HomeMy WebLinkAbout21-47P Revolutions Expansion T&C.
BEEN:1kg...
‘‘
25
Doug Nation -proposal
1 inch =100 feet
P.0.BOX H67
425 SULLIVAN AVENUEISOUTHWINDSOR.CT 06074
PHONE:860.291‘8755
I FAX:860.291 .8757
www.designprofessionalsinc.com
CIVIL &TRAFFIC ENGINEER3 I PLANNERS l SURVEYORS I GI3 ANALYSTS I LAND3CAPE ARCHITECTS
Serwng Connecticut,Massachusztts.¢Rhod:I5/znd
x
Narrative Statement
Revolutions Bowling &Lounge
Special Exception/Site Plan
Seasonal Outdoor Uses
60 Bidwell Road &195 Governor’s Highway
South Windsor,Connecticut
DPI Proj.No.3296
May 24,20 l 3
South Windsor Entertainment,LLC previously secured special exception approval nom the SouthWindsorPlanning&Zoning Commission for establishing an indoor recreation use in an existing25,232 +/-sq.n.building at 60 Bidwell Road.The use includes a high end bowling alley with 16lanes,VIP seating,a lounge,party rooms,banquet facility,kitchens,agrees,restrooms and parkingfor68vehiclesona3.81 acre parcel.The facility is open year round,and opens at 9 am.daily,with closing time ofmidnight Sunday —Wednesday,1 a.m.on Thursday,2 am.on Friday,and 3am.on Saturday.
On May 14,2013 the Planning &Zoning Commission unanimously adopted zoning regulationamendmentstoSection7.13 to allow,by special exception,seasonal outdoor uses during thewarmermonths(April thru October)as an accessory use to an existing approved indoor recreationspecialexceptionuse.
The subj ect application is for seasonal outdoor uses at Revolutions on the facility’s enclosed lawnandpatioarea,contiguous to and westerly of the building.This will includezl)a tent or tents foreventssuchasweddings,retirement parties,anniversary celebrations,bat—&bar-mitzvahs,awardceremonies,corporate outings,auctions,team building and the like,with an anticipated maximumtentsizeof60’x 100’(which can hold approximately 250 guests for dinner);2)entertainment,including music and dancing;3)areas primarily dedicated to serving,preparation,sales andconsumptionoffoodandbeverages,including alcoholic beverages (with an expanded patio,maximum seating of 150);and 4)Areas primarily dedicated to outdoor recreational activities.Revolutions has dedicated 150 existing parking spaces on the building’s north side toaccommodatetheseseasonaloutdooruses(89 spaces required per zoning).Staff size at present is30(6 FT &24 PT).With the new outdoor uses,staffing is expected to increase to 36 year round,and 39 during the warmer months.Hours of operation for the outdoor uses will vary,but couldbeginasearlyas7a.m..Closing time for the outdoor area will generally be at or before ll P.M.for functions,such as weddings.The outdoor bar/patio area is expected to be open Sunday thruThursdayuntilmidnight,and until 1 am.on Friday and Saturday and holidays.The area of the
proposed outdoor uses is far away from any residential areas,and the applicant has already
performed sound checks to ensure compliance with the zoning regulations.Thank you.
G.\Jabs\3296\Docs\App|icatlons\3296 Sp Exc Narratlv:201 3—05—24.doc
PLANNINE DEPARTMENT
October 1,2021
CERTIFIED MAIL 7019 2280 0001 5119 0518
Craig Douglas Nation
660 Main Street
South Windsor,CT 06074
Dear Mr.Nation,
Re:AppL 21-47P,Revolutions Outdoor Field Expansion Temporary and Conditional Permit —
request for a one year permit to create additional outdoor multi-purpose recreational fields 240’
X 400’,to accommodate league play,on property located westerly of 60 Bidwell Road,on 195
Governor’s Highway,i zone
We are pleased to advise you that the Planning &Zoning Commission voted on September 28,
2021 to approve with conditions the above referenced application.
This approval is a request for a one-year temporary and conditional permit to allow the creation
of two multivpurpose fields soccer fields and associated parking on property located at 195
Governor’s Highway,behind Revolutions Bowling and Lounge facility at 60 Bidwell Road,i zone.
This approval is subject to the following conditions:
1t This one-yearTemporary and Conditional permit will expire on September 28,2022,and
must be renewed before that time if the use is to continue.
2.lf there are buildings,structures,signs or other items that require a building permit or other
Town approvals/permits,all such approvals or permits must be obtained prior to
construction or use ofthe site.All free standing signs and/or building signs require the
issuance of a sign permit before they are erected.
3.Parking forthis use is allowed on-site only or in approved parking lots,During the oneeyear
permit period,the applicant shall file site plans for approval for the proposed parking areas
under Section 6.14 —Off -Site parking facilities as well as a special exception/site plan
modification for the expansion of the outdoor recreation use associated with the existing
revolutions approval.
Sincerely,‘dmQwém/m
Bart Pacekonis,Chairman
PLANNING &ZONING COMMISSION
BP/cgo
cc:Assessor
Building Official
Zoning Enforcement Officer
Tel (830)544-2511 Ext 329154i]Sullivan Avenue Suuth Windsnr.CT DBDM Planning@SnuthWindsur-CTgW
PLANNING DEPARTMENT
October 15,2021
Craig Douglas Nation
660 Main Street
South Windsor,CT 06074
Dear Mr.Nation:
Re:Appi.21-47P,Revolutions Outdoor Fieid Expansion Temporary and Conditionai
Permit —request for a one year permit to create additional outdoor multi‘purpose
recreationai fieids 240’X 400’,to accommodate ieague play,on property Iocated
westeriy of 60 Bidwell Road,on 19S Governor’s Highway,i zone.
This is to advise you that the Planning and Zoning Commission voted on Tuesday,
October 12,2021,to set the erosion and sedimentation bond for Appl.21-47P at
$10,000
A bond or letter of credit in this amount must be posted prior to the start of work.
Sincerely,
4’3 (mi Pa a;Kmxt .‘t
Bart Pacekonis,Chairman
Planning and Zoning Commission
BP/cgo
Town Engineer
Chief Building Official
Zoning/Wetlands Enforcement Officer
1540 Sullivan Avenue.Suuth Windsnr,CT UEUM i Tel (8E0)644-2511 Ext 329 Flanning@Snu1hWindsor-CT.guv
PIANNING BEFARTM ENT
November 24,2025
Craig D.Nation
660 Main Street
South Windsor‘CT 06074
Dear Mr.Nation:
Re:Appl.21—471),Revolutions Outdoor Field Expansion
I am pleased to advise you that the South Windsor Planning and Zoning Commission,at its
Regular Meeting on November 18.2025,voted to release the following bonds:
Appl.21-47P Revolutions Outdoor Field Expansion E&S Bond in the amount of $10,000
reduced by $5,000 to leave a balance of $5,000.The remaining $5,000 is being held for
completion of the overflow parking area adjacent to the site.An as—built of this area showing
improvements that have been made should be submitted.
A check will be mailed to you from the Town ofSouth Windsor.If you have any further
questions contact the Planning Department at 860—644—251 l.ext.2253.Thank you.
Very truly yours,
/"\
t
yxIt;
Paul Bernstein.Chairman
Planning &Zoning Commission
PB/js
cc:Town Engineer
154U Sullivan Avenue,Suuth Windsor,ET [15074 i Tel (H60)344-2511 Ext 232g i Planning@SnuthWindsnr-CT.gnv