HomeMy WebLinkAbout20-16P KAZ Equipment LLC Wash Bay T&C RenewalTOWN OF SOUTH WINDSORPLANNING&ZONING COMMISSIONAPPLICATIONFORM
Application Number:w
Oiflcial Receipt Date:3 "[0'320
Mum's Application #z QOQ~§0 0533
APPLICANT:
‘mmr LLc.’
PROJECT NAME:[4)ajh bag]
NAME,ADDRESS,TELEPHONE 8r,EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
grit.My)”,fag 7?X’7/277 n‘c '.0m
Estimated presentation time :
THIS APPLICATION IS FOR:(Check all that apply):
D
Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required)
D
D
D
D
D
B
D
E Temporary and Conditional Permit (Public Hearing Required)for
XTemporary and Conditional Permit Renewal for
D Detached In Law Apartment or D Accessory Apartment (Public Hearing and Ce ’icate of Mailing Required)
D Major Home Occupation (Certificate of Mailing Required)for
D Other (explain in detail)
PLEASE NOTE:An Application Pending Sign is required to be posted on the property for all applications
ten (10)days prior/tQeing heard by the Commission.
C t Sigiature of Property Owner
t/yw mxk «Ski/mPrintNameofApplicantPrintNameof Property Owner Revised i /15/2o2o
Zone Change to (Public Hearing and Certificate of Mailing Required)
D
D Minor D MajorSubdivision
D Resubdivision (Public Hearing Required)D Minor D Major
Conditional Subdivision
Special Exception to Table (Public Hearing and Certificate of Mailing Required)
Site Plan of Development D New D Modification Building(s)Sq Ft
General Plan of Development
Earth Filling (Sec.7.6)and/or Earth Removal (Sec.7.16)(Public Hearing and Certificate of Mailing Required)
Regulation Amendment D Zoning D Subdivision -Attach proposed amendment (Public Hearing Required)
Equipment
187 South Satellite Road
SouthWindsor,CT06074
P:860.761.0381
F:860.761 .0384
To whom this may concem,
The purpose of this letter is to obtain a temporary and conditional permit for the
Mi-T-M WTR Series Water Treannent System (specification included in packet)which
will be housed in the 26x12x40 Freestanding 12.50z Gray 3’RFTR Cover for the wash
bay.This will be located at Kaz Equipment’s new location of 67 McGuire Road in
South Windsor,CT.Thank you for your time and consideration.
Best Regards,
Eric Olivieri
Owner
860-798-71 87
m52A33.25$385I8.‘m§4._z.or§oa$uvw.zsup‘wwazv9.:>2fwoimm/&~Z®Ppp.4:2mx.omdunmmhu_z<"mNhEzv_z<"mnbVAOCdmx.omqmmpuw_zs$.3eéo_z<..$‘88cdXmmum"mx.mna>_z
_zn_
€»_.
_.\w/g,///m5z;J,.II//1.JI/lZQ9mV/JV9.®//l(mmwaoQ7z\no<mm%¢Vinngwmmo>0az>za>mm>«m5;Hmz>z~&mx.5mqu~wN.D_Z<uCZ><>F>NFM§wuinwSmmmamx.wruo.ww..uw.§mx.0w\.3mubn_z<“cz><>=n>mrm\gozowoRom3U.LTx\Xmwwu
QmmgmzaQ.mung.2nown><oma34>OnmmmEOIHM>n0SNNGW4mq>amA%OOZZmndnc«.I4~z.ocu(mNwmocqxu9am»?k822mmroo.m>mq.:m..>wmDQ>.~mmVDm>_z>omEnhm>mm§m24umm<9!.2uu@.4><Dmno.0
9:noc5mno>0‘—XMNUNXmwbmVyWwmkwgXmmE.,1.INy‘.2x,./’1/\u/nE/IIXmwho/MuI[Xua.&g
‘74Pp l9'Z¢P
Mi“?
h]!T WI 'A‘LXI'=1l TnLAI‘MJH
WTR Series
Recycle Systems
WTR Series Recycle Systems Combine
Enhanced Design with State-ot-the-Art
Technology io Offer:—Quality recycled wash water without
common odor problems-Easy operation and maimenance—Poly skid is conslmcted of hardened polymertobenowcorrosiveandcanbeeasilylifted
and moved with aforklift from all sides
CSA approved control panel which meels
the requirements at the US and Canadian
standards for an industrial Conuol Panel
Features:-CSA listed NEMA~4 corrosion‘proof control
panel for safe and reliable operation
Pumps are easily accessible
Hose connectors are designed tor easy
accessibility and quick installation;
the connectors are clearly marked—5 and 30-mioron filters
All options can be added to the
WTR Series after the initial set-up.
CSACIRTIFIED
WTR-10-0M10 shown with aptiana/pHcontroller,MIX-0130 and UHP controller WX—0131
5 and 30-micran nlters Optional pH controller,MIX-0130
WTR-10-0M1 0
wrn-1o-0M3o "
(1)5-mlcron,100 sq.it.
(1)30 micron.100 sg ll,(1)gomffrcognwgggnftn
110 Ibo
110 lo.
1.0 HP
1.0 HP
1/2 HP 80 gallons 20 gallons 208-230V.10,15.0A
20 gallons 208-230V.30,3.0A
72in.x4it.x5tt.750 lb,
1/2 HP 80 gallons 72inrx4lt.x5it.i 750 lo.
Accessories:
19-0274 Filter -Replacement litter lor cartridge lilter,30-micron.100 sq.it.1 lilter needed All models
19-0282 Filter -Replacement filter lor cartridge lilter,5-mlcron,100 sq.lt..1 lilter needed
Activated carbon -Order per pound
All models
All models330302
055-0046 Ozone -Far specialized applications where sterilization ol the waste stream is desired;12 watts,6 grams/day All models
Options:
WX-0130
wit-0131
WX-0132
pH controller -For when pH adjustment is needed;1.0A 48ml/minute chemical pumponrbonmiier-Forwhen ortP adjustment is needed;16A 4ami/minute chemicaipump
460V option -Upgrades 208A230V model to operate at 460V
All modelsAilnRBixEis
WTR-l 0-0M30
Process &Flow Description
1.Surface-Mount Sump Pump -Umreated wash wa‘er is introduced into the system via a 1.0 HP sudace-muunt sump pump,which is
included and Iocated on the unit
2.Activated Carbon Filter -The hnal treatment stage 0f the system occurs as the water is filtered through activated carbon which absorbs
hydroearbons,herbicides,pesticides,metals and dozens of other carbon-based constituents.Activated carbon also works as a polisher for treated
water Io remove chlorides.
3.pH Controller (Option #WX—O130)-The automated pH control system keeps the water at an appropriate pH level so the gerrnicide is effective
at killing bacteria and controlling odor.
4.ORP Controller (Option #WX—0131)-For longer term control of bacteria,the ORP iniection system automatically measures and injects a
germicide to control odor by killing odor-causing bacteria.
5.Cartridge Filter -Designed to trap and remove solids from the water,Reusable 5 and (SO-micron dual mtersr Pressure gauge indicates when
mters need to be changed or cleaned.
6.Treated Water in Holding Tank -Once the water is treated,it is pressurized where it will be ready tor reuse at soVPSI to so-PSI.
‘l
Corona Discharge Ozone Injection (Accessory «8550046)-Wash water is injected with a high concentration oi ozone via a corona
discharge ozone injection system for a “quick kill"of live bacteria on contact.Ozone also breaks up emulsmed oils,allowing them to coalesce.
(Hangs from back of control panel bracket.)
Electrical Control Panel -NEMA-4 rated corrosion-proof control panel for sale and reliable operation.CSA listed.
m
Sample Equipment Wash Pad Application
Remote Box for Pressure
Washer with Hose Reel Model #WTR-10-0M30
and Wall Mount Brackei Wash Water Recycle System
(#50-01 96 and #13-0207A01)HEG-3004-0E2G
(Stationary Natural Gas/LP
Hot Water Pressure Washer)
Model #1 2-0074 Model #3-0328
3‘x 9'Fiberglass 1.0 HP Surface-Mount Sump
3-Stage Collection Pit Pump Included with System
Wsie
i“E Distributed by:
Mi»T»M Corporation
5O Mi-T—M Drive
Peosta lA 52068
800-553-9053
563-5564 235 fax
corp@mitmrcom
www.mitrn.com
VTlISnLMM
13
Performance under Pressure.”
'VI Water Treatment Systems httpszl/wwwmitm .com/waler-lrealmem-systems/WTRSeries/1022
IMPORTANT SAFETY WARNINGSREADALLSAFETYWARNiNGsBEFOREINSTALLINGIN-GROUND FIBERGLASS PIT SYSTEM
HAZARD POTENTIAL CONSEQUENCE
RISK OF BODILY INJURY Injury may occur from the In-
ground Fiberglass Pit System.
PREVENTION
theDo notinstallwithoutreadmgentiremanual.lmpToper and installationunderstandln WI%void warranty.
DO NOToverreach orstand on unstable supportincludingpitbracing.
Wet surfaces can be slippery,wear protectivefootgearandkeepgoodfootingandbalanceatalltimes.
DO NOT DRINK THE WATER IN THE IN-
GROUND FIBERGLASS PIT SYSTEMH
This is non-potable water and is not suitable
for consumption.
Do not submerge yourself or pets into anoperablepit.
ST0IOO90P299JTR6—~
FLOW CHART
As pressure washers are being Operated,used water flows into the Wash Water Catch Pit (1).From there,it moves intothecoreofthesystem;the 3-Stage Collection Pit (2).The performance of this pit regulates the performance of yourentiresystem.This pit is designed to remove initial contaminants from the system.Increasing the amount ofcontaminantsremovedatthisstage,increases the life of the remaining components in your system.After moving through a seriesofcleansingweirsinthe3-Stage Collection pit,the water flows into the Sump Pit (3).Water is then pumped into theReclamationUnitforfinalcleansingbeforebeingsentbacktothepressurewashers.4 Mi-T-M®ln-Ground Fiberglass Pit System Operator's Manual
&ISAVE THESE INSTRUCTIONS!&
PLANNING DEPARMENT
IN-HOUSE REFERRAL FORM
DATE:3/9/20
TO:Michael Maniscalco,Michael Gantick,Walter Summers,Jeff Doolittle
Ray Favreau,Chris Dougan,Heather Oatis,Kevin Cooney,Tony Manfre,
John Caldwell,Andrea Confrancesco,Chris Duchesne,Vincent Stetson
FROM:Michele Lipe,AICP,Director of Flaming
The Planning &Engineering Departments have received plans for the following projects:
Appl 20—16P,Kaz Equipment Temporary Structure for a Wash Bay (2-yr permit renewal)
Location:67 McGuire Road
g Site Plan D Subdivision No.Acres .64 ac Zone GC
E Industrial g Commercial B Residential No.Lots/Units
Water:g Public B Private Well Sewerage:@ Public D Septic System
Project Description:40’X 26’structure for equipment washing (not constructed to date)
Future Town-owned property involved?D Yes @ No
D new street(s)E new detention area
D new open space/recreation area E]active Bpassive
Planning Department notes:
The wash unit is self-contained and will not discharge into the sewer or drainage system
Please comment by 3/24/20 and retum to the Planning Department.
App.#20-16P Kaz Equipment Wash Station T&C Renewal
Flaming Department Report 4/1 4/20
1.Request for renewal of a two year temporary and conditional permit for astoragetenttobeusedtosetupawashbayforequipmentat67McGuire Road,GC zone.To DATE THE TENT HAS NOT BEEN ERECTED.The current
permit expires in June of 2020 and the applicant is now ready to request the
permit.
2.The storage tent is approximately 40’X 20’and is proposed to be located
approximately 10 feet south of the existing building on an existing paved area.The washing system proposed is a self-contained unit that does not discharge
any water into the storm system.
3.A picture of the structure and brochure of the equipment has been provided.The applicant is proposing to screen the tent structure from Route 5 by creatinganequipmentdisplayareaalongtheedgeofthetent.In the future,he hopes toreplacethistemporarystructurewithapermanentstructure.
4.The building code limits the duration of temporary structures.The applicantwillberesponsibleforobtainingabuildingpermitandensuringthistemporary
structure maintains a current building permit.
5.The property is currently serviced by a well and septic system.At the time ofconstruction,a permit will be required from the Health Department.
6.The regulations state that Temporary and conditional permits may be grantedbytheCommissionforaperiodnottoexceed2years.Such approval may be
given after a public hearing if,in the judgment of the Commission,the publicconvenienceandwelfarewillbesubstantiallyserved,and the appropriate use
of neighboring property will not be substantially or permanently injured,andtrafficandotherhazardswillnotresultfromsuchuse.Renewals are grantedwithoutpublichearing.
If this application is approved,the Planning Department has no requested
modifications.
1540 SULLIVAN AVENUE 0 SOUTH WINDSOR,CT 06074
TELEPHONE (860)644-2511
April 20,2020
KAZ Equipment LLC
Eric Olivieri
67 McGuire Road
South Windsor,CT 06074
Dear Mr.Olivieri:
Re:Appl.20-16P,KAZ Equipment LLC Temporary and Conditional Permit Renewal
We are pleased to advise you that the Planning &Zoning Commission voted on April l4,2020 to approve
the above referenced application for renewal of a temporary and conditional permit This approval is for a
wash bay,on property located at 67 McGuire Road,GC zone,This approval is subject to the following
modifications:
The Temporary and Condition permit will expire on April l4,2022.The permit will have to
renewed at that time if the use is to continue.
2.Building Depanment,Fire Marshal’s office and Health Department must be consulted and
proper permits obtained to for the outdoor storage tent.
Sincerely,
79w denim”
Bart Pacekonis,Chairman
PLANNING &ZONING COMMISSION
BP/llz
Cc:Zoning Enforcement Offlcer
Assessor
Building Official
Fire Marshal