHALL INSPECT THE SITE FOR, AND VERIFY THE LOCATIONSOF ANY EXISTING SUBSTRUCTURES AND UNDERGROUND UTILITIES, AND SHALLNOT RELY ON THESE PLANS OR DRAWINGS ALONE. THE CONTRACTOR SHALLTAKE ALL MEASURES NECESSARY TO PROTECT EXISTING UNDERGROUNDUTILITIES AND SUBSTRUCTURES. THE CONTRACTOR SHALL BE RESPONSIBLEFOR ANY DAMAGE DURING CONSTRUCTION, IRRESPECTIVE OF WHETHER OR NOTTHE DAMAGED UTILITY WAS SHOWN ON THE DRAWINGS.E.THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY OF ANY DAMAGE TO ANYEXISTING UNDERGROUND WET OR DRY UTILITIES, OR TO ANY CONDUITSDAMAGED DURING TRENCHING, AND SHALL REPAIR THEM IMMEDIATELYACCORDING TO THE STANDARDS OF THE AGENCY HAVING JURISDICTION OVERTHEM.3.2PIPING DESIGN CONDITIONSA.THIS CNG FUELING STATION HAS BEEN DESIGNED FOR THEFOLLOWING PRESSURE AND TEMPERATURE CONDITIONS:COMPRESSOR SUCTION:OPERATING PRESSURE:SEE P&IDDESIGN PRESSURE:200 PSIGDESIGN TEMPERATURE:-20°F TO 130°FCOMPRESSOR DISCHARGE:OPERATING PRESSURE:4,500 PSIGDESIGN PRESSURE:5,000 PSIGDESIGN TEMPERATURE:-20°F TO 130°F3.3 ACCEPTABLE PRODUCT MANUFACTURING LOCATIONSA.GAS PIPING MATERIALS (PIPE, STAINLESS STEEL TUBE, GAS VALVES, FITTINGSAND INSTRUMENTATION) SHALL BE MANUFACTURED IN ANY OF THE FOLLOWINGREGIONS: NORTH AMERICA, THE EUROPEAN UNION, SOUTH KOREA, JAPAN, ANDREPUBLIC OF CHINA (TAIWAN).B.GAS PIPING MATERIALS MANUFACTURED IN ANY REGION OUTSIDE THOSE LISTEDABOVE SHALL NOT BE USED OR INSTALLED.3.4PIPE SPECIFICATIONSA.ALL UNDERGROUND CARBON STEEL PIPE SHALL BE PROPERLY CLEANED ANDEPOXY-COATED PRIOR TO BURIAL, ELECTRICALLY INSULATED FROMABOVEGROUND PIPING OR STRUCTURES, AND CATHODICALLY PROTECTED INACCORDANCE WITH THIS SPECIFICATION AND CURRENT INDUSTRY STANDARDS.B.ALL CARBON STEEL PIPE MATERIAL CONVEYING NATURAL GAS SHALL BESEAMLESS ASTM A106, GRADE B MATERIAL. PIPE FITTINGS SHALL BE USED ASFOLLOWS.1.SCHEDULE 40 PIPE SHALL BE JOINED USING WROUGHT STEEL SCHEDULE 40ASTM A234 GR. WPB BUTT WELDING FITTINGS. FLANGED FITTINGS FORSCHEDULE 40 PIPE SHALL BE RAISED-FACE WELDNECK-TYPE, ANSI B16.5,EITHER CLASS 150 OR CLASS 300, PER THE DRAWINGS, USING ASTM A105FORGED CARBON STEEL.2.SCHEDULE 80 PIPE SHALL BE JOINED USING WROUGHT STEEL SCHEDULE80 ASTM A234 BUTT WELDING FITTINGS. FLANGED FITTINGS FOR SCHEDULE 80PIPE SHALL BE RAISED-FACE WELDNECK-TYPE, ANSI B16.5, EITHER CLASS 300OR CLASS 600, PER THE DRAWINGS, USING ASTM A105 FORGED CARBONSTEEL.3.5STAINLESS STEEL TUBINGA.STAINLESS STEEL PRESSURE TUBING SHALL BE SEAMLESS ANDBRIGHT-ANNEALED, MANUFACTURED AND TESTED ACCORDING TO ASTM A269,USING MATERIAL DUAL-CERTIFIED AS TYPE TP316 AND TP316L. TUBE SHALL BECOLD-FINISHED AND FREE OF SCRATCHES. UPON REQUEST, THE TUBE SUPPLIERSHALL FURNISH MILL CERTIFICATES DOCUMENTING COMPLIANCE WITH THISSPECIFICATION.B.ALL BENDS SHALL BE MADE USING TUBING BENDERS, EXCEPT WHEN TUBE ISPULLED UNDERGROUND THROUGH A SLEEVE. BEND ANGLE SHOULD BE 90°WHENEVER POSSIBLE. TUBING SHALL BE ROUTED PARALLEL WITH THE VERTICALAND HORIZONTAL AXES OF THE EQUIPMENT. UNDERGROUND TUBING SHALL BECONTINUOUS, USING COILED PRODUCT WHEREVER FEASIBLE, IN ORDER TOMINIMIZE TUBE WELDING. STRAIGHTEN COILED TUBING FOR INSTALLATIONUSING EQUIPMENT AND METHODS APPROVED BY THE TUBE MANUFACTURER.ROUTE UNDERGROUND TUBING COMPLETELY WITHIN A WATERTIGHT PVC, HDPEOR ENT SLEEVE. UNDERGROUND TUBE SECTIONS SHALL BE JOINED BY ORBITALWELDING. AT NO TIME SHALL MECHANICAL FITTINGS BE PLACED UNDERGROUND.C.ALL ABOVEGROUND TUBING SHALL BE FABRICATED USING STRAIGHT STICKS, ORUPON APPROVAL, COILED TUBE STRAIGHTENED USING SUITABLE EQUIPMENT.ABOVEGROUND TUBE SHALL BE ANCHORED PER CODE TO PREVENT BENDING OREXCESSIVE VIBRATION. RESILIENT TUBING ANCHORS, SUCH AS PARKERPARKLAMP OR UNISTRUT CUSH-A-CLAMP, SHALL BE USED. TUBING SUPPORTSSHALL BE SPACED OUT AND NOT EXCEED 7 FEET APART PLACEMENT.D.REQUIRED TUBE WALL THICKNESS FOR CNG SERVICE (INCHES):OUTSIDE DIA. [IN.] WALL THICKNESS [IN.]BASIS1/40.049AVG. WALL THK.3/80.065AVG. WALL THK.1/20.083AVG. WALL THK.3/40.109 (COIL)AVG. WALL THK.3/40.109AVG. WALL THK.10.120MIN. WALL THK.10.120 (COIL)MIN. WALL THK.10.134AVG. WALL THK.*10.139 (COIL)AVG. WALL THK.*NOTE: COILED TUBING FOR UNDERGROUND ROUTING (ALL SIZES) PREFERREDE.COMPRESSION TUBE FITTINGS SHALL BE TYPE 316 STAINLESS STEEL,DOUBLE-FERRULE, WITH A MAWP OF NOT LESS THAN 5,500 PSIG. ACCEPTABLEPRODUCTS ARE LISTED BELOW. NO OTHER PRODUCTS MAY BE USED WITHOUTPRIOR APPROVAL BY THE ENGINEER. ALL COMPRESSION FITTINGS FURNISHEDBY THE THE CONTRACTOR SHALL BE CATALOGUED PRODUCTS OF A SINGLEMANUFACTURER.1.SWAGELOK34" AND 1" COMPRESSION TUBE FITTINGS SHALL BE HYDRAULICALLY SWAGED.* HEAVY WALL TUBE FITTINGS (0.134 AVG WALL THK AND ABOVE) SHALL BEPARKER "SEAL-LOK" SAE J1453 O-RING FACE SEAL-TYPE.ALL TUBING SHALL BE MECHANICALLY FLARED USING A PARKER PARFLANGEFLARING SYSTEM. THE CORRECT DIE AND PIN SETS SHALL BE USED FOR EACHTUBING SIZE. FITTINGS SHALL BE ZINC PLATED CARBON STEEL WITH A MINIMUMDYNAMIC PRESSURE RATING OF 5000 PSIG.BRAZED SLEEVES ARE NOTPERMITTED.F.BALL VALVES: HABONIM, SSP, OR SWAGELOK, 316 STAINLESS STEEL BODY ANDTRIM, SUITABLE FOR COMPRESSED NATURAL GAS SERVICE.G.NEEDLE VALVES: ANDERSON GREENWOOD, SWAGELOK OR SSP, 316 STAINLESSSTEEL BODY AND TRIM, SUITABLE FOR COMPRESSED NATURAL GAS SERVICE,5500 PSI, OR APPROVED EQUAL.H.SLEEVE (FOR BURIED TUBING): PVC CONDUIT, FLEXIBLE ENT CONDUIT, OR PEP(POLYETHYLENE) PIPE, SIZED AS SHOWN ON THE DRAWINGS.3.5POLYETHYLENE (PEP) PIPE: DR 7, 9, OR 11A.POLYETHYLENE PIPE TO BE DESIGNED IN ACCORDANCE WITH PPI HANDBOOK OFPE PIPE, 2 ND EDITION, RATED FOR NOT LESS THAN THE MAXIMUM PRESSURE OFTHE SUPPLY SYSTEM, AND NOT USED WITH PRESSURES GREATER THAN 125PSIG.B.PEP SHALL BE WARRANTED FOR NATURAL GAS DISTRIBUTION ANDMANUFACTURED ACCORDING TO PPI DESIGNATION PE 4710 AND ASTM D 2513; CPCHEM YELLOW STRIPE 8300 OR APPROVED EQUAL. PEP SHALL BE JOINED USINGBUTT FUSION IN COMPLIANCE WITH PIPE MANUFACTURER'S INSTALLATIONMANUAL.C.A COATED COPPER CLAD STEEL TRACER WIRE (#12 GAUGE OR LARGER) SHALLBE INSTALLED WITH ALL BURIED PEP. TRACER WIRE TO BE LAID WITHIN 6"DIRECTLY ABOVE THE PEP WHERE PRACTICAL. WRAPPING OF THE TRACER WIREAROUND PEP IS PROHIBITED.1.CONTRACTOR TO USE AS FEW CONNECTIONS AS POSSIBLE2.WIRE CONNECTIONS TO BE MADE USING CSA CERTIFIED PRESSURE TYPE,DIRECT BURY (PER UL 486D) MECHANICAL CONNECTORS3.A MINIMUM 5' OF ADDITIONAL TRACER WIRE TO BE COILED, BURIED, ANDTERMINATED AT THE ENDS OF UNDERGROUND PEP4.TRACER WIRE TO FOLLOW PEP ABOVEGROUND USING TRACER WIRE CLAMPSALONG EACH ANODELESS RISER3.6INSTRUMENTATION AND SPECIALTY ITEMSA. PRESSURE GAUGES: LIQUID FILLED, RANGE TO BE 150-200% OF MAXIMUMPRESSURE EXPECTED, TO BE MOUNTED ON BLEED/BLOCK VALVE UNLESSOTHERWISE SPECIFIED.B. ESD VALVE (AV-1): FLANGED, FIRE-RATED BALL VALVE WITH ACTUATOR,FACTORY ASSEMBLED, PILOT-GAS-TO-OPEN, SPRING CLOSED.C. FIRE EXTINGUISHER(S): AMEREX CORPORATION, COMPLIANCE FLOW MODEL #592WITH A 4A:80B:C MINIMUM RATING, CURRENTLY CERTIFIED AND TAGGED WITHLOCAL INSPECTION TAG, MOUNTED IN A LOCKABLE WEATHER-PROOFENCLOSURE, UNLESS OTHERWISE SPECIFIED.3.7 INSTALLATIONA.THE CONTRACTOR SHALL USE ONLY TUBING INSTALLERS WHO ARE TRAINED ANDCERTIFIED BY THE TUBE FITTING MANUFACTURER TO INSTALL TUBE ANDASSOCIATED FITTINGS PER THE MANUFACTURER'S INSTALLATIONINSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE PROOF OF CERTIFICATIONTO CLEAN ENERGY'S PROJECT MANAGER PRIOR TO COMMENCING WORK.B.ALL PIPING SHALL BE INSTALLED NEATLY AND IN A WORKMAN-LIKE MANNER. ALLPIPING SHALL BE PROPERLY ANCHORED, SUPPORTED, OR PITCHED ACCORDINGTO THESE CONSTRUCTION SPECIFICATIONS AND THE DRAWINGS, OR IN THEABSENCE OF SPECIFIC DETAIL, PER DIRECTION OF THE ENGINEER. ALL PIPINGSHALL RUN TRUE TO VERTICAL AND HORIZONTAL AXES OF THE EQUIPMENT ANDFACILITY. THE CONTRACTOR SHALL PROVE ALL PIPING IS FREE OF OBSTRUCTIONAND DEBRIS, PRIOR TO CONNECTING TO ABOVEGROUND EQUIPMENT. AT NO TIMESHALL ANY GAS OR CNG PIPING BE CONSTRUCTED OVERHEAD UNLESSOTHERWISE NOTED ON THESE PLANS, OR AS APPROVED BY THE ENGINEER.C. ALL VALVES SHALL BE INSTALLED NEATLY AND IN A WORKMAN-LIKE MANNER.ALL VALVES SHALL BE ACCESSIBLE FOR EASY OPERATION AND MAINTENANCE.D.CLEAN THE INTERNAL PIPE SURFACE OVER ITS ENTIRE LENGTH, REMOVING ALLDIRT, DEBRIS, AND LOOSE CORROSION OR SCALE, BEFORE THE PIPE IS FITTEDOR ALIGNED FOR WELDING. OPEN ENDS OF ALL PIPE RUNS SHALL BE KEPTSECURELY CLOSED TO PREVENT THE ENTRANCE OF DIRT, DEBRIS, WATER, ORANIMALS INTO THE PIPE. ALL END CLOSURES SHALL BE APPROVED BY CLEANENERGY.E.ALL CARBON STEEL PIPE WELDS SHALL INCLUDE A TIG (TUNGSTEN INERT GAS)ROOT. THE FILLER PASSES SHALL BE STICK SHIELDED METAL ARC WELDING(SMAW).F.TUBE AND PIPE CONNECTIONS TO ALL EQUIPMENT REQUIRING MAINTENANCEACCESS SHALL BE REMAKEABLE USING FLANGED, THREADED OR SWAGEDFITTINGS. WELDED OR OTHER PERMANENT FITTINGS SHALL NOT BE USED ATTHESE LOCATIONS.3.8FABRICATION, HANDLING AND STORAGEA.ALL VALVES, PRE-FABRICATED PIPING, FLANGES, ETC. SHALL BE PROTECTEDDURING STORAGE, TRANSIT, AND ERECTION WITH PLYWOOD COVERS 1/2" THICK,AND SECURED WITH BOLTS FOR CLOSURE, OR EQUAL. SHOP FABRICATEDSECTIONS SHALL NOT BE LEFT WITH OPEN ENDS EXPOSED TO ATMOSPHEREDURING STORAGE, TRANSIT, OR ERECTION. SUITABLE CAPS SHALL BE PROVIDEDON ALL MECHANICAL CONNECTIONS.B.TEMPORARY SUPPORTS SHALL BE PROVIDED AND INSTALLED DURING ERECTIONTO AVOID OVER-STRESSING PIPING OR EQUIPMENT TO WHICH PIPING ISCONNECTED.3.9TRENCHESA.SEE GENERAL NOTE ON SHEET G-0.13.10WELDINGA.WELDING PROCEDURES SHALL BE IN ACCORDANCE WITH ANSI B31.3, "PROCESSPIPING, CHAPTER V, "FABRICATION, ASSEMBLY, AND ERECTION".B.THE CONTRACTOR SHALL SUBMIT WELDING PROCEDURE SPECIFICATIONS (WPS)TO THE ENGINEER FOR APPROVAL, PRIOR TO STARTING WORK. EACH WPSSHALL BE IDENTIFIED WITH THE THE CONTRACTOR'S NAME AND IDENTIFICATIONNUMBER. WELDING SHALL NOT COMMENCE UNTIL THE PROCEDURE ISAPPROVED.C.EACH WELDER MUST PROVIDE A COMPLETE PROCEDURE QUALIFICATIONRECORD (PQR) SIGNED BY AN AUTHORIZED OFFICER OF THE TESTINGLABORATORY OR DEPUTY WELDING INSPECTOR AND THE CONTRACTOR'SAUTHORIZED REPRESENTATIVE. PREVIOUS WELDING CERTIFICATION (ACTIVECERTIFICATION WITHIN THE PREVIOUS SIX (6) MONTHS) MAY BE SUBMITTED FORAPPROVAL.D.WELD TESTS SHALL BE PERFORMED PER ANSI B31.3, AND APPROVED BY THEENGINEER.1.NOT LESS THAN 5% OF ALL BUTT WELDS BY EACH WELDER PERFORMINGWORK AT THE SITE SHALL BE RANDOMLY SELECTED AND RADIOGRAPHED.2.RADIOGRAPHS SHALL BE EVALUATED BY A CERTIFIED RADIOGRAPHICINTERPRETER. THE RADIOGRAPHIC INTERPRETER'S WRITTEN REPORT OF HISEVALUATION SHALL BE SUBMITTED TO CLEAN ENERGY BEFORE THE WELDSARE BURIED.3.11PIPE COATING AND PAINTINGA.ALL UNDERGROUND CARBON STEEL PIPE SHALL BE FACTORY-COATED WITHFUSION-BONDED EPOXY (FBE), TO MEET ALL CODE REQUIREMENTS INCLUDINGTHOSE ESTABLISHED BY LOCAL UTILITY COMPANY OR JURISDICTIONS.1.FACTORY COATING SHALL BE DESIGNED TO RESIST DISBONDMENT WHENEXPOSED TO CATHODIC PROTECTION CURRENTS.2.FACTORY COATING SHALL BE 3M SCOTCHKOTE FUSION-BONDED EPOXYCOATING 6233P. NO OTHER COATING IS ACCEPTABLE WITHOUT PRIORAPPROVAL BY THE ENGINEERB.WELDED PIPE JOINTS AND FITTINGS FOR UNDERGROUND PIPING SYSTEMSSHALL BE FIELD-COATED IN ACCORDANCE WITH CURRENT CODES AND THECOATING MANUFACTURER'S APPLICATION MANUAL. FIELD COATING SHALL BEAPPROVED BY THE DESIGNATED INSPECTOR PRIOR TO BURIAL. FIELD COATINGSHALL BE 3M SCOTCHKOTE LIQUID EPOXY COATING 323P.C.PRIOR TO BURIAL, COATED PIPE SHALL BE TESTED ALONG ITS ENTIRE LENGTHWITH AN ELECTRIC HOLIDAY DETECTOR. ANY HOLIDAYS DETECTED SHALL BEREPAIRED PER "B" ABOVE FOR 6" ON EITHER SIDE OF THE HOLIDAY. AFTER ALLHOLIDAYS ARE REPAIRED, THE ENTIRE LENGTH OF PIPE SHALL BE TESTED AGAIN.D.EXPOSED PIPING, VALVES, FITTINGS, FLANGES AND RELATED MATERIAL SHALL BEPRIMED AND PAINTED WITH AN INDUSTRIAL MAINTENANCE COATING, INACCORDANCE WITH THE PAINT MANUFACTURER'S INSTRUCTION MANUAL.PRIMER SHALL BE DEVOE DEVPRIME 1407, AND FINISH , DEVCRYL 1449. FINISHCOLOR SHALL BE SAFETY YELLOW. AT UNDERGROUND PIPE RISERS, EPOXYCOATING SHALL EXTEND A MINIMUM OF 2 INCHES ABOVE THE FINISHED GROUNDSURFACE.3.12 CATHODIC PROTECTIONA.ALL BURIED STEEL PORTIONS OF THE PIPING SYSTEM SHALL BE ELECTRICALLYISOLATED (USING DIELECTRIC FITTINGS) AND CATHODICALLY PROTECTED INACCORDANCE WITH CURRENT CODES AND NACE INTERNATIONAL STANDARDRP0169, CURRENT EDITION TO INSURE A -850 MILLIVOLT PIPE-TO-SOIL POTENTIALFOR A MINIMUM OF 30 YEARS. SOIL RESISTIVITY TEST SHALL BE THERESPONSIBILITY OF THE CONTRACTOR.B.THE CONTRACTOR SHALL FURNISH ALL PERMANENT MATERIALS FOR TESTLEADS, INCLUDING WIRE, CONDUIT AND FITTINGS, TERMINAL POST, TERMINALUNITS, CAD WELD THERMITE CARTRIDGES, ETC. PER INDUSTRY ACCEPTEDPRACTICES.C.ELECTRICAL TEST LEADS SHALL BE TERMINATED IN A FRAME AND COVERED ATFINISHED GRADE.3.13 PNEUMATIC PRESSURE TESTA.WHEN ASSEMBLY (WELDED OR MECHANICAL) OF A GAS PIPING OR TUBINGSYSTEM IS COMPLETE, CLEANED AND PURGED OF ALL CONSTRUCTION ANDASSEMBLY DEBRIS, A PNEUMATIC PRESSURE TEST SHALL BE PERFORMED INACCORDANCE WITH ASME/ANSI B31.3 (U.S) OR CSA B51/B149.1 (CANADA). THECONTRACTOR SHALL NOTIFY CLEAN ENERGY'S PROJECT MANAGER THAT A TESTIS SCHEDULED, NOT LESS THAN 2 BUSINESS DAYS BEFORE THE TEST ISSCHEDULED TO BEGIN.B.AT NO TIME SHALL THE TUBING ASSEMBLY BE HYDROSTATICALLY TESTED, NOEXCEPTIONS.C. IF COLD WEATHER LIMITS ACHIEVABLE TEST PRESSURES, THE CONTRACTORSHALL SUBMIT AN ALTERNATIVE COLD WEATHER PRESSURE TEST PLAN TOCLEAN ENERGY FOR REVIEW.D.REMOVE ALL PRESSURE SENSITIVE DEVICES AND EQUIPMENT NOT RATED TOWITHSTAND FINAL TEST PRESSURE, BEFORE PNEUMATIC PRESSURE TEST.E.CONNECT A SOURCE OF HIGH-PRESSURE GAS WITH APPROPRIATE REGULATOR,GAUGES, VALVES, SAFETY RELIEF VALVE, AND FITTINGS TO ONE END OF THESYSTEM TO ALLOW SYSTEM TO BE SAFELY PRESSURIZED AND DEPRESSURIZED.DRY AIR OR NITROGEN SHALL BE USED FOR THE LOW PRESSURE PIPING(COMPRESSOR SUCTION). NITROGEN SHALL BE USED FOR THE HIGH PRESSURETUBING (COMPRESSOR DISCHARGE).3.14 PURGING AND PRESSURIZINGA.ALL PURGING AND PRESSURIZING SHALL BE PERFORMED BY THE CONTRACTORAND OBSERVED BY THE ENGINEER OR THE ENGINEER'S DESIGNATEDREPRESENTATIVE. THE ESD SYSTEM SHALL BE OPERATIONAL BEFORE THEPIPING SYSTEM IS PRESSURIZED WITH NATURAL GAS. NATURAL GAS SHALL NOTBE INTRODUCED INTO THE SYSTEM WITHOUT PRIOR AUTHORIZATION BY CLEANENERGY'S CONSTRUCTION MANAGER. ALL AIR SHALL BE PURGED FROM THEENTIRE SYSTEM TO THE SATISFACTION OF CLEAN ENERGY'S CONSTRUCTIONMANAGER, AND IN ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'SINSTRUCTIONS, BEFORE THE SYSTEM MAY BE PRESSURIZED.B.ALL FABRICATION, WELD TESTING, PRESSURE TESTING AND WORK REQUIRINGFLAME OR SPARKING DEVICES SHALL BE COMPLETED BEFORE INTRODUCINGNATURAL GAS TO ANY PIPING SYSTEM.C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\P0.0 PIPING NOTES CA.dwg12/05/202412/6/2024 4:37:24 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING NOTES 21330.00PBMLP0.0REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PB BBV1GENERAL NOTES:1.EQUIPMENT INSIDE THE DASHED LINE IS PART OF THE MANUFACTURER'S FACTORY ASSEMBLY PROVIDEDBY CLEAN ENERGY.2.CLEAR SPACE OF AT LEAST 3 FEET SHALL BE PROVIDED FOR ACCESS TO ALL VALVES AND FITTINGS OFMULTIPLE GROUPS OF CONTAINERS.3.EMERGENCY SHUT-OFF DISCONNECT WILL DISCONNECT ELECTRICAL POWER AND STOP DISPENSINGOPERATIONS.4.SELF CLOSING VALVES ON THE INLET OF THE COMPRESSORS SHALL SHUT OFF THE GAS SUPPLY TO THECOMPRESSOR WHEN ONE OF THE FOLLOWING OCCURS:4.1.AN EMERGENCY SHUTDOWN DEVICE IS ACTIVATED.4.2.A POWER FAILURE OCCURS.4.3.THE POWER TO THE COMPRESSOR IS SWITCHED TO THE OFF POSITION .5.PROVIDE AN OVER-PRESSURE PROTECTION DEVICE IN THE FUELING TRANSFER SYSTEM TO PREVENTOVERPRESSURE IN THE VEHICLE PER 2013 NFPA 52.6.CONTROL CIRCUIT SHALL BE ARRANGED SO THAT, WHEN AN EMERGENCY SHUTDOWN DEVICE ISACTIVATED OR ELECTRICAL POWER IS CUT OFF, SYSTEMS THAT SHUT DOWN SHALL REMAIN DOWN UNTILMANUALLY ACTIVATED OR RESET AFTER A SAFE CONDITION IS RESTORED PER 2013 NFPA 52.7.PROVIDE CONNECTION FOR NATURAL GAS GENERATOR FUEL SUPPLY.8.IF MSA OUTLET PRESSURE EXCEEDS 150PSIG PLASTIC PIPE CANNOT BE USED. PLEASE CONTACT CEENGINEERING TO DETERMINE AN APPROVED SUBSTITUTE.9.ITEMS SHOWN IN GRAY REPRESENT FUTURE WORK.10.CAP OUTLET OF SS TUBE IN PHASE 1. INSTALL BV-4 IN PHASE 2.IS-16"L. O.BV-86"1PI1PIBUFFER AND ESD VALVE PANEL METER SETASSEMBLY(BY UTILITY)PV-1TYPA.G.6" FLANGEDANODELESSRISERU.G.A.G.U.G.A.G.U.G.A.G.U.G.A.G.U.G.6-G-CS 1"1PINATURAL GAS DRYERVTA200 PSIG6"6"6"6"4"6-G-CS4-G-HDPE4-G-HDPE1PI1"A.G.U.G.DESIGN SYSTEM PERFORMANCE(SEE NOTE 8)MSA OUTLET PRESSURE[PSIG]FLOW RATE[SCF/MIN]15 Guaranteed676A.G.U.G.BV-52"CL 150, 2" FPT PLUG IN 2"THREADED CS UNION(SEE NOTE 7)4"X2"THREAD-O-LET6-G-CS2-G-CS 6"4"4"CL1503"3"3"3"CL1503"3"3"3"1"PI2A.G.U.G.2" ENT CONDUITU.G.1-CNG-SSTDRAIN 1"1"TIME-FILLPOST3/8"FP-18TIME-FILLPOST3/8"FP-01L.C.BV-41"3/8-CNG-SST(TYP)FILL NOZZLE: STAUBLINGV1 CMV08/02 WITH HOLDER (TYP)INLINE HOSE BREAKAWAY FITTING24' LONG, 1/4" CNG FILL HOSEASSEMBLY SYNFLEX OR EQUALWITH SPIRAL WRAP (TYP)4"X4"X3/16" STEEL TUBEPRIME AND PAINTED YELLOWHOSE RETRACTOR (TYP)CF-1TIME-FILLPOST3/8"FP-02DUAL HOSEFUEL POST ASSY. (TYP 17)1-CNG-SST4-G-HDPE1-CNG-SST4-G-HDPEBBV1TYP4" ANODELESSRISER W/ 4" RFFA.G.4-G-CS4-G-CS4" ANODELESSRISER W/ 4" RFF1"X1/2" REDUCING TEE3" VENT WITHWIRE MESH ENDS3-V-CS2 3/8" WEEPHOLE3"3"SEE NOTE 1(TYP FOR ALL DASHED RECTANGLES)1-V-CS2DV5,000 PSIGPSVDV4,500 PSIG3/4"(N) CNG STORAGEL.O.1" CL3000THREADEDCS UNION(TYP 3)10,000 SCF(N) BUFFER STORAGE VESSELS3/4-CNG-SSTPR-115 PSIGSET @3"PR-115 PSIGSET @3"SUPPLIED BY ANGISHIPPED LOOSE1-CNG-SSTSUPPLIED BY ANGISHIPPED LOOSEDUPLEX CNG COMPRESSOR SKID A (MANUFACTURED BY ANGI)VTAHP200279-338SCFM1"X3/4"5,200 PSIGPRV500 PSIG935 PSIG2,500 PSIGVTAHP2001"X3/4"5,200 PSIGPRV500 PSIG935 PSIG2,500 PSIGPSIG10-15279-338SCFMPSIG10-15DRAIN 1"1"CF-1100 PSIG115 PSIG100 PSIG115 PSIGSINGLE HOSEFUEL POST ASSY.1-CNG-SST1"x3/4"4"x3"4"x3"PR-1(BY CE)PR-1(BY CE)REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUT HORIZED USE, REPRODUCT ION, PUBLI CATION, DI STRIBUTION OR SAL E IN WHOL E OR I N PART , IS STRICTLY FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PB C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\P1.0-P&ID DIAGRAM.dwg12/6/202412/6/2024 4:37:40 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING & INSTRUMENTATION DIAGRAM 21330.00PBMLP1.0 EQUIPMENT SCHEDULEITEM NOMARKQTY.DESCRIPTIONMFR.MODEL NO.MAWP[PSIG]SERVICEPRESSURE[PSIG]SIZE OR CAPACITY11GAS DRYERPSB21-6200156" INLET & OUTLET2SKID A1TWIN CNG COMPRESSOR SKIDANGI(ARIEL)ARIEL: JGQ/2-4 STAGE185 (INLET)5,000 (OUTLET)16 (INLET)4,500 (OUTLET)2 x 200 HP3CF-12SINGLE COALESCING FILTERASSY.FILTER: PARKERFILTER RACK: CECJN4C-4CN5067725,0004,5001" INLET & OUTLET4V-11CNG STORAGE VESSELCPI-5,5004,500(1) 20"OD X 23' L, 3/4" NPT5-1BUFFER/ESD VALVE PANELANGI-5,0004,5001", 1 INLET, 2 OUTLETS2,500 SCF/MIN MAX (EST.)6FP 11FUEL POSTW/ (1) FUEL HOSE ASSY.CEC5110294,5004,500SINGLE SIDE FUEL POST24FT HOSE LENGTH(1) 1/4" FILL x 1/4" VENT HOSEPARKER & OPW BREAKAWAYSSTAUBLI NOZZLE7FP 2-1817FUEL POSTW/ (2) FUEL HOSE ASSY.CEC5110314,5004,500SINGLE SIDE FUEL POST24FT HOSE LENGTH(1) 1/4" FILL x 1/4" VENT HOSEPARKER & OPW BREAKAWAYSSTAUBLI NOZZLEPIPE AND TUBING SCHEDULEMARKSIZEBASISSCHWALL THK[IN]MATERIALSPECIFICATIONMAWP[PSIG]SERVICEPRESSURE[PSIG]SERVICETEMP.[°F]NOTE1-V-SST1"OD316 SS0.120316 SSASTM A2135,2800-40-149.120" MIN. WALL SEAMLESS TUBE1-V-CS21"NPS800.179CSASTM A106B3,4700-3,00030-130SEAMLESS PIPE2-V-CS22"NPS800.218CSASTM A106B2,2100-1,00030-130SEAMLESS PIPE3-V-CS23"NPS800.300CSASTM A106B2,3600-1,00030-130SEAMLESS PIPE2-G-CS2"NPS400.154CSASTM A106B1,2032030-110SEAMLESS PIPE3-G-CS3"NPS400.216CSASTM A106B1,460125-15030-110SEAMLESS PIPE4-G-CS4"NPS400.237CSASTM A106B1,3002030-110SEAMLESS PIPE6-G-CS6"NPS400.280CSASTM A106B1,1002030-110SEAMLESS PIPE3-G-HDPE3"NPSSDR 70.500HDPEASTM D2513150125-14050-70HDPE, PE47104-G-HDPE4"NPSDR 110.409PEPASTM D25131002050-70HDPE, PE47106-G-HDPE6"NPSDR 110.602PEPASTM D25131002050-70HDPE, PE47103/8-CNG-SST3/8"OD(TUBE)0.065316 SSASTM A2136,82090-110-40-149SEAMLESS TUBE3/4-CNG-SST3/4"OD(TUBE)0.134316 SSASTM A2135,8804,500-40-149SEAMLESS TUBE1-CNG-SST1"OD(TUBE)0.120316 SSASTM A2695,280120-4,500-40-1490.120" MIN. WALL SEAMLESS TUBEVALVE AND INSTRUMENTATION SCHEDULEMARKSIZECONNECTIONMATERIALDESCRIPTIONMFR.PART NO.MAWP[PSIG]SERVICEPRESSURE[PSIG]NOTEBLV-11/2"MPT316 SSBLEED VALVESWAGELOKSS-BVM89,2904,500BBV-11/4"MPT316 SSBLOCK & BLEED VALVEWIKA433974710,0000-4,500BV-13/8"SWAGED316 SSCNG BALL VALVESWAGELOKSS-AFSS6-LH6,00095-4,500BV-33/4"SWAGED316 SSCNG BALL VALVESWAGELOKSS-AFSS12-LH5,8004,500LOCKABLE HANDLEBV-41"FNPT316 SSCNG BALL VALVEHABONIM10 FH27W-666MYI/NPT6,0004,500API 607 FIRE-RATEDBV-52"FPTCSGAS BALL VALVESVFF8004466AGSE002000001,50015FIRE-RATEDBV-74"CL 150 RFF316 SSGAS BALL VALVEHABONIM40 F73W-6666AI/15028515API 607 FIRE-RATEDBV-86"CL 150 RFFCSGAS BALL VALVEHABONIM60 F73W-4466AI/15028515API 607 FIRE-RATEDCV-13/8"SWAGED316 SSCNG CHECK VALVESWAGELOKSS-CHS6-255,0004,500PI-12.50"1/4" MPT316 SSPRESSURE GAUGEWIKATYPE 233.30, P/N 925163410020-58GLYCERIN-FILLEDPI-22.50"1/4" MPT316 SSPRESSURE GAUGEWIKA983200410,0001,000-4,500GLYCERIN-FILLEDPV-11/2"MPT316 SSPURGE VALVESWAGELOKSS-4PM8372015IS-16"CL 150 RFFCSINLET Y-STRAINERKECKLEY62RFY-CSM40M36-SBB-SA728520-60PR-13"CL 150 RFFCASTDUCTILEPRESSURE REGULATORKIMRAYTBD25020-58SET AT 15 PSIGSYMBOLSPRODUCTLINE SIZEMATERIAL3-G-PEPLEGENDLINE DESIGNATIONABBREVIATIONSPIA.G.ABOVE GROUNDAAIRCNGCOMPRESSED NATURAL GASCSCARBON STILL (SCH. 40)CS2CARBON STEEL (SCH. 80)XXSCARBON STEEL (SCH. XXS)DDRAINESDEMERGENCY SHUTDOWN(E)EXISTING(F)FUTUREFPFUEL POSTFMTFUEL MNGMNT. TERMINALGNATURAL GAS (0-400 PSIG)HHIGHLLOWL.O.LOCKED OPENL.C.LOCKE CLOSEDMMETER(N)NEWN.C.NORMALLY CLOSEDN.O.NORMALLY OPENPIPRESSURE INDICATORPEPPOLYETHYLENE PIPEPRVPRESSURE RELIEF VALVEPVCPOLYVINYL CHLORIDE PIPERRREMOVE AND REPLACESSOLENOIDSSSTAINLESS STEELSSTSTAINLESS STEEL TUBE(TYP)TYPICALU.G.UNDERGROUNDVVENTBALL VALVENORMALLY CLOSEDVALVECHECK VALVENEEDLE VALVEPLUG VALVE3-WAY VALVEBLOCK AND BLEEDVALVEPRESSURE REGULATOR(SETTING AS NOTED)BLEED OR PURGE VALVEGAS-ACTUATED VALVESOLENOID VALVESOLENOID VALVE(3-WAY)LOCAL INSTRUMENT ORGAUGEPANEL MOUNTEDINSTRUMENT OR GAUGEPOINT OF CONNECTIONRELIEF VALVEFLEXIBLE HOSEPLUGCAPUNIONHOSE COUPLINGTHREADED PLUGFILTERFLEX CONNECTORPRESSURE INDICATOR(RANGE AS NOTED)PIPE REDUCTION/EXPANSION CONICALSTRAINER (BUILT-IN)PRIMARY LOCATIONPROGRAMMABLELOGIC CONTROLELECTRICAL SIGNALPNEUMATIC SIGNALREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUT HORIZED USE, REPRODUCT ION, PUBLI CATION, DI STRIBUTION OR SAL E IN WHOL E OR I N PART , IS STRICTLY FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PB C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\P1.1-P&ID SCHEDULE.dwg12/6/202412/6/2024 4:37:45 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING & INSTRUMENTATION SCHEDULE 21330.00PBMLP1.1 4.3MATERIALSA. GENERAL1.ALL MATERIALS SHOWN ON THE DRAWING PLANS AND DETAILS ARE THEMAIN ITEMS OF CONSTRUCTION AND ARE NOT TO BE CONSTRUED ASALL-INCLUSIVE. THE CONTRACTOR SHALL MAKE COMPLETE ALLELECTRICAL INSTALLATIONS IN A NEAT, PROFESSIONAL, ANDWORKMANLIKE MANNER.2.THESE DESIGN DRAWINGS ARE SCHEMATIC AND DO NOT SHOW ALLOFFSETS, BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS WHICH MAY BENEEDED FOR PROPER INSTALLATION. EXCEPT WHERE SHOWN INDIMENSIONAL DETAIL, THE LOCATIONS OF SWITCHES, RECEPTACLES,LIGHTS, MOTORS, OUTLETS, AND OTHER EQUIPMENT ON PLANS AREAPPROXIMATE. SUCH ITEMS SHALL BE PLACED SO AS TO ELIMINATEINTERFERENCE WITH DUCTS, PIPING, AND EQUIPMENT. THE EXACTLOCATION SHALL BE DETERMINED IN THE FIELD.3.EQUIPMENT SIZES SHOWN ON THE DRAWINGS ARE MINIMUM UNLESSOTHERWISE INDICATED. BEFORE INSTALLING ANY WIRE OR CONDUIT, THECONTRACTOR SHALL OBTAIN THE EXACT EQUIPMENT REQUIREMENTS ANDSHALL INSTALL WIRE, CONDUIT, DISCONNECT SWITCHES, MOTORSTARTERS, HEATERS, CIRCUIT BREAKERS, AND OTHER ITEMS OF THECORRECT SIZE FOR THE EQUIPMENT ACTUALLY INSTALLED. HOWEVER,WIRE AND CONDUIT SIZES SHOWN ON THE DRAWINGS SHALL BE TAKEN ASA MINIMUM AND SHALL NOT BE REDUCED WITHOUT WRITTEN APPROVAL.4.MATERIALS AND EQUIPMENT FURNISHED BY THE THE CONTRACTOR SHALLBE NEW, AND BE IN COMPLIANCE WITH THESE SPECIFICATIONS.MATERIALS AND EQUIPMENT SHALL BE PRODUCTS THAT HAVE BEEN INSATISFACTORY COMMERCIAL OR INDUSTRIAL USE AT LEAST TWO YEARSPRIOR TO AWARD OF CONTRACT.5.ALL CONDUIT, CONDUIT FITTINGS, AND ENCLOSURES SHALL BE PROPERLYPROTECTED FROM ANY MOISTURE DURING STORAGE. THE CONTRACTORSHALL ENSURE THAT AT THE TIME OF USE, THE MATERIALS ARE CLEAN,DRY AND SUITABLE FOR THEIR INTENDED USE.6.MAIN CIRCUIT BREAKERS FEEDING SYSTEMS RATED 1000 AMPS AND ABOVESHALLINCLUDE GROUND FAULT CIRCUIT INTERRUPTERS (GFCI).8. MAIN SWITCHBOARD SHALL BE NEMA 3R, WITH AN INTERRUPTINGCAPACITY OF 65KAIC, FULLY RATED. ROOF OF SWITCHBOARD SHALLSLOPE AWAY FROM THE SWITCHBOARD'S FRONT.9.ELECTRICAL EQUIPMENT SHALL BE LISTED BY A NATIONALLY-RECOGNIZEDTESTING LABORATORY ACCEPTABLE BY THE AHJ.B.CABLE AND WIRE1.CABLE AND WIRE FOR POWER AND CONTROL CIRCUITS AT 600 VOLTS ANDBELOW SHALL BE 600 VOLT COPPER, TYPE THWN-2. WIRE SIZES #12 AWGAND SMALLER MAY BE SOLID OR STRANDED; ALL LARGER SIZES SHALL BESTRANDED.2.IF ALLOWED BY THE ELECTRIC UTILITY COMPANY, ALUMINUMCONDUCTORS MAY BE USED FOR THE MAIN UTILITY FEEDER. CONTRACTORSHALL SUBMIT WIRE DATA AND CALCULATIONS FOR APPROVAL BY THEENGINEER.3.GROUND WIRE SHALL BE MEDIUM DRAWN BARE STRANDED COPPER . ALLGROUND CONNECTIONS AND FITTINGS SHALL BE CAST OR FORGEDCOPPER ALLOY BODY.4.INSTRUMENT WIRING SHALL BE AS CALLED FOR ON THE PLANS.C.GROUNDINGINSTALL GROUND WELL'S/ RODS AS NOTED ON THE ELECTRICALDRAWINGS.D.CONDUIT1.ABOVEGROUND CONDUIT FOR POWER CONDUCTORS IN PERMANENTLYINSTALLED NON-FLEXING SERVICE SHALL BE THREADED RIGID METALCONDUIT (RMC) OR THREADED STEEL INTERMEDIATE CONDUIT (IMC).UNDERGROUND CONDUIT SHALL BE SCHEDULE 40 PVC, UNLESS NOTEDOTHERWISE IN THE DRAWINGS.2.UNDERGROUND PVC CONDUIT SHALL BE FITTED WITH RMC SWEEPS ANDRISERS AT TRANSITIONS TO ABOVEGROUND; HOWEVER, RISERS INTOPANELS OR SWITCHBOARDS IN NON-HAZARDOUS LOCATIONS MAY BE PVC.UNDERGROUND RMC SHALL BE PVC-COATED GALVANIZED STEEL.3.FLEXIBLE CONDUIT SHALL BE STEEL LIQUID-TIGHT WITH A PVC JACKETSUITABLE FOR THE AREA CLASSIFICATION IN WHICH IT IS TO BE INSTALLED.4.CONDUIT INSTALLED WITHIN HAZARDOUS AREAS SHALL BE THREADED IMCOR RMC. PROVIDE CONDUIT SEALS WHERE CONDUIT CROSSESBOUNDARIES OF HAZARDOUS AREAS, OR AS OTHERWISE REQUIRED BYCODE.E.CONDUIT FITTINGS1.CONDUIT BODIES WITH COVERS SHALL HAVE URETHANE GASKETS ANDSTAINLESS STEEL ATTACHING SCREWS. CONDUIT BODIES INNON-HAZARDOUS AREAS AND DIV. 2 HAZARDOUS AREAS SHALL BECOOPER "CONDULET" FORM 8; AND IN DIV 1 HAZARDOUS AREAS, COOPER"CONDULET" OE OR GU SERIES. BODY MATERIAL SHALL BE FERALOY IRONALLOY, ELECTROGALVANIZED AND FINISHED WITH ACRYLIC PAINT.2.METAL CONDUIT RISERS INTO PANEL BOARDS AND SWITCHBOARDS SHALLBE FITTED WITH INSULATED GROUNDING BUSHINGS. BUSHINGS SHALLHAVE GROUNDING SADDLES AND SET SCREWS SUITABLE FOR A #6 AWGBCW GROUND BOND WIRE.3.MAINTAIN 1 FOOT MINIMUM HORIZONTAL CLEARANCE BETWEEN INCOMINGUNDERGROUND UTILITIES (GAS OR ELECTRIC) AND OTHER PIPING ORCONDUITS.4.WHERE MULTIPLE CONDUITS COME TO THE SURFACE, THROUGH SLABS ORPADS, CONDUIT SHALL CONTINUE TO 6 INCHES ABOVE THE SURFACEBEFORE CONNECTING TO FITTINGS OR SEALS, WHEREVER PRACTICAL.5.WHERE A SINGLE CONDUIT COMES TO THE SURFACE THROUGH A SLAB ORPAD, CONCRETE ENCASEMENT SHALL TERMINATE AT THE SLAB OR PADSURFACE. IF RISING INTO SLAB-MOUNTED OR PAD MOUNTEDSWITCHBOARDS, MOTOR CONTROL CENTERS, AND SIMILAR EQUIPMENT,EXTEND THE CONDUIT UP 3 INCHES ABOVE SURFACE OF SLAB.6.TYPE PVC CONDUIT SHALL BE PERMITTED WHERE ENCASED IN ACONCRETE ENVELOPE A MINIMUM OF 50 MM (2 IN.) THICK AND PROVIDEDWITH NOT LESS THAN 600 MM (24 IN.) OF COVER MEASURED FROM THE TOPOF THE CONDUIT TO GRADE.7.THREADED RIGID METAL CONDUIT OR THREADED STEEL INTERMEDIATEMETAL CONDUIT SHALL BE USED FOR THE LAST 600 MM (24 IN.) OF THEUNDERGROUND RUN TO EMERGENCE OR TO THE POINT OF CONNECTIONTO THE ABOVEGROUND RACEWAY.H.ABOVEGROUND CONDUIT INSTALLATION1.ARRANGEMENT AND GROUPING OF DUCTS SHALL BE RUN AS-SHOWN ONTHE DRAWINGS, FROM PLACE-TO-PLACE, AND SHALL BE INSTALLED ATELEVATIONS IN ABOVEGROUND CONDUIT.2.SUPPORT EXPOSED CONDUIT ON MAXIMUM SIX (6) FOOT CENTERS ANDWITHIN TWO (2) FEET OF ANY CONNECTION POINT. CONDUIT AND FITTINGSMAY BE SUPPORTED FROM MACHINERY SUPPORTING STRUCTURESADEQUATE FOR ADDITIONAL WEIGHT. CONDUIT AND FITTINGS SHALL NOTBE CLAMPED OR WELDED OR BOLTED TO VESSELS FOR MACHINERYEXCEPT AS SPECIFICALLY PERMITTED BY CLEAN ENERGY OR AS SHOWNON THE DRAWINGS.3.FACTORY 90 DEGREE CONDUIT BENDS SHALL BE USED FOR CONDUIT SIZED1-1/2 INCHES AND ABOVE. RADIUS OF FIELD BENDS SHALL NOT BE LESSTHAN 10 TIMES DIAMETER OF CONDUIT. CONDUIT BENDS AND OFFSETSSHALL BE AVOIDED WHERE POSSIBLE. CONDUIT FLATTENED OR WRINKLEDDURING BENDING SHALL NOT BE USED.4.ENDS OF ALL METAL CONDUITS TERMINATING IN PANEL BOARDS ANDSWITCHBOARDS SHALL BE PROVIDED WITH INSULATED GROUNDINGBUSHINGS. BOND INSULATED GROUNDING BUSHINGS TO EQUIPMENTGROUND USING #6 AWG BCW.5.INSTALL LIQUID-TIGHT FLEXIBLE METALLIC CONDUIT BETWEEN RIGIDCONDUIT AND MOTORS, VIBRATING EQUIPMENT, MOVABLE EQUIPMENT,AND INSTRUMENTS. MINIMUM ONE (1) FOOT AND MAXIMUM THREE (3) FEETIN LENGTH.6.INSTALL CONDUIT SEALS WHERE REQUIRED. POUR SEALS WITH THE SEALMANUFACTURER'S SPECIFIED COMPOUND AFTER SYSTEMS AREFUNCTIONAL AND HAVE BEEN ACCEPTED BY CLEAN ENERGY AND THEJURISDICTION. SEAL FITTING PLUGS SHALL NOT BE INSTALLED FOR 24HOURS AFTER POURING SEALING COMPOUND.7.OPEN ENDS OF CONDUITS SHALL BE CAREFULLY PLUGGED DURINGCONSTRUCTION TO PREVENT THE ENTRANCE OF FOREIGN MATERIALS.AFTER CONDUITS ARE INSTALLED, PULL A MANDREL THROUGH EACHCONDUIT TO CLEAR THE CONDUIT OF DEBRIS. FOLLOW THE MANDREL WITHWIRE BRUSHES AND SWABS TO COMPLETELY CLEAN THE CONDUIT.IMMEDIATELY AFTER A CONDUIT IS CLEANED, PLUG OR CAP THE RUN.INSTALL PULL STRINGS IN ALL SPARE CONDUITS, 3/16" NYLON MIN.8.COVERED OPENINGS ON CONDUIT FITTINGS SHALL NOT BE BLOCKED BYSTRUCTURAL STEEL OR PIPE WHICH WOULD NECESSITATE DISASSEMBLYOF PIPE, OR OTHER EXTREME MEASURES, FOR ACCESS TO THE INTERIOROF FITTINGS FOR FUTURE WIRE REPLACEMENT AND PULLING.9.ON MASONRY AND CONCRETE STRUCTURES, CONDUITS SHALL BEATTACHED WITH ONE-HOLE PIPE STRAPS AND CLAMP-BACKS USINGSCREW ANCHORS OR EXPANSION BOLTS.10.EXPOSED CONDUIT SHALL BE INSTALLED PARALLEL TO STRUCTURALMEMBERS AND SURFACES.11.TWO OR MORE CONDUITS IN THE SAME GENERAL ROUTING SHALL BEPARALLEL WITH SYMMETRICAL BENDS.12.CONDUITS SHALL BE INSTALLED AT LEAST 6 INCHES FROM HIGHTEMPERATURE PIPING, DUCTS, AND FLUES.13.CONDUIT CONNECTIONS TO SHEET METAL ENCLOSURES SHALL BESECURELY FASTENED BY LOCKNUTS INSIDE AND OUTSIDE.14.CONDUITS SHALL BE INSTALLED BETWEEN THE REINFORCING STEEL INWALLS OR SLABS WHICH HAVE REINFORCEMENT IN BOTH FACES. IN SLABSWHICH HAVE ONLY A SINGLE LAYER OF REINFORCING STEEL, CONDUITSSHALL BE CLEAR OF THE STEEL AND THE CONCRETE SURFACE.15.UPON COMPLETION, ENSURE THAT EQUIPMENT IS CLEAN; STRUCTURALELEMENTS ARE COMPLETE AND TIGHT; ARE PROPERLY HARNESSED,SECURED, AND IDENTIFIED; CONDUITS ARE BUSHED, TAGGED, ANDSUPPORTED; SEALS ARE IN PLACE; GROUND WIRES ARE PROVIDED ANDCONNECTED; TAGS, LABEL PLATES, AND INSTRUCTION PLATES AREATTACHED AND SECURE.C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\E0.0 ELECTRICAL NOTES CA.dwg12/05/202412/6/2024 4:37:48 PM2024/12/06USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 ELECTRICAL NOTES 21330.00PBMLE0.0F.CABLE AND WIRE TERMINATIONS1.ALL POWER CABLE SHALL BE TERMINATED WITH COMPRESSION LUGS ORMECHANICAL LUGS .2.CONTROL, ALARM AND SIGNAL WIRE SHALL BE TERMINATED WITHCOMPRESSION SPADES OR RING LUGS WHERE SCREW TERMINALS AREPROVIDED. SOLDER CONNECTIONS ARE NOT ALLOWED.3.CABLES AND CONDUCTORS SHALL BE CONTINUOUS BETWEEN TERMINALS,AND NOT JOINED BY SPLICES OR WIRE NUTS, EXCEPT AS NECESSARY TOCONNECT TWO OR MORE WIRING BRANCHES TOGETHER IN A JUNCTIONBOX.4.IN CLASS I, DIVISION 2 LOCATIONS, ALL WIRING METHODS PERMITTED IN501.10(A) AND THE FOLLOWING WIRING METHODS SHALL BE PERMITTED:(1) RIGID METAL CONDUIT (RMC) AND INTERMEDIATE METAL CONDUIT(IMC) WITH LISTED THREADLESS FITTINGS.(2) ENCLOSED GASKETED BUSWAYS AND ENCLOSED GASKETED WIREWAYS.(3) TYPE PLTC AND TYPE PLTC-ER CABLE IN ACCORDANCE WITH THEPROVISIONS OF ARTICLE 725, INCLUDING INSTALLATION IN CABLE TRAYSYSTEMS. THE CABLE SHALL BE TERMINATED WITH LISTED FITTINGS.G.ENCLOSURES1.ENCLOSURES FOR EQUIPMENT AND DEVICES SHALL BE UL LISTED, NEMA3R OR NEMA4 IN NON-HAZARDOUS AREAS, AND NEMA 7 IN CLASS 1 , DIV 1 OR DIV 2 AREAS.2.ENCLOSURES IN NON-HAZARDOUS AREAS SHALL BE PROVIDED WITH WATER TIGHT CONDUIT HUBS ON TOP- AND VERTICAL SURFACES.GASKETS AND O-RINGS SHALL BE INSTALLED AS INSTRUCTED BYMANUFACTURER, TO MAINTAIN WEATHER TIGHTNESS.3.PULL BOXES AND JUNCTION BOXES SHALL BE UL LISTED FOR NEMA 3R INNON-HAZARDOUS AREAS, AND NEMA 7 IN CLASS 1, DIV 1 EXTERIOR AREAS.ALL PULL BOXES INSTALLED WHEREVER TRAFFIC MIGHT COME INCONTACT SHALL BE TRAFFIC RATED. ALL IN-GROUND PULL BOXES SHALLBE EQUIPPED WITH LOCK DOWN DEVICES.H.EQUIPMENT MOUNTING1. EQUIPMENT SHALL BE SECURED WITH CORROSION-PROOF BOLTS,STRAPS, HANGERS, AND SUCH OTHER HARDWARE AND DEVICES AS ARENECESSARY OR APPROPRIATE.I.SPECIALTY EQUIPMENT1. ESD PUSH BUTTONS: BUTTONS SHALL BE MAINTAINED PUSH-PULL TYPEWITH LARGE, RED, MUSHROOM HEAD PUSH BUTTON THAT IS NORMALLYCLOSED. ESD BUTTONS SHALL BE LISTED FOR GROUP D, CLASS 1,DIVISION 2 HAZARDOUS AREAS. DO NOT INSTALL ESD BUTTONS IN CLASS1,DIVISION 1 HAZARDOUS AREAS.2. EMERGENCY PHONE: FURNISH EMERGENCY TELEPHONE(S) IF SHOWN INTHE DRAWINGS. FURNISH STANDARD INDUSTRIAL DIAL-OUT PHONE WITHWEATHER PROOF ENCLOSURE FOR OUTDOOR USE. CEE CO EMERGENCYTELEPHONE, PART NO. WPP-331-D-R.4.4 INSTALLATION REQUIREMENTSA.GENERAL1.INSTALL THE SWITCHBOARD ON THE FOUNDATIONS AS INDICATED BYTHESE DRAWINGS. INSTALL CONDUITS, WIRE, LIGHTING FIXTURES,GROUND GRID, ETC., AS SHOWN ON THE DRAWINGS.B.GROUNDING1.ALL EQUIPMENT GROUNDS SHOULD BE THROUGH SLAB, HIDDEN WHEREPOSSIBLE AND PROTECTED BY PVC CONDUIT.2.GROUNDING SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH NECARTICLE 250, PART III. SYSTEM GROUND SHALL CONSIST OF 4/0 BARE COPPER STRANDED WIRE GROUND RING 30" BELOW GRADE, ENCIRCLINGTHE EQUIPMENT COMPOUND WITH INTERCONNECTING RUNS BETWEENMAJOR EQUIPMENT COMPONENTS. ALL WIRE TO WIRE CONNECTIONSSHALL BE MADE USING BURNDY "HYGROUND" IRREVERSIBLECOMPRESSION FITTINGS. A MINIMUM OF TWO GROUND RODS SHALL BECONNECTED TO THE SYSTEM AT OPPOSITE SIDES OF THE EQUIPMENTAREA. ADDITIONAL GROUND RODS TO BE INSTALLED AS NECESSARY.GROUND RING TO BE EXTENDED TO FUELING AREAS AND OTHEREQUIPMENT AREAS REMOTE FROM EQUIPMENT COMPOUND, WITHGROUND RODS INSTALLED PER CLEAN ENERGY SPECIFICATIONS.3.AFTER THE GROUNDING SYSTEM HAS BEEN INSTALLED, CONTRACTOR SHALL PERFORM THE FOLLOWING TEST BEFORE ANY GROUND RODS ARECOVERED:A FALL-OF-POTENTIAL TEST METHOD SHALL BE PERFORMED BY A NETACERTIFIED TESTING AGENCY TO ENSURE THE GROUNDING ELECTRODESYSTEM DOES NOT EXCEED 25 OHMS PER NEC ARTICLE 250.C.CONNECTIONS AND CONTROLS1.THE CONTRACTOR SHALL WIRE ALL CONTROL DEVICES FURNISHED BYOTHERS IN ACCORDANCE WITH SCHEMATIC AND WIRING DIAGRAMS FURNISHED WITH THE EQUIPMENT, THIS SPECIFICATION, AND THE CONSTRUCTION DRAWINGS. D.IDENTIFICATION AND LABELING1.INSTALL NON-CORRODING METAL-STRIP CONDUIT TAGS WITH EMBOSSEDCONDUIT NUMBERS AT END POINTS OF ALL CONDUITS, AND AT PENETRATIONS INTO SLABS, GROUND, AND THE EQUIPMENT, ATTACHEDWITH DOUBLE METAL BANDS.2.IDENTIFY EACH CONDUCTOR USING BRADY-TAGS PROTECTED BYHEAT-SHRINKABLE SLEEVES. CONDUCTORS SHALL BE MARKEDWHEREVER THEY TERMINATE IN AN EQUIPMENT ENCLOSURE, AND SHALLBE MARKED WITH THE TERMINAL ID NO. PROVIDED IN THE EQUIPMENTMANUFACTURER'S SHOP DRAWING(S).3.IDENTIFY EACH ITEM OF ELECTRICAL EQUIPMENT WITH A 1 INCH X 2.5 INCHENGRAVED NAMEPLATE. THE LETTERING SHALL BE 316 INCH HIGH, WITHBLACK TEXT ON A WHITE BACKGROUND.4.ALL SPARE CONDUCTORS SHALL BE TAPED AT EACH END AND IDENTIFIED AS SPARE.5.THE INSULATION OF A SINGLE-CONDUCTOR WIRE SHALL BE COLORED ASFOLLOWS:120/208 VOLT CIRCUITSWIRE COLORNEUTRALWHITEPHASE A BLACKPHASE BREDPHASE CBLUEGROUNDGREENFOR LARGE CONDUCTORS AVAILABLE ONLY WITH BLACK INSULATION,APPLY SUITABLY COLORED ELECTRICAL TAPE NEAR TERMINATIONS.E.TESTING AND DEFICIENCIES1.WHEN DEFICIENCIES ARE FOUND, THE DEFICIENCY SHALL BE CORRECTEDAND THE TEST RE-RUN. THIS PROCEDURE SHALL BE REPEATED UNTIL THEDEFICIENCY IS CLEARED. TESTS SHALL BE PERFORMED BY QUALIFIED ANDEXPERIENCED PERSONS.2.ALL INSTALLATIONS AND WIRING SHALL BE THOROUGHLY TESTED TODETERMINE PROPER POLARITY, PHASING, FREEDOM FROM SHORTCIRCUITS, FOR CONTINUITY AND OPERATION OF CONTRACTOR SUPPLIEDEQUIPMENT, RELAYS, INSTRUMENTS, ETC. THE CONTRACTOR SHALLOPERATE ALL CIRCUIT BREAKERS, HAND SWITCHES AND PUSH BUTTONSBY HAND TO DEMONSTRATE PROPER MECHANICAL FUNCTION.3.COMPLETE TEST AND INSPECTION RECORDS SHALL BE MADE BY THE THECONTRACTOR AND INCORPORATED INTO A REPORT, WHICH SHALL BEGIVEN TO THE CLEAN ENERGY. ALL READINGS TAKEN SHALL BERECORDED.4. ALL TESTS SHALL BE PERFORMED IN THE PRESENCE OF CLEAN ENERGY'SPROJECT MANAGER OR REPRESENTATIVE UNLESS INSTRUCTEDOTHERWISE.6. AUTHORIZATION MUST BE OBTAINED FROM CLEAN ENERGY BEFORE ANYWORK IS DONE ON AN ENERGIZED CIRCUIT. THERE SHALL BE NOINTERRUPTION OF ENERGIZED CIRCUITS WITHOUT PRIOR AUTHORIZATION.7. ALL CABLES AND EQUIPMENT INDICATED FOR 480V SERVICE, INCLUDINGMOTORS AND TRANSFORMERS, SHALL BE TESTED FOR GROUND ANDSHORTS BY MEANS OF A MEGGER INSULATION TESTING INSTRUMENT,WHICH SHALL IMPRESS A VOLTAGE OF NOT LESS THAN 500 VOLTS UPONTHE CIRCUIT UNDER TEST.8. WHERE TESTS INDICATE THAT INSULATION WAS DAMAGED BY HANDLING OR DURING INSTALLATION, NEW CABLE SHALL BE INSTALLED AT THETHE CONTRACTOR'S EXPENSE.9.ALL ABOVE GRADE CONNECTIONS SHALL BE ACCESSIBLE FOR INSPECTIONAND TESTING. INTERLOCKING CONTROL AND INSTRUMENTATION WIRINGFOR EACH SYSTEM AND/OR PART OF A SYSTEM SHALL BE CAREFULLYCHECKED TO ASCERTAIN THAT THE SYSTEM WILL FUNCTION PROPERLY ASINDICATED BY THE WIRING DIAGRAMS, SCHEMATIC DIAGRAMS, DESCRIPTION OF OPERATION, ETC.10.CLEAN ENERGY PERSONNEL SHALL SET CIRCUIT BREAKERS AND RELAYSPROPERLY COORDINATED SO THAT EQUIPMENT WILL BE IN PROPER OPERATING CONDITION BEFORE BEING PLACED IN SERVICE.11.UPON COMPLETION OF PRELIMINARY CHECKS, ALL EQUIPMENT SHALL BETESTED FOR SATISFACTORY OPERATION. CLEAN ENERGY PERSONNELSHALL START EQUIPMENT AS DIRECTED BY CLEAN ENERGY'S PROJECTMANAGER OR OTHER AUTHORIZED REPRESENTATIVE.F.ENCLOSURES AND SUPPORTS1.SUPPORTS AND ENCLOSURES SHALL BE PROVIDED FOR ALL CONTRACTORFURNISHED EQUIPMENT.2.BOLT ELECTRICAL EQUIPMENT TO RACKS, PLATES WELDED TO RACKS,PLATES WELDED OR BOLTED TO OTHER STRUCTURES, BUILDINGS, ORWHERE PERMITTED, TO EQUIPMENT. DO NOT WELD TO ELECTRICALEQUIPMENT. PROVIDE BACKING PLATES WHERE EQUIPMENT IS ATTACHEDTO METAL THAT IS LESS THAN 1/8" INCH THICK. CONDUIT BOXES UP TO 6INCHES SQUARE MAY BE SUPPORTED IN CONDUIT RUNS WITHOUTADDITIONAL SUPPORT; HOWEVER, BOXES ON FREE-STANDING STUB-UPSSHALL BE PROVIDED WITH EXTRA SUPPORT.3.SUPPLEMENTARY SUPPORTS, CLIPS, AND BRACKETS SHALL BECONSTRUCTED FROM STANDARD ROLLED STEEL SHAPES, HOT DIPPEDGALVANIZED AFTER FABRICATION. ANGLES, PLATES, CHANNELS,UNI-STRUT, POWER STRUT OR RODS MAY BE USED FOR THIS PURPOSE.WELDING TO A GALVANIZED STRUCTURE SHALL NOT BE PERMITTED. USECORROSION-PROOF BOLTS, STRAPS, ETC.4.RACKS SHALL BE STRUCTURAL SHAPES WELDED OR BOLTED TOGETHERAND SUPPORTED FROM OTHER STRUCTURES, OR INDEPENDENTLYSUPPORTED BY CONCRETE FOUNDATIONS.G.UNDERGROUND CONDUIT INSTALLATION1.MINIMUM BURIAL DEPTH FOR UNDERGROUND CONDUIT SHALL BE 24INCHES BELOW TOP OF FINISHED GRADE. WHERE POWER CONDUIT ISINSTALLED IN THE SAME TRENCH AS GAS PIPE, INSTALL GAS PIPE AT LEAST6" ABOVE THE CLOSEST POWER CONDUIT. ALL UNDERGROUND CONDUITRUNS MUST BE CLEAR OF CROSSING PIPES OR STRUCTURES BY AT LEAST6 INCHES; THUS, MINIMUM DEPTHS GREATER THAN 24 INCHES MAY BENEEDED FOR ADEQUATE SEPARATION FROM OTHER UNDERGROUNDSTRUCTURES .2.CONDUITS PLACED UNDERGROUND SHALL BE RUN AS SHOWN ONDRAWINGS AND SUPPORTED A MINIMUM OF EVERY 10 FEET, USINGFABRICATED DUCT SPACERS, TO PREVENT SAGGING WHILE WAITING FORENCASEMENT OR BACKFILL. CONDUITS RUN IN MULTIPLE SHALL BESEPARATED AT LEAST 2 INCHES CLEAR. THEY SHALL BE SEPARATEDEVENLY THROUGHOUT THE RUN, EXCEPT WHERE IT IS NECESSARY TO FANOUT AT RISERS AND TRANSITIONS. CHANGE OF HORIZONTAL DIRECTIONSOF CONDUIT RUNS SHALL BE MADE IN LONG, GENTLE SWEEPS. INSTALLSPARE CONDUITS AS SHOWN ON DRAWINGS. BACKFILL AND TRENCHINGSHALL BE CONSISTENT WITH THE PROVISIONS OF THIS SPECIFICATION.277/480 VOLT CIRCUITSWIRE COLORNEUTRALGRAYPHASE A BROWNPHASE B ORANGEPHASE C YELLOWGROUNDGREEN/YELLOWCONTROL CIRCUITSWIRE COLOR24VDC (+)ORANGE24VDC (-)YELLOW24VDC SIGNALBLUE120VAC SIGNALREDSPAREVIOLETREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZED USE, REPRODUCTI ON, PUBLI CATION, DISTRIBUTION OR SAL E IN WHOLE OR IN PART, IS STRICTLY FORBI DDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M 30% DESIGN REVIEW12/5/2024A PBPART 4 - ELECTRICAL4.1 GENERALA.ELECTRICAL EQUIPMENT, MATERIALS, WORKMANSHIP AND TESTING SHALLBE PROVIDED OR PERFORMED AS DESCRIBED HEREIN. WORK COVEREDBY THESE SPECIFICATIONS INCUDES THE FOLLOWING:1. INSTALLATION OF A NEW 480 VOLT SWITCHBOARD(S).2. INSTALLATION OF INSTRUMENTATION, CONDUIT AND WIRE AS SHOWN ON THE DRAWINGS.3. INSTALLATION OF EQUIPMENT GROUNDING SYSTEM AS SHOWN ON THE DRAWINGS.4. INSTALLATION OF POWER AND LIGHTING CONDUITS AND WIRE AS REQUIRED FOR THIS PROJECT.B.DRAWINGS: THE CONTRACTOR SHALL PROVIDE ALL ELECTRICAL EQUIPMENT AND INCIDENTALS, UNLESS NOTED OTHERWISE, AS NEEDEDTO COMPLETE THE WORK INDICATED IN THE SPECIFICATIONS AND DESIGNDRAWINGS. C.CODES1.MATERIALS, EQUIPMENT, AND INSTALLATION PROVIDED AND PERFORMEDUNDER THIS SECTION SHALL CONFORM TO THE LATEST REQUIREMENTS OFTHE FOLLOWING CODES:NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 70, NECNFPA 70E - STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE.NFPA 52 - VEHICULAR GASEOUS FUEL SYSTEM CODE.LOCAL CODES AND REGULATIONS.2.IN CASE OF DIFFERENCES AMONG BUILDING CODES, SPECIFICATIONS,STATE AND FEDERAL LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDSAND ELECTRICAL DEPARTMENT REGULATIONS AND THE CONTRACTDRAWINGS, THE MOST STRINGENT SHALL GOVERN. THE CONTRACTORSHALL PROMPTLY NOTIFY CLEAN ENERGY IN WRITING UPON DISCOVERYOF ANY SUCH DIFFERENCES.4.2.WORKMANSHIPA.ALL CABLES, CONDUITS, PIPING OR EQUIPMENT LOCATIONS AND ELEVATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL BERESPONSIBLE FOR FIELD CHECKING AND MAKING ALL NECESSARYOFFSETS, AS REQUIRED TO AVOID EXISTING INTERFERENCES AND TOCOORDINATE WITH OTHER TRADES.B.THE DRAWINGS OR SPECIFICATIONS ARE NOT INTENDED TO ALLOW A VIOLATION OF ELECTRICAL WORKING SPACE AROUND ELECTRICAL EQUIPMENT. A 30"W MIN x 48"D x 6'-6"H SPACE SHALL BE CLEAR TO THEFLOOR IN FRONT OF ALL ELECTRICAL PANELS, CONTROLS OR ITEMS THATREQUIRE MAINTENANCE OR ACCESS WHILE ENERGIZED. ANY DEVIATIONFROM THIS MINIMUM SHALL BE APPROVED IN WRITING BY THE ENGINEER.C.THE ELECTRICAL DESIGN IS BASED ON TYPICAL VENDOR EQUIPMENT. THECONTRACTOR SHALL COORDINATE EQUIPMENT INSTALLATION WITH THEACTUAL EQUIPMENT FURNISHED.D.THE CONTRACTOR SHALL PROVIDE ALL FUSES REQUIRED FOR PROJECTPOWER, INCLUDING ANY FUSES BLOWN DURING INITIAL TESTING.E.BONDING JUMPERS SHALL BE INSTALLED TO INSURE CONTINUITY WHERECONDUIT CONNECTIONS AT CONCENTRIC KNOCKOUTS ARE TO SERVE AS AGROUND.F.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ALL WALLS,FLOORS AND PAVING CAUSED BY CONTRACTOR. CONTRACTOR SHALLCOORDINATE WITH CLEAN ENERGY TO PATCH, PAINT AND REPAIR TOMATCH EXISTING CONDITIONS.G.NOTHING IN THESE DRAWINGS AND SPECIFICATIONS SHALL BECONSTRUED AS ALLOWING WORK THAT VIOLATES GOVERNING CODES.THIS SHALL NOT BE CONSTRUED AS RELIEVING THE CONTRACTOR FROMCOMPLYING WITH ANY REQUIREMENTS OF THE PLANS OR SPECIFICATIONSWHICH MAY COMPLY WITH, BUT EXCEED THOSE OF GOVERNING CODES.H.SHOULD ANY DEVIATIONS FROM WORK INDICATED ON THE DRAWINGS ORDESCRIBED IN SPECIFICATIONS BE NECESSARY IN ORDER TO MEETCONDITIONS AT THE SITE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFYTHE ENGINEER IN WRITING FOR APPROVAL OF THE DEVIATION REQUESTED.I.CONTRACTOR TO INSTALL 3M 2200 SCOTCH® VINYL MASTIC PAD MIL, 6-1/2"X 4-1/2", OR EQUIVALENT TO THE ENTIRE INSIDE OF EACH MOTOR HOUSINGCOVER TO PROTECT AGAINST AND PREVENT PREMATURE FAILURE DUE TOWIRE RUBBING.J.CONTRACTOR TO INSTALL APPROVED CONDUIT BUSHING IN EACH MOTORJUNCTION BOX SERVICE ENTRANCE, AND DRYER EXPLOSION PROOF BOXSERVICE ENTRANCE TO PROTECT WIRE FROM CUTS OR ABRASIONS. SERVICE CONDUITS PER UTILITY CO.C4003Ø, 4WMCB3800AF800AT3P, LSI65KAICMCC AUTILITY TRANSFORMERMAIN BREAKERMCB1800AF/800AT3P W/ LOCKING DEVICE65kAIC, LSIG (GFP)C410(FURNISHED BY OTHERS)KIRK KEYGENERATOR BREAKERTERMINALLUG BOXMAIN BREAKERKIRK KEYC401STANDBY GENERATOR SEQUENCE:UNDER NORMAL OPERATION THE GAS DRYER AND ALL OF THECOMPRESSORS ARE ENABLED TO OPERATE.IN THE EVENT UTILITY POWER IS LOST, A MOBILE GENERATOR CANBE BROUGHT IN AND THE OPERATOR WILL SWITCH OVER TO THEGENERATOR USING THE KIRK KEY INTERFACE. UNDERGENERATOR POWER, UP TO (2) COMPRESSORS, A GAS DRYER,AND AUXILIARY LOADS WILL BE ENABLED TO OPERATE. THEREMAINING EQUIPMENT WILL REMAIN OFF UNTIL NORMAL POWERIS RESTORED AND THE OPERATOR USES THE KIRK KEYINTERFACE TO MANUALLY RESTORE THE SYSTEM TO NORMALPOWER.LUG BOXMCB2800AF800AT3P, LSIG65KAICMOBILEGENERATORSHORT CIRCUIT AVAILABLE: TBDINTEGRATED MAIN SWITCHBOARD "MSB" NEMA 3R, 65KAIC PANEL FULLY RATEDXFMR480-208/120V3Ø, 30KVAZ=5.25% (ASSUMED)MCB17125AF50AT3P65KAICPANEL LA110A3P480/277VAC, 800A COPPER BUS, 3Ø, 4WPSB 21-6GAS DRYER(36.3 FLA)#2/0GNDC414PANEL "LA"SHEET NOTES:UTILITY COMPANY TRANSFORMER. CONTRACTOR TO PROVIDE REQUIRED SLAB BOX ANDALL ASSOCIATED UNDERGROUND CONDUITS AND GROUNDING PER UTILITY COMPANYCONSTRUCTION DOCUMENTS.LOCATION AND TYPE OF UTILITY METER TO BE COORDINATED WITH LOCAL UTILITYCOMPANY.ALL PROTECTIVE DEVICES ARE FULLY RATED.3/4"X10' GND RODMCB4225AF50AT3P,65KAICGASDRYERSOFTSTARTLOCKABLECB1C411SS1M1 W/BYPASS&O/LCOMPRESSOR SKID A SUPPLIED BY MFR (ANGI)800AF800AT3PCOMPRESSOR A1(240 FLA)200HPSOFTSTARTC412SS2M4 W/BYPASS&O/LCOMPRESSOR A2(240 FLA)200HP15KVA1Ø XFMR 'T1'480V-120VCB22660AT2PCB206300AT3PNEW DUAL MOTOR CONTROL CABINET "MCC A" NEMA 4,Δ480, SUPPLIED BY COMPRESSOR MANUFACTURER,ANGI.SCCR=65kAIC.CB210300AT3P100AF3P14AT5.1-27ADS342M2OL342COOLER FANMOTOR A1(14 FLA)10HP1-1.6AT1-1.6AMP348M3OL348PRELUBEMOTOR A1(1.1 FLA)0.5HP14AT5.1-27ADS442M5OL442COOLER FANMOTOR A2(14 FLA)10HP1-1.6AT1-1.6AMP448M6OL448PRELUBEMOTOR A2(1.1 FLA)0.5HPCB231100AT1P120VAC POWERCB23330AT1P120VAC UPS POWERJ-BOXC417#2/0 GROUNDINGCONDUCTOR, TYP.C:\Users\arturo.moreno\Clean Energy Fuels Corp\Engineering Design - Projects\USA Hauling\03. Drawings\Sheet Set (CAD Plan Set)\E1-SINGLE LINE.dwg12/5/202412/6/2024 4:37:53 PM2024/12/06USA HAULING & RECYCLING600 NUTMEG ROAD NORTHSOUTH WINDSOR, CT 06074SINGLE LINE DIAGRAM21330.00PBMLE1.0REDUCED PLANCAUTION: THIS DRAWING MAY BE REDUCED24' IN ORIGINAL DRAWINGREVISIONS DATEREVBYCNG FUELING STATIONCKnow what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTSTHESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGSAND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THEUSE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANYUNAUTHORIZED USE, REPRODUCTION, PUBLICATION, DISTRIBUTION OR SALE IN WHOLE OR IN PART, IS STRICTLY FORBIDDEN.4675 MAC ARTHUR COURT, STE. 800 | NEWPORT BEACH, CA 92660TEL:(949) 437-1000 | FAX: (949) 724-1397 | WWW.CLEANENERGYFUELS.COM30% DESIGN REVIEW12/5/2024APB This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Project Narrative: The project site is an existing recycling facility located on the east side of Nutmeg Road North. The site contains three properties (570, 600 and 602 Nutmeg Road) with a combined 13.01 acres and is in the Industrial Zone. The applicant is proposing to install a natural gas fueling facility which would serve only their fleet of vehicles, along with other site improvements including a new exit driveway and the conversion of a stormwater basin to underground storage. The proposed natural gas fueling facility contains a duplex compressor, transformer and dryer along with associated equipment on concrete pads surrounded by concrete bollards. The fueling site is detailed in the attached CNG Fueling Station plans (by others). Also attached are photos representing the proposed facility and the proposed concrete barrier fueling area that will be installed along the existing truck parking spaces. The compressors have a decibel reading of 60dB @ 1’ from the compressor housing and 50dB at 10’. The compressors are located a minimum of 130’ from the nearest property line and approximately 500’ from the street line. The proposed natural gas fueling facility is anticipated to meet the Town’s noise control regulations and not generate excessive noise. This facility will be constructed using the following equipment:  Mini excavator (similar to a CAT 304E2)  Plate Compactor (similar to a Husqvarna Model LG204)  Telehandler (similar to a JLG 9000lb/43 Ft. Telehandler)  Crane for setting large equipment (Grove GMK4090) The area that will be created by converting the stormwater basin to underground storage will be used for material storage and equipment maneuvering in support of the applicant’s current business operations. There will be no increase of traffic or parking for the site with this proposal. The number of parking spaces provided is the same total number of spaces as currently exist on the three properties. The vehicles utilizing the site will also remain unchanged with the proposed improvements. Parking calculations were performed using the Town regulations along with the employee counts for the site. A total of 60 spaces are required for the three properties and the total existing (& proposed) spaces are approximately 107 which are provided on the three combined properties. ELLINGTON ROAD ROAD ELLINGTON ELLINGTONBOULEVARDJOHNFITCHBOULEVARDJOHNFITCHSTRONGROADROADSTREETIDENTGLEN D A LERO ADROADEDWINGOVERN OR'SBIDWELL R O A D ROADROADCOLONY M A S C O LO R O A D ROAD WESTSTRONG ROADROADPIERCEROADBURGESSSTRONGNORTHROADNUTMEGSOUTHHI GHW AYROADHI G H W A Y FOSTERROADNUTMEGSOU THSA TELLI TESOUTHROADROAD DR I VEDRI VEBELDONMARILYNROADEDGEWOOD JUDYLA.LANEJ UDYELI ZABETHSTREETBARBARA POND BRICKYARD BR OOKB R OOKPODUNK5 CODY CI R.CODYCI R.BAKER'S LA.GOVERNOR'SAVE.CONNECTICUTTALBOTLA.352map 2159A 350map 2159A 352map 2159A 353map 2159A 354map 2159A 355map 2159A 356map 2159A 358map 359map 2159A 360map 2159A 361map 2159A 363map 2159A 364map 2159A 365map 2159A 366map 2159A 367map 2159A 362map 2159A 351map 2159A 357map 2159A 1000'S51°22'07"E 626.81'N51°22'07"W 373.49'N51°19'23"W 373.49'N51°22'07"W 488'S51°22'07"E 399.5'S50°50'58"E 182.63'S51°16'33"E 297.97'S31°07'53"W 82.3'N50°46'14"W 50.43'S31°07'54"W 348.4'N31°07'53"E 368map 2159A 0 SCALE: 1"= 1000' 1000 1000 2000 LOCATION SITE PROJECT CONTACT JONATHAN@USARECYCLE.COM, (860) 746-3218 555 TAYLOR ROAD, ENFIELD, CT 06082 MR SOUTH WINDSOR PROPERTIES, LLC. JONATHAN MURRAY Civil Engineering Land SurveyingEnvironmental Consulting Construction Management SITE DEVELOPMENT PLANS USA HAULING & RECYCLING - CNG FUELING STATION 570, 600 & 602 NUTMEG ROAD, SOUTH WINDSOR, CT OF PREPARED FOR MR SOUTH WINDSOR PROPERTIES, LLC. 555 TAYLOR ROAD, ENFIELD, CT 06082 LIST OF SHEETS DATE: 7/8/25 OVERALL MAP SITE DEVELOPMENT PLAN DETAILS AND NOTES DETAILS AND NOTES SUBMITTED UNDER SEPARATE COVER: IMPROVEMENT LOCATION PLANS PREPARED BY OTHERS AND IMPROVEMENT LOCATION MAP AS BUILT PLAN IMPROVEMENT LOCATION MAP AS BUILT PLAN 1 2 3 4 1 OF 2 2 OF 2 PREPARED BY: Project No. 4481-159 LOCATION MAP SCALE: 1" = 1000' REVISED: www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive+/- 1,600 FT+/- 1,400 FT1603.28' 1370.34' MARCEL O. BIZIER JORDAN & ELAINE PERLROTH ALBERT J. SCHNEIDER N/F EXISTING EDGE OF BIT. PAVING 74 1000.00' (TOTAL)S EXISTING BIT. CONC. CURBING 309.55'S F T ELECTRICAL TRANSFORMER PAD 10' SIDE YARD7 2 EXISTING LIGHT POLE50.43'IN PLACE. 8" MIN. COMPACTED EXISTING UTILITY POLE GRAVEL AREA (TYP.) EXISTING SPOT GRADE10' SIDE YARD AREA373.19'EXISTING WATER MAIN AND HYDRANT GRAVEL 76S S EXISTING SANITARY MANHOLE AND PIPE S 74 EXISTING CATCH BASIN AND PIPE 7 6 MONUMENT TO BE SET S EXISTING MONUMENT F EXISTING IRON PIN F IRON PIN TO BE SET S BASIN LEGEND DETENTION 348.40' (TOTAL)WETLANDAREA INLANDGRAVEL 290.34'297.97'78 5.39 ac. 235,171 sq. ft.TREELINE LOT 310' SIDE YARDPAD CONCRETE 2.05 ac. 89,697 sq. ft.1" DIA. STONE. STRIP OF CRUSHED 25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATION GRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S SA R E A ALBERT J. SCHNEIDER G R A V E L N/F E 190,217.86E 189,297.31 80LIONEL R. GELINAS N 177,041.65 N 176,650.26 10' SIDE YARDSTATIONN/F HYD.RECYCLING 1928.72' (TOTAL)WG METAL E 283.00'FF82.30'F EXISTING 626.81'373.49'S 10' SIDE YARDGasE10' SIDE YARDEGInv. 73.16 SFL 71.01S Rim 80.16 Rim 78.54 SMH #2 EXISTING EDGE OF PAVEMENTSMH #1 EG808"PVC S C A L E GATE S EG100.86'81 488.00'EGP A V E M E N T12.00'2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.B I T U M I N O U S3 5' BUILDING LI NE@ 1.80%EG82 40.00'15.00'EG114.00' 75.00'6" U.D.8"PVC TF:79.06ESG78 L.F.INV:77.46Fl 75.19 DETENTION BASIN TRENCH DRAIN EXISTING GT 140.15' RELIABLE REFUSE BUILDING 105.00'PadW ALLConc.25' REAR YARD50.00'CONCRETE 82 40.00'EXIST.100.05'2.33 ac. Fin. Floor 83.06146.26'101,667 sq. ft.100.08'C E N T E R LOT 12 0.00'165.00'R E N E W A L S (247.13' TOTAL)R E S O U R C E 5.29 ac. APRON 230,694 sq. ft. CONCRETE1 81.04'(PARCEL 1)35' BUILDING LINE80Gate LOT 2METAL SHED (TYP.)62.87'EXISTING TREE LINE 140.18' 10' SIDE YARD 283.00'157.93'377.02'399.50' (2289.82' TOTAL)F182.63'F 934.45' (TOTAL) 16.37'F F 16.03' JOSEPH W. VIBERT, JR. 80N/FLIMITED PARTNERSHIP LIEBERT FAMILY N/F 73.66 + 76.50 + 76.50 78.25 + 78.75 78.75 + 79.25 + +/- 75.2 7677.00 + + +/- 75.6 + +/- 75.4 27123 EVERSOURCE 0 SCALE: 1"= 100' 100 100 200 78 79 77 Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS SCALE: 1"= 100' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION OVERALL MAP SHEET NO.OF1 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive 570 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 600 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 580 NUTMEG ROAD LRG, LLC N/F 602 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 612 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 636 NUTMEG ROAD NORTH NUTMEG ASSOCIATES, LLC. N/F 652 NUTMEG ROAD ANNE-KAY CORPORATION N/F 614 NUTMEG ROAD VIRBERT JOHNSON EDITH ARLINE N/F 564 NUTMEG ROAD THE JE SHEPARD COMPANY N/F 540 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 550 FOSTER ROAD THE JE SHEPARD COMPANY N/F 585 NUTMEG ROAD SJD PROPERTY MANAGEMENT, LLC N/F 571 NUTMEG ROAD MJJ REALTY, LLC N/F 595 NUTMEG ROAD NUTMEG ROAD NORTH 595, LLC N/F 591 NUTMEG ROAD NUTMEG ROAD NORTH 591, LLC N/F 625 NUTMEG ROAD SPIRIT MASTER FUNDING X, LLC N/F 239 FOSTER ROAD FOSTER ROAD ASSOCIATES, LLC. N/F 560 NUTMEG ROAD 560 NUTMEG ROAD NORTH, LLC N/F 555 NUTMEG ROAD LIMITED PARTNERSHIP 555 NUTMEG OWNER N/F PROPOSED ENTRANCE AND PARKING IMPROVEMENTS UNDERGROUND STORMWATER STORAGE UNITS PROPOSED CONVERSION OF STORMWATER POND WITH FUELING STATION PROPOSED CNG 604 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F INDUSTRIAL ZONERURAL RESIDENTIAL ZONE500' PROPERTY DRIVEWAY CUTS (TYP.) APPROXIMATE LOCATION OF ABUTTING NUTMEG ROAD NORTH + + +++ +++ ++ ++ + + + + + + + ++ + + + + + + 5WF 4WF 3WF 2WF 1WF 9WF 10WF 10WF 11WF 5WF 6WF 23WF 22WF 21WF20WF 19WF 18WF 17WF 16WF 15WF 14WF 13WF 12WF 1XWF 2XWF 3XWF 4XWF 5XWF 19WF 6XWF 7XWF 9XWF8XWF 15XWF 14XWF 13XWF 12XWF 10XWF 19XWF 18XWF17XWF 16XWF 20XWF20X-1WF 20X-2WF20X-3WF 20X-4WF 20X-6WF 20X-7WF 20X-8WF + + + + + + + + + + + + + + + + + + + + + + + JORDAN & ELAINE PERLROTH ALBERT J. SCHNEIDER N/F EXISTING EDGE OF BIT. PAVING 74 1000.00' (TOTAL)S EXISTING BIT. CONC. CURBING 309.55'S F T ELECTRICAL TRANSFORMER PAD 10' SIDE YARD7 2 EXISTING LIGHT POLE50.43'IN PLACE. 8" MIN. COMPACTED EXISTING UTILITY POLE GRAVEL AREA (TYP.) EXISTING SPOT GRADE 10' SIDE YARD AREA 373.19'EXISTING WATER MAIN AND HYDRANT GRAVEL 76S S EXISTING SANITARY MANHOLE AND PIPE S 74 EXISTING CATCH BASIN AND PIPE 7 6 MONUMENT TO BE SET S EXISTING MONUMENT F EXISTING IRON PIN F IRON PIN TO BE SET S BASIN LEGEND DETENTION 348.40' (TOTAL)WETLANDAREA INLAND GRAVEL 290.34'297.97'78 5.39 ac. 235,171 sq. ft.TREELINE LOT 310' SIDE YARDPAD CONCRETE 2.05 ac. 89,697 sq. ft.1" DIA. STONE. STRIP OF CRUSHED 25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATION GRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S SA R E A ALBERT J. SCHNEIDER G R A V E L N/F E 190,217.86E 189,297.31 80LIONEL R. GELINAS N 177,041.65 N 176,650.26 10' SIDE YARDSTATIONN/F HYD.RECYCLING 1928.72' (TOTAL)WG METAL E 283.00'FF82.30'F EXISTING 626.81'373.49'S 10' SIDE YARDGasE10' SIDE YARDEGInv. 73.16 SFL 71.01S Rim 80.16 Rim 78.54 SMH #2 EXISTING EDGE OF PAVEMENTSMH #1 EG808"PVC S C A L E GATE S EG100.86'81 488.00'EGP A V E M E N T12.00'2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.B I T U M I N O U S3 5' BUILDING LINE@ 1.80%EG82 40.00'15.00'EG114.00' 75.00'6" U.D.8"PVC TF:79.06EGS 78 L.F.INV:77.46Fl 75.19 DETENTION BASIN TRENCH DRAIN EXISTING GT 140.15' RELIABLE REFUSE BUILDING 105.00'PadW ALLConc.25' REAR YARD50.00'CONCRETE 82 40.00' EXIST.100.05'2.33 ac. Fin. Floor 83.06146.26'101,667 sq. ft.100.08'C E N T E R LOT 1 20.00'165.00' R E N E W A L S (247.13' TOTAL)R E S O U R C E 5.29 ac. APRON 230,694 sq. ft. CONCRETE 181.04'(PARCEL 1)35' BUILDING LINE80Gate LOT 2METAL SHED (TYP.)62.87'EXISTING TREE LINE 140.18' 10' SIDE YARD 283.00'157.93'377.02'399.50' (2289.82' TOTAL)F182.63'F 934.45' (TOTAL) 16.37' F F 16.03' JOSEPH W. VIBERT, JR. 80N/FLIMITED PARTNERSHIP LIEBERT FAMILY N/F CONCRETE BITUMINOUS BUILDING STORAGE W G + INV. = 72.72 15" R.C.P. + INV. = 72.75 15" R.C.P. + INV. = 72.86 24" R.C.P. + + + + + + + + + + + + + + + + + + + + + + + + + + + + INV. = 71.97 18" R.C.P. + + + + + + + + + 74 + + + + + INV. = 73.88 8" PVC + + + + + + + + + + + + + + + + + + ++ + + + + + 76 + + T.F. = 76.20 C.B. TYPE 'CL' + + + + + + + + + + + + GATE + (TYP) BOLLARD + + + + + FENCE CHAINLINK + + + + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ + ++ ++ + + T.F. = 77.82 C.B. TYPE 'CL' + + + + + + + + + +7878 + + + + + + + + ++ + + + + + + + + + + + + + + + + BIT CURB + + GATE + + + + + + + + + + + + + + + + + + + + + +80+ + + + + + + + + + + + T.F. = 81.45 SANITARY M.H. + T.F. = 81.46 SANITARY M.H. + + + + + ++ + + + 73.66 + 76.50 + 76.50 78.25 + 78.75 78.75 + 79.25 + +/- 75.2 7677.00 + + +/- 75.6 + +/- 75.4 27123 EVERSOURCE 0 SCALE: 1"= 40' 40 40 80 ZONING COMPLIANCE TABLE PARKING COMPLIANCE TABLE 78 79 77 Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION SITE PLAN SHEET NO.OF2 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive 602 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 600 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 580 NUTMEG ROAD LRG, LLC N/F MAP REFERENCE:NUTMEG ROAD NORTHELECTRICAL TRANSFORMER COMPOUND STATION EQUIPMENT NATURAL GAS FUELING MOTORWAY SERVICE AREA 570 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 32 SPACES PROVIDED FUELING/PARKING AREA. APPROXIMATE LIMIT OF PROPOSED 9 SPACES PROVIDED FUELING/PARKING AREA. APPROXIMATE LIMIT OF PROPOSED REGULATED ACTIVITIES INLET PROTECTION (TYP.) 6/3/1996 PREPARED BY DESIGN PROFESSIONALS, INC. SURVEY, 602 NUTMEG ROAD NORTH, SOUTH WINDSOR, CONNECTICUT" DATED SURVEY FOR 570, 600 AND 602 NUTMEG STREET NORTH, PLAN ENTITLED "PROPERTY 2. WETLAND SCIENTIST, REGISTERED SOIL SCIENTIST OF DAVISON ENVIRONMENTAL. WETLAND DELINEATION PERFORMED ON JANUARY 18, 2025 BY ERIC DAVISON, 1. 10"ø INV.= 72.5 TF= 76.0+/- NEW YARD DRAIN 8"ø INVERTS = 72.3 15"ø INVERT = 72.0 WITH 8"ø TEE OUTLET PIPES. 15"ø SLOTTED HDPE PIPE @ 0.0% 17'- 15"ø HDPE@ 2.0% REMOVE 18"ø IN & 24"ø OUT 15"ø IN TO REMAIN NEW 15"ø OUT= 75.2 TF= 77.6+/- EXIST. CB NEW 10"ø INV.= 72.0 (MATCH EXIST.) INV.= 71.8+/- TF= 78.5+/- NEW STORM MANHOLE 65 L.F.- 10"ø HDPE @ 0.77% 24"ø INV. OUT (N)= 73.4 EX. 18"ø INV. IN (E)= 74.65+/- 15"ø INV. IN (W)= 74.85 TF= 78+/- WQV= 2.7 CFS AND 10 YEAR STORM BYPASS. CONTECH CDS OR EQUIVALENT SIZED FOR NEW HYDRODYNAMIC SEPARATOR STRUCTURE 18"ø INV. OUT (S)= 72.3 15"ø INV. IN (W)= 72.3 TF= 80+/- WQV= 1.5 CFS AND 10 YEAR STORM BYPASS. CONTECH CDS OR EQUIVALENT SIZED FOR NEW HYDRODYNAMIC SEPARATOR STRUCTURE FROM EAST TO 18"ø PIPE. TIE EXIST. 8" PVC PIPE 8"ø INVERTS= 74.1 18"ø INVERT= 73.7 WITH 8"ø TEE INLET PIPES. 18"ø SLOTTED HDPE @ 0.0% 8"ø INVERTS= 73.75 18"ø INVERT= 72.3 WITH 8"ø TEE INLET PIPES. 18"ø SLOTTED HDPE @ 0.0% 46'- 15"ø HDPE PIPE @ 0.5% REMOVE EXISTING 15"ø PIPE EX. ROOF LEADERS TO REMAIN NEW 15"ø INV IN & OUT=72.55 EX TF= 77.82 EXIST. CB (TO REMAIN) PIPE @ 0.5% 65'- 15"ø HDPE 8"ø INVERTS OUT= 72.5+/- 8"ø INVERTS IN= 74.0/73.7 TOP OF STONE = 75.75 TOP OF CHAMBERS = 75.25 BOTTOM OF CHAMBERS = 72.50 BOTTOM OF STONE = 72.0 EACH OF SC-800 STORM CHAMBERS WITH STONE. TO UNDERGROUND STORAGE: 23 ROWS OF 21 UNITS EXISTING STORMWATER BASIN TO BE CONVERTED START NEW BCLC END NEW BCLC NEW GRASS ISLAND ALONG SCALE START BITUMINOUS CURBING 18'9'WITHIN LIMITS OF IMPROVEMENTS REMOVE EXISTING CURBING GRADE TO DRAIN (TYP.) PRIOR TO THE START OF CONSTRUCTION PROPOSED ELEVATIONS TO BE FIELD VERIFIED TIE EX. ROOF LEADER TO CB REMOVE EX. 15"ø PIPE NEW 15"ø INV=72.9 EX TF= 76.20 EXIST. CB (TO REMAIN) GAS AND ELECTRICAL SERVICE LINES. PROPOSED EASEMENT FOR UNDERGROUND AREAS ON SITE. SHALL BE LOCATED WITHIN EXISTING PAVED 8 SPACES PROVIDED. ADDITIONAL PARKING PROPOSED RELOCATED PARKING SPACES END BITUMINOUS CURBING CURBING END BITUMINOUS LIMIT OF CLEARING (TYP.) SOUTH = +/-830 NORTH = +/-710 SIGHT LINE 570 NUTMEG ROAD 600 NUTMEG ROAD 602 NUTMEG ROAD 100' U.R.A.100' U.R.A. 100' U.R.A. REMOVED. STRUCTURE TO BE EXISTING OUTLET PROPOSEDEXISTING ZONING DISTRICT: I (INDUSTRIAL ZONE) ZONING COMPLIANCE BASED UPON ARTICLE VI OF THE ZONING REGULATION MAX. BUILDING HEIGHT: MAX. LOT COVERAGE: MAX. IMPERVIOUS COVERAGE: MAX. STORIES MIN. SIDE YARD: MIN. REAR YARD: MIN. FRONT YARD: MIN. DEPTH: MIN. LOT FRONTAGE: MIN. LOT SIZE: 40 FT 50% 65% 2 STORIES 10 FT 25 FT 35 FT 150 FT 100 FT 30,000 SF I DISTRICT REQUIREMENTS EXISTING PROPOSED EXISTING PROPOSED 570 NUTMEG ROAD 600 NUTMEG ROAD 602 NUTMEG ROAD < 40 FT 6.1% 44.5% < 2 STORIES +/-16 FT > 25 FT > 35 FT > 150 FT 100.86 FT 230,432 SF ALONG EXISTING BASIN INSTALL SILT FENCE/HAYBALES INSTALL HAYBALE BARRIER -SEE DETAIL OF STOCKPILE AREA APPROXIMATE LOCATION 872 S.F., 0.02 AC.748 S.F., 0.017 AC. TOTAL DISTURBANCE 1,620 S.F., 0.037 AC. ALONG CONSERVATION AREA INSTALL SILT FENCE/HAYBALES UPLAND REVIEW DISTURBANCES WETLAND DISTURBANCES WETLAND SIZE LOCATION 32,548 S.F., 0.75 AC., 13.8%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC.,30' STORMWATER TREATMENT NOTE: PROCEDURES. RECOMMENDED MAINTENANCE. SUGGESTED INSPECTION INTERVALS & CLEANING (6) MONTHS OR PER THE MANUFACTURER'S RECOMMENDATION. INCLUDE MANUFACTURERS THE SYSTEM MUST BE INSPECTED AND CLEANED TO THE SHORTER OF A MINIMUM OF SIX 7. OF THE SYSTEM. AND OTHER DESIGN ELEMENTS THAT CORRESPOND TO THE HYDRAULIC CHARACTERISTICS PROPOSED SIZE AND ELEVATION OF CRITICAL WEIR, ORIFICE, PIPE INVERT ELEVATIONS, 6. ORIENTATION OF THE SYSTEM IN PLAN VIEW WITH RESPECT TO THE APPROVED SITE PLAN.5. CRITICAL LOCATIONS. EVENT IN THE FIRST STRUCTURE LOCATED UPSTREAM OF THE SYSTEM AND ANY OTHER CALCULATIONS OF THE HYDRAULIC GRADE LINE ELEVATIONS FOR THE DESIGN STORM 4. FLOW. ANNUAL TOTAL SUSPENDED SOLIDS WILL BE REMOVED FROM THE WATER QUALITY CALCULATIONS OR DOCUMENTATION VERIFYING THAT 80% (MIN.) OF THE AVERAGE 3. EXCEED THE DESIGN STORM FLOW. "CONVEYED" FLOW FOR THE SPECIFIED SYSTEM AND MODEL, WHICH MUST EQUAL OF 2. EXCEED THE WATER QUALITY FLOW. "TREATED" FLOW FOR THE SPECIFIED SYSTEM AND MODEL, WHICH MUST EQUAL OR1. FABRICATION. SHOP DRAWING SUBMITTAL'S MUST INCLUDE: PROPOSED SYSTEM MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER PRIOR TO MONTHS OR PER THE MANUFACTURERS' RECOMMENDATION. SHOP DRAWINGS OF THE THE SYSTEM MUST BE INSPECTED AND CLEANED TO THE SHORTER OF A MINIMUM OF SIX (6) OF THE 10-YEAR PEAK DESIGN STORM FLOW. OF THE TOTAL SUSPENDED SOLIDS FROM THE WATER QUALITY FLOW & WITH INTERNAL BYPASS THE STORMWATER TREATMENT SYSTEMS MUST BE DESIGNED TO REMOVE A MINIMUM OF 80% CATCH BASINS HYDRODYNAMIC SEPARATORS ~CHECK OUTLET PIPES FOR BLOCKAGE AND ANY SEDIMENT, CLEAR AS REQUIRED. ~CHECK FRAMES AND COVERS FOR DAMAGE AND REPAIR AS REQUIRED; ~REMOVE SEDIMENT BEFORE DEPTH REACHES THE MAXIMUM SEDIMENT DEPTH ~CHECK OUTLET PIPES FOR BLOCKAGE AND CLEAR AS REQUIRED. ~CHECK FRAMES AND GRATES FOR DAMAGE AND REPAIR AS REQUIRED; ~REMOVE SEDIMENT WHEN DEPTH OF ACCUMULATED SEDIMENT EXCEEDS 12"; STORAGE SYSTEM: STRUCTURES IS ESSENTIAL FOR THE CONTINUED OPERATION OF THE UNDERGROUND TWICE ANNUALLY. CLEANING SEDIMENT AND DEBRIS FROM THE PRE-TREATMENT THE EXISTING CATCH BASINS AND NEW TREATMENT STRUCTURES WILL BE INSPECTED OPERATION & MAINTENANCE STORMWATER SEQUENCE OF CONSTRUCTION ANTICIPATED ESTIMATED CONSTRUCTION SCHEDULE 1. SEE SEQUENCE OF CONSTRUCTION FOR FURTHER DETAILS AND CLARIFICATION.2. ON WEATHER CONDITIONS. CONSTRUCTION WILL BE COMPLETED BY THE END OF DECEMBER. OF SEPTEMBER AND THE PROJECT IS EXPECTED TO LAST 8-12 WEEKS, DEPENDING AN ESTIMATED START DATE FOR THE PROJECT IS SCHEDULED FOR THE END CURBING START BITUMINOUS PROJECT ENGINEER. A LOCATION SELECTED BY TOWN STAFF AND THE LOCATED AT THE EDGE OF THE EXISTING PAVEMENT AT TO FURTHER REDUCE MATERIAL TRACKING IT SHALL BE CONSTRUCTION ACCESS/TRACKING PAD IS REQUIRED OPERATIONS AND MAINTENANCE (O&M) PLAN. IF A BE PERFORMED AS PART OF THE FACILITY'S CURRENT DEBRIS REMOVAL GENERATED BY THIS PROJECT SHALL FOR ALL CONSTRUCTION ACCESS. DUST CONTROL AND THE SITE'S EXISTING PAVED DRIVEWAY SHALL BE USED REMOVE EROSION & SEDIMENTATION CONTROLS ONCE VEGETATION IS ESTABLISHED.14. FUELING STATION PLANS. INSTALL FUELING STATION EQUIPMENT AS SHOWN ON CLEAN ENERGY'S CNG13. INSTALL FOUNDATIONS FOR FUELING STATION EQUIPMENT.12. INSTALL ELECTRICAL AND GAS LINES WITHIN EASEMENTS.11. COMPLETE CONSTRUCTION & RESTORATION.10. DRAINAGE STRUCTURES. INSTALL THE SLOTTED HDPE INLET AND OUTLET HEADER PIPES AND CONNECT TO9. COMPLETE INSTALLATION OF THE UNDERGROUND STORAGE SYSTEM. INSTALL NON-WOVEN SEPARATION GEOTEXTILE ON PREPARED SUBGRADE AND 8. INSTALLATION OF THE UNDERGROUND STORAGE SYSTEM. EXCAVATE & REPLACE UNSUITABLE MATERIALS PRIOR TO STARTING THE7. AND PLACE INTO STORAGE CONTAINERS TO BE REMOVED OFF-SITE. EXCAVATE EXISTING MATERIAL ON THE BOTTOM OF THE STORMWATER BASIN 6. OUTLET STRUCTURE TO REMOVE THE STANDING WATER IN THE BASIN. INSTALL PUMP(S) IN THE EXISTING BASIN & DISCHARGE PIPING TO THE EXISTING5. FLOW INTO THE EXISTING BASIN OUTLET STRUCTURE. TO BE USED DURING CONSTRUCTION AS NEEDED TO MAINTAIN TEMPORARY INSTALL A PUMP IN EACH TREATMENT STRUCTURE WITH DISCHARGE PIPING4. DISCHARGE EXISTING STORM DRAINAGE TO THE TREATMENT STRUCTURES. INSTALL NEW STORMWATER TREATMENT STRUCTURES AND NEW PIPING TO 3. DRAINAGE INSTALLATION. SAWCUT & REMOVE PAVEMENT AS REQUIRED TO COMPLETE NEW STORM2. OR AS ORDERED BY THE ENGINEER. INSTALL EROSION CONTROL MEASURES AT LOCATIONS INDICATED ON PLANS1.16'62.90'159' 74' NOT APPLICABLE 570 NUTMEG ROAD 190.94' PROPOSED 30' BITUMINOUS CONCRETE DRIVEWAY PROPOSED STOP SIGN GRANTOR MR SOUTH WINDSOR PROPERTIES, LLC. MR SOUTH WINDSOR PROPERTIES, LLC. EVERSOURCE ENERGY EVERSOURCE ENERGY EASEMENTS GRANTEE TYPE OF EASEMENT ELECTRICAL GAS DATE FILED PENDING PENDING VOL/PG 7/8/25 7/8/25 - 4.5 SPACES PER 1,000 SF. OF GFA - BUSINESS OFFICE < 50,000 SF. OF GFA MINIMUM REQUIRED PARKING SPACES FOR THE LARGEST SHIFT, WHICHEVER IS GREATER EMPLOYEES 3 2- 1 SPACE PER 700 SF. OF GFA OR 1 SPACE PER - COMMERCIAL AND INDUSTRIAL TOTAL = 20 SPACES REQUIRED = 6.7 = 7 SPACES 3 2= 60 x 10 IN TRANSFER STATION NUMBER OF EMPLOYEES = OR 14,000 /700 = 20 SPACES EX. TRANSFER STATION = 14,000 S.F. 602 NUTMEG ROAD PARKING AND ACESS - OFF STREET PARKING AND LOADING (TABLE 6.4.3B) ZONING COMPLIANCE BASED UPON SECTION 6.4 < 40 FT 21.3% 62.3% < 2 STORIES 62.9 FT > 25 FT 159 FT > 150 FT 146.26 FT 101,495 SF N/A N/A 28% N/A N/A > 25 FT N/A > 150 FT 50.43 FT 234,788 SF N/A N/A 31% N/A 10 FT > 25 FT N/A > 150 FT 50.43 FT 234,788 SF < 40 FT 21.3% 69.7% NO CHANGE 62.9 FT > 25 FT 159 FT > 150 FT 146.26 FT 101,495 SF < 40 FT 6.1% 44.5% NO CHANGE +/-16 FT > 25 FT > 35 FT > 150 FT 100.86 FT 230,432 SF PROPOSED GAS SERVICE 47 SPACES PROVIDED TOTAL = 9 + 31 = 40 SPACES REQUIRED = 31 SPACES3 2= 46 EMPLOYEES = 46x EX. GARAGE - 46 DRIVERS NUMBER OF EMPLOYEES = OR TOTAL = 32 SPACES 15,600/700 = 22.3 = 23 SPACES EX. GARAGE = 15,600 S.F. 2000 /1000 = 2 x 4.5 = 9 SPACES EX. OFFICE BUILDING = 2,000 S.F. 600 NUTMEG ROAD 32 SPACES PROVIDED 28 SPACES PROVIDED FOR MORE DETAILS - SEE CLEAN ENERGY PLANS PROPOSED GAS PUMPS (TYP.) FOR MORE DETAILS - SEE CLEAN ENERGY PLANS PROPOSED GAS PUMPS (TYP.) HOURS OF OBSERVED FAILURE. REPAIR OR REPLACE WITHIN 244. EROSION CONTROL NOTES. IS HALF FULL AND DEPOSIT PER REMOVE SEDIMENT WHEN BAG3. NOTES OR AS DIRECTED. CONTROLINSPECT PER EROSION2. SPECIFICATIONS. INSTALL PER MANUFACTURER1. NOTES: NOT TO SCALE REQUIRED TACK COAT AS (COMPACTED) 8" PROCESSED GRAVEL COMPACTED SUBGRADE BITUMINOUS PAVEMENT SECTION 4" HMA S0.5 IN TWO EQUAL LIFTS BITUMINOUS PAVEMENT NOT TO SCALE DRIVEWAY APRON DETAIL NOT TO SCALE PAVEMENT 21 48°1'-0" 9"3"1"6"CURB (BCLC) BITUMINOUS CONCRETE SECTION CURBING SHALL BE MACHINE EXTRUDED.2. PRIOR TO PLACING CURB. AND AN APPROVED TACK COAT SHALL BE APPLIED JUST SURFACE ON WHICH CURBING IS PLACED SHALL BE CLEAN1. CURB NOTES: SUBGRADE ELEVATION LIMITS OF IN 12" (MAX.) LAYERS MATERIAL COMPACTED APPROVED NATIVE GRANULAR FILL OR 0.25 O.D. MATERIAL BEDDING PIPE DIA.PLACED BY HANDPIPE O.D.12"VARIES12" IN ROCK 4" IN EARTH NOTES: NOT TO SCALE OF ELLIPTICAL PIPE OR HORIZ. SPAN & BACKFILL TRENCH EXCAVATION TRENCHING & BACKFILLING USE WATERTIGHT RUBBER GASKETS IN ALL PIPE JOINTS.2. ALL PIPE TO BE HDPE UNLESS OTHERWISE SPECIFIED.1. I.D. + 2' (PIPE UNDER 30") ELLIPTICAL PIPE OVER & FOR HORIZ. I.D. + 3' FOR PIPE 30" & NOT TO SCALE WIDTH OF EXCAVATION ANGULAR STONE 3/4" - 2" WASHED, CRUSHED 42" NOTE: SEE PLANS FOR INVERTS AND PIPE SIZE. INLET/OUTLET PIPE HEADER DETAIL Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION DETAILS AND NOTES SHEET NO.OF3 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive NOT TO SCALE INLET SEDIMENT CONTROL DEVICE NOT TO SCALE EMBANKMENT SLOPETOE OF SLOPEFLOW OF SLOPETOE DEPTH OF 4" BURY TO A SIDE SLOPE VARIES BOTTOM OF SWALE SIDE SLOPE VARIES FLOWSWALECL VARIESAS DIRECTED(100' MAX.)FLOWBALES BUTTED TOGETHER BOTTOM OF DRAINAGE WAY A POINT A SHALL BE HIGHER THAN POINT B A B - +10' - +10' BALED HAY OR STRAW TOGETHER BALES BUTTED BARRIER CREATE A CONTINUOUS BETWEEN BALES TO WEDGE LOOSE STRAW (2 STAKES PER BALE) OR REBAR EACH BALE 2"x2"x3' LONG STAKES WIRE OR TWINE DIRECTION OF BINDING EXISTING GRADE BACKFILL COMPACTED BARRIER CREATE A CONTINUOUS BETWEEN BALES TO WEDGE LOOSE STRAW OR STRAW BALED HAY WIRE OR TWINE DIRECTION OF BINDING OR REBARS EACH BALE 2"x2"x3' LONG STAKES GRADE EXISTING SECTION AT TOE OF SLOPE PLAN PLAN SECTION AT SWALE B HAY BALES NOT TO SCALE FLOW 3'-0" MIN.NOTES: OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER3. POSTS (0.5 # STEEL/L.F.). THE MINIMUM POST LENGTH SHALL BE 5'-0". SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL 2. INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.1. 100 2'-6" MIN.12" MIN. 6" MIN.10'-0" MAX. SILT FENCE ELEVATION SECTION GRADE FINISH FENCE (SEE NOTE 2) ATTACHED TO WIRE SILT FENCE FABRIC SELF-SUPPORTING (MIN. LENGTH: 3' - 6') 1" x 2" WOOD STAKE GROUND FABRIC BELOW EXTEND 6" OF BACKFILL RECOMPACTED GRADE FINISH 2 MAX 3RUN-OFF FLOW DIRECTION (TYP.) NOT TO SCALE SOIL STOCKPILE DETAIL PER EROSION & SEDIMENTATION PLAN PLACEMENT OF MATERIAL STOCKPILE NOT TO SCALE TURFGRASS SEED MIX FINISH GRADE (SEE GRADING PLAN) (SEE GRADING PLAN) PREPARED SUBGRADE 4" TOPSOIL (4" THICKNESS) SUBGRADE EXISTING TURF ESTABLISHMENT (POA PRATENSIS) KENTUCKY BLUE GRASS (ELYMUS CANADENSIS) CANADA WILDRYE (SORGHASTRUM NUTANS) INDIAN GRASS (CHAMAECRISTA FASCICULATA) PARTRIDGE PEA RUBRA L. SSP. RUBRA) RED FESCUE (FESTUCA (AGROSTIS CANINA) VELVET BENTGRASS, SPECIES 10 5 15 10 35 25 (POUNDS) BY WEIGHT PROPORTION 95 95 95 95 97 96 (PERCENT) PURITY MINIMUM 90 90 90 90 80 85 (PERCENT) GERMINATION MINIMUM EROSION & SEDIMENTATION CONTROL PLAN: EROSION & SEDIMENTATION CONTROL NOTES: APPLIED AT A RATE OF 100 LBS. PER ACRE. TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS (LOLIUM PERENNE)13. THE FOLLOWING GRASS SEED MIXTURES SHALL BE APPLIED AT A RATE NO LESS THAN 100 LBS. PER ACRE:11. FALL: AUGUST 15 TO SEPTEMBER 15 SPRING: APRIL 15 TO JUNE 15 THE FOLLOWING DATES FOR SEEDING SHALL BE USED:10. AREAS OUTSIDE OF PAVED AREAS, WALKS, AND BUILDINGS ARE TO RECEIVE A MINIMUM 4" OF TOPSOIL.9. ESTABLISHMENT" SPECIFICATION IN CTDOT 819, AT THE COMPLETION OF PROJECT. ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF8. CONTROL DEVICES AS SHOWN ON THESE PLANS OR AS ORDERED BY THE ENGINEER. THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL EROSION AND SEDIMENTATION7. OR TOWN. CONSTRUCTION PERIOD IF DEEMED NECESSARY OR REQUIRED BY THE ENGINEER ADDITIONAL EROSION CONTROL MEASURES WILL BE INSTALLED DURING THE6. MANNER WHICH IS CONSISTENT WITH THE INTENT OF THE PLAN. SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A5. REPLACED OR INCREASED AS REQUIRED BY SPECIFIC FIELD CONDITIONS. WITHIN 24-HOURS AFTER A RAIN EVENT OF AT LEAST A HALF-INCH, AND MAINTAINED, ALL ON-SITE EROSION AND SEDIMENT CONTROLS ARE REQUIRED TO BE INSPECTED4. BY THE ENGINEER OR TOWN. CONTRACTOR DURING THE CONSTRUCTION PERIOD AS NECESSARY OR AS REQUIRED ALL EROSION CONTROL DEVICES SHALL BE MAINTAINED OR REPLACED BY THE3. AND THE TOWN REGULATIONS. GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL", DATED 2024, AS AMENDED ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE "CONNECTICUT ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CONSTRUCTED IN 2. ON THE PLANS, OR AS DIRECTED BY THE TOWN PRIOR TO CONSTRUCTION. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED AS SHOWN1. ACTIVITIES. ALL TEMPORARY STORMWATER DISCHARGE WILL BE DIRECTED TO THESE TRAPS. TEMPORARY SEDIMENT TRAPS WILL BE INSTALLED AS NECESSARY DURING CONSTRUCTION4. ALL DISTURBED AREAS HAVE BEEN STABILIZED, AS REQUIRED BY FIELD CONDITIONS. DUST CONTROL MEASURES WILL BE APPLIED DURING THE CONSTRUCTION PERIOD UNTIL3. OF SOIL. AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL ON-SITE STOCKPILES2. NOTED OR AGREED UPON WITH TOWN STAFF. SITE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, UNLESS OTHERWISE ALL EROSION AND CONTROL MEASURES WILL BE INSTALLED AT THE PROJECT1. DUMPING STRAPS PORTS OUTFLOW OPTIONAL CURB FILTER LIFT STRAPS STORM GRATE CURB OPENING SILT SACK ENTIRE STONE ENVELOPE WRAP FILTER FABRIC AROUND 3"4' MIN.HDPE PIPE 12" or 18" SLOTTEDVARIESPAVEMENT STRUCTURE BACKFILL WITH TOPSOIL OR 8"ø TEE PIPE STOCKPILE (TYP.) OF MATERIAL GRADIENT SIDE PLACED ON DOWN SYSTEM TO BE EROSION CONTROL N.T.S. PLAN VIEW B-B FIBERGLASS SEPARATION CYLINDER AND INLET CENTER OF CDS STRUCTURE, SCREEN AND SUMP OPENING PVC HYDRAULIC SHEAR PLATE 2'-0" [610](2'-0" [610])1'-9" [533](4'-6" [1372])N.T.S. ELEVATION A-A FIBERGLASS SEPARATION CYLINDER AND INLET SOLIDS STORAGE SUMP SEPARATION SCREEN INLET PIPE (MULTIPLE INLET PIPES MAY BE ACCOMMODATED) OUTLET PIPE PVC HYDRAULIC SHEAR PLATE (4'-0" [1219])FLOW PERMANENT POOL ELEV. OIL BAFFLE SKIRT CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RINGS/RISERS A A 48" [1219] I.D. MANHOLE STRUCTURE TOP SLAB ACCESS (SEE FRAME AND COVER DETAIL) N.T.S. (DIAMETER VARIES) FRAME AND COVERMAX. FLOW MAX. BB F OR MAI NTENANCE CALL 1.800.338.1122 www.contechES.com TMClean water sta rt s here ®VARIESSEE NOTE 3 5" (TYP.)ODNOT TO SCALE 3' - 4' SECTION PRECAST BASE 1' - 4' AS REQUIRED SECTION(S) PRECAST RISER SEE NOTE 4 3' OR 4' SECTION PRECAST CONE 1/2 OD NOTES: FRONT SECTION TOP SECTION SIDE SECTION SEE NOTE 1 PRECAST STORM DRAIN MANHOLE (H-20) 6" 8"8"8"24" 4'-0" DIA. 6"6"4"PITCH SHELF MIN. 1"/FT CONCRETE OR BRICK BRICK INVERT CONCRETE OR LINE OF PIPES MIN. 1" PITCH @ SPRING CONCRETE OR BRICK SHELF BRICK & MORTAR KNOCKOUT WITH BETWEEN PIPE AND SEAL ANNULAR SPACE FILTER FABRIC STONE BASE OVER " CRUSHED4 312" OF SECTION AND TOP OF BASE MIN. 4" FROM BOTTOM KNOCKOUTS FOR PIPES LINE OF PIPES MIN. 1" PITCH @ SPRING CONCRETE OR BRICK SHELF BRICK INVERT CONCRETE OR ABOVE MANHOLE COVER ALL MATERIALS ARE TO MEET CONN. DOT SPECIFICATIONS FORM 818 AS AMENDED.5. FILL LIFTING HOLES WITH MORTAR.4. ALL PIPES SHALL BE CUT FLUSH WITH INSIDE WALLS.3. FOR SHALLOW STRUCTURES, USE 8" SLAB IN PLACE OF CONE SECTION.2. AND NUMBER OF PIPES. INCREASE WALL THICKNESS 1" FOR EACH 1 FT. OF INSIDE DIAMETER INCREASE. MANHOLE INSIDE DIAMETER MAY BE INCREASED AS DIRECTED BY THE ENGINEER TO ACCOMMODATE SIZE1. 6" MIN. - 12" MAX. OR BRICK WITH CONC. BLOCKS ADJUST FRAME ELEV. AND COVER CAST IRON FRAME NOT TO SCALE YARD DRAIN (MIN.)AGGRECATE (MIN.)NOT TO SCALE (CONTECH CDS OR APPROVED EQUAL) HYDRODYNAMIC SEPARATOR SC-800 UNDERGROUND STORAGE DETAIL NOT TO SCALE D C B A ACCEPTABLE FILL MATERIALS: STORMTECH SC-800 CHAMBER SYSTEMS WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".5. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.4. COMPACTION REQUIREMENTS. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR 3. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.2. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".1. PLEASE NOTE: COLORS. TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 750 · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2” (50 mm).· TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · REQUIREMENTS FOR HANDLING AND INSTALLATION:5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.4. CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH 3. SC-800 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".2. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".1. NOTES: MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE FILL MATERIAL FOR LAYER 'D' STARTS FROM THE FINAL FILL: PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S N/A PREPARATION REQUIREMENTS. INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED C PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. (375 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 15" FILL MATERIAL FOR LAYER 'C' STARTS FROM INITIAL FILL: THIS LAYER. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF FINES OR PROCESSED AGGREGATE. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 ¹AASHTO M43 OR A-1, A-2-4, A-3 ¹AASHTO M145 DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL B ABOVE. FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER FILL SURROUNDING THE CHAMBERS EMBEDMENT STONE: 5CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE 3, 357, 4, 467, 5, 56, 57 ¹AASHTO M43 NO COMPACTION REQUIRED. A SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. FILL BELOW CHAMBERS FROM THE FOUNDATION STONE:5CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE 3, 357, 4, 467, 5, 56, 57 ¹AASHTO M43 2,3PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE. 12" (300 mm) MIN 12" (300 mm) MIN51" (1295 mm) (75 mm) MIN 3" SUBGRADE SOILS (SEE NOTE 3) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) (2.4 m) MAX 8' AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL INCREASE COVER TO 21" (525 mm). RUTTING FROM VEHICLES MAY OCCUR, UNPAVED INSTALLATIONS WHERE *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR PROJECT SPECIFIC REQUIREMENTS. PLEASE SEE THE LAYOUT SHEET(S) FOR MINIMUM REQUIREMENTS FOR INSTALLATION. **THIS CROSS SECTION DETAIL REPRESENTS (375 mm) MIN* 15" 6" (150 mm) MIN EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PERIMETER STONE (SEE NOTE 4) SC-800 END CAP (838 mm) 33" 6" (150 mm) MIN(SEE NOTE 3) Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION DETAILS AND NOTES SHEET NO.OF4 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive FINISH GRADE WATER TIGHT GASKET 18" PVC CATCH BASIN FRAME AND GRATE STANDARD CAST IRON ROUND 1' (MIN.)6" CONCRETE 4" PROCESSED Barton & Loguidice, LLC 1 Drainage Summary Report MR South Windsor Properties, LLC Proposed Underground Stormwater Storage 600 Nutmeg Road, South Windsor, CT June 17, 2025 PROJECT DESCRIPTION The project site is an existing recycling facility located on the east side of Nutmeg Road North. The site contains three properties (570, 600 and 602 Nutmeg Road) with a combined 13.01 acres and is in the Industrial Zone. The applicant is proposing to install a natural gas fueling facility on site along with site improvements including a new entrance to the facility and the conversion of a stormwater basin to underground storage. EXISTING CONDITIONS The existing stormwater basin is centrally located amid the three parcels and straddles the property line between parcels #600 and #602. The site’s truck scale is located along the southern edge of the basin. There are three storm drains that outlet into the existing basin. These piped systems collect and carry the stormwater from #602, the easternmost section of the subject properties, as well a portion from the rear of #600. The basin has a concrete outlet control structure that drains to an existing 18” diameter pipe connected to a storm system at the western portion of the parcels. This storm system also collects the stormwater from the front of the site and outlets to the existing storm drain system in Nutmeg Road North. The basin holds approximately 9 inches of water and provides stormwater storage above this elevation. PROPOSED CONDITIONS The proposed improvement includes the installation of an underground storage system consisting of 483 units of SC-800 Infiltration chambers surrounded by crushed stone. Two new hydrodynamic structures will be installed to provide treatment of the stormwater prior to discharging to the underground storage area. The proposal is to install an underground storage system to replace the existing above ground storage of the basin. The bottom of the proposed system will be installed at the approximate bottom of the existing basin. No infiltration is considered and the storage system has been sized to replace the available volume in the existing basin. See the attached Water Quality Flow and Storage Volume computations. Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 6/17/2025 J:\4481\159\Design\Drainage Analysis\20250616 DRAIN_Treatment Structure Sizing WQV = Water Quality Volume (acre-feet) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) I = Percent Impervious Cover, Impervious Area / Total Area DA = Drainage Area (Acres)DA = 1.000 acres IA = Impervious Area (Acres)IA = 1.000 acres I = 100%R = 0.95 WQV = 0.103 acre-feet Q = Runoff Depth (in watershed inches) WQV = Water Quality Volume (acre-feet) DA = Drainage Area (acres) Q(in) = 1.24 watershed inches Q(in) = 1.24 watershed inches P = 1.3 in CN = 98 Ia = 0.041 inches Tc = 0.167 hours Ia/P = 0.032 qu = 775 csm/in WQF = Water Quality Flow (cfs) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 1.496 cfs Determine NCRS Curve Number (CN) From Appendix D, Figure 1 - Graphical Solution of Runoff Equation (Fig. 2-1 from TR-55) of the 2024 CT Stormwater Manual From Appendix D, Figure 3 - Unit Peak Discharge for NRCS Type III Rainfall Distribution (Exh. 4-111 of TR-55) of the 2024 CT SW Manual Compute Water Quality Flow Determine Initial Abstraction (Ia) From Appendix D, Figure 4 - Initial Abstraction Values for Runoff CNs (Table 4-1 of TR-55) of the 2024 CT Stormwater Manual Determine Unit Peak Discharge (qu) Time of Concentration (Tc) PROPOSED TREATMENT STRUCTURE SIZING Compute Water Quality Volume Determine Percent Impervious Cover (I)Calculate Volumetric Runoff Coefficient (R) Calculate Water Quality Volume Compute Runoff Depth DA WQVQin )12( )( ×= )(inuQDAqWQF××= Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 6/17/2025 J:\4481\159\Design\Drainage Analysis\20250616 DRAIN_Treatment Structure Sizing WQV = Water Quality Volume (acre-feet) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) I = Percent Impervious Cover, Impervious Area / Total Area DA = Drainage Area (Acres)DA = 3.000 acres IA = Impervious Area (Acres)IA = 2.500 acres I = 83%R = 0.80 WQV = 0.260 acre-feet Q = Runoff Depth (in watershed inches) WQV = Water Quality Volume (acre-feet) DA = Drainage Area (acres) Q(in) = 1.04 watershed inches Q(in) = 1.04 watershed inches P = 1.3 in CN = 97 Ia = 0.062 inches Tc = 0.250 hours Ia/P = 0.048 qu = 550 csm/in WQF = Water Quality Flow (cfs) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 2.681 cfs PROPOSED TREATMENT STRUCTURE SIZING Compute Water Quality Volume Determine Percent Impervious Cover (I)Calculate Volumetric Runoff Coefficient (R) Calculate Water Quality Volume Compute Runoff Depth From Appendix D, Figure 3 - Unit Peak Discharge for NRCS Type III Rainfall Distribution (Exh. 4-111 of TR-55) of the 2024 CT SW Manual Compute Water Quality Flow Determine NCRS Curve Number (CN) From Appendix D, Figure 1 - Graphical Solution of Runoff Equation (Fig. 2-1 from TR-55) of the 2024 CT Stormwater Manual Determine Initial Abstraction (Ia) From Appendix D, Figure 4 - Initial Abstraction Values for Runoff CNs (Table 4-1 of TR-55) of the 2024 CT Stormwater Manual Determine Unit Peak Discharge (qu) Time of Concentration (Tc) DA WQVQin )12( )( ×= )(inuQDAqWQF××= Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 6/17/2025 J:\4481\159\Design\Drainage Analysis\20250616 DRAIN_Treatment Structure Sizing The existing basin water elevation fluctuates between 72.8 and 73.2. Elevation 72.8 was used as the bottom of the existing available storage. The outlet structure grate is at elevation 75.4, therefore there is 2.6 feet of storage. The average area of the basin between elevation 72.8 and 75.4 is 14,475 square feet. STORAGE VOLUME REQUIRED= 2.6 FT * 14,475 SF =37,635 C.F. Each SC-800 unit by Contech has a storage volume of 78.4 cubic feet. This storage is calaculated including 6" of stone above and below the units and 3" of stone between the units. The stone volume is considered using 40% voids. NUMBER OF STORAGE UNITS REQUIRED = 37,635 CF/78.4 CF =480.04 Units The proposed system includes 23 rows of 21 units each for a total of 483 units. This provides a storage of 37,867 CF. There is also additional storage in the inlet and outlet slotted pipes and stone which has not been quantified in the volume above. PROPOSED UNDERGROUND STORAGE STRUCTURE SIZING Compute Existing Stormwater Basin Volume Compute Proposed Underground Storage Volume W F 23 W F 22 W F 21WF 20WF 19 W F 18 + + ++ + + 89,697 sq. ft.25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATIONGRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S S CURTAIN DRAIN A R E A ALBERT J. SCHNEIDER G R A V E L INV:75.65 N/F TF:79.20 E 190,217.86 80INV=78.0N 176,650.26 HIGH POINT 10' SIDE YARD CURTAIN DRAIN HYD. 1928.72' (TOTAL) WGE F F 82.30' 626.81'1 5" R C P 10' SIDE YARD GasE 10' SIDE YARD GV hyd.EGInv. 73.16 FL=72.95(W) S FL 71.01 Rim 80.16 15" RCPFL=73.29(E) Rim 78.54 SMH #2 FL=73.23(N)EXISTING EDGE OF PAVEMENT4" U.D.INV:76.38 8" SMH #1 PVC EGTF=77.53 S C A L E INV:76.29 18" 6" S TF:80.43 18"RCP FL 24"RCP 74.70 FL:75.40FL 18"RCP 74.95 TF:79.37EG 81 FL 15"RCP 75.28 4" U.D. FL 6"PVC 75.35 8"P VC 18"RCP24"RCP TF 78.70 EGP A V E M E N T RESET TF:81.10 2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.INV:77.25 8" FL 74.11 B I T U M I N O U S Grate El. 76.70 INV:76.90 18"@ 1.80%24"F.E.EGWeir El. 74.47bldg. TF 80.10 8"Orifice FL 73.46fuel Outlet Structure 8" CIP82EG 6" U.D. 6" U.D. 8"PVC TF:79.06 EG78 L.F.INV:77.46 Fl 75.19DETENTION BASIN TRENCH DRAIN EXISTING GT pad conc. 4" U.D.8" P VC 140.15' PadW ALLRoof Le a d er Conc. FL 74.00 25' REAR YARDCONCRETE FL 74.50 15"F.E. 82 FL 74.05 15"F.E. EXIST.100.05'Fin. Floor 83.06100.08'C E N T E R FL 15" 74.06 FL 10" 74.11 R E N E W A L TF 79.11 TRENCH DRAINR E S O U R C E 5.29 ac. 15"RCP6"PVCAPRON 230,694 sq. ft. 10" ADS Solid FL 74.47 CONCRETE 181.04'TF 77.42 (PARCEL 1) Roof Leader pad LOT 2 METAL SHED (TYP.) conc.EXISTING TREE LINE 140.18' 10' SIDE YARD CURTAIN DRAIN 283.00' 157.93' 377.02' 399.50' (2289.82' TOTAL) F F 934.45' (TOTAL) 16.37' INV. 74.75 16.03' CURTAIN DRAIN JOSEPH W. VIBERT, JR. 80N/F LIMITED PARTNERSHIP LIEBERT FAMILY N/F CONCRETE BITUMINOUS W G INV. = 72.7215" R.C.P.INV. = 72.7515" R.C.P. INV. = 72.8624" R.C.P. INV. = 71.9718" R.C.P. 74 INV. = 73.888" PVC 76 T.F. = 76.20C.B. TYPE 'CL' GATE (TYP) BOLLARD FENCE CHAINLINK T.F. = 77.82C.B. TYPE 'CL' 7878 BIT CURB GATE80 T.F. = 81.45SANITARY M.H. T.F. = 81.46SANITARY M.H. + 76.50 + 76.50 78.25 + 78.75 78.75 + 79.25 0 SCALE: 1"= 50' 50 50 100 78 79 77 Civil Engineering Land SurveyingEnvironmental Consulting Construction Management 4481.115 PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE DPL KRG MMZ REVISIONS SCALE: 1"= 50' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION WATERSHED PLAN SHEET NO.OF1 1 SO. WINDSOR, CT 06/17/25 J:\ \ \ .dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive (2.5 ACRES IMPERVIOUS) AREA= 3.0 ACRES TREATMENT STRUCTURE #2 (1.0 ACRES IMPERVIOUS) AREA= 1.0 ACRES TREATMENT STRUCTURE #1 1723 B SNEET I 0‘2 qylll¥lfllilgzlv V'I’Iiil‘gv ‘illlll 1 11ml!nhmmmmmmnglumndv llllll W'I'i IWIlIl‘II:l §~w htnmdunLvulnuznn|mJE11u|mmmmIUmH1n|E|11nnhmi1.k iv xx F:R wlilillw'II m n 1 u PM / //L_._s'cou:/ g a o-mv _\_M$e cON<RETE SIDEWNJ‘ N1 $ ,‘V = L Px / V i 3 /1"‘/ ‘x -.\=xt’”\.//'/«: 1i;v.E _m‘ \1k V“ gfsxn}w “gm“asLs ”3m fc/“wt:// v no \g|:hy u wucmnm)£¢w / y 5V?wag {wb‘EQE ‘ND\(A‘ED) c .‘1 WALK 5':Hgw ;;:::1::i‘w \Oh svewge mm.CONCRETE PAD DETAH.Tim cA L PAv EM EMT DErNL DETAH.__. N ‘E .n s \/ I /~ K’"r \ \\ ,‘\‘ \N/F MANUEL M LIEBERT \.\4 \\‘f ’N/F JOSEPH w,voBERT, \i ‘/ 53+s3 5‘?/ .1: M$¢ue vmauw)151 4'!—x q Lum g g¢ i$¢3 .'~\-:Eu5%‘2 3C O i/é m x / *3 /e‘aa/\ij / Iu-\ E \ l/s‘a,h \ \Wd /"" /Ss i ////——v ; Tao'y — ///\,1 i i \/ 1> \‘l 5‘ k ‘(an‘‘\u...v a‘mhv ‘ ’i /3"IfFuELDLAND ‘aAneA:5.3m :I :::wv<<£’gum? §m3 ‘A x I ///"’_-\’\I /‘ 1 { l \/I /o 5%\‘v‘a,7r \l u¢.u ‘E '4':w \9 G a;/-kz LL‘/__awfa:x///V‘\.nv q !I.“5-‘u .»7»u /so i‘w 5 i . Wd x l 4>/‘>Ss x \_/ \wu \E r ,Vk‘a x. vsa Erma-EMT 'Ky g 3Z‘~Ase 1 l“ «a5 EUE‘J(1~)K£)‘L‘Juanee‘xwnwI.pawn-Mu;)7dn.aa ‘exwxzmw ‘.‘k'n K ‘ms“M w mans...) \‘ LJEENJ—D ____.wxm BALE:o§mm :ENLE (v19) i —7m —EXh$YkNG CDNTEQR E mDw$ED $M1Du w Exsnuc,swam oaNNmg —o——mama:man owawme u auswmc.mum-mm o ammo mou awe 0 womszu mm MPE Id $‘YE \JGH‘T‘N‘: ‘97 W DQA\M $no an an:uy 1 ggw ammxn amn’pav 5;.wsx LATER» NOW Wdvtphnnw rig,“'0'huh-mp-Inunu u m.w(and W am‘m Frorusw (my. x mint czmxrvcmcvwJIn:m ‘cuss A1cum."vo u mmmuy con-n ton w:smmuos /\KV \/_' //y/1—u sve ‘1;VA w») \**—‘5;3¢\ z Km:N «5‘«0‘25"£va v z;.g i7 /1 I i X . '*‘jér ’l ___.‘Wrh._-,¢«§EP_/_\_._‘9 ’be“x4g-Dc ‘0 w \//-1 u ‘Q c:W‘3Q /I // r- fig mtM3lY'‘—‘w cuK u anm ’\\ 7%c,4., / a w/m u N/F.A ¢no C N UM TV‘190 sL-va 5.4 calm KW!” ,g fyrf;D l ,-/-\ \N/F /’L i o~EL R GELIN AS gRmcAL concinns‘‘A ~ xmV [Newt u)knack to non-“men -m o WHVFR 2)nu mxerin evadinga)tuna ervsm%e:l$€°:§ii.”.m£m ~..;—.;‘_._..CELSJRACUO"SEQJEEEE m,n,x...u)mur I grub2)Insun seam-nan“ , u???”u.:nFm 43 szrwExnvne ‘suckunefor imam5)Coutrun drahuge mTE§m ..u.m"6)7)a“:Con trutt wrung NHd‘ugsI drhmuy i E‘LVA’HON w ON vXLIS DATUH $1,133...Dunn hu ~= ‘nwu‘n-u-._‘':‘ l" "‘“" Hui-l:M-nu ""nu u t mu un—‘ 5"’}~r¢"7/ MN - 2 wEY ug [puweu ny mwARD 5~Aaam o 3cm::uaunsr Am:vnon mwu AH areas d‘sturbw byr_______4’0' a saws wamNus 1w: ma wETLANas Wd -wAL.P0\_E swuv m max,;E ‘..‘-IZ.""~"" Eroslun(P),fertiHled,contra1 Mum-rsweded R E 1.I A B L E owea S s -sunsuay mFm: z h m ‘u n ‘3‘?““__._,..‘u.-u.-.:‘Mendedmthe ‘ieu.by the Tom Enginepr wo‘5mm HREFUSE4FLocabaAwsiOL5EFaRmon1oa: .mwirlwr‘;Jun.“ M ::§r£m="&:‘‘=¢~m-u "m “HE-m o— ~n..:‘r..;::l ._ lira“1.mmf . S l T E793D1G3A5HTAHV5EWu,‘ SIGN DETAIL 5 pEyEIYV ‘E NOV AFFEC‘EU EY THE.DC‘IEAR $VORM NVTS ‘§unausneo e,r .2 n II “-~h-:‘u-n bu :3"wmlkw'”':‘::r~h RESOURCE TREEL:REVERENW~PnEpAata NA?=6“.O}.:‘iBERNARh 'No.KwGc:B.w Mn‘r—u w m..m,.mu»..m ..m:P R E P A R E acmwxmu .YRusreE‘5y Damn rummu,gs “:31rzmgm u.m....A".m.RELIABLEmmu”mm v SOUTH um nus nu Ana swvy me suo5ummn mm m. I L132;cmum:m Accaamuct um me sn~omos swvn n5 mrmu n w com w wuwce I .yxsm.Rcc‘d Rf-p..lu"q’sm‘m Accumsv m smvrvs no uvs u n ALBERT pnssibu simngautoshutting harmstnpsonurea canstructioniwkmd.nay be supp‘unntedtoHt P LA N RENEWAL D REFUSE. WINDSOR, :w 2:351“ J.SCHNE‘DER \ groom-Hes. i rL/VY, (7S‘étaia g CIQM4/ shlll be toysol‘ed and:ondiUons found C ENTER F O R INC. CONN. wowen ucwa 1o mvs ‘s "new av m:cnwzcunv :g ‘Fnc'i'N mu.""imam l 50PM‘ssocmxun 0v nun suwsmu m m15‘.,,,;.".‘ZSI$II‘“" 'unuo t.nu».u mu:rm;:;ns a..."n tAn m.n “mm E Sm»-QE ngmloiu mun:uocr s ~c use:RT-C.1 gnu I“:40‘on:544:“nun 73154‘ N/F ALBERT J.SCHNEIDEH LOIVC.n.5v (NP.of 5) N/F JEAN c.PELnER ,,”53'I5‘Ia”w ‘.(000 00 hR£h=54‘0 HLRES 6 2¢.£/ s 53 £55705? N/F JEAN c.PELTIER ‘i‘ 395.r9 5 53*;3—10'£._ ’ 36 ’1 v DAOR GETMUN THRON NIF LIONEL H.GELINAS Resém§F”:\\\V‘. 3m \‘5,\KV!.d’“:55.x m NIF SANTO J.LOMBARDO ’Tom C.\0x\‘ -InvbVJfRlAL20N£:I‘I vilu rKarIf ynxnx js IEAK ‘-as’ IIDE ;l0’ I NEREBV CERTIFY YHAT THIS MAP C0 PLIES WITH A-2 CLA§IFICAYION AS DEFINID 8V CONNECTICUT ASSOCIA‘NON OF LAND SHRVEVORS.INCwmwwv4 Anon WINDSOR,CONNECTICU‘I ASSOCIATES INC. SO F1.IMTEIJULY 7'”'7.DA'II M150"K ALI DID.SR"P L &L$wusnn n moan.m.‘PIE s Ls. REVISION El|IIIII|IFETH|I|Illgl|1£ll|lim‘ulpglulll]I}nll‘IHII|I|Iult|;|yg|gmmimpg Wmllulnllmhtllldullfmhu‘IMuulmllmEuhulfmhmmmmmmM usmb Jossw uenam a co SANTO &NANCY LOMBARDO .n."u",.. “unnu‘-..,,:‘ REAR OF 580 NORTH NUTMEG ROAD SOUTH WImSOR.OONW ctan me E “ A . SCALI 1I N r j'¢'¢’ PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 7-9-25 TO: Michael Maniscalco, Walter Summers, Kevin Vincens, John Henault, Molly Keays, Andrew Abbagnaro, Kevin Cooney, Tony Manfre, Autum Burke, Dave Turkington, Andrea Cofrancesco, Vincent Stetson, David Gesualdi, Marc Melanson, Scott Roberts, Trishanna Branford, Marco Mucciacciaro, Michele Lipe FROM: Justin Russo, PLA, Assistant Planner The Planning & Engineering Departments have received plans for the following projects: Appl. 25-31P USA Hauling & Recycling CNG Fueling Station Location: 570, 600, and 602 Nutmeg Road Site Plan Subdivision No. Acres 13.0 Zone I Industrial Commercial Residential No. Lots/Units 3 Water: Public Private Well Sewerage: Public Septic System Site plan for natural gas fueling station and associated improvements. Project Description: Future Town-owned property involved? Yes No new street(s) new detention area new open space/recreation area active passive Planning Department notes: Visit https://www.southwindsor-ct.gov/planning-department/pages/planning-and-zoning- commission-applications to review pending applications Please comment by 7-21-25 and return to the Planning Department. Town of SOUTH WINDSOR Building Department 1540 Sullivan Ave. South Windsor, CT 06074 Tel. (860) 644-2511 Ext 2230 July 10, 2025 PZC Application 25-31P Site Plan 570, 600, and 602 Nutmeg Rd USA Hauling and Recycling CNG Fueling Station The application has been reviewed under the 2022 CT State Building Codes. After reviewing this application, I have the following comments and questions regarding this application. 1) There is nothing on the plans showing any of the equipment, pedestals, fencing, crash protection, etc. Be advised that this is a review for the Planning and Zoning application only and not for any other permits. If you have any questions, please feel free to contact me. Marc Melanson Building Official MEMORANDUM To:Michele Lipe,Director of Planning Justin Russo Autum Burke From:John Henault,P.E.,Project Engineer 044/ Date:July 10,2025 Re:App 25-31P —CNG Fueling Station i have reviewed the above site plans and have the following Engineering comments: 1.The site has a combined 13.01 acres.What is the total area of disturbance for the proposed plan in acres?What is the post-development Directly Connected lmpervious Area (DCIA)in square feet? 2.The Watershed Plan attached to the Drainage Summary Report does not delineate a treatment area for the proposed 32-space fueling/parking area.Upon reviewing satellite images of the site,it appears that the proposed CNG fueling station area is currently a dirt parking area.The proposed CNG fueling station will be bituminous pavement.This will increase runoff.Does this area sheet flow to the existing detention basin on the 570 Nutmeg Road parcel?ls this detention basin adequately sized to handle the increased runoff?ls a forebay,hydrodynamic separator or other engineered device needed to remove pollutants from runoff? 3.Were the pre-development and post-development conditions analyzed using HydroCAD or other software modeling to verify that the design can control the 10 and 100-year post—development peak flow rates to their respective pre—development flow rates as required according to Town zoning regulations?This should be done for the parcel at 570 Nutmeg Road as well,where the proposed fueling/parking area will be located? 4.The applicant is proposing to convert an existing stormwater basin to an underground storage system.No infiltration is considered,and the plans show that the existing outlet structure is to be removed.Is a new outlet control structure going to be installed to slowly release stormwater to the existing 18"pipe connected to the stormwater system at the western portion of the parcels,or will the water percolate into the ground (even though no formal credit for infiltration is given)? 5.The plans do not include a sheet showing the grading with spot elevations,including for the area of the proposed fueling/parking area. 6.The Drainage Summary Report does not include storm sewer tabulations showing that the pipes are sized and sloped to adequately convey the proposed runoff under 10-year storm event conditions. 7.What is proposed for the aboveground area over the underground storage? Memo To:Kevin Grindle.PE Batton &Loguidice From:Michale M.Lipe,AICP Director of Planning Date:7/28/25 Re:Appl #25-3 1P,CNG Fueling Station Site Plan Application Planning Review Comments The following are the Flaming Department comments.Engineering comments have been sent separately. Building Department comments are attached. Please make the necessary revisions and submit three COMPLETE sets of revised plans (including landscaping, lighting,and architectural elevations)and 10 sets ll”X 17”plans by Wednesday,August 13 to be sent out with the agendas (scheduled for 8-19-25). General Comments Zoning data table reflects that 600 Nutmeg is no longer in conformance —eg.impervious coverage greater than 65%. Either a reduction in pavement must be made or a lot line adjustment to so that the lots remain in conformance is require. Site Plan Comments 1.All easements should be shown on the plans.Town Clerk map 2134 shows the easements that are currently on file for these properties All easements should be shown and listed in the easement table. 2.The setbacks should be clearly shown on all lots.All concrete pads for the CNG gas structures must meet setback requirements. 3.Please identify all trees to be removed and protected on the site plans.Any trees to be removed within the Town ROW should be identified for review by the tree warden. 4.What is the intended use for the detention area that is being covered?Will it be landscaped or used for parking?If used for parking,has it been included in the impervious coverage calculations? 5.The scale shown on C1.0 of the CNG plans does not appear on the site plan drawings.The aerial does indicate a number of dumpsters in that general area.Will these dumpsters be removed for trucks to be able to access the scale in that area? 6.Is there any new exterior lighting or landscaping being added? 1540 Sullivan Avenue,South VWndsor,CT 06074 PH 860-644-251 1,ext.2252 e-michele.|ipe@southwindsor—ct.gov South Windsor Planning Department MEMORANDUM To: Michele Lipe, From: Jeff Doolittle, P.E. John Henault Date: 8-1-25 Re: App 25-31P – 600 Nutmeg Rd SP I have reviewed the plans submitted for the above application and have the following comments: 1. The plans show a new 30 foot wide new driveway off Nutmeg Road to the site. Explain why this driveway is needed, why it is so wide and how it will be used. This new driveway should be narrowed and/or restricted to only access or egress if possible. 2. During construction of the new underground detention system, notes indicate that the existing detention pond will be dewatered and excavated. A more complete dewatering and excavation plan needs to be provided with treatment as necessary to insure no stormwater is discharged to the Town’s stormwater system or downstream water courses with high concentrations of contaminants or pollutants, per the Town’s Stormwater Illicit Discharge Ordinance and CT DEEP stormwater guidelines and regulations. Storm water quality samples from the existing stormwater detention basin should be submitted to the Town Engineer as part of this plan development. 3. It is not clear how the surface of the new underground detention system will be finished. Will this area be paved or finished with topsoil and turf grass or some other material? This needs to be clearly shown on the plans. 4. Will the proposed natural gas fueling/parking stations have a gravel/stone surface, be paved or have some other surface treatment? Label this on the plans. 5. Where will any additional runoff from the natural gas fueling stations drain to and how will this be treated? 6. The impervious area on 600 Nutmeg Road is proposed to be 69.7% that exceeds the 65% allowed in the industrial zone. This impervious area should be reduced to 65% or less with additional green space and landscaping added to the plan. 7. The pipe sizes and invert elevations for the two new hydrodynamic separators and new stormwater outlet manhole need to be included on the plan detail sheets. Let me know if there are questions about these comments. PLANNINE DEPARTMENT August 5‘2025 Kevin Grindle.ASLA.PLA Barton &Loguidice 855 Winding Brook Drive Glastonbury.CT 06033 Dear Mri Grindle. Re:Appl.25—31P.USA Hauling &Recycling CNG Fueling Station i request for a site planapprovaltoconstructanaturalgasfuelingstationandassociatedsiteimprovementson properties located at 570.600,and 602 Nutmeg Road.I zone. Please be advised that the Public Meeting ofthe Planning &Zoning Commission for the above referenced matter has been scheduled for Tuesday,August 19,2025. This meeting will be held in the Madden Room on the downstairs level of the South Windsor Town Hall.Someone must be present to represent the application. One sign advertising the meeting must be posted on the property for ten (10)consecutive days prior to the hearing and must be clearly visible from town streets.The sign must be posted on Nutmeg Road frontage by Saturday,August 9.2025. Signs can be picked up at the Planning office ofthe South Windsor Town Hall.1540 Sullivan Avenue.Please call (860)644-251 l ext.2329 if you have any questions.Monday 8:00 a.m.— 7:00 p.m..Tuesday —Thursday 8:00 a.m.e 4:30 p.m.and Friday 8:00 a.m.e l :00 p.m. Sincerelv. Jgshua Stem Administrative Secretarv/Land Use Coordinator 1540 Sullivan Avenue,South Windsor,ET 05074 i Tel (000)0411-2511 Ext 232B i Planning@SouthWindsnr-Cl.guv Barton & Loguidice, LLC. USA Hauling & Recycling - CNG Fueling Station South Windsor, CT Page 1 of 5 COMMENT RESPONSE SUMMARY - Application #25-31P Comments dated: July 28, 2025 from Michele M. Lipe, AICP Director of Planning General Comments Zoning data table reflects that 600 Nutmeg is no longer in conformance - e.g. impervious coverage greater than 65%. Either a reduction in pavement must be made or a lot line adjustment to so that the lots remain in conformance is required. Response: Parcels #600 & #602 shall be combined to bring the new overall lot area into conformance. The zoning compliance table has been updated to reflect combining these two lots. Site Plan Comments 1. All easements should be shown on the plans. Town Clerk map 2134 shows the easements that are currently on file for these properties. All easements should be shown and listed in the easement table. Response: All easements (existing and proposed) have been shown on the proposed easement survey maps included with this submission. The easement table only lists the two proposed new easements. 2. The setbacks should be clearly shown on all lots. All concrete pads for the CNG gas structures must meet setback requirements. Response: Setbacks have been clearly shown on all lots and all concrete pads for the CNG gas structures have been adjusted to meet the setbacks. 3. Please identify all trees to be removed and protected on the site plans. Any trees to be removed within the Town ROW should be identified for review by the tree warden. Response: B&L’s survey crew has field verified that all trees being removed as part of this project fall within private property therefore, no trees within the ROW have been identified. 4. What is the intended use for the detention area that is being covered? Will it be landscaped or used for parking? If used for parking, has it been included in the impervious coverage calculations? Response: This area will be paved and will be used for material storage and equipment maneuvering in support of the applicant’s current business operations. 5. The scale shown on C1.0 of the CNG plans does not appear on the site plan drawings. The aerial does indicate a number of dumpsters in that general area. Will these Barton & Loguidice, LLC. USA Hauling & Recycling - CNG Fueling Station South Windsor, CT Page 2 of 5 dumpsters be removed for trucks to be able to access the scale in that area? Response: The scale that was previously shown on the CNG plans has been removed. The dumpsters/containers shown on the aerial photo will remain in this location and no additional truck access is required at this time. 6. Is there any new exterior lighting or landscaping being added? Response: Lighting cut sheets for the three new lights identified on the project plans have been submitted for Staff review. These three lights are being installed to replace existing pole mounted lights at these locations. All other site & security lighting shall remain unchanged. Existing landscaping including vegetated buffers shall be maintained, no additional landscaping is proposed for this site. Comments dated: July 10, 2025 from Marc Melanson, Building Official 1. There is nothing on the plans showing any of the equipment, pedestals, fencing, crash protection, etc. Response: Equipment for the fueling station and related compound fencing & bollards are included in the separate plan set prepared by Clean Energy, which is included in the Town’s submission. Comments dated: July 10, 2025 from John Henault, P.E., Project Engineer 1. The site has a combined 13.01 acres. What is the total area of disturbance for the proposed plan in acres? What is the post-development Directly Connected Impervious Area (DCIA) in square feet? Response: The total area of disturbance across the three lots is 0.77 acres. The post-development DCIA is 87,224 square feet. 2. The Watershed Plan attached to the Drainage Summary Report does not delineate a treatment area for the proposed 32-space fueling/parking area. Upon reviewing satellite images of the site, it appears that the proposed CNG fueling station area is currently a dirt parking area. The proposed CNG fueling station will be bituminous pavement. This will increase runoff. Does this area sheet flow to the existing detention basin on the 570 Nutmeg Road parcel? Is this detention basin adequately sized to handle the increased runoff? Is a forebay, hydrodynamic separator or other engineered device needed to remove pollutants from runoff? Barton & Loguidice, LLC. USA Hauling & Recycling - CNG Fueling Station South Windsor, CT Page 3 of 5 Response: The proposed improvements on #570 Nutmeg Road include the installation of the fueling compound and concrete barriers with piping to provide fueling at the truck parking areas. This lot will remain a dirt/gravel surface as in the existing conditions. A portion of dirt surface and the existing bituminous drive on the site will be disturbed to install the fueling equipment compound area. This area will consist of a gravel surface surrounding the concrete equipment pads. The total additional impervious area proposed on this lot is 780 square feet. The adjacent landscaped area and trees will remain. The gravel will offer infiltration of stormwater in the area of the equipment compound. An flow that does not infiltrate sheet flows across the parking area and lawn to the existing drainage basin on the lot to remain. 3. Were the pre-development and post-development conditions analyzed using HydroCAD or other software modeling to verify that the design can control the 10 and 100-year post-development peak flow rates to their respective pre- development flow rates as required according to Town zoning regulations? This should be done for the parcel at 570 Nutmeg Road as well, where the proposed fueling/parking area will be located? Response: Additional stormwater calculations are included that analyze the existing and proposed conditions using PondPack. Also included are calculations to compare the conditions for 570 Nutmeg. 4. The applicant is proposing to convert an existing stormwater basin to an underground storage system. No infiltration is considered, and the plans show that the existing outlet structure is to be removed. Is a new outlet control structure going to be installed to slowly release stormwater to the existing 18" pipe connected to the stormwater system at the western portion of the parcels, or will the water percolate into the ground (even though no formal credit for infiltration is given)? Response: Stormwater calculations are attached. The new outlet structure includes an internal concrete weir and orifice to control the proposed storm flows. A liner will be installed for the underground system and no infiltration is proposed. 5. The plans do not include a sheet showing the grading with spot elevations, including for the area of the proposed fueling/parking area. Response: Grades have been added to the plans to show the grading in this area. 6. The Drainage Summary Report does not include storm sewer tabulations showing that the pipes are sized and sloped to adequately convey the proposed runoff under 10- year storm event conditions. Response: Pipe analysis has been included for the proposed new pipes on the site. 7. What is proposed for the aboveground area over the underground storage? Response: This area will be paved with bituminous concrete and will be used for Barton & Loguidice, LLC. USA Hauling & Recycling - CNG Fueling Station South Windsor, CT Page 4 of 5 material storage and equipment maneuvering in support of the applicant’s current business operations. Comments dated: August 1, 2025 from Jeff Doolittle, P.E. 1. The plans show a new 30 foot wide new driveway off Nutmeg Road to the site. Explain why this driveway is needed, why it is so wide and how it will be used. This new driveway should be narrowed and/or restricted to only access or egress if possible. Response: The new driveway shall be restricted to egress only and shall have ‘Do Not Enter’ signs installed. It has also been narrowed to 16 feet wide with widened radius’ at the road to accommodate outbound trucks. The driveway is being added to improve circulation for the existing truck traffic. 2. During construction of the new underground detention system, notes indicate that the existing detention pond will be dewatered and excavated. A more complete dewatering and excavation plan needs to be provided with treatment as necessary to insure no stormwater is discharged to the Town’s stormwater system or downstream water courses with high concentrations of contaminants or pollutants, per the Town’s Stormwater Illicit Discharge Ordinance and CT DEEP stormwater guidelines and regulations. Storm water quality samples from the existing stormwater detention basin should be submitted to the Town Engineer as part of this plan development. Response: The existing pond water will be pumped into a filter bag. The filter bag will discharge to the existing detention basin outlet structure. Any unsuitable materials in the bottom of the pond will be excavated and disposed of off-site prior to installation of the stone and underground storage units. Storm water quality samples will be collected and tested. The results will be submitted to the Town Engineer prior to the start of the pond dewatering. 3. It is not clear how the surface of the new underground detention system will be finished. Will this area be paved or finished with topsoil and turf grass or some other material? This needs to be clearly shown on the plans. Response: This area will be paved with bituminous concrete and has been shown on the plans. 4. Will the proposed natural gas fueling/parking stations have a gravel/stone surface, be paved or have some other surface treatment? Label this on the plans. Response: The equipment compound area will be gravel surrounding concrete equipment pads. The remainder of the lot will remain a dirt/gravel surface as currently exists. The existing adjacent grass island and trees will remain. 5. Where will any additional runoff from the natural gas fueling stations drain to and how will this be treated? Barton & Loguidice, LLC. USA Hauling & Recycling - CNG Fueling Station South Windsor, CT Page 5 of 5 Response: The only additional runoff from the natural gas fueling station will be from the limited areas of concrete pads that are being installed to support the equipment. These pad areas will discharge runoff into the surrounding crushed stone and gravel surface throughout the CNG compound area and truck access drives/parking areas. All these areas will continue to sheet-flow to the western detention basin, where the water is infiltrated. No new treatment upstream of the existing basin is proposed at this time. 6. The impervious area on 600 Nutmeg Road is proposed to be 69.7% that exceeds the 65% allowed in the industrial zone. This impervious area should be reduced to 65% or less with additional green space and landscaping added to the plan. Response: Parcels #600 & #602 shall be combined to bring the new overall lot area into conformance. The zoning compliance table has been updated to reflect combining these two lots. 7. The pipe sizes and invert elevations for the two new hydrodynamic separators and new stormwater outlet manhole need to be included on the plan detail sheets. Response: This information is included on the plans. ELLINGTON ROAD ROAD ELLINGTON ELLINGTONBOULEVARDJOHNFITCHBOULEVARDJOHNFITCHSTRONGROADROADSTREETIDENTGLEN D A LERO ADROADEDWINGOVERN OR'SBIDWELL R O A D ROADROADCOLONY M A S C O LO R O A D ROAD WESTSTRONG ROADROADPIERCEROADBURGESSSTRONGNORTHROADNUTMEGSOUTHHI GHW AYROADHI G H W A Y FOSTERROADNUTMEGSOU THSA TELLI TESOUTHROADROAD DR I VEDRI VEBELDONMARILYNROADEDGEWOOD JUDYLA.LANEJ UDYELI ZABETHSTREETBARBARA POND BRICKYARD BR OOKB R OOKPODUNK5 CODY CI R.CODYCI R.BAKER'S LA.GOVERNOR'SAVE.CONNECTICUTTALBOTLA.352map 2159A 350map 2159A 352map 2159A 353map 2159A 354map 2159A 355map 2159A 356map 2159A 358map 359map 2159A 360map 2159A 361map 2159A 363map 2159A 364map 2159A 365map 2159A 366map 2159A 367map 2159A 362map 2159A 351map 2159A 357map 2159A 1000'S51°22'07"E 626.81'N51°22'07"W 373.49'N51°19'23"W 373.49'N51°22'07"W 488'S51°22'07"E 399.5'S50°50'58"E 182.63'S51°16'33"E 297.97'S31°07'53"W 82.3'N50°46'14"W 50.43'S31°07'54"W 348.4'N31°07'53"E 368map 2159A 0 SCALE: 1"= 1000' 1000 1000 2000 LOCATION SITE PROJECT CONTACT JONATHAN@USARECYCLE.COM, (860) 746-3218 555 TAYLOR ROAD, ENFIELD, CT 06082 MR SOUTH WINDSOR PROPERTIES, LLC. JONATHAN MURRAY Civil Engineering Land SurveyingEnvironmental Consulting Construction Management SITE DEVELOPMENT PLANS USA HAULING & RECYCLING - CNG FUELING STATION 570, 600 & 602 NUTMEG ROAD, SOUTH WINDSOR, CT OF PREPARED FOR MR SOUTH WINDSOR PROPERTIES, LLC. 555 TAYLOR ROAD, ENFIELD, CT 06082 LIST OF SHEETS DATE: 7/8/25 OVERALL MAP SITE DEVELOPMENT PLAN DETAILS AND NOTES DETAILS AND NOTES SUBMITTED UNDER SEPARATE COVER: IMPROVEMENT LOCATION PLANS PREPARED BY OTHERS AND IMPROVEMENT LOCATION MAP AS BUILT PLAN IMPROVEMENT LOCATION MAP AS BUILT PLAN 1 2 3 4 1 OF 2 2 OF 2 PREPARED BY: Project No. 4481-159 LOCATION MAP SCALE: 1" = 1000' REVISED: 8/12/25 www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive+/- 1,600 FT+/- 1,400 FT1603.28' 1370.34' MARCEL O. BIZIER JORDAN & ELAINE PERLROTH ALBERT J. SCHNEIDER N/F EXISTING EDGE OF BIT. PAVING 74 1000.00' (TOTAL)S EXISTING BIT. CONC. CURBING 309.55'S F T ELECTRICAL TRANSFORMER PAD 10' SIDE YARD7 2 EXISTING LIGHT POLE50.43'IN PLACE. 8" MIN. COMPACTED EXISTING UTILITY POLE GRAVEL AREA (TYP.) EXISTING SPOT GRADE10' SIDE YARD AREA373.19'EXISTING WATER MAIN AND HYDRANT GRAVEL 76S S EXISTING SANITARY MANHOLE AND PIPE S 74 EXISTING CATCH BASIN AND PIPE 7 6 MONUMENT TO BE SET S EXISTING MONUMENT F EXISTING IRON PIN F IRON PIN TO BE SET S BASIN LEGEND DETENTION 348.40' (TOTAL)WETLANDAREA INLANDGRAVEL 290.34'297.97'78 5.39 ac. 235,171 sq. ft.TREELINE LOT 310' SIDE YARDPAD CONCRETE 2.05 ac. 89,697 sq. ft.1" DIA. STONE. STRIP OF CRUSHED 25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATION GRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S SA R E A ALBERT J. SCHNEIDER G R A V E L N/F E 190,217.86E 189,297.31 80LIONEL R. GELINAS N 177,041.65 N 176,650.26 10' SIDE YARDSTATIONN/F HYD.RECYCLING 1928.72' (TOTAL)WG METAL E 283.00'FF82.30'F EXISTING 626.81'373.49'S 10' SIDE YARDGasE10' SIDE YARDEGInv. 73.16 SFL 71.01S Rim 80.16 Rim 78.54 SMH #2 EXISTING EDGE OF PAVEMENTSMH #1 EG808"PVC S C A L E GATE S EG100.86'81 488.00'EGP A V E M E N T12.00'2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.B I T U M I N O U S3 5' BUILDING LI NE@ 1.80%EG82 40.00'15.00'EG114.00' 75.00'6" U.D.8"PVC TF:79.06ESG78 L.F.INV:77.46Fl 75.19 DETENTION BASIN TRENCH DRAIN EXISTING GT 140.15' RELIABLE REFUSE BUILDING 105.00'PadW ALLConc.25' REAR YARD50.00'CONCRETE 82 40.00'EXIST.100.05'2.33 ac. Fin. Floor 83.06146.26'101,667 sq. ft.100.08'C E N T E R LOT 12 0.00'165.00'R E N E W A L S (247.13' TOTAL)R E S O U R C E 5.29 ac. APRON 230,694 sq. ft. CONCRETE1 81.04'(PARCEL 1)35' BUILDING LINE80Gate LOT 2METAL SHED (TYP.)62.87'EXISTING TREE LINE 140.18' 10' SIDE YARD 283.00'157.93'377.02'399.50' (2289.82' TOTAL)F182.63'F 934.45' (TOTAL) 16.37'F F 16.03' JOSEPH W. VIBERT, JR. 80N/FLIMITED PARTNERSHIP LIEBERT FAMILY N/F 73.66 27123 EVERSOURCE M 0 SCALE: 1"= 100' 100 100 200 Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS 8/12/25 SCALE: 1"= 100' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION OVERALL MAP SHEET NO.OF1 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive 570 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 600 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 580 NUTMEG ROAD LRG, LLC N/F 602 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 612 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 636 NUTMEG ROAD NORTH NUTMEG ASSOCIATES, LLC. N/F 652 NUTMEG ROAD ANNE-KAY CORPORATION N/F 614 NUTMEG ROAD VIRBERT JOHNSON EDITH ARLINE N/F 564 NUTMEG ROAD THE JE SHEPARD COMPANY N/F 540 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 550 FOSTER ROAD THE JE SHEPARD COMPANY N/F 585 NUTMEG ROAD SJD PROPERTY MANAGEMENT, LLC N/F 571 NUTMEG ROAD MJJ REALTY, LLC N/F 595 NUTMEG ROAD NUTMEG ROAD NORTH 595, LLC N/F 591 NUTMEG ROAD NUTMEG ROAD NORTH 591, LLC N/F 625 NUTMEG ROAD SPIRIT MASTER FUNDING X, LLC N/F 239 FOSTER ROAD FOSTER ROAD ASSOCIATES, LLC. N/F 560 NUTMEG ROAD 560 NUTMEG ROAD NORTH, LLC N/F 555 NUTMEG ROAD LIMITED PARTNERSHIP 555 NUTMEG OWNER N/F PROPOSED ENTRANCE AND PARKING IMPROVEMENTS UNDERGROUND STORMWATER STORAGE UNITS PROPOSED CONVERSION OF STORMWATER POND WITH FUELING STATION PROPOSED CNG 604 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F INDUSTRIAL ZONERURAL RESIDENTIAL ZONE500' PROPERTY DRIVEWAY CUTS (TYP.) APPROXIMATE LOCATION OF ABUTTING NUTMEG ROAD NORTH + + +++ +++ ++ ++ + + + + + + + ++ + + + + + + 5WF 4WF 3WF 2WF 1WF 9WF 10WF 10WF 11WF 5WF 6WF 23WF 22WF 21WF20WF 19WF 18WF 17WF 16WF 15WF 14WF 13WF 12WF 1XWF 2XWF 3XWF 4XWF 5XWF 19WF 6XWF 7XWF 9XWF8XWF 15XWF 14XWF 13XWF 12XWF 10XWF 19XWF 18XWF17XWF 16XWF 20XWF20X-1WF 20X-2WF20X-3WF 20X-4WF 20X-6WF 20X-7WF 20X-8WF + + + + + + + + + + + + + + + + + + + + + + + MARCEL O. BIZIER JORDAN & ELAINE PERLROTH ALBERT J. SCHNEIDER N/F EXISTING EDGE OF BIT. PAVING 1000.00' (TOTAL)S EXISTING BIT. CONC. CURBING 309.55'S F T ELECTRICAL TRANSFORMER PAD 10' SIDE YARD EXISTING LIGHT POLE50.43'IN PLACE. 8" MIN. COMPACTED EXISTING UTILITY POLE GRAVEL AREA (TYP.) EXISTING SPOT GRADE 10' SIDE YARD AREA 373.19'EXISTING WATER MAIN AND HYDRANT GRAVEL S S EXISTING SANITARY MANHOLE AND PIPE S EXISTING CATCH BASIN AND PIPE MONUMENT TO BE SET S EXISTING MONUMENT F EXISTING IRON PIN F IRON PIN TO BE SET S BASIN LEGEND DETENTION 348.40' (TOTAL)WETLANDAREA INLAND GRAVEL 290.34'297.97'5.39 ac. 235,171 sq. ft.TREELINE LOT 310' SIDE YARDPAD CONCRETE 2.05 ac. 89,697 sq. ft.1" DIA. STONE. STRIP OF CRUSHED 25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATION GRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S SA R E A ALBERT J. SCHNEIDER G R A V E L N/F E 190,217.86E 189,297.31 LIONEL R. GELINAS N 177,041.65 N 176,650.26 10' SIDE YARDSTATIONN/F HYD.RECYCLING 1928.72' (TOTAL)WG METAL E 283.00'FF82.30'F EXISTING 626.81'373.49'S 10' SIDE YARDGasE10' SIDE YARDEGInv. 73.16 SFL 71.01S Rim 80.16 Rim 78.54 SMH #2 EXISTING EDGE OF PAVEMENTSMH #1 EG8"PVC S C A L E GATE S EG100.86'488.00'EGP A V E M E N T12.00'2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.B I T U M I N O U S3 5' BUILDING LINE@ 1.80%EG40.00'15.00'EG114.00' 75.00'6" U.D.8"PVC TF:79.06EGS 78 L.F.INV:77.46Fl 75.19 DETENTION BASIN TRENCH DRAIN EXISTING GT 140.15' RELIABLE REFUSE BUILDING 105.00'PadW ALLConc.25' REAR YARD50.00'CONCRETE 40.00' EXIST.100.05'2.33 ac. Fin. Floor 83.06146.26'101,667 sq. ft.100.08'C E N T E R LOT 12 0.00'165.00' R E N E W A L S (247.13' TOTAL)R E S O U R C E 5.29 ac. APRON 230,694 sq. ft. CONCRETE 181.04'(PARCEL 1)35' BUILDING LINEGate LOT 2METAL SHED (TYP.)62.87'EXISTING TREE LINE 140.18' 10' SIDE YARD 283.00'157.93'377.02'399.50' (2289.82' TOTAL)F182.63'F 934.45' (TOTAL) 16.37' F F 16.03' JOSEPH W. VIBERT, JR. N/FLIMITED PARTNERSHIP LIEBERT FAMILY N/F CONCRETE BITUMINOUS BUILDING STORAGE W GINV. = 72.72 15" R.C.P. INV. = 72.75 15" R.C.P. INV. = 72.86 24" R.C.P. INV. = 71.97 18" R.C.P. 74 INV. = 73.88 8" PVC 76 T.F. = 76.20 C.B. TYPE 'CL' GATE (TYP) BOLLARD FENCE CHAINLINK T.F. = 77.82 C.B. TYPE 'CL' 7878 BIT CURB GATE80 T.F. = 81.45 SANITARY M.H. T.F. = 81.46 SANITARY M.H. 73.66 + 76.50 + 76.50 78.25 + 78.75 78.75 + 79.25 + +/- 74.4 7677.20 + + +/- 74.5 + +/- 75.5 27123 EVERSOURCE 76.80 + + 78.30 79.00 + 78.10 + 77.00 + 78.80+ 77.90 + 78.90 + 78 79 77 M OF EXISTING GAS LINE APPROX. LOCATION 0 SCALE: 1"= 40' 40 40 80 ZONING COMPLIANCE TABLE PARKING COMPLIANCE TABLE BIT DRIVE Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS 8/12/25 SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION SITE PLAN SHEET NO.OF2 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive 602 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 600 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 580 NUTMEG ROAD LRG, LLC N/F MAP REFERENCE:NUTMEG ROAD NORTHELECTRICAL TRANSFORMER COMPOUND STATION EQUIPMENT NATURAL GAS FUELING MOTORWAY SERVICE AREA 570 NUTMEG ROAD PROPERTIES, LLC MR SOUTH WINDSOR N/F 32 SPACES PROVIDED FUELING/PARKING AREA. APPROXIMATE LIMIT OF PROPOSED 9 SPACES PROVIDED FUELING/PARKING AREA. APPROXIMATE LIMIT OF PROPOSED REGULATED ACTIVITIES INLET PROTECTION (TYP.) 6/3/1996 PREPARED BY DESIGN PROFESSIONALS, INC. SURVEY, 602 NUTMEG ROAD NORTH, SOUTH WINDSOR, CONNECTICUT" DATED SURVEY FOR 570, 600 AND 602 NUTMEG STREET NORTH, PLAN ENTITLED "PROPERTY 2. WETLAND SCIENTIST, REGISTERED SOIL SCIENTIST OF DAVISON ENVIRONMENTAL. WETLAND DELINEATION PERFORMED ON JANUARY 18, 2025 BY ERIC DAVISON, 1. 10"ø INV.= 72.5 TF= 76.0+/- NEW YARD DRAIN 8"ø INVERTS = 72.3 15"ø INVERT = 72.0 WITH 8"ø TEE OUTLET PIPES. 15"ø SLOTTED HDPE PIPE @ 0.0% 17'- 15"ø HDPE@ 1.2% 65 L.F.- 10"ø HDPE @ 0.77% FROM EAST TO 24"ø PIPE. TIE EXIST. 8" PVC PIPE 8"ø INVERTS= 74.1 24"ø INVERT= 73.4 WITH 8"ø TEE INLET PIPES. 24"ø SLOTTED HDPE @ 0.0% 46'- 18"ø HDPE PIPE @ 0.5% PIPE @ 0.5% 65'- 15"ø HDPE START NEW BCLC NEW GRASS ISLAND ALONG SCALE START BITUMINOUS CURBING WITHIN LIMITS OF IMPROVEMENTS REMOVE EXISTING CURBING GRADE TO DRAIN (TYP.) PRIOR TO THE START OF CONSTRUCTION PROPOSED ELEVATIONS TO BE FIELD VERIFIED TIE EX. ROOF LEADER TO CB REMOVE EX. 15"ø PIPE NEW 15"ø INV=72.9 EX TF= 76.20 EXIST. CB (TO REMAIN) END BITUMINOUS CURBING CURBING END BITUMINOUS LIMIT OF CLEARING (TYP.) SOUTH = +/-830 NORTH = +/-710 SIGHT LINE 570 NUTMEG ROAD 600 NUTMEG ROAD 602 NUTMEG ROAD 100' U.R.A.100' U.R.A. 100' U.R.A. REMOVED. STRUCTURE TO BE EXISTING OUTLET PROPOSEDEXISTING ZONING DISTRICT: I (INDUSTRIAL ZONE) ZONING COMPLIANCE BASED UPON ARTICLE VI OF THE ZONING REGULATION MAX. BUILDING HEIGHT: MAX. LOT COVERAGE: MAX. IMPERVIOUS COVERAGE: MAX. STORIES MIN. SIDE YARD: MIN. REAR YARD: MIN. FRONT YARD: MIN. DEPTH: MIN. LOT FRONTAGE: MIN. LOT SIZE: 40 FT 50% 65% 2 STORIES 10 FT 25 FT 35 FT 150 FT 100 FT 30,000 SF I DISTRICT REQUIREMENTS EXISTING EXISTING PROPOSED ALONG EXISTING BASIN INSTALL SILT FENCE/HAYBALES INSTALL HAYBALE BARRIER -SEE DETAIL OF STOCKPILE AREA APPROXIMATE LOCATION 872 S.F., 0.02 AC.748 S.F., 0.017 AC. TOTAL DISTURBANCE 1,620 S.F., 0.037 AC. ALONG CONSERVATION AREA INSTALL SILT FENCE/HAYBALES UPLAND REVIEW DISTURBANCES WETLAND DISTURBANCES WETLAND SIZE LOCATION 32,548 S.F., 0.75 AC., 13.8%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., 0.0%0.0 S.F., 0.0 AC., 0.0% 0.0 S.F., 0.0 AC., STORMWATER TREATMENT NOTE: PROCEDURES. RECOMMENDED MAINTENANCE. SUGGESTED INSPECTION INTERVALS & CLEANING (6) MONTHS OR PER THE MANUFACTURER'S RECOMMENDATION. INCLUDE MANUFACTURERS THE SYSTEM MUST BE INSPECTED AND CLEANED TO THE SHORTER OF A MINIMUM OF SIX 7. OF THE SYSTEM. AND OTHER DESIGN ELEMENTS THAT CORRESPOND TO THE HYDRAULIC CHARACTERISTICS PROPOSED SIZE AND ELEVATION OF CRITICAL WEIR, ORIFICE, PIPE INVERT ELEVATIONS, 6. ORIENTATION OF THE SYSTEM IN PLAN VIEW WITH RESPECT TO THE APPROVED SITE PLAN.5. CRITICAL LOCATIONS. EVENT IN THE FIRST STRUCTURE LOCATED UPSTREAM OF THE SYSTEM AND ANY OTHER CALCULATIONS OF THE HYDRAULIC GRADE LINE ELEVATIONS FOR THE DESIGN STORM 4. FLOW. ANNUAL TOTAL SUSPENDED SOLIDS WILL BE REMOVED FROM THE WATER QUALITY CALCULATIONS OR DOCUMENTATION VERIFYING THAT 80% (MIN.) OF THE AVERAGE 3. EXCEED THE DESIGN STORM FLOW. "CONVEYED" FLOW FOR THE SPECIFIED SYSTEM AND MODEL, WHICH MUST EQUAL OF 2. EXCEED THE WATER QUALITY FLOW. "TREATED" FLOW FOR THE SPECIFIED SYSTEM AND MODEL, WHICH MUST EQUAL OR1. FABRICATION. SHOP DRAWING SUBMITTAL'S MUST INCLUDE: PROPOSED SYSTEM MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER PRIOR TO MONTHS OR PER THE MANUFACTURERS' RECOMMENDATION. SHOP DRAWINGS OF THE THE SYSTEM MUST BE INSPECTED AND CLEANED TO THE SHORTER OF A MINIMUM OF SIX (6) OF THE 10-YEAR PEAK DESIGN STORM FLOW. OF THE TOTAL SUSPENDED SOLIDS FROM THE WATER QUALITY FLOW & WITH INTERNAL BYPASS THE STORMWATER TREATMENT SYSTEMS MUST BE DESIGNED TO REMOVE A MINIMUM OF 80% CATCH BASINS HYDRODYNAMIC SEPARATORS ~CHECK OUTLET PIPES FOR BLOCKAGE AND ANY SEDIMENT, CLEAR AS REQUIRED. ~CHECK FRAMES AND COVERS FOR DAMAGE AND REPAIR AS REQUIRED; ~REMOVE SEDIMENT BEFORE DEPTH REACHES THE MAXIMUM SEDIMENT DEPTH ~CHECK OUTLET PIPES FOR BLOCKAGE AND CLEAR AS REQUIRED. ~CHECK FRAMES AND GRATES FOR DAMAGE AND REPAIR AS REQUIRED; ~REMOVE SEDIMENT WHEN DEPTH OF ACCUMULATED SEDIMENT EXCEEDS 12"; STORAGE SYSTEM: STRUCTURES IS ESSENTIAL FOR THE CONTINUED OPERATION OF THE UNDERGROUND TWICE ANNUALLY. CLEANING SEDIMENT AND DEBRIS FROM THE PRE-TREATMENT THE EXISTING CATCH BASINS AND NEW TREATMENT STRUCTURES WILL BE INSPECTED OPERATION & MAINTENANCE STORMWATER SEQUENCE OF CONSTRUCTION ANTICIPATED ESTIMATED CONSTRUCTION SCHEDULE 1. SEE SEQUENCE OF CONSTRUCTION FOR FURTHER DETAILS AND CLARIFICATION.2. ON WEATHER CONDITIONS. CONSTRUCTION WILL BE COMPLETED BY THE END OF DECEMBER. OF SEPTEMBER AND THE PROJECT IS EXPECTED TO LAST 8-12 WEEKS, DEPENDING AN ESTIMATED START DATE FOR THE PROJECT IS SCHEDULED FOR THE END CURBING START BITUMINOUS PROJECT ENGINEER. A LOCATION SELECTED BY TOWN STAFF AND THE LOCATED AT THE EDGE OF THE EXISTING PAVEMENT AT TO FURTHER REDUCE MATERIAL TRACKING IT SHALL BE CONSTRUCTION ACCESS/TRACKING PAD IS REQUIRED OPERATIONS AND MAINTENANCE (O&M) PLAN. IF A BE PERFORMED AS PART OF THE FACILITY'S CURRENT DEBRIS REMOVAL GENERATED BY THIS PROJECT SHALL FOR ALL CONSTRUCTION ACCESS. DUST CONTROL AND THE SITE'S EXISTING PAVED DRIVEWAY SHALL BE USED REMOVE EROSION & SEDIMENTATION CONTROLS ONCE VEGETATION IS ESTABLISHED.14. FUELING STATION PLANS. INSTALL FUELING STATION EQUIPMENT AS SHOWN ON CLEAN ENERGY'S CNG13. INSTALL FOUNDATIONS FOR FUELING STATION EQUIPMENT.12. INSTALL ELECTRICAL AND GAS LINES WITHIN EASEMENTS.11. COMPLETE CONSTRUCTION & RESTORATION.10. DRAINAGE STRUCTURES. INSTALL THE SLOTTED HDPE INLET AND OUTLET HEADER PIPES AND CONNECT TO9. COMPLETE INSTALLATION OF THE UNDERGROUND STORAGE SYSTEM. INSTALL NON-WOVEN SEPARATION GEOTEXTILE ON PREPARED SUBGRADE AND 8. INSTALLATION OF THE UNDERGROUND STORAGE SYSTEM. EXCAVATE & REPLACE UNSUITABLE MATERIALS PRIOR TO STARTING THE7. AND PLACE INTO STORAGE CONTAINERS TO BE REMOVED OFF-SITE. EXCAVATE EXISTING MATERIAL ON THE BOTTOM OF THE STORMWATER BASIN 6. OUTLET STRUCTURE TO REMOVE THE STANDING WATER IN THE BASIN. INSTALL PUMP(S) IN THE EXISTING BASIN & DISCHARGE PIPING TO THE EXISTING5. FLOW INTO THE EXISTING BASIN OUTLET STRUCTURE. TO BE USED DURING CONSTRUCTION AS NEEDED TO MAINTAIN TEMPORARY INSTALL A PUMP IN EACH TREATMENT STRUCTURE WITH DISCHARGE PIPING4. DISCHARGE EXISTING STORM DRAINAGE TO THE TREATMENT STRUCTURES. INSTALL NEW STORMWATER TREATMENT STRUCTURES AND NEW PIPING TO 3. DRAINAGE INSTALLATION. SAWCUT & REMOVE PAVEMENT AS REQUIRED TO COMPLETE NEW STORM2. OR AS ORDERED BY THE ENGINEER. INSTALL EROSION CONTROL MEASURES AT LOCATIONS INDICATED ON PLANS1.16'62.90'159' 74' 190.94' GRANTOR MR SOUTH WINDSOR PROPERTIES, LLC. MR SOUTH WINDSOR PROPERTIES, LLC. EVERSOURCE ENERGY EVERSOURCE ENERGY EASEMENTS GRANTEE TYPE OF EASEMENT ELECTRICAL GAS DATE FILED PENDING PENDING VOL/PG 7/8/25 7/8/25 - 4.5 SPACES PER 1,000 SF. OF GFA - BUSINESS OFFICE < 50,000 SF. OF GFA MINIMUM REQUIRED PARKING SPACES FOR THE LARGEST SHIFT, WHICHEVER IS GREATER EMPLOYEES 3 2- 1 SPACE PER 700 SF. OF GFA OR 1 SPACE PER - COMMERCIAL AND INDUSTRIAL PARKING AND ACESS - OFF STREET PARKING AND LOADING (TABLE 6.4.3B) ZONING COMPLIANCE BASED UPON SECTION 6.4 < 40 FT 21.3% 65.2% < 2 STORIES 62.9 FT > 25 FT 159 FT > 150 FT 146.26 FT 101,667 SF PROPOSED GAS SERVICE FOR MORE DETAILS - SEE CLEAN ENERGY PLANS PROPOSED GAS PUMPS (TYP.) PROPOSED ELECTRICAL SERVICE NO CHANGE NO CHANGE 57.4% NO CHANGE NO CHANGE NO CHANGE NO CHANGE NO CHANGE NO CHANGE NO CHANGE DO NOT ENTER SIGN PROPOSED STOP AND DO NOT ENTER SIGN DRIVEWAY (OUTBOUND ONLY) PROPOSED 16' WIDE BITUMINOUS CONCRETE 42 SPACES PROVIDED (2 HANDICAPED) TOTAL = 9 + 31 = 40 SPACES REQUIRED = 31 SPACES3 2= 46 EMPLOYEES = 46x EX. GARAGE - 46 DRIVERS NUMBER OF EMPLOYEES = OR TOTAL = 32 SPACES 15,600/700 = 22.3 = 23 SPACES EX. GARAGE = 15,600 S.F. 2000 /1000 = 2 x 4.5 = 9 SPACES EX. OFFICE BUILDING = 2,000 S.F. 49 EXISTING SPACES 600 NUTMEG ROAD 32 TRUCK SPACES PROVIDED 43 SPACES PROVIDED (2 HANDICAPED) TOTAL = 20 SPACES REQUIRED = 6.7 = 7 SPACES 3 2= 60 x 10 IN TRANSFER STATION NUMBER OF EMPLOYEES = OR 14,000 /700 = 20 SPACES EX. TRANSFER STATION = 14,000 S.F. 43 EXISTING SPACES 602 NUTMEG ROAD 32 EXISTING TRUCK SPACES 570 NUTMEG ROAD 100' U.R.A. (LOT 3) 570 NUTMEG ROAD (LOT 1) 600 NUTMEG ROAD (LOT 2) 602 NUTMEG ROAD N/A N/A 10.9% N/A N/A N/A N/A > 150 FT 50.43 FT 235,171 SF < 40 FT 6.1% 46% < 2 STORIES +/-16 FT > 25 FT > 35 FT > 150 FT 100.86 FT 230,694 SF NO CHANGE NO CHANGE 11.2% NO CHANGE >10 FT * NO CHANGE NO CHANGE NO CHANGE NO CHANGE NO CHANGE16'10'8"ø INVERTS OUT= 72.5+/- 8"ø INVERTS IN= 74.0/73.7 TOP OF STONE = 75.63 TOP OF AQUABOX = 75.13 BOTTOM OF AQUABOX = 72.50 BOTTOM OF STONE = 72.0 EACH OF AQUABOX WITH STONE. TO UNDERGROUND STORAGE: 40 ROWS OF 60 UNITS EXISTING STORMWATER BASIN TO BE CONVERTED TF= 78.5+/- (SEE DETAIL) NEW OUTLET STRUCTURE PROPERTIES, LLC., FILE # E25128" AT A SCALE OF 1"=50', DATED 4/17/2025, REVISED THROUGH 8/11/2025. CONNECTICUT LIGHT & POWER COMPANY D/B/A EVERSOURCE ENERGY ACROSS THE PROPERTY OF MR SOUTH WINDSOR DATED 4/17/2025, REVISED THROUGH 8/11/2025 AND "EASEMENT MAP, DEPICTING EASEMENT AREA TO BE GRANTED TO THE EVERSOURCE ENERGY ACROSS THE PROPERTY OF MR SOUTH WINDSOR PROPERTIES, LLC., FILE # E25128" AT A SCALE OF 1"=50', - SEE MAPS TITLED "EASEMENT MAP, DEPICTING EASEMENT AREA TO BE GRANTED TO YANKEE GAS SERVICES COMPANY D/B/A OUTLET. DISCHARGE TO THE EXISTING POND FOR DEWATERING EXISTING POND WITH APPROXIMATE AREA FOR FILTER BAG(S) PAVEMENT SAWCUT & REMOVE EXISTING END NEW BCLC AT EX. CB EXISTING PAVEMENT OF EXISTING STORMWATER BASIN, MATCH INSTALL BITUMINOUS CONCRETE IN AREA SAWCUT & REMOVE EXISTING CURB (TYP.) REMOVE 18"ø IN & 24"ø OUT EX 15"ø IN TO REMAIN) NEW 15"ø OUT= 74+/- (MATCH TF= 77.6+/- EXIST. CB LEADER & 15"ø PIPE. REMOVE EXISTING SE ROOF EX. NE ROOF LEADER TO REMAIN NEW 15"ø INV IN & OUT=72.55 EX TF= 77.82 EXIST. CB (TO REMAIN) FROM SE TO 18" ø PIPE. TIE EXISTING ROOF LEADER 8"ø INVERTS= 73.75 18"ø INVERT= 72.3 WITH 8"ø TEE INLET PIPES. 18"ø SLOTTED HDPE @ 0.0% 24"ø INV. OUT (N)= 73.4 EX. 18"ø INV. IN (E)= 73.8+/- 15"ø INV. IN (W)= 73.8 TF= 78+/- Q10= 10.5 CFS. WQV= 2.7 CFS AND 10 YEAR STORM BYPASS CONTECH CDS OR EQUIVALENT SIZED FOR NEW HYDRODYNAMIC SEPARATOR STRUCTURE #2 18"ø INV. OUT (S)= 72.3 15"ø INV. IN (W)= 72.3 TF= 80+/- Q10= 5.8 CFS. WQV= 1.5 CFS AND 10 YEAR STORM BYPASS CONTECH CDS OR EQUIVALENT SIZED FOR NEW HYDRODYNAMIC SEPARATOR STRUCTURE #1 LOTS 1 & 2 COMBINED ** PROPOSED 600/602 NUTMEG ROAD (**) AS PART OF THE PLANNING AND ZONING APPROVAL REQUIREMENTS LOT 600 AND 602 WILL BE MERGED INTO A SINGLE LOT NOTE: (*) NO PROPOSED BUILDING, SET BACK IS TO CONCRETE PADS/EQUIPMENT FOR MORE DETAILS - SEE CLEAN ENERGY PLANS PROPOSED NATURAL GAS PUMPS (TYP.) ELECTRICAL SERVICE LINES. PROPOSED EASEMENT FOR UNDERGROUND HOURS OF OBSERVED FAILURE. REPAIR OR REPLACE WITHIN 244. EROSION CONTROL NOTES. IS HALF FULL AND DEPOSIT PER REMOVE SEDIMENT WHEN BAG3. NOTES OR AS DIRECTED. CONTROLINSPECT PER EROSION2. SPECIFICATIONS. INSTALL PER MANUFACTURER1. NOTES: WELL VEGETATED, GRASSY AREA NOT TO SCALE REQUIRED TACK COAT AS (COMPACTED) 8" PROCESSED GRAVEL COMPACTED SUBGRADE BITUMINOUS PAVEMENT SECTION 4" HMA S0.5 IN TWO EQUAL LIFTS BITUMINOUS PAVEMENT NOT TO SCALE DRIVEWAY APRON DETAIL DO NOT ENTER NOT TO SCALE 6.25 30 31-1119 POSTS 1 .080 SQ. FT. AREA (INCHES) SIZE D.O.T. # CONN. THK. ALUM. SIGN FACE - RED LEGEND - SILVER BACKGROUND - SILVER (R5-1) DO NOT ENTER SIGN NOT TO SCALE PAVEMENT 21 48°1'-0" 9"3"1"6"CURB (BCLC) BITUMINOUS CONCRETE SECTION CURBING SHALL BE MACHINE EXTRUDED.2. PRIOR TO PLACING CURB. AND AN APPROVED TACK COAT SHALL BE APPLIED JUST SURFACE ON WHICH CURBING IS PLACED SHALL BE CLEAN1. CURB NOTES: SUBGRADE ELEVATION LIMITS OF IN 12" (MAX.) LAYERS MATERIAL COMPACTED APPROVED NATIVE GRANULAR FILL OR 0.25 O.D. MATERIAL BEDDING PIPE DIA.PLACED BY HANDPIPE O.D.12"VARIES12" IN ROCK 4" IN EARTH NOTES: NOT TO SCALE OF ELLIPTICAL PIPE OR HORIZ. SPAN & BACKFILL TRENCH EXCAVATION TRENCHING & BACKFILLING USE WATERTIGHT RUBBER GASKETS IN ALL PIPE JOINTS.2. ALL PIPE TO BE HDPE UNLESS OTHERWISE SPECIFIED.1. I.D. + 2' (PIPE UNDER 30") ELLIPTICAL PIPE OVER & FOR HORIZ. I.D. + 3' FOR PIPE 30" & NOT TO SCALE WIDTH OF EXCAVATION ANGULAR STONE 3/4" - 2" WASHED, CRUSHED 42" NOTE: SEE PLANS FOR INVERTS AND PIPE SIZE. INLET/OUTLET PIPE HEADER DETAIL Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS 8/12/25 SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION DETAILS AND NOTES SHEET NO.OF3 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive NOT TO SCALE INLET SEDIMENT CONTROL DEVICE NOT TO SCALE EMBANKMENT SLOPETOE OF SLOPEFLOW OF SLOPETOE DEPTH OF 4" BURY TO A SIDE SLOPE VARIES BOTTOM OF SWALE SIDE SLOPE VARIES FLOWSWALECL VARIESAS DIRECTED(100' MAX.)FLOWBALES BUTTED TOGETHER BOTTOM OF DRAINAGE WAY A POINT A SHALL BE HIGHER THAN POINT B A B - +10' - +10' BALED HAY OR STRAW TOGETHER BALES BUTTED BARRIER CREATE A CONTINUOUS BETWEEN BALES TO WEDGE LOOSE STRAW (2 STAKES PER BALE) OR REBAR EACH BALE 2"x2"x3' LONG STAKES WIRE OR TWINE DIRECTION OF BINDING EXISTING GRADE BACKFILL COMPACTED BARRIER CREATE A CONTINUOUS BETWEEN BALES TO WEDGE LOOSE STRAW OR STRAW BALED HAY WIRE OR TWINE DIRECTION OF BINDING OR REBARS EACH BALE 2"x2"x3' LONG STAKES GRADE EXISTING SECTION AT TOE OF SLOPE PLAN PLAN SECTION AT SWALE B HAY BALES NOT TO SCALE FLOW 3'-0" MIN.NOTES: OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER3. POSTS (0.5 # STEEL/L.F.). THE MINIMUM POST LENGTH SHALL BE 5'-0". SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL 2. INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.1. 100 2'-6" MIN.12" MIN. 6" MIN.10'-0" MAX. SILT FENCE ELEVATION SECTION GRADE FINISH FENCE (SEE NOTE 2) ATTACHED TO WIRE SILT FENCE FABRIC SELF-SUPPORTING (MIN. LENGTH: 3' - 6') 1" x 2" WOOD STAKE GROUND FABRIC BELOW EXTEND 6" OF BACKFILL RECOMPACTED GRADE FINISH 2 MAX 3RUN-OFF FLOW DIRECTION (TYP.) NOT TO SCALE SOIL STOCKPILE DETAIL PER EROSION & SEDIMENTATION PLAN PLACEMENT OF MATERIAL STOCKPILE NOT TO SCALE TURFGRASS SEED MIX FINISH GRADE (SEE GRADING PLAN) (SEE GRADING PLAN) PREPARED SUBGRADE 4" TOPSOIL (4" THICKNESS) SUBGRADE EXISTING TURF ESTABLISHMENT NOT TO SCALE PLAN VIEW ELEVATION VIEW FILTER BAG FILTER BAG PUMP WATER FILTER BAG PROBLEM IS CORRECTED. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE 6. INTAKES SHOULD BE FLOATING AND SCREENED. THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP 2 1THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 5. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFED BY THE MANUFACTURER AND SECURELY CLAMPED.4. PLACED ON SLOPES GREATER THAN 5%. ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTITLE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE " STONE TO BE INSTALLED UNDER BAGS. TO BE DISCHARGED 4 3BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, IF NOT 4" LAYER OF 3. FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED.2 1REPLACED WHEN THEY BECOME A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE 2. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. 1. PUMPED WATER FILTER BAGS: NOTES (POA PRATENSIS) KENTUCKY BLUE GRASS (ELYMUS CANADENSIS) CANADA WILDRYE (SORGHASTRUM NUTANS) INDIAN GRASS (CHAMAECRISTA FASCICULATA) PARTRIDGE PEA RUBRA L. SSP. RUBRA) RED FESCUE (FESTUCA (AGROSTIS CANINA) VELVET BENTGRASS, SPECIES 10 5 15 10 35 25 (POUNDS) BY WEIGHT PROPORTION 95 95 95 95 97 96 (PERCENT) PURITY MINIMUM 90 90 90 90 80 85 (PERCENT) GERMINATION MINIMUM EROSION & SEDIMENTATION CONTROL PLAN: EROSION & SEDIMENTATION CONTROL NOTES: APPLIED AT A RATE OF 100 LBS. PER ACRE. TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS (LOLIUM PERENNE)13. THE FOLLOWING GRASS SEED MIXTURES SHALL BE APPLIED AT A RATE NO LESS THAN 100 LBS. PER ACRE:11. FALL: AUGUST 15 TO SEPTEMBER 15 SPRING: APRIL 15 TO JUNE 15 THE FOLLOWING DATES FOR SEEDING SHALL BE USED:10. AREAS OUTSIDE OF PAVED AREAS, WALKS, AND BUILDINGS ARE TO RECEIVE A MINIMUM 4" OF TOPSOIL.9. ESTABLISHMENT" SPECIFICATION IN CTDOT 819, AT THE COMPLETION OF PROJECT. ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF8. CONTROL DEVICES AS SHOWN ON THESE PLANS OR AS ORDERED BY THE ENGINEER. THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL EROSION AND SEDIMENTATION7. OR TOWN. CONSTRUCTION PERIOD IF DEEMED NECESSARY OR REQUIRED BY THE ENGINEER ADDITIONAL EROSION CONTROL MEASURES WILL BE INSTALLED DURING THE6. MANNER WHICH IS CONSISTENT WITH THE INTENT OF THE PLAN. SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A5. REPLACED OR INCREASED AS REQUIRED BY SPECIFIC FIELD CONDITIONS. WITHIN 24-HOURS AFTER A RAIN EVENT OF AT LEAST A HALF-INCH, AND MAINTAINED, ALL ON-SITE EROSION AND SEDIMENT CONTROLS ARE REQUIRED TO BE INSPECTED4. BY THE ENGINEER OR TOWN. CONTRACTOR DURING THE CONSTRUCTION PERIOD AS NECESSARY OR AS REQUIRED ALL EROSION CONTROL DEVICES SHALL BE MAINTAINED OR REPLACED BY THE3. AND THE TOWN REGULATIONS. GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL", DATED 2024, AS AMENDED ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE "CONNECTICUT ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CONSTRUCTED IN 2. ON THE PLANS, OR AS DIRECTED BY THE TOWN PRIOR TO CONSTRUCTION. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED AS SHOWN1. ACTIVITIES. ALL TEMPORARY STORMWATER DISCHARGE WILL BE DIRECTED TO THESE TRAPS. TEMPORARY SEDIMENT TRAPS WILL BE INSTALLED AS NECESSARY DURING CONSTRUCTION4. ALL DISTURBED AREAS HAVE BEEN STABILIZED, AS REQUIRED BY FIELD CONDITIONS. DUST CONTROL MEASURES WILL BE APPLIED DURING THE CONSTRUCTION PERIOD UNTIL3. OF SOIL. AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL ON-SITE STOCKPILES2. NOTED OR AGREED UPON WITH TOWN STAFF. SITE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, UNLESS OTHERWISE ALL EROSION AND CONTROL MEASURES WILL BE INSTALLED AT THE PROJECT1. DUMPING STRAPS PORTS OUTFLOW OPTIONAL CURB FILTER LIFT STRAPS STORM GRATE CURB OPENING SILT SACK ENTIRE STONE ENVELOPE WRAP FILTER FABRIC AROUND 3"4' MIN.HDPE PIPE 12" or 18" SLOTTEDVARIESPAVEMENT STRUCTURE BACKFILL WITH TOPSOIL OR 8"ø TEE PIPE STOCKPILE (TYP.) OF MATERIAL GRADIENT SIDE PLACED ON DOWN SYSTEM TO BE EROSION CONTROL INTAKE HOSE CLAMPS CLAMPS DISCHARGE HOSE DISCHARGE HOSE PUMP PUMP WELL VEGETATED, GRASSY AREA 15' 10'INTAKE HOSE STANDARD PER HAY BALE BARRIER EMBEDDED AND STALKED HAY BALES OR STRAW N.T.S. PLAN VIEW B-B FIBERGLASS SEPARATION CYLINDER AND INLET CENTER OF CDS STRUCTURE, SCREEN AND SUMP OPENING PVC HYDRAULIC SHEAR PLATE 2'-0" [610](2'-0" [610])1'-9" [533](4'-6" [1372])N.T.S. ELEVATION A-A FIBERGLASS SEPARATION CYLINDER AND INLET SOLIDS STORAGE SUMP SEPARATION SCREEN INLET PIPE (MULTIPLE INLET PIPES MAY BE ACCOMMODATED) OUTLET PIPE PVC HYDRAULIC SHEAR PLATE (4'-0" [1219])FLOW PERMANENT POOL ELEV. OIL BAFFLE SKIRT CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RINGS/RISERS A A 48" [1219] I.D. MANHOLE STRUCTURE TOP SLAB ACCESS (SEE FRAME AND COVER DETAIL) N.T.S. (DIAMETER VARIES) FRAME AND COVERMAX. FLOW MAX. BB F OR MAI NTENANCE CALL 1.800.338.1122 www.contechES.com TMClean water sta rt s here ®VARIESSEE NOTE 3 5" (TYP.)ODNOT TO SCALE 3' - 4' SECTION PRECAST BASE 1' - 4' AS REQUIRED SECTION(S) PRECAST RISER SEE NOTE 4 3' OR 4' SECTION PRECAST CONE 1/2 OD NOTES: FRONT SECTION TOP SECTION SIDE SECTION SEE NOTE 1 PRECAST STORM DRAIN MANHOLE (H-20) 6" 8"8"8"24" 4'-0" DIA. 6"6"4"PITCH SHELF MIN. 1"/FT CONCRETE OR BRICK BRICK INVERT CONCRETE OR LINE OF PIPES MIN. 1" PITCH @ SPRING CONCRETE OR BRICK SHELF BRICK & MORTAR KNOCKOUT WITH BETWEEN PIPE AND SEAL ANNULAR SPACE FILTER FABRIC STONE BASE OVER " CRUSHED4 312" OF SECTION AND TOP OF BASE MIN. 4" FROM BOTTOM KNOCKOUTS FOR PIPES LINE OF PIPES MIN. 1" PITCH @ SPRING CONCRETE OR BRICK SHELF BRICK INVERT CONCRETE OR ABOVE MANHOLE COVER ALL MATERIALS ARE TO MEET CONN. DOT SPECIFICATIONS FORM 818 AS AMENDED.5. FILL LIFTING HOLES WITH MORTAR.4. ALL PIPES SHALL BE CUT FLUSH WITH INSIDE WALLS.3. FOR SHALLOW STRUCTURES, USE 8" SLAB IN PLACE OF CONE SECTION.2. AND NUMBER OF PIPES. INCREASE WALL THICKNESS 1" FOR EACH 1 FT. OF INSIDE DIAMETER INCREASE. MANHOLE INSIDE DIAMETER MAY BE INCREASED AS DIRECTED BY THE ENGINEER TO ACCOMMODATE SIZE1. 6" MIN. - 12" MAX. OR BRICK WITH CONC. BLOCKS ADJUST FRAME ELEV. AND COVER CAST IRON FRAME NOT TO SCALE YARD DRAIN (MIN.)AGGRECATE (MIN.)(800 mm) 31.5" 6" (150 mm) MIN MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE FILL MATERIAL FOR LAYER 'D' STARTS FROM THE FINAL FILL: PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S N/A PREPARATION REQUIREMENTS. INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED C THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. (450 mm) ABOVE THE TOP OF THE AQUABOX MODULES. NOTE THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" FILL MATERIAL FOR LAYER 'C' STARTS FROM INITIAL FILL: THIS LAYER. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF FINES OR PROCESSED AGGREGATE. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 ¹AASHTO M43 OR A-1, A-2-4, A-3 ¹AASHTO M145 20,000 lbs (89 kN). EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO RELATIVE DENSITY FOR PROCESSED AGGREGATE PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% OVER THE AQUABOX MODULES IS REACHED. COMPACT BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL B 'C' LAYER ABOVE. MODULES FROM THE FOUNDATION STONE ('A' LAYER) TO THE FILL SURROUNDING THE AQUABOX PERIMETER STONE: CLEAN, CRUSHED, ANGULAR STONE 467, 5, 56, 57 ¹AASHTO M43 NO COMPACTION REQUIRED. A MODULE. THE SUBGRADE UP TO THE BOTTOM OF THE AQUABOX FILL BELOW AQUABOX MODULES FROM FOUNDATION STONE: CLEAN, CRUSHED, ANGULAR STONE 467, 5, 56, 57 ¹AASHTO M43 2,3PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE. THERMOPLASTIC LINER DETAIL NON-WOVEN GEOTEXTILE EARTH THERMOPLASTIC LINER OVERLAP ON TOP SEVERAL INCHES TO ANCHOR (PER MANUFACTURER'S RECOMMENDATIONS) ANGULAR STONE NON-WOVEN GEOTEXTILE SEE NOTE 2) (CAN BE SLOPED OR VERTICAL / EXCAVATION WALL 12" (300 mm) MIN (450 mm) MIN* 18" 6" (150 mm) MIN PROJECT SPECIFIC REQUIREMENTS. PLEASE SEE THE LAYOUT SHEET(S) FOR MINIMUM REQUIREMENTS FOR INSTALLATION. **THIS CROSS SECTION DETAIL REPRESENTS SIDEWALL PANEL (TYP FOR EXTERIOR SIDES) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) D C B A SUBGRADE SOIL. MIN ALLOWABLE BEARING PRESSURE 2000 PSF (95.8 kPa) (SEE NOTE 1) (FILL SPECIFICATIONS BY OTHERS) IN SITU MATERIAL OR COMPACTED FILL ADJACENT SOILS SHOULD BE STABLE ACCEPTABLE FILL MATERIALS : AQUABOX-1 ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.4. COMPACTION REQUIREMENTS. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT ADS FOR 3. ADS AQUABOX COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.2. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #57 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 57 (AASHTO M43) STONE".1. PLEASE NOTE: PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL. EXCAVATION WALL SHOULD BE COMPLIANT WITH OSHA SAFETY STANDARDS. DEEPER EXCAVATIONS AND MULTI-LAYER AQUABOX SYSTEMS MAY REQUIRE SLOPED OR BENCHED EXCAVATIONS. 2. THE ADS AQUABOX SYSTEM. MOISTURE CONDITIONS. SUBGRADE PREPARATION AND/OR IMPROVEMENT SHOULD BE SPECIFIED BY THE DESIGN ENGINEER AS NECESSARY TO MEET THE PERFORMANCE REQUIREMENTS OF THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE PERFORMANCE CHARACTERISTICS OF THE SUBGRADE SOILS WITH CONSIDERATION FOR THE RANGE OF EXPECTED 1. NOTES: FOR NON-TRAFFIC APPLICATION) CONCRETE COLLAR (NOT REQUIRED CUBE SIDEWALL PANEL (TYP FOR EXTERIOR SIDES) INCREASE COVER TO 24" (600 mm). INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED 12" (300 mm) NYLOPLAST INSPECTION PORT BODY ADS N-12 RISER 12" (300 mm) NYLOPLAST ADAPTER (PART# 1257AGHPU) AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL (2.0 m) MAX 6.5' OF SHEETDATE:DRAWING #:DRAWN:CHECKED:PRIOR APPROVAL. EOR SHALL REVIEW THIS DRAWING PRIOR TO BIDDING AND/OR CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE EOR TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS/STORMTECH UNDER THE DIRECTION OF THE PROJECT’S ENGINEER OF RECORD (“EOR”) OR OTHER PROJECT REPRESENTATIVE. THIS DRAWING IS NOT INTENDED FOR USE IN BIDDING OR CONSTRUCTION WITHOUT THE EOR’S HILLIARD, OH 430264640 TRUEMAN BLVDDATEDRWNCHKDDESCRIPTIONModular Stormwater Management SystemAquaboxNOT TO SCALE (CONTECH CDS OR APPROVED EQUAL) HYDRODYNAMIC SEPARATOR NOT TO SCALE UNDERGROUND STORAGE DETAIL NOT TO SCALE OUTLET STRUCTURE WITH WEIR INV.= 71.0 SECTION INV.= 71.65 +/- TOP OR MASONRY UNITS PRECAST CONCRETE INV.=72.0 PROPOSED 10" HDPE PIPE INV.= +/-71.60 EXISTING 18" RCP PIPE CONCRETE WEIR EXISTING 18" RCP PIPE INV.=72.0 HDPE PIPE PROPOSED 15" ELEVATION= 74.5 CONCRETE WEIR INV.= 72.0 10" DIAM. HOLE INV.=72.0 HDPE PIPE PROPOSED 15" OR MASONRY UNITS PRECAST CONCRETE INV.= 72.0 10" DIAM. HOLE INV.=72.0 PROPOSED 10" HDPE PIPE 6" MIN. - 12" MAX. OR BRICK WITH CONC. BLOCKS ADJUST FRAME ELEV. COVER TO GRADE CAST IRON FRAME AND Civil Engineering Land Surveying PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE MJP KRG MMZ REVISIONS 8/12/25 SCALE: 1"= 40' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION DETAILS AND NOTES SHEET NO.OF4 4 Environmental Consulting Construction Management 7/8/25 SOUTH WINDSOR, CT 4481.159 J:\4481\159\Design\PLOT_Site Plan_Clean Energy.dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive FINISH GRADE WATER TIGHT GASKET 18" PVC CATCH BASIN FRAME AND GRATE STANDARD CAST IRON ROUND 1' (MIN.)6" CONCRETE 4" PROCESSED RELEVANT CODES AND STANDARDSABBREVIATIONSACASPHALTIC CONCRETEAFGABOVE FINISHED GRADEAHJAUTHORITYHAVING JURISDICTIONATSAUTOMATIC TRANSFER SWITCHBCWBARE COPPER WIREBLDGBUILDINGCL CENTER LINECNGCOMPRESSED NATURAL GASCOMPCOMPRESSORCONCCONCRETECMUCONCRETE MASONRY UNITCONTCONTINUOUSCU FTCUBIC FEETCRINDCARD READER INSIDE DISPENSERCSCARBON STEELDIA OR ØDIAMETERDEPTDEPARTMENTDWGDRAWING(E)EXISTINGEAEACHELEV OR ELELEVATIONEQEQUALENCLENCLOSUREESDEMERGENCY SHUT DOWNEXISTEXISTING(F)FUTUREFGFINISH GRADEFHFIRE HYDRANTFIGFIGUREFOCFACE OF CURBFPFUEL POST (TIME FILLED)FSSPFUEL SYSTEM SUPPORT PANELFXFIRE EXTINGUISHERGALVGALVANIZEDGNDGROUNDGRCGALVANIZED RIGID CONDUITHCHANDICAPHPHORSE POWERHORIZHORIZONTALMAWPMAXIMUM ALLOWABLE WORKING PRESSUREMAXMAXIMUMMCCMOTOR CONTROL CABINETMCP MASTER CONTROL PANELMINMINIMUMMSAMETER SET ASSEMBLY (GAS UTILITY)MSBMASTER SWITCH BOARDMTRMOTORMTSMANUAL TRANSFER SWITCH(N)NEWN/ANOT APPLICABLENGVNATURAL GAS VEHICLENTSNOT TO SCALENONUMBEROCON CENTERPLPLATEPOCPOINT OF CONNECTIONPBPUSH BUTTONREFREFERENCEREINFREINFORCEMENT(RR)REMOVE AND REPLACESCHSCHEDULESECSECTIONSIMSIMILARSPRSPRINKLEREDSQSQUARESFSQUARE FEETSSSTAINLESS STEELSTDSTANDARDTHKTHICKTHRUTHROUGHTOCTOP OF CURBXFMRTRANSFORMERTYPTYPICALUNOUNLESS NOTED OTHERWISEVERTVERTICALGENERAL NOTESTHE WORK SHALL CONFORM TO THE MOST RECENT EDITION OF THEFOLLOWING CODES AND STANDARDS AS SUPPLEMENTED, AMENDED,OR OTHERWISE MODIFIED BY LOCAL REQUIREMENTS:2021 INTERNATIONAL BUILDING 2021 INTERNATIONAL PLUMBING 2020 NATIONAL ELECTRICAL CODE 2021 INTERNATIONAL MECHANICAL CODE NFPA52 VEHICULAR FUEL SYSTEMS CODE 2023IN THE EVENT OF A CONFLICT BETWEEN DRAWINGS, WRITTENSPECIFICATIONS, AND/OR REFERENCED STANDARDS, THE MOSTSTRINGENT SHALL GOVERN.PROJECT DESCRIPTIONNOTE: THE TERM "CONTRACTOR" OR "CONTRACTORS" AS USED INTHESE GENERAL NOTES SHALL REFER TO THE PRIME CONTRACTOR AND ALL SUB-CONTRACTORS.1. THIS SET OF CONSTRUCTION DOCUMENTS COVERS THE CNGSYSTEM IMPROVEMENTS ONLY AND MAY NOT SHOW ALLEXISTING SITE IMPROVEMENTS FOR THE FACILITY.2. THE CONTRACTORS SHALL PRESERVE AND MAINTAIN ACCESSTO EXISTING EXITS AND MAKE EVERY EFFORT TO MINIMIZEDISRUPTIONS TO EXISTING OPERATIONS AT ALL TIMES DURINGCONSTRUCTION.3. THE CONTRACTORS SHALL BE RESPONSIBLE FOR VERIFYINGTHAT ALL MATERIALS, LABOR, INSTALLATION, FABRICATION,ETC. SHALL CONFORM TO ALL CODES AND REGULATIONS OFAPPLICABLE GOVERNING AGENCIES.4. THE CONTRACTOR SHALL VERIFY DIMENSIONS AND SITECONDITIONS PRIOR TO COMMENCING ANY WORK. THECONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OFANY DISCREPANCY CONTAINED WITHIN THESE CONSTRUCTIONDOCUMENTS WHICH ARE RELATED TO THE CONTRACTOR'SSCOPE OF WORK. SHOULD AN ERROR APPEAR IN THESECONSTRUCTION DOCUMENTS OR RELATED WORK PERFORMEDBY OTHER CONTRACTORS AFFECTING THE CONTRACTOR'SSCOPE OF WORK, THE CONTRACTOR SHALL NOTIFY THEENGINEER AT ONCE FOR INSTRUCTIONS AS TO THEPROCEDURE FOR CONTINUATION OF WORK. SHOULD THECONTRACTOR PROCEED WITH WORK AFTER IDENTIFYINGSUCH A CONFLICT WITHOUT OBTAINING INSTRUCTIONS FROMTHE ENGINEER, THE CONTRACTOR SHALL ASSUME THE FULLRESPONSIBILITY FOR ALL REMEDIAL WORK NECESSARY TOSATISFY THE REQUIREMENTS OF THESE CONSTRUCTIONDOCUMENTS AND THE APPLICABLE BUILDING CODES.5. THE CONTRACTOR SHALL REFER TO THE BID DRAWINGS ANDWRITTEN TECHNICAL SPECIFICATIONS - IF ANY - FORADDITIONAL INFORMATION AND REQUIREMENTS WHICH AREHEREBY INCORPORATED INTO THE PROJECT REQUIREMENTSBY REFERENCE.6. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS WITHTHOSE SHOWN ON THE DRAWINGS AND PROMPTLY REPORTANY DISCREPANCIES TO THE ENGINEER. VERIFY EXISTINGCONDITIONS WITHIN THE WORK AREA AND REVIEWMODIFICATIONS REQUIRED TO SUIT EXISTING CONDITIONSPRIOR TO FABRICATION AND INSTALLATION OF NEW WORK ORMODIFICATIONS TO EXISTING CONDITIONS.7. THE CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN,ORDERLY CONDITION, FREE OF DEBRIS AND LITTER. EACHCONTRACTOR SHALL, IMMEDIATELY UPON COMPLETION OFEACH PHASE OF HIS WORK, REMOVE ALL TRASH AND DEBRISTHAT RESULTS FROM THE PERFORMANCE OF HIS WORK.8. CONSTRUCTION MATERIALS STORED ON THE SITE SHALL BEPROPERLY STACKED AND PROTECTED TO PREVENT DAMAGEAND DETERIORATION UNTIL USED. FAILURE TO PROTECTMATERIALS MAY BE CAUSE FOR REJECTION OF WORK.9. THE CONTRACTOR SHALL PROTECT NEW AND EXISTINGFINISHES AND CONSTRUCTION FROM DAMAGE THAT MAYOCCUR DURING CONSTRUCTION. DAMAGE TO NEW AND/OREXISTING FINISHES AND CONSTRUCTION SHALL BE REPAIREDOR REPLACED (THE OWNER'S DECISION) WITH IDENTICALMATERIAL AT THE CONTRACTOR'S EXPENSE.10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGTHE OWNER WITH ACCURATE "AS-BUILT" RECORD DRAWINGSAT THE COMPLETION OF CONSTRUCTION. RECORDDRAWINGS WILL BE MADE BY "RED-LINING" FORMALCONSTRUCTION DRAWINGS TO IDENTIFY ANY AND ALLCHANGES WHICH MAY HAVE BEEN MADE IN THE FIELD.11. ALL WORK SHOWN ON THESE DRAWINGS SHALL BECONSTRUED AS BEING NEW WORK AND PART OF THISCONTRACT UNLESS NOTED BEING EXISTING OR OTHERWISE.12. CONTRACTOR SHALL COMPLY WITH ALL NATIONAL POLLUTANTDISCHARGE ELIMINATION SYSTEM (NPDES) AND LOCALJURISDICTION STORM WATER POLLUTION PREVENTION (SWPP)RULES AND REGULATIONS PRIOR TO THE COMMENCEMENT OFANY WORK AND DURING ANY CONSTRUCTION ACTIVITIES.13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATIONOF ALL DIMENSIONS, MATERIALS & QUANTITIES AS PART OFTHE CIVIL, STRUCTURAL, MECHANICAL, P&ID AND ELECTRICALPLANS. NO EXCEPTIONS.14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ACOMPLETE SET OF CONSTRUCTION PLANS TO ALLSUB-CONTRACTORS DISCIPLINES FOR REFERENCE AND USE.15.THE CONTRACTOR SHALL BE RESPONSIBLE FORRE-ESTABLISHING ALL DAMAGED OR DISTURBED TEMPORARYAND PERMANENT BENCH MARKS AT THEIR OWN EXPENSE.NOT TO SCALEVICINITY MAPFLOOD MAP:09003C0378F EFFECTIVE: 9/26/2008REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBPROJECT DESCRIPTION: INSTALLATION OF COMPRESSED NATURAL GAS VEHICLEFUELING STATION WITH ASSOCIATED CONTROLS EQUIPMENT PADS, CONNECTINGPIPING, ELECTRICAL, SAFETY SYSTEMS, AND OTHER MINOR SITE WORK AT THEPROJECT SITE LISTED ABOVE.SITENOT TO SCALENOT TO SCALEFEMA MAPSITEZONE: XNFPA70 NATIONAL ELECTRICAL CODE (NEC) AS ADOPTED BY THELOCAL AUTHORITY HAVING JURISDICTIONASME B31.3 PROCESS PIPING CODE 2020c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C0.0-COVER SHEET.dwg5/7/20258/7/2025 11:50:33 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 COVER SHEET 21330.00PBMLCS.1CNG FUELING STATIONUSA HAULING & RECYCLING600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074PROJECT TEAMOWNER (S)PROJECT CONTACT(S)USA HAULING & RECYCLING555 TAYLOR RDENFIELD, CT 06082(860)746-3200CLEAN ENERGYTREY CLIMER4675 MACARTHUR COURT SUITE 300NEWPORT BEACH, CA 92660(317)460-1885APN: 65100600 (PID: 5386)ZONING: IPOCCUPANCY: IND/COMMLAND CLASS: ITYPE OF CONSTRUCTION: II-BAUTHORITY HAVING JURISDICTION: TOWN OF SOUTH WINDSOR, CTENGINEER OF RECORDCLEAN ENERGYATTN: MATTHEW W LOSER, PE, LEED AP3333 MICHELSON SUITE 300IRVINE, CA 92612(949) 398-1338Sheet List TableSheet NumberSheet TitleGENERALCS.1COVER SHEETG0.0GENERAL NOTES BUILDINGG0.1CODE COMPLIANCE TABLESC0.1GENERAL ARRANGEMENT & ELEVATIONS FASTFILLCIVILC1.0SITE PLANC2.0SITE DETAILS 1 OF 2C2.1SITE DETAILS 2 OF 2C3.0STRUCTURAL DETAILC3.1STRUCTURAL NOTESPIPINGP0.0PIPING NOTESP1.0PIPING & INSTRUMENTATION DIAGRAMP1.1PIPING & INSTRUMENTATION SCHEDULEP2.0PIPING PLANP3.0PIPING DETAILSP4.0SIGNAGE PLANELECTRICALE0.0ELECTRICAL NOTESE1.0SINGLE LINE DIAGRAME2.0CONDUIT SCHEDULEE3.0ELECTRICAL PLANE3.1GROUNDING PLANE3.2HAZARDOUS AREA PLANE5.0ELECTRICAL SECTIONS AND DETAILS REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C0.0-COVER SHEET.dwg5/7/20258/7/2025 11:50:34 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 GENERAL NOTES BUILDING 21330.00PBMLG0.0LOCATION OF CONCRETESTRENGTH, psiTYPE3500*FOOTINGSSLAB ON GRADEMISCELLANEOUS3500*3500*HARD ROCKHARD ROCKHARD ROCKGENERAL NOTES1.1SUMMARYA.THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE COMPRESSEDNATURAL GAS (CNG) FUELING FACILITY AND RELATED STRUCTURES TO BE CONSTRUCTED HEREUNDER ASNECESSARY TO MAKE A COMPLETE AND WORKING INSTALLATION, EXCEPT FOR WORK SPECIFICALLYEXCLUDED.B.ALL PHASES OF THE PROJECT SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THESESPECIFICATIONS AND THE APPROVED CONSTRUCTION DRAWINGS. IF THERE IS ANY CONFLICT BETWEENTHIS DOCUMENT AND THE DRAWINGS, THE DRAWING(S) SHALL GOVERN AND THE ENGINEER SHALL BENOTIFIED.C.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL THE REQUIRED PERMITS (I.E. BLDG. &SAFETY, PLUMBING, ELECTRICAL, PRESSURE VESSEL, FIRE DEPARTMENT FEES, CERTIFICATE OFOPERATION OR PERMIT TO OPERATE), AND SHALL ENSURE THAT CITY LICENSES AND TAXES ARE CURRENTAS REQUIRED FOR THE PROJECT, EXCEPT AS NOTED IN THIS SPECIFICATION AND CONTRACT DOCUMENTS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING FOR ALL REQUIRED INSPECTIONS AT THEAPPROPRIATE STAGES OF CONSTRUCTION. IF ANY OF THE CONTRACTOR'S WORK FAILS ANY INSPECTION,THE CONTRACTOR SHALL TAKE THE APPROPRIATE MEASURES TO CORRECT ANY DEFICIENCY AT NOEXPENSE TO CLEAN ENERGY.E.THE CONTRACTOR'S WORK SHALL CONFORM TO ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONSOF THE STATE, COUNTY, AND CITY INVOLVED. APPROVED DRAWINGS AND PERMITS SHALL NOT BECONSTRUED AS LICENSE TO CONSTRUCT WORK NOT CONFORMING WITH THE GOVERNING CODES ANDSHALL NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE GOVERNING CODES, PLANS, ANDSPECIFICATIONS.F.THE CONTRACTOR SHALL CHECK THE ACCURACY OF ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION.NOTIFY ENGINEER OF ANY DISCREPANCIES OR INCONSISTENCIES.1.2 MATERIALSA.THE CONTRACTOR SHALL HANDLE AND INSTALL ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITHMANUFACTURER'S INSTALLATION INSTRUCTIONS AND THE REQUIREMENTS IN THESE CONSTRUCTIONSPECIFICATIONS.B.CLEAN ENERGY SHALL PROVIDE THE CONTRACTOR WITH MAJOR EQUIPMENT ASSEMBLIES LISTED AS "CLEANENERGY FURNISHED" IN THIS SPECIFICATION OR THE DRAWINGS. CLEAN ENERGY FURNISHED EQUIPMENTAND MATERIAL WILL BE DELIVERED TO THE JOB SITE BY CLEAN ENERGY AND THE CONTRACTOR SHALL BERESPONSIBLE FOR UNLOADING AND PROPERLY STORING THEM ON THE CONSTRUCTION SITE TO ENSURE NODAMAGE IS DONE TO EQUIPMENT OR MATERIAL (I.E. RAIN, VANDALISM, ETC). ON-SITE STORAGE LOCATION(S)SHALL BE COORDINATED WITH CLEAN ENERGY AND/OR THE CLIENT.1.3 MATERIAL HANDLING AND STORAGED.AFTER RECEIPT OF CLEAN ENERGY FURNISHED MATERIALS BY THE CONTRACTOR, ANY SHORTAGES OFAND/OR DAMAGES TO THE MATERIALS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THECONTRACTOR SHALL BE FINANCIALLY ACCOUNTABLE FOR SUCH SHORTAGES, ERRORS, OR DAMAGES.E.THE CONTRACTOR SHALL BE FINANCIALLY ACCOUNTABLE FOR LOST OR STOLEN CLEAN ENERGY FURNISHEDEQUIPMENT.F.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER STORAGE AND HANDLING OF ALL CLEAN ENERGYFURNISHED EQUIPMENT AND MATERIAL UNTIL THE INSTALLATION IS ACCEPTED BY CLEAN ENERGY'SREPRESENTATIVE.G.THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAULING AWAY ALL UNUSED CONTRACTOR SUPPLIEDMATERIALS, WASTE, AND SPOILS. ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE SITE DAILYAND DISPOSED OF IN A LEGAL MANNER.H.ALL UNUSED CLEAN ENERGY SUPPLIED MATERIAL SHALL BE RETURNED TO CLEAN ENERGY UPONCOMPLETION OF CONSTRUCTION.1.4USE OF SITE, TEMPORARY UTILITIES AND INSPECTIONSA.THE CONTRACTOR'S ACTIVITIES SHALL BE RESTRICTED TO THE DESIGNATED CONSTRUCTION SITE ANDSTORAGE AREAS DURING EXECUTION OF THIS WORK.B.PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN APPROVAL FROM CLEAN ENERGY'SREPRESENTATIVE FOR ON-SITE DIRT REMOVAL OR STOCK PILING TO INSURE MINIMUM DISRUPTION OFEXISTING SITE OPERATION.C.THE CONTRACTOR SHALL PROVIDE ALL REQUIRED TEMPORARY FACILITIES INCLUDING SANITARY FACILITIES,HAND WASHING, AND TELEPHONES.D.EVERY REQUEST FOR INSPECTION SHALL REQUIRE A FORTY-EIGHT (48) HOUR ADVANCE NOTICE BEFORESUCH INSPECTION IS DESIRED.1.5START-UP PROCEDURESA.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY TEMPORARY CLEARANCES TO RELEASE GAS ANDELECTRICAL SERVICE FOR START-UP. THIS WILL NOT INCLUDE FINAL INSPECTION BY AGENCIES WHICHREQUIRE A CERTIFICATE TO OPERATE.B.THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY'S PROJECT MANAGER A MINIMUM OF THREE (3) WEEKSBEFORE THE DATE THE SYSTEM CAN BE STARTED SO AS TO COORDINATE START-UP WITH THE EQUIPMENTVENDOR(S) AND/OR APPROVED REPRESENTATIVES.C.THE CONTRACTOR SHALL HAVE QUALIFIED ELECTRICAL AND MECHANICAL REPRESENTATIVES PRESENTDURING START-UP TO MAKE ANY NECESSARY REPAIRS IN THE EVENT OF LEAKS OR FAILURES.D.A PRELIMINARY WALK-THROUGH SHALL BE MADE AFTER START-UP WITH CLEAN ENERGY REPRESENTATIVES.THE ITEMS ON THE PUNCH LIST DEVELOPED DURING THIS WALK-THROUGH SHALL BE COMPLETED WITHINTEN (10) WORKING DAYS.E.FINAL WALK-THROUGH SHALL BE CONDUCTED WITH THE CLEAN ENERGY PROJECT MANAGER, ENGINEER ORTHEIR AUTHORIZED REPRESENTATIVE, AND THE CONTRACTOR TO SIGN OFF THE COMPLETION OF THEPUNCH LIST ITEMS. ALL ITEMS SHALL BE COMPLETED AND SIGNED OFF BEFORE RETENTION MONEY WILL BEPAID TO THE CONTRACTOR1.6 INSTALLATIONA.THE CONTRACTOR SHALL CHECK THE ACCURACY OF FOUNDATION LOCATIONS, ELEVATIONSM LOCATIONAND PROJECTION OF ALL ANCHOR BOLTS AND EMBEDDED ITEMS. CLEAN ENERGY WILL REQUIRE 24 HOURSNOTICE FOR INSPECTION OF THE CONTRACTOR'S WORK.1.7 DRAWINGSA.FINAL INTERPRETATION OF ALL DRAWINGS WILL BE BY CLEAN ENERGY, IN CONSULTATION WITH THEENGINEER, AND CLEAN ENERGY'S DECISION WILL BE FINAL.B.TWO COMPLETE SETS OF "APPROVED FOR CONSTRUCTION" DRAWINGS WILL BE PROVIDED TO THE THECONTRACTOR FIVE (5) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION.C. ALL DRAWINGS PREPARED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ENGINEER OF RECORDFOR APPROVAL PRIOR TO ADMITTING DRAWINGS INTO THE CONSTRUCTION DRAWING SET.D.UPON SUBSTANTIAL COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL MARK-UP ONE (1) COPY OF"APPROVED FOR CONSTRUCTION" DRAWINGS TO AS-BUILT CONDITIONS. AS-BUILT DRAWINGS SHALL SHOWALL SIGNIFICANT CHANGES, DIMENSIONS (INCLUDING DEPTH), AND RELATIVE POINTS OF REFERENCE. THESEALTERED DRAWINGS SHALL BE SUBMITTED TO CLEAN ENERGY WITHIN TWO (2) WEEKS (TEN (10) WORKINGDAYS) AFTER COMPLETION OF CONSTRUCTION. RETENTION RELEASE IS CONTINGENT UPON RECEIVINGACCURATE AS-BUILT DRAWINGS.1.8MISCELLANEOUS EQUIPMENTA.THE CONTRACTOR SHALL PROVIDE MASTER LOCK, PADLOCKS, HI VIS, ALUMINUM, PRO SERIES PICKRESISTANT 5 PIN LOCKING MECHANISM WITH 2 KEYS AT LOCATIONS SPECIFIED. ALL GATES, PANELS ANDDOORS SHALL INCLUDE A BLACK MASTER LOCK, GRAINGER #4RD90 THAT IS KEYED TO 10G504. ALL SAFETYRELIEF VALVES SHALL INCLUDE A RED MASTER LOCK, GRAINGER #4RD94 THAT IS KEYED TO 10G502.1.9 DESIGN PARAMETERSA.THIS PROJECT HAS BEEN DESIGNED PER CODES INDICATED ON SHEET C3.0.B.OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS,UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE ENGINEER WHEN DRAWINGS BYOTHERS SHOW OPENINGS, POCKETS, ETC. LARGER THAN 6" NOT SHOWN ON THE DRAWINGS, BUT WHICHARE LOCATED IN STRUCTURAL MEMBERS.C.ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE OF THE LATEST REVISION.D.DESIGN LOADS: SEE STRUCTURAL DETAILS, SHEET C3.0E.WIND ANALYSIS PER ASCE. SEE STRUCTURAL DETAILS SHEET C3.0F.SEISMIC ANALYSIS PER ASCE UTILIZING THE EQUIVALENT LATERAL FORCE ANALYSISSEE STRUCTURAL DETAILS ON SHEET C3.0CONCRETEA. THE CONTRACTOR SHALL NOT MAKE ANY CONCRETE POURS WITHOUT FIRST NOTIFYING CLEAN ENERGY.B. IF FOUNDATION SLABS AND FOOTINGS ARE POURED PRIOR TO TRENCHING FOR PIPING AND ELECTRICAL, SLEEVES ARE REQUIRED UNDER BLOCK WALL FOOTINGS OR EQUIPMENT FOUNDATIONS FOR ALL PROPOSED GAS PIPING OR ELECTRICAL CONDUITS PASSING UNDER FOOTINGS OR FOUNDATIONS.C. CEMENT SHALL MEET IBC STANDARDS FOR PORTLAND CEMENT & BLENDED HYDRAULIC CEMENTS.D. READY MIX CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH REQUIREMENTS OF IBCSTANDARDS. BATCH TICKETS WILL BE RETURNED TO CLEAN ENERGY.E.REINFORCED CONCRETE IS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN METHOD".F.CONCRETE NORMAL WEIGHT IS 150 PCF. UNLESS NOTED OTHERWISE.G.CONCRETE MIXING OPERATION, ETC. SHALL CONFORM TO ASTM C94.H.CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WETSEAL OF A CIVIL ENGINEER, LICENSED IN THE STATE THE PROJECT IS LOCATED, FOR REVIEW BY THEENGINEER. THE MIX DESIGNS SHALL STATE THE PROJECT NAME AND THE INTENDED USAGE OF THECONCRETE.I.SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES:*DESIGN STRENGTH = 3000 psi* PER TABLE 19.3.1.1 ACI-318-14 - CONCRETE MIX SHALL BE DESIGNED FOR EXPOSURE CLASSES F0, S0, P0 AND C0.J.PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE V IN CONTACT WITH SOIL AND TYPE IIELSEWHERE. CEMENT SHALL HAVE AN EQUIVALENT ALKALINE CONTENT LESS THAN 0.6%.K.AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTMC33. AGGREGATE SHALL BE NON-REACTIVEL.FLY ASH OR POZZOLANS, IF USED, SHALL CONFORM WITH ASTM C618. USAGE SHALL NOT EXCEED 15PERCENT BY WEIGHT OF THE TOTAL OF CEMENTITIOUS MATERIALS. POZZOLANS USED TO MITIGATE THEEFFECT OF SULFATE CONTAINING SOILS SHALL BE DETERMINED BY TEST OR SERVICE RECORD.M.PLACEMENT OF CONCRETE SHALL CONFORM TO SECTION 1905 OF THE BUILDING CODE.O.ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE WELL-SECURED INPOSITION PRIOR TO PLACING CONCRETE.P.MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH SLAB ON GRADE, DO NOT REQUIRESLEEVES, UNLESS OTHERWISE NOTED. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE PLACINGCONCRETE. DO NOT CUT ANY REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORINGOPENINGS IN CONCRETE IS NOT PERMITTED. NOTIFY THE ENGINEER IN ADVANCE OF CONDITIONS NOTSHOWN ON THE STRUCTURAL DRAWINGS.Q.CONTRACTOR SHALL SUBMIT MINIMUM OF TWO COPIES OF REBAR SHOP DRAWINGS SHOWING ALL BENDS,LAPS, HOOKS AND CHAINS REQUIRED FOR THE PROPER CONSTRUCTING OF THE REINFORCING ON PLANS.R.ALL CONCRETE SLABS WILL BE A SMOOTH TROWEL FINISH ON ALL CURB FACES AND EDGES WITH BROOMFINISH ON ALL FLAT SURFACES EXCEPT WHEN MATCHING EXISTING CONCRETE SURFACES. ALL SLABFINISHES SHALL BE FREE OF STAINS, DISCOLORATION, VOIDS, CRACKS, OR SURFACE DISCONTINUITIES. IFANY OF THESE CONDITIONS EXIST, CLEAN ENERGY WILL REQUIRE THE CONTRACTOR TO REPLACE THE SLAB.THE CONTRACTOR SHALL VERIFY WITH CLEAN ENERGY WHICH TYPE OF BROOM FINISH WHICH WILL BEACCEPTABLE.REINFORCING STEELA.REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF BUILDING CODE AND ASTM 615 OR ASTMA706 GRADE 60.B.BARS SHALL BE CLEAN OF RUST, GREASE, OR OTHER MATERIALS LIKELY TO IMPAIR BOND. ALL REINFORCINGBAR BENDS SHALL BE MADE COLD.C.REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. LAP ALL HORIZONTAL BARSAT CORNERS AND INTERSECTIONS. STAGGER ALL SPLICES UNLESS NOTED OTHERWISE ON PLANS.D.ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACEINSPECTION IS MADE.E.REBARS IN SLABS SHALL BE SECURELY SUPPORTED ON WELL-CURED CONCRETE BLOCKS OR APPROVEDMETAL CHAIRS, PRIOR TO PLACING CONCRETE.F.REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE ACI 318 AND ACI 530 MANUALS.G.MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO PLACEMENT OF CONCRETE.H.CONCRETE PROTECTION FOR REINFORCEMENTMIN COVER (INCHES)a.CONCRETE CAST AGAINST AND PERMANENTLYEXPOSED TO EARTH:3b.CONCRETE EXPOSED TO EARTH OR WEATHER:#6 THROUGH NO. 18 BARS2#5 BAR, W31 OR D31 WIRE AND SMALLER 112c.CONCRETE NOT EXPOSED TO WEATHER OR INCONTACT WITH GROUND:SLABS, WALLS, JOISTS:#14. AND #18 BARS112#11 BAR AND SMALLER34BEAMS, COLUMNS:PRIMARY REINFORCEMENT, TIES,STIRRUPS, AND SPIRALS112I.DEVELOPMENT AND SPLICES OF REINFORCEMENT SHALL CONFORM TO ACI 318, CHAPTER 12 FOR CONCRETE AND ACI 530 FOR MASONRY. FOR CONCRETE, SEE PLANS AND DETAILS.MASONRYA.MASONRY MATERIALS SHALL BE STORED SO THAT AT THE TIME OF USE THE MATERIALS ARE CLEAN ANDSTRUCTURALLY SUITABLE FOR THE INTENDED USE.B.SURFACES TO BE IN CONTACT WITH MASONRY GROUT OR MORTAR SHALL BE CLEAN AND FREE OFDELETERIOUS MATERIALS.C.MASONRY DESIGN SHALL BE PER ACI 530, LATEST CODE EDITIOND.ALL MASONRY SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH F`M=1500 psi.E.ALL MORTAR SHALL BE TYPE S, PROPORTIONED BY VOLUME ACCORDING TO ASTM C270. MORTAR SHALLHAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH = 1800 psi.F.ALL GROUT SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2000 psi, AND SHALL BEPROPORTIONED BY VOLUME ACCORDING TO ASTM C476.G.ALL MASONRY UNITS SHALL BE MEDIUM WEIGHT ASTM C90, GRADE N, TYPE 1 UNITS, UNLESS NOTEDOTHERWISE.H.CEMENT SHALL BE AS SPECIFIED FOR CONCRETE.I.PROVIDE A MINIMUM OF 1/2" GROUT BETWEEN MAIN REINFORCING AND MASONRY UNITS.J.ALL DEFORMED REINFORCING BAR SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THEREINFORCEMENT SECTION OF THESE GENERAL NOTES.K.ALL HORIZONTAL AND VERTICAL LAP SPLICES SHALL BE IN CONFORMANCE WITH SECTION 2107.5 OF THECURRENT BUILDING CODE, UNLESS NOTED OTHERWISE.L.CELLS SHALL BE IN VERTICAL ALIGNMENT. ALL VERTICAL MASONRY WALL REINFORCING SHALL BECENTERED IN THE WALL, LAPPED WITH BARS DOWELED INTO THE FOOTINGS AND GROUTED SOLID, UNLESSNOTED OTHERWISE.M.ALL MASONRY WALLS SHALL HAVE A CONTINUOUSLY GROUTED BOND BEAM WITH (1) #4 BAR AT THE TOPAND BOTTOM OF THE WALL, UNLESS NOTED OTHERWISE. PROVIDE BENT CORNER BARS AT ALLINTERSECTIONS PER TYPICAL DETAILS.N.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROVIDING LATERAL BRACING ADEQUATE TO RESISTTEMPORARY LOADS, WIND LOADS, AND SEISMIC LOADS DURING CONSTRUCTION.O.SEE TYPICAL DETAILS FOR ADDITIONAL REINFORCING REQUIRED AT WALL PENETRATIONS, TERMINATIONS,OPENINGS, AND CONTROL JOINTS.P.ALL MIX DESIGNS SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WETSEAL OF A LICENSED CIVIL ENGINEER AND SHALL BE SUBMITTED FOR REVIEW BY THE STRUCTURALENGINEER. THE DESIGNS FOR EACH TYPE OF MASONRY STRENGTH SPECIFIED SHALL STATE THE PROJECTNAME AND LOCATION OF USAGE.Q.FOR GROUT LIFT CONSTRUCTION, REFER TO ACI 530.1, PART 3, SECTION 3.5D.R.MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH MASONRY WALLS DO NOT REQUIRESLEEVES, UNLESS OTHERWISE INDICATED IN THE PROJECTS SPECIFICATIONS, MECHANICAL OR ELECTRICALDRAWINGS. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE GROUTING. DO NOT CUT ANYREINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENING IN GROUTED MASONRYIS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS NOT SHOWN ON THESTRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH MASONRY LINTELSUNLESS SPECIFICALLY DETAILED.S.ALL SOLID AND HOLLOW MASONRY UNITS SHALL BE CLEAN AND ALL DUST AND DIRT REMOVED FROM THESURFACE. ALL EXPOSED FACES OF ANY WALL SHOWING GROUT SPOTTING OR JOINT MORTAR PROJECTIONSHALL BE WIRE BRUSHED AND/OR TOOLED CLEANED TO ENSURE A UNIFORM APPEARANCE.EARTHWORK AND FOUNDATION DESIGNA.FOLLOWING EARTHWORK AND FOUNDATION DESIGN SHALL BE PER GEOTECHNICAL ENGINEERING REPORT;SITE PREPARATION, EARTH EXCAVATION, SITE BACKFILL, FOUNDATION BACKFILL, WEATHER EXPOSURECONTROL, FOUNDATION DESIGN, ETC.B. EXCAVATION SHALL BE PERFORMED AT SPECIFIED LOCATIONS AS REQUIRED PER APPROVED DRAWINGS.ALL FOOTINGS SHALL BE PLACED ON UNDISTURBED NATURAL EARTH OR ON PREPARED SUBGRADE, PERTHE GEOTECHNICAL ENGINEERING REPORT OR COMPACTED TO 95% PROCTOR.C. THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY IN WRITING FOR ANY POTENTIAL TRENCHING DEVIATIONFROM APPROVED PLANS OR EXCAVATING PROBLEMS PRIOR TO START OF CONSTRUCTION. NEGLIGENCESHALL NOT CONSTITUTE A CHANGE ORDER.D. ANY MATERIALS USED FOR BACKFILL SHALL BE CLEAN AND FREE OF ALL DEBRIS (WOOD SCRAPS, WELDINGROD, PIPE SCRAPS, OR OTHER DELETERIOUS SUBSTANCES). NO LUMPS OR ROCK LARGER THAN 4 INCHES INDIAMETER ARE ALLOWED WITHIN TWELVE (12) INCHES OF ANY FOUNDATION. BACKFILL MATERIAL SHALL BEAS PER GEOTECHNICAL REPORT.E.ALL BACKFILL UNDER FOUNDATIONS AND SLABS SHALL BE COMPACTED TO A MINIMUM OF 95% MODIFIEDPROCTOR AT THE OPTIMUM MOISTURE CONTENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTOF OBTAINING A COMPACTION REPORT AND SUBMITTING THE RESULT TO THE CLEAN ENERGY.F.ALL TRENCHES FOR GAS PIPES SHALL HAVE A MINIMUM COVER OF EIGHTEEN (18) INCHES ABOVE THE TOPOF PIPE (OR SLEEVE) FROM FINISH GRADE. A MINIMUM OF TWELVE (12) INCHES OF SAND SHALL BEPROVIDED BELOW THE PIPE AND SIX (6) INCHES ABOVE THE PIPE.G.ALL TRENCHES FOR ELECTRICAL CONDUITS SHALL HAVE A MINIMUM COVER OF TWENTY-FOUR (24) INCHESABOVE THE TOP OF CONDUIT FROM FINISH GRADE. BACKFILL SHALL BE CLEAN NATURAL SOIL UNLESSOTHERWISE SPECIFIED.H.EXPANSIVE SOILS SHALL REQUIRE THAT ELECTRICAL CONDUIT(S) TRENCHES BE FILLED WITH SAND AMINIMUM SIX (6) INCHES ABOVE THE TOP OF CONDUIT.I.SLURRY BACKFILL MAY BE USED AT THE CONTRACTOR'S EXPENSE INSTEAD OF SOIL FOR BACKFILL TOEXPEDITE COMPLETION OF TRENCHES WITH CLEAN ENERGY'S PRIOR WRITTEN APPROVAL.J.EXISTING ASPHALT SHALL BE SAWCUT TO ALLOW PLACEMENT OF FOOTINGS AND SLABS. ASPHALT SHALL BEPATCHED TO MATCH THE EXISTING ORIGINAL GRADE. THE CONTRACTOR SHALL ENSURE THAT PATCHEDAREAS DO NOT POND. ALL SURFACES, BOTH VERTICAL AND HORIZONTAL, TO RECEIVE ASPHALT PATCHINGSHALL HAVE AN ACCEPTABLE BONDING AGENT, SUCH AS SS1 OR AR4000, APPLIED PRIOR TO APPLICATIONOF ASPHALT.K.THE CONTRACTOR SHALL PROTECT OPEN TRENCHES OR EXCAVATIONS FROM WATER RUN OFF OR RAIN.THE CONTRACTOR SHALL ANTICIPATE AND BE PREPARED TO AVOID ANY DELAYS DUE TO WATERINFILTRATION OR RAIN.L.THE CONTRACTOR SHALL PROPERLY DISPOSE OF ALL CONTAMINATED SOILS, HAZARDOUS WASTE, AND / OROTHER MATERIALS DUE TO CONTRACTOR'S WORK AT CONTRACTOR'S EXPENSE. PACKAGE AND TRANSPORTALL HAZARDOUS MATERIALS TO AN APPROVAL WASTE FACILITY. THE CONTRACTOR SHALL COMPLY WITHALL FEDERAL, STATE, AND LOCAL RULES, REGULATIONS, AND REQUIREMENTS AND SHALL BE RESPONSIBLEFOR THE HAZARDOUS WASTE MANIFEST SHIPPING FROM THE POINT OF GENERATION, THROUGHTRANSPORTATION, TO THE FINAL APPROVED TREATMENT, STORAGE, AND DISPOSAL FACILITY. M.THE CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EARTHWORK OPERATIONS FORFILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IFANY SUCH STRUCTURES ARE FOUND, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY.N.FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:ALLOWABLE BEARING* = 1,500 PSF*VALUES MAY BE INCREASED BY 1/3 FOR WIND OR SEISMIC LOAD CASES.FOOTINGS SHALL BEAR ON FIRM NATURAL SOILS. MINIMUM DEPTH OF FOOTINGS BELOW LOWEST ADJACENTFINAL GRADE SHALL BE 18"; MINIMUM WIDTH OF FOOTING SHALL BE 18", UNLESS NOTED OTHERWISE ONPLAN OR IN SOILS REPORT.O.CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORINGREQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING,SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES INACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES.P.EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR OR ENGINEER PRIOR TO PLACINGTHE CONCRETE AND REINFORCING. CONTRACTOR TO NOTIFY THE INSPECTOR WHEN INSPECTION OFEXCAVATION IS READY.Q.ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLSBEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTORS SHALL BRACE ORPROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORSARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL PROVIDE FORDESIGN, PERMITS AND INSTALLATION OF SUCH BRACING.R.FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS SHOWN ON DRAWINGS. SHOULDSOIL ENCOUNTERED AT THESE DEPTHS NOT BE APPROVED BY THE INSPECTOR OR ENGINEER, FOUNDATIONELEVATIONS WILL BE ALTERED BY CHANGE ORDER.S.FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN THE BUILDING PERIMETER SHALL BEMECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS REPORT AND APPROVED BY THEENGINEER. FLOODING WILL NOT BE PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BEINSPECTED BY THE ENGINEER REPRESENTATIVE.T.SLABS ON GRADE SHALL BE SUPPORTED ON COMPACTED FILL AS PER THE RECOMMENDATIONS OF THESOILS REPORT.STRUCTURAL STEEL1.STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THEAISC 'SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS' AND 'CODE OF STANDARD PRACTICE FOR STEELBUILDINGS AND BRIDGES'.2.MATERIALS:WIDE FLANGEASTM A992 G50ANGLES, CHANNELS, PLATES AND BARSASTM A36PIPESASTM 53 GR B, Fy=35ksiHSS SECTIONSASTM A500 GR B, Fy=46ksiBOLTSASTM A325NANCHOR BOLTSASTM F1554, UNO.3.STRUCTURAL STEEL SURFACES THAT ARE NOT EXPOSED TO WEATHER SHALL BE LEFT UNPAINTED.4.WELDED JOINTS SHALL CONFORM TO THE PREQUALIFIED JOINT DETAILS AS INDICATED IN THE STRUCTURALWELDING CODE (AWS D1.1) BY THE AMERICAN WELDING SOCIETY. WELDS SHALL BE MADE USING A FILLERMETAL HAVING 70 KSI MINIMUM TENSILE STRENGTH, FILLER METAL SHALL HAVE A MINIMUM CHARPYV-NOTCH TOUGHNESS OF 20 FT-LBS AT 0 DEGREES FAHRENHEIT, UNLESS NOTED OTHERWISE.5.WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WELD SIZE SHALL BEAISC MINIMUM UNLESS A LARGER SIZE IS NOTED.6.WELDING TESTS AND INSPECTIONS, SEE SPECIFICATIONS.7.PAINT PRIME OR GALVANIZE EXPOSED STEEL.POST INSTALLED ANCHORS1.EXPANSION AND SCREW ANCHORS SHALL BE IN CONFORMANCE WITH ACI 318, APPENDIX D AND ICC-ESACCEPTANCE CRITERIA AC 193.2.ANCHORS SHALL BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS.3.HOLES DRILLED INTO REINFORCED CONCRETE SHALL NOT DAMAGE OR CUT EXISTING REINFORCING STEEL.HOLES DRILLED INTO PRE-STRESSED OR POST-TENSIONED CONCRETE SHALL HAVE A CLEARANCE OF 1"MINIMUM FROM TENDONS. LOCATE EXISTING TENDONS USING NON-DESTRUCTIVE METHODS PRIOR TODRILLING.4.EPOXY ADHESIVE USED FOR SETTING DOWELS AND ANCHORS SHALL BE IN CONFORMANCE WITH ACI318APPENDIX D AND ICC-ES ACCEPTANCE CRITERIA AC 308.5.ANCHORS OR DOWELS EMBEDDED IN EPOXY SHALL BE INSTALLED PER THE MANUFACTURER'SINSTRUCTIONS.6.HOLES RECEIVING EPOXIED ANCHORS SHALL BE CLEAN AND FREE OF DUST PRIOR TO APPLYING EPOXYADHESIVE.7.EPOXY ANCHORS SHALL NOT BE INSTALLED IN THE UNDERSIDE OF FLOORS OR ROOFS.8.EXPANSION AND EPOXY ANCHORS SHALL BE AS NOTED ON PLANS.9.APPROVED ANCHORING METHODS ARE TO BE USED FOR ANCHORING EQUIPMENT AS SPECIFIED ONDRAWINGS. CLEAN ENERGY AND ENGINEER SHALL BE NOTIFIED AND CONSULTED FOR ANY REQUIREDCORRECTION METHODS FOR MISPLACED BOLTS OR ANCHORS. TYPEPERIODIC SPECIALINSPECTION1.INSPECTION OF REINFORCINGSTEEL, INCLUDING PRESTRESSINGTENDONS, AND PLACEMENT.2.REINFORCING BAR WELDING:a.VERIFY WELDABILITY OFREINFORCING BARS OTHERTHEN ASTM A 706;b.INSPECT SINGLE-PASS FILLETWELDS, MAXIMUM 516"; ANDc.INSPECT ALL OTHER WELDS.3.INSPECT ANCHORS CAST IN CONCRETE.4.INSPECT ANCHORSPOST-INSTALLED IN HARDENEDCONCRETE MEMBERS.a.ADHESIVE ANCHORSINSTALLED IN HORIZONTALLYOR UPWARDLY INCLINEORIENTATION TO RESISTSUSTAINED TENSION LOADS.b.MECHANICAL ANCHORS ANDADHESIVE ANCHORS NOTDEFINED IN 4.a.5.VERIFYING USE OF REQUIREDDESIGN MIX.6.PRIOR TO CONCRETE PLACEMENT,FABRICATE SPECIMENS FORSTRENGTH TEST, PERFORMSLUMP AND AIR CONTENT TEST,AND DETERMINE THETEMPERATURE OF THECONCRETE.7.INSPECTION OF CONCRETE ANDSHOTCRETE PLACEMENT FORPROPER APPLICATIONTECHNIQUES.8.VERIFY MAINTENANCE OFSPECIFIED CURING TEMPERATUREAND TECHNIQUES.9.INSPECTION OF PRESTRESSEDCONCRETE:a.APPLICATION OFPRESTRESSING FORCES.b.GROUTING OF BONDEDPRESTRESSING TENDONS10.INSPECT ERECTION OF PRECASTCONCRETE MEMBERS.11.VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TOSTRESSING OF TENDONS INPOST-TENSIONED CONCRETE ANDPRIOR TO REMOVAL OF SHORESAND FORMS FROM BEAMS ANDSTRUCTURAL SLABS.12.INSPECT FORMWORK FOR SHAPE,LOCATION AND DIMENSIONS OFTHE CONCRETE MEMBER BEINGFORMED.REFERENCEDSTANDARDNOTE:a.WHERE APPLICABLE, SEE ALSO SECTION 1705.12, SPECIAL INSPECTION FOR SEISMIC RESISTANCE.b.SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH FOR THE ANCHOR ISSUED BY ANAPPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFICREQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGNPROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL TO THE COMMENCEMENT OF THE WORK.IBCREFERENCEaAWS D1.4ACI 318: 26.5.4--ASTM C 172ASTM C 31ACI 318:26.4.5, 26.121908.10ACI 318: 26.4.7-26.4.91908.6, 1908.7,1908.8XACI 318: 26.10.2-XACI 318: CH 19, 26.4.3,26.4.41904.1, 1904.2,1908.2, 1908.3ACI 318: 17.8.2.4XACI 318: 26.9.2.1-XACI 318: CH. 20, 25.2, 25.3,26.5.1-26.5.31908.4ACI 318: 17.8.2CONTINUOUSSPECIAL INSPECTION-XACI 318: 17.8.2TABLE 1705.3 REQUIRED SPECIAL INSPECTION AND TEST OF CONCRETE CONSTRUCTIONXX---X--X-X--XACI 318: 26.4.7-26.4.91908.9---ACI 318: 26.9.2.3X-X-ACI 318: CH. 26.8-ACI 318: 26.10.1(b)-X-VERIFICATION AND INSPECTION TASKCONTINUOUSDURING TASK LISTED1.VERIFY MATERIALS BELOW SHALLOWFOUNDATIONS ARE ADEQUATE TO ACHIEVE THEDESIGN BEARING CAPACITY.2.VERIFY EXCAVATIONS ARE EXTENDED TOPROPER DEPTH AND HAVE REACHED PROPERMATERIAL.3.PERFORM CLASSIFICATION AND TESTING OFCOMPACTED FILL MATERIALS.4.VERIFY USE OF PROPER MATERIALS, DENSITIESAND LIFT THICKNESSES DURING PLACEMENTAND COMPACTION OF COMPACTED FILL.5.PRIOR TO PLACEMENT OF COMPACTED FILL,OBSERVE SUBGRADE AND VERIFY THAT SITEHAS BEEN PREPARED PROPERLY.PERIODICALLYDURING TASK LISTED-X-X-X-X-XTABLE 1705.6 REQUIRED SPECIAL INSPECTION AND TEST OF SOILSVERIFICATION AND INSPECTION TASKCONTINUOUSDURING TASK LISTED1.VERIFY ELEMENT MATERIALS, SIZES AND LENGTHS COMPLYWITH THE REQUIREMENTS.2.DETERMINE CAPACITIES OF TEST ELEMENTS AND CONDUCTADDITIONAL LOAD TESTS, AS REQUIRED.3.OBSERVE DRIVING OPERATIONS AND MAINTAIN COMPLETEAND ACCURATE RECORDS FOR EACH ELEMENT.4.VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRMTYPE AND SIZE OF HAMMER, RECORD NUMBER OF BLOWS PERFOOT OF PENETRATION, DETERMINE REQUIREDPENETRATIONS TO ACHIEVE DESIGN CAPACITY, RECORD TIPAND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TOFOUNDATION ELEMENT.5.FOR STEEL ELEMENTS, PERFORM ADDITIONAL INSPECTIONS INACCORDANCE WITH SECTION 1705.26.FOR CONCRETE ELEMENTS AND CONCRETE-FILLEDELEMENTS, PERFORM ADDITIONAL INSPECTIONS INACCORDANCE WITH SECTION 1705.37.FOR SPECIALTY ELEMENTS, PERFORM ADDITIONALINSPECTIONS AS DETERMINED BY THE REGISTERED DESIGNPROFESSIONAL IN RESPONSIBLE CHARGE.PERIODICALLYDURING TASK LISTEDXXXX----------TABLE 1705.7 REQUIRED SPECIAL INSPECTION AND TEST OF DRIVEN DEEP FOUNDATIONS ELEMENTSIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBNIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NIF REQ'D TYPE OFINSPECTIONREQ'D?Y/NNNNYYYNNNNNNNYYYYYYYYYNYNc:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C0.0-COVER SHEET.dwg5/7/20258/7/2025 11:50:36 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 CODE COMPLIANCE TABLES 21330.00PBMLG0.1"IFC SECTION 2308 (IFGC SECTION 413)COMPRESSED NATURAL GAS MOTORFUEL-DISPENSING FACILITIES"SECTIONCODE DESCRIPTIONCOMPLYNOTES2308.3(413.3)LOCATION OF DISPENSING OPERATIONS AND EQUIPMENT.COMPRESSION, STORAGE AND DISPENSING EQUIPMENT SHALL BELOCATED ABOVE GROUND, OUTSIDE. Yes No N/A2308.3.1(413.3.1)"LOCATION ON PROPERTY. COMPRESSION, STORAGE ANDDISPENSING EQUIPMENT SHALL BE INSTALLED AS FOLLOWS:1. NOT BENEATH POWER LINES.2. 10 FT (3048 MM) OR MORE FROM THE NEAREST BUILDING OR LOTLINE THAT COULD BE BUILT ON, PUBLIC STREET, SIDEWALK ORSOURCE OF IGNITION.3. 25 FT (7620 MM) OR MORE FROM THE NEAREST RAIL OF ANYRAILROAD TRACK AND 50 FEET (15 240 MM) OR MORE FROM THENEAREST RAIL OF ANY RAILROAD MAIN TRACK OR ANY RAILROADOR TRANSIT LINE WHERE POWER FOR TRAIN PROPULSION ISPROVIDED BY AN OUTSIDE ELECTRICAL SOURCE, SUCH AS THIRDRAIL OR OVERHEAD CATENARY.4. 50 FT (15,240 MM) OR MORE FROM THE VERTICAL PLANE BELOWTHE NEAREST OVERHEAD WIRE OF A TROLLEY BUS LINE. Yes No N/A2308.4(413.5)PRIVATE FUELING OF MOTOR VEHICLES. SELF-SERVICECNG-DISPENSING SYSTEMS, INCLUDING KEY, CODE AND CARDLOCK DISPENSING SYSTEMS, SHALL BE LIMITED TO THE FILLING OFPERMANENTLY MOUNTED FUEL CONTAINERS ON CNG-POWEREDVEHICLES. Yes No N/A2308.5(413.6)PRESSURE REGULATORS. PRESSURE REGULATORS SHALL BEDESIGNED AND INSTALLED OR PROTECTED SO THAT THEIROPERATION WILL NOT BE AFFECTED BY THE ELEMENTS (FREEZINGRAIN, SLEET, SNOW OR ICE), MUD OR DEBRIS. THE PROTECTION ISALLOWED TO BE AN INTEGRAL PART OF THE REGULATOR. Yes No N/A2308.6(413.7)VALVES. GAS PIPING TO EQUIPMENT SHALL BE PROVIDED WITH AREMOTE, READILY ACCESSIBLE MANUAL SHUTOFF VALVE. Yes No N/AMANUAL BALL VALVE AFTERMETER SET ASSEMBLY2308.7(413.8)EMERGENCY SHUTDOWN CONTROL. AN EMERGENCY SHUTDOWNCONTROL SHALL BE LOCATED WITHIN 75 FEET (22 860 MM) OF, BUTNOT LESS THAN 25 FEET (7620 MM) FROM, DISPENSERS AND SHALLALSO BE PROVIDED IN THE COMPRESSOR AREA. UPON ACTIVATION,THE EMERGENCY SHUTDOWN SYSTEM SHALL AUTOMATICALLYSHUT OFF THE POWER SUPPLY TO THE COMPRESSOR AND CLOSEVALVES BETWEEN THE MAIN GAS SUPPLY AND THE COMPRESSORAND BETWEEN THE STORAGE CONTAINERS AND DISPENSERS. Yes No N/A2308.8.1.1(413.9.1)CLOSED TRANSFER SYSTEM. A DOCUMENTED PROCEDURE THATEXPLAINS THE LOGICAL SEQUENCE FOR DISCHARGINGTHECYLINDER SHALL BE PROVIDED TO THE FIRE CODE OFFICIAL FORREVIEW AND APPROVAL. THE PROCEDURE SHALL INCLUDE WHATACTIONS THE OPERATOR WILL TAKE IN THE EVENT OF ALOW-PRESSURE OR HIGH-PRESSURE NATURAL GAS RELEASEDURING THE DISCHARGING ACTIVITY. A DRAWINGILLUSTRATINGTHE ARRANGEMENT OF PIPING, REGULATORS ANDEQUIPMENT SETTINGS SHALL BE PROVIDED TO THE FIRE CODEOFFICIAL FOR REVIEW AND APPROVAL. THE DRAWING SHALLILLUSTRATE THE PIPING AND REGULATOR ARRANGEMENT ANDSHALL BE SHOWN IN SPATIAL RELATION TO THE LOCATION OF THECOMPRESSOR, STORAGE VESSELS AND EMERGENCY SHUTDOWNDEVICES. Yes No N/ASECTION 2308.3 ONLYAPPLIES TO DEFUELINGOPERATION.2308.8.1.2(413.9.2)ATMOSPHERIC VENTING. ATMOSPHERIC VENTING OF CNG SHALLCOMPLY WITH SECTIONS 2308.8.1.2.1 THROUGH 2308.8.1.2.6. Yes No N/A"2308.8.1.2.1(413.9.2.1)PLANS AND SPECIFICATIONS. A DRAWING ILLUSTRATING THELOCATION OF THE VESSEL SUPPORT, PIPING, THE METHOD OFGROUNDING AND BONDING, AND OTHER REQUIREMENTS SPECIFIEDHEREIN SHALL BE PROVIDED TO THE FIRE CODE OFFICIAL FORREVIEW AND APPROVAL. Yes No N/A"2308.8.1.2.2(413.9.2.2)CYLINDER STABILITY. A METHOD OF RIGIDLY SUPPORTING THEVESSEL DURING THE VENTING OF CNG SHALL BE PROVIDED. THESELECTED METHOD SHALL PROVIDE NOT LESS THAN TWO POINTSOF SUPPORT AND SHALL PREVENT THE HORIZONTAL AND LATERALMOVEMENT OF THE VESSEL. THE SYSTEM SHALL BE DESIGNED TOPREVENT THE MOVEMENT OF THE VESSEL BASED ON THE HIGHESTGASRELEASE VELOCITY THROUGH VALVE ORIFICES AT THEVESSEL’S RATED PRESSURE AND VOLUME. THE STRUCTURE ORAPPURTENANCE SHALL BE CONSTRUCTED OF NONCOMBUSTIBLEMATERIALS. Yes No N/A"2308.8.1.2.3(413.9.2.3) Yes No N/A"2308.8.1.2.4(413.9.2.4)GROUNDING AND BONDING. THE STRUCTURE OR APPURTENANCEUSED FOR SUPPORTING THE CYLINDER SHALL BE GROUNDED INACCORDANCE WITH NFPA 70. THE CYLINDER VALVE SHALL BEBONDED PRIOR TO THE COMMENCEMENT OF VENTINGOPERATIONS. Yes No N/A"2308.8.1.2.5(413.9.2.5)VENT TUBE. A VENT TUBE THAT WILL DIVERT THE GAS FLOW TOATMOSPHERE SHALL BE INSTALLED ON THE CYLINDER PRIOR TOCOMMENCEMENT OF THE VENTING AND PURGING OPERATION. THEVENT TUBE SHALL BE CONSTRUCTED OF PIPE OR TUBINGMATERIALS APPROVED FOR USE WITH CNG IN ACCORDANCE WITHCHAPTER 53. THE VENT TUBE SHALL BE CAPABLE OF DISPERSINGTHE GAS NOT LESS THAN 10 FEET (3048 MM) ABOVE GRADE LEVEL.THE VENT TUBE SHALL NOT BE PROVIDED WITH A RAIN CAP OROTHER FEATURE THAT WOULD LIMIT OR OBSTRUCT THE GAS FLOW.AT THE CONNECTION FITTING OF THE VENT TUBE AND THE CNGCYLINDER, A LISTED BIDIRECTIONAL DETONATION FLAMEARRESTER SHALL BE PROVIDED. Yes No N/A"2308.8.1.2.6(413.9.2.6)SIGNAGE. APPROVED “NO SMOKING” SIGNS COMPLYING WITHSECTION 310 SHALL BE POSTED WITHIN 10 FEET (3048 MM) OF THECYLINDER SUPPORT STRUCTURE OR APPURTENANCE. APPROVEDCYLINDER SHALL BE BONDED SIGNS SHALL BE POSTED ON THECYLINDER SUPPORT STRUCTURE OR APPURTENANCE. Yes No N/A"XXXSEPARATION DISTANCE FOR ATMOSPHERIC VENTING OF CNGTABLE 2308.8.1.2.3151525BuildingsBuilding openingsCNG compressor and storgae vesselsCNG dispensersLot linesPublic waysVehiclesEQUIPMENT OR FEATUREMIN SEPARATION (ft)25252525XXXXXXXXXXX TIME FILL STATION ELEVATIONS (1" = 5')SHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY(N) CALTRANS TYPE KBARRIER RAIL (TYP)(N) ESD POST20'12'(E) LIGHT POLE(N) FIRE EXTINGUISHERSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY60' O.C. TYPSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCY60' MAX. O.C. TYPREFER TO PLAN FORREQUIRED BOLLARDPROTECTION(N) ESD POST(N) FIRE EXTINGUISHEREQEQ3'FROM PARKING STRIPINGFROM PARKING STRIPING3'PLAN SOUTH ELEVATION(N) ESD POST(N) FIRE EXTINGUISHERSOUTH ELEVATION (N) COMM PANEL(N) DRYER(N) DUPLEX ANGICOMPRESSOR(N) LIGHT POLE(N) MSA(N) DUPLEX ANGICOMPRESSOR(N) LIGHT POLE(N) MSA(N) MSG(N) DRYERNORTH ELEVATION EAST ELEVATION WEST ELEVATION (N) MSG(N) ANGI MCP(N) LIGHT POLE6' 6' 6' 6'61'61'27(N) MSGNO SMOKINGFLAMMABLE GAS140CNG6'27(N) VENT(N) STORAGE VESSEL14'-2"12'(N) 4" Ø CONCRETEBOLLARDS AT4' O.C., (TYP)(N) TRANSFORMER(N) TRANSFORMER(E) LIGHT POLE3'-6"LUG(N) COM BOX(N) LUG BOXMREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZ ED USE, REPROD UCTION , PU BLIC ATI ON, DISTRIBUT ION OR SALE IN W HOLE OR IN PART, IS STRICT LY FO RBIDDEN . 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBNTSWSNENOTES1. COLOR IS TO MATCH PANTONE COLOR SYSTEM OR EQUIVALENT 1101 HIGH GLOSS LACQUER ENAMEL OR EQUIVALENT.Feet1050BOLLARD COLOR CHARTPANTONE 3500 CCNG COMPOUND PLANc:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C0.1-GENERAL ARRANGEMENT AND ELEVATIONS.DWG02/28/20258/7/2025 11:51:20 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 GENERAL ARRANGEMENT & ELEVATIONS FASTFILL 21330.00PBMLC0.1 M(N) MSA(N) FENCE61'27'(N) (2) MAN GATES(N) ANGI DUPLEX 200 HP SKID(N) 23' STORAGE VESSEL(N) PRIORITY PANEL(N) REMOVABLEBOLLARDS(N) BOLLARDS(N) TRANSFORMERBY OTHERS(N) SWITCHGEAR (N) ANGI MOTORCONTROL PANEL(N) 21-6 PSB DRYER(N) LUG BOX(N) DOUBLE GATETYP.(N) CE COM PANEL(N) ANGI COM PANEL13'5'9'9'-4"3'5'-4"8'-6"6'4'2'16'-6"10'-2"13'-6"14'-7"25'9'-10"12'10'20'-9"6'6'6'7'-5"3'12'8'-6"6'-6"C3.071C3.02 C3.0 4 C3.0 3C3.0C2.1G14'-2"C3.05C2.0DC3.08M(N) MSA12'74'61'27'216'(E) LIGHT POLETYPICAL OF 3(E) BLOCK HEATER OUTLET POST TYPICAL OF 828'36'-6"10'SET BACK(N) EQUIPMENT COMPOUND(1)ANGI DUPLEX 200 HP SKID(1) PRIORITY PANEL(1) STORAGE VESSEL(1) PSB 21-6 DRYER(1) SWITCHBOARD(1) COMMUNICATION BOX(N) CHAINLINK FENCE AND GATES(N) BOLLARDS(N) FUELING AREA35 PARKING STALLS17 DUAL-HOSE POSTS1 SINGLE HOSE POST4 ESD POSTS(E)ENTRANCE/EXIT(E)ENTRANCE/EXIT(N) JERSEY BARRIERC2.1E(N) TIMEFILL POSTC2.1D(N) WHEEL STOPC2.1FPLPL (N) BOLLARDSC3.08OVERALL SITE PLAN (1" = 30')REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C1.0-SITE PLAN.dwg08/07/20258/7/2025 11:52:10 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 SITE PLAN 21330.00PBMLC1.01. ALL TRAFFIC CONTROL SIGNS SHALL BE FABRICATED AS SHOWN IN THE NATIONAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS EXCEPT AS NOTED ON THE PLANS.2. ALL CURB RADII ARE SHOWN TO THE FACE OF CURB AND ALL DIMENSIONS ARE TO FACE OF CURB, WHERE APPLICABLE, UNLESS OTHERWISE NOTED.3. ALL 3' GATES SHALL BE SPACED TO OPEN FREELY AND MISS ANY BOLLARDS WHEN OPENED4. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY CORNERS.5. CONTRACTOR SHALL MATCH EXISTING PAVEMENT AND CURB & GUTTER IN GRADE, SIZE, TYPE, ANDALIGNMENT AT ADJACENT ROADWAYS/ DRIVEWAYS.6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO DAMAGE TO ANY EXISTING IMPROVEMENTS DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC.REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS.7. ALL PAVEMENT PAINT SHALL BE SHERWIN WILLIAMS "PROMAR TRAFFIC MARKING", WHITE ON ASPHALT,YELLOW ON CONCRETE. PAINT SHALL BE APPLIED IN TWO (2) COATS TO A CLEAN, DRY SURFACE USINGTEMPLATE OR STRIPING MACHINE. STRIPES SHALL BE 4" WIDE UNLESS OTHERWISE NOTED.GENERAL NOTESWSNE03060901" = 30'15ENLARGED SITE PLAN (1" = 8')LPGRAVEL TIE WIREAT 12" O.C.(TYP)FINISHED SURFACECAP, SEE NOTE 11-5/8" O.D.TOP RAIL1 - 5/8" O.D.BOTTOM RAILSTEEL BAND,SEE NOTE 2POST(SEE NOTE 3)TENSIONBAR2"6' (TYP)LOCKABLELATCHWALK GATE3'-6"8' POST SPACINGCONCRETE FOOTING3'-0" CLEARN.T.S.BLACK VINYL FENCE-DLINE POST (TYP)(SEE NOTE 3)3' (TYP)LOCK BOXPANIC HARDWAREHOOVER FENCE CO.D-6045 SURFACE MOUNT EXITBAR - SUPERIOR KIT WITH LOCK BOXMOUNTING PLATEFENCE NOTES:1.WIRE GAUGE SHALL CONFORM WITH AHJ'S STANDARDSFOR SECURITY FENCE.2.SECURE DRIVE-FIT GALVANIZED CAP TO POST WITH 1/4"ROUND-HEAD RIVET.3.STEEL BANDS AT TENSION BARS SHALL BE 1/8"X1" MINIMUM,SPACED AT MAXIMUM 16" O.C.4.SLOPE POSTS USED AT GRADE CHANGES GREATER THAN5%.5.ALL GATES SHALL BE LOCKABLE.6. ALL 3'-0" GATES SHALL HAVE A SURFACE MOUNTED PANIC BAR INSTALLED.A. HARDWARE SHALL BE INSTALLED 36" ABOVE FINISHED GRADE.B. KEYED ENTRY IS REQUIRED AT ALL 3' WALK GATES.C. NO PANIC HARDWARE IS REQUIRED AT DOUBLE GATES.7.POST SPACING SHALL BE A MAXIMUM OF 8'-0" O.C.8.EMBEDDED POST BASE SHOWN. IF SURFACE MOUNTED,PROVIDE 1/2" TK STL BASE PLATE W/ PROVISIONS FORFOUR 1/2" Ø ANCHOR BOLTS INTO CONCRETE.9.WALK GATE (INCLUDE DOOR SWING) TO BEUNOBSTRUCTED BY BOLLARDS. COORDINATE LOCATION TOBE BETWEEN BOLLARDS AS SHOWN IN C-1.0.6' (TYP)4'-6"1'-2"2"LOCKABLELATCHDOUBLE GATE6'-8"CONCRETE FOOTING6' (TYP)6'-0" CLEARTYPICALREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C2.0 SITE DETAILS.dwg04/09/20258/7/2025 11:52:21 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 SITE DETAILS 1 OF 2 21330.00PBMLC2.0 N.T.S.JERSEY BARRIER ANDWHEEL STOP ANCHORAGEE-N.T.S.BARRIER MOUNTEDESD & FUEL POSTSFIRE EXTINGUISHERAND CABINETEMERGENCY SHUTDOWNSTATION (EFS21095)7' MIN 10'EX.SURFACETOP OF FIREEXTINGUISHERCABINET = 60" MAX SHUTDOWNNATURAL GASCOMPRESSEDEMERGENCYESD POSTTIME FILLFUEL POSTASSEMBLYJERSEY BARRIERCNG FILL HOSE WITH INLINE BREAKAWAY,NGV1 NOZZLE, HOSE RETRACTOR ANDSPIRAL WRAP HOSE PROTECTORVENTJERSEY BARRIER42"12"Ø STRONG-BOLTANCHORS,EMBEDDED 3.5"(2) EACH SIDE TYP.12"Ø STRONG-BOLTANCHORS,EMBEDDED 3.5"(2) EACH SIDE TYP.-D3" CLEAR(MAX)AAEXISTINGSURFACEUSE 1-1/4" x 26" PINTHROUGH ALL FOURCONNECTING LOOPSNOTES:A. 2' EMBEDMENT IN PAVEMENT; 3' EMBEDMENT IN COMPACTED MATERIAL.B. CONTRACTOR SHALL INSTALL WHEEL STOPS IN ORDER TO PROVIDE 2' MINIMUM CLEARANCE FROM JERSEY BARRIER TO ANY VEHICLE.3/8" TOOLED EDGETYP.1/2" MAX CLEARANCE8"GROUT HOLE FULL2'12"1/2" STD. PIPE OR 3/4" REINF RODSHALL BE PLACED PRIOR TO SURFACINGOR IN A HOLE DRILLED IN THE FINISHEDSURFACE WITH A TIGHT FIT OBTAINED BYAN APPROVED METHOD, OR DRIVEN INTOTHE SURFACING.2-#3s10"8'N.T.S.WHEEL STOP DETAILF-WHEEL STOP12' 1'8'3'4'4'K-RAIL4'3'6" DIA.BOLLARDS 1'8' 1'8'4'8'3'PARKINGSTRIPE,TYP.1/2"EXPANSIONJOINTLIGHT POLEAND FIXTURE,TYPICAL PERELECTRICAL PLANSJOINTSEALERN.T.S.LIGHT POLEPREFORMEDJOINT MATERIALFINISHEDSURFACEMATCHPAVEMENTTHICKNESSOR 6" MIN 3'20'OPTIONAL SECONDLIGHT FIXTURESEE DETAIL 7/C3.0FOR FOUNDATIONDETAIL18'SECURITY CAMERAS,SEE CAMERA PLANFOR LOCATIONS-A(CNG COMPOUND)5" THK. PCCW/ 4x4 W1.4 x W1.4 WWF6" TYPE II AGG. BASEPCC PAVEMENT UNDER CANOPY8" TYPE II AGG. BASE8" THK. PCC CONC.(4,000 PSI) W/ #5 BARS@12" O.C. EA. WAYPAVEMENT SECTIONSN.T.S.B-6" THK. 3/4" CLEANSTONECOMPACTED SUBGRADEPER GEOTECH REPORT(CNG COMPOUND)GRAVEL SURFACEGEOTEXTILEFABRICHOUSE KEEPING PAD 321A-A2'0"1" DIA. REBAR DOWELEDINTO CONCRETE PAVEMENT12" EMBEDMENT. 6 FT C/C ON EACHSIDESEE NOTE A NO. 4 REBAR (TYP)(2 LOCATIONS PERWHEEL STOP)8' X 12" WIDE X 10" TALLCONCRETE WHEEL STOP3,000 PSI (MIN)10" TOPWIDTH (MAX)6"CONCRETE SLAB(f'c = 3000 psi)WITH 65 KSI W4/ W 4,4" X 4" WIRE MESHPER ASTM 10644'0"3"CLR.TYP.COMPACTED BACKFILLPER PROJECT SPEC.ASPHALT, SEE CIVILDRAWINGS, TYP.PRE-CAST K-RAIL 10'OR 20' LONG SECTIONASPHALT CEMENT (AC) PAVEMENT4" TYPE II AGG. BASE5.5" ASPHALT CEMENT4COMPACTED SUBGRADEPER GEOTECH REPORTCOMPACTED SUBGRADEPER GEOTECH REPORTCOMPACTED SUBGRADEPER GEOTECH REPORTHEAVY DUTYREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C2.0 SITE DETAILS.dwg04/09/20258/7/2025 11:52:25 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 SITE DETAILS 2 OF 2 21330.00PBMLC2.1 REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBDESIGN LOADS: (SEE MANUFATURER'S CUT SHEET FOR ACTUAL EQUIPMENT LOAD)DEAD LOADSEQUIPMENT:a.ELECTRICAL EQUIPMENT = 2000#b.COMPRESSOR = 17000# / CLEAN 2.0c.STORAGE VESSELS = 25,000#d.DRYER = 7,810#RISK CATEGORY: IISITE CLASS: DGEOTECHNICAL REPORT:PREPARED BY: PSIPROJECT No. 05322692DATE: 08/25/2023GENERAL NOTES:1.DESIGN PARAMETERS:a.ASCE 7-16b.AISC MANUAL OF STEEL CONSTRUCTION 14TH EDITIONc.ACI 318-19d.ACI 530-16e.ACI 360-R (SLABS ON GRADE)f.AWS D1.1-15g.ASTM (AMERICAN SOCIETY FOR TESTING & MATERIALS)h.C160 CRSI (CONCRETE REINFORCING STEEL INSTITUTE)c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C3.0 STRUCTURAL DETAILS.dwg4/9/20258/7/2025 11:52:35 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 STRUCTURAL DETAIL 21330.00PBMLC3.0CONCRETE MAT FOUNDATION W/#5@12"OC EACH WAY, TOP ANDBOTTOM.SEE NOTE 1.6 MAX/MIN 112" CLR. 3" CLR.1'-6" MIN.UNO3"CLR.TYP.SEE PLAN12" 1"-6"HOUSE KEEPINGSLAB ORGRAVEL SEE PLAN1/2"=1'-0"CEC SINGLE COMPRESSOR PAD SECTION41/2" = 1'-0"DRYER PAD SECTION CONCRETE MATFOUNDATION w/#5@12"OC EACHWAY, TOP ANDBOTTOM.HOUSEKEEPING SLAB ORCOMPACTED GRAVEL(SEE PLAN)1'-6" MIN.UNO6" MAX.SEE NOTE 1SEE PLAN12" 1'-6"3"CLR.TYP.112" CLR3 CONCRETE MATFOUNDATION W/#5@12"OC CENTERED.HOUSEKEEPING SLAB ORCOMPACTED GRAVELSEE PLAN1'-6" MIN.UNO6" MAX.SEE NOTE 1SEE PLAN12" 1'-6"3"CLR.TYP.1/2" = 1'-0"ELECTRICAL EQUIPMENT PAD SECTION2INSTALL 1" STEEL PLATESPACER AT HIGH END, IFNOT PROVIDED BYMANUFACTURERDRAIN, TYP.SLOPE1/2" = 1'-0"STORAGE VESSEL PAD SECTION - 3 TANKS1CONCRETE MAT FOUNDATIONw/ #5@12"OC EACH WAY, TOPAND BOTTOM.HOUSEKEEPINGSLAB OR GRAVELSEE PLAN1'-6" MIN.UNO6" MAX.SEE NOTE 1SEE PLAN1'-0"1'-6"3"CLR.TYP.112"CLR FOUNDATION NOTES:1.SEE GEOTECH REPORT FOR EXCAVATION, SUBGRADE IMPROVEMENTAND BACKFILL MATERIALS.3/4" = 1'-0"BOLLARD TYPE B - REMOVABLE18"Ø CONCRETEFOUNDATION, TYP.GREASED PLASTIC SLEEVE.4'-6"3'-6" MINIMUM CAP PL18, TOPAND BOTTOM.SHALL BE 6"Ø SCHEDULE40 PIPE, TYP.FINISH PAVEMENTOR GRADE, TYP.1'-0"DRILL 1" DIA.HOLE THRUBOLLARD1'-0"53/4" = 1'-0"BOLLARD TYPE C - DISPENSERSBOLLARD SHALL BE 6"ØSCHEDULE 40 CONCRETEFILLED PIPE, TYP.FINISH PAVEMENTOR GRADE, TYP.18"Ø CONCRETEFOUNDATION, TYP.3'-6"4'-6" 1'-0"GROUT CAP, SEE CIVILDRAWINGS, TYP.6MANUFACTURER PROVIDED ANCHORLOCATION.APPLY LOCTITE 242 TO THREADS PRIORTO PLACING NUT. PROPERLY INSTALL ANDTORQUE ANCHORS. ALLOW LOCTITE TOCURE FOR 24 HOURS PRIOR TO TURNINGEQUIPMENT.PROVIDE FLOWABLE NON-SHRINK GROUTAFTER ANCHORS ARE INSTALLED UNDERCLIP, IF REQD. THICKNESS VARIES.INSTALLATION SEQUENCE NOTES:1.SET UNIT.2.DRILL AND CLEAN ALL HOLES.3.INSTALL ANCHORS PER PUBLISHED ICCREPORT AND TORQUE BOLTS.ANCHOR ASSEMBLY, SEEEQUIPMENT DETAILS.FLAT WASHERS TO MATCHDIAMETER OF ANCHOR IFREQUIRED, QUANTITY PERLOCATION.EMBEDMENT2" MINIMUM VARIES PROJECTIONCONCRETE PAD,SEE PLAN.NOTES:1.ANCHORAGE FOR EQUIPMENT TO BE INSTALLED INMANUFACTURER'S PROVIDED LOCATIONS.2.NUMBER OF ANCHORS PROVIDED IN THE EQUIPMENT DETAILSARE THE MINIMUM REQUIRED TO RESIST ENVIRONMENTALLOADS. ALL ANCHORAGE LOCATIONS PROVIDED BYMANUFACTURER TO BE ANCHORED PER THIS DETAIL, UNO.3.CONTRACTOR TO VERIFY MAT REINFORCING PRIOR TODRILLING HOLES. DO NOT DAMAGE MAT REINFORCING.3"=1'-0"TYPICAL EQUIPMENT ANCHORAGE DETAILEQUIPMENT ANCHORAGE SCHEDULE (SEE NOTES BELOW)EQUIPMENT TYPEANCHORQUANTITYANCHORSIZEANCHOR TYPEEMBED."E"PROJ."P"ISTALLATIONTORQUE (SEENOTES)COMPRESSOR145/8" ØHIT-RE 500 V3 + HAS-V-36 (ASTM F1554GR.36) 5/8. 2198025 HAS-V-36 5/8"X8"(ELEMENT) / 2123401 HIT-RE 500 V3(ADHESIVE). H = 6.000 IN. (H = -IN)6"2 1/2"80 FT. LBS.STORAGE VESSEL87/8"ØHIT-RE 500 V3 + HAS-V-36 (ASTM F1554GR.36) 5/8. 2198025 HAS-V-36 5/8"X8"(ELEMENT) / 2123401 HIT-RE 500 V3(ADHESIVE). H = 6.000 IN. (H = -IN)8"2 1/2"80 FT. LBS.DRYER43/4"ØHIT-RE 500 V3 + HAS-V-36 (ASTM F1554GR.36) 5/8. 2198025 HAS-V-36 5/8"X8"(ELEMENT) / 2123401 HIT-RE 500 V3(ADHESIVE). H = 6.000 IN. (H = -IN)6"2 1/2"80 FT. LBS.MISC. EQUIPMENTVARIES3/8"ØHILTI KWIK BOLT TZ SS304 (ESR-1917) ORGALVANIZED ROD W/ HILTI HIT-RE 500-SDEPOXY (ESR-3814)212"1 1/2"30 FT. LBS.FILL / ESD POST41/2"ØHILTI KWIK BOLT TZ SS304 (ESR-1917) ORGALVANIZED ROD W/ HILTI HIT-RE 500-SDEPOXY (ESR-3814)312"1 1/2"30 FT. LBS.4. PROVIDE DOUBLE NUT AS REQUIRED PERVENDOR INSTALLATION BOOK FORVIBRATING MACHINE ANCHORAGE.5. BOLT PROJECTION "P" IN ABOVE TABLEMUST INCLUDE GROUT THICKNESS IFGROUT REQUIRED6. ANCHORAGE TORQUE VALUE SHALL BEPER MPII - (MANUFACTURER'S PRINTEDINSTALLATION INSTRUCTIONS)636"Ø CONCRETE FOUNDATION W/ #4 TIES@12"OC MAX., TYP.INSTALL J-BOLTS ORANCHOR W/ WASHER,SUPPLIED BY LIGHTPOLE VENDOR, OR(12"DIA; 14" OA LENGTH;10" EMBED.)112" NON-SHRINK LEVELINGGROUT MINIMUM.20' HT. LIGHT POST9" SQ. MIN.12" SQ. MAX.4'-0"3'-0"3" CLR.3" CLR.TYP.2-#4 TIESIN TOP 5"112" CLR.A#4 TIES.(6) #6 VERTICALBARS.STAGGER HOOKS.3/4" = 1'-0"LIGHT POST FOUNDATION - IMPACTFINISH PAVEMENTOR GRADE, TYP.ASECTIONAT CNG COMPOUND ONLY7 REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\C3.0 STRUCTURAL DETAILS.dwg4/9/20258/7/2025 11:56:32 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 STRUCTURAL NOTES 21330.00PBMLC3.1D212Db INTERIOR - ALTERNATE90° & 135° HOOKSEXTERIOR - 90° HOOK @SLAB SIDETYPICAL BAR BENDSSTIRRUP & TIESINGLE PIECE HOOPCROSS TIETWO PIECE HOOP135 DEGCROSSTIE - ALTERNATEPOSITION OF 90° HOOKBAR SIZED2/INCHES#3112"#42"#5212"180° END HOOK45° BEND90° END HOOKD1D1D1BAR SIZED1/INCHES#3514"#46"#59"#61014"D1/INCHES214"3"334"412"BAR SIZE#7#8#9#104Db6Db 6 D b 6Db FOR #5 OR SMALLER 6 D b 3 " M I ND2D2 OR 2.5MIN.6 MAX.1SEE SCHEDULEOFFSET LAPREINFORCING LAPSPLICE LENGTHACONCRETESTRENGTHfy=60,000 PSIREBAR SIZE#3#4#5#6#7#8SPLICE LENGTH f'c=3000 PSI16"22"27"33"48"55"f'c=4000 PSI14"19"24"28"42"47"f'c=5000 PSI13"17"21"25"37"42"CONCRETE REINFORCINGLAP SPLICE LENGTHf'm=1,500 PSIfy=60,000 PSI#3#4#5#6#7#8LENGTH18"24"30"36"42"48"1.THIS PROJECT CONTAINS ITEMS DELEGATED FOR DESIGN BY THECONTRACTOR. ALL SUCH ITEMS DELEGATED FOR DESIGN BY THECONTRACTOR ARE INDICATED ON THE PLANS. THE CONTRACTOR ISRESPONSIBLE FOR PROVIDING THE ENGINEERING AND DRAWINGS FORTHESE ELEMENTS. THE CONTRACTOR'S SUBCONSULTANTS ARERESPONSIBLE FOR PROVIDING A CODE COMPLIANT DESIGN INACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS.2.CLEAN ENERGY SHALL ONLY REVIEW THESE ITEMS FOR COMPLIANCEWITH THE DESIGN INTENT OF THE PROJECT AND FOR STRUCTURALCOMPATIBILITY.3.ITEMS DELEGATED FOR DESIGN:A.ALL CANOPIES AND AWNINGS.B.ALL STEEL STAIRS.DEFERRED ITEMS PART 3- PIPING AND EQUIPMENT INSTALLATION3.1 GENERALA.THIS SECTION OF THE SPECIFICATIONS, TOGETHER WITH ANY SPECIALCONDITIONS AND THE CONSTRUCTION DRAWINGS, COVER THE WORK OFFABRICATING, INSTALLING, AND TESTING THE PIPING SYSTEMS REQUIRED FORTHIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FORUNDERSTANDING THE INTENT OF THE CONSTRUCTION DRAWINGS ANDPROVIDING A COMPLETE WORKING SYSTEM. ANY OMISSIONS ORDISCREPANCIES AMONG THE DRAWINGS, SPECIFICATIONS, AND OTHERCONTRACT PROVISIONS SHALL BE BROUGHT TO THE ATTENTION OF THEENGINEER FOR CLARIFICATION.B.PIPING SYSTEMS COVERED BY THESE SPECIFICATIONS INCLUDE ALLUNDERGROUND AND ABOVEGROUND PIPING, INCLUDING VENTS AND ALLSTAINLESS STEEL PRESSURE TUBING.C.CONSTRUCTION AND INSTALLATION SHALL CONFORM TO THE FOLLOWING CODESAND STANDARDS AS ADOPTED OR AMENDED BY THE AUTHORITIES HAVINGJURISDICTION.ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE)B31.3 - PROCESS PIPINGB16.5 - STEEL PIPE FITTING AND FLANGESINTERNATIONAL FUEL GAS CODEINTERNATIONAL FIRE CODENFPA (NATIONAL FIRE PROTECTION ASSOCIATION) 52 - VEHICULAR GASEOUS FUEL SYSTEMS CODED.THE CONTRACTOR SHALL INSPECT THE SITE FOR, AND VERIFY THE LOCATIONSOF ANY EXISTING SUBSTRUCTURES AND UNDERGROUND UTILITIES, AND SHALLNOT RELY ON THESE PLANS OR DRAWINGS ALONE. THE CONTRACTOR SHALLTAKE ALL MEASURES NECESSARY TO PROTECT EXISTING UNDERGROUNDUTILITIES AND SUBSTRUCTURES. THE CONTRACTOR SHALL BE RESPONSIBLEFOR ANY DAMAGE DURING CONSTRUCTION, IRRESPECTIVE OF WHETHER OR NOTTHE DAMAGED UTILITY WAS SHOWN ON THE DRAWINGS.E.THE CONTRACTOR SHALL NOTIFY CLEAN ENERGY OF ANY DAMAGE TO ANYEXISTING UNDERGROUND WET OR DRY UTILITIES, OR TO ANY CONDUITSDAMAGED DURING TRENCHING, AND SHALL REPAIR THEM IMMEDIATELYACCORDING TO THE STANDARDS OF THE AGENCY HAVING JURISDICTION OVERTHEM.3.2PIPING DESIGN CONDITIONSA.THIS CNG FUELING STATION HAS BEEN DESIGNED FOR THEFOLLOWING PRESSURE AND TEMPERATURE CONDITIONS:COMPRESSOR SUCTION:OPERATING PRESSURE:SEE P&IDDESIGN PRESSURE:200 PSIGDESIGN TEMPERATURE:-20°F TO 130°FCOMPRESSOR DISCHARGE:OPERATING PRESSURE:4,500 PSIGDESIGN PRESSURE:5,000 PSIGDESIGN TEMPERATURE:-20°F TO 130°F3.3 ACCEPTABLE PRODUCT MANUFACTURING LOCATIONSA.GAS PIPING MATERIALS (PIPE, STAINLESS STEEL TUBE, GAS VALVES, FITTINGSAND INSTRUMENTATION) SHALL BE MANUFACTURED IN ANY OF THE FOLLOWINGREGIONS: NORTH AMERICA, THE EUROPEAN UNION, SOUTH KOREA, JAPAN, ANDREPUBLIC OF CHINA (TAIWAN).B.GAS PIPING MATERIALS MANUFACTURED IN ANY REGION OUTSIDE THOSE LISTEDABOVE SHALL NOT BE USED OR INSTALLED.3.4PIPE SPECIFICATIONSA.ALL UNDERGROUND CARBON STEEL PIPE SHALL BE PROPERLY CLEANED ANDEPOXY-COATED PRIOR TO BURIAL, ELECTRICALLY INSULATED FROMABOVEGROUND PIPING OR STRUCTURES, AND CATHODICALLY PROTECTED INACCORDANCE WITH THIS SPECIFICATION AND CURRENT INDUSTRY STANDARDS.B.ALL CARBON STEEL PIPE MATERIAL CONVEYING NATURAL GAS SHALL BESEAMLESS ASTM A106, GRADE B MATERIAL. PIPE FITTINGS SHALL BE USED ASFOLLOWS.1.SCHEDULE 40 PIPE SHALL BE JOINED USING WROUGHT STEEL SCHEDULE 40ASTM A234 GR. WPB BUTT WELDING FITTINGS. FLANGED FITTINGS FORSCHEDULE 40 PIPE SHALL BE RAISED-FACE WELDNECK-TYPE, ANSI B16.5,EITHER CLASS 150 OR CLASS 300, PER THE DRAWINGS, USING ASTM A105FORGED CARBON STEEL.2.SCHEDULE 80 PIPE SHALL BE JOINED USING WROUGHT STEEL SCHEDULE80 ASTM A234 BUTT WELDING FITTINGS. FLANGED FITTINGS FOR SCHEDULE 80PIPE SHALL BE RAISED-FACE WELDNECK-TYPE, ANSI B16.5, EITHER CLASS 300OR CLASS 600, PER THE DRAWINGS, USING ASTM A105 FORGED CARBONSTEEL.3.5STAINLESS STEEL TUBINGA.STAINLESS STEEL PRESSURE TUBING SHALL BE SEAMLESS ANDBRIGHT-ANNEALED, MANUFACTURED AND TESTED ACCORDING TO ASTM A269,USING MATERIAL DUAL-CERTIFIED AS TYPE TP316 AND TP316L. TUBE SHALL BECOLD-FINISHED AND FREE OF SCRATCHES. UPON REQUEST, THE TUBE SUPPLIERSHALL FURNISH MILL CERTIFICATES DOCUMENTING COMPLIANCE WITH THISSPECIFICATION.B.ALL BENDS SHALL BE MADE USING TUBING BENDERS, EXCEPT WHEN TUBE ISPULLED UNDERGROUND THROUGH A SLEEVE. BEND ANGLE SHOULD BE 90°WHENEVER POSSIBLE. TUBING SHALL BE ROUTED PARALLEL WITH THE VERTICALAND HORIZONTAL AXES OF THE EQUIPMENT. UNDERGROUND TUBING SHALL BECONTINUOUS, USING COILED PRODUCT WHEREVER FEASIBLE, IN ORDER TOMINIMIZE TUBE WELDING. STRAIGHTEN COILED TUBING FOR INSTALLATIONUSING EQUIPMENT AND METHODS APPROVED BY THE TUBE MANUFACTURER.ROUTE UNDERGROUND TUBING COMPLETELY WITHIN A WATERTIGHT PVC, HDPEOR ENT SLEEVE. UNDERGROUND TUBE SECTIONS SHALL BE JOINED BY ORBITALWELDING. AT NO TIME SHALL MECHANICAL FITTINGS BE PLACED UNDERGROUND.C.ALL ABOVEGROUND TUBING SHALL BE FABRICATED USING STRAIGHT STICKS, ORUPON APPROVAL, COILED TUBE STRAIGHTENED USING SUITABLE EQUIPMENT.ABOVEGROUND TUBE SHALL BE ANCHORED PER CODE TO PREVENT BENDING OREXCESSIVE VIBRATION. RESILIENT TUBING ANCHORS, SUCH AS PARKERPARKLAMP OR UNISTRUT CUSH-A-CLAMP, SHALL BE USED. TUBING SUPPORTSSHALL BE SPACED OUT AND NOT EXCEED 7 FEET APART PLACEMENT.D.REQUIRED TUBE WALL THICKNESS FOR CNG SERVICE (INCHES):OUTSIDE DIA. [IN.] WALL THICKNESS [IN.]BASIS1/40.049AVG. WALL THK.3/80.065AVG. WALL THK.1/20.083AVG. WALL THK.3/40.109 (COIL)AVG. WALL THK.3/40.109AVG. WALL THK.10.120MIN. WALL THK.10.120 (COIL)MIN. WALL THK.10.134AVG. WALL THK.*10.139 (COIL)AVG. WALL THK.*NOTE: COILED TUBING FOR UNDERGROUND ROUTING (ALL SIZES) PREFERREDE.COMPRESSION TUBE FITTINGS SHALL BE TYPE 316 STAINLESS STEEL,DOUBLE-FERRULE, WITH A MAWP OF NOT LESS THAN 5,500 PSIG. ACCEPTABLEPRODUCTS ARE LISTED BELOW. NO OTHER PRODUCTS MAY BE USED WITHOUTPRIOR APPROVAL BY THE ENGINEER. ALL COMPRESSION FITTINGS FURNISHEDBY THE THE CONTRACTOR SHALL BE CATALOGUED PRODUCTS OF A SINGLEMANUFACTURER.1.SWAGELOK34" AND 1" COMPRESSION TUBE FITTINGS SHALL BE HYDRAULICALLY SWAGED.* HEAVY WALL TUBE FITTINGS (0.134 AVG WALL THK AND ABOVE) SHALL BEPARKER "SEAL-LOK" SAE J1453 O-RING FACE SEAL-TYPE.ALL TUBING SHALL BE MECHANICALLY FLARED USING A PARKER PARFLANGEFLARING SYSTEM. THE CORRECT DIE AND PIN SETS SHALL BE USED FOR EACHTUBING SIZE. FITTINGS SHALL BE ZINC PLATED CARBON STEEL WITH A MINIMUMDYNAMIC PRESSURE RATING OF 5000 PSIG.BRAZED SLEEVES ARE NOTPERMITTED.F.BALL VALVES: HABONIM, SSP, OR SWAGELOK, 316 STAINLESS STEEL BODY ANDTRIM, SUITABLE FOR COMPRESSED NATURAL GAS SERVICE.G.NEEDLE VALVES: ANDERSON GREENWOOD, SWAGELOK OR SSP, 316 STAINLESSSTEEL BODY AND TRIM, SUITABLE FOR COMPRESSED NATURAL GAS SERVICE,5500 PSI, OR APPROVED EQUAL.H.SLEEVE (FOR BURIED TUBING): PVC CONDUIT, FLEXIBLE ENT CONDUIT, OR PEP(POLYETHYLENE) PIPE, SIZED AS SHOWN ON THE DRAWINGS.3.5POLYETHYLENE (PEP) PIPE: DR 7, 9, OR 11A.POLYETHYLENE PIPE TO BE DESIGNED IN ACCORDANCE WITH PPI HANDBOOK OFPE PIPE, 2 ND EDITION, RATED FOR NOT LESS THAN THE MAXIMUM PRESSURE OFTHE SUPPLY SYSTEM, AND NOT USED WITH PRESSURES GREATER THAN 125PSIG.B.PEP SHALL BE WARRANTED FOR NATURAL GAS DISTRIBUTION ANDMANUFACTURED ACCORDING TO PPI DESIGNATION PE 4710 AND ASTM D 2513; CPCHEM YELLOW STRIPE 8300 OR APPROVED EQUAL. PEP SHALL BE JOINED USINGBUTT FUSION IN COMPLIANCE WITH PIPE MANUFACTURER'S INSTALLATIONMANUAL.C.A COATED COPPER CLAD STEEL TRACER WIRE (#12 GAUGE OR LARGER) SHALLBE INSTALLED WITH ALL BURIED PEP. TRACER WIRE TO BE LAID WITHIN 6"DIRECTLY ABOVE THE PEP WHERE PRACTICAL. WRAPPING OF THE TRACER WIREAROUND PEP IS PROHIBITED.1.CONTRACTOR TO USE AS FEW CONNECTIONS AS POSSIBLE2.WIRE CONNECTIONS TO BE MADE USING CSA CERTIFIED PRESSURE TYPE,DIRECT BURY (PER UL 486D) MECHANICAL CONNECTORS3.A MINIMUM 5' OF ADDITIONAL TRACER WIRE TO BE COILED, BURIED, ANDTERMINATED AT THE ENDS OF UNDERGROUND PEP4.TRACER WIRE TO FOLLOW PEP ABOVEGROUND USING TRACER WIRE CLAMPSALONG EACH ANODELESS RISER3.6INSTRUMENTATION AND SPECIALTY ITEMSA. PRESSURE GAUGES: LIQUID FILLED, RANGE TO BE 150-200% OF MAXIMUMPRESSURE EXPECTED, TO BE MOUNTED ON BLEED/BLOCK VALVE UNLESSOTHERWISE SPECIFIED.B. ESD VALVE (AV-1): FLANGED, FIRE-RATED BALL VALVE WITH ACTUATOR,FACTORY ASSEMBLED, PILOT-GAS-TO-OPEN, SPRING CLOSED.C. FIRE EXTINGUISHER(S): AMEREX CORPORATION, COMPLIANCE FLOW MODEL #592WITH A 4A:80B:C MINIMUM RATING, CURRENTLY CERTIFIED AND TAGGED WITHLOCAL INSPECTION TAG, MOUNTED IN A LOCKABLE WEATHER-PROOFENCLOSURE, UNLESS OTHERWISE SPECIFIED.3.7 INSTALLATIONA.THE CONTRACTOR SHALL USE ONLY TUBING INSTALLERS WHO ARE TRAINED ANDCERTIFIED BY THE TUBE FITTING MANUFACTURER TO INSTALL TUBE ANDASSOCIATED FITTINGS PER THE MANUFACTURER'S INSTALLATIONINSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE PROOF OF CERTIFICATIONTO CLEAN ENERGY'S PROJECT MANAGER PRIOR TO COMMENCING WORK.B.ALL PIPING SHALL BE INSTALLED NEATLY AND IN A WORKMAN-LIKE MANNER. ALLPIPING SHALL BE PROPERLY ANCHORED, SUPPORTED, OR PITCHED ACCORDINGTO THESE CONSTRUCTION SPECIFICATIONS AND THE DRAWINGS, OR IN THEABSENCE OF SPECIFIC DETAIL, PER DIRECTION OF THE ENGINEER. ALL PIPINGSHALL RUN TRUE TO VERTICAL AND HORIZONTAL AXES OF THE EQUIPMENT ANDFACILITY. THE CONTRACTOR SHALL PROVE ALL PIPING IS FREE OF OBSTRUCTIONAND DEBRIS, PRIOR TO CONNECTING TO ABOVEGROUND EQUIPMENT. AT NO TIMESHALL ANY GAS OR CNG PIPING BE CONSTRUCTED OVERHEAD UNLESSOTHERWISE NOTED ON THESE PLANS, OR AS APPROVED BY THE ENGINEER.C. ALL VALVES SHALL BE INSTALLED NEATLY AND IN A WORKMAN-LIKE MANNER.ALL VALVES SHALL BE ACCESSIBLE FOR EASY OPERATION AND MAINTENANCE.D.CLEAN THE INTERNAL PIPE SURFACE OVER ITS ENTIRE LENGTH, REMOVING ALLDIRT, DEBRIS, AND LOOSE CORROSION OR SCALE, BEFORE THE PIPE IS FITTEDOR ALIGNED FOR WELDING. OPEN ENDS OF ALL PIPE RUNS SHALL BE KEPTSECURELY CLOSED TO PREVENT THE ENTRANCE OF DIRT, DEBRIS, WATER, ORANIMALS INTO THE PIPE. ALL END CLOSURES SHALL BE APPROVED BY CLEANENERGY.E.ALL CARBON STEEL PIPE WELDS SHALL INCLUDE A TIG (TUNGSTEN INERT GAS)ROOT. THE FILLER PASSES SHALL BE STICK SHIELDED METAL ARC WELDING(SMAW).F.TUBE AND PIPE CONNECTIONS TO ALL EQUIPMENT REQUIRING MAINTENANCEACCESS SHALL BE REMAKEABLE USING FLANGED, THREADED OR SWAGEDFITTINGS. WELDED OR OTHER PERMANENT FITTINGS SHALL NOT BE USED ATTHESE LOCATIONS.3.8FABRICATION, HANDLING AND STORAGEA.ALL VALVES, PRE-FABRICATED PIPING, FLANGES, ETC. SHALL BE PROTECTEDDURING STORAGE, TRANSIT, AND ERECTION WITH PLYWOOD COVERS 1/2" THICK,AND SECURED WITH BOLTS FOR CLOSURE, OR EQUAL. SHOP FABRICATEDSECTIONS SHALL NOT BE LEFT WITH OPEN ENDS EXPOSED TO ATMOSPHEREDURING STORAGE, TRANSIT, OR ERECTION. SUITABLE CAPS SHALL BE PROVIDEDON ALL MECHANICAL CONNECTIONS.B.TEMPORARY SUPPORTS SHALL BE PROVIDED AND INSTALLED DURING ERECTIONTO AVOID OVER-STRESSING PIPING OR EQUIPMENT TO WHICH PIPING ISCONNECTED.3.9TRENCHESA.SEE GENERAL NOTE ON SHEET G-0.13.10WELDINGA.WELDING PROCEDURES SHALL BE IN ACCORDANCE WITH ANSI B31.3, "PROCESSPIPING, CHAPTER V, "FABRICATION, ASSEMBLY, AND ERECTION".B.THE CONTRACTOR SHALL SUBMIT WELDING PROCEDURE SPECIFICATIONS (WPS)TO THE ENGINEER FOR APPROVAL, PRIOR TO STARTING WORK. EACH WPSSHALL BE IDENTIFIED WITH THE THE CONTRACTOR'S NAME AND IDENTIFICATIONNUMBER. WELDING SHALL NOT COMMENCE UNTIL THE PROCEDURE ISAPPROVED.C.EACH WELDER MUST PROVIDE A COMPLETE PROCEDURE QUALIFICATIONRECORD (PQR) SIGNED BY AN AUTHORIZED OFFICER OF THE TESTINGLABORATORY OR DEPUTY WELDING INSPECTOR AND THE CONTRACTOR'SAUTHORIZED REPRESENTATIVE. PREVIOUS WELDING CERTIFICATION (ACTIVECERTIFICATION WITHIN THE PREVIOUS SIX (6) MONTHS) MAY BE SUBMITTED FORAPPROVAL.D.WELD TESTS SHALL BE PERFORMED PER ANSI B31.3, AND APPROVED BY THEENGINEER.1.NOT LESS THAN 5% OF ALL BUTT WELDS BY EACH WELDER PERFORMINGWORK AT THE SITE SHALL BE RANDOMLY SELECTED AND RADIOGRAPHED.2.RADIOGRAPHS SHALL BE EVALUATED BY A CERTIFIED RADIOGRAPHICINTERPRETER. THE RADIOGRAPHIC INTERPRETER'S WRITTEN REPORT OF HISEVALUATION SHALL BE SUBMITTED TO CLEAN ENERGY BEFORE THE WELDSARE BURIED.3.11PIPE COATING AND PAINTINGA.ALL UNDERGROUND CARBON STEEL PIPE SHALL BE FACTORY-COATED WITHFUSION-BONDED EPOXY (FBE), TO MEET ALL CODE REQUIREMENTS INCLUDINGTHOSE ESTABLISHED BY LOCAL UTILITY COMPANY OR JURISDICTIONS.1.FACTORY COATING SHALL BE DESIGNED TO RESIST DISBONDMENT WHENEXPOSED TO CATHODIC PROTECTION CURRENTS.2.FACTORY COATING SHALL BE 3M SCOTCHKOTE FUSION-BONDED EPOXYCOATING 6233P. NO OTHER COATING IS ACCEPTABLE WITHOUT PRIORAPPROVAL BY THE ENGINEERB.WELDED PIPE JOINTS AND FITTINGS FOR UNDERGROUND PIPING SYSTEMSSHALL BE FIELD-COATED IN ACCORDANCE WITH CURRENT CODES AND THECOATING MANUFACTURER'S APPLICATION MANUAL. FIELD COATING SHALL BEAPPROVED BY THE DESIGNATED INSPECTOR PRIOR TO BURIAL. FIELD COATINGSHALL BE 3M SCOTCHKOTE LIQUID EPOXY COATING 323P.C.PRIOR TO BURIAL, COATED PIPE SHALL BE TESTED ALONG ITS ENTIRE LENGTHWITH AN ELECTRIC HOLIDAY DETECTOR. ANY HOLIDAYS DETECTED SHALL BEREPAIRED PER "B" ABOVE FOR 6" ON EITHER SIDE OF THE HOLIDAY. AFTER ALLHOLIDAYS ARE REPAIRED, THE ENTIRE LENGTH OF PIPE SHALL BE TESTED AGAIN.D.EXPOSED PIPING, VALVES, FITTINGS, FLANGES AND RELATED MATERIAL SHALL BEPRIMED AND PAINTED WITH AN INDUSTRIAL MAINTENANCE COATING, INACCORDANCE WITH THE PAINT MANUFACTURER'S INSTRUCTION MANUAL.PRIMER SHALL BE DEVOE DEVPRIME 1407, AND FINISH , DEVCRYL 1449. FINISHCOLOR SHALL BE SAFETY YELLOW. AT UNDERGROUND PIPE RISERS, EPOXYCOATING SHALL EXTEND A MINIMUM OF 2 INCHES ABOVE THE FINISHED GROUNDSURFACE.3.12 CATHODIC PROTECTIONA.ALL BURIED STEEL PORTIONS OF THE PIPING SYSTEM SHALL BE ELECTRICALLYISOLATED (USING DIELECTRIC FITTINGS) AND CATHODICALLY PROTECTED INACCORDANCE WITH CURRENT CODES AND NACE INTERNATIONAL STANDARDRP0169, CURRENT EDITION TO INSURE A -850 MILLIVOLT PIPE-TO-SOIL POTENTIALFOR A MINIMUM OF 30 YEARS. SOIL RESISTIVITY TEST SHALL BE THERESPONSIBILITY OF THE CONTRACTOR.B.THE CONTRACTOR SHALL FURNISH ALL PERMANENT MATERIALS FOR TESTLEADS, INCLUDING WIRE, CONDUIT AND FITTINGS, TERMINAL POST, TERMINALUNITS, CAD WELD THERMITE CARTRIDGES, ETC. PER INDUSTRY ACCEPTEDPRACTICES.C.ELECTRICAL TEST LEADS SHALL BE TERMINATED IN A FRAME AND COVERED ATFINISHED GRADE.3.13 PNEUMATIC PRESSURE TESTA.WHEN ASSEMBLY (WELDED OR MECHANICAL) OF A GAS PIPING OR TUBINGSYSTEM IS COMPLETE, CLEANED AND PURGED OF ALL CONSTRUCTION ANDASSEMBLY DEBRIS, A PNEUMATIC PRESSURE TEST SHALL BE PERFORMED INACCORDANCE WITH ASME/ANSI B31.3 (U.S) OR CSA B51/B149.1 (CANADA). THECONTRACTOR SHALL NOTIFY CLEAN ENERGY'S PROJECT MANAGER THAT A TESTIS SCHEDULED, NOT LESS THAN 2 BUSINESS DAYS BEFORE THE TEST ISSCHEDULED TO BEGIN.B.AT NO TIME SHALL THE TUBING ASSEMBLY BE HYDROSTATICALLY TESTED, NOEXCEPTIONS.C. IF COLD WEATHER LIMITS ACHIEVABLE TEST PRESSURES, THE CONTRACTORSHALL SUBMIT AN ALTERNATIVE COLD WEATHER PRESSURE TEST PLAN TOCLEAN ENERGY FOR REVIEW.D.REMOVE ALL PRESSURE SENSITIVE DEVICES AND EQUIPMENT NOT RATED TOWITHSTAND FINAL TEST PRESSURE, BEFORE PNEUMATIC PRESSURE TEST.E.CONNECT A SOURCE OF HIGH-PRESSURE GAS WITH APPROPRIATE REGULATOR,GAUGES, VALVES, SAFETY RELIEF VALVE, AND FITTINGS TO ONE END OF THESYSTEM TO ALLOW SYSTEM TO BE SAFELY PRESSURIZED AND DEPRESSURIZED.DRY AIR OR NITROGEN SHALL BE USED FOR THE LOW PRESSURE PIPING(COMPRESSOR SUCTION). NITROGEN SHALL BE USED FOR THE HIGH PRESSURETUBING (COMPRESSOR DISCHARGE).3.14 PURGING AND PRESSURIZINGA.ALL PURGING AND PRESSURIZING SHALL BE PERFORMED BY THE CONTRACTORAND OBSERVED BY THE ENGINEER OR THE ENGINEER'S DESIGNATEDREPRESENTATIVE. THE ESD SYSTEM SHALL BE OPERATIONAL BEFORE THEPIPING SYSTEM IS PRESSURIZED WITH NATURAL GAS. NATURAL GAS SHALL NOTBE INTRODUCED INTO THE SYSTEM WITHOUT PRIOR AUTHORIZATION BY CLEANENERGY'S CONSTRUCTION MANAGER. ALL AIR SHALL BE PURGED FROM THEENTIRE SYSTEM TO THE SATISFACTION OF CLEAN ENERGY'S CONSTRUCTIONMANAGER, AND IN ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'SINSTRUCTIONS, BEFORE THE SYSTEM MAY BE PRESSURIZED.B.ALL FABRICATION, WELD TESTING, PRESSURE TESTING AND WORK REQUIRINGFLAME OR SPARKING DEVICES SHALL BE COMPLETED BEFORE INTRODUCINGNATURAL GAS TO ANY PIPING SYSTEM.c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P0.0 PIPING NOTES CA.dwg02/24/20258/7/2025 11:56:39 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING NOTES 21330.00PBMLP0.0REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB BBV1GENERAL NOTES:1.EQUIPMENT INSIDE THE DASHED LINE IS PART OF THE MANUFACTURER'S FACTORY ASSEMBLY PROVIDEDBY CLEAN ENERGY.2.CLEAR SPACE OF AT LEAST 3 FEET SHALL BE PROVIDED FOR ACCESS TO ALL VALVES AND FITTINGS OFMULTIPLE GROUPS OF CONTAINERS.3.EMERGENCY SHUT-OFF DISCONNECT WILL DISCONNECT ELECTRICAL POWER AND STOP DISPENSINGOPERATIONS.4.SELF CLOSING VALVES ON THE INLET OF THE COMPRESSORS SHALL SHUT OFF THE GAS SUPPLY TO THECOMPRESSOR WHEN ONE OF THE FOLLOWING OCCURS:4.1.AN EMERGENCY SHUTDOWN DEVICE IS ACTIVATED.4.2.A POWER FAILURE OCCURS.4.3.THE POWER TO THE COMPRESSOR IS SWITCHED TO THE OFF POSITION .5.PROVIDE AN OVER-PRESSURE PROTECTION DEVICE IN THE FUELING TRANSFER SYSTEM TO PREVENTOVERPRESSURE IN THE VEHICLE PER NFPA 52.6.CONTROL CIRCUIT SHALL BE ARRANGED SO THAT, WHEN AN EMERGENCY SHUTDOWN DEVICE ISACTIVATED OR ELECTRICAL POWER IS CUT OFF, SYSTEMS THAT SHUT DOWN SHALL REMAIN DOWN UNTILMANUALLY ACTIVATED OR RESET AFTER A SAFE CONDITION IS RESTORED PER NFPA 52.7.PROVIDE CONNECTION FOR NATURAL GAS GENERATOR FUEL SUPPLY.8.IF MSA OUTLET PRESSURE EXCEEDS 150PSIG PLASTIC PIPE CANNOT BE USED. PLEASE CONTACT CEENGINEERING TO DETERMINE AN APPROVED SUBSTITUTE.IS-16"L. O.BV-86"1PIBUFFER AND ESD VALVE PANEL METER SETASSEMBLY(BY UTILITY)PV-1TYPA.G.6" FLANGEDANODELESSRISERU.G.A.G.U.G.A.G.U.G.A.G.U.G.6-G-CS 1"1PINATURAL GAS DRYERVTA200 PSIG6"6"6"6"6"6-G-CS4-G-HDPE4-G-HDPE1PI1"A.G.U.G.DESIGN SYSTEM PERFORMANCEMSA OUTLET PRESSURE[PSIG]FLOW RATE[SCF/MIN]15 Guaranteed676A.G.U.G.BV-52"CL 150, 2" FPT PLUG IN 2"THREADED CS UNION(SEE NOTE 7)2" THREAD-O-LET6-G-CS2-G-CS 6"4"4"18"LCL1504"4"4"4"1"PI2A.G.U.G.U.G.1-CNG-SST1"2" ENT CONDUIT1"DRAIN TIME-FILLPOST3/8"FP-18HOSE RETRACTOR (TYP)TIME-FILLPOST3/8"FP-013/8-CNG-SST(TYP)FILL NOZZLE: STAUBLINGV1 CMV08/02 WITH HOLDER (TYP)4"X4"X3/16" STEEL TUBEPRIME AND PAINTED YELLOWCF-124' LONG, 1/4" CNG FILL HOSEASSEMBLY SYNFLEX OR EQUALWITH SPIRAL WRAP (TYP)TIME-FILLPOST3/8"FP-02L.C.BV-41"INLINE HOSE BREAKAWAY FITTING1-CNG-SSTDUAL HOSEFUEL POST ASSY. (TYP 17)4-G-HDPE3/4-CNG-SSTBBV14" ANODELESSRISER W/ 4" RFFTYPA.G.BV-1L.C.3/8"4-G-CSCV-13/8"4" ANODELESSRISER W/ 4" RFFBLV-13/8-CNG-SST4-G-CS1" TEE3" VENT WITHWIRE MESH ENDS3-V-CS2 3/8" WEEPHOLESEE NOTE 1(TYP FOR ALL DASHED RECTANGLES)4"DV5,000 PSIGPSV3/4"1-V-CS24,500 PSIGDV(N) CNG STORAGEL.O.1" CL3000THREADEDCS UNION(TYP 3)10,000 SCF(N) BUFFER STORAGE VESSELS3/4-CNG-SSTPR-115 PSIGSET @4"1-CNG-SSTDUPLEX CNG COMPRESSOR SKID A (MANUFACTURED BY ANGI)VTAHP200279-338SCFM1"X3/4"5,200 PSIGPRV500 PSIG935 PSIG2,500 PSIGVTAHP2001"X3/4"5,200 PSIGPRV500 PSIG935 PSIG2,500 PSIGPSIG10-15279-338SCFMPSIG10-15100 PSIG115 PSIG100 PSIG115 PSIGSINGLE HOSEFUEL POST ASSY.1-CNG-SST1"x3/4"6"x4"PR-1(BY CE)SUPPLIED BY ANGISHIPPED LOOSE2PI0 to 10,0006"6"6-G-CS4-G-HDPE1-CNG-SST6-G-CS4"x3"4"x3"18"LCL1504"4"4"4"4"PR-115 PSIGSET @4"PR-1(BY CE)4"x3"4"x3"SUPPLIED BY ANGISHIPPED LOOSEBBV1TYP6'SPOOLPIECEA.G.U.G.3/8-CNG-SSTA.G.U.G.A.G.U.G.REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZ ED USE, REPROD UCTION , PU BLIC ATI ON, DISTRIBUT ION OR SALE IN W HOLE OR IN PART, IS STRICT LY FO RBIDDEN . 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P1.0-P&ID DIAGRAM.dwg5/6/20258/7/2025 11:56:49 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING & INSTRUMENTATION DIAGRAM 21330.00PBMLP1.0 EQUIPMENT SCHEDULEITEM NOMARKQTY.DESCRIPTIONMFR.MODEL NO.MAWP[PSIG]SERVICEPRESSURE[PSIG]SIZE OR CAPACITY11GAS DRYERPSB21-6200156" INLET & OUTLET2SKID A1TWIN CNG COMPRESSOR SKIDANGI(ARIEL)NG300EARIEL: JGQ/2-4 STAGE5,000 (OUTLET)4,500 (OUTLET)2 x 200 HP3CF-11SINGLE COALESCING FILTERASSY.FILTER: PARKERFILTER RACK: CECJN4C-4CN5067725,0004,5001" INLET & OUTLET4V-11CNG STORAGE VESSELCPI8X16266T5,5004,500(1) 20"OD X 23' L, 3/4" NPT5-1BUFFER/ESD VALVE PANELANGI-5,0004,5001", 1 INLET, 2 OUTLETS2,500 SCF/MIN MAX (EST.)6FP 11FUEL POSTW/ (1) FUEL HOSE ASSY.CEC5110294,5004,500SINGLE SIDE FUEL POST24FT HOSE LENGTH(1) 1/4" FILL x 1/4" VENT HOSEPARKER & OPW BREAKAWAYSSTAUBLI NOZZLE7FP 2-1817FUEL POSTW/ (2) FUEL HOSE ASSY.CEC5110314,5004,500DUAL OPP. SIDE FUEL POST24FT HOSE LENGTH(1) 1/4" FILL x 1/4" VENT HOSEPARKER & OPW BREAKAWAYSSTAUBLI NOZZLEPIPE AND TUBING SCHEDULEMARKSIZEBASISSCHWALL THK[IN]MATERIALSPECIFICATIONMAWP[PSIG]SERVICEPRESSURE[PSIG]SERVICETEMP.[°F]NOTE1-V-SST1"OD316 SS0.120316 SSASTM A2135,2800-40-149.120" MIN. WALL SEAMLESS TUBE1-V-CS21"NPS800.179CSASTM A106B3,4700-3,00030-130SEAMLESS PIPE3-V-CS23"NPS800.300CSASTM A106B2,3600-1,00030-130SEAMLESS PIPE2-G-CS2"NPS400.154CSASTM A106B1,2032030-110SEAMLESS PIPE4-G-CS4"NPS400.237CSASTM A106B1,3002030-110SEAMLESS PIPE6-G-CS6"NPS400.280CSASTM A106B1,1002030-110SEAMLESS PIPE4-G-HDPE4"NPSDR 110.409PEPASTM D25131002050-70HDPE, PE47103/8-CNG-SST3/8"OD(TUBE)0.065316 SSASTM A2136,82090-110-40-149SEAMLESS TUBE3/4-CNG-SST3/4"OD(TUBE)0.134316 SSASTM A2135,8804,500-40-149SEAMLESS TUBE1-CNG-SST1"OD(TUBE)0.120316 SSASTM A2695,280120-4,500-40-1490.120" MIN. WALL SEAMLESS TUBEVALVE AND INSTRUMENTATION SCHEDULEMARKSIZECONNECTIONMATERIALDESCRIPTIONMFR.PART NO.MAWP[PSIG]SERVICEPRESSURE[PSIG]NOTEBBV-11/4"MPT316 SSBLOCK & BLEED VALVEWIKA433974710,0000-4,500BLV-11/2"MPT316 SSBLEED VALVESWAGELOKSS-BVM89,2904,500BV-13/8"SWAGED316 SSCNG BALL VALVESWAGELOKSS-AFSS6-LH6,00095-4,500BV-33/4"SWAGED316 SSCNG BALL VALVESWAGELOKSS-AFSS12-LH5,8004,500LOCKABLE HANDLEBV-41"FNPT316 SSCNG BALL VALVEHABONIM10 FH27W-666MYI/NPT6,0004,500API 607 FIRE-RATEDBV-52"FPTCSGAS BALL VALVESVFF8004466AGSE002000001,50015FIRE-RATEDBV-74"CL 150 RFF316 SSGAS BALL VALVEHABONIM40 F73W-6666AI/15028515API 607 FIRE-RATEDBV-86"CL 150 RFFCSGAS BALL VALVEHABONIM60 F73W-4466AI/15028515API 607 FIRE-RATEDFH-14"X18"CL 150 RFFSSFLEX HOSEUNISOURCE"SUPERFLEX"SF22CSA-400-49-49-182850-20CSA-LISTEDCV-13/8"SWAGED316 SSCNG CHECK VALVESWAGELOKSS-CHS6-255,0004,500CV-24"CL 150 RFFCSCNG CHECK VALVEWHEATLY51004502712127515API 6DPI-12.50"1/4" MPT316 SSPRESSURE GAUGEWIKATYPE 233.30, P/N 925163410010-20GLYCERIN-FILLEDPI-22.50"1/4" MPT316 SSPRESSURE GAUGEWIKA983200410,0001,000-4,500GLYCERIN-FILLEDIS-16"CL 150 RFFCSINLET Y-STRAINERKECKLEY62RFY-CSM40M36-SBB-SA728515PR-13"CL 150 RFFCASTDUCTILEPRESSURE REGULATORKIMRAYABY 318 FGT PR-D REG25015-20SET AT 15 PSIGSYMBOLSPRODUCTLINE SIZEMATERIAL3-G-PEPLEGENDLINE DESIGNATIONABBREVIATIONSPIA.G.ABOVE GROUNDAAIRCNGCOMPRESSED NATURAL GASCSCARBON STILL (SCH. 40)CS2CARBON STEEL (SCH. 80)XXSCARBON STEEL (SCH. XXS)DDRAINESDEMERGENCY SHUTDOWN(E)EXISTING(F)FUTUREFPFUEL POSTFMTFUEL MNGMNT. TERMINALGNATURAL GAS (0-400 PSIG)HHIGHLLOWL.O.LOCKED OPENL.C.LOCKE CLOSEDMMETER(N)NEWN.C.NORMALLY CLOSEDN.O.NORMALLY OPENPIPRESSURE INDICATORPEPPOLYETHYLENE PIPEPRVPRESSURE RELIEF VALVEPVCPOLYVINYL CHLORIDE PIPERRREMOVE AND REPLACESSOLENOIDSSSTAINLESS STEELSSTSTAINLESS STEEL TUBE(TYP)TYPICALU.G.UNDERGROUNDVVENTBALL VALVENORMALLY CLOSEDVALVECHECK VALVENEEDLE VALVEPLUG VALVE3-WAY VALVEBLOCK AND BLEEDVALVEPRESSURE REGULATOR(SETTING AS NOTED)BLEED OR PURGE VALVEGAS-ACTUATED VALVESOLENOID VALVESOLENOID VALVE(3-WAY)LOCAL INSTRUMENT ORGAUGEPANEL MOUNTEDINSTRUMENT OR GAUGEPOINT OF CONNECTIONRELIEF VALVEFLEXIBLE HOSEPLUGCAPUNIONHOSE COUPLINGTHREADED PLUGFILTERFLEX CONNECTORPRESSURE INDICATOR(RANGE AS NOTED)PIPE REDUCTION/EXPANSION CONICALSTRAINER (BUILT-IN)PRIMARY LOCATIONPROGRAMMABLELOGIC CONTROLELECTRICAL SIGNALPNEUMATIC SIGNALREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UNAUTHORIZ ED USE, REPROD UCTION , PU BLIC ATI ON, DISTRIBUT ION OR SALE IN W HOLE OR IN PART, IS STRICT LY FO RBIDDEN . 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P1.1-P&ID SCHEDULE.dwg5/6/20258/7/2025 11:56:58 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING & INSTRUMENTATION SCHEDULE 21330.00PBMLP1.1 MP-3.0BU.G. TO A.GTRANSITION1"-CNG-SSTIN 2" ENT1"-CNG-SSTP-3.0FFP 1FP 2FP 3FP 4FP 5FP 6FP 7FP 8FP 9FP 10FP 11FP 12FP 13FP 14FP 15FP 16FP 17FP 18P-3.0H(TYP.)SEE ENLARGEDCOMPOUNDLAYOUTP-3.0AP-3.0IM6' SPOOL4"-G-HDPE(2) 1"-CNG-SST(1) 3/8"-CNG-SSTEACH IN 2" ENT6" BALL VALVE6" Y-STRAINERCL 150, 2" FPT PLUG IN2" THREADED CS UNION6" ANODELESSRISER1"-CNG-SSTIN 2" ENT(2) 1"-CNG-SSTCOMPRESSORDISCHARGE LINES TEECONNECTION(N) VALVE PANEL(N) STORAGE VESSEL(2) 1"-CNG-SST(1) 3/8"-CNG-SST4"x18"L FLEX HOSE4"x3" PIPE REDUCER3" PRESSURE REGULATOR4"x3" PIPE REDUCER4" CHECK VALVE4" CONICAL STRAINER4" BALL VALVE4" CS PIPE4" FLANGED RISER(TYP. 2-LOC,)A.G TO U.GTRANSITION(TYP.)P-3.0DP-3.0GP-3.0AP-3.0CP-3.0C(N) COMPRESSOR(N) DRYER(N) MSAP-3.0BP-3.0E6" PIPE4"-G-HDPE4" HDPE PIPE4"-G-HDPE3/4"-CNG-SST1"-CNG-SST3/8"-CNG-SST3/8"-CNG-SSTGENERAL PIPING NOTES1. SEE DRAWING P-0.0 FOR ADDITIONAL REQUIREMENTS.2. MAINTAIN 10' MINIMUM CLEAR DISTANCE OF NEW GAS METER SET TOELECTRICAL MAIN SWITCHBOARD AND SIMILAR EQUIPMENT.3. EQUIPMENT TIE-INS AND ROUTING SHOWN ARE APPROXIMATE AND MAYVARY AS MUCH AS 5 FEET IN ANY DIRECTION TO ACCOMMODATE FIELDCONDITIONS. REFER TO VENDORS' CERTIFIED DRAWINGS AND INSTALLATIONINSTRUCTIONS FOR FURTHER INFORMATION.4. ALL BURIED STAINLESS STEEL TUBING SHALL BE RUN IN CONTINUOUS PVCOR ENT SLEEVE(S). TUBING SHALL BE CONTINUOUS WITH NO VALVES, UNIONS,OR FITTINGS BURIED OR INACCESSIBLE.5. SEE DRAWING P-4.0 FOR SAFETY SIGNAGE DETAILS AND LOCATIONS.6. FIRE EXTINGUISHER(S): 4A: 80B:C MINIMUM RATING, CURRENTLY CERTIFIEDAND TAGGED WITH LOCAL INSPECTION TAG, MOUNTED IN A LOCKABLEWEATHER-PROOF ENCLOSURE, UNLESS OTHERWISE SPECIFIED, AND WITHIN 50-FEET OF DISPENSERS AND AT THE EQUIPMENT COMPOUND.7. RUN TIME FILL PIPING ABOVE GROUND ON JERSEY BARRIER. PROVIDEUNISTRUT SUPPORTS 6' MAX O.C.REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P2-PIPING PLAN.dwg08/07/20258/7/2025 11:57:16 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING PLAN 21330.00PBMLP2.0FUELING AREA LAYOUT (1" = 20')WSNE02040601" = 20'10ENLARGED COMPOUND LAYOUT (1" = 4')WSNE GRADE9" ±PVC CAPLOOSESS TUBING2" ENT SLEEVEPLUG END OF SLEEVE WITHSILICONE OR POLYURETHANE FOAMN.T.S.TYPICAL SLEEVE TRANSITION-AELECTRICAL CONDUITS(SEE ELECTRICAL PLANFOR ACTUAL NUMBERS)BARE COPPER GROUND WIRE MINIMUM30" BELOW EARTH'S SURFACE(SEE ELECTRICAL PLAN FOR SIZE ANDAPPROX. LOCATION)2" ENTRED DETECTABLE"WARNING" MARKERTAPE ALONG TRENCHSLURRY, SAND, NATIVE BACK FILLEXIST. FINISHED GRADESLURRY OR SAND12"6"12"12" MIN2" MINAS REQUIREDN.T.S.TYPICAL TRENCH SAW CUT EXISTING PAVEMENTOR TRENCH EXISTING GROUNDSS TUBING,SIZE PER P&ID18" MINIMUM2"TYP6"MIN.6"MIN.B-VALVE PANEL CONNECTION(S)N.T.S.-DCOMPR. 1A BUFFER STORAGEFAST FILLSee above rightfor continuationPressure Gauge 2-1/2", LF, SS(1.5-2x Inlet Pressure)Block and BleedGauge ValveHoke/SwagelokBleed ValveFireproofBall ValveConnection toMSAPipe SupportPer Detail (TYP)See below leftfor continuationY-StrainerNATURAL GASNATURAL GASNATURAL GASFlanged Dryer InletFlanged Dryer OutletPIPE SUPPORT AND FOUNDATIONUNISTRUT "CUSH-A-CLAMP"PART NUMBERSPIPE SIZE[NPS]MATERIALPART NO.3"304 SS056N062SS4"304 SS072N080SS6"304 SS106N114SSCUSH-A-CLAMP PIPE SUPPORT(SEE TABLE)UNISTRUT P1000 CHANNEL1-5/8" X 1-5/8", 12 GAGE,UNISTRUT DEFENDER FINISHUNISTRUT 12 " X 1516 " CAP SCREW,P/N HHCS050094EG AND CHANNELNUT P/N P1010 (TYP 2-LOC)UNISTRUT POST BASEP/N P2072A SQUNISTRUT END CAP P/N P1280AHILTI KWIK BOLT 31/2" X 3-3/4"HOT DIP GALVANIZED(TYP 4-LOC)2'2'FireproofBall ValvePressure Gauge2-1/2", LF, SS(1.5-2x Inlet Pressure)Block and BleedGauge ValveFlex HosePressureRegulatorFlanged Connectionto CompressorCheck ValveSCHEMATIC INLET PIPING DETAILN.T.S.C-COALESCING FILTER CONNECTION(S)N.T.S.COALESCING FILTER ON RACKBLEED VALVE1" BALL VAVLE (2 LOC)FLOWFLOWFILTER RACK ASSEMBLY(SEE P-1.0 & P-1.1 FOR FILTER COUNTAND LOCATION)MOUNTING CONNECTION FORCONCRETE PADMOUNTING CONNECTION FORK-RAIL INSTALLATIONF-NATURAL GASNATURAL GASDETAIL OF ANODELESS RISERN.T.S.LENGTH PER PLANNATURAL GASNATURAL GASANODELESS RISERW/ FLANGE ISOLATION KIT(PE 4710 MATERIAL)(RFF-END - A106B CS)ANODELESS RISERW/ FLANGE ISOLATION KIT(PE 4710 MATERIAL)(RFF-END - A106B CS)-EN.T.S-GSPHERICAL STORAGE VESSELSREFER TO NOTE 3.6 @ P0.0FOR U.G PE PIPE REQUIREMENT6000 PSI GAUGEW/BLOCK & BLEEDVALVE1/2"EPOXY ANCHOR BOLTS4" EMBED5"X5"X3/8" STEEL PLATE3/8" DIA WEEP HOLETHREAD-O-LETOR TEE, QTY &SIZE AS REQ'D3" SCH 80 CS PIPE10'0"16"2'8"2'x2' SLABCUSTOMER VENT CONNECTION15"15"13" TYP 1/2" (TYP 4)5"5"15"VENT STACK MOUNTING3/163/165"x5"x3/8" A36STEEL GUSSET15"x15"x3/8"A36 STEEL PLATEDRAINSEE STRUCTURAL DRAWINGSFOR FOOTING INFORMATIONAND ANCHORAGE DETAILSK-RAIL BRACKETTOPSST FUEL LINE#2/0 BCW GROUND3/4"C ESD CIRCUIT3'(TYP)9"1'-6"PLAN VIEWGRADEP-3.0AK-RAILBRACKET3/8" SS FUEL LINE3/8" BALL VALVE3/8" SS3"x3"x1.88" SQUARE FUELING POSTFUELING NOZZLE HOLDERP3300 UNISTRUT1-5/8"X7/8"#2/0 BCWGROUND"A"DETAIL "A"SCALE 4:1N.T.S.H-JERSEY BARRIER MOUNTED FUEL POSTMANUFACTURERSUPPLIED SERVITGROUND POSTN.T.S.PIPING SUPPORT ON BARRIEREX. SURFACEBARRIER1" SS TUBINGCUSHION CLAMPED3/4" EMT (GROUND)1" RGC (ESD)UNISTRUTTOP MOUNTED-Ic:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P3-PIPING SECTIONS AND DETAILS.dwg5/6/20258/7/2025 11:57:30 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 PIPING DETAILS 21330.00PBMLP3.0REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB MMENGLARGED FUELING AREA SIGNAGE PLAN (1" =20')SIGN SPECIFICATIONSYMBOLSIGN #LOCATION:CNG EQUIPMENT COMPOUND ENTRANCESMATERIAL:10" X 14" X 1/8", ALUMINUM FASTENED WITH SCREWS OR STRAPS.SUPPLIED BY:MATERIAL:METAL TAG WITH RED BACKGROUND AND 1" WHITE LETTERING.LOCATION: TIED TO BODY OF BLOCK VALVE (BV) IMMEDIATELY DOWNSTREAM OF METER SET ASSEMBLY (MSA).SUPPLIED BY:LOCATION:ABOVE EACH ESDMATERIAL:14" X 10" X 1/8" THICK ALUMINUM, ROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, 2" HIGH RED LETTERS WITH WHITE BACKGROUND.SUPPLIED BY:MATERIAL:14" X 3.5" X 1/8" METAL DECAL, FASTENED WITH SCREWS OR STRAPS, 0.875" HIGH RED LETTERS WITH WHITE BACKGROUND.LOCATION:SUPPLIED BY:GAS SHUTOFFVALVESUPPLIED BY:OUTSIDE FENCE FACING STREET /MATERIAL:SUPPLIED BY:MATERIAL:MIN. 3" ADHESIVE LETTERING, BLACK LETTERS WITH WHITE BACKGROUNDLOCATION:CONTRACTORCONTRACTORCONTRACTORABOVE EACH FIRE EXTINGUISHER / ESD POSTSUPPLIED BY:MATERIAL:12"W X 18"H ON 1/8" THICK SHEET METAL, ROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, RED LETTERS WITH WHITE BACKGROUND.CONTRACTORNO SMOKINGFLAMMABLE GASCODE REFERENCE:CODE REFERENCE:CODE REFERENCE:CODE REFERENCE:CODE REFERENCE:STOP MOTORCAGI B19.1UPC 1212.5NFPA 52 SECTION 11.3.2.16.5NFPA 52 SECTION 5.1.2.1 & 5.2.2.111" X 11" X 1/8" THICK FIBERGLASS, FASTENEDWITH SCREWS, BLACK CHARACTERS WITH NFPAHAZARD WITH WHITE DIAMOND BACKGROUND.GRAINGER ITEM#:5AZ67EXCEPTION: DECAL @ STORAGE VESSELCONTRACTORNFPA 52 SECTION 7.14.12.1, IFC 5003.7.1CONTRACTORCONTRACTORLOCATION:MATERIAL:GRAINGER ITEM#:4T661, 1M112, 1M328, 1K991SUPPLIED BY:MATERIAL:SAFETY SIGN 10" X 14" SIZELOCATION:SUPPLIED BY:CONTRACTORCONTRACTORGRAINGER ITEM#:4T648, 1M244, 1M460, 1M016ROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, SAFETY SIGN 10" X 14" SIZEROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, GRAINGER ITEM#:4T689, 1M158,1M374, 1K911GRAINGER ITEM#: 4FP26LOCATION:SHUTDOWNNATURAL GASCOMPRESSEDEMERGENCYNO SMOKINGFLAMMABLE GASNATURAL GAS VEHICLE FUELCYLINDERS SHALL BE INSPECTEDAT INTERVALS NOT EXCEEDING 3YEARS TO ENSURE SAFEOPERATION OF THE VEHICLE.NATURAL GAS FUEL CYLINDERSPAST THEIR END OF LIFE DATESHALL NOT BE REFUELED ANDSHALL BE REMOVED FROMSERVICE2013 NFPA 52 SECTION 7.14.12VISIBLE SIDES OF STORAGE VESSEL(S)ABCDEFGHJ140CNGSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCYELEVATION AT EMERGENCY SHUT DOWN (TYP.)42"12" MIN ELEVATION AT EQUIPMENT AREA (TYP.)48" (MIN.)140CNGCOLOR CODE:GRAINGER ITEM# SIZE1 - BLUE5AX794"4 - REDAD8514"0 - YELLOW5AH224"CNG- WHITE "C"-4T7462" "N"-4T757 2" "G"-4T7502"CODE REFERENCE:NFPA 704 SECTION 4.2.3.3YCNEGREMESTOP CNG EQUIPMENT COMPOUND ENTRANCESCNG EQUIPMENT COMPOUND ENTRANCESLOCATION:CNG EQUIPMENT COMPOUND ENTRANCESMATERIAL:SAFETY SIGN, 10" X 14"ROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, SUPPLIED BY:CONTRACTORGRAINGER ITEM#:4T633, 1M276, 1M492, 1M054KON STORAGE VESSEL(S) AND ALL ACCESS GATE(S)TO CNG EQUIPMENT COMPOUNDSIGN SPECIFICATIONSYMBOLSIGN #MATERIAL:SAFETY SIGN, SIZE 10" X 14" SUPPLIED BY:CONTRACTORCNG EQUIPMENT COMPOUND ENTRANCESSUPPLIED BY:LOCATION:DRIVEWAYMATERIAL:SECURITY SIGN SIZE 10" X 14"MATERIAL, 65 MIL THICK. 0.875" HIGH LETTERINGBLACK LEGEND COLOR, WHITE BACKGROUND,FOUR MOUNTING HOLES.CONTRACTORGRAINGER ITEM#:4T678, 1M152, 1M368, 1K905ROUNDED CORNERS FASTENED WITH SCREWS OR STRAPS, GRAINGER ITEM#:3JE44SUPPLIED BY:LOCATION:CNG COMPOUND ENTRANCES /MATERIAL:CLEAN ENERGYLOREN ELECTRIC SIGNSNATURAL GASSUPPLIED BY:MATERIAL: ADHESIVE PIPE LABEL TAPEBLACK LETTERING, SIZE PER ASME A13.1 TABLE 3SAFETY YELLOW BACKGROUNDCONTRACTORVENDOR: GRAINGER 4T609/4T561 <2"Ø PIPEASME A13.1LMNQRCNG DISPENSER AREA FOR FAST FILL ONLYLOCATION:12" X 18" X 1/8", ALUMINUM FASTENED WITH SCREWS OR STRAPS.ITEM#: CLEN-AP-00034OSUPPLIED BY:LOCATION:CNG DISPENSERSMATERIAL:CLEAN ENERGYLOREN ELECTRIC SIGNS4" X 6.5",DECAL ITEM#: CLEN-AP-00034SUPPLIED BY:LOCATION:CNG DISPENSERSMATERIAL:CLEAN ENERGYLOREN ELECTRIC SIGNS2" X 3.5",DECAL ITEM#:TBDLOCATION:MOUNTED ON DISPENSER POSTS OR CANOPY COLUMNS.MOUNTED AT HEIGHT OF 72" ABOVE GRADE.REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBThis CNG dispenser temperature compensation systemhas been verified as accurate in accordance with Clean Energy Telephone No.: 1-866-278-3674NFPA 52-2019.c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\P4.0 SIGNAGE PLAN.dwg08/07/20258/7/2025 11:58:00 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 SIGNAGE PLAN 21330.00PBMLP4.01. ALL SIGNS SHALL BE IN ACCORDANCE WITH OSHA SPECIFICATIONS 1910.145 AND ANSI SPECIFICATION Z535.2. ALL SIGNS SHALL BE SUITABLE FOR OUTDOOR USE AND INSTALLED WITH A 2" TAMPER RESISTANT CHAIN LINK FENCE SIGN MOUNTING KIT WHERE APPLICABLE3. SIGNS SHALL BE MADE OF 0.08 INCH THICK ALUMINUM WITH BAKED ENAMEL BACKGROUND UNLESS OTHERWISE NOTED. LETTERS SHALL BE BAKED ENAMEL OR 3M WEATHERIZED VINYL - SIZE, COLOR AND FONT AS NOTED.4. VENDORS LISTED ARE FOR ESTABLISHING STANDARDS OF QUALITY AND PERFORMANCE. OTHER MANUFACTURERS MAY BE SUBSTITUTED UPON APPROVAL.5. CONTRACTOR SHALL PROVIDE AND INSTALL SIGNAGE AS SHOWN ON THE DRAWINGS. IN ADDITION, CONTRACTOR SHALL TAG ALL EQUIPMENT AND VALVES AND SHALL LABEL ALL LINES IN ACCORDANCE WITH ANSI A13.1.6. SIGNS SHALL BE PROVIDED AND INSTALLED WITH NECESSARY BRACKETS, SUPPORTS AND HARDWARE. BRACKETS, SUPPORTS AND HARDWARE SHALL BE GALVANIZED. ALL HARDWARE SHALL BE VANDAL AND TAMPER RESISTANT.7. WHERE SIGNAGE IS TO BE ATTACHED TO EXTERIOR SURFACE OF EQUIPMENT, SUCH AS COMPRESSOR ENCLOSURE OR DISPENSER FRONT PANEL, SIGN MATERIAL SHALL BE SELF ADHESIVE VINYL.8. SIGNS SHALL BE LOCATED FOR EASY VISIBILITY FROM ALL SIDES.SIGNAGE NOTESSUPPLIED BY:MATERIAL: ADHESIVE PIPE LABEL TAPEWHITE LETTERING, SIZE PER ASME A13.1 TABLE 3SAFETY BLUE BACKGROUNDCONTRACTORVENDOR: GRAINGER 781VR4 <3/4"Ø PIPEASME A13.1SCOMPRESSED AIRPLACE MARKER:1. TO INDICATE DIRECTION OF FLOW BY LABELINGWITH ARROWS AT ONE OR BOTH ENDS OF THELABEL2. TO BE VISIBLE FROM THE POINT OF NORMALAPPROACH3.NEAR VALVES, FLANGES, EQUIPMENTCONNECTIONS, AND CHANGES IN PIPE DIRECTION4.BOTH SIDES OF OF CEILING, WALL OR FLOORPENETRATIONS5.AT ANY LINE ENTRY OR RE-ENTRY POINT6.EVERY 25' TO 50' ON STRAIGHT PIPE RUNS7.IT IS RECOMMENDED THAT PIPES LESS THAN .75"IN DIAMETER BE LABELED WITH A PERMANENTTAG.PIPE MARKER SIZE CHART - ASME 13.1 TABLE 3GRATE TUBING PROTECTION* MANUFACTURER: FIBERGRATE OR EQUIVALENT* PART NUMBERS: AS SHOWN OR EQUIVALENT(NOTE: ALTERNATE SIZES AVAILABLE)PART NUMBERS:1. GRATE (#264465) SPEC: 1" DEEP 1-1/2x1-1/2" SQUARE MESH, 4'x8' PANEL SIZE, YELLOW, CORVEX, GRIT2. SQUARE TUBE (#1644350) SPEC:3"x3"x1/4" SQUARE TUBE, LENGTH 20', DARKGRAY.3. SQUARE TUBE TO GRATE CLAMP (#710160) SPEC: M-5 CLIP ASSEMBLY FOR 1" DEEPx1-1/2" SQ.MESH, FASTENER LENGTH 1-3/4", 3/4" THICK4.SQUARE TUBE TO PAD L -SHAPE CLAMP (#1614400)SPEC: 3"x3"x3/8" LEG ANGLE, LENGTH 20', DARK GRAY5.C-SHAPE & OVER STEP/C-SHAPE (#1664300) SPEC:C-CHANNEL 6"x1-5/8"x1/4", LENGTH 20', DARKGRATEENLARGED COMPOUND SIGNAGE PLAN (1" =6')KEY MAP SAFETY SIGNAGE PLAN (1" =30')ESD & FIREEXTINGUISHERESD & FIREEXTINGUISHERESD & FIREEXTINGUISHERSEE ENLARGEDCOMPOUND PLANSEEENLARGEDCOMPOUNDPLAN(TYP.)(TYP.)(TYP.)ESD & FIREEXTINGUISHERESD & FIREEXTINGUISHERESD & FIREEXTINGUISHERESD & FIREEXTINGUISHER 4.3MATERIALSA. GENERAL1.ALL MATERIALS SHOWN ON THE DRAWING PLANS AND DETAILS ARE THEMAIN ITEMS OF CONSTRUCTION AND ARE NOT TO BE CONSTRUED ASALL-INCLUSIVE. THE CONTRACTOR SHALL MAKE COMPLETE ALLELECTRICAL INSTALLATIONS IN A NEAT, PROFESSIONAL, ANDWORKMANLIKE MANNER.2.THESE DESIGN DRAWINGS ARE SCHEMATIC AND DO NOT SHOW ALLOFFSETS, BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS WHICH MAY BENEEDED FOR PROPER INSTALLATION. EXCEPT WHERE SHOWN INDIMENSIONAL DETAIL, THE LOCATIONS OF SWITCHES, RECEPTACLES,LIGHTS, MOTORS, OUTLETS, AND OTHER EQUIPMENT ON PLANS AREAPPROXIMATE. SUCH ITEMS SHALL BE PLACED SO AS TO ELIMINATEINTERFERENCE WITH DUCTS, PIPING, AND EQUIPMENT. THE EXACTLOCATION SHALL BE DETERMINED IN THE FIELD.3.EQUIPMENT SIZES SHOWN ON THE DRAWINGS ARE MINIMUM UNLESSOTHERWISE INDICATED. BEFORE INSTALLING ANY WIRE OR CONDUIT, THECONTRACTOR SHALL OBTAIN THE EXACT EQUIPMENT REQUIREMENTS ANDSHALL INSTALL WIRE, CONDUIT, DISCONNECT SWITCHES, MOTORSTARTERS, HEATERS, CIRCUIT BREAKERS, AND OTHER ITEMS OF THECORRECT SIZE FOR THE EQUIPMENT ACTUALLY INSTALLED. HOWEVER,WIRE AND CONDUIT SIZES SHOWN ON THE DRAWINGS SHALL BE TAKEN ASA MINIMUM AND SHALL NOT BE REDUCED WITHOUT WRITTEN APPROVAL.4.MATERIALS AND EQUIPMENT FURNISHED BY THE THE CONTRACTOR SHALLBE NEW, AND BE IN COMPLIANCE WITH THESE SPECIFICATIONS.MATERIALS AND EQUIPMENT SHALL BE PRODUCTS THAT HAVE BEEN INSATISFACTORY COMMERCIAL OR INDUSTRIAL USE AT LEAST TWO YEARSPRIOR TO AWARD OF CONTRACT.5.ALL CONDUIT, CONDUIT FITTINGS, AND ENCLOSURES SHALL BE PROPERLYPROTECTED FROM ANY MOISTURE DURING STORAGE. THE CONTRACTORSHALL ENSURE THAT AT THE TIME OF USE, THE MATERIALS ARE CLEAN,DRY AND SUITABLE FOR THEIR INTENDED USE.6.MAIN CIRCUIT BREAKERS FEEDING SYSTEMS RATED 1000 AMPS AND ABOVESHALLINCLUDE GROUND FAULT CIRCUIT INTERRUPTERS (GFCI).8. MAIN SWITCHBOARD SHALL BE NEMA 3R, WITH AN INTERRUPTINGCAPACITY OF 65KAIC, FULLY RATED. ROOF OF SWITCHBOARD SHALLSLOPE AWAY FROM THE SWITCHBOARD'S FRONT.9.ELECTRICAL EQUIPMENT SHALL BE LISTED BY A NATIONALLY-RECOGNIZEDTESTING LABORATORY ACCEPTABLE BY THE AHJ.B.CABLE AND WIRE1.CABLE AND WIRE FOR POWER AND CONTROL CIRCUITS AT 600 VOLTS ANDBELOW SHALL BE 600 VOLT COPPER, TYPE THWN-2. WIRE SIZES #12 AWGAND SMALLER MAY BE SOLID OR STRANDED; ALL LARGER SIZES SHALL BESTRANDED.2.IF ALLOWED BY THE ELECTRIC UTILITY COMPANY, ALUMINUMCONDUCTORS MAY BE USED FOR THE MAIN UTILITY FEEDER. CONTRACTORSHALL SUBMIT WIRE DATA AND CALCULATIONS FOR APPROVAL BY THEENGINEER.3.GROUND WIRE SHALL BE MEDIUM DRAWN BARE STRANDED COPPER . ALLGROUND CONNECTIONS AND FITTINGS SHALL BE CAST OR FORGEDCOPPER ALLOY BODY.4.INSTRUMENT WIRING SHALL BE AS CALLED FOR ON THE PLANS.C.GROUNDINGINSTALL GROUND WELL'S/ RODS AS NOTED ON THE ELECTRICALDRAWINGS.D.CONDUIT1.ABOVEGROUND CONDUIT FOR POWER CONDUCTORS IN PERMANENTLYINSTALLED NON-FLEXING SERVICE SHALL BE THREADED RIGID METALCONDUIT (RMC) OR THREADED STEEL INTERMEDIATE CONDUIT (IMC).UNDERGROUND CONDUIT SHALL BE SCHEDULE 40 PVC, UNLESS NOTEDOTHERWISE IN THE DRAWINGS.2.UNDERGROUND PVC CONDUIT SHALL BE FITTED WITH RMC SWEEPS ANDRISERS AT TRANSITIONS TO ABOVEGROUND; HOWEVER, RISERS INTOPANELS OR SWITCHBOARDS IN NON-HAZARDOUS LOCATIONS MAY BE PVC.UNDERGROUND RMC SHALL BE PVC-COATED GALVANIZED STEEL.3.FLEXIBLE CONDUIT SHALL BE STEEL LIQUID-TIGHT WITH A PVC JACKETSUITABLE FOR THE AREA CLASSIFICATION IN WHICH IT IS TO BE INSTALLED.4.CONDUIT INSTALLED WITHIN HAZARDOUS AREAS SHALL BE THREADED IMCOR RMC. PROVIDE CONDUIT SEALS WHERE CONDUIT CROSSESBOUNDARIES OF HAZARDOUS AREAS, OR AS OTHERWISE REQUIRED BYCODE.E.CONDUIT FITTINGS1.CONDUIT BODIES WITH COVERS SHALL HAVE URETHANE GASKETS ANDSTAINLESS STEEL ATTACHING SCREWS. CONDUIT BODIES INNON-HAZARDOUS AREAS AND DIV. 2 HAZARDOUS AREAS SHALL BECOOPER "CONDULET" FORM 8; AND IN DIV 1 HAZARDOUS AREAS, COOPER"CONDULET" OE OR GU SERIES. BODY MATERIAL SHALL BE FERALOY IRONALLOY, ELECTROGALVANIZED AND FINISHED WITH ACRYLIC PAINT.2.METAL CONDUIT RISERS INTO PANEL BOARDS AND SWITCHBOARDS SHALLBE FITTED WITH INSULATED GROUNDING BUSHINGS. BUSHINGS SHALLHAVE GROUNDING SADDLES AND SET SCREWS SUITABLE FOR A #6 AWGBCW GROUND BOND WIRE.3.MAINTAIN 1 FOOT MINIMUM HORIZONTAL CLEARANCE BETWEEN INCOMINGUNDERGROUND UTILITIES (GAS OR ELECTRIC) AND OTHER PIPING ORCONDUITS.4.WHERE MULTIPLE CONDUITS COME TO THE SURFACE, THROUGH SLABS ORPADS, CONDUIT SHALL CONTINUE TO 6 INCHES ABOVE THE SURFACEBEFORE CONNECTING TO FITTINGS OR SEALS, WHEREVER PRACTICAL.5.WHERE A SINGLE CONDUIT COMES TO THE SURFACE THROUGH A SLAB ORPAD, CONCRETE ENCASEMENT SHALL TERMINATE AT THE SLAB OR PADSURFACE. IF RISING INTO SLAB-MOUNTED OR PAD MOUNTEDSWITCHBOARDS, MOTOR CONTROL CENTERS, AND SIMILAR EQUIPMENT,EXTEND THE CONDUIT UP 3 INCHES ABOVE SURFACE OF SLAB.6.TYPE PVC CONDUIT SHALL BE PERMITTED WHERE ENCASED IN ACONCRETE ENVELOPE A MINIMUM OF 50 MM (2 IN.) THICK AND PROVIDEDWITH NOT LESS THAN 600 MM (24 IN.) OF COVER MEASURED FROM THE TOPOF THE CONDUIT TO GRADE.7.THREADED RIGID METAL CONDUIT OR THREADED STEEL INTERMEDIATEMETAL CONDUIT SHALL BE USED FOR THE LAST 600 MM (24 IN.) OF THEUNDERGROUND RUN TO EMERGENCE OR TO THE POINT OF CONNECTIONTO THE ABOVEGROUND RACEWAY.H.ABOVEGROUND CONDUIT INSTALLATION1.ARRANGEMENT AND GROUPING OF DUCTS SHALL BE RUN AS-SHOWN ONTHE DRAWINGS, FROM PLACE-TO-PLACE, AND SHALL BE INSTALLED ATELEVATIONS IN ABOVEGROUND CONDUIT.2.SUPPORT EXPOSED CONDUIT ON MAXIMUM SIX (6) FOOT CENTERS ANDWITHIN TWO (2) FEET OF ANY CONNECTION POINT. CONDUIT AND FITTINGSMAY BE SUPPORTED FROM MACHINERY SUPPORTING STRUCTURESADEQUATE FOR ADDITIONAL WEIGHT. CONDUIT AND FITTINGS SHALL NOTBE CLAMPED OR WELDED OR BOLTED TO VESSELS FOR MACHINERYEXCEPT AS SPECIFICALLY PERMITTED BY CLEAN ENERGY OR AS SHOWNON THE DRAWINGS.3.FACTORY 90 DEGREE CONDUIT BENDS SHALL BE USED FOR CONDUIT SIZED1-1/2 INCHES AND ABOVE. RADIUS OF FIELD BENDS SHALL NOT BE LESSTHAN 10 TIMES DIAMETER OF CONDUIT. CONDUIT BENDS AND OFFSETSSHALL BE AVOIDED WHERE POSSIBLE. CONDUIT FLATTENED OR WRINKLEDDURING BENDING SHALL NOT BE USED.4.ENDS OF ALL METAL CONDUITS TERMINATING IN PANEL BOARDS ANDSWITCHBOARDS SHALL BE PROVIDED WITH INSULATED GROUNDINGBUSHINGS. BOND INSULATED GROUNDING BUSHINGS TO EQUIPMENTGROUND USING #6 AWG BCW.5.INSTALL LIQUID-TIGHT FLEXIBLE METALLIC CONDUIT BETWEEN RIGIDCONDUIT AND MOTORS, VIBRATING EQUIPMENT, MOVABLE EQUIPMENT,AND INSTRUMENTS. MINIMUM ONE (1) FOOT AND MAXIMUM THREE (3) FEETIN LENGTH.6.INSTALL CONDUIT SEALS WHERE REQUIRED. POUR SEALS WITH THE SEALMANUFACTURER'S SPECIFIED COMPOUND AFTER SYSTEMS AREFUNCTIONAL AND HAVE BEEN ACCEPTED BY CLEAN ENERGY AND THEJURISDICTION. SEAL FITTING PLUGS SHALL NOT BE INSTALLED FOR 24HOURS AFTER POURING SEALING COMPOUND.7.OPEN ENDS OF CONDUITS SHALL BE CAREFULLY PLUGGED DURINGCONSTRUCTION TO PREVENT THE ENTRANCE OF FOREIGN MATERIALS.AFTER CONDUITS ARE INSTALLED, PULL A MANDREL THROUGH EACHCONDUIT TO CLEAR THE CONDUIT OF DEBRIS. FOLLOW THE MANDREL WITHWIRE BRUSHES AND SWABS TO COMPLETELY CLEAN THE CONDUIT.IMMEDIATELY AFTER A CONDUIT IS CLEANED, PLUG OR CAP THE RUN.INSTALL PULL STRINGS IN ALL SPARE CONDUITS, 3/16" NYLON MIN.8.COVERED OPENINGS ON CONDUIT FITTINGS SHALL NOT BE BLOCKED BYSTRUCTURAL STEEL OR PIPE WHICH WOULD NECESSITATE DISASSEMBLYOF PIPE, OR OTHER EXTREME MEASURES, FOR ACCESS TO THE INTERIOROF FITTINGS FOR FUTURE WIRE REPLACEMENT AND PULLING.9.ON MASONRY AND CONCRETE STRUCTURES, CONDUITS SHALL BEATTACHED WITH ONE-HOLE PIPE STRAPS AND CLAMP-BACKS USINGSCREW ANCHORS OR EXPANSION BOLTS.10.EXPOSED CONDUIT SHALL BE INSTALLED PARALLEL TO STRUCTURALMEMBERS AND SURFACES.11.TWO OR MORE CONDUITS IN THE SAME GENERAL ROUTING SHALL BEPARALLEL WITH SYMMETRICAL BENDS.12.CONDUITS SHALL BE INSTALLED AT LEAST 6 INCHES FROM HIGHTEMPERATURE PIPING, DUCTS, AND FLUES.13.CONDUIT CONNECTIONS TO SHEET METAL ENCLOSURES SHALL BESECURELY FASTENED BY LOCKNUTS INSIDE AND OUTSIDE.14.CONDUITS SHALL BE INSTALLED BETWEEN THE REINFORCING STEEL INWALLS OR SLABS WHICH HAVE REINFORCEMENT IN BOTH FACES. IN SLABSWHICH HAVE ONLY A SINGLE LAYER OF REINFORCING STEEL, CONDUITSSHALL BE CLEAR OF THE STEEL AND THE CONCRETE SURFACE.15.UPON COMPLETION, ENSURE THAT EQUIPMENT IS CLEAN; STRUCTURALELEMENTS ARE COMPLETE AND TIGHT; ARE PROPERLY HARNESSED,SECURED, AND IDENTIFIED; CONDUITS ARE BUSHED, TAGGED, ANDSUPPORTED; SEALS ARE IN PLACE; GROUND WIRES ARE PROVIDED ANDCONNECTED; TAGS, LABEL PLATES, AND INSTRUCTION PLATES AREATTACHED AND SECURE.c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E0.0 ELECTRICAL NOTES CA.dwg12/05/20248/7/2025 11:58:07 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 ELECTRICAL NOTES 21330.00PBMLE0.0F.CABLE AND WIRE TERMINATIONS1.ALL POWER CABLE SHALL BE TERMINATED WITH COMPRESSION LUGS ORMECHANICAL LUGS .2.CONTROL, ALARM AND SIGNAL WIRE SHALL BE TERMINATED WITHCOMPRESSION SPADES OR RING LUGS WHERE SCREW TERMINALS AREPROVIDED. SOLDER CONNECTIONS ARE NOT ALLOWED.3.CABLES AND CONDUCTORS SHALL BE CONTINUOUS BETWEEN TERMINALS,AND NOT JOINED BY SPLICES OR WIRE NUTS, EXCEPT AS NECESSARY TOCONNECT TWO OR MORE WIRING BRANCHES TOGETHER IN A JUNCTIONBOX.4.IN CLASS I, DIVISION 2 LOCATIONS, ALL WIRING METHODS PERMITTED IN501.10(A) AND THE FOLLOWING WIRING METHODS SHALL BE PERMITTED:(1) RIGID METAL CONDUIT (RMC) AND INTERMEDIATE METAL CONDUIT(IMC) WITH LISTED THREADLESS FITTINGS.(2) ENCLOSED GASKETED BUSWAYS AND ENCLOSED GASKETED WIREWAYS.(3) TYPE PLTC AND TYPE PLTC-ER CABLE IN ACCORDANCE WITH THEPROVISIONS OF ARTICLE 725, INCLUDING INSTALLATION IN CABLE TRAYSYSTEMS. THE CABLE SHALL BE TERMINATED WITH LISTED FITTINGS.G.ENCLOSURES1.ENCLOSURES FOR EQUIPMENT AND DEVICES SHALL BE UL LISTED, NEMA3R OR NEMA4 IN NON-HAZARDOUS AREAS, AND NEMA 7 IN CLASS 1 , DIV 1 OR DIV 2 AREAS.2.ENCLOSURES IN NON-HAZARDOUS AREAS SHALL BE PROVIDED WITH WATER TIGHT CONDUIT HUBS ON TOP- AND VERTICAL SURFACES.GASKETS AND O-RINGS SHALL BE INSTALLED AS INSTRUCTED BYMANUFACTURER, TO MAINTAIN WEATHER TIGHTNESS.3.PULL BOXES AND JUNCTION BOXES SHALL BE UL LISTED FOR NEMA 3R INNON-HAZARDOUS AREAS, AND NEMA 7 IN CLASS 1, DIV 1 EXTERIOR AREAS.ALL PULL BOXES INSTALLED WHEREVER TRAFFIC MIGHT COME INCONTACT SHALL BE TRAFFIC RATED. ALL IN-GROUND PULL BOXES SHALLBE EQUIPPED WITH LOCK DOWN DEVICES.H.EQUIPMENT MOUNTING1. EQUIPMENT SHALL BE SECURED WITH CORROSION-PROOF BOLTS,STRAPS, HANGERS, AND SUCH OTHER HARDWARE AND DEVICES AS ARENECESSARY OR APPROPRIATE.I.SPECIALTY EQUIPMENT1. ESD PUSH BUTTONS: BUTTONS SHALL BE MAINTAINED PUSH-PULL TYPEWITH LARGE, RED, MUSHROOM HEAD PUSH BUTTON THAT IS NORMALLYCLOSED. ESD BUTTONS SHALL BE LISTED FOR GROUP D, CLASS 1,DIVISION 2 HAZARDOUS AREAS. DO NOT INSTALL ESD BUTTONS IN CLASS1,DIVISION 1 HAZARDOUS AREAS.2. EMERGENCY PHONE: FURNISH EMERGENCY TELEPHONE(S) IF SHOWN INTHE DRAWINGS. FURNISH STANDARD INDUSTRIAL DIAL-OUT PHONE WITHWEATHER PROOF ENCLOSURE FOR OUTDOOR USE. CEE CO EMERGENCYTELEPHONE, PART NO. WPP-331-D-R.4.4 INSTALLATION REQUIREMENTSA.GENERAL1.INSTALL THE SWITCHBOARD ON THE FOUNDATIONS AS INDICATED BYTHESE DRAWINGS. INSTALL CONDUITS, WIRE, LIGHTING FIXTURES,GROUND GRID, ETC., AS SHOWN ON THE DRAWINGS.B.GROUNDING1.ALL EQUIPMENT GROUNDS SHOULD BE THROUGH SLAB, HIDDEN WHEREPOSSIBLE AND PROTECTED BY PVC CONDUIT.2.GROUNDING SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH NECARTICLE 250, PART III. SYSTEM GROUND SHALL CONSIST OF 4/0 BARE COPPER STRANDED WIRE GROUND RING 30" BELOW GRADE, ENCIRCLINGTHE EQUIPMENT COMPOUND WITH INTERCONNECTING RUNS BETWEENMAJOR EQUIPMENT COMPONENTS. ALL WIRE TO WIRE CONNECTIONSSHALL BE MADE USING BURNDY "HYGROUND" IRREVERSIBLECOMPRESSION FITTINGS. A MINIMUM OF TWO GROUND RODS SHALL BECONNECTED TO THE SYSTEM AT OPPOSITE SIDES OF THE EQUIPMENTAREA. ADDITIONAL GROUND RODS TO BE INSTALLED AS NECESSARY.GROUND RING TO BE EXTENDED TO FUELING AREAS AND OTHEREQUIPMENT AREAS REMOTE FROM EQUIPMENT COMPOUND, WITHGROUND RODS INSTALLED PER CLEAN ENERGY SPECIFICATIONS.3.AFTER THE GROUNDING SYSTEM HAS BEEN INSTALLED, CONTRACTOR SHALL PERFORM THE FOLLOWING TEST BEFORE ANY GROUND RODS ARECOVERED:A FALL-OF-POTENTIAL TEST METHOD SHALL BE PERFORMED BY A NETACERTIFIED TESTING AGENCY TO ENSURE THE GROUNDING ELECTRODESYSTEM DOES NOT EXCEED 25 OHMS PER NEC ARTICLE 250.C.CONNECTIONS AND CONTROLS1.THE CONTRACTOR SHALL WIRE ALL CONTROL DEVICES FURNISHED BYOTHERS IN ACCORDANCE WITH SCHEMATIC AND WIRING DIAGRAMS FURNISHED WITH THE EQUIPMENT, THIS SPECIFICATION, AND THE CONSTRUCTION DRAWINGS. D.IDENTIFICATION AND LABELING1.INSTALL NON-CORRODING METAL-STRIP CONDUIT TAGS WITH EMBOSSEDCONDUIT NUMBERS AT END POINTS OF ALL CONDUITS, AND AT PENETRATIONS INTO SLABS, GROUND, AND THE EQUIPMENT, ATTACHEDWITH DOUBLE METAL BANDS.2.IDENTIFY EACH CONDUCTOR USING BRADY-TAGS PROTECTED BYHEAT-SHRINKABLE SLEEVES. CONDUCTORS SHALL BE MARKEDWHEREVER THEY TERMINATE IN AN EQUIPMENT ENCLOSURE, AND SHALLBE MARKED WITH THE TERMINAL ID NO. PROVIDED IN THE EQUIPMENTMANUFACTURER'S SHOP DRAWING(S).3.IDENTIFY EACH ITEM OF ELECTRICAL EQUIPMENT WITH A 1 INCH X 2.5 INCHENGRAVED NAMEPLATE. THE LETTERING SHALL BE 316 INCH HIGH, WITHBLACK TEXT ON A WHITE BACKGROUND.4.ALL SPARE CONDUCTORS SHALL BE TAPED AT EACH END AND IDENTIFIED AS SPARE.5.THE INSULATION OF A SINGLE-CONDUCTOR WIRE SHALL BE COLORED ASFOLLOWS:120/208 VOLT CIRCUITSWIRE COLORNEUTRALWHITEPHASE A BLACKPHASE BREDPHASE CBLUEGROUNDGREENFOR LARGE CONDUCTORS AVAILABLE ONLY WITH BLACK INSULATION,APPLY SUITABLY COLORED ELECTRICAL TAPE NEAR TERMINATIONS.E.TESTING AND DEFICIENCIES1.WHEN DEFICIENCIES ARE FOUND, THE DEFICIENCY SHALL BE CORRECTEDAND THE TEST RE-RUN. THIS PROCEDURE SHALL BE REPEATED UNTIL THEDEFICIENCY IS CLEARED. TESTS SHALL BE PERFORMED BY QUALIFIED ANDEXPERIENCED PERSONS.2.ALL INSTALLATIONS AND WIRING SHALL BE THOROUGHLY TESTED TODETERMINE PROPER POLARITY, PHASING, FREEDOM FROM SHORTCIRCUITS, FOR CONTINUITY AND OPERATION OF CONTRACTOR SUPPLIEDEQUIPMENT, RELAYS, INSTRUMENTS, ETC. THE CONTRACTOR SHALLOPERATE ALL CIRCUIT BREAKERS, HAND SWITCHES AND PUSH BUTTONSBY HAND TO DEMONSTRATE PROPER MECHANICAL FUNCTION.3.COMPLETE TEST AND INSPECTION RECORDS SHALL BE MADE BY THE THECONTRACTOR AND INCORPORATED INTO A REPORT, WHICH SHALL BEGIVEN TO THE CLEAN ENERGY. ALL READINGS TAKEN SHALL BERECORDED.4. ALL TESTS SHALL BE PERFORMED IN THE PRESENCE OF CLEAN ENERGY'SPROJECT MANAGER OR REPRESENTATIVE UNLESS INSTRUCTEDOTHERWISE.6. AUTHORIZATION MUST BE OBTAINED FROM CLEAN ENERGY BEFORE ANYWORK IS DONE ON AN ENERGIZED CIRCUIT. THERE SHALL BE NOINTERRUPTION OF ENERGIZED CIRCUITS WITHOUT PRIOR AUTHORIZATION.7. ALL CABLES AND EQUIPMENT INDICATED FOR 480V SERVICE, INCLUDINGMOTORS AND TRANSFORMERS, SHALL BE TESTED FOR GROUND ANDSHORTS BY MEANS OF A MEGGER INSULATION TESTING INSTRUMENT,WHICH SHALL IMPRESS A VOLTAGE OF NOT LESS THAN 500 VOLTS UPONTHE CIRCUIT UNDER TEST.8. WHERE TESTS INDICATE THAT INSULATION WAS DAMAGED BY HANDLING OR DURING INSTALLATION, NEW CABLE SHALL BE INSTALLED AT THETHE CONTRACTOR'S EXPENSE.9.ALL ABOVE GRADE CONNECTIONS SHALL BE ACCESSIBLE FOR INSPECTIONAND TESTING. INTERLOCKING CONTROL AND INSTRUMENTATION WIRINGFOR EACH SYSTEM AND/OR PART OF A SYSTEM SHALL BE CAREFULLYCHECKED TO ASCERTAIN THAT THE SYSTEM WILL FUNCTION PROPERLY ASINDICATED BY THE WIRING DIAGRAMS, SCHEMATIC DIAGRAMS, DESCRIPTION OF OPERATION, ETC.10.CLEAN ENERGY PERSONNEL SHALL SET CIRCUIT BREAKERS AND RELAYSPROPERLY COORDINATED SO THAT EQUIPMENT WILL BE IN PROPER OPERATING CONDITION BEFORE BEING PLACED IN SERVICE.11.UPON COMPLETION OF PRELIMINARY CHECKS, ALL EQUIPMENT SHALL BETESTED FOR SATISFACTORY OPERATION. CLEAN ENERGY PERSONNELSHALL START EQUIPMENT AS DIRECTED BY CLEAN ENERGY'S PROJECTMANAGER OR OTHER AUTHORIZED REPRESENTATIVE.F.ENCLOSURES AND SUPPORTS1.SUPPORTS AND ENCLOSURES SHALL BE PROVIDED FOR ALL CONTRACTORFURNISHED EQUIPMENT.2.BOLT ELECTRICAL EQUIPMENT TO RACKS, PLATES WELDED TO RACKS,PLATES WELDED OR BOLTED TO OTHER STRUCTURES, BUILDINGS, ORWHERE PERMITTED, TO EQUIPMENT. DO NOT WELD TO ELECTRICALEQUIPMENT. PROVIDE BACKING PLATES WHERE EQUIPMENT IS ATTACHEDTO METAL THAT IS LESS THAN 1/8" INCH THICK. CONDUIT BOXES UP TO 6INCHES SQUARE MAY BE SUPPORTED IN CONDUIT RUNS WITHOUTADDITIONAL SUPPORT; HOWEVER, BOXES ON FREE-STANDING STUB-UPSSHALL BE PROVIDED WITH EXTRA SUPPORT.3.SUPPLEMENTARY SUPPORTS, CLIPS, AND BRACKETS SHALL BECONSTRUCTED FROM STANDARD ROLLED STEEL SHAPES, HOT DIPPEDGALVANIZED AFTER FABRICATION. ANGLES, PLATES, CHANNELS,UNI-STRUT, POWER STRUT OR RODS MAY BE USED FOR THIS PURPOSE.WELDING TO A GALVANIZED STRUCTURE SHALL NOT BE PERMITTED. USECORROSION-PROOF BOLTS, STRAPS, ETC.4.RACKS SHALL BE STRUCTURAL SHAPES WELDED OR BOLTED TOGETHERAND SUPPORTED FROM OTHER STRUCTURES, OR INDEPENDENTLYSUPPORTED BY CONCRETE FOUNDATIONS.G.UNDERGROUND CONDUIT INSTALLATION1.MINIMUM BURIAL DEPTH FOR UNDERGROUND CONDUIT SHALL BE 24INCHES BELOW TOP OF FINISHED GRADE. WHERE POWER CONDUIT ISINSTALLED IN THE SAME TRENCH AS GAS PIPE, INSTALL GAS PIPE AT LEAST6" ABOVE THE CLOSEST POWER CONDUIT. ALL UNDERGROUND CONDUITRUNS MUST BE CLEAR OF CROSSING PIPES OR STRUCTURES BY AT LEAST6 INCHES; THUS, MINIMUM DEPTHS GREATER THAN 24 INCHES MAY BENEEDED FOR ADEQUATE SEPARATION FROM OTHER UNDERGROUNDSTRUCTURES .2.CONDUITS PLACED UNDERGROUND SHALL BE RUN AS SHOWN ONDRAWINGS AND SUPPORTED A MINIMUM OF EVERY 10 FEET, USINGFABRICATED DUCT SPACERS, TO PREVENT SAGGING WHILE WAITING FORENCASEMENT OR BACKFILL. CONDUITS RUN IN MULTIPLE SHALL BESEPARATED AT LEAST 2 INCHES CLEAR. THEY SHALL BE SEPARATEDEVENLY THROUGHOUT THE RUN, EXCEPT WHERE IT IS NECESSARY TO FANOUT AT RISERS AND TRANSITIONS. CHANGE OF HORIZONTAL DIRECTIONSOF CONDUIT RUNS SHALL BE MADE IN LONG, GENTLE SWEEPS. INSTALLSPARE CONDUITS AS SHOWN ON DRAWINGS. BACKFILL AND TRENCHINGSHALL BE CONSISTENT WITH THE PROVISIONS OF THIS SPECIFICATION.277/480 VOLT CIRCUITSWIRE COLORNEUTRALGRAYPHASE A BROWNPHASE B ORANGEPHASE C YELLOWGROUNDGREEN/YELLOWCONTROL CIRCUITSWIRE COLOR24VDC (+)ORANGE24VDC (-)YELLOW24VDC SIGNALBLUE120VAC SIGNALREDSPAREVIOLETREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PBPART 4 - ELECTRICAL4.1 GENERALA.ELECTRICAL EQUIPMENT, MATERIALS, WORKMANSHIP AND TESTING SHALLBE PROVIDED OR PERFORMED AS DESCRIBED HEREIN. WORK COVEREDBY THESE SPECIFICATIONS INCUDES THE FOLLOWING:1. INSTALLATION OF A NEW 480 VOLT SWITCHBOARD(S).2. INSTALLATION OF INSTRUMENTATION, CONDUIT AND WIRE AS SHOWN ON THE DRAWINGS.3. INSTALLATION OF EQUIPMENT GROUNDING SYSTEM AS SHOWN ON THE DRAWINGS.4. INSTALLATION OF POWER AND LIGHTING CONDUITS AND WIRE AS REQUIRED FOR THIS PROJECT.B.DRAWINGS: THE CONTRACTOR SHALL PROVIDE ALL ELECTRICAL EQUIPMENT AND INCIDENTALS, UNLESS NOTED OTHERWISE, AS NEEDEDTO COMPLETE THE WORK INDICATED IN THE SPECIFICATIONS AND DESIGNDRAWINGS. C.CODES1.MATERIALS, EQUIPMENT, AND INSTALLATION PROVIDED AND PERFORMEDUNDER THIS SECTION SHALL CONFORM TO THE LATEST REQUIREMENTS OFTHE FOLLOWING CODES:NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 70, NECNFPA 70E - STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE.NFPA 52 - VEHICULAR GASEOUS FUEL SYSTEM CODE.LOCAL CODES AND REGULATIONS.2.IN CASE OF DIFFERENCES AMONG BUILDING CODES, SPECIFICATIONS,STATE AND FEDERAL LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDSAND ELECTRICAL DEPARTMENT REGULATIONS AND THE CONTRACTDRAWINGS, THE MOST STRINGENT SHALL GOVERN. THE CONTRACTORSHALL PROMPTLY NOTIFY CLEAN ENERGY IN WRITING UPON DISCOVERYOF ANY SUCH DIFFERENCES.4.2.WORKMANSHIPA.ALL CABLES, CONDUITS, PIPING OR EQUIPMENT LOCATIONS AND ELEVATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL BERESPONSIBLE FOR FIELD CHECKING AND MAKING ALL NECESSARYOFFSETS, AS REQUIRED TO AVOID EXISTING INTERFERENCES AND TOCOORDINATE WITH OTHER TRADES.B.THE DRAWINGS OR SPECIFICATIONS ARE NOT INTENDED TO ALLOW A VIOLATION OF ELECTRICAL WORKING SPACE AROUND ELECTRICAL EQUIPMENT. A 30"W MIN x 48"D x 6'-6"H SPACE SHALL BE CLEAR TO THEFLOOR IN FRONT OF ALL ELECTRICAL PANELS, CONTROLS OR ITEMS THATREQUIRE MAINTENANCE OR ACCESS WHILE ENERGIZED. ANY DEVIATIONFROM THIS MINIMUM SHALL BE APPROVED IN WRITING BY THE ENGINEER.C.THE ELECTRICAL DESIGN IS BASED ON TYPICAL VENDOR EQUIPMENT. THECONTRACTOR SHALL COORDINATE EQUIPMENT INSTALLATION WITH THEACTUAL EQUIPMENT FURNISHED.D.THE CONTRACTOR SHALL PROVIDE ALL FUSES REQUIRED FOR PROJECTPOWER, INCLUDING ANY FUSES BLOWN DURING INITIAL TESTING.E.BONDING JUMPERS SHALL BE INSTALLED TO INSURE CONTINUITY WHERECONDUIT CONNECTIONS AT CONCENTRIC KNOCKOUTS ARE TO SERVE AS AGROUND.F.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ALL WALLS,FLOORS AND PAVING CAUSED BY CONTRACTOR. CONTRACTOR SHALLCOORDINATE WITH CLEAN ENERGY TO PATCH, PAINT AND REPAIR TOMATCH EXISTING CONDITIONS.G.NOTHING IN THESE DRAWINGS AND SPECIFICATIONS SHALL BECONSTRUED AS ALLOWING WORK THAT VIOLATES GOVERNING CODES.THIS SHALL NOT BE CONSTRUED AS RELIEVING THE CONTRACTOR FROMCOMPLYING WITH ANY REQUIREMENTS OF THE PLANS OR SPECIFICATIONSWHICH MAY COMPLY WITH, BUT EXCEED THOSE OF GOVERNING CODES.H.SHOULD ANY DEVIATIONS FROM WORK INDICATED ON THE DRAWINGS ORDESCRIBED IN SPECIFICATIONS BE NECESSARY IN ORDER TO MEETCONDITIONS AT THE SITE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFYTHE ENGINEER IN WRITING FOR APPROVAL OF THE DEVIATION REQUESTED.I.CONTRACTOR TO INSTALL 3M 2200 SCOTCH® VINYL MASTIC PAD MIL, 6-1/2"X 4-1/2", OR EQUIVALENT TO THE ENTIRE INSIDE OF EACH MOTOR HOUSINGCOVER TO PROTECT AGAINST AND PREVENT PREMATURE FAILURE DUE TOWIRE RUBBING.J.CONTRACTOR TO INSTALL APPROVED CONDUIT BUSHING IN EACH MOTORJUNCTION BOX SERVICE ENTRANCE, AND DRYER EXPLOSION PROOF BOXSERVICE ENTRANCE TO PROTECT WIRE FROM CUTS OR ABRASIONS. SERVICE CONDUITS PER UTILITY CO.C4003Ø, 4WMCB3800AF800AT3P, LSI65KAICMCC AUTILITY TRANSFORMERMAIN BREAKERMCB1800AF/800AT3P W/ LOCKING DEVICE65kAIC, LSIG (GFP)C410(FURNISHED BY OTHERS)KIRK KEYGENERATOR BREAKERTERMINALLUG BOXMAIN BREAKERKIRK KEYC401STANDBY GENERATOR SEQUENCE:UNDER NORMAL OPERATION THE GAS DRYER AND ALL OF THECOMPRESSORS ARE ENABLED TO OPERATE.IN THE EVENT UTILITY POWER IS LOST, A MOBILE GENERATOR CANBE BROUGHT IN AND THE OPERATOR WILL SWITCH OVER TO THEGENERATOR USING THE KIRK KEY INTERFACE. UNDERGENERATOR POWER, UP TO (2) COMPRESSORS, A GAS DRYER,AND AUXILIARY LOADS WILL BE ENABLED TO OPERATE. THEREMAINING EQUIPMENT WILL REMAIN OFF UNTIL NORMAL POWERIS RESTORED AND THE OPERATOR USES THE KIRK KEYINTERFACE TO MANUALLY RESTORE THE SYSTEM TO NORMALPOWER.LUG BOXMCB2800AF800AT3P, LSIG65KAICMOBILEGENERATORSHORT CIRCUIT AVAILABLE: TBDINTEGRATED MAIN SWITCHBOARD "MSB" NEMA 3R, 65KAIC PANEL FULLY RATEDXFMR480-208/120V3Ø, 30KVAZ=5.25% (ASSUMED)MCB17125AF50AT3P65KAICPANEL LA110A3P480/277VAC, 800A COPPER BUS, 3Ø, 4WPSB 21-6GAS DRYER(36.3 FLA)#2/0GNDC414PANEL "LA"SHEET NOTES:UTILITY COMPANY TRANSFORMER. CONTRACTOR TO PROVIDE REQUIRED SLAB BOX ANDALL ASSOCIATED UNDERGROUND CONDUITS AND GROUNDING PER UTILITY COMPANYCONSTRUCTION DOCUMENTS.LOCATION AND TYPE OF UTILITY METER TO BE COORDINATED WITH LOCAL UTILITYCOMPANY.ALL PROTECTIVE DEVICES ARE FULLY RATED.3/4"X10' GND RODMCB4225AF50AT3P,65KAICGASDRYERSOFTSTARTLOCKABLECB1C411SS1M1 W/BYPASS&O/LCOMPRESSOR SKID A SUPPLIED BY MFR (ANGI)800AF800AT3PCOMPRESSOR A1(240 FLA)200HPSOFTSTARTC412SS2M4 W/BYPASS&O/LCOMPRESSOR A2(240 FLA)200HP15KVA1Ø XFMR 'T1'480V-120VCB22660AT2PCB206300AT3PNEW DUAL MOTOR CONTROL CABINET "MCC A" NEMA 4,Δ480, SUPPLIED BY COMPRESSOR MANUFACTURER,ANGI.SCCR=65kAIC.CB210300AT3P100AF3P14AT5.1-27ADS342M2OL342COOLER FANMOTOR A1(14 FLA)10HP1-1.6AT1-1.6AMP348M3OL348PRELUBEMOTOR A1(1.1 FLA)0.5HP14AT5.1-27ADS442M5OL442COOLER FANMOTOR A2(14 FLA)10HP1-1.6AT1-1.6AMP448M6OL448PRELUBEMOTOR A2(1.1 FLA)0.5HPCB231100AT1P120VAC POWERCB23330AT1P120VAC UPS POWERJ-BOXC417#2/0 GROUNDINGCONDUCTOR, TYP.20A, 1P20A, 2PC210COMPOUNDLIGHTINGC100CONVENIENCERECEPTACLEPCCOMMUNICATIONPANEL20A, 1PC200c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E1-SINGLE LINE.dwg5/7/20258/7/2025 11:58:16 AM2025/08/07USA HAULING & RECYCLING600 NUTMEG ROAD NORTHSOUTH WINDSOR, CT 06074SINGLE LINE DIAGRAM21330.00PBMLE1.0REDUCED PLANCAUTION: THIS DRAWING MAY BE REDUCED24' IN ORIGINAL DRAWINGREVISIONS DATEREVBYCNG FUELING STATIONCKnow what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTSTHESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGSAND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THEUSE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANYUNAUTHORIZED USE, REPRODUCTION, PUBLICATION, DISTRIBUTION OR SALE IN WHOLE OR IN PART, IS STRICTLY FORBIDDEN.4675 MAC ARTHUR COURT, STE. 800 | NEWPORT BEACH, CA 92660TEL:(949) 437-1000 | FAX: (949) 724-1397 | WWW.CLEANENERGYFUELS.COMISSUED FOR PERMIT 5/7/20250PBISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251PB MCC A480VAC3 PHASEDISTRIBUTIONGAS DRYER480V PANELDRYERCONTROL PANELMCC AXFMR "T1"120VACMCC A120/24VCONTROLSUPSMSBA1FAN MOTORA1A1PRELUBEMOTORA1OILHEATERCONTROLPANEL(CCP1)COMPRESSORSKID JBOX(J21)COMPRESSORDUAL COMPRESSORSKID A(P21)FAN MOTORA2A2PRELUBEMOTORA2BUFFERPRIORITYPANELCONTROLPANELCOMPRESSORCP400 REMOTEMONITORING PANELA2C412 - MAIN MOTOR COMPRESSOR #2C110 - 120V POWER / ESDC111 - 120V RUNNING SIGNALSESD ESD ESD #1ESD #2C101OILHEATERC411 - MAIN MOTOR COMPRESSOR #1C413 - 480V FANS/ PRELUBE MOTORSC113 - 120V OIL HEATERCM110 - 24VDC RUNNING SIGNALSC115 - 120V POWER / ESDCM111 - PROFINET COMM.C40 - 120V POWERCM115 - PROFINET COMM.CM50C50 - ESDC414 - 480V POWERSEAL-OFF,TYP.208/120VAC PANEL LAXFMR C410MCC AMSBC410C210 COMPOUND LIGHTSC100 RECEPTACLEESD ESD #6CM80 CM51UTILITYSERVICETRANSFORMERLUGBOXC401MOBILEGENERATORC400UTILITYPOWERMSA-DRYER SPOOLPIECEC80 COMMUNICATIONPANELC200 - 120V POWERCM200 - CAT6 COMM.c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E2-CONDUIT SCHEDULE.dwg5/7/20258/7/2025 11:58:25 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 CONDUIT SCHEDULE 21330.00PBMLE2.0REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB MC400C401C210C40C115CM15C414CM110C50CM111C110C111CM80C411C412C411C113EXISTING LIGHTPOLEE-5.08ESD #3ESD #4ESD #5ESD #6EXISTING LIGHTPOLEEXISTING LIGHTPOLESEE FUELING AREA LAYOUT FOR FIELD ESDBUTTON CONDUIT C101 CONTINUATION.U.G. TO A.G. TRANSITION OF FIELDESD BUTTON CONDUIT C101 RUNALONG TOP OF TIME-FILL K-RAILC101C101CM50CM51CM5160'TYPICALSPACING FROMEACH ESD POST60'60'6'-10"C80CM80C410C200CM200MC400GAS DRYERSTORAGE VESSELSESD #1MCC A MSB PANEL LA ANGI NG300E DUAL 200HPCOMPRESSOR SKID ACOMPOUNDLIGHTPOLECP-400UTILITY XFMRLUGBOX MSAESD #2C401C210C40C115CM15PRIORITYPANELC414CM110C50CM111C110C111CM80C411C412C411C113E-5.08SEE FUELING AREA LAYOUT FOR FIELD ESDBUTTON CONDUIT C101 CONTINUATION.C101CM50CM51CM51C80CM80UGPSMETERDISTR.C410COMMUNICATIONPANELC200CM200REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E3-ELECTRICAL PLAN.dwg08/07/20258/7/2025 11:58:39 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 ELECTRICAL PLAN 21330.00PBMLE3.0FUELING AREA LAYOUT (1" = 20')WSNE02040601" = 20'10ENLARGED COMPOUND LAYOUT, (1" = 4')W S N EELECTRICAL NOTES1.PROVIDE PIGTAILS PER E-1.0 FOR ALL EQUIPMENT GROUNDING. CONNECT ALL PIGTAILS TOMAIN GROUND BUS.2.ALL BURIED GROUND CONNECTIONS SHALL BE MADE WITH COMPRESSION FITTINGS PERE-5.0, OR CADWELDED3.HOME RUN ROUTING TO BE DETERMINED IN THE FIELD.4.SEE TYPICAL GROUND WELL DETAIL ON SHEET E-5.0, OR CADWELDED.5.POLE RISER AND UTILITY TRANSFORMER GROUNDING SHALL BE DONE BY THE UTILITYCOMPANY.6.ALL ELECTRICAL WIRING SHALL CONFORM TO NEC SECTION 501.10(A) FOR CLASS 1 DIVISION 1AREAS AND SECTION 501.10(B) FOR CLASS 1 DIVISION 2 AREAS.7.CONTRACTOR SHALL PROVIDE CONDUIT SEALS FOR ALL ELECTRICAL INSTALLATIONS WITHINTHE CLASSIFIED AREAS AS REQUIRED BY CHAPTER 500 OF THE NEC FOR CLASSIFIED AREAS.REFER TO SHEET E2.0 FOR LOCATIONS OF ALL CONDUIT SEAL OFFS.8.REFER TO NFPA 52 TABLE 8.4.2.0 AND NEC ARTICLE 514 FOR EXTENT OF CLASSIFIED AREA(S)FOR PROPOSED CNG AS WELL AS EXISTING LIQUID AND PROPANE FUELS (IF ANY).9.CLASSIFIED AREA(S) IN PLAN VIEW ARE SHOWN HATCHED. AREA(S) EXTENDING OVER TOP OFUNPIERCED WALL(S) SHOWN AS DASHED LINE.10.COMPRESSOR SKID WITH EMERGENCY SHUTDOWN (ESD) PUSH BUTTON IS FACTORYINSTALLED.11.COORDINATE PHONE SERVICE REQUIREMENTS WITH OWNER.12.COORDINATE EQUIPMENT INSTALLATION AND CONDUIT ROUTING WITH OTHER WORK.13.CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND PIPINGAND CONDUITS PRIOR TO START OF EXCAVATION.14.COORDINATE ROUTING AND INSTALLATION OF ELECTRIC SERVICE WITH LOCAL UTILITY.15.EQUIPMENT DIMENSIONS AND TIE-IN POINTS ARE APPROXIMATE. COORDINATE INSTALLATIONIN THE FIELD BASED UPON ACTUAL EQUIPMENT AND EQUIPMENT INSTALLATION MANUALSPROVIDED.16.EMERGENCY SHUTDOWN (ESD) PUSH BUTTONS SHALL BE LOCATED WITHIN75 FEET AND NOT LESS THAN 25 FEET FROM DISPENSING AREAS FOR TIMEFILL APPLICATIONS. (IFC 2308.7)17.EMERGENCY SHUTDOWN (ESD) PUSH BUTTONS SHALL BE LOCATED WITHIN10 FEET AND ALSO GREATER THAN 25-FEET FROM DISPENSING AREAS FORFAST FILL APPLICATIONS. (NFPA 11.3.2.12.11)18.UNDERGROUND CONDUIT SHALL BE BURIED NOT LESS THAN 24-INCHESBELOW GRADE. MAINTAIN 3 FT MINIMUM HORIZONTAL CLEARANCE BETWEENINCOMING UNDERGROUND UTILITIES (GAS OR ELECTRIC) AND OTHER PIPINGOR CONDUITS RUNNING PARALLEL TO THEM AND 1FT MINIMUM VERTICALCLEARANCE WHERE CROSSING.19.REFER TO CONDUIT SCHEDULE AND SINGLE LINE DIAGRAM FOR CONDUITAND CONDUCTOR SIZING AND TYPES. ALL NEW CONDUCTORS SHALL BETYPE THWN-2, UNLESS NOTED OTHERWISE.20.ALL CONDUIT RUNS SHOWN ARE SCHEMATIC.DENOTES CONDUITSLISTED ON SHEET E-2.0CXXXELECTRICAL LEGEND MGAS DRYERSTORAGE VESSELSESD #1MCC A MSB PANEL LA ANGI NG300E DUAL 200HPCOMPRESSOR SKID ACOMPOUNDLIGHTPOLECP-400UTILITY XFMRLUGBOX MSAESD #2PRIORITYPANELEXISTING LIGHTPOLEESD #3ESD #4ESD #5ESD #6EXISTING LIGHTPOLEEXISTING LIGHTPOLE#4/0 BC GROUND GRID EXTENDEDTO TIMEFILL ROW. SEE FUELINGAREA LAYOUT FOR CONTINUATION.#4/0 BC GROUND GRIDCONDUCTOR, TYP.E5.04#2/0 BC EQUIPMENTGROUNDING CONDUCTOR, TYP.E5.05E5.03E5.06#4/0 BC GROUND GRIDEXTENDED ALONG TOP OFTIME-FILL FUELING K-RAIL#2/0 BC EQUIPMENT GROUNDCONDUCTOR WHIP CONNECTED TOBASE OF EACH (N) FUEL POST.UGPSMETERDISTR.COMMUNICATIONPANELMGAS DRYERSTORAGE VESSELSESD #1MCC A MSB PANEL LA ANGI NG300E DUAL 200HPCOMPRESSOR SKID ACOMPOUNDLIGHTPOLECP-400UTILITY XFMRLUGBOX MSAESD #2PRIORITYPANEL#4/0 BC GROUND GRID EXTENDEDTO TIMEFILL ROW. SEE FUELINGAREA LAYOUT FOR CONTINUATION.#4/0 BC GROUND GRIDCONDUCTOR, TYP.E5.04#2/0 BC EQUIPMENTGROUNDING CONDUCTOR, TYP.E5.05E5.03E5.06UGPSMETERDISTR.COMMUNICATIONPANELREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E3-ELECTRICAL PLAN.dwg08/07/20258/7/2025 11:58:44 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 GROUNDING PLAN 21330.00PBMLE3.1FUELING AREA LAYOUT (1" = 20')02040601" = 20'10ENLARGED COMPOUND LAYOUT, (1" = 4')W S N E W S N E GROUNDING NOTES1. FOR ELECTRICAL ABBREVIATIONS, LEGEND, NOTES & SPECIFICATIONS, SEE DRAWING CS-0AND E-0.0.2. CONDUIT ROUTING IS A SCHEMATIC ONLY AND IS NOT INTENDED TO SHOW EXACTEQUIPMENT LOCATION OR CONDUIT ROUTING. THE ELECTRICAL CONTRACTOR SHALLDETERMINE, IN THE FIELD, THE BEST ROUTING TO AVOID ANY INTERFERENCE WITHEXISTING UNDERGROUND UTILITIES, EXISTING ABOVEGROUND STRUCTURES OR OTHEREQUIPMENT.3.THE ELECTRICAL CONTRACTOR SHALL FOLLOW EQUIPMENT MANUFACTURER'SRECOMMENDATIONS FOR INSTALLATION AND TERMINATION OF CONDUIT AND WIRING.4. GROUND CONNECTIONS AT MAIN GROUND LOOP SHALL BE MADE USING BURNDY"HYGROUND" IRREVERSIBLE COMPRESSION FITTINGS, OR CADWELDED. THE NEW GROUNDLOOP CABLE SHALL BE CONTINUOUS.5. GROUNDING CABLE SHALL BE INSTALLED WITHOUT SHARP BENDS OR KINKS, AND WHEREBENDS OR LOOPS ARE REQUIRED, THEY SHALL BE MADE WITH AS LARGE A RADIUS ASPOSSIBLE.6. ALL CONNECTIONS TO BE GROUNDED, CONNECTED OR BONDED MUST BE MADE TO CLEANAND BRIGHT METAL SURFACES.7. ELECTRICAL CONTRACTOR SHALL VERIFY GROUND CONNECTION POINTS ON COMPRESSORAND DRYER SKIDS.8. UNDERGROUND GROUND WIRE SHALL BE A MINIMUM OF 30 INCHES BELOW FINISHEDGRADE.9. GROUNDING SHALL BE PERFORMED AS SPECIFIED PER NEC, ARTICLE 250.10. GROUND WIRES THRU CONCRETE SHALL HAVE A SLEEVE THAT EXTENDS 4" ABOVE GRADE.THE SLEEVES SHALL BE SCHEDULE 40 PVC PIPE FILLED WITH GE RTV SILICONE, AFTERGROUND WIRE HAS BEEN INSTALLED.11.#4/0 BARE COPPER GROUND RING WIRE SHALL BE BURIED AT A DEPTH THE EARTH'SSURFACE OF NOT LESS THAN 30" WITH POWER CONDUITS AND CONTROL CONDUITS.12.USE COUPLING AND DRIVING STUD TO DRIVE GROUND ROD TO AVOID MUSHROOMING.13.BOND TOGETHER ALL CONDUIT STUB-UPS IN SAME LOCATION AND CONNECT TO MAINGROUND CABLE.14.THE NEW GROUNDING SYSTEM SHALL BE TESTED TO SHOW A RESISTANCE TOGROUND OF NO MORE THAN 25 OHMS. GROUND TESTS CALLED FOR IN THIS NOTESHALL BE CARRIED OUT USING A "DEDICATED GROUND TESTER". 15.REMOVABLE GUARD POSTS HAVE SUBSTANTIAL CONCRETE FOOTING. ELECTRICALCONTRACTOR SHALL COORDINATE LOCATION OF GROUND LOOP TO AVOID THESEFOOTINGS.16.EACH CNG STORAGE VESSEL SHALL BE GROUNDED.17.ALL CONDUITS IN PULL BOXES SHALL BE BONDED TOGETHER AND CONNECTED TOTHE MAIN GROUND LOOP WITH #2/0 AWG COPPER WIRE. MEXISTING LIGHTPOLEESD #3ESD #4ESD #5ESD #6EXISTING LIGHTPOLEEXISTING LIGHTPOLER 15', 0"FROM COMPRESSOR SKIDR 15', 0" WITHIN 15° OF LINEOF DISCHARGE FROM VENTSTACK OPENINGR' 5', 0" AROUND DISCHARGE OF VENT STACKOPENING AND VERTICALLY R 15', 0" WITHIN 15° OFLINE OF DISCHARGE FROM VENT STACK OPENINGR 15', 0"FROM DRYER SKIDR 10', 0"FROM STORAGE VESSELSR' 5', 0" AROUND DISCHARGE OF VENTSTACK OPENING AND VERTICALLYR 15', 0" WITHIN 15° OF LINE OFDISCHARGE FROM VENT STACK OPENINGR 5', 0", FROM FUEL POSTSMGAS DRYERSTORAGE VESSELSESD #1MCC A MSB PANEL LA ANGI NG300E DUAL 200HPCOMPRESSOR SKID ACOMPOUNDLIGHTPOLECP-400UTILITY XFMRLUGBOX MSAESD #2PRIORITYPANELR 15', 0"FROM COMPRESSOR SKIDR 15', 0" WITHIN 15° OF LINEOF DISCHARGE FROM VENTSTACK OPENINGR' 5', 0" AROUND DISCHARGE OF VENT STACKOPENING AND VERTICALLY R 15', 0" WITHIN 15° OFLINE OF DISCHARGE FROM VENT STACK OPENINGR 15', 0"FROM DRYER SKIDR 10', 0"FROM STORAGE VESSELSR' 5', 0" AROUND DISCHARGE OF VENTSTACK OPENING AND VERTICALLYR 15', 0" WITHIN 15° OF LINE OFDISCHARGE FROM VENT STACK OPENINGUGPSMETERDISTR.COMMUNICATIONPANELREDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E3-ELECTRICAL PLAN.dwg08/07/20258/7/2025 11:58:50 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 HAZARDOUS AREA PLAN 21330.00PBMLE3.2FUELING AREA LAYOUT (1" = 20')02040601" = 20'10ENLARGED COMPOUND LAYOUT, (1" = 4')W S N E W S N ECLASS 1, DIV 2 SPACECLASS 1, DIV I SPACEELECTRICAL LEGEND MOTOR CONTROL CENTERLOCKWASHER, 1/2", SILICON BRONZENUT, HEX, 1/2"-13, SILICON BRONZELUG, #2/0 CABLE, COMPRESSION TYPEBOLT, 1/2"-13x1", SILICON BRONZEEQUIPMENT GROUND BUS DETAIL34122222ITEMQTYEQUIPMENT GROUNDDESCRIPTIONTO GROUND WELLOR SWITCHGEARN.T.S.1-CORNER POSTGRADE#4/0 GROUND LOOPPVC SLEEVE2 AWG BONDING JUMPERDESCRIPTIONCONNECTOR, GROUND, BURNDY, TYPE GAR OR EQUAL11ITEMQTYN.T.S.FENCE POST GROUNDINGPOSTFOUNDATION3-BACKFILLITEMN.T.S.DETAIL - GROUND WELLSECTIONAL GROUND ROD, 3/4"x10'-0", COPPER CLAD STEELCONCRETE BOX, 10"x17"x12" DEEPBOX COVER (CONCRETE), MARKED "GROUND"CONNECTOR, 3 #4/0 THRU 250KCMIL TO 3/4" ROD2---43QTY-1DESCRIPTIONGRAVEL10'-0" 6"MAIN GROUND CONDUCTOR SEEPLAN DRAWINGS FOR NUMBER &SIZE OF CONNECTIONSMAKE LOOP AS LARGE ASPOSSIBLE, AVOID SHARP BENDSDRIVING STUD & COUPLING(RE-USE FOR EACHINSTALLATION)SAND FILL (DONOT COVERCONNECTOR)GRADE ORPAVEMENT4-CONNECTOR, GROUND, BURNDY, FOR COPPER BRAID, BURNDY TYPE GG13BRAID, COPPER, FLEXIBLE, BURNDY TYPE B12"2FENCE POSTGATEGATE POSTGRADE#4/0 GROUND LOOP2 AWG BONDING JUMPERDESCRIPTIONCONNECTOR, GROUND, BURNDY, TYPE GAR OR EQUAL11ITEMQTYN.T.S.GATE POSTPVC SLEEVEPOSTFOUNDATION5-N.T.S.EQUIPMENT FRAMELESS THAN 1/4"1/2"-13 NUTDRILL 9/16" DIAMETER HOLEEXTERNALINTERNALBARE #2-#2/0 COPPERGROUND CONDUCTORBURNDY SERVIT POSTCAT #KC26BOLTED EQUIPMENT GROUNDING6-GRADEHAZARDOUS AREACONDUIT SEAL AT STUBUPN.T.S.GALVANIZED RIGIDCONDUIT CONDUIT RISERFROM U/G PVC CONDUIT.CONNECTION TO HAVE 24"HORIZONTAL GALVANIZEDRIGID CONDUIT RUN.CONDUITSTUB-UP (TYP.)-10CONDUIT SEAL FITTING TO BEWITHIN 18" OF HAZARDOUS AREABOUNDARY.6"FRONT VIEWSIDE VIEWN.T.S.GROUNDING CONNECTION DETAILCABLE TO CABLECABLE TO FLANGEBURNDY TYPE YGLR-C GRIDLOKGROUND ROD TO GRID CONNECTION34" DIA. GROUND RODCABLE TO GROUND RODBURNDY TYPE YGHP-CHYTAP CONNECTORBURNDY TYPE YGIBGROUNDLINK CONNECTORELEMENT "B"ELEMENT "A"7-[102][134][92][90][44]POLYESTERENCLOSURENEMA 4 RATEDEMERGENCY STOPBUTTONFRONT COVERSCREWSALUMINUMENCLOSURENEMA 4 RATEDN.T.S.EMERGENCY STOP DEVICE (ESD)-8PRODUCT DETAILS:·OPERATOR IS TURN TO RELEASE ACTION MUSHROOM SWITCH. THE COLOR OF THE SWITCH IS REDWITH BLACK COLLAR.·OPERATOR CONTACTS HAVE 2 NC CONNECTIONS. CONTACTS ARE RATED CLASS 1 DIVISION 2GROUP BCD·THE ENCLOSURE IS ALUMINUM AND YELLOW IN COLOR3.531.735.263.624.00OPERATORCONTACTSHERMETICALLYSEALED 2 N.C.RATED FOR CLASS 1DIV. 2 GROUPS BCDESD POST ON JERSEY BARRIERSHUTDOWNNATURAL GASCOMPRESSEDEMERGENCYW:\Engine e r in g A u t oC AD F i le s \ 1 - CN G D e si g n \P l a n S he e t s\ WO R KI N G F OL DE R \ FI R E E XT I NG U IS HE R SI GN . j p g FINISHEDSURFACE10A:120B:C FIREEXTINGUISHERN.T.S.UNIVERSAL JERSEYBARRIER MOUNTEDESD POSTCLASS I DIV 2BOUNDARYR5'3'-6"FUEL POSTESD BUTTONCE#15322 W/ KA54CONTACT BLOCKS IFLOCATED WITHINHAZARDOUS LOCATION-11REFER TO LIGHTINGFIXTURE SCHEDULEON SHEET E-1.0BOND CONDUIT TO POLEWITH GROUNDING STRAPN.T.S.EQUIPMENTGROUNDGASKETED ELECTRICALHAND HOLEGROUND GRIDCONDUCTORLIGHT STANDARD,GALVANIZED STEEL POLEGROUT AROUNDPOLE BASEPVC CONDUITSJ-BOX FOR SECURITYCAMERA AT 18.5' (MIN)LIGHT POLE SECTION INNON-HAZARDOUS AREARIGID METAL CONDUIT2-c:\Users\omar.navarrete\clean energy fuels corp\engineering design - projects\usa hauling & recycling (21330.00)\03. drawings\sheet set (cad plan set)\E5-ELECTRICAL SECTIONS AND DETAILS.dwg02/25/20258/7/2025 11:58:58 AM2025/08/07USA HAULING & RECYCLING 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT 06074 ELECTRICAL SECTIONS AND DETAILS 21330.00PBMLE5.0REDUCED PLAN CAUTION: THIS DRAWING MAY BE REDUCED 24' IN ORIGINAL DRAWING REVISIONS DATEREV BY CNG FUELING STATION C Know what's below. CALL 811 before you dig.DRAWN BY:CHECKED BY:ASSET NO: COPYRIGHT, 2013 CLEAN ENERGY DESIGN PATENTS THESE DRAWINGS AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF CLEAN ENERGY AND ITS SUBSIDIARIES. THESE DRAWINGS AND SPECIFICATIONS ARE PROTECTED IN THEIR ENTIRETY BY DOMESTIC AND INTERNATIONAL COPYRIGHT AND PATENT STATUTES. THE USE OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE RESTRICTED TO THE ORIGINAL USE FOR WHICH THEY WERE PREPARED. ANY UN AUTHORI ZED US E, R EPRODUCTION, PUBL ICATION , D ISTRIBU TI ON OR SALE I N WHO LE OR IN PART, I S ST RIC TL Y FORBIDDEN. 4 6 7 5 M A C A R T H U R C O U R T , S T E . 8 0 0 | N E W P O R T B E A C H , C A 9 2 6 6 0 T E L :(9 4 9 ) 4 3 7 -1 0 0 0 | F A X : (9 4 9 ) 7 2 4 -1 3 9 7 | W W W .C L E A N E N E R G Y F U E L S .C O M ISSUED FOR PERMIT 5/7/20250 PB ISSUED FOR PERMIT (COMPOUND SHIFT) 8/7/20251 PB STORMWATER MANAGEMENT REPORT FOR 600 NUTMEG ROAD NORTH SOUTH WINDSOR, CT PREPARED FOR USA HAULING & RECYCLING August 11, 2025 855 Winding Brook Drive Glastonbury, CT 06033 T: 860.633.8770 F: 860.633.5971 Barton & Loguidice, LLC 600 Nutmeg Road North South Windsor, CT TABLE OF CONTENTS Project Description .........................................................................................................1 Existing Drainage .............................................................................................................1 Proposed Drainage ..........................................................................................................1 Summary & Conclusion ...................................................................................................2 Erosion and Sedimentation Control ................................................................................2 APPENDICES Appendix A. Drainage Area Mapping Appendix B. PondPack Results (Existing and Proposed) Appendix C. Stormwater Calculations: • #570 Drainage Computation • Water Quality Volume • Pipe Flow Analysis Appendix D. NOAA Precipitation Frequency Estimates Soils Data TABLES Table No. 1. Design Point - Peak Flow Comparison Barton & Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 1 PROJECT DESCRIPTION The project site is an existing recycling facility located on the east side of Nutmeg Road North. The site contains three properties (570, 600 and 602 Nutmeg Road) with a combined 13.01 acres and is in the Industrial Zone. The applicant is proposing to install a natural gas fueling facility on 570 Nutmeg and other site improvements including a new exit drive from the facility and the conversion of a stormwater basin to underground storage. EXISTING CONDITIONS The existing stormwater basin is centrally located amid the three parcels and straddles the property line between parcels #600 and #602. The site’s truck scale is located along the southern edge of the basin. There are three storm drains that outlet into the existing basin. These piped systems collect and carry the stormwater from #602, the easternmost section of the subject properties, as well a portion from the rear of #600. The basin has a concrete outlet control structure that drains to an existing 18” diameter pipe connected to a storm system at the western portion of the parcels. This storm system also collects the stormwater from the front of the site and outlets to the existing storm drain system in Nutmeg Road North. The basin holds approximately 9 inches of water and provides stormwater storage above this elevation. The majority of the existing soils are mapped as Udorthents-Urban land with Sudbury sandy loam, Ninigret fine sandy loam and Walpole sandy loam. The soil groups vary as A/D and B/D. For the Pondpack analysis, Group C was used for the entire site. The existing soils information is included in Appendix D. The area of #570 to be disturbed for the new fueling area includes a portion of dirt surface and a portion of the existing bituminous drive. This area currently sheet flows to the west and the existing detention area along the western property line of this lot. The drainage sub-areas are depicted on the watershed map which is attached in Appendix A. PROPOSED CONDITIONS The proposed improvement includes the installation of an underground storage system consisting of 2400 units of Aquabox storage units surrounded by crushed stone. Two new hydrodynamic structures will be installed to provide treatment of the stormwater prior to discharging to the underground storage area. The proposal is to install an underground storage system to replace the existing above ground storage of the basin. The bottom of the proposed system will be installed at the approximate bottom of the existing basin. No infiltration is considered and the storage system has been sized to replace the available volume in the existing basin. The existing detention basin and the proposed underground storage have been modeled in Pondpack to compare the existing and proposed stormwater flows. The new manhole outlet that is to be installed on the existing outlet pipe from the basin will be configured with a concrete Barton & Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 2 weir and orifice opening to control the peak flows leaving the underground storage area. The Pondpack analysis is attached in Appendix B. The disturbance for the new fueling area on #570 will include an additional 780 square feet of impervious area for the installation of the concrete pads for the proposed equipment. A gravel surface will surround the concrete pads providing infiltration opportunities. The adjacent landscaped area with trees will remain. Any increase in flows for the impervious increase is negligible and calculations are attached in Appendix C. The Water Quality Flow computations are included in Appendix C. PEAK FLOWS Peak flows for the site were calculated using the TR-20 method in PondPack. Runoff coefficients are based on values given in the Connecticut Department of Transportation (CTDOT) Drainage Manual. Rainfall intensities are those from NOAA and are included in Appendix D. Times of concentration were determined through analysis of the site and from charts also contained in the CTDOT Drainage Manual. The drainage areas for the project site were determined through analysis of topographic mapping. PIPE FLOW ANALYSIS A combination of the rational method and the Hydraflow software program was utilized in order to analyze and design the proposed pipe collection system. All drainage pipes were designed to collect and distribute the 10-year storm event prior to discharging. The hydraulic design of the pipes within the proposed drainage system was based on the Manning’s Equation. All proposed pipes utilized in the design are high-density polyethylene (HDPE) with a friction factor (n) of 0.012. The minimum slope of all proposed pipes in the system is 0.005 ft/ft. The pipe flow analysis generated by Hydraflow is attached in Appendix C. Barton & Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 3 SUMMARY AND CONCLUSION As shown in the attached calculations, the stormwater quality detention basin will reduce the peak flows from the existing conditions. In addition, the required water quality flow for the piped systems will be treated by two hydrodynamic separator structures. A summary of peak flows for the existing and proposed conditions is provided below. The PondPack calculation results are included in Appendix B. STORM EVENT EXISTING CONDITIONS (CFS) PROPOSED CONDITIONS (CFS) DIFFERENCE 2-yr 2.34 2.34 0 10-yr 3.28 3.14 -0.14 25-yr 4.31 4.07 -0.24 100-yr 9.85 8.78 -1.07 TABLE NO. 1: DESIGN POINT (EXISTING STORM SYSTEM)– PEAK FLOW COMPARISON EROSION & SEDIMENTATION CONTROL PLAN The potential impact of the project on the surrounding areas is related to the temporary transport of soils and sediments associated with the construction phases of the project. The impact of the project on the surrounding areas will be controlled as specified in the plan set or as required to meet field conditions. The proposed plan complies with the 2024 CT Guidelines for Soil Erosion and Sediment Control. APPENDIX A DRAINAGE AREA MAP + + +++ +++ ++ ++ + + + + + + + ++ + + + + + + 9WF 10WF 10WF 11WF 5WF 6WF 23WF 22WF21WF20WF 19WF 18WF 17WF 16WF 15WF 14WF 13WF 12WF 1XWF2XWF 3XWF 4XWF 5XWF 19WF 6XWF 7XWF 9XWF8XWF 15XWF 14XWF 13XWF 12XWF 10XWF 19XWF 18XWF17XWF 16XWF 20XWF20X-1WF 20X-2WF 20X-3WF20X-4WF20X-6WF20X-7WF 20X-8WF + + + + + + + + + + + + + + + + + + + + MARCEL O. BIZIER N/F ALBERT J. SCHNEIDER78 76N/F EXISTING EDGE OF BIT. PAVING 1000.00' (TOTAL) EXISTING BIT. CONC. CURBING 309.55' S F T ELECTRICAL TRANSFORMER PAD EXISTING LIGHT POLE IN PLACE. 8" MIN. COMPACTED EXISTING UTILITY POLE GRAVEL AREA (TYP.) EXISTING SPOT GRADE AREA EXISTING WATER MAIN AND HYDRANT GRAVEL S EXISTING SANITARY MANHOLE AND PIPES EXISTING CATCH BASIN AND PIPE MONUMENT TO BE SETS EXISTING MONUMENT F EXISTING IRON PIN F IRON PIN TO BE SET S BASIN LEGEND DETENTION 348.40' (TOTAL) WETLAND AREA INLAND GRAVEL 290.34'297.97'785.39 ac. 235,171 sq. ft. TREELINELOT 310' SIDE YARDPAD CONCRETE 2.05 ac. 89,697 sq. ft. 1" DIA. STONE. STRIP OF CRUSHED 25' REAR YARDTYPICAL 10' WIDE AREA CONSERVATIONGRAVEL INV:73.78 (SEE DETAIL) OUTLET STRUCTURE S S CURTAIN DRAIN A R E A ALBERT J. SCHNEIDER G R A V E L INV:75.65 N/F TF:79.20 E 190,217.86 80INV=78.0N 176,650.26 HIGH POINT 10' SIDE YARD STATION CURTAIN DRAIN HYD. RECYCLING 1928.72' (TOTAL) WG METAL E 283.00'F F 82.30' EXISTING 626.81' S 1 5" R C P 10' SIDE YARD GasE 10' SIDE YARD GV hyd.EGInv. 73.16 FL=72.95(W) S FL 71.01 Rim 80.16 15" RCPFL=73.29(E) Rim 78.54 SMH #2 FL=73.23(N)EXISTING EDGE OF PAVEMENT4" U.D.INV:76.38 8" SMH #1 PVC EGTF=77.53 80 8"PVC S C A L E INV:76.29 18" 6"S TF:80.43 18"RCP FL 24"RCP 74.70 FL:75.40FL 18"RCP 74.95 TF:79.37EG 81 FL 15"RCP 75.28 4" U.D. FL 6"PVC 75.35 8"P VC 18"RCP24"RCP TF 78.70 EGP A V E M E N T 12.00' RESET TF:81.10 2" WATER SERVICE60 L.F.~ 8"CIPSan. Lat.INV:77.25 8" FL 74.11 B I T U M I N O U S Grate El. 76.70 INV:76.90 18"@ 1.80%24"F.E.EGWeir El. 74.47bldg. TF 80.10 8"Orifice FL 73.46fuel Outlet Structure 8" CIP82EG 6" U.D. 6" U.D. 8"PVC TF:79.06 EG78 L.F.INV:77.46 Fl 75.19DETENTION BASIN TRENCH DRAIN conc. padEXISTING GT pad conc. 4" U.D.8" P VC 140.15'105.00' PadW ALLRo of Le a der Conc. FL 74.00 25' REAR YARDCONCRETE FL 74.50 15"F.E. 82 FL 74.05 15"F.E. EXIST.100.05'2.33 ac. Fin. Floor 83.06 101,667 sq. ft.100.08'C E N T E R FL 15" 74.06 LOT 1 FL 10" 74.11 R E N E W A L TF 79.11 TRENCH DRAINR E S O U R C E 5.29 ac. 15"RCP6"PVCAPRON 230,694 sq. ft. 10" ADS Solid FL 74.47 CONCRETE 181.04'TF 77.42 (PARCEL 1) Roof Leader 80 pad LOT 2 METAL SHED (TYP.) 62.87' conc.EXISTING TREE LINE 140.18' 10' SIDE YARD CURTAIN DRAIN 283.00' 157.93' 377.02' 399.50' (2289.82' TOTAL) F F 934.45' (TOTAL) 16.37' INV. 74.75 16.03'CURTAIN DRAIN JOSEPH W. VIBERT, JR. 80N/F LIMITED PARTNERSHIP LIEBERT FAMILY N/F 71.391076BRK+ 2100WF 20X-471.83+71.931077WF ST+ 2101WF 20X-672.02+ 72.172098WF 20X-2+72.21 2099WF 20X-3+ 2102WF 20X-772.28+2103WF 20X-872.32+ 72.572097WF 20X-1+ 75.131078TB ST+ CONCRETE BITUMINOUS BUILDINGSTORAGE W G INV. = 72.7215" R.C.P.INV. = 72.7515" R.C.P. INV. = 72.8624" R.C.P. INV. = 71.9718" R.C.P. 74 INV. = 73.888" PVC 76 T.F. = 76.20C.B. TYPE 'CL' GATE (TYP) BOLLARD FENCE CHAINLINK T.F. = 77.82C.B. TYPE 'CL' 7878 BIT CURB GATE80 T.F. = 81.45SANITARY M.H. T.F. = 81.46SANITARY M.H. 75.11 + 76.50 + 76.50 78.25 + 78.75 78.75 + 79.25 78 79 77 CONCRETE BOLLARD HYD SCALE LSA BIT DRIVE BITUMINOUS GRAVELC.B. TYPE 'C-L' HYD WV LSA CONCRETE LPLP LP WV 74.92 74.94 75.75 75.82 75.92 76.02 76.09 BLOCK CONC 76.24 76.25 WP 76.25C.B. TYPE 'C'76.26 76.27 76.32 76.33 76.37 76.39 76.49 WP 76.50 76.52 76.5676.63 76.65 76.66 76.7076.70 76.75 76.77 76.7776.79 POST 76.80 76.8276.82 76.85 76.86 76.88 76.93 76.9576.95 76.96 76.98 77.0377.03 WP 77.03 77.05 77.06 SIGN 77.07 77.07 77.08WP 77.08 WP 77.09 WP BARRIER JERSEY 77.19 77.19 77.19 77.20 77.20 77.24 77.2777.2777.31 77.34SANITARY MH 77.34 77.35 77.35 WP 77.36 77.3677.36 77.37 WP 77.37 77.39 77.39 77.39 77.40 77.40 77.41 BLOCK CONC BITUMINOUS 77.41 77.42 77.42 WP 77.4377.43 77.4377.43 77.45 77.47 + 77.47 77.5077.5077.50 77.50 77.5077.50 BIT EDGE OF C.B. TYPE 'C' 77.51 77.52 77.53 77.53 77.53 77.54 77.54 77.54 77.54 77.54 77.55 77.55 77.55 CBX 77.56 77.56 JERSEY BARRIER 77.57 77.5777.57 77.57 77.5777.59 77.5977.59 77.60 77.60 77.61 77.61 77.62 77.62 77.64 77.64 LP 77.65 77.67 77.69 WP 77.70 77.70 77.71 77.72 77.74 77.75 77.75 77.78 77.82 77.85 77.85 77.86 77.86 77.89 'C-L' C.B. TYPE 77.92 78.09 78.17 78.18 78.18 78.18 78.20 78.21 + 78.21 + 78.22 78.22 78.23 + 78.24 + 78.24 78.25 78.25 78.31 78.3178.34 + 78.34 78.34 + 78.39 78.41 + 78.44 78.44 + 78.47 78.53 78.62 78.6878.68 + 82.19+ 82.24 83.29 83.31 83.34 83.56 83.67 83.73 83.75 83.76 83.77 83.78 83.79 83.87 83.88 83.90 83.9583.97 83.98 83.98 84.01 84.01 84.04 84.04 84.06 WP 84.07 84.07 WP 84.09 84.10 84.10 84.15 84.15 84.16 84.16 84.20 84.21 84.24 84.33 84.35 84.39 84.41 84.42 84.4384.44 84.44 84.45 84.45 84.47 84.52 84.53 84.54 84.55 84.55 84.55 84.68 84.72 84.72 84.75 84.78 84.78 84.80 84.82 84.87 84.92 84.92 84.9284.93 84.97 85.01 85.16 85.16 85.19 85.21 85.25 85.25 85.25 85.26 85.2685.27 85.33 85.33 85.33 85.34 85.41 85.42 85.47 85.48 85.56 85.60 85.65 85.68 85.68 85.8985.9386.00 86.05 86.0586.08 + 86.11 86.11 86.16 86.21 86.24 86.25 86.2986.30 86.42 86.43 86.4386.46 86.46 86.48 86.49 86.55 + 86.55 86.56 86.57 86.58 86.59 86.6186.62 86.66 86.68 86.68 86.71 86.72 86.74 86.78 86.7986.81 86.82 86.85 86.87 86.88 86.9186.91 86.9386.94 86.94 87.04 87.33 87.54 87.74 88.04 92.81 95.53 100.70 102.14 0 SCALE: 1"= 80' 80 80 160 Civil Engineering Land SurveyingEnvironmental Consulting Construction Management 4481.115 PROJ. ENGINEER PROJ. MANAGER OFFICE REVIEW PROJECT DATE DPL KRG MMZ REVISIONS SCALE: 1"= 80' 600 NUTMEG ROAD NORTH PREPARED FOR USA HAULING & RECYCLING CNG FUELING STATION WATERSHED PLAN SHEET NO.OF1 1 SO. WINDSOR, CT 08/08/25 J:\ \ \ .dgn www.bartonandloguidice.com Fax: (860) 633-5971 Phone: (860) 633-8770 Glastonbury, CT 06033 855 Winding Brook Drive (2.5 ACRES IMPERVIOUS) AREA= 3.0 ACRES TREATMENT STRUCTURE #2 (1.0 ACRES IMPERVIOUS) AREA= 1.0 ACRES TREATMENT STRUCTURE #1 AREA= 2.4 ACRES #570 NUTMEG ROAD DRAINAGE APPENDIX B PONDPACK RESULTS Project Summary 600 Nutmeg Road, South WindsorTitle Denise P. Lord, P.E.Engineer Barton & Loguidice, LLCCompany 8/11/2025Date Existing Conditions - Above Ground Pond Proposed Conditions - New Underground StorageNotes Page 1 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Table of Contents 33Composite Rating Curve, 2 years (Proposed Conditions 2YR) 30Individual Outlet Curves, 2 years (Proposed Conditions 2YR) 27Outlet Input Data, 2 years (Proposed Conditions 2YR) Proposed Outlet 26Composite Rating Curve, 2 years (Existing Conditions 2YR) 21Individual Outlet Curves, 2 years (Existing Conditions 2YR) 17Outlet Input Data, 2 years (Existing Conditions 2YR) Ex Outlet 16Elevation vs. Volume Curve, 2 years (Proposed Conditions 2YR) 15Elevation-Area Volume Curve, 2 years (Existing Conditions 2YR) Detention 14Runoff CN-Area, 2 years (Proposed Conditions 2YR) 13Runoff CN-Area, 2 years (Existing Conditions 2YR) Area 2 11Time-Depth Curve, 25 years (Existing Conditions 25 YR) 9Time-Depth Curve, 2 years (Existing Conditions 2YR) 7Time-Depth Curve, 100 years (Existing Conditions 100 YR) 5Time-Depth Curve, 10 years (Existing Conditions 10 YR) NOAA South Windsor 2Master Network Summary Subsection: Master Network Summary Catchments Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 2.5912.1000.2402Existing Conditions 2YR Area 1 2.5912.1000.2402Proposed Conditions 2YR Area 1 4.1512.1000.39210Existing Conditions 10 YR Area 1 4.1512.1000.39210Proposed Conditions 10 YR Area 1 5.1112.1000.48725Existing Conditions 25 YR Area 1 5.1112.1000.48725Proposed Conditions 25 YR Area 1 6.6012.1000.633100Existing Conditions 100 YR Area 1 6.6012.1000.633100Proposed Conditions 100 YR Area 1 7.0912.1000.6392Existing Conditions 2YR Area 2 7.0912.1000.6392Proposed Conditions 2YR Area 2 11.7212.1001.08910Existing Conditions 10 YR Area 2 11.7212.1001.08910Proposed Conditions 10 YR Area 2 14.5712.1001.37225Existing Conditions 25 YR Area 2 14.5712.1001.37225Proposed Conditions 25 YR Area 2 18.9512.1001.809100Existing Conditions 100 YR Area 2 18.9512.1001.809100Proposed Conditions 100 YR Area 2 Node Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 2.3412.5000.7792Existing Conditions 2YR OUT 2.3412.5000.8662Proposed Conditions 2YR OUT 3.2812.5501.35910Existing Conditions 10 YR OUT 3.1412.5501.46010Proposed Conditions 10 YR OUT 4.3112.5501.72625Existing Conditions 25 YR OUT Page 2 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Subsection: Master Network Summary Node Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 4.0712.5501.83325Proposed Conditions 25 YR OUT 9.8512.4002.299100Existing Conditions 100 YR OUT 8.7812.4002.409100Proposed Conditions 100 YR OUT Pond Summary Maximum Pond Storage (ac-ft) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel (N/A)(N/A)9.6812.1000.8782Existing Conditions 2YR Detention (IN) 0.41773.512.3412.5000.7792Existing Conditions 2YR Detention (OUT) (N/A)(N/A)9.6812.1000.8782Proposed Conditions 2YR Detention (IN) 0.32573.292.3412.5000.8662Proposed Conditions 2YR Detention (OUT) (N/A)(N/A)15.8612.1001.48110Existing Conditions 10 YR Detention (IN) 0.67274.283.2812.5501.35910Existing Conditions 10 YR Detention (OUT) (N/A)(N/A)15.8612.1001.48110Proposed Conditions 10 YR Detention (IN) 0.57474.073.1412.5501.46010Proposed Conditions 10 YR Detention (OUT) (N/A)(N/A)19.6912.1001.85825Existing Conditions 25 YR Detention (IN) 0.83074.744.3112.5501.72625Existing Conditions 25 YR Detention (OUT) (N/A)(N/A)19.6912.1001.85825Proposed Conditions 25 YR Detention (IN) Page 3 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Subsection: Master Network Summary Pond Summary Maximum Pond Storage (ac-ft) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 0.73074.574.0712.5501.83325Proposed Conditions 25 YR Detention (OUT) (N/A)(N/A)25.5612.1002.442100Existing Conditions 100 YR Detention (IN) 0.95875.119.8512.4002.299100Existing Conditions 100 YR Detention (OUT) (N/A)(N/A)25.5612.1002.442100Proposed Conditions 100 YR Detention (IN) 0.89575.108.7812.4002.409100Proposed Conditions 100 YR Detention (OUT) Page 4 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 10 YR Storm Event: 10 YearLabel: NOAA South Windsor Return Event: 10 yearsSubsection: Time-Depth Curve Time-Depth Curve: 10 Year 10 Year Label hours0.000Start Time hours0.100Increment hours24.000End Time years10Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.00.00.00.00.00.000 0.00.00.00.00.00.500 0.10.10.10.10.01.000 0.10.10.10.10.11.500 0.10.10.10.10.12.000 0.10.10.10.10.12.500 0.20.20.20.20.23.000 0.20.20.20.20.23.500 0.20.20.20.20.24.000 0.30.30.30.30.24.500 0.30.30.30.30.35.000 0.30.30.30.30.35.500 0.40.40.40.40.46.000 0.40.40.40.40.46.500 0.50.50.50.50.47.000 0.60.50.50.50.57.500 0.60.60.60.60.68.000 0.70.70.70.70.68.500 0.80.80.80.70.79.000 0.90.90.90.80.89.500 1.01.01.01.00.910.000 1.21.21.11.11.110.500 1.41.41.31.31.211.000 2.11.81.71.61.511.500 3.43.33.12.92.512.000 3.73.63.63.53.512.500 3.83.83.83.73.713.000 4.04.03.93.93.913.500 4.14.14.14.04.014.000 4.24.24.24.14.114.500 4.34.34.34.24.215.000 4.44.44.34.34.315.500 4.44.44.44.44.416.000 4.54.54.54.44.416.500 4.54.54.54.54.517.000 Page 5 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 10 YR Storm Event: 10 YearLabel: NOAA South Windsor Return Event: 10 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 4.64.64.64.64.517.500 4.64.64.64.64.618.000 4.74.64.64.64.618.500 4.74.74.74.74.719.000 4.74.74.74.74.719.500 4.84.74.74.74.720.000 4.84.84.84.84.820.500 4.84.84.84.84.821.000 4.84.84.84.84.821.500 4.94.94.94.94.822.000 4.94.94.94.94.922.500 4.94.94.94.94.923.000 4.94.94.94.94.923.500 (N/A)(N/A)(N/A)(N/A)4.924.000 Page 6 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 100 YR Storm Event: 100 YearLabel: NOAA South Windsor Return Event: 100 yearsSubsection: Time-Depth Curve Time-Depth Curve: 100 Year 100 Year Label hours0.000Start Time hours0.100Increment hours24.000End Time years100Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.00.00.00.00.00.000 0.10.10.10.00.00.500 0.10.10.10.10.11.000 0.10.10.10.10.11.500 0.20.20.20.20.22.000 0.20.20.20.20.22.500 0.30.30.30.30.23.000 0.30.30.30.30.33.500 0.40.40.40.30.34.000 0.40.40.40.40.44.500 0.50.50.50.50.45.000 0.60.50.50.50.55.500 0.60.60.60.60.66.000 0.70.70.70.60.66.500 0.80.80.70.70.77.000 0.90.90.80.80.87.500 1.01.00.90.90.98.000 1.11.11.11.01.08.500 1.31.21.21.21.19.000 1.41.41.41.31.39.500 1.71.61.61.51.510.000 1.91.81.81.71.710.500 2.22.22.12.02.011.000 3.32.92.72.52.311.500 5.45.24.94.63.912.000 5.85.85.75.65.512.500 6.16.06.05.95.913.000 6.36.36.26.26.113.500 6.56.56.46.46.414.000 6.76.66.66.66.514.500 6.86.86.86.76.715.000 6.96.96.96.96.815.500 7.07.07.07.06.916.000 7.17.17.17.17.016.500 7.27.27.27.17.117.000 Page 7 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 100 YR Storm Event: 100 YearLabel: NOAA South Windsor Return Event: 100 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 7.37.27.27.27.217.500 7.37.37.37.37.318.000 7.47.47.47.37.318.500 7.47.47.47.47.419.000 7.57.57.57.57.519.500 7.57.57.57.57.520.000 7.67.67.67.67.620.500 7.67.67.67.67.621.000 7.77.77.77.77.621.500 7.77.77.77.77.722.000 7.87.87.77.77.722.500 7.87.87.87.87.823.000 7.87.87.87.87.823.500 (N/A)(N/A)(N/A)(N/A)7.824.000 Page 8 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: NOAA South Windsor Return Event: 2 yearsSubsection: Time-Depth Curve Time-Depth Curve: 2 Year 2 Year Label hours0.000Start Time hours0.100Increment hours24.000End Time years2Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.00.00.00.00.00.000 0.00.00.00.00.00.500 0.00.00.00.00.01.000 0.10.10.10.00.01.500 0.10.10.10.10.12.000 0.10.10.10.10.12.500 0.10.10.10.10.13.000 0.10.10.10.10.13.500 0.20.10.10.10.14.000 0.20.20.20.20.24.500 0.20.20.20.20.25.000 0.20.20.20.20.25.500 0.20.20.20.20.26.000 0.30.30.30.30.36.500 0.30.30.30.30.37.000 0.30.30.30.30.37.500 0.40.40.40.40.48.000 0.40.40.40.40.48.500 0.50.50.50.50.59.000 0.60.60.50.50.59.500 0.70.60.60.60.610.000 0.80.70.70.70.710.500 0.90.90.80.80.811.000 1.31.21.11.00.911.500 2.12.11.91.81.612.000 2.32.32.32.22.212.500 2.42.42.42.42.313.000 2.52.52.52.52.413.500 2.62.62.62.52.514.000 2.62.62.62.62.614.500 2.72.72.72.72.715.000 2.72.72.72.72.715.500 2.82.82.82.82.816.000 2.82.82.82.82.816.500 2.92.82.82.82.817.000 Page 9 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: NOAA South Windsor Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 2.92.92.92.92.917.500 2.92.92.92.92.918.000 2.92.92.92.92.918.500 3.02.92.92.92.919.000 3.03.03.03.03.019.500 3.03.03.03.03.020.000 3.03.03.03.03.020.500 3.03.03.03.03.021.000 3.03.03.03.03.021.500 3.13.13.13.13.122.000 3.13.13.13.13.122.500 3.13.13.13.13.123.000 3.13.13.13.13.123.500 (N/A)(N/A)(N/A)(N/A)3.124.000 Page 10 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 25 YR Storm Event: 25 YearLabel: NOAA South Windsor Return Event: 25 yearsSubsection: Time-Depth Curve Time-Depth Curve: 25 Year 25 Year Label hours0.000Start Time hours0.100Increment hours24.000End Time years25Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.00.00.00.00.00.000 0.10.00.00.00.00.500 0.10.10.10.10.11.000 0.10.10.10.10.11.500 0.10.10.10.10.12.000 0.20.20.20.20.22.500 0.20.20.20.20.23.000 0.30.20.20.20.23.500 0.30.30.30.30.34.000 0.30.30.30.30.34.500 0.40.40.40.40.35.000 0.40.40.40.40.45.500 0.50.50.50.40.46.000 0.50.50.50.50.56.500 0.60.60.60.60.67.000 0.70.70.60.60.67.500 0.80.70.70.70.78.000 0.90.80.80.80.88.500 1.01.00.90.90.99.000 1.11.11.11.01.09.500 1.31.21.21.21.110.000 1.51.41.41.41.310.500 1.71.71.61.61.511.000 2.52.32.11.91.811.500 4.24.03.83.63.012.000 4.54.54.44.34.312.500 4.74.74.64.64.613.000 4.94.94.84.84.813.500 5.05.05.05.04.914.000 5.25.15.15.15.114.500 5.35.35.25.25.215.000 5.45.45.35.35.315.500 5.45.45.45.45.416.000 5.55.55.55.55.516.500 5.65.65.65.55.517.000 Page 11 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 25 YR Storm Event: 25 YearLabel: NOAA South Windsor Return Event: 25 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 5.65.65.65.65.617.500 5.75.75.75.75.618.000 5.75.75.75.75.718.500 5.85.85.85.75.719.000 5.85.85.85.85.819.500 5.85.85.85.85.820.000 5.95.95.95.95.920.500 5.95.95.95.95.921.000 6.05.95.95.95.921.500 6.06.06.06.06.022.000 6.06.06.06.06.022.500 6.06.06.06.06.023.000 6.16.16.16.16.123.500 (N/A)(N/A)(N/A)(N/A)6.124.000 Page 12 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Area 2 Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 98.0000.00.02.50098.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil C 79.0000.00.00.50079.000Open space (Lawns,parks etc.) - Fair condition; grass cover 50% to 75% - Soil C 94.833(N/A)(N/A)3.000(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 13 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Area 2 Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 98.0000.00.02.50098.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil C 79.0000.00.00.50079.000Open space (Lawns,parks etc.) - Fair condition; grass cover 50% to 75% - Soil C 94.833(N/A)(N/A)3.000(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 14 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Detention Return Event: 2 yearsSubsection: Elevation-Area Volume Curve Volume (Total) (ac-ft) Volume (ac-ft) A1+A2+sqr (A1*A2) (acres) Area (acres) Planimeter (ft²) Elevation (ft) 0.0000.0000.0000.2750.072.09 0.2020.2020.8530.2940.072.80 0.5780.3760.9390.3330.074.00 1.0610.4831.0350.3570.075.40 1.2800.2191.0940.3730.076.00 Page 15 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Detention Return Event: 2 yearsSubsection: Elevation vs. Volume Curve Elevation-Volume Pond Volume (ac-ft) Pond Elevation (ft) 0.00072.00 0.06972.50 0.49573.81 0.90575.13 0.98975.63 Page 16 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Outlet Input Data Requested Pond Water Surface Elevations ft72.00Minimum (Headwater) ft0.50Increment (Headwater) ft75.63Maximum (Headwater) Outlet Connectivity E2 (ft) E1 (ft) OutfallDirectionOutlet IDStructure Type 76.0072.09Ex OrificeForwardEx WeirRectangular Weir 76.0072.26Ex CulvertForwardEx OrificeOrifice-Circular 76.0074.70Ex CulvertForwardEx Weir - 2Rectangular Weir 76.0071.69TWForwardEx CulvertCulvert-Circular (N/A)(N/A)TailwaterTailwater Settings Page 17 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Ex Weir Structure Type: Rectangular Weir 1Number of Openings ft72.09Elevation ft2.90Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: Ex Orifice Structure Type: Orifice-Circular 1Number of Openings ft72.26Elevation in10.0Orifice Diameter 0.600Orifice Coefficient Page 18 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Ex Culvert Structure Type: Culvert-Circular 1Number of Barrels in18.0Diameter ft40.00Length ft40.00Length (Computed Barrel) ft/ft0.006Slope (Computed) Outlet Control Data 0.013Manning's n 0.200Ke 0.018Kb 0.200Kr ft0.00Convergence Tolerance Inlet Control Data Form 1Equation Form 0.0045K 2.0000M 0.0317C 0.6900Y 1.092T1 ratio (HW/D) 1.194T2 ratio (HW/D) -0.500Slope Correction Factor Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ft73.33T1 Elevation ft³/s7.58T1 Flow ft73.48T2 Elevation ft³/s8.66T2 Flow Page 19 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Ex Weir - 2 Structure Type: Rectangular Weir 1Number of Openings ft74.70Elevation ft8.90Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: TW Structure Type: TW Setup, DS Channel Free OutfallTailwater Type Convergence Tolerances 30Maximum Iterations ft0.01Tailwater Tolerance (Minimum) ft0.50Tailwater Tolerance (Maximum) ft0.01Headwater Tolerance (Minimum) ft0.50Headwater Tolerance (Maximum) ft³/s0.001Flow Tolerance (Minimum) ft³/s10.000Flow Tolerance (Maximum) Page 20 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Weir (Rectangular Weir) --------------------------------------- Upstream ID = (Pond Water Surface) Downstream ID = Ex Orifice (Orifice-Circular) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.000.000.000.000.0072.09 0.00(N/A)0.000.000.000.000.000.0072.26 0.00(N/A)0.000.0072.5972.5972.590.3272.59 0.00(N/A)0.000.0073.0873.0873.091.6273.09 0.00(N/A)0.000.0073.5873.5873.592.4973.59 0.00(N/A)0.000.0074.0874.0874.093.1174.09 0.00(N/A)0.000.0074.5874.5874.593.5574.59 0.00(N/A)0.000.0074.6974.6974.703.6774.70 0.00(N/A)0.000.0075.0875.0875.093.8875.09 0.00(N/A)0.000.0075.5975.5975.592.1775.59 0.00(N/A)0.000.0076.0076.0076.003.5076.00 Message WS below an invert; no flow. WS below an invert; no flow. H=.50; Htw=.50; Qfree=2.97; H=1.00; Htw=.99; Qfree=8.10; H=1.50; Htw=1.49; Qfree=14.33; H=2.00; Htw=1.99; Qfree=21.21; H=2.50; Htw=2.49; Qfree=28.46; H=2.61; Htw=2.60; Qfree=30.08; H=3.00; Htw=2.99; Qfree=35.85; H=3.50; Htw=3.50; Qfree=43.22; H=3.91; Htw=3.91; Qfree=49.13; Page 21 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Orifice (Orifice-Circular) --------------------------------------- Upstream ID = Ex Weir (Rectangular Weir) Downstream ID = Ex Culvert (Culvert-Circular) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.000.000.000.000.0072.09 0.00(N/A)0.000.000.000.000.000.0072.26 0.00(N/A)0.000.0071.98Free Outfall72.590.3172.59 0.00(N/A)0.000.0072.3772.3773.081.6073.09 0.00(N/A)0.000.0072.5772.5773.582.4973.59 0.00(N/A)0.000.0072.6772.6774.083.1174.09 0.00(N/A)0.000.0072.7572.7574.583.5574.59 0.00(N/A)0.030.0072.7772.7774.693.6474.70 0.00(N/A)0.770.0073.6873.6875.083.1175.09 0.00(N/A)0.000.0075.3575.3575.591.3075.59 0.00(N/A)0.000.0075.6375.6376.001.5976.00 Message WS below an invert; no flow. WS below an invert; no flow. CRIT.DEPTH CONTROL Vh= .087ft Dcr= .242ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .254ft Dcr= .567ft CRIT.DEPTH Hev= .00ft H =.90 H =1.40 H =1.83 H =1.92 H =1.40 H =.24 H =.37 Page 22 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Culvert (Culvert-Circular) --------------------------------------- Mannings open channel maximum capacity: 8.75 ft³/s Upstream ID = Ex Orifice, Ex Weir - 2 Downstream ID = Tailwater (Pond Outfall) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.00Free Outfall0.000.000.0072.09 0.00(N/A)0.000.00Free Outfall0.000.000.0072.26 0.00(N/A)0.000.00Free OutfallFree Outfall71.980.3172.59 0.00(N/A)0.000.00Free OutfallFree Outfall72.371.5973.09 0.00(N/A)0.000.00Free OutfallFree Outfall72.572.5473.59 0.00(N/A)0.000.00Free OutfallFree Outfall72.673.1274.09 0.00(N/A)0.000.00Free OutfallFree Outfall72.753.5774.59 0.00(N/A)0.000.00Free OutfallFree Outfall72.773.6974.70 0.00(N/A)0.000.00Free OutfallFree Outfall73.689.6575.09 0.00(N/A)0.000.00Free OutfallFree Outfall75.3515.4975.59 0.00(N/A)0.000.00Free OutfallFree Outfall75.6315.7476.00 Message WS below an invert; no flow. WS below an invert; no flow. CRIT.DEPTH CONTROL Vh= .071ft Dcr= .206ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .172ft Dcr= .474ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .226ft Dcr= .604ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .257ft Dcr= .672ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .280ft Dcr= .721ft CRIT.DEPTH Hev= .00ft CRIT.DEPTH CONTROL Vh= .287ft Dcr= .734ft CRIT.DEPTH Hev= .00ft BACKWATER CONTROL.. Vh= .490ft hwDi= 1.404ft Lbw= 40.0ft Hev= .00ft Page 23 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Culvert (Culvert-Circular) --------------------------------------- Mannings open channel maximum capacity: 8.75 ft³/s Upstream ID = Ex Orifice, Ex Weir - 2 Downstream ID = Tailwater (Pond Outfall) Message FULL FLOW...Lfull=37.93ft Vh=1.195ft HL=2.259ft Hev= .00ft FULL FLOW...Lfull=38.69ft Vh=1.233ft HL=2.348ft Hev= .00ft Page 24 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Weir - 2 (Rectangular Weir) --------------------------------------- Upstream ID = (Pond Water Surface) Downstream ID = Ex Culvert (Culvert-Circular) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.000.000.000.000.0072.09 0.00(N/A)0.000.000.000.000.000.0072.26 0.00(N/A)0.000.0071.980.000.000.0072.59 0.00(N/A)0.000.0072.370.000.000.0073.09 0.00(N/A)0.000.0072.570.000.000.0073.59 0.00(N/A)0.000.0072.670.000.000.0074.09 0.00(N/A)0.000.0072.750.000.000.0074.59 0.00(N/A)0.000.0072.770.000.000.0074.70 0.00(N/A)0.000.0073.68Free Outfall75.096.5075.09 0.00(N/A)0.000.1275.3575.2275.5917.8375.59 0.00(N/A)0.000.3275.6375.3076.0034.1776.00 Message WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. H=.39; Htw=.00; Qfree=6.50; H=.89; Htw=.52; Qfree=22.42; H=1.30; Htw=.60; Qfree=39.58; Page 25 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Existing Conditions 2YR Storm Event: 2 YearLabel: Ex Outlet Return Event: 2 yearsSubsection: Composite Rating Curve Composite Outflow Summary Convergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.0072.09 0.00(N/A)0.0072.26 0.00(N/A)0.3172.59 0.00(N/A)1.5973.09 0.00(N/A)2.4973.59 0.00(N/A)3.1174.09 0.00(N/A)3.5574.59 0.00(N/A)3.6474.70 0.00(N/A)9.6175.09 0.00(N/A)15.4975.59 0.00(N/A)15.7476.00 Contributing Structures (no Q: Ex Weir,Ex Orifice,Ex Weir - 2,Ex Culvert) (no Q: Ex Weir,Ex Orifice,Ex Weir - 2,Ex Culvert) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Culvert (no Q: Ex Weir - 2) Ex Weir,Ex Orifice,Ex Weir - 2,Ex Culvert Ex Weir,Ex Orifice,Ex Weir - 2,Ex Culvert Ex Weir,Ex Orifice,Ex Weir - 2,Ex Culvert Page 26 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Outlet Input Data Requested Pond Water Surface Elevations ft72.00Minimum (Headwater) ft0.50Increment (Headwater) ft75.63Maximum (Headwater) Outlet Connectivity E2 (ft) E1 (ft) OutfallDirectionOutlet IDStructure Type 75.6372.00Ex CulvertForwardPr OrificeOrifice-Circular 75.6374.50Ex CulvertForwardPr WeirRectangular Weir 75.6371.65TWForwardEx CulvertCulvert-Circular (N/A)(N/A)TailwaterTailwater Settings Page 27 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Ex Culvert Structure Type: Culvert-Circular 1Number of Barrels in18.0Diameter ft30.00Length ft30.00Length (Computed Barrel) ft/ft0.005Slope (Computed) Outlet Control Data 0.013Manning's n 0.200Ke 0.018Kb 0.200Kr ft0.00Convergence Tolerance Inlet Control Data Form 1Equation Form 0.0045K 2.0000M 0.0317C 0.6900Y 1.093T1 ratio (HW/D) 1.195T2 ratio (HW/D) -0.500Slope Correction Factor Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ft73.29T1 Elevation ft³/s7.58T1 Flow ft73.44T2 Elevation ft³/s8.66T2 Flow Page 28 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Pr Orifice Structure Type: Orifice-Circular 1Number of Openings ft72.00Elevation in10.0Orifice Diameter 0.600Orifice Coefficient Structure ID: Pr Weir Structure Type: Rectangular Weir 1Number of Openings ft74.50Elevation ft4.00Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: TW Structure Type: TW Setup, DS Channel Free OutfallTailwater Type Convergence Tolerances 30Maximum Iterations ft0.01Tailwater Tolerance (Minimum) ft0.50Tailwater Tolerance (Maximum) ft0.01Headwater Tolerance (Minimum) ft0.50Headwater Tolerance (Maximum) ft³/s0.001Flow Tolerance (Minimum) ft³/s10.000Flow Tolerance (Maximum) Page 29 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ex Culvert (Culvert-Circular) --------------------------------------- Mannings open channel maximum capacity: 7.99 ft³/s Upstream ID = Pr Orifice, Pr Weir Downstream ID = Tailwater (Pond Outfall) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.00Free Outfall0.000.000.0072.00 0.00(N/A)0.000.00Free OutfallFree Outfall72.080.6772.50 0.00(N/A)0.000.00Free OutfallFree Outfall72.422.0073.00 0.00(N/A)0.000.00Free OutfallFree Outfall72.532.5873.50 0.00(N/A)0.000.00Free OutfallFree Outfall72.623.0874.00 0.00(N/A)0.000.00Free OutfallFree Outfall72.703.5474.50 0.00(N/A)0.000.00Free OutfallFree Outfall73.317.5475.00 0.00(N/A)0.010.00Free OutfallFree Outfall74.6013.7475.50 0.00(N/A)0.000.00Free OutfallFree Outfall74.8814.7275.63 Message WS below an invert; no flow. BACKWATER CONTROL.. Vh= .107ft hwDi= .306ft Lbw= 30.0ft Hev= .00ft CRIT.DEPTH CONTROL Vh= .196ft Dcr= .533ft CRIT.DEPTH Hev= .00ft BACKWATER CONTROL.. Vh= .215ft hwDi= .622ft Lbw= 30.0ft Hev= .00ft BACKWATER CONTROL.. Vh= .255ft hwDi= .668ft Lbw= 30.0ft Hev= .00ft BACKWATER CONTROL.. Vh= .267ft hwDi= .730ft Lbw= 30.0ft Hev= .00ft BACKWATER CONTROL.. Vh= .391ft hwDi= 1.191ft Lbw= 30.0ft Hev= .00ft INLET CONTROL... Submerged: HW =2.95 INLET CONTROL... Submerged: HW =3.23 Page 30 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Pr Orifice (Orifice-Circular) --------------------------------------- Upstream ID = (Pond Water Surface) Downstream ID = Ex Culvert (Culvert-Circular) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.000.000.000.000.0072.00 0.00(N/A)0.000.0072.0872.0872.500.6872.50 0.00(N/A)0.000.0072.4272.4273.002.0073.00 0.00(N/A)0.000.0072.5372.5373.502.5873.50 0.00(N/A)0.000.0072.6272.6274.003.0874.00 0.00(N/A)0.000.0072.7072.7074.503.5374.50 0.00(N/A)0.000.0073.3173.3175.003.4175.00 0.00(N/A)0.000.0074.6074.6075.502.4975.50 0.00(N/A)0.000.0074.8874.8875.632.2775.63 Message WS below an invert; no flow. CRIT.DEPTH CONTROL Vh= .137ft Dcr= .362ft CRIT.DEPTH Hev= .00ft H =.58 H =.97 H =1.38 H =1.80 H =1.69 H =.90 H =.74 Page 31 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Individual Outlet Curves RATING TABLE FOR ONE OUTLET TYPE Structure ID = Pr Weir (Rectangular Weir) --------------------------------------- Upstream ID = (Pond Water Surface) Downstream ID = Ex Culvert (Culvert-Circular) Tailwater Error (ft) Downstream Channel Tailwater (ft) Convergence Error (ft³/s) Downstream Hydraulic Grade Line Error (ft) Next Downstream Hydraulic Grade Line (ft) Converge Downstream Hydraulic Grade Line (ft) (into) Headwater Hydraulic Grade Line (ft) Device Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.000.000.000.000.000.0072.00 0.00(N/A)0.000.0072.080.000.000.0072.50 0.00(N/A)0.000.0072.420.000.000.0073.00 0.00(N/A)0.000.0072.530.000.000.0073.50 0.00(N/A)0.000.0072.620.000.000.0074.00 0.00(N/A)0.000.0072.700.000.000.0074.50 0.00(N/A)0.000.0073.31Free Outfall75.004.1475.00 0.00(N/A)0.000.0074.6074.6075.5011.2675.50 0.00(N/A)0.000.0074.8874.8875.6312.4275.63 Message WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no flow. H=.50; Htw=.00; Qfree=4.14; H=1.00; Htw=.10; Qfree=11.40; H=1.13; Htw=.38; Qfree=13.51; Page 32 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Scenario: Proposed Conditions 2YR Storm Event: 2 YearLabel: Proposed Outlet Return Event: 2 yearsSubsection: Composite Rating Curve Composite Outflow Summary Convergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) 0.00(N/A)0.0072.00 0.00(N/A)0.6772.50 0.00(N/A)2.0073.00 0.00(N/A)2.5873.50 0.00(N/A)3.0874.00 0.00(N/A)3.5274.50 0.00(N/A)7.5475.00 0.00(N/A)13.7475.50 0.00(N/A)14.6975.63 Contributing Structures (no Q: Pr Orifice,Pr Weir,Ex Culvert) Pr Orifice,Ex Culvert (no Q: Pr Weir) Pr Orifice,Ex Culvert (no Q: Pr Weir) Pr Orifice,Ex Culvert (no Q: Pr Weir) Pr Orifice,Ex Culvert (no Q: Pr Weir) Pr Orifice,Ex Culvert (no Q: Pr Weir) Pr Orifice,Pr Weir,Ex Culvert Pr Orifice,Pr Weir,Ex Culvert Pr Orifice,Pr Weir,Ex Culvert Page 33 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc Index Proposed Outlet (Outlet Input Data, 2 years (Proposed Conditions 2YR))...27, 28, 29 Proposed Outlet (Individual Outlet Curves, 2 years (Proposed Conditions 2YR))...30, 31, 32 Proposed Outlet (Composite Rating Curve, 2 years (Proposed Conditions 2YR))...33 P NOAA South Windsor (Time-Depth Curve, 25 years (Existing Conditions 25 YR))...11, 12 NOAA South Windsor (Time-Depth Curve, 2 years (Existing Conditions 2YR))...9, 10 NOAA South Windsor (Time-Depth Curve, 100 years (Existing Conditions 100 YR))...7, 8 NOAA South Windsor (Time-Depth Curve, 10 years (Existing Conditions 10 YR))...5, 6 N Master Network Summary...2, 3, 4 M Ex Outlet (Outlet Input Data, 2 years (Existing Conditions 2YR))...17, 18, 19, 20 Ex Outlet (Individual Outlet Curves, 2 years (Existing Conditions 2YR))...21, 22, 23, 24, 25 Ex Outlet (Composite Rating Curve, 2 years (Existing Conditions 2YR))...26 E Detention (Elevation-Area Volume Curve, 2 years (Existing Conditions 2YR))...15 Detention (Elevation vs. Volume Curve, 2 years (Proposed Conditions 2YR))...16 D Area 2 (Runoff CN-Area, 2 years (Proposed Conditions 2YR))...14 Area 2 (Runoff CN-Area, 2 years (Existing Conditions 2YR))...13 A Page 34 of 3427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 8/11/2025 PondPack CONNECT Edition [10.02.00.01] Bentley Systems, Inc. Haestad Methods Solution Center20250811 Nutmeg Detention BOX.ppc APPENDIX C #570 DRAINAGE CALCULATION WATER QUALITY VOLUME CALCULATIONS PIPE FLOW ANALYSIS Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 8/11/2025 J:\4481\159\Design\Drainage Analysis\20250808 DRAIN_Treatment Structure Sizing Existing Storm Drainage Proposed Storm Drainage TOTAL Area = 2.4 AC.TOTAL Area = 2.4 AC. Impervious Area= 0.59 AC.Impervious Area=0.60 AC. Lawn Area= 0.42 AC.Lawn Area=0.42 AC. Gravel/Dirt Area=1.39 Gravel/Dirt Area=1.38 AC. Weighted "C" = 0.7660 Weighted "C" = 0.76625 TC=10 min., I 25= 6.4 TC=10 min., I 25= 6.4 Q 25 = 2.4 x 0.7660 x 6.40 = 11.76576 CFS Q 25 = 2.4 x 0.76625 x 6.40 = 11.7696 CFS As shown with the 25 year storm calculation above, any increase in flows is negligible and with the addition of gravel surrounding the proposed equipment concrete pads, will be infiltrated into the soil. #570 NUTMEG DRAINAGE ANALYSIS Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 8/11/2025 J:\4481\159\Design\Drainage Analysis\20250808 DRAIN_Treatment Structure Sizing WQV = Water Quality Volume (acre-feet) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) I = Percent Impervious Cover, Impervious Area / Total Area DA = Drainage Area (Acres)DA = 1.000 acres IA = Impervious Area (Acres)IA = 1.000 acres I = 100%R = 0.95 WQV = 0.103 acre-feet Q = Runoff Depth (in watershed inches) WQV = Water Quality Volume (acre-feet) DA = Drainage Area (acres) Q(in) = 1.24 watershed inches Q(in) = 1.24 watershed inches P = 1.3 in CN = 98 Ia = 0.041 inches Tc = 0.167 hours Ia/P = 0.032 qu = 775 csm/in WQF = Water Quality Flow (cfs) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 1.496 cfs PROPOSED TREATMENT STRUCTURE SIZING Compute Water Quality Volume Determine Percent Impervious Cover (I)Calculate Volumetric Runoff Coefficient (R) Calculate Water Quality Volume Compute Runoff Depth Determine NCRS Curve Number (CN) From Appendix D, Figure 1 - Graphical Solution of Runoff Equation (Fig. 2-1 from TR-55) of the 2024 CT Stormwater Manual From Appendix D, Figure 3 - Unit Peak Discharge for NRCS Type III Rainfall Distribution (Exh. 4-111 of TR-55) of the 2024 CT SW Manual Compute Water Quality Flow Determine Initial Abstraction (Ia) From Appendix D, Figure 4 - Initial Abstraction Values for Runoff CNs (Table 4-1 of TR-55) of the 2024 CT Stormwater Manual Determine Unit Peak Discharge (qu) Time of Concentration (Tc) DA WQVQin )12( )( ×= )(inuQDAqWQF××= Barton Loguidice, LLC 600 Nutmeg Road North South Windsor, CT 8/11/2025 J:\4481\159\Design\Drainage Analysis\20250808 DRAIN_Treatment Structure Sizing WQV = Water Quality Volume (acre-feet) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) I = Percent Impervious Cover, Impervious Area / Total Area DA = Drainage Area (Acres)DA = 3.000 acres IA = Impervious Area (Acres)IA = 2.500 acres I = 83%R = 0.80 WQV = 0.260 acre-feet Q = Runoff Depth (in watershed inches) WQV = Water Quality Volume (acre-feet) DA = Drainage Area (acres) Q(in) = 1.04 watershed inches Q(in) = 1.04 watershed inches P = 1.3 in CN = 97 Ia = 0.062 inches Tc = 0.250 hours Ia/P = 0.048 qu = 550 csm/in WQF = Water Quality Flow (cfs) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 2.681 cfs From Appendix D, Figure 3 - Unit Peak Discharge for NRCS Type III Rainfall Distribution (Exh. 4-111 of TR-55) of the 2024 CT SW Manual Compute Water Quality Flow Determine NCRS Curve Number (CN) From Appendix D, Figure 1 - Graphical Solution of Runoff Equation (Fig. 2-1 from TR-55) of the 2024 CT Stormwater Manual Determine Initial Abstraction (Ia) From Appendix D, Figure 4 - Initial Abstraction Values for Runoff CNs (Table 4-1 of TR-55) of the 2024 CT Stormwater Manual Determine Unit Peak Discharge (qu) Time of Concentration (Tc) PROPOSED TREATMENT STRUCTURE SIZING Compute Water Quality Volume Determine Percent Impervious Cover (I)Calculate Volumetric Runoff Coefficient (R) Calculate Water Quality Volume Compute Runoff Depth DA WQVQin )12( )( ×= )(inuQDAqWQF××= Hydraflow Plan ViewProject File: 20250811 Pipe Analysis NUTMEG.stmNo. Lines: 508-12-2025Hydraflow Storm Sewers 2005TreatmentStructure #2TreatmentStructure #1Existing pipe systemto the east to remain24" diameter header pipe with several8" inlets to underground system. Storm Sewer TabulationPage 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line IDcoeff (I) flow fullLine To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up DnLine(ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft)1 End 46.0 0.14 0.88 0.90 0.13 0.79 5.0 5.3 7.3 5.76 8.39 4.74 18 0.54 72.55 72.30 73.47 73.34 77.82 80.00 Ex cb2-TS12 1 65.0 0.74 0.74 0.90 0.67 0.67 5.0 5.0 7.4 4.95 5.13 4.03 15 0.54 72.90 72.55 74.15 73.86 76.20 77.82 Ex cb2-Ex cb13 End 74.0 0.00 3.03 0.00 0.00 2.37 0.0 14.2 4.4 10.52 0.00 3.35 24 0.00 73.40 73.40 75.59 75.45 78.00 78.50 out-TS24 3 17.0 0.37 0.37 0.81 0.30 0.30 8.0 8.0 6.0 1.80 7.59 1.47 15 1.18 74.00 73.80 75.91 75.90 77.60 78.00 TS2-Excb35 3 60.0 2.66 2.66 0.78 2.07 2.07 14.0 14.0 4.5 9.27 7.43 5.24 18 0.50 74.10 73.80 76.23 75.76 78.00 78.00 TS2-Ex EastProject File: 20250811 Pipe Analysis NUTMEG.stmNumber of lines: 5 Run Date: 08-12-2025NOTES: Intensity = 37.27 / (Inlet time + 4.00) ^ 0.73; Return period = 10 Yrs. Hydraflow Storm Sewers 2005*See note*NOTE: 24" diameter header pipe is to be placed level with minimumof 6- 8" diameter inlet pipes to the underground system. APPENDIX D NOAA PRECIPITATION FREQUENCY ESTIMATES SOILS DATA [Meg 5 Pmmred Ev. m wz usA %IP66 mosw Men Slice Medium (SLM) Outdoor LED Area Light QUICK LINKS Ordering Guide Performance Ivue DatE FEATURES &SPECIFICATIONS Construction .Rugged die-cast aluminum housing contains facmry prewired driver and optical unit,Cast aluminum wiring access door located underneath. -Fixtures are finished with LSI'S DuraGrip‘ polyester powder coat finishing process. The DuraGrip finish withstands extreme weather changes without cracking or peeling.Other standard LSI finishes available.Consult factory. -Shipping weight:33 lbs in carton. Optical System-Staterof-the-Art one piece silicone optic sheet delivers industry leading optical control with an integrated gasket to provide IP66 rated seal. -Proprietary silicone refractor optics provide exceptional coverage and uniformity in distribution types 2,3.4,SW, FT,FTA,AM,and LC/RC. -Silicone optical material does not yellow or crack with age and provides a typical light transmittance of 93-95%, -Zero uplight. -Available in 5000K,4000K,3500K, 3000K and 2700K color temperatures per ANS C78.377.Also Available in Phospho Converted Amber with Peak intensity at 610nm. -7O or SOCRI Minimum. -Integral louver (IL)and integral half louver (IH)options available for enhanced backlight control. Electrical-High-performance driver features overvoltage,under»voltage,shortcircuit and over temperature protection. s O-IOV dimming (10%-100%)standard. 'Standard Universal Voltage (120-277 VAC) Input 50/60 Hz or optional High Voltage (347-480 VAC). -L80 Calculated Life:>100k Hours (See Lumen Maintenance chart) -Total harmonic distortion:<20% r Operating temperature:-40°C to +50°C (-40°F to +122“F),42L and 48L lumen packages rated to +409C.55L lumen package rate to +35°C. ~Power factor:>90 -Input power stays constant over life. -Field replaceable IOkV surge protection device meets a minimum Category C Low operation (per ANSI/IEEE C62.4I.2). -High-efficacy LEDs mounted to metal—core circuit board to maximize heat dissipation. -Driver is fully encased in potting material for moisture resistance and complies with FCC standards.Driver and key electronic components can easily be accessed. Controls -Optional integral passive infrared Bluetooth‘"motion sensor.Fixtures operate independently and can be commissioned via IOS or Android configuration app. -AirLink'”Blue wireless control system with technology partner Silvair incorporates Luminaire Level Lighting Controls (LLLC) and high-end trim. Photometrics Dimensions Installation -A single fastener secures the hinged door, underneath the housing and provides quick &easy access to the electrical compartment. 'Included terminal block accepts up to 12 ga.Wire. Utilizes LSI's traditional B3 drill pattern. (See drawing in poles section) Warranty-LSI Iuminaires carry a 5-year limited warranty.Refer to httgs:[[www.lsicorp. com/resources/terms—conditions- warrarity/for more information. Listings-Listed to UL 1598 and UL 8750. -Meets Buy American Act requirements. -DarkSky approved with 3000K color temperature selection and fixed mounting. -Title 24 Compliant;see local ordinance for qualification information. 'Suitable for wet locations. 'IP66 rated Luminaire per IEC 60598-I. -3G rated for ANSI 036.31 high vibration applicationsapplicationsare qualified. -lK08 rated Iuminiare per IEC 66262 mechanical impact code. -DesignLights Consortium'(DLC)qualified product.Not all versions of this product may be DLC qualified.Please check the DLC Qualified Products List at wwwr designlights.org/QPL to confirm which versions are qualified. 'Patented Silicone Optics (US Patent NO. 10,816,165 BZ) LSI Industries Inc. OVERVIEW Lumen Package 9.000 V 55.000 Waktage Range 62 r 436 Efficacy Range (LPW)114 -162 Wexght Ibs(kg>27 (I22) Control Options IMSBT,ALB.ALS, 7-Pin,PCI Slice Medium Outdoor LED Area Light 1n 0 Have questinns?(aH us at (800)456-7800 ORDERING GUIDE Back to muck Lmks ACCESSORY ORDERING INFORMATION5 EXIERIIALSHIEIDIII -OPIIOIIS 3 ExternalShleld See shielding 6"External Shleld G rde ‘rtk’dennleslrmsn.see nrnstr notions tusrne mm!oe lotaremn nand mleoi note see FusrrrgArtessory mode lur romoatmrlrlv nnlvavarlaole rrr 9L izt,taL wt lumen Patioges tumult tatlory torlead trmearrtrayarlattrlrty Roravariaole wrtn 551 tumen Parkaqewnerrw-eéov rssuxrtroo. l tustornltrnrenanrt wattauenmiages available tonsitittartory vdiies arewttnirr rnnrtsirvslanttam tnlerarrtesuiii rirli Dlt listen z liotavarlaole on “typo Svr orstntmtran.llnai avariaole wrlnltrRt outnoutrons t a Motronsertscrs are lrelutnnlrouraule vraan apolnat ran teunwnlnadea lrnmvatrr srnarlnnone‘snatrveann stare see rnntrolssetnon inrrnnre detail; s LSI Indu$tvles Inc, .tonirol nevrte m dinning tau must he amend seuaratelv see Attessurv orderrng lrrlnrrnalron Attessmies are snipoee senaralely and held installed mmunnmmnvu:SIM LED 36L Sll HA UNV DIM 50 70CRI AISCSM BRZ II Prefix ligh!Sourze luman Palkage lens Disllihulion Oriemationl Voltage Dlivu SIM -Shm Medium LED EL -9,000 Imx 11L -12,000 Ims IEL -10,000 lms 24L -24,000 Ims 30L -30,000 lmx 36L—56000 Ims IZL-42,000 Imx 48L »48,000 lms 55L »55,000 Im: (ustom lumen Fatkages‘ SIL-Silimne Z-IypeZ 3-IypeE A»Iype4 5W-Type S Widen-Forwam Throw HA -Fmward Ihtow Automotive AN -Auiomotive Meithandise lt -Lei!(omei In »Right (omer (hlank)-slandald (no Iotanon) l-0:106 Iotated letl 90° R-000(5 mated right 90" UHV-Universal Voltage (HO-277‘!)IIV »High VoltagE (347»480V) DIM -0-10v Dimming (10-10031) (nlorlempemme tolni Rendeiing (onirols Finish Onlions 50 -5,000 (El 40-4,000 (U 35 -3,500 ((l (00 (Rl only) 70(RI-70 (RImmI80[RI (Elanli l -None Wiieless (onliols System Alst -Airlink Svnanse (onlrol System“ ALSESIJZ -AiiLink Synaose Conlrol Syglem wnh 1 2-20‘Motion Sensovi ALSISM-AiiLink Svnanse (onliol Syslem With 20-40'Motion Sensor“ AlBllllllll Atr1rnl<Bhre long Range Wireless Morton 0 Photo Sensor (onlroller (8-24'mountrng herght)“Atemrzut -Alrtint Blue tong Range Wrreress Morton e Photo Senror controller (25-40 moootrno heron)” Stand-Alone Controls EXI-0-10V Dirnmlng leads extended to houxing exterlor [lllP -7 Pin (onlrol Reteptacle ANSI (1 36.41‘ lllSBllL -integral Blueloolh"Motion and Phototell Sensor (0»24'Mil)“ IMSEHI -lnteorai Bluetooth"Motion and Phototell Sensor (ZS-40‘MH)” Button Tyne Phototells P0120 -120VPUNK-277 -208 -277V Ptlm e 347V Elli -Bla(k m ’Dam Bronze 6”“'6“"Me‘a'6'“ GPT -Giaphile MSV >Metallk Silver PIP magnum PM m '3a”?ve'de 5m" WllT -Whlte (Blank)v None lH (Modgraie >l Iegral SpinHall light louvei (many lSlh-alnlegial m SDI“L'g logyetLwmJDarkSkyApproved((T’s 30 -3.000 ((l 17-2,700 ((1 (00 tRl only) Allk -Phosphor (onverled Arnberl CONTROIS ACCESSORIES Descrlntlon Order Number lwrst lock Photocell (IZDV)for use wrth ER7P IZZSII lwrsl Lotk Phototell (208-277)tor use with (R7?IZlSlS twtst Lotk Phototeli (347V)tor use wrlh CRIP 122516 twist lotk Photoceii (480V)tor use with ERIP IIZSIEO ArLink 5 Pin twist Lock (ontroller 661409 A‘rtlnk 7 Pin iwtst lock [ontroiier 661410 Shorllng (ap tor use with (WP 109518 MOUNTING AttESSORIES‘ Destrlnllon Order llumber Round Pole Adapter (3"Round/tapered Poles)4082mm Round Pole Adapter (4"Round Poles)3799mm Round Pole Adapter (5"Round Poles)37996BtLR 05 to BE Adapter 80068631ll FUSIIIG OPTIONS’ Single Fusing (120V) A(;?Q;‘fg:‘;dE See FSingleFusing(277V) Double Fusing (200V.240V) Double Fusing (480V) Double Fusing (347V) Slice Medium Outdoor LED Area Light 8 Have uuestions?(all us a1 (800)1136-7800 ACCESSORIES Ivne OPTICS ROTATION Top View @U mam mm Lan 0pm nnmgu mum Q pal: use m:mum ma TmnL mam nnuzm mum)(Dunn;nmm Lam ileum (LR mm naunt Imm nununnn Reulmexx wulnsu Imam wla mnblmmmpnle (zS'nD) Reulw 'WMS [imam DISH AEwhIE LilED').D90 (Dmm‘e ZIW‘J.Wu (InvIEI U‘EH (Mam Replam iwllhd (A'mum nnlel 0'5 [S'muave DOW ACCESSORIES/OPTIONS Integral Louver (IL)and House-Side Shield (IH) megral lower (IL)and haw nower (1H)accessory smelds avanabne for .mpvoveu backngm controi wrtnou:sacrmcmg street we partormance Lsrs unkegra;Lam/er 0L)and unnegran HOUSE‘SIdE Smeld (IH)cptlons deIIVer backhght Contro‘that Slgnlflcanny reduces SDI” ngm behmd me poles far appncamns wnh pole Iocauans cxuse m amacant propemesThedesignmaxnmzesnovwamvenecteangmwnnavedncmggnave‘mamtammg me opncau d‘stnbunon selected.and mos:importantny alimmanng ngm trespass aatn opucns rotate wnh the opttcal dustnbutton Luminaive Shown wim Integral Lcuve'(IL) Luminaire snown7PinPhomelectricCantrolwithCR7P 7-ptn ANSI (mam-2013 control vecaptacla cotton avananne tar twist lock phamcunhuls Gr wlre‘Ess Control mo¢ules Conlml accessones sand sapatataty Dtmnnng teads tram the receptacte wtn be connecteu to the anver dtmmmg taads (Consatt factory tor atternate wtrrng; C n www IatLQH)Cu‘LSI lnduslries Inc.tOOOG AHM \I rut.’é rn 3/11 pct o7;’on/15 SPECJHO£JH2 MOUNI'ING A I I 3\'RIES Ega Unlvusil Hnunring Evade! Mwnu m 2 F square av vound (tapered/might)um;mm (Z)mnunm‘ng hale spam hEKween 35"Ia 5" Par!Numhu:BM UHE (LR “Hid Nnlml Pli|l hue one uemn mmHaunn m Ewmglnew mmmdmn naIeswKn nme 59am lumen 14 Ia w Pan uumnu:m pun ms xx (Ln 15‘Iih “Hid "nun!Vim True mm nevsnn insmatmn m Ewing/MW (antruman pmaswnh ma suawi {mm 14 m 4.6“ Pin Humher:IKS W15 E135 XX (LR _ g E Mluihhle SHVMH Mmmu umu a 2"(51mm)IP.2375"(60mm)0.D Iannn and uvawdeswo”ohm (max 45°ahava nomonta‘) Pin Numhu:HA ASE (In 5mm:Inn-m run Mmmu nntu a 1"(51mm)IF,2.575"(60mm)0 D.Ianon and aHuws '0!mwnting Mu 104 Inminawes Pin Kumhu:KIA m1 ' Wale Inlemal mime: Mnunu inside a"m 5"squave un‘e and aHows mv mounimg up m A \mnn'anne: Pin Humhu:EM X_IS$'[ll .u£‘g §E x § WIII Hnunl 3mm Mounu nmn venna‘waH sunam (havdwave/anmmx nut \nduded) Pan Numhu:EKSBSWH (Ll Undude:smiawmnnml uunmnms) Watm Pale Enmt Muuntx 0M0 wooden We:(6"rmnn’nmrn UD‘navdwave/anmon um \nduded) Pan Mumhzv:BKS 1w VIP (LR (Intludas sunare (ondmt nunrnmm) 9llEDING,NLB &MISLAEIBSORIB a §5 lnlegnl Lnnvu indwmual law ur LEDS m Numha:60ml He‘d InxtaH lnlEnvaI Lnuvgv mnwdexmaxumum nadhgm (untml hv sniedhng Eam Imam Mall mum me dmvmutmn, Pm Numhu:mm F‘eln InStaII Imegla‘Ha”{WW DIUWUES mm bawhgm luMlDl wilhuul imnamng honl [xtunal Shield Exlema‘shie‘d murkswew at hum mute tmm anvxme m \ummawe.addmuna‘smemmg mmmurahun;avaWamE Part Numhu:783607E1I [1")IUESSEBLI (5") a g. 3mm:Pales M -$9':Ieel ana alummum unles m 4'2 5"and 6"sues rm vewm and new mnmuthon Pin Numhev:IWESQ/ESO Raund Volts Io rm‘meal and alummum ncla m 4"ana 5"mes In!vetmm and new zonmumon Van Numbu:tRP/slw Iinmd Pnla 20'-IE‘slee‘and alummum [1mm '0!Iavum arm nnw mmmmnn Pan Kumhu:HIP 3%x Blvd Snlkcs 1U‘Hm!mm xmkg (3‘vemmmended uev Inminaivej xilwneadheswe (mvers anvwximamv 15’hngav {29 at mm Smke)arm aunhtalmn lam Silike Pin Ilnmhu:75165] Adhuivr Pin NumhEl:75ml hulk Gun Pin Numhrv:151636 Slice Medium Outdoor LED Area Light hoe 0 Have questinns?(all us at (800)4364800 PERFORMANCE Back m Gulck Lmks LSI Industries Inc. DELIVERED LuMENs' LumenPatkage mun (RI $000Km 4001mm soauxtu WanagaDelivevedlumensEffitatyBUGRatlnyDellveredlumensEmmyBUERatlngDeIlvevedLumensHflcatyBHGRatlng 91 z 70 9411 149 az-uo-Gz 9603 152 32-11162 9603 152 a2-uo-Gz 52 3 954a 152 Bz—Uo-Gz 9743 155 32110-52 9m 155 32110-62490631Mawn-65 gaze 153 31110-53 9431 150 a1—uo-«35w9151142awn-62 14511 150 33110-62 9450 150 Ewe-E2179454150sz-uorsz 9557 153 52750-52 9552 153 52410552n4953115152415-52 9725 154 32-40-52 9725 154 92-00-52954915392-00-51 9045 155 92-00-51 9045 155 92-00-51AM11/95 0949 144 91-00-52 9515 153 92-00-52 9313 150 91-u0-52 121 2 70 12553 147 9500-52 12795 150 9300-52 12790 150 93-00-52 15 5 12214 150 92-00-52 12974 153 92-00-52 12924 153 92-09-5241205514292-00-53 12112 151 92-00-54 12545 140 92-00-531233314594005212504140940052125541405400 525wn1250314092-00-52 12051 151 92-00-52 12951 151 92-00-52F141259214993-00-52 12950 152 93-00-52 12950 152 93-00-524141294015193-00-51 13111 154 93-00-52 13111 154 93-00-5211/171 11903 137 92-09-53 12555 145 92-00-53 12317 142 92-00-53 191 2 20 19421 135 93-00-53 19797 139 93-00-53 19792 139 93-00-53 135 3 19591 135 93-00-53 19072 141 19072 141 93-00-5341279313292-00-54 19999 140 19505 137 92-00-545w1912513494-00-52 19499 137 19499 137 94-00-52511952515293-00-53 19904 140 19904 140 93-00-531955513993-00-53 19037 141 19037 141 93-00-53114 AM 19995 140 93-00-52 19271 143 19221 143 93-00-520/95 17559 131 92-00-53 19570 139 19223 135 92-00-53 241 2 20 23351 145 94-00-53 24505 152 24414 152 94-00-53 151 3 23999 149 93-00-53 25174 155 25079 155 93410-5342449515293-00-55 25522 159 25552 159 93-00-555w2329914995005324953155249591549500-53112405914993-00-53 25239 151 25143 155 93-00-532307914393-00-53 24210 150 24119 150 94-00-531144112495114993-00-52 25229 152 25134 155 93-00-520/91 24353 151 93-00-54 25522 159 25522 159 9300-54 901 2 70 29454 139 94-00-53 30909 145 30191 145 94-00-53 213 3 30259 142 93-00-54 31751 149 31531 149 93-00-5443950914493-00-55 32029 151 32055 151 93-00-555w3000214195-00-53 31422 149 31353 147 95-00-53113034514294-00-54 31932 149 31212 149 94-00-542910913294-00-54 30535 143 30420 143 94-00-545144143013414294-00-53 31920 149 31200 149 94-00-5315295304301439300-55 31991 150 31591 150 9300-55 351 2 70 34123 134 94-00-53 35795 140 35550 140 94-00-53 255 3 35053 137 94-00-54 35771 144 35532 144 94-00-5443541413993-00-55 32114 145 37099 145 93-00-555w347451359500-54 35449 143 35311 142 95-00-54513514213094-00-54 35954 145 35725 144 94-00-54r143371113294-00-54 35353 139 35230 130 94-00-54103513013994-00-53 35051 145 35712 144 9400-533520713093-00 55 35992 145 35992 145 9300-550/111 421 2 20 39955 122’9500-54 41925 134 41752 133 95-00-54 314 3 41055 131 94-00-55 43050 132 42905 132 94-00-5544151913293-00-55 43511 139 43494 139 94-00-555w4059513095-00-54 42590 135 42529 135 95-00-54r14115113194-00-54 43129 139 43015 132 94-00-54n43949412594-00-54 41419 132 41253 131 9500-54404114513154-00-53 43152 132 43000 132 94-00-53152115412751319300-55 43255 132 43255 132 93-00-55 491 2 20 44390 121 55-00-54 45555 122 45399 125 95-00-54 352 3 45325 124 94-00-55 47547 130 47357 129 94-00-5544599512594-00-55 49204 131 49195 131 94-00-555w4500212395-00-54 47435 129 47302 129 95-00-54114479912294-00-55 45994 129 45917 129 94-00-55r114459012195-00-54 45275 127 45599 129 95-00-544104531012594-00-53 49579 132 49395 132 94-00-5315/91 45225 125 94-00-55 47921 131 47921 131 94-00-55 Slice Medium Outdoor LED Area Light Tvne' G Have questions?(al{usa1 (800)436-7800 PERFORMANCE (CONT.)Back to Qmck Lmks 'EIMHKaI 001a at 25“:(11”1).4mm walliQE mav 011191 DY ‘/-10% ‘LEDx am [16001111117 0000100 1110121012 va1ue1 am nammal. 1.11mm"mammanm valuasalm ave (001116190 021 TM‘ZI 0am an 11100 dala arm 01751111 121mg 2 11 atmldame W110 IESNA 11121-11.Flmmed Va1uE§IEUVESEHI 10101110101511 Va10€haSEd 1m 11711?dma11nm 1M1 am w1mm 111 1mm:109 61111 01-00-00 10101 10:1 1110311011 101 (he dam undev 123mg. 1.n moldante W110 IEXMA 11121-11.(0111110100 Va1ues veuveient 11m?duvahom 11101 mew 51x 116195 109 111114 11100-001010 m1 00100011 1m 111E devilE 00001 1551010. :1? ,LSI lnduslries Inc..c7c VJL1 "% DELIVERED [UMENS‘ Lumen Packaga D'wimim [RI 3000K (U 4000K tU 5000K ((T WanageDellveredlumen:Elmaq EllG Raung Delivered humans Elflcaty BUG Rating Dellvered Lumens Emmy BHE Rating 551 Z 70 49553 114 E5-U0—64 5Z012 119 35-00-64 51816 119 05-00-64 410 3 5093A 117 Ed-UO-GS 55430 113 3400765 53219 121 04-00-65 4 50544 116 EA-UO-GS 52970 111 34-0065 52950 121 E4—U0-65 SW 50487 116 ES-UO-M 52961 121 35-00-64 52761 121 BSvUD-M 51064 117 04-00-65 53566 123 34-00-65 51364 121 0400465FT FTA 48984 112 05-0064 51384 118 35-00-04 51191 117 05-00-644M5104511704-0065 51546 123 34-00-63 51144 122 34-0063 lE/RC 50247 116 34-00-05 52659 121 84-00465 52659 121 B4—U0-GS IUMEN SCAIJHG FACTOR 70(RI -80ml 1000K 70(Rl -3500K 80ml 3000K 70ERI -Z700K 80ERI 0.95 1.00 0,06 ELEURKAL DATA (AMPS)-1700KI3000K/1500KI4000KI5000K‘ Lumens unv zuav 140v 177v WV 480v 91 0.52 0.50 0.26 0.22 0.13 0.15m0.71 0.41 0.35 0.31 0.24 0.13 13L 1.13 0.55 0.56 0.49 0.39 0.28 24L 1.14 0J7 0167 0.50 0.46 0.34 501 1.70 1.02 0.09 0.77 0161 0.44 351 2.11 1.25 1,00 0.92 0.73 0.53 411 2.02 1.51 1.31 1.13 0.90 0.05 431 3.06 1.76 1.55 1.12 1106 0.76 551 1.61 2,10 1.02 1.57 1.26 0.91 RKOMMENDED [UHEN MAINIENAME'(0-15'T) Amhitnt lntial‘25W Sohr‘15W l00hl‘ 91 -131 100$97%911 90%06% 241 -wl 100%95%09%841 791 , 551 100%91%02%74%671 DEllVEnEI)IUMENS‘ lumenPatkage Dlsulhullon [has n hm converted Amhel (Peak 610mm)WattageDeliveledlumensEmcacvBuERalIng 91 2 5040 80 02700-01 74 1 6010 82 BIVUDVGZ 5w 5471 74 01-0061 FT 5001 79 BlrUD-GZ HA 5924 81 01700761 AM 5995 81 BIAUO-Gl 121 Z 7510 74 02-00-02 102 1 7749 76 01-00-62 5W 7045 60 03-00-62 FT 7470 73 EZ-UO-GZ F14 7620 75 32-00-62 AM 7720 76 Bl-UO-Gl 101 Z 9111 69 02-00-62 115 1 9502 71 32-00-62 5W 0112 65 01-00-62 FT 9237 60 02-00-62 FTA 9411 70 E2-U0-62 AM 9546 71 BZ-UU-Gl Z41 2 10955 61 EZ-UO-GZ 115 1 11271 64 920062 5W 10249 59 B1—U0-62 FT 10067 62 EZ-UU-GZ F14 11007 61 BZ-UU-GZ AM 11210 64 020061 REIOMMENDED llJMEN HAIN‘IENAN‘E‘(40“0 Amhimt InliaF 15W $01!!“7510’100W 7l.-101.1001 97%92%80%84% 241 -481 100%94%071 001 74% REtDMMENDED 11111611 HAINIENANCE'(50"0 mien,[my 25h:5W 75“,:mmx 71 -161 100%96%9151 B71 01% ELEtIIlItAl DAIA-PhoshnIConvened Amlm (AMPSY lumen;1201 208V 240V 27W 147V 480V 91 0.62 0.16 0.11 0.27 0.21 0.15 121 0.85 0.50 0.41 0.10 0.10 0.22 181 1.11 0.65 0.56 0.49 0.19 0.20 Z41 1.47 0.85 0.71 0.64 0.51 0.17 Slice Medium Outdoor LED Area Light 0 Have questions?(all us at (300)436-7800 PHOTOMETRICS Luminaire photometry has been conducted by an accredited laboratory in accordance with IESNA LM-79.As specified by IESNA LM-79 the entire luminaire Is tested as the source resulting in a luminaire efficuency of 100% SLM-LED-3OL-SIL-2’40-7OCRI W09 Back to Quick Links ISO Fooltandie Polal [urve 15'Mounting Height/15'Gila Seating lm .zn Iiit SLM-LED-3OL-SIL-3-40-7OCRI ISO Fooltandle u 0.5 F(I Veriuai Plane I Horizoniaitone Pnlal EllillE ZS'Mounting Heignt/25'Grid Spating Isrt .m .Irt ‘0.5 K I Vemral Plarie I Horrznntal (one LSI lndustrre5 InC.LL I i Luminalra Daia nu!1 Dishihuiion nestlintion 4000 KEMn.70 (Ri Delivered lumen;30,908 Walk ZIE Elfitatv i45 lB ivne Tvpe ii r Short BUG Raliliu SA-UO-Gi lonal Lumen Summary lone lumens 7i luminaiie law (040“)5.205 17% Medium (30-60”)WADE 62% High (60-30“)6,293 20% Very lligli (30-90“)30i 1% UuUglll (Mi—100°)0 0% lntal Flux 30.908 l00% luminaire Data Tyne 3 Dktrihulion Duuinlinn 4000 Kelvm,70 (RI Delivevei lumens ElJSl Walk 2i} Elfitaty M9 IB lwe iype Iii -Shun BUG Rating 0300-04 Iona!lumen Summary lone lumen;ll luminaire Luw (0-10“)3,533 0% Medium (30-60”)0,345 58% lligh (60—30”)9,441 30% Very Hieh (Eu-90°)432 l”/a llplight (En-100“)0 0% iolal Flux $1,751 l00% Slice Medium Outdoor LED Area Light 0 Have questions?(aH us at (800)1136-7800 PHOTOMETRICS (CONT.) SLM-LED-3OL-SIL-FT-40-70CRI ISO Foottandle Tx De Polal curve ZS‘Moununq He‘ght /15'6nd Spaung Isrc lm .m g »0.5F{I VevlKaI Plane l Hanzomal (one SLM-LED-3OL-SILA4-4O-7OCRI ISO Footcandle Pulal (um // / \_¢¥W ZS'Mounting Height /ZS‘Gvid Snatmg ISK .m .m 0.5 R I Vernal Plane I Humunta{(une L5l Industries lnc. ‘ X luminalle Data Tm Mistribuh'on Duaiption 40UD Kelwn,70 (m Deliveled lumenx 31,3}2 Wam 213 Emmy 149 IE5 Ivve Tyne IV -Shon BUG Raling B47U0»G4 Iona!lumen Summary lune Lumen;9s luminaive lnw (0‘30“)4,047 13% Medium (10-60“)16,376 Sl% High (SD-M”)10,361 §4% VEW Minh (80-90”)549 2% Unliht (gu-IEO“)0 0% Iotal Flu!M32 100% lumlnalre Data Tyne A Distrihurion Dasainh’nn 4000 Kelvin‘70 (RI Delivued lumens 32,079 Watt Ill Emcacv 1S0 IE5 Me Type IV -Very mu BUG Rating 33-00-63 Ional lumen Summary 1m lumem 'A luminaiu lnw (0-30“)m9 11% Madmm (an-son)14,044 44% High (so-34°)131$;44% Veryuigmao-wn)Lm 4% unligmwn-W)0 0% Intalnux 31.079 400% Slice Medium Outdoor LED Area Light Q Havequesnonsuanusat (800)436-7800 PHOTOMETRICS (CONT.) SLM-LED-30L-SIL-SW-40-7OCRI ISO fontcandie Ti pe Palai (um ZS’Muunlmg Helgm /ZS’6nd Snamng ISK IZH Im SLM—LED-3OL-SILrFTA-40-70CRI 150 Footzandie 1 mm I VenKaI Plane I Honzcntal (one Folai curve 25'Mounting Height /25'Grid Snatmg ISH IZR Im 1 0.5 H I Vemral Plane I Hoiizonial tune LEI Industrieg Inc.‘my r;iiii' luminaire Data Win NI Distrihuiion Dacrintion 4000 Kelvm.70 (Rl Delivered lumens 31,472 WIIB IE Emmy M3 IES m1!Woe VS -Snon BUG Raiinn BS-U0-6$ lonal lumen Summary Ion![MIMM $4 [iiinIllaiM low (0-30“)L647 12% Hedium (30-60“)0,607 43% High (60-30")13,033 44% Vuy High (00-90”)305 1% Uniight (ED-130°)0 0% Total Flux 31,472 100% 4i ,5 Vi i luminaiie bata [wt FT!Distrihution nesniplian 4000 Kelvin,70 (Pi Deiivued lumens 30.535 Wart 273 Etfitarv 743 IE5 Type Type I -Very Shovt 000 Raiing 0400-6} Zonal lumen Summary lone lumens %luminaire low (0-30“)7,445 ZS% Hadium (50-60”)175$57% Niall (60-00“)5,324 17% Verv High (80-90“)434 1% llplighl (90-13?)0 0% Ioial Flux 50,565 i00% Slice Medium Outdoor LED Area Light Th)? 0 Have questions?(an u:at (800)435—7800 PHOTOMETRICS (CONT.) SLM-LED-3OL-SIL-AM-40—7OCRI ISO Fooltandle Polar (urve ’T 0,5 H I Vemm Plane .Honzontal (one SLM-LED-3OL-SIL-LC-40-7OCRI ISO Foolcandle Polal (mve iV JJ ‘ .0.5K I Vemtal Plane I Hunzonlal (one L51 1nduslries Inc.'L’I I V \Z luminaire Dala Type AH Distrihuh‘on nauinh’on 4000 KsMn,7U (RI Delivmd lumens 31,020 Watt 2B Efmatv 14g IFS [we Type HI -Vevv Short BUG Raiing 837M103 lonal lumen Summary lone lumen:%Luminaiu low (ll-W)6,626 Zl"/a Medium (50-60%19,761 62% Hinh (60-30")5,07Z l5% Very High (BO—90")361 ‘39 Unligh‘l (90430“)0 0% ialal Flux 31,820 100% luminaire Data mu lt Dmibution nesuiminn 4000 KEIvin,70 (R! Delivemd lumen;31,301 Watt 113 Etliurv 150 IB Twe N/A HUG Raling MUG-GS lanai lumen Summary lone llllMllS 54 lum1ilalre low (040“)4965 16% Medium (30-00“)14179 44% High (60-00“)117m 17% Verv High (30-90“)1010 3% Upligm (So-100“)0 0% inlal Fiux 31091 100% Slice Medium Outdoor LED Area Light Iyue‘ Q Have questions?(all us at (800)436-7800 PHOTOMETRICS (CONT.) SLM-LED—3OL-SIL-RC-40-7OCRI ISO Footcandle PRODUCT DIMENSIONS Back to Quick Lmks 16" (407mm) 415116" (126mm) 28~11/16"(129mm) w 111581 Mmmn Pnmnwll Xensm Bunnm mew00.815 00.563 3.37.7.1. <rE’1 LSI 1d sistve n c.».1 ' ‘0E luminaile Dala [we Rt Dklrihutian Damiminn 4000 KEMH,70 (R! Dglivued lumen:31,090 Wam ZB Emmy 150 HS Me N/A BIJE Rating BEVUUVGS lonal lumen Summary lane lumen;%luminaire low (040“)4964 16% Hmium (30-60”)14118 44% High (6030“)H710 37% VEry High (NJ-W)1018 3% Upligm (90-1311“)o 0% Mal Flux 11800 100% lumlnaire EPA than Iilt Degree 0°15°30°45° -I Slngle 0.5 1.2 2.1 2.6 n c mam 1.1 1.3 2.1 2.6 L m"0,9 1.8 2.5 3.1 J.190°1.2 2.3 2.9 3.6 J.IN120°1.3 3.0 4.4 5.4+090°1.2 2.3 2.9 3.6 ‘(antral—°—1 l_‘_. IopVIew l mmade 0-3/8"(340mm) Slice Medium Outdoor LED Area Light We 0 Have quastiuns?(an us a1 (800)436-7800 CONTROLS Back to Quick Links lntegral Bluetooth‘"Motion and Photocell Sensor (IMSBTXL) Slum low profile sensor provides multHevel control based on motion and/or daylight Sensor controls 0-10 VDC LED drivers and is IP66 rated for cold and wet locations (-40°F to i67°F).Two unique PIR lenses are available and used based on fixture mounting height.Ail control parameters are adjustable via an IOS or Android App capable of storing and transmitting sensor profilesl Click here to learn more details about IMSBT Lzvnou E5 'E E}'E rt.Es.E .ql LEVI10N Anp Apple Android AirLink Blue (ALBMRXLR,ALBCSX) Wireless Bluetooth Mesh Lighting Control System that incorporates Luminaire Levei Lighting Controis (LLLC)and highvend trim to provide energy savings code compliance and enhanced safety/security for parking lots and parking garages.Three key components;Bluetooth wireless radio/sensor controller.Time Keeper and an IOS App with technology partner Silvair.Capable of grouping multiple fixtures and sensors as well as scheduling time-based events by zone,Radio/Sensor Controller is factory integrated into Area/Site,Wall Mounted,Parking Garage and Canopy luminaires. Click here to learn more details about AirLink Blue AirLink Blue App Apple Sensor Sequence of Operations re ii/n r”C7'G'i 25 SPECiiio Bii22(ag L5i industries f inc.i“ Standard Pmgrammlng on Event Oil Event 0n light level Dim Light level Daylight Harvesting Delay lo Dll Sensitivity OMSBlxl/IMSBlxl Motion No Motion 100%N/A 0n:Auto (alihration 20 minutes High OMS Motion No Motion N/A N/A N/A 30 setonds Auto Operation Description 0n Event inggEi that antivales lights to tum on;either automatit via motion detetled or manually attivaled via push of button. Offlvent lrigger tnat artivates lights to turn oil:either automatit via no motion detetteo or manually attrvateo vra ouxh ol button. 0n llght level lhe light level that the lixturei will lurn on to when ON EVENI otturs‘ Dlm Uglit Level The light level that the fixtures will dim down to when no motion is detetteo, Delay to Dlm The amount oi time alter whith no motion i3 detetted that the lixtures Will be triggered to dim down.ihis seouente is optional,and sensor tan be programmed to only trigger the fixture to turn oil by entering 100%in this field. Delay to 0h ihe amount ol time alter which no motion is detected that the lixtures Will be triggered to turn oil.ll delay to dim is part of the programmed funttionality.this is the amountol time after whlth no motion is deletted after the fixture have already dimmed down. Sensitivity lhe sensitiVity tan be set to high,medium.low,or auto where applitable.High wrll detert smaller.Simple motions.tow will only detect larger more tomplex motions.Auto temperature talibration adjusts the PIR sensitiVitv as ambient temperature rises to intrease detettion pt heat movement through the field of View, xazam r a Steel Poles Square Straight E®® FEATURES &SPECIFICATIONS Pole Shaft ~Straight poles are 4",S”.or 6"square. Pole shaft is electro-welded ASTM-ASOO Grade C steel tubing with a mmimum yield strength of 50,000 psi. On Tenon Mount steel poles,tenon is 2—3/8”OD.high-strength pipe.Tenon is 4-3/4”in length. Hand-Hole -standard hand-hole location is 12"above pole base. -Poles 22’and above have a 3x6 reinforced hand hole. Base Pole base is ASTM-A36 hot-rolled steel plate with a minimum yield strength of 36,000 psi. Two-piece square base cover is optional. Anchor Bolts ~Anchor bolts are not provided as standard on pole orders.Anchor bolts must be ordered as an accessory,anchor bolts feature Zincplated double nuts and washers.Galvanized anchor bolts are optional. Anchor Bolts conform to ASTM F 1554-07a Grade 55 With a minimum yield strength of 55.000 PSI. Ground Lug -Ground lug is standard. Pm‘j QUICK LINKS lmt Dalt Duplex Receptacle -Weatherproof duplex receptacle is optional. Ground Fault Circuit lnterrupter -Self-testing Ground fault circuit interrupter is optional. Finishes r Every pole is provided with the DuraGrip Protection System and a 5-year limited warranty.NOTE:Warranty only applies to the finish. When the top-of-the line DuraGrip Plus Protection System is selected.in addition to the DuraGrip Protection System.a non-porous.automotive-grade corrosion coating is applied to the lower portion of the pole interior sealing and further protecting it from corrosion.This option extends the limited warranty to 7 years.NOTE:Warranty only applies to the flnish. Determining The Luminaire/Pole Combination For Your Application: -Select luminaire from luminaire ordering information. Select bracket configuration if required Determine EPA value from luminaire/ bracket EPA chart Select Pole Height Select MPH to match wind speed in the application area (See windspeed maps). Confirm pole EPA equal to or exceeding value of luminaire/bracket EPA -Consult factory for special wind load requirements and banner brackets. Pole Vibration Damper -A pole vibration damper is recommended in open terrain areas of the country where low steady state winds are common. 'Non-tapered poles and lightly loaded poles are more susceptible to destructive vibration if a damper is not installed. Warranty LSI poles come standard with a1 year materials and workmanship warranty. Refer to https'//www.|sicorp.com/ resources/terms—conditions-warranty/for more information. Listings r UL Listed -BAA/TAA Compliant 'BABAA Compliant ‘lf Specified LSI Industries lnC. Steel Poles Square Straight 0 Have questions?(an us at (800)436v7$00 ORDERING GUIDE Back to Qwck Lmks Pole Selia 450 »4"x 4"Square Siraight Pole (New Euiid) 550 »5"x 5"Suuaie Sliaighl Poie (New Euiid) 6m -6“x 6"Square Straigm Pole (New Build) SSIIU -5”x 5”Square Straight Poie (Relrofii) GSOU -6"x 6"Square Strargm Poie (Retrofit) Haunting Methad Bait-0n Mounl‘-See poie seiemon guide ior paiierns and irxlure malmes 35 -5"iradrtional Drrllrnq Paiterrr B!-3"Redured Patiern BZ -Z"Low Profile Driilrng Panern BZR -Raised Z"iow Profiie Drilling Panerri (m4ONLY) i-ienon Mount -See pole selemon gume iqr ienon and iixiure/inatket maltries Maml SHE >11 Ga.Sleel (4SD/4SQU arid SSQ/SSOU 0rilVJ S076 -07 6a.Sleel Mwnting Configuratiun Pole Finish $-Single/Parallel 01w -Double D90 -Double DN90 —Double 190 —iriuie Iiilzi]—iripie n90 »Quad Dim -Quad N»ienori Mount (Standard ienon Sile is 2-3/8" 0D)” (Elanir)-Use with I tor Mounting Method Options GA —Galvanized Author Bolts Sf -Single iloodl DF -Double iloodl DGP —DuraGrip'Plus W -Less Antnor Bolts (m -(ondun Ratewav‘ llSA -BABAA (ompllant‘) i-No Mounling Holex‘ HeiqhP a, ll!’ Bi 14’ 15’ 16’ 17’ His” 20’ ZZ’ zzisu 1" 25‘ 16‘ 17’ 18’ 30’ 32’ 35’ 39’ Bill —Bronze 3l.it »Biatk PIP -Platinum Pius Win —White SVG -Satin Verde Green 6P1 -Graphite MSV -Metaliit Silver Bu —Altemate Bronze GMG -Gun Metal Grav ACCESSORY ORDERING INFORMATION l-XE?Area light Eiatkels -3"Reduted Drlll Pattern and Area light Bratkels -5"lradillurial Drill Pattern Snet Sheets, Z-Poleherghtswrllhave-l-ilZ‘tolerante 3r See Flood Lighting Biatkets settiori lor thoite oi {BO hrarkets LSI Industries Inc. i 47 (i?selettiori must inditate required height and side or pole mounting lptation Mounting template required at tirne or order SA USA nnlv applies tn 4S0 poles up to 26‘and SSit/Sstlu poles up to 3D‘, ANCHOR BOLT KIT ORDERING INFORMATION TYPKALORDEREXAHPLE:450 33 $11G 24 S PIP DGP Egg Need more information?Have additional questions? %Click here for our lossar Call us at (800)1136-7800 Part Number Destriotion 122559Eut ABG —4"Square Base {over 1225mm 5Bt -S"Square Base (over 1225mm 68E -6"Square Base (over BZABBHR SBI -5’Square Universal Base (over 111252tlll 63C -5’Square Universal Base [over 1225mm ERZ —Weatherproof Duolex Rereptade 1225mm GH »Ground Fault (irrurt interrupter 132336 MHS -mounting Hole Plugs for use With 5"traditional drill pattern (3 set oi 3 plugs) 681126 MH3 «mounting Hole Plugs tor use with 3”reduted drill pattern (3 set oi}plugs) 725341 MHZ -Mounting Hole Plugs for use with 2"reduced drill pattern (1 sets ol 3 plugs) 172539 Vibration Damper -4"Square Pole (oolt~on mountonly) 172538 Vibration Damper -5"Square Pole (bolt-on mount onlv) 178361 Vrbratlon Damper -6"Square Pole (bolteon mount onlv) Part Number Description An KIT 121584 480 SllG/SOIG Anchor Bolts (Steel Plated) AB KIT 122609 480 SllG/SDIG Anchor Bolts (Galvanized) AB Kit 1.215850 550 SllG Anthor Bolts (Steel Plated) AB itii 111610 ESQ SllG Author Bolts (Galvanized) AB Kll 111586 ESQ $07G Anthor Bolts (Steel Plated) AB illi 122611 530 507G Anthor Bolts (Galvanized) AB tilt 122612 GSO 507G Anthor Bolts (Galvanized) Steel Poles Square Straight 0 Have queslions?(aH us a1 (E00)$64800 DRILLING LOCATIONS W E»? Back IO GU‘Ck Links FIXTURE CONFIGURATIONS Side“(”lv lwulnrallnnsmllhelimmalehamngmalSinEAv Z~0mm lwa Iatalinns will helm”In the lell arm n'ghl al Side A 3-lwn Iazallons will he AS'm m9 Ien and vlghl ol Xlde A and (wu loralmnx will hE 135° In the lEll and nqnl alxme A (unsult lanorv luv :uxlum vanalmnsv Slandavd El and DF val?umpamnunsave lataIEd 3/4 l DI Ill?helglll ul lhE vale llom lllE DaSE.meal all ZO'nulPS.Maxlmum llelglll lul Kl and DF ;i s'de “B”puleumualaliunsunzu‘nulls lsu‘nuntngnasa.Side “D” Side “A”(Hand-hole Side) i'ii» Singie DN90 D1 80 Parallel TN120 ONQO LSI Industries lnc. Sides A B t D Hand-hole X Slngle X D180 X X D90 X X DN90‘ 190 X X X THIN 090 X X X X QNW Single lEn x Double FEIJ X X Steel Poles Square Straight 0 Have questions?(aH us a1 (800)4E6-780D BOLT CIRCLE STANDARD BASEPLATE 4"(1BZrnm)square10-1/3"(257mm)sq.5"(lllmm)maleIO-l/"(257mm)sq. //\ \ 5"(121mm)squave10-1/8“(257mm)sn.\/ Tvne Back to Quick Lmks 6"(151mm)sauale11"(305mm)sn. UNIVERSAL BASEPLATE l-tutl Galvanized ovttun to l"x m"sttatottt headed atttttut halt.(atttatt latiotv lot unasttotts LSt tndusmes tnc.’‘tn ,3 m4 \\/\\/\/ I1"(27!mm)Dia.Bo|mme 1l"(Mum)Dia.Boli tilde ll"(119mm)Dia.Boll (irtle l2"(305mm)Dia.Bolt tilde Bnll tilde Designalov B (D J Kolltilde Slottedl"-ll"(103mm-l79mrn)Slotted9”-ll”(ZZ9mm-279mm)Siotted9"-ll"(229mm-279mm)Slottedl2”(305mm) AmhorBollSize 3/"" (l9mmx609mm)3/”" (19mm x 609mm)(ZSmmx 762mm)(25mm x762mm) AmhomollPvojedion 3-1/4”(33mm)3-1/4“(83mm)4h001mm)(102mm) Base Plate OpeningtorllmmayEnltv 5-5/8”(92mm)HM”(lZlmm)4-5/8"(lllmm)5-5/8"(143mm) Base Plate Dimemiom 104/8"su.x 3/4“thk.(157mm x 19mm)10-1/8”m.x3/4"tnk.(157mm x l9mm)lO-l/8"sqtxl”tnk.(257mm x 25mm)lZ'Sqlxl-l/B'Whk,(305mm x 29mm) Poleaause ll lt 7 7 Note.Bate plate tllustlattuns may mange wrlhaut nultte.Do not use tot Settlng anthal halts.(onsult lattctv lm the annmmlate antnm lmlt temnlate. Kolt mde Dzsignatol 5"(117mm)Squaw11.125"(133mm)sq. F 5”(lllmm)mum 5”(l51mmMUau11.75"a9lmm)m 11-1/1"(318mm) l4"(356mm)Dia. E ll mt Bull (lulu Bull tilde Slullad1075‘‘SlottedlU-B"ll “44"(Zslgyr‘ttgtdVKSmm) Anthnv Boll Sim 334x Z4‘(lgmm x 609 mm)VXEU"(25mm x 751mm)l"x30"(25mm x 752mm) Amhw Enll Ptolettion H ’4‘ (E3 m‘m‘(102 mm)(t02mm) Kan Ptale Openinglo!Wilewav Entvv (lZltnml4-3 4 5-l/8”(tit)mm)5-5/8”(t43mm) Ease Plate Dimensinns ltrls‘E :q x 3/4”tltl(28$mm)lQ mm)tt-K/"5n.x l"thk.(298 mm x ZS mm)IZ l/Z"Sq.x l l/ll"thk.(Ellmm x 29mm) Poll Gauge ll 7 7 Note:Ease plate tllutlrattont may (nange without noltte.Do not use tot setlmg anthov bolts.(ongult ladow lot the aupronrtale anthor bolt temolatE. Steel Poles Square Straight 0 Have uuexlions?(an us at (800)436-7800 PRODUCT DIMENSIONS Sm - H=1-3/3"(60mm)0.0.)(44/4"(111mm)TEnon UntinnalEase(um E'—§9' (Um -11.9m) IZ" (305mm)‘ Standam Pmieztion mw \ OM \L00 .lno (4)Anthol Balk Foundation 3v Omen ONLY FDR USE WIIH [All PRBDUH BZN-Raw Z"Iow nloiile dn1ling pattern SH)!VIEW :— SF - Sinnlt Hand Pale Preyanlinn wg Me- kt ik Ink 0.561 0.750 0.563 \ AwLSIIndustriesInc.IL n;5/8 Pr owns/25 5FEC.1070.B.0622 Hand-hm x EolHJn Haunt l-Bolt Vanem In my m Pou‘;‘‘1 SHIPPING WEIGHIS 4"(102mm)sq‘11 Ga.\s appronmatelv 7.50 lbs/IL 4"(102mm)su‘07 Ga‘is aunroximatew 10.00 lbs,/ft. 5"(127mm)sq.11 Ga.Is approximatelv 9.00 |bS./fl. 5"(127mm)sq.07 Ga.is approximatew 12.50 Inn/ft, 6"(152mm)sq.07 Ga,is approximatelv 15.40 lbs/ft. Anthm Bans (3/4"x 24")(19mm x 609mm,,,,,Tiswg .s_.15 lbs.(7kg)/set Anthm Eolts (1"x 30")(25mm x 762mm)30 lbs.(14kg)/Set Steel Poles Square Straight We 0 Have questions?(aH us a‘(800)436-7800 WIND SPEED Back to Qu‘ck Lmlc EPAWDHMWI MUN: AI u’l [Mugma‘ TM guammee pale:ave n39: guaramaeanm anoN :a I! meet WE Haw/urmt/mum ha EPA wwmmems :n’nbmahan Mm w Indmues r:med m u xunnm nm mmmg anv mm H usmssuma: a wk may has Ham a Icwy pennam EPA mung m :‘grs. man whxw me mamaun wnum am: wm max mam m me 1n n;le. where w Immmsx ma wls :annot wm be alien: km!a resuwmkw rm raw a:dam?(Mad m (m mum Nam M9 mlm‘almns Mm a 13 gm!famu am gleam mm rslou'y.Emma:was umnea la wnmand BO MW swanvwm wm wmmnu mm m 104 Mm {FAX am 1m Imatm 1m m In away Horn nummna «Ear Ire;(0mm LE!tn!cmev aveax Nam:NumGnE man mes aw m9 Alla'mt and mm of Mmm masmavea;Fmaunhramrmn Hmdam [awauammuuamm {5Q LSI Industries Inc.. 1 1 A Pmi‘Mtg.Height length (ti)Wall Thi¢(ca)sou um:m naignam ma an)Ancnm hon ma (in)ua nvu 115 Hvu 12D m m Hm m Hm 1m Mm 16o MPH 170 HP"m MPH 4"x 11-ga x 12’12 11 B 8”-11"0.75 13.9 12.5 113 9.2 7.6 63 5.2 4.3 3.6 4"x u-ga x 14’14 11 B 8"»11”0.75 10.7 9.5 8.5 6.8 5.4 4.4 3.5 2.7 2.1 4"x 11-ga x 16’16 11 B B”-11”0,75 8.2 7.2 6.4 4.9 3.8 2.9 2.1 1.5 10 4"x 11-ga x 18’18 11 8 8”-11”0.75 6.3 5.4 4.7 3.4 2.4 1.6 1.0 0.4 n/a 4"x11-gax20'20 11 B 8”»11"0.75 4.6 3.9 32 2.1 1.2 0.6 n/a n/a n/a 4”x11-gax22‘22 11 B 8”'11”0.75 7.6 6.6 5.7 4.2 3.0 2.0 1.2 0.5 n/a 4"x n—ga x 24’Z4 11 B 8”-11"0.75 6.0 5.1 43 2.9 1.6 0.9 n/a n/a n/a 4"x ll-ga x 26’26 11 B 8”-11"0.75 4.6 3.7 3.0 1,7 0.7 n/a n/a n/a n/a 4"x 7-ga x 14’14 7 B 8'50“0.75 183 16.4 14.9 122 102 8.5 7.1 5,9 5,0 4"x 7-ga x 16’16 7 B 8"-11"0.75 14.7 13.2 11.8 9.6 78 63 52 4.2 3.4 4"x 7-9a x 18’18 7 B 8"-11"0.75 11.9 10,5 9.3 74 5.9 4.6 3.6 2.8 2.1 4"x 7-ga x 211’20 7 B 8">11”0.75 9.6 8.4 7.4 5.7 4.3 3.2 2.3 1.6 0.9 4"x 7-ga x 22’22 7 B 8”’11"0.75 7.7 6.6 5.7 4.2 3.0 2.0 1.2 0.5 n/a 4"x 71a x 24’24 7 B 8”-11"0.75 6.0 5,1 4.3 2.9 1.8 0.9 n/a n/a n/a 4"x 7—ga x 26'Z6 7 B 8"-11"0.75 4.6 3.7 3.0 1.7 0.7 n/a n/a n/a n/a 4"x7-gax28"28 7 B 8”-11”0.75 33 2.5 1.8 0.7 n/a n/a n/a n/a n/a 4"x7—gax30"30 7 B 8“-11”0.75 2.2 14 0.8 n/a n/a n/a n/a n/a n/a 5"x 11-ga x 14‘14 11 t 9"-11"0.75 17.4 15.7 14.1 11.5 9.3 7.7 6.3 5.2 4.2 5"x 11-ga x 16’16 11 (9”-11"0.75 13.8 123 10.9 8.7 6.9 5.5 4.3 33 2.5 5"x Il-ga x 18’18 11 t 9"-11"0.75 10.8 9.6 8.4 6,5 4,9 3.7 2.6 1.8 1.1 5"x 11—9a x 20’20 11 E 9"-11"0.75 8.5 7.3 6.3 4.6 3.2 2.1 12 0.5 n/a 5"x 11-ga x 22’22 11 C 9"-11"0.75 10.9 9.5 8.3 6.2 4.5 3.2 2.1 1.2 0.5 5"x 11-ga x 24’24 11 C 9"»11"0.75 8.8 7.5 6.4 4,5 3.0 1.8 0.8 n/a n/a 5"x 111a x 26’26 11 C 9”-11”0.75 6.8 5.7 4.6 3.0 1.6 0.6 n/a n/a n/a 5"x 11-ga x 28’28 11 C 9"-11"0.75 5.2 4.1 3.2 1.6 0.4 n/a n/a n/a n/a 5"x 11-ga x 30’30 11 6 9"»11"0.75 3.6 2.7 1.8 0.4 n/a n/a n/a n/a n/a 5”x 7-9 x 28’20 7 D 9"-11"1.00 21.6 19.3 173 14.0 11.3 9.2 7.4 6.0 4.8 S"x 7-ga x 22’22 7 D 9”—11"1.00 20.7 18.6 16.6 13.3 10.7 8.5 6.8 5.4 4.2 5"x 7-ga x 24’24 7 D 9"-11"1.00 17.7 15.6 13.8 10.8 8,5 6.6 5.0 3.7 2.6 5"x 7-ga x 26’26 7 D 9"-11”1.00 14.9 13.1 11.4 8.8 6.6 4.9 3.5 2.3 13 5"x 7-ga x 28’28 7 D 9“-11”1.00 12.5 10.9 9.4 6.9 4.9 3,4 21 1.0 n/a 5"x 7-ga x 30’30 7 D 9"-11"1.00 103 8.9 7.5 5.2 3.4 2.0 0.8 n/a n/a 5"x 7w x 35’35 7 D 9”-11”1.00 6.0 4.8 3.6 1.8 n/a n/a n/a n/a n/a 6"x 7—ga x 24’24 7 1 12"1.00 18.6 16.4 14.3 11.2 8.6 6.5 4.8 3.4 22 6"x 7-ga x 26‘26 7 1 12”1.00 15.6 13.4 11.7 8.8 6.5 4.6 3.0 1.8 0.7 6"x 7—ga x 28’28 7 J 12"1.00 12.9 10.9 9.3 6.7 4.6 2.8 1.5 n/a n/a 6"x 7-ga x 30’30 7 J 12"1.00 10.4 8.8 73 4.8 2.9 13 n/a n/a n/a 6"x 71a x 32’32 7 J 12"1.00 83 6.8 5.5 3.1 13 n/a n/a n/a n/a 6"x 7-ga x 34’34 7 J 12"1.00 6.5 5.0 3.7 1.6 n/a n/a n/a n/a n/a 6"x 7-ga x 35’35 7 J 12"1.00 5.5 42 2.9 0.9 n/a n/a n/a n/a n/a 6"x 7-ga x 39’39 7 J 12"1.00 2.3 1.0 n/a n/a n/a n/a n/a n/a n/a Steel Poles Square Straight 1W 0 Have questions?(am us at ($00)436-7300 WIND SPEED L51 Industhes 1nc. 1 WLE‘mg.Heighl Leng‘lh (m Wall mm (g3)30H {Ikui EPA Duignahl Dia.(in)Andw'Boll nia (in)110 MPH 115 KPH mHPH 13H MPH 1M!MPH 150 NPil 160 MPH 170 MPH 100 MPH 5"x ll-ga x 14'14 11 F 11"0.75 1716 15.8 14.2 11.5 9.0 7.7 63 51 4,5 5”x u-ga x 14'14 11 F 13"0.75 17.6 15.8 14.2 11.5 9.4 7.7 63 5.1 4} 5"x u-ga x 16'16 11 F 11“0.75 1149 112 11.0 0.1 7.0 5.5 4.1 3.4 1.5 5"x ll—va x 16'16 11 F 13"0.75 13.9 12.2 11.0 1.1 7.0 5.5 4.3 5.4 ZS 5"x u-ya x 18'10 11 F 11"0.75 110 9.6 0.4 0.5 5.0 1.7 2.7 1.0 1.1 5"x ll-ga x 10'10 11 F B”0.75 110 9.6 0.4 6.5 5.0 3.7 1.7 1.0 1.1 5"x u-ga x 20'20 11 F 11"0.75 0.6 7.4 6.4 4.6 33 2.1 1.1 0.5 5"x u-ga x 20'20 11 F 13"0.75 0.0 7.4 6‘4 4.6 3.5 22 1.3 0.5 5"x u—ga x 12'22 H F 0"0.75 127 0.1 0.6 7.4 5.6 A1 3.0 10 Ll 5"x 11-ga x 12'22 0 F IZ"075 103 05 7.7 5.7 4.1 20 10 0.9 5"x ll-ga x ZZ'21 11 F 13"0,15 8,6 7,4 6,4 4.6 3,1 10 L1 - 5"x 11-ga x 20'24 11 F 11”0.75 10.1 8.9 7.6 5.6 4.0 1.6 1.6 0.7 5"x ll-ga x 24'24 11 F 11”0.75 0.0 6.9 5.0 4.0 1.6 1.5 0.5 - 5"x ll-ga x 24'24 11 F 13"0475 6.7 5,5 4.6 5.0 1.7 0.7 r v 5"x 1.1-ya x 16'26 11 F 11"0.75 0.1 6.9 5.0 4.0 1.5 11 r r 5"x 11-ga x 16'16 11 F 11"0.75 6.1 5.1 4.1 1.6 1.5 -V - 5"x ll-na x 26'16 1]F 13"0.75 5.0 4.0 3.1 1.6 0.5 -- 5"x ll-ga x 20'10 11 F 11"0.75 63 51 43 15 1.1 --- 5"x ll-na x 20'10 11 F 11"0.75 4.6 3.6 1.1 11 --- 5"x ll-ga x 20'10 11 F 13"0.75 5.4 15 1.7 5"x ll-ga x 30'30 11 F 1.1"0.75 0,7 1.7 20 12 S"x 11-ga x 30’30 11 F 11"0.75 3,1 12 1,4 5"x 111a x 30'30 11 F 13"0.75 1.0 11 0.5 -A 5"x 7-ga x 20'10 7 6 11"1 11.7 10.1 17,4 14.0 11.4 93 7,5 6,0 4.0 5"x 7~ga x 20'10 7 6 l3"1 21.7 10.4 17.4 14.0 11 4 9.1 7.5 6.0 4.0 5"x 7-ga x 21'11 7 6 11"1 11.0 10.7 16.7 13.0 10.6 05 6.0 5.4 41 5"x 7-ya x 22'21 7 6 11"1 13.4 10.6 104 15.0 111 0.0 00 6.4 5.1 5"x 7-ga x ZZ'21 7 6 11"1 11.1 10.0 17.0 13.7 11.0 0.0 7.0 5.6 4.1 5"x 7-ga x 24'14 7 6 11”1 11.5 15.7 13.9 109 06 6,7 5.0 3.1 17 5"x 7-ga x 24'Z4 7 6 11"1 10.0 17.4 150 1B 9.9 7.0 6.0 4.7 3,5 5"x 7-ga x 24'14 7 6 13”I 10.1 16,0 141 11.0 0.7 6.7 53 3.9 1,0 5"x 7-ga x 26'16 7 6 11 1 15 0 111 11 5 0 0 6 7 4 9 3 5 13 13 Steel Poles Square Straight We 0 Have nueslions?(aH us at (800)436-7800 WIND SPEED LSI Induslrics Inc."" '1 vow MmHeIgM ungm (n)Walmumga)BaucImE EPA Designam Ilia.an)Andm non nia (m)1m MPH us m 11o Hm no MPH 1w HPH 1511 HPH 16H HVH m HDH 1w HPH 5"x7—ga 126'26 7 G 12"1 17.0 14.8 13.0 10.2 7.9 6.0 4.4 3.1 2.1 5"x 7-ga x 26'26 7 G 13"1 15.3 11.5 11.8 9.0 6.8 5.0 3.6 2.5 1.4 5"x 7-uax 28'28 7 G 11"1 12,5 10.9 9.5 7.0 5.0 3.3 2.1 1.0 5"x 7-gax 23’ZE 7 6 12"1 14.2 12.4 11.0 8.2 6.0 4.3 1.0 1.7 0.8 S"x 7-aax ZB'28 7 G 13"1 12.9 11.0 9.7 7.2 5.2 3.6 2.2 1.1 5"x 7-ga x30 30 7 6 11"1 10.4 8.8 7.6 5.3 3.4 2.0 0.8 5”x7-ga x30’30 7 G 12"1 12.0 10.3 9.0 6.4 4.4 2.9 1.6 0.5 5"x 1-ga x 30'30 7 G 13"1 10.6 9.1 7.7 5.5 3.6 2.1 1.0 5"x7-ga x35'35 7 G 11"l 6.0 4.8 3.6 1.8 5"x 7-ga x 35'35 7 G 12”l 7.3 6.0 4.8 2.7 1.1 5"x 7-ga x 35'35 7 G 13”1 6.3 5.0 3.3 1.9 6"x7-gaxl4'24 7 H 11"1 16.5 14.4 12.6 9,6 7.2 5.3 3.8 2.5 1.4 6"x 7-ga x 24’24 7 H 12-1/2”1 19.8 17.5 15.4 12.0 9.2 7.0 5.3 3.8 2.7 6"x Ha x 24'24 7 H 14"1 23.0 20.5 18.0 14.3 11.2 8.9 6.9 5.3 3.3 6”x 7-gax 26'Z6 7 H 11"1 13.7 11.8 10.2 7.5 5.3 3.6 2.1 1.0 6"x 7-ga x 26'26 7 H 12-1/2"1 16.5 14.6 12.6 9.6 7.0 5.2 3.6 2.2 1.1 6"x 7-ga x 26'26 7 H 14"1 19.6 17.3 15.2 11.7 8.9 6.7 5.0 3.5 2.2 6"x 7-ga x 28'28 7 H 11"1 11.0 9.3 7.8 5.5 3.5 1.9 0.6 6"x 7-ua x28'28 7 H 12»1/2"1 13.8 12.0 10.2 7.5 5.2 3.4 1.9 0.7 6"x 7-ya x28'28 7 H 14"1 16.4 14.5 12.5 9.4 6.9 4.7 3.2 1.8 0.7 6"x 7-ga x 30'30 7 H 11"l 9.0 7.3 6.0 3.6 1.9 0.5 6"x 7-ga x 30'30 7 H 12—1/2"1 11.4 9.6 8.0 5.5 3.4 1.7 6"x7-9ax30'30 7 H 14"1 14.0 12,0 10.0 7.2 5.0 3.2 1.6 6"x7-gax32'32 7 H 11"1 7.0 5.5 4.2 2.0 6"x 7-gax32'32 7 H 12-1/2”1 9.2 7.6 6.0 3.8 1.8 6"x 7-gax32'32 7 H 14"1 11.4 9.7 8.0 5.4 3.2 1.6 - 6"x 7-ga x 34'34 7 H 11"l 5.1 3.7 2.5 0.6 6"x 7-ga x 34'34 7 H 12-1/2”1 7.2 5.6 4.4 2.2 6"x7-ga x34’34 7 H 14"1 9.3 7.6 6.2 3.6 1.7 6"x 7-ga x 35’35 7 H 11"1 4.2 3.0 1.8 »»»--- 6"x7-ga x35'35 7 H 12-1/2"1 6.2 4.8 3.6 1.4 6"x I-ga x35'35 7 H 14"1 8.2 6.6 5.2 2.9 1.0 ---- 6"x 7-ga x 39'39 7 H 11"1 1.0 6"x 7-ga x39'39 7 H 12-1/2”1 3.0 1.6 0.5 6"x 7-ga x 39'39 7 H 14"1 4.6 3.3 2.0 SURVEY NOTES:MAP REFERENCES} 7.BEARINGS DEP/CTED HEREONAPE BA$ED UPON NORTH AMER/CAN DA TUM (NAB 85)7.PLOT PLAN PREPARED FOR RECYCLEPS,/NC SOUTH WINDSOR CT.$CALE.WERE OETAINED V/A GN55 OBSERVA TIONS PROCESSED THROUGH THE SMARTNET 7"=40'.DA TE'MAY 7997.EY.‘DES/6N PROFESSIONALS /NC.SHEET]OF 2.VRS RTK NETWORK,5V WLVR MAP NUMEER 2759A. 2.FIELD SURVEY WAS CONDUCTED EY EARTON&LOGUID/CE /N APRIL 2025‘2. 3.PROPOSED EQUIPMENT COMPOUND DEP/CTED HEREON WAS TAKEN FROM MAPREFERENCE#3.3.4.UNDERGROUND UTILITY STRUCTUREAND FACILITY LOCA TIONS DEPICTED ANDNOTEDHEREONHAVEREENCOMPILED/N PART FROM RECORD MAPPINGSUPPLIEDBYTHERESPECTIVEUTILITYEOMPANIESORGOVERNMENT AGENCIES, MUST BE CONSIDERED APPROX/MA TE IN NA TURE.ADDITIONALL Y OTHER SUCHFEATURESMAYEXISTONTHESITETHEEXISTENCEOFWHICHAREUNKNOWN FROM PAROL TEST/MONYAND FROM OTHER SOURCES THESE LOCA T/ONS 4, TO BARTON&LOGUID/CE THE SIZE LOCA TION AND EXISTENCE OFALL SUCH 5.FEA TURES MUST BE FIELD DETERMINED AND VERIFIED EY THEAPPROPR/A TEAUTHORITIESPRIORTOCONSTRUCTION.CALL BEFORE YOU DIG:7-800-922-4455. \CONcRErEuUHEADWALL 5 -1-wv (W):69 24 (10“RC9) Mm \Z ¥DRILL HOLE INcsmag'C'HEADWALL FOUND PREPARED FOR BERNARDSOUTHWINDSOR.CONNVDAVID5.MARNICKA S,WL.R. ELECTR/CAL PLAN CNGNUTMEGROADNORTH4/2I/2025.BY:CLEAN PROPOSED GAS SERVICENODATE.BY:EVERSOURCE PLOT PLAN PREPAREDI”=40’.DA TE}MA Y I997.S.W.L.R.MAP NUMBER CHAIN UNKFENCE B.BERKMAN TRUSTEE NUTMEG ROAD NORTHSCALE:7":TUO'.DATE}MARCH 5,7986'BY:MAP NUMBER 75063. FUELING STA TION USA HA ULING&RECYCL/NG 500SOUTHWINDSOR,CT 06074.SCALE‘I"=4'DA TE.‘4CENERGY. SKETCH 502 NUTMEG ROAD.SCALE:I"=50’.ENERGY.m?“ FOR RECYCLERS,INC.SOUTH WINDSOR CT SCALE.’1BY.’DESIGN PROFESSIONALS,INC.SHEET]OF 2.0.. 2734A.§ .TF =74 57wv(E):5s 57 (30”wow GA TE b /Nv.E;.3 :rYPE'c-L' (E)7533:72.45 «WI/5)72-5 § /Nv (SW):71,93 n5”HEP) N/F :Nvwv (N)(s):z 56as 77130"77 (30'REP)R07)I INM-(E)TE.74 :SI 5&55 (30"RCP)‘y INV (W):68,35 {30"RCP) BITUMINOUS sAN/TARVMH cum/N5 -EVERsOURCE BITUMINOUScups/Na LL!E.:L 9m12 LOCUS MAP (NOT TO SCALE) 27725 AC L/NIT am MR SOUTH WINDSOR 72—75 smmwouscwews PROPERTIES LLCCONCRErES.W.L.R.VOL,2063 PG.277S/DEWALK N/F EIrAPImN '\ ca.WEE 'C-I' rot:a;5m 75 :75 so600NUTMEGROADNORTH row or CONCRETE (PARCEL 7~MAP opsN/Ns —-72.09S23°07’57”W 40.00’as.rvpg'C'REFERENCE #5)(SPILLWAY)ITE.=75.14wv(N)70,44 as PCP)INV =72 26 nowvm 523°07’57”W 2.50’ MR SOUTH WINDSOR PROPERTIES LLC 5.VV.L.R.VOL.2063 PG.287 602 NUTMEG ROAD (PARCEL 2 -MAPAPPROXLOCAr/oN ”W:‘5):70 5‘”5W9”or EX/srINC ELECTRIC arELEpHaNE55;:VICE WANSEORMERPAD EoxTELEPHONE \-—/-SANITARY MH --$66°58’03”E _INv .-7I5y (73”RC»)‘ E _i FENCE GATE ...488.00’.. ——mc?5RA—rE—:7550 .V \' 566°58’03”E 74.28y9057CB_rwE 1.'C' i (PARCEL -REFERENCE #5) 523°07’57”W 3250’P.O.B.#2 N 865767.O77E:73 45 HInIMINoL/s CURE/N6 GA 7E CONrPOL 30x SANmwv MN L LP LP E 704782043INV.(E)=as o5 (75”ECP)INv (w):sa 15 (15”QCP) CB rvnE'DEL'n::7314 Apppox.1001 TIONOEExmwsCA5 LINE t.I .I' CB WEE ‘c’' _u 555°58'03"E' -520.59’.., ' .6A5(——MEr R:"EIrLIMINo‘us'C'uREIN‘C " “"""'i”__..‘4 ‘ElrEDGE ‘or ~ -—-..+.+.EIwMINoUs 35’I ‘CONCRETE b ca.rvpE'C' ,7 +,”YDSIGN . r 7 'J Eon-ARI).7n‘ ...SCALE 40.43’58X JERSEYBARRIER I . L 'WP‘'. \+ /PROPOSEDAREA :250 ELECTRICSO.FT OR EASEMENTO006 ACRES ’B’ _‘‘‘’I /_.1..r .'+”W -\,..,.470404’___.G N66:53'O3”W T I “P.O.B.#7 c5.WEE Cw CHAINFENCE LINK i 796.77’A ..‘ N 865398.07 27077a“ INVTF : (N)74 :SI 59 as a5”RCPI N66 "58’03"W PROPOSED p}: E 704727722 INV.(E)=59 .95 as”RCP)373,49/4"PLIP SERVICE N23°07’57”E \iINv(sW):6g 7E (75”RCP)f WR‘74.00'‘\ MONUMENTCONCRETE PROPosEDpOLE \ ‘\ FOUND PROPOSED UNDERGROUNDELECTRICSERVICE f W"'. PROPOSED ELECTRIC EASEMENT ’A’iAREAi20,554 SQ FT.OR 0.47ACRES ‘3??“‘\ C5 TVRE'CI'‘\GRAVFI \\ 72'6 ‘E \RR N/F G1N Lh‘r.\ LRG LLC R i’n \ S.VV.L.R.VOL.2680 PG.77 a 580 NUTMEG ROAD LEGEND.’ BOUNDARY LINE _._.-_.._..—.._l EASEMENT LINE \ CHAINLINK FENCE GAS LINE ELECTRIC LINE M—CROSSUTILITY TRAEASEMENTVEL DRAINAGEANDINFA VOR OF EOVERHEADWIRESW—PARCEL 7&3 OVER PARCEL 2 TELEPHONE LINE _IN THIS AREA-MAP REFERENCE #5 WA TER VAL VE o WV DRAINAGE EASEMENT IN FA VOR :. c LP CONCBLOCK WP JERSEVEARRIER wp I PROPOSED COMPOUND METER SET A SSEMBL Y N66°58’03”W/ 20.00’/’I BITUMINOUS ‘\kl‘ .\ EQUIPMENT SO mmTmsmswey'uagmgju PROPOSED UTILITY TRANSFORMERCONCRETE T \72-7 \N/F \MR SOUTH WINDSOR PROPERTIES LLC S.WL.R.VOL.2063 PG.277 570 NUTMEG ROAD (PARCEL 3 -MAP REFERENCE #5) PROPOSED METER SOCKET PROPOSED CNG FUELING STA TION O SO WOO 150 200 SCALE:1“=50’ r_suRvEv_sw Numg Ru Nmm‘seumymuwIAguINFA H YDRAN T H YD INOF THISPARCEL AREA»3 OVERMAP REFERENCEPARCEL 2 35 THIS SURVEYAND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONSCALLBOXCBX20-300b-I THRU 20-300b-20 OF THE REGULA TIONS OF CONNECT/CUT AGENCIES"MINUMUM STANDARDS FOR SURVEYSAND MAPS IN THE STA TE OF CONNECTICUT”LIGHTPOLE LP DRAINAGE EASEMENT IN FA VOR m ASAN ENDORSEDEASEMENT BYMAP.THEBOUNDARYCONNECTICUTASSOCIADETERMINA TIONTION CA OFTEGORYLAND RESURVEYSURVEYORS OF INC EXISTINGIT ISOFPARCEL7&3 OVER PARCEL 2 WOODEN POST W/OUTLETS WP IN THIS AREA-MAP REFERENCE #5 PROPERTYBOUNDARIES AND ORIGINAL SURVEY OF PROPOSED EASEMENT SOUTH WINDSOR LAND RECORDS S.WL.R.CONFORMING TO HORIZONTAL ACCURACY CLASS A-2. MAP BLOCK LOT 72-5 INCROSSFA VORTRA OFVEL PARCEL&UTILITY 2 OVEREASEMENTRARCEL 3 W CORRECTASTOTHE BEST NOTEDOFMY KNOWLEDGEHEREON,AND BELIEF THIS MAP IS SUBSTANTIALL Y LANDSCAPE AREA LSA IN TH/SAREA-MAP REFERENCE #5 PROPOSED ELECTRIC EASEMENT KEVIN J.FLOWERS CT LS #70573 ANY ORIGINAL OR DUPLICA TE OF THIS MAP IS NOT VALID UNLESS IT BEARSTHEEMBOSSEDSEALOFTHESURVEYORWHOSEREGISTRATIONAPPEARS ABO VE.NO OTHER CERT/FICA TION OR WARRANTY IS EXPRESSED OR IMPLIED. V .. ar ion .. gw ... ww banenanauowmmmmom h-PROJ.ENGINEER ASF KRG KJF EASEMENT MAP DEPICTING EASEMENT AREA TO BE GRANTED TOTHECONNECTICUTLIGHTSIPOWERCOMPANYDIBIAIEVERSOURCEENERGYACROSSTHEPROPERTYOF MR SOUTH WINDSOR PROPERTIES LLC FILE No.E25128 RROI.MANAGER OFFICE REVIEW REVIEIONS 5/28/2025 7/7/2025 8/6/2025 '_ PROJECT 4481-159 8/11/2025 SCALE:1"=50' SURVEY NO TE51 MAP REFERENCES! 7 BEAR/N65 DEp/CTED HEREON ARE BASED UPON NOR TH AMER/CAN DA mM (NAB 33)7.PLor PLAN PREPARED FOP PECYCLEPS.INC.SOUTH W/NDsOP c7 SCALE:WERE DD rA/NED V/A GNss 055EPVA TIONs PROCESSED rHPouGH WE SMAPTNET I"=40h DA TE MA Y 7997.BY:DEs/GN PPOEEss/ONALS /NC.SHEEN OE 2‘VRS RrK NETWOPKV 5,W.L.P,MAP NUMBER 2759A. 2.F/ELD SURVEY WAS CONDUUED 5V BART0N&LOGU/DICE INAPP/L 2025,2.PREPARED FOR DERNARD a.BEPKMAN,TRUSTEE NUTMEG ROAD NOR THSOUTHWINDSOR,CONN.SCALE:I":Toot DA TE:MARCH 5,7935.BY:3 RROPOSED EQUIPMENT COMPOUND DEP/CTED HEREON WAS TAKEN PROM MAP DA V/D S.MARN/CKL s.WLR.MAP NUMDER 15063REFERENCEx3L3.ELECTRICAL PLAN CNG FUELING STA TION USA HA ULINGE RECYCLING 60044UNDERGROUNDUTILITVSTRUCTUREANDEACILITYLOCATIONSDEPICTEDANDNUTMEGROADNORTHSOUTHWINDSOR,CT 05074.SCALE-I":4'.DA TE-NO TED HEREON HA VE B'EEN COMPILED IN PART FROM RECORD MAPPING 4/21/2025,Ev,-CLEAN ENERGXSUPPLIEDEvTHERESPECTIVEUTILITVCOMPANIESORGOVERNMENTAGENCIES,FROM PAROL TESTIMONYAND FROM OTHER SOURCES THESE LOCA TIONS 4.PROPOSED GAS SERVICE SKETCH 602 NUTMEG ROAD.SCALE;I":50'. FEAMUST TURESBE CONSIDEREDMAv EXIS T ONAPPROX/MATHE SITE TETHE IN EXISNA TURE.TENCE ADDITIONALLOPWHICH AREY OTHERUNKNO SUCHWN NO DA TE ay-EvERSOURCE ENERGY “‘3“ TO BARTON E L OOUIDICE THE SIZE LOCA TION AND EXISTENCE OE ALL SUCH 5.PL OT PLAN PREPARED FOR RECYCLERS,INC.SOUTH WINDSOR CT.SCALE.-ZFEATURESMUSTDEFIELDDETERMINEDANDVERIFIEDBYTHEAPPROPRIATEI"=40’DA TE:MA Y 7991.Dy.-DESIGN PROFESSIONALS,INC.SHEET I OF 2.GA AUTHORITIES PRIOR TO CONSTRUCTION.CALL BEFORE VOU DIG;I-800-922-4455.S.W.L.R.MAP NUMBER 2734A.“a; é CONCREVEHEADWALL :NV“(W)=59 24 {30”PCP)CHA/N LINK HVD 'FENCE CE 7VPE C v .DRILL HOLE INI;:74 37 ”HEAD WALL FOUND[NV (F)55E7(KO PCP)[NV IN)55 77(30 RC9)/NV (5):55,77L70NECP}’NV (E)3 ES 55 (3U"RCP},INV (w;:5535 (SOHRCP) E/rUMINOU5 SANITARY MN CUREING '—EVERSOURCE EITUM/NOLJSCUREVNG GA TE i?eE‘ITSYPE 33 'C-L':5NINv(E)i 72 as (Ana/C)72—5INV(SW)=7:93U5“RCP) N/F m R§amINZI LOCUS MAF (NOT TO SCALE) 2/I2J' EI7UM/NOUSCUVEING AC UNIT—\a MR SOUTH WINDSOR PROPERT/ES LL CCONCRETE5.WL.R4 VOL,2053 PG.277SIDEWALK EXT APRON \.E/rL/MI'NOU5 CUPE/NG C5 TYRE 'C-L' IOP OF GFA TE :7550500NUTMEGROADNORTH TOP QF CONCRETE 523”0]'57"W (PARCEL 7‘MAP OPENING(SPILL WA -‘V1 71.09_ 5 7YFE C REFERENCE #5)40.00' )'7044 ’75 RCP)I’NV.=7226 (V0”PVC) 72-75 N/FAPPROX.L0CAT,ON [NV {5)7054\75 RCP‘OF EXISTING ELECTR/C ETELEPHONE$ERV/CE rRANSFDRMEFPAD SR/WTARV MH 565°58'03”E /NV ‘71.55 (IS RED) _FENCE E ..,488.00' MR SOUTH W/NDSOR PROPERTIES LLC 5.WLAR.VOL.2053 PG.237 602 NUTMEG ROAD (PARCEL 2 T MAP REFERENCE #5) TE:=75 45[NV/N\/:W}E)=-'69.0568.35 (75(15"RCP)RCP)‘GA [ECONTROL EGX CH rVpE 'C'___'_SSG°58'03"E'ewwgcgi CB TVPE 'DEL' TF :7134 .520.59’.EARR/ER +\ CHAINP.O.B.#7 CB 7VPE'C'L'LINK N 855398.07 \.CONCRETE INVTF.‘:(N):535574.5I (I5'RCP)N66958,03”WE704,277.22 I ”pg/I‘WEM IIVV(NV (E)(5W):59.55:69 75(75"RCPI'(15"RCF)373 49/PROPOSEDPROPOSED4"PLIP SER VICEPROPOSEDELECTRIOSERVICEPOLE PROPOSED GAS EA SEMENT ’A' AREA :17,977 SO.FT.OR 0.47ACRES P.0.3.#2 L,CDNCN855209.33 5LOCK E 704777985 \ \ N23”07'57”E CE PVPE ‘C-L'ERAV/EI 30.00' 72-6 N N/F m. LRG LL C \ 5.WL.R.VOL.2680 PG,77 580 NUTMEG ROAD LEGEND PROPOSED OAS EASEMENT 'D' AREA =7.050 SO.FT.OR 0.02 ACRESBOUNDARYLINE EAsEMENT LINE i CHAINL/NK FENCE GAS L/NE ELECTRIC LINE .._M.__CROSS TRA VEL DRAINA GE AND OVERHEAD WIRES W w.....,,_PARCELUTILITY EASEMENT7.2 3 OVER INPARCELFA VOR 2 OF K: TELEPHONE LINE ..IN THIS AREA—MAP REFERENCE #5 WA TER VAL VE °WV GE EASEMENT IN FA VOR 35. PROPOSED COMPOUND SET ASSEMBL Jag“EITUMINouSyIEARRIER N66”58’03”W00’ EQUIPMENT METER Y so PROPOSED UTIL/TY TRANSFORMER PROPO5ED CNG FUELING STA T70 PROPOSED METER SOCKET 72-7 N/F MR SOUTH WINDSOR S.VV.L.R.VOL.2053 PG.277 570 NUTMEG ROAD (PARCEL 3 -MAP REFERENCE #5) PROPERTIES LLC o 50 700 150 200 SCALE:1"=50’ mm.Mm...“IJSSMLSWEWD NW...a.DRAINA GE IN FA VORHYDRANTHVDOFPARCEL3OVERPARCEL2 CALLBOX CBX IN THIS AREAF MAP REFERENCE #5 THIS SURVEV AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS20-300b-7 THRU 20-300b-2O OF THE REOULA TIONS OF CONNECTICUT A OENCIES L/GH TPOLE LP DRAINA GE EASEMENT IN FA VOR "MINUMUM STANDARDS FOR SURVEVS AND MAPS IN THE STA TE OF CONNECTICUT" WOODEN Posr W/OUTLETS WP m ASA N ENDORSEDEASEMENT 3VMA P,THEBOUNDARVCONNECTICUT DE TERM/NAASSOCIA TIONTION CA OFTEGORLAND Y RESURSUR VEVORSVEY OF INC.EXIS IT TINCISOFPARCEL7RSOVERPARCEL2INTHISAREA-MAP REFERENCE #5 PROPER TY BOUNDARIES AND ORIGINAL SURVEY OF PROPOSED EA SEMENTSOUTHW/NDSOR LAND RECORDS 3.WL.R.CONFORMINO TO HORIZONTAL ACCURA CY CLASS A-2. MAP BL OCK L O T 72-5 INCROSSPA VORTRA OFVEL PARCELE UTILITY 2 OVEREASEMENTPARCEL 3 \\\\V CORRECTTOTHE BESTAS NOOF TEDMY KNOHEREON.WLEDCE AND BELIEF THIS MAP IS SUBSTANTIALL Y LANDSCA PE AREA LSA IN THIS AREA MAP REFERENCE #5 PROPOSED GAS EASEMENT KE VIN I.FL O WERS CT LS #70573 ANY ORIGINAL OR DUPLICA TE OF THIS MAP IS NOT VALID UNLESS IT BEA RSTHEEMBOSSEDSEALOFTHESURVEYORWHOSEREOISTRATIONAPPEARS ABOVENOOTHERCERTIFICATIONORWARRANTYISEXPRESSEDORIMPLIED. --.... .-ii .Sg 0 f§Elgg H lgi‘a“.-I—"PROJ.ENGINEER ASF- EAS E M E N T MAP EVERSOLIRCE DEPKmNG EéiEngEENT ENSERGR'agRgggI'LSQRYRgPEE/R/TV AREA To BE GRANTED To OF MR SOUTH WINDSOR PROPERTIES LLC FILE No.E25725 57%602 NUTMEG RD SOUTH WINDSOR CT PROLMANAGER KRG OFFICE REVIEW KJF REVlSlOVS 5/28/2025 7/7/2025 8/6/2025 _PROJECT 4487-159 DA'IE 4/17I2025 SHEET ”0‘1 OF 1 Sin/2025 'SCA_E:1"=50‘ Appl #25-31P, CNG Fueling Station Site Plan Planning Department Report 8-19-26 1. Request for a site plan approval to construct a natural gas fueling station and other associated site improvements on properties located at 570, 600, and 602 Nutmeg Road (13 acres in total), I zone. 2. The existing recycling facility was originally approved in the late 1980’s, later expanded the operations adding a building to the east of the existing detention area in the mid 1990’s. They are now requesting to add a natural gas fueling facility to serve the current fleet of vehicles. Other site improvements proposed including adding an exit only drive to the north of the existing site entrance and converting the existing detention basin into an underground detention storage area. 3. Because of the previous development pattern and existing property lines, there are several cross travel, drainage and conservation easements on the properties that affect the operations of the lots. (For example, you may notice parking areas that cross over property lines.) 4. The improvements to be added to accommodate the fueling equipment include concrete pads with bollards and fencing acting as barriers around the units themselves. The plan calls out a parking area, including wheel stops, for these trucks to be fueled. There are existing dumpsters stored onsite to the easterly part of the site that will remain. 5. There is new lighting proposed to replace existing pole lighting on site in this area. We have asked for some further details related to the height of the poles and intensity of the lighting to verify compliance with zoning. All other security and site lighting will remain unchanged. 6. In the area of the existing detention basin that will be filled, the applicant has they intend to use this land for maneuvering as well as storage of products. What types of products would be stored? 7. The existing site plans had met the required parking at the time of approval. Currently 60 spaces are required based onuses on the site; 107 spaces are provided amongst the three properties. With the changes proposed and the addition of an “Exit Only” drive, the parking is shifting from 570 Nutmeg to 600 Nutmeg Road, but easements in place address this. 8. Due to changes, and to be complying with zoning coverage ratios, the applicant is combining the properties at 600 and 602 Nutmeg into one lot. The new impervious coverage proposed is: 57.4%; 65% allowed. 9. There are regulated wetlands on the site. the IWA/CC approved the application on July16 with the following conditions: Bonds shall be collected: $5,000 for installation and maintenance of erosion and sediment controls, and $10,000 for the installation of stormwater structures 10. Fire Marshal and building official have reviewed the site plan and do not have any comments on the site layout. They will review detail building plans at the time of the building permit. If this application is approved, the Planning Department request the following modifications: -a new deed be filed combining the properties at 600 and 602 Nutmeg Road and the site plan and zoning table modified to reflect one lot (correct setbacks, parking table, etc.) IBITEXH A TEXHIBIA EXHIBIT A mm anunwous cunawe Emma smmmrsn msw m as com/Emu pnowosan gov AND no Nov emu 5m m uNozusnouNu swam;4o Rows as so umvsEmao;mmaox wnu STONEpnoposza:Lsvmons vo as new mama:aomm o;5m“:n owonmwEsumOEcoNsmucnoNsowomoEAowaox soumGEgumsmmmpoEmumox75umpo;smNE 75 5:mwoszu v5 wma anumous coucuEvE aw wvws w.u om 7DmVEwAv(omaown mam 6"o ‘NVERYS OUY=72 5’/- uEMovE Emma mamawnmLmnsoEmwovEMENrs .Eua smnEu HopE wpE a a one w m a a EEE 0mm EwEsENDRnumouscuRRma‘s a INVERR 2 f aRAuE vo—uRim (w)Ru»mvERrs 72 3 sAwcw &msmuasmsrmeEmma Ex nE amovs zxlsnNs cuaa my)sx‘sr ca no mumawunmouscommawAREA ESTI MATED CONSTRUCTION SCHEDULEstomwnznaAswmus“uvwzm 2x Nanoonzwsam mum wanmmmmvmm mmm sscugmmommREMOVEEmmasEmoa;smmgmu E pawn s mmmws.a ,2 Mm wmm LEADER s ‘5'“pwE smn ca ac pEmm)454m “DEE FIE-E a ask“z SEEmumswmmucmEwmmumuwmwwmm r 75 2a NEW vs a my 2 9 NEw Hvunoowmc SEFAEAmn smucmEE mnEMoVEExumwcomscncascaEouxwLEmsuzEnEowExnooELEADERmcawovmsCEsANDmvEAE5mmEvpAssma5sassss‘.vs a unpE 0‘/-mRE c o 5%‘5 amv MWRu.mv nuns mu Rave R o wWITHH-ITEE INLEY PWES|§IINVERV H VERYS-7175 ..“E aISTING ROOF LEADEkm"5E YO IE"n P‘FE N/FEMRsourH WINDSORPROPERTIESLLc N/F g MR SOUTH WIND5°R 3:PROFERTIES LLC soo NUTMEG 'ROAD Mwuv’k’\§Yl I E‘im i ‘ g .u. NOT‘EN'YER AFPROXIHATE AIEA FOR HLTER EAG(5)502 NUTMEG 'ROAD DO 1 srxRr‘RnuRmausRaN ‘\_\ 5IGN ‘A FOR DEWATERING EXIS'IHE POND WnH Em:EnumNous DSCHIRSE To THE alsflNG DONE CW'NG i‘OUTLEYE FEL‘AELC REFLEK EU‘LUNG HAHYNEW BCLC EXISYINGE Wm ruTEE mLEr wvs's2".INVERT‘ .NVERT§1‘.‘TIE als'3'FVC PIPEFRO"E‘sr YD 1‘”.”PE. ApanoxwArE Locum OF SVOCKFILE AVEA NEw RvoRomNAmc sEpARAmR sRRucruRE R2 .sEE aEmL comEcR cas OR EoumLEm sxzEa EaR F“OFOSED GAS FUNPS (YVF )wcv:2.7 EEs Am:w vERR sroRn svnss .sEE cLEAN ENEREV mm m o.s cEs Eon HORE aEuuLs Y 7E‘/-‘s X a l mv n INVm (wIN (E 7s s7LB‘/'AvvnoxmxxE um uE pRcvosEa 24 a INV OU1 (N)73 4 FUELING/FARKING AREA. s sRAcEs pRowDEa v _ L iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii iiiiiiiiiiiiii V iiiiiiiiiiiiii 51‘ucru :REHcvED. —— NEW OUYLETREEDEk [yYF7B50/- OUYLETHEYO EE I S'YRU Y RE m .I i RRovosEo ax;sERwCE RRoRosEo ELEcvR‘cM SERVICE THE SITE S EXISYING PAVED DRIVEWAV SHALL EE USED INLET FROTECYION (YVD)EaR m cmmucnm AECEEE oust comRoL mo aEaRys REnoVRL aENERAYEa Ev ms ERoJEcv ERALL RawRwxv EERmE AREAREREREoRMEoAsRARvorwEEmmmcuRRENraEERAnoNsANDMAwENARcE(om REAR .E A sAwcur s REMOVE EmmacoNsYRVcmuAEcEss/VEAcxxNa RAa ms REamREu RAVEMEm m EuRmER ReoucE MAYERIAL VRAcxma n ERALL RELocAVEoA1mEEaaEOEmEEmmaRAVEMEmAV A Locum EELEcVEa EV mm srAEE AND LEERRoLecxENGINEER msLALL RAVDALE DAARLER N/F LRG LLC 530 NUTI‘TEG RQAD LNsrALL ELLL EENCE/RAVDALEEALoNaEmmaDASLN ARRRoxLMAEE Lmn DE RRopoEED I FUELING/FARKINGE2ERAcEs RRaVLDED AFEAV I __‘.\\ I NEW 15 a OU >7l'/(HAYCN —¥i ANTICIPATEDEx15mmaREM/u )— REMOVEv vamu aouv SEQUENCE OF CONSTRUCTIONNEwERAssusLARnALoNascALEywsuuERos‘aAcoRvRmEEAsuREsAvLocwaAwmEAvEaWW;aA AEAAAEREW .NE MREEA NEW VARa aRAm 5 /a 5AAAmRAaEw a KsuruwcxERAERAVEREAY Ag REaV‘REa w EORAEEVE AEWSVEAR 1w mV 72 s asLE m—a RnRE E am x W.LAEWEVaRRWArEAVREAYEEAmRWUAESAAaAERRmmmsciARaEEmmasvamuRAmAEE vow rREAmERr SVRVEVVRE;pRoRosED EAsEnEm EDR mDERaRDUND ..LAELALLARDRALAEAEA AEALHEALEEADELUREWAEEEAAREEWALELEcmcALEERVLCEmEsvaAEAsEDDVALREEDRERVEWRAEAEEEEDm RALRVALR LERADAAAVELEMmVAEExLsmEDAELAWEERELRAELVAEELEcrRLCALTRANsEoRmER E LAELAEEAVRREVLRxAEExamaAAswaEERAAEEEALAE:aVAEExEmEDVVLE:EVRVEmRE re READVE vRE svARDIRa WALER IR mE DAmNAruRALaAsEuELLNasrAnoNccnvowoEamRMENraExam?:25;‘:$D::;:”;2E$:LL:::€s;i1€:sc:;gimmW 7 ExEAVAEAAERLAEEAREAVAALERAVEALAL;ARDAVDEVARRRELRELRELALLIVLDRDAweDRDERaRoVRD smRAaE 5mmLNsrALLELLEEENCE/RAVDALEEALoNacoNsERVAnoN AREA A LRELALLRDEERRLErE LzsuLLAmN.WDVEREERAAARDAEEDVExDLEaRRREAAREDsuaaRAaEAAD owns uNDERaRuDRD smRAaEsvsvER A WALLVREELanEDADAEDLEVAADDVRELAEADEARAEEARDEaAAEma N/F DRALAAED EVAacLVAEs MR SOUTH WINDSOR m EDRRLELEEDRERVEVVDRAREERDA A PROPERTIES LLC V LAEVALLELEEVALEALARDEAEELREERRRREAEEREAVEs70Nu‘rMEG 'ROAD R WALLADDREERER;EDAEVLLLEEELARDAEDWRW u WAsuELALE LEDELLREEVARDAEDVLRRERLAEERDWAaRELEAREAEREVEEAE5mmRLARE R RERDVEERosmAEEDLEEALARDAEDRVRDLEEREEVEGEVADDRLEESVARLDREA FROFOSED.EEE ELEAN NATURALERERaV ELANsGAS FUNPS (TVF)OPERATION &MAINTENANCE-——— SLADELVAEE LEEssEmLEDA .AE EDARRVED DRERARDADE RAE DRDERLRDDRDsmAAEEmm EoR noRE DELALEs ~ ;"~.EEEExEmaEAVERAAsLREARRREWVAEAVRERVEVADELVREEWLLEELREREEREDAARVALLVELEANLAEEEDLEEALAAD DEDRDERRAVAE RRE LREAVREA: gALgR EAELN§ AERDVEEEDLRERWRER DEW DE AEEDAALALED EEDLRERV ExEEEDE R-cJEEREcxERAREEAADERALEEEORDARAEEARDRERALAAEREDVREDDDVLEVRREEEDAELaERAEE ARa ELEAR As RaowRED i135?»W VREAaETVERELER‘I-REEVEEADELRMEfglVEN ROIREDE RVDR RERDVEEEDLRERLAEEAAE w L RA DERVRAEAEREE A R LEE WWR EEDRERV DELLAcEExEAAREEAADEDVEREEaRDARAEEARDREEALRAEREAVLRED BLE a:DE LRELREL‘DEVEARom sVsRERDEDsDLLDsERaRREARDEELER ELDRR Raw mE wuER aDAEm new L WL‘VR LRVERRAL Ems;ADE MAP c:Ecx owLEr REFERENCE muss EoR aLccxAaE Arm Aw sEDwEm ELEAR As REDD RED E°§§S§$§§7S:E«:§;‘§E'REW:;5§§REEVEVER RAEVAE.AEEEEVEDARDELEAAEDLD §§§°A1E§§3E3§J LRE ERDRLEAQE iL1°§EL§L“a‘SVE'§2LS:EER:§LoR A mm R DE Ax LE, w 'CmiCaELL DDELLAEARDAAEREDRREDDALAAUARVLADDEEDVEREDAVEDRscLERusvREDLEVEREDADLLSELERnsL D:DAVLsDR ERVLADRRERVAL :AERLEAVLDR 3RD»DRAwwE suawnAL s Rug LREEDDE L VREALEa-ELWEER EREEAEELREDEVEEERAADRDDEL WALERRAELEDVALDR 1 EmmEDRAE:EV VE EOEso:RRERAREDRumEa5w EDD EV READAADEED DEALER RomAVEREa ARaREssLYD-AAL;sou RwwDsDRmom LR:EDRREEDEVRDALEDRLAREAERLEE AEDAERLV 2 ExcEEDLEaggggvig'g;gg;gg;¢£§;igmELVALERDUALLV ELDR “5“"W WEE WW MW “MW E EALEVLALLDRA DR RDEARERLALDLRVERLEVLRE REE WRLOE VRE AVEAAEE A :LowEALEVLALLDREDELRERVD RRLAL mm EVEAERDED EDLEDE ALELEEAADELLREELEVALLoRsEaR RLLE LE RERDVED EADR ERE RALERDDALLVV REDEELERELD A L;ac EVERE LR LRE RLRsv swunERE LDEAEED DRELREAR aE VRE EVSE'ER AAD ARV DERERLALLLEALLDEALLDAEEDALEALALLDRDELREEvRRLARVLERRLLRREEAEELLDLREAAAADVEDELLE DEAR RARALRE ARD AALAEEERELLAAEELAcEssDEE sLREEy RARxmaEEDLADAEEEMARR LDADLia EAuARLE E A mEDALREEDRRAAREEAAEEDVRDAAmm;msmcv FAILDDEVALALELEM;EREEDRLREREEVLARDVzDREL WEAR AEDDLRED RARRLAEEAAEEE ADE 1AREEE E ERAEEE DEELEE REE E Ema LAME EE DEEE: DE EE EDRRERELAL LERAEE :ER Ra m LRDDELALAL EE aEaEA aR L ERAEE DER A ERELaVEEE EDA LRELAREES ERLEL RRLEREVERR EREA EA EmRAVREERDAaALE”LL EDDRVVREEROAD EDARALREEADAD LLaL LL ,DL n ARDRDEEDEAMDARLVREEAaxnDEEL.E EaRALRED LaLELRLEL AEDVLRERERLE ExLsELRE EADRDEED ERRLLAE ExLELLRE RRDAasED RLR LDLELEE LDDDA 5E RLR LDLEADRLAEE LDDEL RLR DEW LEDEL ALR ERDRLVARD LEEL ALD AELR VARD LEEL RE.ELDE ma LDEL RAx DLDRLEE LALDRLED RAx .RAEAVLDDEDDVEAADE ESE, RAE LDL EDVEALDE EDE RAx DLLLDLAD RELERL .DEL mm AL RDERAREE EDALEL RDERLREEELEDERRDERAREE RDERAREE RDLRARDE RLA RD EL RD RDERARDE LDAL LL LL RLA RD ERARDE L.A AD ERAREE mm EE ”ALLA s: LLEAEEL LDDLEELLLEAELELED EL LEDEL ,LE EL A AEEL .Ls EL m EL .,..EEL,LELDRLEE E L ALDRLEE DELL,LDL LL LE DLE.DEL E LD EL RDERAREE RD ERAREE RD ERLREE RD ERAREE RD ERAREE RD ERAREE LAD ERARDE ALA RD EAARDE RD ERARDE m RALREE ADAD ELLA RVLREE RaAD ADA RDLREa ADAD LLExLELLRELRDERsAAaEs LAExLsLLRDEAAELE AL ExLELLRE ERAEEE Ex DEELEEAALLDLREELDDDEE ADDD LDDD Ex DARAEE EEDDD E LE EDDLDD .m .LL EDAEEE RDRDERDEERLLDLEEEE Ex DDAADE ELE DALVEAS LDLDL E LLDAAEEE DR E ERRLDVEED E ALL LDLAEED.LLLLDLRAEEDREDALDED Ex LRLREEERELLLLDRELLDDDEE LADDD LDD E LD LAAEEE DA RDRDER DE ERRLDLEEE E LD LRLAAREEEA ELALLDR EDD .R E D EEAEED LDLA DSEADEDREDLLRED a RRDEDEEDELLEARDELEVALLDRDEEALLLEALWELR DALELEE RLRELRVEALELEVALLDREANunwEwncsmwEL£HiNVs VNAr coaazs»oun 'ro YRE RVDRAUU:cNAiACYEwISHcSDELREAVELERLLREEmERRVELDELREAEELEDARDELEAREDLDLREERDALEADEARLRLRDA DE ELxLELRDRLRDDRDERLRERARVEAELDREAEREEDRAERDALLDRLRELVDEAARDEADLDREAEAEEDRRERDEDRALALERARDEAADDEsLEDLREREDLLDRLRLERVALELELEARRDARDEEDDRED EAsEMENTS __A—"LL R CNG FUELING STATION DRL DARLD L n DDA..ADLL~LDD LDLRA SITE PLAN ELLLR-ED RRAD ~LoR'R DALE LLLEDDAARLDREAADLEELxDEDEELDERERL VDLDDRDLEL -,RDARDLDDED LAsRARLDE LRE DD ALA‘R‘RLRDLD D DEL .LRDDA:EE’RLRDA LDED AR§RDVALEAELE ADDELEDDLLRERLREDVLRERERLsLoL EDD ARDEDL LRLLL DE READED LRvoA SLRDLE LDL REGULATED ACTIVITIES LL L .KgcDLLLLLLE RRDDDLRRLRDDDAAADLEDLLED LLE EVLASDDAEEEREDDL ELEDLALEDL L L D5 AERDLRD ‘RRDDDLR RLRDEDR RRDRERLLED LLD EVEREDDAEE ERERDL Ex;L L Ls AERDLRD.DEALLDR m RDLRED RDAD LDDRVLRED RDAD DDL RDLREDRDAD LDLAL DLLLLDDAREE LELALExsRAEELLADVLDED LLDAAEEDELLDVLDEDLDRARDLEAALDL ALEAALEDLRDVLDEDDRLADLLADLDLRELLARDLLLELDDLDSEDLDAEJLL,DDEEDDLDDDL DDDEDDAEDDD DD<LDDALDD-.EEE RAE;LLLLED EAEERERLRAE DEALDLLRDEADERERL AREA LD DE DRARLED LDVARxEE ELLDDEzsLzA‘DAEDERV EEsALAsca‘LEoELEDRR Ax DLDLA RELLARDDLELVRDAREED DDLEDDAE DDA DDDE DDAD DDA DDEE DDAE DDD DDLE DDAE DDD EVERDDDRLDDALED .Lm msERERDL AEVLsEDAEADDELRERRDAERLLRRDA-DR L/LL/LDJE DERRDDDLARD EAsER‘ERL RLRDDDRRRDRERLLEDRDADEALELLRDEASERERL LL:AREA La DE DRARLED LD LRE EDD (DRREDRRDLERL’L‘ED ELLLLLELLE E’ILL‘IDDDLDLEAL”:EDLLEDELADREREDR RLDLDAEVEALD EDD D“ALEDLREEEREAE LLLLéLL ADRDLDREVLEEDLERDVDRLLLLZaLsRERDRERLLD RRDDVLRRLRDLDAVELARDREVLDRDLDLDDDARDE;DLDLE DDLAE DDLE DDAE LLLEE DDLLAD LLEDDE DDLLAD mm anwmous cuaamc zxmm smwwmn mw vo a:cowsmu woman smp Auu no Nev man 5m m wosneuouw smmaz m Rows o;so uwsmuo;Aauwox mm smNEwomanmmmwsmasmm,vzmnsn 50mm o:smNs =n omoremmssumo;coNsmcmN sonom as Mmaox 2 sommo:mums mp)mp oF AeuAaox 75 vsmpo;smNs s s3mposzn.s‘wms anumous coNcam aw mm;m u an;7DRWEWAV(OUTBOUND ONLV)B“:‘NVERTS DUI’:72 S‘/'wznove zxmms cwawew‘ww umvs o;mpaovsmgms ysua gonzo Hm wpz a o onwm.a a ms 0mm mm2m:anumous cuuamc yam mm o /. GRADE mim—Am um awn .Nvam n z N/F omMRscumwmosorz$5pRoFERnesLLceooNUTMEGhow APFROXMAYE AREA FOR FILTER EAG{$> § a: SAWCUV E REMOVE EXKSHNG CURB KTYF)my cam,mm; mmu ammmous comm m Am a;ESTI MATED CONSTRUCTION SCH EDULEEmmamRMwmwmm.Mm New ‘5 w,wv w A oumzss Exmmc ”mam amumNE mo:Ex‘smcmm ss we:m «mm oNa;Msnmmumm59mmwmm cownhs.wm g pao‘mvcoNsmmou OWE ‘5 gammamm‘smmsurwmw Wm vo a2 As”cummuV2 wms av wenzpzwpm o;a uscswgzamm&.s‘w my,ca uo mum.)mm “mug mpg u o9.z SEE5mm;a:mmwmgommmnmmucummm ax r 5 2aNEWweMm g NEW wnuouwmc szmmmp mucwns mnzmovsEx.m pwz comm cns on zouymm sum mumExmosmmmcawavriscs5ANDmvmmmmussowsacss./. .5 aw w (wmw.ouv (5)m -A _____________________________ w”suman Hm a ommmmmsmmwas,m mmwmvsms.n 7sn:sxusrma mo;mmmomsarowawas N/F MR SOUTH W'NUSOR PROPERTIES LLC2m,smnsn Hap:a mm 502 ‘ROAD DO NO#\ENYEH sum‘anummscunaJts SIGNTNonmtscum V\ $IGN m oswnsams Emma poNn mm m snunmous mscuARss m ma Exxsms pom; WWW 9mm. §YARY NEW HCLC 502 NUTMEGwnuwTEEmmwas,2 m "wenawlNvEms:74:! won :Asx 1o 2m mpg.we sx‘sm pvc ma Amoxmns Locumo;srocxvu AmNewmnuommmcsmmansmcrung“2 .szz mmcommcosonsommsmsuzzuranPROPOSEDGASPUMF5(TVDJ wav 2.7 crs mo m ma swan amss -SEE CLEAN ENERGV FLANS ma m s cas ma ma:nmuas ‘5 .mv mwEXwaIa"amv INVour IN N(E)7Xa &‘/FUELmG/FARKINGAmoxmuz mm AREAVa;paoposaa 9 $FACE5 PROVIDED LVN?*1 4.710‘/azo l Emma 0mmsmucruasm as \aznovzn. L _______________________________'—\\_____::,,,,,,,,_—_______“::,,gsiwoungs,rgLU£E‘\_K \rs 7a s./» ,,,,,,,,,,, _______i I ‘1?o§a'/nv .sa-o noun m ,~_____.______________________________ vaovoszo aAs same: unoposao mama“ssawcE Foo m coNsmucnou Acczss.nusr comoL ANDmsswa-s Exxsma moo omvzw”sum az uszn mm vuoncnm mm DEsRIS REMOVAL EENEEAYED EV THIS VROJECT SHALL Ho'IOkWAV SERVICE AREAa2msonmsoAspmo:m:mxuws cuanzmOFERAYIONSANDMAINTENANCE(0AM)FLAN‘IF A SAWCUT k RENOVE EXIS'IING CONSYRUEYION ACCESS/TRACKING PAD IS REOVIRED ?AVEMENYYOFURYHERkEDHCEMATERIALYRACKINGIVSNALLBELomaonmsue;as ma msma mama."AYALocumsumoavTown5m:Am:wePNUJECYENGINEER.msmL “vans ammo N/FLns LLc530Nunass ROAD INSYALL SILY FENCUHAVMLE5AaonaEmmamm AFPROXIHAYE LINIT OF PROPOSED I FUELING/PARKINGnsncEs vaovmsn AREA. I ______________ N57”15%.m our:744.(“Area "“‘ANTICIPATED5xwemmREMIN)‘move “a".m a 2w our SEQUENCE OF CONSTRUCTIONNEWGRASSISLANDALONGSCALE-,ggw:ggéglga'dgamgwasumamaswawamwsNEWVARDDRAIN/2 mmlmmmm.“mama.acammazwawaw.“Mmwmm".mv u sesLsxou.woos a om I $32§§1EE¥$§$§22¢55E$3.1:E:'YEWEI:?i§;?$v25:u’ab"ui§°vaaposso sassnam Fen wasnonowoELECYRICALSERVICELINES.‘wow2;:zzsxéas:swag:'.i'::§g::5:;‘ssasmaisrrae:Lzcmm nwsaomsa ,MWmowMmmamaoaamaamovammwa.mum aAs rusoma am:swam mm“mg 5mm wma w ms am smuoaCOMPOUND muumam a womczEmma m.mo Namum:WWWaomwzusvowe aonaa oz umoCsoa;v a mamigos wmoww z mama”mmWWWmomsmmwmm INSTALL SILY FENCE/HAYEALES msmmoa o;m wazmow mmz mm Mona coNEEamxoN Am a WNWWENEEEEamaEEEmEMEomEmEasuaomEEEamumwmumormEwoEaaEoWanaM“WEE 9 MmMEmmmm“WEN.aEmEaWWDEaNNEmo N/F mam swam; MR SOUTH WINDSOR m comEvEEomaEawwomaa PROPERTIES LLC ..Wm“mmENDaAEEmEEwm“SEEM57oNumEG'RoAD .1 wsmEooamoNEEwmmamnoNEaWEm .x ‘mmoNmMaEaaasmaaEmma,EssaawaaaELEwENEmsm5mmmas a aEHaVEEEasaNEEaamaamammoasomvsoavmmsasuaasoa i -PROFOSEDsEEcLEAN NAYuRALENEnov GASmus PuMFS (YVFJ OPERATION 8 MAINTENANCE FOR MORE DEYAILS mE Exam Ema ammo NEWvmmmmommaWMEWEEEED mumnzsWEwww ls EssmmEaEmasmw.m wE cow’LoEo aaEawmmmarmmwonmwoao;ME umzaoaoumyou“WEE mm mm.waENaEmaE .Eawmmosamm Emma-ENEMWEWE was EommE “among mumEEEExomEWEsEonaEoamEmommama :TgMBHNEI:WEEAVHETMEERVEJEEEEEAEEEMEiiIEN~0IEEaW w moEEEaIEaAMEs a EEEamwaEEoEEoEmmaaEsVEEHAEWEEWEWEW WM .Na coma EA ,u Eon omEaE mo aEaM Es aEoowEo BLE anon:EmvEAa»EAKoEE‘aNaromsusumomsouosEaon’v‘wzwnzaoumuEEoWEMAmNvEaNAEamsE MAP “Eaxommm REFERENCE EomacmE m m 5mm “Ems mum MomsWEWEE ow mM REEE nmmmEasWEaEo m ommaEaomENomoa,o WE mm.m»oEaammosEWW o;a:v 51E o).WEWE aEaNEmwEEEWEa oN mom am;EV Em mmEaoEoEEasysEEaWE.aa WEWEEENE mama amE aEE‘EN EWEEaEmom WEWEEEENW uEoEVEaEa swowowmmoa Emommu“Emma“mpEmmaEawmmomwaE y EvEEEEEaVEEaWEW EEEEEomEwnEaouLr E EEEEEEDWEE:Eaw END norm WEE mosyEooEEoE E Emma msunxE:E Eonm,mENEso,aamEamEmomwaso;wé‘moumEE av nowoEs‘oN nowwowssmmsmcsow wwosou coaaEEwEm Emma onEomm“ I giggggwg gggggggggikgiy‘mWE"M Ham WW ws'ww °‘ E mmmxsoxaocmmnoxVEEWEwxxmmmoExxExxEmEExxonxoxxEsosEExaEasaoaEwxa EE momma NE WEEMW A “mums“ow xxE xxwm amEEmEEEEvxxoxxEoxxxE aEExEx Exaxa .xc U I O ac Emma .xE mo swarm mama WEE“OE WE WEE mmoxxEx sCALE v 40vEmnmmmoasEaaxExxxxxaxoExxEExExExxxEExxxxEwWxxxaEEEEExxaxxExxpxoxEEExxEEaxx EwaEaMEWEEE Eomia EEEoEoNmEEEm::EEmmaaEEaaEaaamsmcvmLouswAEzoNE, EamaocowomE momma 5mm.EEWEEEEEEEEE oEEmommawmwmmmma; MWWEMEDMM WEEmamEEWEEEEE‘EE m E mans;y m s;aEaE EE§EE .Eoanmm .EmE E‘EaNE 1111:;o om “Emmy WEE EEE E EEEWEEEEoxmExxaoEsxsxxEx«xxExEvExaonEExso owwEaaoEaW E»mowmoam EammEaaowamumm EaomsEaEmmamaamv5IEEEoMaWEa ‘aammEMEaEm Exam EaonosEE Exam Exam EEOEoEEo Em EoxEuE wows;ma LoxEaoxuaE ommamxso Exxxx.Exaxxxxxa x5 xxmamxxaoEEExmsxaExxxoxoExxxxExoxxEExExoxxEExxx.xxExxxouxcaxExxoE mxxxEExExxExxEExxxxxxxmxxaxxxxxxxxx mm s:x0 ExxxaEmooxoaxxxaExonExxoExxxoExxxaaExxxaE xxx EocxxxaE xxx axxx.xoExxxaEmy.“xxxxxxoExxxoExOExxxoE WEE,5E ow”;ma“mm,aa Ex ,xEoEx xsa xx x xx ExxxxEx.EE Ex m Ex .,xE ExxxxxoxxEsxxsxoxxExExxx.axxxxxx.xxxxxxxxx Ex NaaxxxaE mxxxasxacxxNoENacxxxaEmamasxaExxxoENacxxxoE 5mxocxxxaExoExxxaE Emma“.Eaxa EnaxomEE ma aw mm aaxE xEExxEmxmxsExEEE oExxExxxaEExEEs a Exxsm WEE Ex oEExEEwEaxxaEmoExmuxxoaoE.E E WEE EExaxxxaEmsxxsmxmxxxExxsxxEEExaxxxExxxExEEx xxxxEx o:ExxxoxEExxx Ex oxxxEE xx xxxxExxExaExxxoxaEsExa xxsxxcEs xoxxaxaxx osxxaEsxEoaxxEa Ex xxExEEExsxxxxoaE .EMEuaooxxoammEs xuxxExoE ExxxoxEEs Eax xx xx xxxxxxExxxxxxox ”gm-xxx”xxxxcxs xaxxxxxosxxaEsxEoaxxEa s mmEaExzEmaEEExxxxoxoEaaxxxExEWExa oxxxxcE mExxxExxEEExxxxox;E ooxxExEEExExExmxxsxxxxEoxxEmxoxoxxExxaaxoxxcaxxaxcxExxsxxEE xsxnoxwsow EEwxLE MxxuucxwEa suEzomnExomox .xcEuoESmuExcnxxExsxEEaxxExnExxxxxxExxxEEsoEEEsxEoxxsmxxoxxxxExxxxsxExExxxxapxacEouxEx EASEMENTs_—CNG FUELING STAT10N xaEaxpEo roa asx xmmo a.cxcmxo SITE PLAN mam Eaxaxaxomx so m xmaoa av xaxE xx,xoxxxxoxEoxxxmxxaxxsunxa:wE xxxmxa xExaxcxxxxoEoxExExExxnxxEomozoxxxoxppxom uEomaJEms xpxExx xox mo xxo aux wxEE as nEwoEa wxa A ExxEaE aox REGULA1ED ACTIVITIES axxxxox xxxxxEE xxxExxExSExExx oxxEExxEx xooxa xxxoaxx xxxasaa axoxaxxxEs “a ExxxsauxEE ExExax ExEExxxExx xa xx xExaxxE xxsaaxx xxxasax xxaaEaxxEx Exa sxExsouxEE sxExax axs x ,xx xExaxxEmExxxaxoxxaxxExxoxxxaaxxxxEExaxaEaxxaxxEaxaxaxaxxxaaxxxaxxaE x ,2 2x)xxxxaExsxxcEsxxoxxaEa xxxxxEEsaxuxaEmxxxaxExxEm xxxxxaExxxaxaEnxxxxxacxxEaxxExxxxasxxExxsasxaxsxa.xxx aasxaaxc.aax uuxxoxxEaox axsmaxmax xEExxxsnxxEaxEExxxsnxxEa ExxExexxxx»xExxaxxxaExxExExxxxExxaaEaxxxxEDxoxxxxEEaxxxExxxEExcaxxxxxaxaxx xExxxxaxaxxxaxxCEx am WE aax oasxaaxa aux aw axxE xax am aaxa aax ExExxoaxEE ExExxx xExass xxE xxaxExxxox xxsauxx xxxasaxxxoxExxxEs Exa xxE .Exxxxa xxx saxxEoxx Ea 1x91“,aglx a:a “a“waxxaxExxExaxxaxaxxEEx xxm aaxxa aw aaxc xxaxE oaxxxa .xxw aaxxxa nums -v sz mm Eé E : z ,(wgm f mmmNsAras wmmW—i—kN)CE COM PANELiWm #i i i i ‘i 51‘i ’'i (m ANG‘coM PANEL L 7 ,:l ‘ ‘J.A ["17 '3-1m ‘.m;¥wym psaunvzsz 9*i 1 ‘ ‘ ‘‘ é ‘ ‘2 E"5 ou 1 3 §m §1§1 3 i aa>‘1‘‘ i‘i AN}ANGIMOTOR CONYROLFANEL . _a _>°i ‘ i i'EE:‘“ g2059' NW . 4»7 5‘ f (E)ENTRANCE/EX‘T > \ ¥w mum vggn‘,- 5,4 ¥mamwmsr7:o aoLwms i (NJANGIDUF’LEX 200 HP SK‘D n (mnoumgmg iCw i ga§ i _’.=v #ENLARGED SITE PLAN 1" (N)aOLLARDs Qa \m EQu‘PMENT COMPOUND£3/v0’(1)ANGI DUPLEX 200 HP SKIDKmPRI0RITVPANEL,(1)STORAGE VEssEL /(Np JERSEY EARRIEé (I)PSBZ1-6 DRVER E ‘(1)sw‘TCHBOARD CZ)(1) (N) COMMUN‘CATION CHNNLINK FENCE BOX AND GATES f 1N)nMEHLL POST (ND BOLLARDS '/—(N)FUELING AREA GENERAL NOTES 1735 DUAL-HOSE PARKING STALLSPOSTS "‘‘umFuRMmwmmmmsmsml3E“swamsav’v’mimm.wJmTMNwwmCONTROLnEvucEsFoRsrRE ETs AND msnwws EXCEPT As NoIEu ON THEISKNGLEHOSEPOSTPLANS l 4 ESD POSTS z m ma mu ARE 5mm to mg m;oF cum mu ALL ommsms ms m mg a;cmwusaswucmgwussomgmsgNam) 4 CONYEACYORaAuxems SHALL ag 5mm To om mggmw Muss w mums WHEN 0mm4CONYEACYOR‘5 RESPONSIELE FOR THE PRDTECTION OF ALL FROPEHW CORNERSscommwasmumm"mswcmmmmncuaasemzawems s‘zs 6 CONTHACTOR SHALL BE RESPONSIBLE FUR REPAIRS IO DAMAGE YO ANV EXISY‘NG wewsm Ar mmcgm Rmnwm/nmvsvws DURING CONS'RUCYION SHCN AS EUT NOT UM‘TED TO DRAINAGE UHLKYIES PAVEMENTwasnoREwAfRsSHALL5EsouALr0ORaEnERmmExLsnNccDNnmoNs1ALLmveuwmaswassasawwnuwsmmmmcmme—wmraouVELLOWDNCDNCREYEFAINI’SHALL EE APPLIED IN TWD I?)COATS YO A CLEAN DRV TEMPLAIE OR SYRIPING MACHINE SIRIFES SHALL EE é WIDE uNLESS OYNERW‘SE NDYED nps AND \MWOVEMENYS SIRIFING Lsmu SURFACE HSING L (D I <1- E I—'5—'n1 noZOOo Q >‘Z i-I—0 o<I—LuD:o<nfU)e5 O O (DZ Zo K 0 (nD 3UJ j:> Lu 2 Z— §z<5 D (15 I _I iu.I Z }_u.g(DZ <w oc D o UJI:3w Q 3 (g m m 3 a u .n1LI OVERALL SITE PLAN (1"=30' WMMM 5%“a PK? Mm“ MW m "3““)‘3’ ‘wwuav w CNECKEDBV m LE my c1 ‘0 PLANNING DEPARTMENT CERTIFIED MAIL #7022 2410 0000 6508 7242 August 22,2025 Kevin Grindle,ASLA.PLA Banon &Loguidice 855 Winding Brook Drive Glastonbury,CT 06033 Dear Mr.Grindle: Re:Appl.25—31P,USA Hauling &Recycling CNG Fueling Station We are pleased to advise you that the Planning &Zoning Commission voted on August 19,2025 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for construction of a natural gas fueling station and associated site improvements on properties located at 570,600,and 602 Nutmeg Road.I zone,as shown on plans prepared by Barton &Loguidice,project #448-159.dated July 8,2025 and as revised August 12,2025.This approval is subject to the following modifications: 1.Prior to commencement of any site work,a meeting must be held with Town Staff. 2.NO building permit will be issued until the final mylars have been filed in the Town Clerk‘s office. 3.This application is subject to the conditions of approval ofthe Inland Wetlands Agency/Conservation Commission.including bonds in the amount of$5.000 to ensure compliance with the erosion and sediment control measures and $10,000 to ensure establishment of storm water system. 4.All bonds must be in one ofthe forms described in the enclosed Bond Policv. UI An as-built plan is required prior to issuance ofa Certificate of Occupancy per Section 9.l .3 ofthe Zoning Regulations. 6.All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7.This approval does not constitute approval ofthe sanitary sewer.which can only be grantedbytheWaterPollutionControlAuthoritv. 8.No building permits will be issued until the Office of State Traffic Administration certificate has been issued (per CGS §14—3 1 1). .The building street number must be included on the final plan.10.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 1 1.All free-standing signs and/or building signs require the issuance ofa sign permit before they are erected. 12.A new deed combining the properties of 600 and 602 Nutmeg Road must be tiled in the office ofthe town clerk. 13.Zoning data table and site plan setbacks should retiect 600 and 602 Nutmeg Road as a combined property.14.An exterior lighting plan.including photometrics.is required and shall conform to Sections 6.3.2 and 6.3.3. 1540 Sullivan Avenue,Suuth Windsnr,ET HEDM i Tel (8511)544-2511 Ext 2329 l Planning@SuuthWindsar-ET.gnv Black and white transparent mylars of Sheet #2 with the above modifications.together with three print copies and one electronic copy of the entire set of plans with live signatures and raised seals must be submitted to this Commission to be stamped and signed.The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of‘the Town Clerk.After filing these plans,a copy ofthe receipt must be submitted to the Planning Department. Sincerelyt ,Xr‘v’W—r/‘F‘ Stephen Wagner,Chairman Planning and Zoning Commission SW/js Enclosure:Bonding Policy cc:Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal : TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE &SUBDIVISION GENERAL:Kevin Grindle CHANGE ORDER CONTACT pERsow Barton and Loguidice,LLC phone No,860 633—8770 Address 600 Nutmeg Road North Site Name U.S.A.Hauling &Recycling P&Z No.25-31P Owner MR South Windsor Properties,LLC‘Phone No.860—746-3218 Contractor To be determined Signature of Owne i Date:12/4/2025 «‘I Date:12/4/2025SignatureofDesignEngr. CHANGE:(Describe location and nature of change.Include Four (4)copies of plan/profile of Change .)Owner is requesting to break the project approved on August 19,2025 by the Planning and Zoning Commission into two(2)separate phases.Phase 1 would include the construction of the Natural Gas Fueling Station (including gas and electrical connections)and Phase 2 would include the basin conversion and entrance improvements. Reason for Change:(Why is change required) Delays in product avaiiability for pond conversion and weather related shut-downs related to parking lot improvements and paving are anticipated to delay the Phase 2 work and the owner/applicant wants the Phase 1 CNG facility on-line and operational prior to starting work on Phase z. APPROVALS:(As Required/v) ,v/lv 7 "Dir.Of Planning Date:b/L)/‘70' Town Engineer ’Date:Z Z Dir.of Publ'c Works Date: other:a ‘W Date:mtg/8f STAFF COMMENTS : White —Town Engineer Yellow -Applicant Pink —Director of Planning Goldenrod —Engineering Department