Loading...
HomeMy WebLinkAbout24-44P 260 Nutmeg Dog DaycareTOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION APPLICATION FORM Application Number: ______________ Official Receipt Date: ______________ VPC Application #: ______________ APPLICANT: _______________________________________________________________________________________________ PROJECT NAME: COMPLETE LOCATION OF PROPERTY: _____________________________________________________________________ OWNER OF RECORD ON LAND RECORDS: ________________________________________________________________ OWNER ADDRESS: _______________________________________________________________________________________ GIS PIN # ______________________________ ZONE _________ NAME, ADDRESS, TELEPHONE & EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: ____________________________________________________________________________________________________________ __________________________________________________________________________Estimated presentation time:_____ THIS APPLICATION IS FOR: (Check all that apply): Zone Change to _______________________ (Public Hearing and Certificate of Mailing Required) Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required) Subdivision Minor Major Resubdivision (Public Hearing Required) Minor Major Conditional Subdivision Special Exception to Table ____________ (Public Hearing and Certificate of Mailing Required) Site Plan of Development New Modification Building(s) Sq Ft __________________________ General Plan of Development Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required) Regulation Amendment Zoning Subdivision - Attach proposed amendment (Public Hearing Required) Temporary and Conditional Permit (Public Hearing Required) for _________________________________________ Temporary and Conditional Permit Renewal for __________________________________________________________ Detached Accessory Apartment Major Home Occupation (Public Hearing and Certificate of Mailing Required) for __________________________ Other (explain in detail) _________________________________________________________________________________ PLEASE NOTE: An Application Pending Sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. ________________________________________________ ___________________________________________________ Signature of Applicant Signature of Property Owner _________________________________________________ ___________________________________________________ Print Name of Applicant Print Name of Property Owner Revised 9/1/2023 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION FOR SITE PLANS APPLICANT 260 Nutmeg Road South,LLC pROJEC-r NAME Proposed Dog Daycare and Grooming This checklist must be siqned by plan preparer (P.E./L.S.)declaring that a“required information is provided.Items 1—7 are required for ali appiications;items 8—11 required where appropriate. Check mark for each item supplied. 1 X 1.On each sheet for plans or maps,title block with the following information: X a.Name,address,email address,and telephone of applicant X b.Name,address,email address,and telephone of Land Surveyor or Professional Engineer c.Name of Development d.Date when drawings were made 2.Key Map:An overall map drawn to a scale of 1 inch equaling either 100 feet or 200 feet.This map will show the overall design of the Development and surrounding propeity within 500 feet. __X_a.Data block which gives needed zoning information such as percentage of lot coverage,acreage of tract,number of apartment units,parkingrequirements,etc. X b.Outline of buildings X c.Layout of streets X d.Surrounding property boundaries within 500 feet X e.Names of abutting property owners X f.Proposed open spaces and recreation areas X g.Driveway cuts on abutting properties and any properties across from proposed site X h.Distance to and name of nearest intersection street X 3.Architectural Elevations:See checklist for Architecture and Design Review. X 4.Plot Plan:A layout map of the proposed site drawn to a scale of 1 inch equaling 4O feet on either of the following size sheets:(1)24"x 36"with a 3/4"ruled margin;(2)18"x 24"with a 1/2"ruled margin,containing the following data: X a.Distance and bearings of all boundary lines and acreage of site.Iron pinsrequiredatallpropertyanglepointsandshownonmap. X b.Proposed streets and street lines with center line station,curve data,and parking spaces c.Building lines in accordance with zoning regulations X d.Proposed buildings and other structures,including signs,outside lighting, and dumpsters (on concrete pad and screened) X e.Easements,noting grantors,grantees,and purpose must be shown in table format,e.g.below X f.Names of abutting property owners X g.Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency.The monumented points within proposed site shall be coordinated.These coordinates shall appear in tabular form on the plot plan.The accessibility of these CGS points shall be determined by the Town Engineer. X h.All open space or other common or public land uses shall be indicated. A-2 certification;P.E./L.S.Seal X 5.Topographic Map:A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches,including ruled margins shall in addition to the requirements of the plot plans show the following: X a.All existing and proposed buildings X b.Curb Lines and pavement width,sidewalks X c.Existing and proposed sanitary sewers X d.Existing and proposed water and all existing utilities 2 Grantor Grantee Type of Easement Date Filed Vol/Pg N/A N/A N/A N/A N/A e.Present wooded area indicated by foliage lines.Any trees to be saved should be shown. f.Existing and proposed contours shall be shown in not Iess than two—foot intervals,but in cases of relatively level land,the contours shall be one-foot intervals and spot elevations. g.Regulated wetlands and 100-year floodplain or note that none are present h.Proposed storm drainage system,showing all catch basins,endwalls, manholes,lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches,within Town ROW.)If plan/profile sheet is provided all of this does not need to be shown.Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. Connections of all springs into proposed storm drainage system as needed j.Location and indications of existing brook channels,and 100-year flood limits k.A-2 &T—2 Certification;P.E &L.S.Seals Landscaping plan Drainage calculations:Zero Runoff Increase per SW Public Improvement Standards. Traffic Report Site Lighting Plan Plans and Profiles:A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally,and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches,including ruled margins and containing the following: a.Layout of streets in sections coordinated by stations with the prohle b.Street plan showing roadways,drainage,sanitary sewer (including house sewer),foundation drains,lot lines,buildings including all utilities with elevations (top frame and inverts),size,type,length,slopes of pipes c.Sight line at driveway &street intersections 3 10. N/A N/A N/A N/A N/A N/A N/A .Profile of roadway showing existing and finished grades.Roadway profilewillshowalltangentgradeandallverticalcurveinformation. Pronle will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations,sizes,lengths,and slopes of pipes. Where any storm drainage line discharges into an existing brook sufncient profile of this brook will be shown to determine conditions. .CGS datum shall be used on all sites accessible to these controls.The Town Engineer shall,based on standard engineering practices,determine the accessibility of these controls. .Pronles shall show all sanitary sewer lines and manholes,including elevations (inverts,top of frame),sizes,lengths,and slopes of pipes.Top of foundation elevations for building shall be shown. .Open Space Site Improvement Plans:For sites which require or include a provision for open spaces,a plan which contains data for site improvement may be required.This map shall be drawn to a scale of 1 inch equals 40feet. .Sanitary Report:Where individual sanitary sewage disposal systems are proposed,the final plans shall include a Sanitary Report certified by a Professional Engineer.The report shall demonstrate the feasibility of the roposed individual systems. “Nun!“mu,” $._Ga"x “9}... CONN 3.14h.'../Oc"(v,)’t" .(o.-"'é§'‘55'h§§§§" 1 8 \‘s ‘ Imn u\\"‘\\‘Il/’“PLAN PREPARER (P.E./L.s.) V/z L/ DATE Michael Lambert Print Name W:\Planning Admin\Forms\Check Lists\Site Plan Checklistdoc February 2002;Rev.4—04,04—23 Lambert Civil Design, LLC 860-670-6308 34 Misty Lane Monroe, CT 06468 Project Narrative Map 60 Block 33 Lot 7 260 Nutmeg Road South 260 Nutmeg Road South, LLC proposes to construct a dog-daycare and grooming facility to be located at 260 Nutmeg Road South. The project includes work on Tax Map 60, Block 33, Lot 7 located in the Town of South Windsor. The property is 1.38 acres with 0.26 acres of wetlands located at the southeastern side of the property. The wetlands were flagged by Ian Cole, LLC. The proposed project is seeking a Wetland permit from the Inland Wetland Commission; as well as a Site Plan and Special Exception permit from the Planning and Zoning Commission. The proposed facility is to be 5,132 square feet with a large fenced in outdoor play area for the dog-daycare. The building is to be located near the central point of the property with the parking lot to the east and fenced in play area to the west. The proposed parking lot will be constructed for 12 parking spaces, including 2 ADA-accessible space near the front entrance. A dumpster is to be located at the rear of the parking lot and is to be a fenced in encloser to provide a screening from the street. The parking lot is to drain to the south into a stone trench and sediment forebay before being routed to an infiltration basin. The basin will also receive runoff from the play area as well as the roof leaders of the building will be routed into the basin. The building will have utilities services from the public utilities located within Nutmeg Road South. Floor drains are proposed within the building and will be discharged into a 1,000-gallon oil/water separator. Approval and permitting will be coordinated with the South Windsor WPCA and the CT DEEP. The project will be built out in 2 phases. Phase 1 will consist of the front section of the building, parking lot and stormwater features. The outdoor play area will also be fenced in and will be expanded to encompass the rear building section. Phase 2 will be the construction of the rear building section. TOWN OF SOUTH WINDSOR,CONNECTICUT Parcei ID Site Address Owner Name Mailing Address Mailing City Mailing State Mailing Zip 6510250A 250 NUTMEG ROAD #A NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06042-OOOO 65102503 250 NUTMEG ROAD #B NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-0000 65102506 250 NUTMEG ROAD #G NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040~0000651025OH250NUTMEGROAD#H NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-000065102501250NUTMEGROAD#l NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-0000 6510250J 250 NUTMEG ROAD #J NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-0000 6510250K 250 NUTMEG ROAD #K NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-0000 6510250L 250 NUTMEG ROAD #L NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER Cl'06040 00006510250M250NUTMEGROAD#M NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-00006510250N250NUTMEGROAD#N PENN HILLS LLC PO BOX 417 GLASTONBURY CT 06033~0000 6510250C 250 NUTMEG ROAD #C NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040»0000 6510250D 250 NUTMEG ROAD #D NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-0000 6510250E 250 NUTMEG ROAD #E NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-00006510250F250NUTMEGROAD#F NUTMEG ROAD SOUTH ASSOCIATES LLC PO BOX 8385 MANCHESTER CT 06040-000065100255255NUTMEGROADLOLABRIDLLC255NUTMEGROADSOUTHWINDSORCT06074»0000 65100279 279 NUTMEG ROAD RMC REAL ESTATE LLC 279 NUTMEG ROAD SOUTH WINDSOR CT 06074-0000 88900050 50 TALBOT LANE DOWE REALTY Hi LLC 400 lsT AVENUE NEEDHAM MA 02494v 000065100274274NUTMEGROADNUTMEGROADSOUTHLLC22CHAPELROADSOUTHWINDSORCI'06074-0000 November 4,2024 PENN HILLS LLC PO BOX 417 GLASTON BURY,CT 06033 Dear Property Owner: Re:Proposed Dog Daycare and Grooming —260 Nutmeg Road South 260 Nutmeg Road South,LLC [n accordance with Section 8.7 of the Town of South Windsor Zoning Regulations,you are hereby notified that an application has been filed on the property abutting yours and is subject to a hearing by the Planning &Zoning Commission.The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments. You may also submit written comments regarding the application prior to the hearing if you so desire, For additional information regarding the specific date this application will be heard,please contact the South Windsor Planning Department (860)6444511,ext.329 or visit:wwwsouthwindsor- ct.gov/planning-department/pages/pending-_and—recently—approved-applications Sincerely, Waz— Agent —Michael Lambert Lambert Civil Design,LLC 860-670-6308 Lambert Civil Design,LLC 34 Misty Lane P:(860)670‘6303 Monroe,CT 06468 LambertCivil@gmail.com SITE 1 2 3 5 6 7 8 9 10 11 12 15 13 14 4 16 SITE 1 2 3 5 6 7 8 9 10 11 12 15 13 14 4 16 Sheet Index: PROPOSED DOG DAYCARE AND GROOMING KEY MAP SCALE: 1"=200' Applicant: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, Connecticut 06074 Property Owner: Map 60 Block 33 Lot 7 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, Connecticut 06074 Consultants: Engineering Lambert Civil Design, LLC 34 Misty Lane Monroe, Connecticut 06468 Tel. (860) 670-6308 Email LambertCivil@Gmail.com Surveying All Seasons Land Surveying, LLC 44 Fair Street Wallingford, Connecticut 06492 Tel. (860) 274-5053 Email: Dan@AllSeasonsLandSurveying.com S1 Property & Topographic Survey Map C1 Layout & Landscaping Plan C2 Grading & Drainage Plan C3 Utility Plan L1 Photometric Plan ES1 Soil Erosion & Sedimentation Control Plan ES2 Soil Erosion & Sediment Control Details D1 Construction Standards & Details D2 Construction Standards & Details DB1 Detention Basin Details #1016 Revision Table October 23, 2024 First Submittal Set DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Cover.dwg LAYOUT: 00 PLOT DATE: Oct 23, 2024 - 11:09pm OPERATOR: swsocTax Map 60 Block 33 Lot 7 260 Nutmeg Road South South Windsor, Connecticut Hartford County DESIGN CIVIL LAMBERT LLC VICINITY MAP SCALE: 1"=1,000' 00 INTERSECTIONS NEARS TO SITE To North, 1,410-LF to Nutmeg Road South & Governors Highway To South, 1,820-LF to Nutmeg Road South & South Satellite Road LAND SURVEYING - LAND PLANNING 44 Fair Street Phone: (860) 274-5053 Wallingford, CT 06492 dan@allseasonslandsurveying.com 1 John Street allseasonslandsurveying.com Millerton, NY 12546 1 inch = 30 feet 30 0 15 30 60 SITE LOCATION MAP © NUTME G R O A D S O U T H 5 6 1 PT #1 TP #3 TP #1 TP #2 60'43.5 ' 50'40' FRONT YA R D S E T B A C K SIDE YARD SETBACKPROPOSED STOP SIGN AND STOP BAR PROPOSED CLEARING LIMIT Existing Sanitary Sewer Easement in Favor of the Town of South Windsor Existing 25 ft Street Tree Easement in Favor of the Town of South Windsor SID E Y A R D S E T B A C K SIDE YARD SETBACK100 FT UPLAND REVIEW AREA PROPOSED DUMPSTER ENCLOSURE 40'60' FENCED IN YARD PROPOSED CONCRETE SIDEWALK Existing Sanitary Sewer Easement in Favor of the Town of South Windsor EXISTING DOUBLE YELLOW CENTERLINE PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED AWNING ENTRANCE PROPOSED STONE TRENCH 90.25' PROPOSED SAWCUT (TYP.) Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t R20' R20' R112' R88' R5'R5'8' 18' 24' 18' 9'8'36'45.1 ' 86.8'57.8'SITE PLAN NOTES: 1.The purpose of this plan is to illustrate the proposed dog grooming and dog daycare facility. The project consists of a 5,183-SF building, associated parking lot, and outdoor area for the dogdaycare. 2.Owner: 260 Nutmeg Road South, LLC 3.Street #: 260 Nutmeg Road South Road 4.Area of Parcel: 60,086 S.F. , 1.38 Acres 5.Parcel is zoned: I (Industrial) 6.Present use: Vacant 7.Proposed use: Dog Grooming and Boarding 8.Wetlands are present per the Town of Southington Wetland Map. Wetlands were flagged by Ian Cole and field located by the surveyor. 9.Examination of the Federal Emergency Management Agency (FEMA) for the Town of South Windsor, Connecticut, Hartford County, Map Number 09003C0378F, Panel Number 378 of 675, Effective Date 09/26/2008 indicates that the subject parcel is located in Zone X. 10.Site to be serviced by public Water and Sewer. 11.Location of any utility information shown on this plan is to be considered approximate. All existing utilities are from best available information, contractor to verify all locations, dimensions, and elevations prior to construction. Lambert Civil Design, LLC makes no claim to the accuracy or completeness of utilities shown. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. Contractor to notify Engineer of any discrepancies. 12.Boundary and topographic information hereon is based on a field survey performed by All Seasons Land Surveying, LLC in June 2024. 13.Vertical Datum is NAVD 1988. Horizontal Datum is NAD 1983. 14.All distances, unless otherwise indicated, are US Survey Feet horizontal distances. 15.All work in connection with this plan shall be completed within five years of the date of approval, or the approval is no longer valid. 16.All site work shall conform to specifications as outlined in C.D.O.T. Form 818, dated 2020 and amended to date. 17.Any regulated activity in a designated Inland Wetland not a part of this plan shall require a separate Inland Wetland Permit. 18.All areas disturbed by construction to be restored with 4" of loam and seeded. 19.All exterior light fixtures shall be full cutoff fixtures with recessed lenses. 20.Underground fuel tanks are prohibited. 21.Town of South Windsor Planning and Engineering Departments to be notified at (860)-644-2511 extension 2329 and 2344, 24 hours before site grading begins. 22.Floor drains are proposed. Approval will be required from South Windsor WPCA and permits from Connecticut DEEP. ZONING INFORMATION ITEM REQUIRED PROVIDED ZONE I I PROPOSED USE Dog Grooming and Boarding LOT AREA 30,000 SF 60,086 SF LOT FRONTAGE 100 FT 285.98 FT LOT DEPTH 150 FT > 150 FT FRONT YARD SETBACK 35 FT 36 FT SIDE YARD SETBACK 10 FT 54 FT REAR YARD SETBACK 1 N/A 1 N/A 1 MAX. LOT COVERAGE 50%8.8% MAX. IMPERVIOUS COVERAGE 65%21% MAX. BUILDING HEIGHT 40 FT < 40 FT Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Site Layout.dwg LAYOUT: C1 PLOT DATE: Oct 23, 2024 - 11:10pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 LAYOUT & LANDSCAPING PLAN PARKING INFORMATION USE REQUIRED PROVIDED PROPOSED BUILDING: DOG GROOMING AND BOARDING 5,183 SF AS REQUIRED BY TENANT 12 HANDICAP PARKING -1 TOTAL # OF SPACES AS REQUIRED BY TENANTS 12 (INCLUDING H.C.) Zoning Notes: 1.Variance was granted to allow 10 ft side yard setback in place of 25 ft rear yard. Variance granted at ZBA meeting on May 4, 2006 (Application #2680-06). 1.THE ABOVE LIST DOES NOT INCLUDE ANY SPECIES LISTED ON THE CONNECTICUT INVASIVE PLANT LIST AND NO PLANT ON THIS LIST SHALL BE PLANTED ON SITE. 2.INTERIOR LANDSCAPED AREAS TO BE INSTALLED WITH LANDSCAPE BED WITH NON-COMBUSTIBLE MULCH. PLANT LIST SYM.QYT.SCIENTIFIC NAME COMMON NAME CONDITION SHADE TREES 2 QUERCUS RUBRA RED OAK B & B, 3" CAL. ACER SACCHARUM SUGAR MAPLE B & B, 3" CAL. LIRIODENDRON TULIPIFERA TULIP TREE - YELLOW POPLAR B & B, 3" CAL. EXISTING EASEMENTS Grantor Grantee Type of Easement Date Filed Vol / Pg Hale Realty LLC Town of South Windsor Street Tree 03/09/2001 1192 / 244 Hale Realty, LLC Lot 7 Sewer 03/09/2001 1192 / 241 Hale Realty, LLC Lot 7 Drainage & Maintenance 05/31/2001 1217 / 171 LANDSCAPING INFORMATION ITEM REQUIREMENT SITE CONDITIONS REQUIRED PROVIDED STREET TREES 1 TREE EVERY 40 FT 286 LF FRONTAGE 8 TREES 8 TREES LANDSCAPE OF PARKING AREA WITH FEWER THAN 30 PARKING SPACES 5% OF INTERIOR PARKING AREA +1 TREE FOR EACH 10 SPACES 3,532 SF PARKING AREA + 12 PARKING SPACES 177 SF + 2 TREES 180 SF + 2 TREES G.T.D.FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 73.7673.95 74.12 74.30 74.0671.8071.2071.2 0 71.6 5 72.3 573.9673.75 74.03 73.79 74.02 74.08 74.6 5 75.01 75.06 74.59 74.56 74.32 72.39 74.7 9 74.6 8 75.47 75.47 74.50 74.48 72.03 71.92 73.05 67.40 67.45 67.33 68.30 69.00 69.30 69.60 69.29 69.49 70.40 70.60 70.40 70.40 70.40 74.56 74.56 74.56 74.56 74.56 74.54 74.05 75.47 74.49 75.10 71.32 71.52 71.21 70.83 70.83 70.84G.T.D.G.T.D.G.T.D.G.T.D.G.T.D. G.T.D. G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.PT #1 TP #3 TP #1 TP #2 Existing Sanitary Sewer Easement in Favor of the Town of South Windsor NUTMEG ROAD SOUTH PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED STONE TRENCH Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Existing Sanitary Sewer Easement in Favor of the Town of South Windsor Existing 25 ft Street Tree Easement in Favor of the Town of South Windsor 100 FT UPLAND REVIEW AREA PROPOSED 2-FT WIDE SWALE FROM SEDIEMTN FOREBAY TO INFILTRATION BASIN PROPOSED 2-FT WIDE SWALE 72 74 7 4 72 70 70707072INV=68.92 (4" SE) INV=68.74 (4" NW) 17 LF @ 1.00% PROP. 4" HDPE INV=70.00 (8" S) INV=69.00 (8" N) 22 LF @ 4.35% PROP. 8" HDPE 6869 70 72 74 68 70 70 68 69 70 70727471 Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C2 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Site Development.dwg LAYOUT: C2 PLOT DATE: Oct 23, 2024 - 11:10pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 GRADING & DRAINAGE PLAN CONSTRUCTION NOTES: 1.The purpose of this plan is to show the proposed grading and drainage systems for this project. 2.All work on the subject property and within the Town of South Windsor right-of-way shall be constructed in accordance with the Town of South Windsor's Construction Standards and Details, latest edition. In the absence of a specific town specification, contractor shall follow the standard specifications for road and bridge construction, CT DOT Form 818, dated 2020 and amended to date. 3.All work within the CTDOT right-of way shall be constructed in accordance with the CTDOT's standard specifications for road and bridge construction, approved and adopted 2020. 4.All manholes shall be 4' diameter concrete structures, unless noted otherwise. All area drains shall be 2' diameter structures. 5.All drainage pipes shown shall be HDPE, unless otherwise noted. 6.The contractor shall be responsible for verifying and determining the location, size, and elevation of all existing utilities, shown or not shown on these plans. Prior to the start of any construction, the engineer shall be notified in writing of any utilities found interfering with the proposed construction, and appropriate remedial action taken before proceeding with the work. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. 7.All drainage pipe shall be installed following manufacturer's installation instructions. 8.All disturbed areas are to be loamed and seeded. 9.See the erosion control plan for the location of the temporary erosion control devices. 10.See details for drainage specifications. 11.Material stockpiles shall be on level sites with silt fence installed around the pile. stockpiles must be seeded and mulched if stored more than 14 days. 12.This project disturbs less than 1-acre of land, therefore, it will not be required to obtain national pollutant discharge elimination system (NPDES) permit coverage as issued by the environmental protection agency (EPA). 222.2 225.37 200 200 NUTME G R O A D S O U T H FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 PT #1 TP #3 TP #1 TP #2 PROPOSED WATER SHUTOFF VALVE PROPOSED DOMESTIC WATER SERVICE LATERAL PROPOSED FIRE SERVICE LATERAL PROPOSED TAP AT WATER MAIN PROPOSED TRANSFORMER PAD PROPOSED OIL/WATER SEPARATOR TANK (1,000 GALLON) INV IN/OUT = 71.83 EXISTING SANITARY MANHOLE FRAME TO BE RESET TO ELEVATION 75.10 PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED UNDERGROUND UTILITIES (ELECTRICAL, CABLE, TELEPHONE) INV 6"=72.31 INV 6"=72.31 INV 6"=72.25 INV 6"=72.25 INV 6"=72.04 INV 6"=72.04 INV 6"=71.58 INV 6"=71.58 INV 6"=71.58 INV 6"=72.48 INV 6"=72.25 INV 8"=59.44 INV 6"=72.95 11 LF @ 6.64% 6" SAN47 LF@ 2 . 1 2%6" SAN 11 LF @ 2.27% 6" SAN 9 LF @ 2.33% 6" SAN 7 LF @ 3.00% 6" SAN 10 LF @ 2.30% 6" SAN 21 LF @ 2.00 % 6" SA N 12 LF @ 5.33% 6" SAN Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C3 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Utility.dwg LAYOUT: C3 PLOT DATE: Oct 23, 2024 - 11:09pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 UTILITY PLAN CONSTRUCTION NOTES: 1.The purpose of this plan is to show the proposed utilities for this project. 2.All work on the subject property and within the Town of South Windsor right-of-way shall be constructed in accordance with the Town of South Windsor's construction standards and details, latest edition. In the absence of a specific town specification, contractor shall follow the standard specifications for road and bridge construction, CT DOT Form 818, dated 2020 and amended to date. 3.The contractor shall be responsible for verifying and determining the location, size, and elevation of all existing utilities, shown or not shown on these plans. Prior to the start of any construction, the engineer shall be notified in writing of any utilities found interfering with the proposed construction, and appropriate remedial action taken before proceeding with the work. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. 4.All workmanship and materials incorporated into the construction of the water lines shall conform to all the local precinct's standards, specifications, rules, and regulations. 5.All workmanship and materials incorporated into the construction of the electric and telephone lines shall conform with the standards of the local provider. 6.Contractor shall coordinate with local provider relative to final layout of underground utilities. 7.All drainage pipe shall be installed following manufacturer's installation instructions. 8.Contractor to verify size of water service lines with architect prior to the start of construction. 9.Final layout of underground utilities to be approved by local provider prior to construction. Utility Company Providers: Water - Metropolitan District Hartford (MDC), 860-278-7850 Electrical - Eversource Sewer - Town of South Windsor WPCA NUTME G R O A D S O U T H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.7 0.9 0.8 0.6 0.6 1.1 0.9 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.7 1.3 1.6 1.9 1.9 1.7 0.8 3.1 2.9 0.7 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.6 1.2 1.8 2.9 3.6 4.3 5.3 3.8 1.3 6.1 6.1 2.0 0.3 0.1 0.0 0.0 0.0 0.0 0.1 0.3 0.7 1.3 2.2 3.8 5.4 7.0 8.7 8.8 4.5 7.8 4.9 1.3 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.5 1.1 2.1 3.3 4.4 4.9 5.2 6.8 6.7 2.7 0.3 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.5 1.1 2.0 2.9 4.4 7.7 3.9 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 1.2 0.0 8.7 5.6 1.8 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 3.8 6.0 2.3 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 8.6 6.9 4.0 1.5 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.9 6.6 6.5 3.3 1.5 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 4.5 4.6 4.6 3.2 1.4 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 4.3 4.3 3.7 2.6 1.5 0.9 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.5 2.4 3.3 3.5 3.2 2.2 1.3 0.7 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.6 1.2 1.8 2.2 1.8 1.4 0.9 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.8 1.1 1.0 0.8 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.5 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 A2@9' A3@9' A4@15' A5@15' A6@15' A7@15' A8@9' A1@9' PHOTOMETRIC PLAN NOTES: 1.The purpose of this plan is to illustrate the photometric/foot-candles of the proposed building wall packs. Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: L1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Photometric Plan.dwg LAYOUT: L1 PLOT DATE: Nov 03, 2024 - 11:31pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 PHOTOMETRIC PLAN NUTME G R O A D S O U T H G.T.D.FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 G.T.D.G.T.D.G.T.D.G.T.D.G.T.D. G.T.D. G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: ES1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - SESC Plan.dwg LAYOUT: ES1 PLOT DATE: Oct 23, 2024 - 11:10pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 SOIL EROSION & SEDIMENT CONTROL PLAN STORMWATER MANAGEMENT MAINTENANCE SCHEDULE SOUTH WINDSOR, CONNECTICUT The following are the required maintenance and monitoring procedures. Riprap and Discharge Aprons - Shall be cleared of all sediment deposits and invasive plant species and are to be inspected for rip-rap damage and deterioration. These procedures to be conducted yearly between May I and before September 15. Emergency Spillway - Shall be cleared of all sediment deposits and invasive plant species and are to be inspected for riprap damage and deterioration. These procedures to be conducted yearly between May 1 and September 15. Repairs shall be executed immediately. Catch Basins - All basin rim areas and sumps shall be cleaned of all sediment, trash and debris. These procedures to be conducted yearly anytime after May I and before September 15. Swales - all swales be cleared of all sediment deposits, invasive plant species and debris. Any erosion shall be repaired. These procedures to be conducted annually. Swales shall be inspected two times a year and after significant rainfall events. Additional maintenance, beyond schedule maintenance, may be required based upon inspections. Water Quality Basin - Basin shall be cleared of all sediment deposits, invasive plant species and debris. These procedures to be conducted yearly between May 1 and September 15. Basin shall be inspected two times a year and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections. Slopes - Slope erosion control blankets and vegetation shall be inspected twice a year and after significant rainfall events. Additional maintenance, beyond schedule maintenance, may be required based upon inspections. Any hills or channeling shall be repaired immediately Parking Lot Sweeping - Use mechanical sweeping on paved areas where dust and fine materials accumulate. These procedures to be conducted yearly anytime after May I and September 15. All sediment deposits, trash and debris shall be removed to a location off-site and disposed of in an environmentally acceptable manner. GENERAL NOTES: 1.Additional notes and details are located on Sheet ES2. 2.At all times during construction, the Developer/Contractor shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer/Contractor shall also be responsible for installing and maintaining all erosion control facilities shown herein. 3.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way and future pavement shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. watering, seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Town Engineer. 4.All inlets shall be cleaned prior to occupancy. 5.All slopes greater than 3:1 shall be protected with Erosion Control Blankets (S150 by North American Green or approved equal) or Hydroseeded with Tackifier 6.All erosion control measures shall remain intact and operational until the site has been stabilized and vegetation is thoroughly established. This may occur after completion of construction, therefore it is critical for the Developer, Contractor and\or Owner to understand the erosion control responsibilities and maintain the erosion control measures. 7.To minimize erosion of the sandy soils, vegetation shall be established immediately following completion of grading within each area. Vegetation may consist of temporary seeding or final loam and seed. 8.If areas of work are not addressed by this plan or sediment and erosion issues arise in areas not covered by this plan, then the plan shall be augmented in the field. Contractor shall be responsible to insure no sediment or erosion problems encroach upon abutting property. This may require additional barriers, swales and bales. 9.All erosion and sediment control measures shall conform to the 2024 Connecticut Guidelines for Soil Erosion and Sediment Control manual. PROP. TEMPORARY STOCKPILE (TYP.) (SEE DETAIL) LOCATION MAY VARY DURING CONSTRUCTION SILT FENCE INLET PROTECTION STAKED BALES CHECK DAM WATTLE\SOCK or STONE EROSION CONTROL BLANKET TEMPORARY WATER BAR (WB) or DIVERSION CHANNEL (TD) *SYMBOLS DEPICTED IN LEGEND AND PLAN ARE NOT DRAWN TO SCALE. SEE DETAILS FOR SPECIFIC INFORMATION EROSION CONTROL SYMBOL LEGEND The following are the required maintenance and monitoring procedures Swales - All swales shall be mowed and be cleared of all sediment deposits, invasive plant species and debris. These procedures shall be conducted monthly. Swales shall be inspected weekly and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections. Catch Basins - All basin rim areas and sumps shall be cleaned of all sediment, trash and debris. These procedures shall be conducted monthly. Basins shall be inspected weekly and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections Slopes - Stablized slopes are essential to preventing sediment movement. Any channels of concentrated flow, such as hills, shall be fixed immediately. Additional control measures, such as bales, riprap, sediment fence and erosion fabric or hydroseed with tackifier may be required. Slopes shall be inspected weekly and after significant rainfall events. Sediment Barriers & Hay Bales - Shall be inspected weekly and after significant rainfall events. Repairs shall be made immediately. Additional barriers and bales may be required depending upon the area of work. If conditions exist which can not be addressed with this plan, then additional barriers shall be implemented to prevent sediment from leaving the site. Street Sweeping - Sediment from the construction site, which has accumulated on the existing streets shall be cleaned up immediately . Contractor to inspect daily Wind Blown Sediment: Shall be minimized. Unpaved travel ways shall be sufficiently watered to minimize wind blown sediment. Other unpaved surfaces shall be watered, temporary vegetated, roughing with disc or other measures in the Connecticut Guidelines for Soil Erosion and Sediment Control manual. TEMPORARY STORMWATER MANAGEMENT MAINTENANCE SCHEDULE (DURING CONSTRUCTION) PROP. INLET PROTECTION AT ALL INLETS (TYP.) (SILTSAC) (SEE DETAIL) PROP. EROSION CONTROL BLANKET OR HYDROSEEDED WITH TACKIFIER ON SLOPES GREATER THAN 3:1 (TYP.) (REFER TO DETAIL) PROP. SILT FENCE (TYP.) PROP. PAVEMENT SAWCUT (TYP.) SOIL EROSION AND SEDIMENT CONTROL NARRATIVE: A.PROJECT INFORMATION 1.Project Description - The project site consist of one 4.15 acre parcel on Nutmeg Road South in South Windsor, CT . 2.Area Proposed Disturbance Due to Construction Activities - 0.95± Acres Total. 3.Phases of Development - Phase 1 Phase 1 - Front Building and Parking Lot Construction Phase 2 - Rear Building 4.Estimated Start of Construction - Spring 2025. 5.Estimated Construction Completion Date - Fall 2029. B.EROSION CONTROL NOTES 1.The purpose of this plan is to depict the required onsite temporary construction erosion control measures. 2.All measures in the plan shall meet as a minimum the best management practices set forth in 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. 3.Whenever practical, natural vegetation shall be retained, protected or supplemented. The stripping of vegetation shall be done in a manner that minimizes soil erosion. 4.Appropriate erosion and sediment control measures shall be installed prior to land disturbance. 5.The area of disturbance shall be kept to a minimum. Disturbed areas remaining idle for more than 30 days shall be stabilized. 6.Measures shall be taken to control erosion within the project area. Sediment in runoff water shall be trapped and retained within the project area using approved measures. 7.All temporary erosion and sediment control measures shall be maintained in functioning condition until final site stabilization is accomplished. 8.All temporary erosion and sediment control measures shall be removed after final site stabilization. Trapped sediment and other disturbed soil areas resulting from the removal of temporary measures shall be permanently stabilized within 30 days unless conditions dictate otherwise. 9.The Town of South Windsor shall reserve the right to require further erosion control practices during construction should they find it necessary. 10.The responsible party shall install, inspect, report, operate, and maintain all stormwater management and erosion control measures required by these plans. 11.Temporary erosion control measures shall be installed in strict accordance with project plans. In addition, similar measures shall be installed where and when the field condition, or field operation of the individual site contractor, may warrant. 12.All disturbed areas designated to be turf, shall receive a minimum application of 4 inches of loam (compacted thickness), prior to final seeding and mulching. 13.In the event that, during construction of any portion of this project, a winter shutdown is necessary, the contractor shall stabilize all incomplete work and provide for suitable methods of diverting runoff in order to eliminate sheet flow across frozen surfaces. 14.Dust shall be controlled by the use of water as necessary throughout the construction period, in accordance with 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. 15.In no way are those temporary erosion control measures indicated on these plans to be considered all inclusive. The contractor shall use judgement in installing supplementary erosion control measures where and when specific site conditions and/or construction methodologies may warrant. 16.Graded areas shall be vegetated to insure erosion control by seeding, mulching, and fertilizing. Disturbed areas shall be planted with suitable plant materials. 17.Grading shall not exceed a ration of 3 horizontal to 1 vertical without special erosion control measures. netting or similar material shall be provided on slopes with a ration greater than 3:1 while ground cover is being established. C.RESPONSIBILITY 1.The responsibility for implementing and maintaining the Soil Erosion and Sedimentation Control Plan rests with the OWNER OF RECORD where any development of the parcel gives cause to erosion and sedimentation. It is also to be said that the OWNER OF RECORD shall be held responsible for informing all concerned regarding responsibility of the SE&SC plan and seeing that the plan becomes a part of the deed in the event the title of the property is transferred. The costs of all drainage erosion and sedimentation control measures will therefore rest with the OWNER OF RECORD. 2.Contact Person: David Turkington Contact Phone: (860) 841-3779 222.2 225.37 200 200 PROP. CONSTRUCTION ENTRANCE Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: ES2DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - SESC Details.dwg LAYOUT: ES2 PLOT DATE: Oct 23, 2024 - 11:10pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 EROSION CONTROL NOTES & DETAILS NOT TO SCALE PUBLI C R O A D CONSTRUCTION ENTRANCE DETAIL N.T.S. CT DOT 2" FILTER FABRIC 50' M I N . 4" min. TAMP DIRT O V E R M A T / B L A N K E T 3'MIN. 4" OVERLAP 2:1 SLOPE2:1 SLOPE6'3'12" WATER T A B L E BERM STAPLES EROSION BLANKET & REINFORCEMENT MAT SLOPE INSTALLATION N.T.S. TYPICAL SLOPE SOIL STABILIZATION WET SLOPE LINING NOTES: 1.SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS AND GRASS. MATS/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 2.LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. MATS/BLANKETS SHOULD BE INSTALLED VERTICALLY DOWN SLOPE. 1 1 2"12"6"4'12"FILTER CLOTH 4 ' ABOVE SOURCE OF WATE R NON-WOVEN GEOTEXTILE FILTER FABRIC UNDER TYPICAL TREATMEBNT 80% GERMINATION - 25-30% KENTUCKY BLUE GRASS GENERIC SEED MIXTURE - 30-35% RED FESCUE 90% GERMINATION - 30-40% PERENNIAL RYE GRASS MIXTURES 85% GERMINATION *4" min. PERMANENT GRASS SEEDING PER FIGURE PS-2 & PS-3 OF THE 2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL MANUAL SESC MANUAL SEED MIXTURE or *ALL LANDSCAPE/PLANTING AREAS SHALL RECEIVE LOAM AND SEED. LOAM & SEED DETAIL N.T.S. * 4" MIN. LOAM & SEED (COMPACTED TO REQUIRED THICKNESS WITH LOAM ROLLER) ACCEPTABLE, COMPACTED, GRADED SUBGRADE Angle 10° upslope for stability and self cleaning. 1. Set posts and excavate a 6"x6" trench, set post downslope. 2. Staple the wire mesh fencing to end post 3. Attach filter fabric to the wire fencing and extend it to the trench. 4. Back fill the trench and compact the excavated soil POSTS POSTS POSTSPOSTS Wire Fencing Filter Fabric Compacted Back Fill 12" Min. Depth 100°00'00" SEDIMENTATION BARRIER DETAIL N.T.S. BAG DETAILINSTALLATION DETAIL DE P T H = D WIDT H = W LE N G T H = L ROAD BROOKFIELD, CT 06904. (203)313-9002 1. AVAILABLE FROM ACF ENVIRONMENTAL 48 OLD GRAYS BRIDGE NOTES: SILTSACK INLET CONTROL DEVICE N.T.S. SILTSACK DUMP STRAP DUMP STRAP 2 EACH DUMP STRAP EXPANSION RESTRAINT (1/4" NYLON ROPE, 2" FLAT WASHERS) 1"REBAR FOR BAG REMOVAL FROM INLET 1"REBAR FOR BAG REMOVAL FROM INLET MIN. SLOPE MIN. SLOPE 2 1 SLOPE OR LESS SOIL STOCKPILE DETAIL N.T.S. NOTES: 1.AREA CHOSE FOR STOCKPILING SHALL BE DRY AND STABLE. 2.MAXIMUM SLOPE OF STOCKPILE SHALL BE 2:1. 3.UPON COMPLETION OF SIOL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH EITHER SILT FENCING OR STARWBALES, THEN STABILIZED WITH VEGITATION OR COVERED WITH POLYETHYLENE SHEETING. 4.TO BE USED WHERE TOPSOIL IS NECESSARY FOR REGRADING AND VEGETATING DISTURBED AREAS. TOPSOIL IS APPLIED TO SUBSOILS THAT ARE DRAUGHTY (HAVING LOW AVAILIABLE MOISTURE FOR PLANTS), STONEY SALTY, HAVE LOW PERMEABILITY, OR ARE EXTREMELY ACID. IT IS ALSO USED TO BACKFILL AROUND SHRUB AND TREE TRANSPLANTS. PRESERVATION OF EXISTING TOPSOIL IS BENEFICIAL FOR ALL TYPES OF LAWN OR ORNAMENTAL PLANTINGS. 5.TEMPORARY STOCKPILING STABILIZATION MEASURES INCLUDE VEGETATIVE COVER, MULCH NONVEGETATIVE COVER, AND PERIPHERAL SEDIMENT TRAPPING BARRIERS. THE STABLIZATION, MEASURE(S) SELECTED SHOULD BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS AND REQUIRED PERIOD OF USE. 6.SEE EROSION AND SEDIMENT CONTROL PLAN FOR LOCATIONS. STABILIZE ENTIRE PILE WITH VEGETATION OR COVER WITH POLYETHYLENE SHEETING HAY BALES OR SILT FENCE BALE WIDTH A A 18" MIN. SECTION A-A 5' - 10' MIN. TO TOE OF SLOPE 4" 4" STRAW BALE BARRIER DETAIL N.T.S. EXISTING GRADE WEDGE LOOSE STRAW BETWEEN BALES TO CREATE A CONTINUOUS BARRIER BALES TO BUTT TOGETHER 2-2"x2"x3' STAKE S (TYP.) STORMWATER RUNOFF FLOW NOTES: 1.BALE BARRIER INSTALLATION SHALL FOLLOW THE CONTOUR OF THE LAND. THE LAST BALES SHALL WING UPSLOPE TO ENSURE PROTECTION. 2.BALE BARRIERS SHALL BE UTILIZED TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DRAINAGE AREAS ONE ACRE IN SIZE OR LESS. MAX. SLOPE BEHIND A BARRIER MUST BE LIMITED TO 2H:1V. 3.BALE BARRIERS SHALL BE INSPECTED PERIODICALLY, AFTER STORM EVENTS GREATER THAN 1" OF RAINFALL AND SHALL BE REMOVED AND REPLACED AFTER 3 MONTHS EXCEPT AS OTHERWISE DIRECTED BY THE ENGINEER OR ENFORCEMENT OFFICIAL. BALES SHALL NOT BE REMOVED UNTIL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. COMPACT BACKFILL (UP GRADIENT) EXCAVATE 4" DEEP AND WIDTH OF BALE EXISTING GRADE R DIRTBAG LENGTH WIDTH SIDE VIEW TOP VIEW AGGREGATE OR STRAW UNDERLAYMENT DIRTBAG SILT CONTROL SYSTEM N.T.S. NOTES: 1.AVAILABLE FROM ACF ENVIORMENTAL 48 OLD GRAYS BRIDGE ROAD, BROOKFIELD, CT 06904. (203)313-9002 HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE SEWN IN SPOUT WATER FLOW FROM PUMP PUMP DISCHARGE HOSE OPENING ACCOMODATES UP TO 4" DISCHARGE HOSE BAG PLACED ON AGGREGATE OR STRAW HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS EROSION CONTROL NOTES WINTER CONSTRUCTION NOTES CONSTRUCTION SEQUENCE ” ” ” ” ” TURF ESTABLISHMENT SPECIFICATIONS 1. ALL PAVEMENT PATCH CONSTRUCTION SHALL CONFORM TO CONN. DOT FORM 816 SPECIFICATIONS AND STANDARDS. PERMANENT PAVEMENT PATCH DETAIL N.T.S. UNDISTURBED EXISTING PAVEMENT GREATER THAN 3" THICK AT SAWCUT ASPHALT, APPLY LIQUID ASPHALT SEALER, SPEC M.17 EXISTING COMPACTED BANK RUN GRAVEL SUBBASE 8" OF 3 4" PROCESSED STONE (SEC. 3.04 & M.05) REMOVE TEMPORARY SURFACE COURSE AND PLACE 2" BITUMINOUS CONCRETE WEARING COURSE ON 2 1 2" BINDER COURSE COMPACTED BACKFILL SAWCUT EDGE FULL DEPTH, APPLY LIQUID ASPHALT SEALER, SPEC M.17 UNDISTURBED EXISTING PAVEMENT 3" OR LESS 12"TRENCH WIDTH 12" PAVEMENT PAYMENT WIDTH 6" BASE 21°48°1" 9" BITUMINOUS CONCRETE LIP CURBING N.T.S. SHOULDER OR PAVEMENT BINDER PAVEMENT C O U R S E BITUMINOUS CONCRETE 6"A A W D 3' 4' 4' 4' 5'+ 5' CONCRETE SIDEWALK N.T.S. LONGITUDINAL SECTION CROSS SECTION A-A PLAN VIEW PREMOLDED 1 4" EXPANSION JOINT, 20'-0" O.C. CONTRACTION JOINT (TYP.) PROCESSED STONE BASE 6" IN DEPTH AFTER COMPACT, SPEC. M.05.01 & 3.04.03APPROVED COMPACTED SUBGRADE CONCRETE WALK NOTE: MINIMUM CROSS SLOPE TO BE 1/4" TO 1' UNLESS OTHERWISE DIRECTED. BROOM FINISH WSEE DRAWINGD SEE W/D CHART CONCRETE WALK PROCESSED STONE BASE SURFACE COURSE CLASS "F" CONCRETE. SURFACE TO BE BROOM FINISHED 4,000 PSI 7% ENTRAINED AIR CLASS "F" CONCRETE NO REINFORCING WIRE 3" WIDTH VARIES 4'-0" MIN. 3"6"5"JOINTS SPACED 20'-0" O.C. DIVIDED INTO RECTANGLES AS DIRECTED 5"APPLY SEALER PER SEC. 8.18 TO SURFACE Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: D1DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Details.dwg LAYOUT: D1 PLOT DATE: Oct 23, 2024 - 11:09pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 CONSTRUCTION DETAILS NOT TO SCALE ELEVATION TREE PLANTING AND GUYING DETAIL INSTALLED IN OPEN AREAS N.T.S. 12" MIN. 12" MIN. 18" MAX. NYLON STRAPPING SAFETY WARNING FLAGS (2 PER GUY) VINYL COATED GALVANIZED STELL WIRE ATTACHED TO STAKE BELOW FINISHED GRADE (3GUYS PER TREE) GALVANIZED TURNBUCKLE TREE WRAPPING APPLIED STARTING FROM BASE TO FIRST BRANCH 2'-0" CEDAR ANCHOR STAKE DRIVE BELOW GRADE FINISEDH GRADE 6" EARTH SAUCER MULCH LAYER 2" CLEARANCE FROM STEM CROWN OF ROOT BALL SET AT SAME ELEVATION OR 1" HIGHER THAN FINISHED GRADE ROOT BALL, TYP.; REMOVE BURLAP FROM AT LEAST 1/3 OF ROOTBALL AS SHOWN CUT ROPES AT TOP OF BALL TOTALLY REMOVE WIRE AND NONBIODEGRADABLE MATERIAL PLANTING SOIL MIX UNDISTURBED EARTH LOOSEN SUBSOIL TO ASSURE POSITIVE DRAINAGE UNDISTURBED EARTH OR COMPACTED SUBSOIL ELEVATION SHRUB PLANTING DETAIL N.T.S. 6" MIN. SEE NOTE 1 BALL DIA. "D" NOTE: 1.AT 'D' LESS THAN 3 FEET IS EQUAL TO 1/2 'D'. 6INCHES MINIMUM, AT 'D' OVER 3 FEET WIDTH IS EQUAL TO 18". MULCH LAYER 4' EARTH SAUCER FINISHED GRADE ROOT BALL, TYP.; REMOVE BURLAP FROM AT LEAST 1/3 OF ROOTBALL AS SHOWN PLANTING SOIL MIX UNDISTURBED EARTH LOOSEN SUBSOIL TO ASSURE POSITIVE DRAINAGE UNDISTURBED EARTH OR COMPACTED SUBSOIL STOP BAR DETAIL N.T.S. 30" X 30" R1-1 STOP SIGN DETAIL N.T.S. NOTES 1.SEE SITE PLAN FOR ACCESSIBLE SPACE LOCATIONS 2.PROVIDE 2 COATS OF PAINT ON ALL SURFACES. 18' - 0" 10' - 0" 4" WHITE PAINT LINES AT 2' O.C. PAINTED AT 45° ANGLE PAINTED WHITE SYMBOL ON BLUE BACKGROUND IN ACCORDANCE WITH FEDERAL STANDARDS ACCESSIBLE SIGN WITH BOLLARD BASE (TYP.) VAN SPACE FLUSH CONDITIONS 8'-0"8-0" ACCESSIBLE PARKING SPACE DETAIL N.T.S. 7.0' NOTES: LOCATE AT EDGE OF PARKING SPACE UNLESS ACCOMPANIED BY "VAN" LETTERING LC 6" (TYP.) 2.5' R 6.5' ACCESSIBLE PARKING SYMBOL N.T.S. 5.5" GRANULAR SUBBASE COURSE COMPACTED SUBGRADE 1.5" BIT. CONC. WEARING COURSE 1.5" BIT. CONC. BINDER COURSE 4" GRANULAR BASE COURSE STANDARD DUTY ASPHALT PAVING DETAIL N.T.S. TYP. SAN TYP. WATER WATER SERVICE TYP. SERVICE CROSSING 18" MIN. SANITARY SERVICE NOTE: MAINTAIN 18" VERTICAL SEPARATION BETWEEN ALL WATER, SANITARY AND STORM MAINS\SERVICES. 18" MIN. 3' MIN. 5' 18" MIN. SANITARY SERVICE LOT 8 SANITARY SERVICE 18" MIN. TYP. STORM N.T.S. 2'24"STONE TRENCH (PEA GRAVEL)PROPOSED IMPERVIOUS DRIVE GRASS FILTER SLOPE FLOW PRETREATMENT FILTER STRIP N.T.S. GEOTEXTILE FILTER FABRIC FLOW CLEANOUT DETAIL N.T.S. NON-PAVED INSTALLATION AT FINISHED GRADE FITTING CLEAN OUT ADAPTOR AND PLUG 6 PVC CLEANOUT RISER 45° SWEEP 6" PVC PIPE 6" SPOOL 5" PVC 6" PVC PIPE -SANITARY LATERAL 6" PVC PIPE -SANITARY LATERAL 45° SWEEP WYE 6"x6"x6" PVC PIPE Note: 1.Refer to Site Plan for Size of Sanitary Lateral. Adjust Size of 45° Sweep Wye Accordingly if Sanitary Lateral is Larger than 6". Cleanout Riser to Remain at 6" PVC unless otherwise noted. NON-PAVEMENT AREA DRAINAGE TEST PIT LOGS Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: D2DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Details.dwg LAYOUT: D2 PLOT DATE: Oct 23, 2024 - 11:09pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 CONSTRUCTION DETAILS NOT TO SCALE STORM CLASS 'C' TRENCH DETAIL N.T.S. ROCK EXCAVATIONEARTH EXCAVATION NOTES: 1.FOR UNSHEETED TRENCH WHERE PIPE O.D. IS 6" OR LESS THAN, PAYMENT WIDTH (W) = 2'-6"; WHERE PIPE O.D. IS GREATER THAN 6" BUT LESS THAN OR EQUAL TO 36" THEN, W = O.D. + 2'-0"; WHERE PIPE O.D. IS GREATER THAN 36" THEN, W = O.D. + 3'-0". 2.IF SUITABLE GRANULAR PIPE BEDDING MATERIAL IS AVAILABLE FROM ON SITE EXCAVATIONS, IT SHALL BE UTILIZED PROVIDED IT CONFORMS WITH THE "STANDARD SPECIFICATIONS", AND IS APPROVED BY THE ENGINEER. NO PAYMENT SHALL BE MADE FOR THIS MATERIAL. 3.TYPICAL FOR PIPE MATERIALS SPECIFIED, AS CAST IRON (C.I.), CONCRETE PIPE, DUCTILE IRON PIPE OR STEEL PIPE. 4.SHEETING OR SHORING OF TRENCH WALLS, WHERE UNSUITABLE CONDITIONS EXIST, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 5.FOR ROCK REMOVAL DEPTHS (H) GREATER THAN 10', INCREASE PAYMENT WIDTH (W) BY 6". REMOVAL DEPTH SHALL BE MEASURED FROM THE TOP OF EXPOSED SURFACE. APPROVED SELECT BACKFILL MATERIAL, COMPACTED IN 12" LIFTS, BANK RUN GRAVEL, GRADATION "C" FORM 816, CLASS II MATERIAL, COARSE SAND OR FINE GRAVEL SUITABLE FOR BACKFILL MARKER TAPE FINISHED GRADE FOR BACKFILL CLASS II MATERIAL STORM SEWER PIPE 3 4" (MAX. SIZE) CRUSHED STONE TO SPRING LINE, CLASS I MATERIAL (SEE NOTE 2) PROVIDE A STABLE BASE AT LEAST 2000 PSI BEARING SOILS FOR A MINIMUM OF FOUR FEET (4') BELOW PIPE 6 1 VERTICAL 1/8 OF O.D. (6" MIN.) W (SEE NOTE 1) 1/8 OF O.D. (4" MIN.)O.D.1'-0" TYP.H(DEPTHVARIES)L=W ROCK L=W+(H/3) EARTH =MEAN PARTICLE SIZEd50 15 8 5 INTERMEDIATE MODIFIED 50 (INCHES) d DESIGNATION RIPRAP 6" 6" 12" 12" RIPRAP INTERMEDIATE MODIFIED STANDARD SPECIAL DESIGN DESIGNATION GRANULAR BEDDING SHALL CONFORM TO MINIMUM BEDDING THICKNESS (INCHES) 1005" #10 15-45 #40 #100 #200 0-5 0-10 5-25 3/4"- 1/4"25-60 1 1/2"55-100 3 1/2"100 TABLE R3 GRADATION FOR GRANULAR BEDDING U.S. STANDARD SIEVE SIZE CONN. DOT. GRADING A BY PASSING PERCENT WEIGHT TABLE R1 VARIES, SEE THICKNESS BEDDING DEPTH SEE TABLE R2 TABLE R2 CLASSIFICATION OF RIPRAP TABLE R1 THICKNESS REQUIREMENTS FOR GRANULAR BEDDING CONN. DOT SPECIFICATION M.02.01 GEOTEXTILE 36 18 12 (INCHES) DEPTH RIPRAP SPECIFICATIONS & GRADATIONS SHALL STANDARD CONFORM TO CONN. DOT. M.12.02 RIPRAP INSTALLATION DETAIL N.T.S. SANITARY CLASS 'B' TRENCH DETAIL N.T.S. ROCK EXCAVATIONEARTH EXCAVATION NOTES: 1.FOR UNSHEETED TRENCH WHERE PIPE O.D. IS 6" OR LESS THAN, PAYMENT WIDTH (W) = 2'-6"; WHERE PIPE O.D. IS GREATER THAN 6" BUT LESS THAN OR EQUAL TO 36" THEN, W = O.D. + 2'-0"; WHERE PIPE O.D. IS GREATER THAN 36" THEN, W = O.D. + 3'-0". 2.IF SUITABLE GRANULAR PIPE BEDDING MATERIAL IS AVAILABLE FROM ON SITE EXCAVATIONS, IT SHALL BE UTILIZED PROVIDED IT CONFORMS WITH THE "STANDARD SPECIFICATIONS", AND IS APPROVED BY THE ENGINEER. NO PAYMENT SHALL BE MADE FOR THIS MATERIAL. 3.TYPICAL FOR ALL FLEXIBLE PIPE MATERIALS, I.E. PVC, CCP, POLYETHLYENE, FRP, AND ABS TRUSS. 4.SHEETING OR SHORING OF TRENCH WALLS, WHERE UNSUITABLE CONDITIONS EXIST, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 5.FOR ROCK REMOVAL DEPTHS GREATER THAN 10', INCREASE PAYMENT WIDTH (W) BY 6". REMOVAL DEPTH SHALL BE MEASURED FROM THE TOP OF EXPOSED SURFACE. APPROVED SELECT BACKFILL MATERIAL, COMPACTED IN 12" LIFTS, BANK RUN GRAVEL, GRADATION "C" FORM 816, CLASS II MATERIAL, COARSE SAND OR FINE GRAVEL SUITABLE FOR BACKFILL 6" DETECTABLE UTILITY WARNING TAPE PLACED 18-IN ABOVE PIPE FINISHED GRADE COARSE SAND M.03.01.2 OR FINE GRAVEL M.01.01-NO. 8 (FORM 816) TAMPED A.O.B.E. MAX. 1' ABOVE PIPE SANITARY SEWER PIPE 3 4" (MAX. SIZE) CRUSHED STONE TO TOP OF PIPE (SEE NOTE 2)PROVIDE A STABLE BASE AT LEAST 2000 PSI BEARING SOILS FOR A MINIMUM OF FOUR FEET (4') BELOW PIPE 6 1 VERTICAL W (SEE NOTE 1) IF PIPE O.D. < 6" = 6" IF PIPE O.D. > 6" = 12" O.D. 1'-0" TYP.H(DEPTHVARIES)L=W ROCK L=W+(H/3) EARTH GEOTEXTILE FILTER FABRIC 6" MIN. LAP OUTLET PROTECTION DETAIL N.T.S. CROSS SECTION 3' to 4'FLOW45° DISTANCE PER PLAN 90° 45° BEND SANITARY SEWER MAIN SERVICE WYE or SADDLE ON EXISTING MAINS 2"x4" WOOD MARKER WITH TOP PAINTED GREEN AND LABELED SEWER PLUG PVC SANITARY SEWER SERVICE 1/4" MIN. PER FOOT FOR 4" SERVICE 1/8" MIN. PER FOOT FOR 6" SERVICE STONE FOUNDATION SUPPORT AROUND WYE CONNECTION SAN. MAIN TRENCH (SEE DETAIL) SAN. MAIN TRENCH (SEE DETAIL) SANITARY SERVICE DETAIL N.T.S. G.T.D.73.7673.95 74.12 74.30 74.0671.8071.2071.2 0 71.6 5 74.56 74.32 72.39 72.03 67.40 67.45 67.33 68.30 69.00 69.30 69.60 69.29 69.49 70.40 70.60 70.40 70.40 70.40 74.56 74.56 74.56 74.56 74.56 71.32 71.52 71.21 70.83 70.83 70.84G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.PT #1 TP #3 TP #1 TP #2 68 69 70 70 68 69 70 7274 7 4 72 71 70 70717 2 70 70 70 72 74 72707071706970 70 69 68 69 70 INV=68.92 (4" SE) INV=68.74 (4" NW) INV=70.00 (8" S) INV=69.00 (8" N) 17 LF @ 1.00% PROP. 4" HDPE 22 LF @ 4.35% PROP. 8" HDPE 3:1 INTERIOR SLOPES 3:1 EXTERIOR SLOPES PROP. NEW ENGLAND WET MIX ON BOTTOM OF BASIN PROP. NEW ENGLAND WILDLIFE AND CONSERVATION MIX ON DISTURBED AREAS SURROUNDING BASIN PROP. NEW ENGLAND EROSION CONTROL / RESTORATION MIX ON BASIN SIDES AND TOP PROP. SLIT FENCEPROP. EMERGENCY SPILLWAY 3:1 EXTERIOR SLOPES 2:1 EXTERIOR SLOPES PROP. STRAWBALES PROP. STRAWBALES Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: DB1DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Detention Basin Detials.dwg LAYOUT: DB1 PLOT DATE: Oct 23, 2024 - 11:09pm OPERATOR: swsocOctober 23, 2024 MSL MSL 1018--------Know what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com------------------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 SILT FENCE INLET PROTECTION STAKED BALES CHECK DAM WATTLE\SOCK or STONE EROSION CONTROL BLANKET TEMPORARY WATER BAR (WB) or DIVERSION CHANNEL (TD) *SYMBOLS DEPICTED IN LEGEND AND PLAN ARE NOT DRAWN TO SCALE. SEE DETAILS FOR SPECIFIC INFORMATION EROSION CONTROL SYMBOL LEGEND SEED MIX & FABRIC LEGEND BOTTOM OF POND ELEV.= TOP OF BERM ELEV.= WEIR ELEV.= 4 1 SPILLWAY ELEV. BOTTOM OF POND TOP OF BERM ELEV. 5' MODIFIED RIP-RAP SPILLWAY DETAIL N.T.S. 10' MODIFIED RIP-RAP DEPTH = 12" MODIFIED RIP-RAP DEPTH = 12" NON-WOVEN FILTER FABRIC ALL SLOPES GREATER THAN 3:1 TO BE STABILIZED IMMEDIATELY FOLLOWING CONSTRUCTION USING MATTING OR HYDROSEED WITH TACKIFIER 69.52 68.92 70.80 TOP ELEV. = SEDIMENT FOREBAY PAVEMENT OVERLAND FLOW MIN . 3 :1 INTER IOR SLOPE 25 YEAR ELEV. = WQV ELEV. = BASIN SCHEMATIC N.T.S. 68.932 YEAR ELEV. = BOTTOM ELEV. = 67.40 STONE INFILTRATION TRENCH 69.83100 YEAR ELEV. =70.00 SPILLWAY ELEV. = SLOPE -> 1.0% MIN. 222.2 225.37 200 200 67.40 70.0 70.8 0 1"=10' 10'5'5'10' Stormwater Management Report October 23, 2024 STORMWATER MANAGEMENT REPORT Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 PROPOSED DOG DAYCARE AND GROOMING MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT October 23, 2024 Prepared For: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, CT 06074 Prepared By: Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 860.670.6308 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 TABLE OF CONTENTS Introduction .......................................................................... 1 A. Project Description ..................................................................................................................... 1 B. Existing Site Conditions ............................................................................................................ 1 C. Proposed Site Conditions .......................................................................................................... 1 Storm drainage analysis & design ...................................... 1 A. Methodology ............................................................................................................................... 1 B. Pre-Development Drainage Conditions .................................................................................. 2 C. Post-Development Drainage Conditions ................................................................................ 2 D. Stormwater Water Quality Treatment .................................................................................... 3 E. Stormwater Conveyance System ............................................................................................. 3 F. Summary ..................................................................................................................................... 4 Erosion & Sediment Control Provisions ............................ 6 A. Temporary Erosion Control Measures .................................................................................... 6 B. Construction Sequence .............................................................................................................. 6 C. Permanent Erosion Control Measures .................................................................................... 7 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 1 ~ Introduction A. Project Description The applicant is seeking to develop the vacant parcel into a Dog Daycare and Grooming facility. The property will be developed with a single driveway curb cut, parking spaces, and outdoor fenced in area for the dog daycare. B. Existing Site Conditions The parcel has been vacant since the construction of Nutmeg Road South. The land surrounding the property has developed and been zoned Industrial I. The property is located on the eastern side of Nutmeg Road South, at the eastern portion of the ‘S’ turn in the roadway. C. Proposed Site Conditions The proposed development will have a commercial building constructed for the use of a dog daycare and grooming facility. The building will be located at the center of the site with parking to the east of the building and a fenced in outdoor yard for the dog daycare on the west side. The development with have a single driveway at the northside of the property with parking spaces on either side of the driveway. The building will be served by public water from Nutmeg Road South and public sanitary sewer runs within the property along Nutmeg Road South. Storm drainage analysis & design A. Methodology The primary method of predicting the surface water runoff rates utilized in this report is a computer program entitled Hydraflow Hydrographs Extension for Autodesk Civil 3D. The Hydraflow program forecasts the rate of surface water runoff based upon several factors, including information on land use, vegetation, watershed areas, soil types, time of concentration, rainfall data, storage volumes and hydraulic capacities of structures. The program predicts the amount of runoff as a function of time. The NOAA National Weather Service was used to determine the rainoff from the specific project location. This website supply information of the rainfall on an intensity (in/hr) and depth (inch) for the known precipitation. Rainfall events with recurrence frequencies of 2, 10, 25, and 100-yr Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 2 ~ during a 24-hr duration were used a data in the Hydraflow analysis. This information can be found in Appendix B. Soil types in the watershed were determined from the Natural Resources Conservation Service of Web Soil Survey, prepared by the United States Department of Agriculture, Soil Conservation Service. The soils over the property are show as Udorthents-Urban Land, and typically has a moderate rate of exfiltration. The soils map can be found in Appendix A. The time of concentration was calculated for the analysis using the TR-55 method. Deep test pits were performed on the property within at the northeast and southern corner of the property. Along with the deep test pits, permeability test was completed to determine the exfiltration rate from the detention systems. For the permeability rates, a safety factor of 50% was taken into consideration for the exfiltration rate. The soil test results can be found in the Infiltration Feasibility Report found in Appendix E. B. Pre-Development Drainage Conditions In order to evaluate the impact of the proposed development, one (1) Point of Analysis (POA) was analyzed to demonstrate that the peak rates of runoff would not increase from the site improvements. The primary POA, Design Point A, is located at the southern boundary line of the project area as the existing property slopes north to south and west to east, away from Nutmeg Road South. The site flows towards the wetlands and watercourse along the southern property boundary with slopes ranging from 2.0% to 10%. Flows from the site flow towards the wetlands along the eastern property boundary as well as the swale along the southern property boundary. The wetlands and swale are interconnected and the swale discharges to the north through a culvert under the abutting property’s driveway. The existing conditions model was used to determine existing flow conditions. The existing conditions flow can be found in Appendix C. C. Post-Development Drainage Conditions The same POA from the Pre-Development scenario was used in the Post-Development analysis. Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 3 ~ The overall drainage patterns remain the same as minimal areas from the site flow into Nutmeg Road South and the remaining areas continue the flow to the east and south. Runoff from the development area’s impervious is captured within the infiltration basin with the pavement area directed to a sediment forebay. The grass areas and roof drainage will be directed directly into the basin. D. Stormwater Water Quality Treatment The stormwater management plan is designed have the pavement area drain into a sediment forebay for pretreatment and then flow into the infiltration basin. The proposed roof and grass areas will either overland flow and be collected and directed into the infiltration basin via pipe networks. The WQV is the initial flush of stormwater that contains most of the sediment and pollutants as defined in the CT DEP 2024 Stormwater Quality Manual. The WQV will be retained by a sediment forebay prior to entering the infiltration basin. The primary treatment of the stormwater runoff for water quality is infiltration through the infiltration basin bottom. CT DEEP requires treatment practices to store and/or infiltrate the the Water Quality Volume through incorporated Best Management Practices. The WQV is based upon the impervious area and the required depth of runoff, depending on location and proximity to a wetland or other critical area. The Water Quality Volume calculations are included in Appendix F. Overall, the stormwater management plan has been designed in accordance with concepts and recommendations found in the CT 2024 Stormwater Quality Manual. E. Stormwater Conveyance System The project site is designed with a Low Impact Design and allows the parking lot and majority of the grass area to be diverted overland sheet flow into swales or a stone infiltration system. The only conveyance system would be for the roof leaders to be collected and discharged directly into the infiltration basin. The roof leader system has been analyzed using the Rational Method to Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 4 ~ convey the 100‐year design storm. The pipe sizing calculations are included in Appendix G of this report. F. Summary The goal of the stormwater management system is two-fold, to ensure peak rates of runoff do not have a negative impact on down gradient properties or storm drainage systems and to maintain water quality by promoting infiltration and renovation of the stormwater on site by utilizing concepts and recommendations from the CT DEEP 2024 Stormwater Quality Manual. Peak rates of runoff flow and volume from this site have been mitigated by installing a stormwater systems to detain and treat the proposed stormwater runoff from the site. The subject site complies with the Town of South Windsor’s Stormwater Management and Erosion Control Regulations and CT DEEP 2024 Stormwater Quality Manual in regards to stormwater treatment and runoff reduction. Proposed stormwater best management practices (BMP) are designed in accordance with the 2024 CT Stormwater Quality Chapter 13 – Structure Stormwater BMP Design Guidance. In addition, stormwater discharges, in terms of peak rate of runoff and total volume, are consistent with the Town of Farmington and 2024 CT Stormwater Quality Manual Standard 1. The results are reported below in Table 1 and 2. Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 5 ~ Table 1: Peak Runoff Site Pre-Development vs Post-Development (Peak Discharge Rate in CFS) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Flow Peak Flow Peak Flow Point Storm (inches) (cfs) (cfs) (cfs) A 2 3.10 0.979 0.712 -0.267 5 4.10 1.247 0.915 -0.332 10 4.92 1.469 1.168 -0.301 25 6.06 1.774 1.472 -0.302 100 7.81 2.243 1.893 -0.350 Table 2: Peak Volume Site Pre-Development vs Post-Development (Storm Volume in Cubic Feet) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Volume Peak Volume Peak Volume Point Storm (inches) (cu-ft) (cu-ft) (cu-ft) A 2 3.10 1,410 983 -427 5 4.10 1,796 1,297 -499 10 4.92 2,115 1,643 -472 25 6.06 2,554 2,131 -423 100 7.81 3,230 2,899 -331 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 6 ~ Erosion & Sediment Control Provisions A. Temporary Erosion Control Measures Temporary erosion and sediment control measures are indicated on the design plans, construction details, general notes and within the drainage report. Although not integral to this stormwater report, due to the size of the proposed development both temporary and permanent erosion control measures will also be specified within the project’s Stormwater Pollution Prevention Plan (SWPPP). All erosion control measures specified are designed to reduce or eliminate potential soil migration and water quality degradation, both during and after the construction period. The following temporary erosion control measures will be implemented; • Silt Fence and/or Silt Logs • Catch Basin Filters – Silt Sock or Dandy Bags • Erosion Control Blankets on slopes 3:1 and steeper • Riprap Aprons & Spillway Stabilization • Turf Establishment - Hydroseeding with mulch and tackifiers These temporary erosion control measures are also discussed in the project’s Operation and Maintenance plan contained in the appendices of this report. In addition to the above-listed erosion control measures, references are made throughout the project documents to the 2024 Connecticut Guidelines for Soil Erosion and Sediment Control for additional measures, as necessary. B. Construction Sequence A site-specific construction sequence sensitive to limiting soil loss due to erosion and associated water quality degradation was prepared specifically for this project and is shown on the project plans. As pointed out in the erosion control notes, it is important for the contractor to recognize that proper judgment in the implementation of work will be essential if erosion is to be limited and protection of completed work is to be realized. Moreover, any specific changes in sequence and/or field conditions affecting the ability of specific erosion control measures to adequately serve their intended purpose should be reported to this office by the contractor. Furthermore, Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 ~ 7 ~ the contractor is encouraged to supplement specified erosion control measures during the construction period where and when in his/ her best judgment, additional protection is warranted. C. Permanent Erosion Control Measures Similar to temporary erosion control measures, all permanent erosion control measures are indicated on the design plans, construction details, general notes, drainage report, SWPPP and O & M project documents. The following permanent erosion control measures will be implemented; • Bituminous Paved Roadway and parking lots • Closed drainage system (catch basins & piping) • Erosion Control Blankets • Inlet & Outlet Protection - Riprap Stabilization • Stormwater Basins with multi-stage outlets • Spillway Stabilization • Turf Establishment - Hydroseeding with mulch and tackifiers Each of the above-mentioned permanent erosion control measures are designed in a project- specific manner within both state and local regulatory compliance standards. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report September 27, 2024 APPENDICES TABLE OF CONTENTS APPENDICES TITLE A FIGURES #1 Key Map #2 Aerial Photo #3 Site Photos #4 Soil Map #5 Natural Diversity Database Map #6 FEMA FIRMette B PRECIPITATION C PRE AND POST DEVELOPMENT ANALYSIS D DETENTION SYSTEM DESIGN E INFILTRATION FEASIBILITY REPORT F WATER QUALITY CALCULATIONS G COLLECTION SYSTEM H OPERATION AND MAINTENANCE MANUAL I STORMWATER WATERSHED AREA MAPS #1 Existing Watershed Area #2 Proposed Watershed Area #3 Proposed Collection System Watershed Area APPENDIX ‘A’ FIGURES SITE KEY MAP SCALE: 1"=500' Town of South Windsor Geographic Information System (GIS) Date Printed: 9/17/2024 Approximate Scale: 1 inch = 200 feetMAP DISCLAIMER - NOTICE OF LIABILITY This map is for assessment purposes only. It is not for legal description or conveyances. All information is subject to verification by any user. The Town of South Windsor and its mapping contractors assume no legal responsibility for the information contained herein. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 SITE PHOTOS Site Photo – Google Street View Looking South – Nov 2023 Site Photo – Google Street View Looking North – N ov 2023 Hydrologic Soil Group—State of Connecticut, Western Part (260 Nutmeg Road South) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 1 of 446332204633250463328046333104633340463337046334004633220463325046332804633310463334046333704633400699100699130699160699190699220699250699280699310699340699370699400 699100 699130 699160 699190 699220 699250 699280 699310 699340 699370 699400 41° 49' 39'' N 72° 36' 9'' W41° 49' 39'' N72° 35' 55'' W41° 49' 32'' N 72° 36' 9'' W41° 49' 32'' N 72° 35' 55'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,470 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 1, Sep 15, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—State of Connecticut, Western Part (260 Nutmeg Road South) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 306 Udorthents-Urban land complex B 2.8 35.7% 308 Udorthents, smoothed B 5.0 64.3% Totals for Area of Interest 7.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—State of Connecticut, Western Part 260 Nutmeg Road South Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—State of Connecticut, Western Part 260 Nutmeg Road South Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 4 of 4 Wilson Wapping Oakland Burnham Burnside Lydallville Windsorville Talcottville Highland Park Mayberry Village Manchester Green East Windsor Hill South Windsor Windsor Manchester East Windsor East Hartford Vernon Ellington Hartford Windsor Locks I 84I 291 US Hwy 5I 91Route 5Rye St Tolland T p k e State Hw y 3 0 Wilbur C r o s s H w yState Hwy 159Route 7 4 I 384 Middle Tpke Route 83State Hwy 74Main S t Rout e 1 9 4 John Fitch BlvdStro n g R d State H wy 83Avery StUS Hwy 6 Tolland S tPalisado AveSulliv a n A v e Griffin R d Middle Rd Center StScantic RdEast RdPinney StClark StBurnside Ave Graham RdWindsor AveAbbott RdEllington Rd State H w y 1 9 4 Cha p e l R d US Hwy 44AKennedy Rd De m i n g S t Talcottville RdKing StBurnham St Silver Ln Plea s a n t V a l l e y R d Dart Hill Rd Nevers RdHartford Rd Hilliard St Port e r S tWapping RdFoster StFelt RdState Hwy 286Barber Hill RdUS H wy 44 Taylor StTripp RdPhelps R d Adams StBroad StOak St Bissel l B r g River St Hartford TpkeWeston StRoberts S t Kelly R d Frog Hollow Rd Ro c k v i l l e R d Chamberlain Rd Gov e r n o r s H w ySta te Hw y 75 O a k l a n d R d State Hw y 1 9 1 Miller RdTro y R d Oakland StSmith St Summit StFoster RdNiederwerfer RdHighland St New b e r r y R d Skinner RdGoodw i n S t Rout e 3 0 Abbe Rd Woodbridge St Forbes S tProspect StHany LnCapen S t Henry St Plantation Rd Elm StWoodland StVibe r t R d Hayden S t a t i o n R d Olcott St Scott DrPierce RdFerry L n Parker StSpruce StSpencer StLong Hill StGreen RdHilton DrSchool StLong Hill RdStoughto n R d Pierson LnAutumn StPine StLydall StSlater StGovernor St Union StPark A v e West RdClark R d Garth Rd Ferguson RdThrall RdBe e l z e b u b R d State Hwy 305 Burg e s s R d Batchelder RdMcKee StOmelia R d Hayes Ave Elm Hill RdS e r v i c e R dDeerfie ld Rd Winderm e r e A v e Hale RdClover StHoll StPlymouth StWindsorville RdHillside StWoolam R d Maple St Park St Croft Dr Ryan Dr River Dr Love Ln Forest StHigh St Bucklan d Hill s Dr Sand Hill RdBrook StFord R d Lawrence RdBissell St Fair v i e w D rLancaster DrVernon StAlden RdNutmeg RdStandish St Rood Ave Bryan DrPond RdLenox StAyers Rd Jenn i n g s R d Sate l l i t e R d Trumbull LnPrestige Pa r k R d Benton StClint o n D r Palm e r D r Farn h a m R d Ma c k t o w n R d Laurel S t Hamilton DrMorris R d Barry Rd Cooper Hill St Debbie Dr Swan Dr Robert Dr Huntington Dr Lefoll BlvdQry B r o o k D r Brent Rd Lyness StSt John St K e n t D r Berle Rd Birc h H i l l D r C e m e t e r y R d Rimfield Dr Pavilion DrNorton RdCedar St Birch R d Gerald DrOrc h a r d H i l l D rFoster Street ExtGail LnColby Dr Mack StGrant RdWilson Ave Diane DrKent LnTudor LnBrookfield StRidgewood RdIdent RdYale DrCipolla DrLindsay LnLoom i s R d Cherry St Nort h v i e w D r Buckland RdGarnet LnIsland Rd Meadow R d Earl StCentral Ave Parking Lo t Wood Dr Wel les Rd Marg a r e t D r Pheasant WayValley St Old Town RdGorski DrQuail XingCor n e r s t o n e D r Seneca Dr B a t s o n D r Bolt o n S t Utopia Rd Wood Pond Rd Lake St T h o m a s S t Progress DrBeldon RdFarmstead DrTu m b l e b r o o k D r Collins Xing Benedict Dr Sally D r Wheeler RdHigh Pa th Rd Wickham Park Trebbe DrKr a w s k i D r Redst o n e R d Elro StRichmond Dr Russell St Bentley DrMaskel RdNeill Rd Hocka n u m B l v d Gree n S t Pitkin S t Elida Ct Laur e l L n Temple DrJoseph LnValley V i e w D r Bretton Rd Lisa Dr Campbell Ave Pine Knob D r Ketchbrook Ln Filley St Ivy LnFoley StCardinal WayJudg e L n Remington Rd Tracy Dr Eva CirDiscovery RdJoshua H l Justin DrDurant StSherwood DrCambridge St Eva Dr All e n D r Dempsey Rd Bis s e l l F e r r y R d Windshire DrElmer St Leverich Dr Arnold Dr Skyline DrCollimo r e R d Sc h a n k R d Naek R d Strickland St Winton Rd Joanne Dr Glenwood StJea n R dJefferson StWoodlawn CirTerrace Ave Kimbe r l y D r Allen Ridge DrCharter Oak St Vintage Ln Rene Ct Beacon Hi ll R d John St Hollis RdGerber RdScantic Meadow RdOld K e n n e d y R d Sa x t o n L n Robert RdArdsley Ln Andreis TrlGarden StAmato DrAustin CirRiverside DrTower Rd Shay St J o h n D r Glenwo o d R d Welling t o n R d Lilac StO x f o r d L n Sele DrAnn StAlna Ln Williams St N u t m e g D r Rossetto DrLocust StLynch Dr Nook Farms Rd Shady LnEagle Dr Amy Dr Aut u m n D r Blinn St Dover RdField DrRuby DrPearl DrLilley StTomel DrPatria RdKu p c h u n o s D r Jay C i r Wind RdWilliam StHearthstoneWalker TerMatthew LnBidw e l l R d Fairwa y Dr Canterbury LnCarroll RdI 91McKee StCenter StMeadow Rd Nutmeg RdRoute 30 Park Ave Bissell B r g School StMain StEllington RdWilbur Cross HwyMain St I 91Ser v i c e R d I 84 Slater StI 91I 84 US Hwy 6Broad StI 84 I 291 I 384 Wi n d s o r v i l l e R d I 384 Ellingt o n R d Miller Rd Kin g S t Goodwin St Exit 1 Exit 5 Exit 33 Exit 61 Exit 60 Exit 4 Exit 62 & 60 Exit 58 Exit 65 Exit 3 Exit 39&41 Exit 63 Exit 40 Exit 34 Exit 54 §¨¦84 §¨¦384 §¨¦291 §¨¦91 £¤5 £¤44A SV191 SV74 SV159 SV30 SV194 SV286 SV218 SV75 SV83 SV178 SV305 Natural Diversity Data Base June 2024 Areas NOTE: This map shows known locations of State and Federal Listed Species and Critical Habitats. Information on listed species is collected and compiled by the Natural Diversity Data Base (NDDB) from a variety of data sources . Exact locations of species have been buffered to produce the generalized locations. This map is intended for use as a preliminary screening tool for conducting a Natural Diversity Data Base Review Request. To use the map, locate the project boundaries and any additional affected areas. If the project is within a hatched area there may be a potential conflict with a listed species. For more information, use DEEP ezFile https://filings.deep.ct.gov/DEEPPortal/ to submit a Request for Natural Diversity Data Base State Listed Species Review or Site Assessment. More detailed instructions are provided along with the request form on our website. https://portal.ct.gov/deep-nddbrequest Use the CTECO Interactive Map Viewers at http://cteco.uconn.edu to more precisely search for and locate a site and to view aerial imagery with NDDB Areas. QUESTIONS: Department of Energy and Environmental Protection (DEEP) 79 Elm St, Hartford, CT 06106 email: deep.nddbrequest@ct.gov Phone: (860) 424-3011 SOUTH WINDSOR, CT 0 10.5 Miles ± Critical Habitat State and Federal Listed Species Town Boundary National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 9/17/2024 at 9:21 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 72°36'22"W 41°49'50"N 72°35'44"W 41°49'23"N Basemap Imagery Source: USGS National Map 2023 APPENDIX ‘B’ PRECIPITATION NOAA Atlas 14, Volume 10, Version 3 Location name: South Windsor, Connecticut, USA* Latitude: 41.8266°, Longitude: -72.6009° Elevation: 70 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.336 (0.261‑0.432) 0.407 (0.316‑0.524) 0.523 (0.404‑0.675) 0.620 (0.477‑0.805) 0.753 (0.562‑1.02) 0.853 (0.623‑1.18) 0.958 (0.680‑1.38) 1.08 (0.724‑1.59) 1.25 (0.807‑1.91) 1.38 (0.876‑2.16) 10-min 0.476 (0.370‑0.612) 0.577 (0.448‑0.742) 0.742 (0.574‑0.957) 0.879 (0.676‑1.14) 1.07 (0.796‑1.45) 1.21 (0.883‑1.68) 1.36 (0.964‑1.96) 1.52 (1.03‑2.25) 1.76 (1.14‑2.70) 1.96 (1.24‑3.07) 15-min 0.560 (0.436‑0.720) 0.679 (0.527‑0.873) 0.873 (0.676‑1.13) 1.03 (0.796‑1.34) 1.26 (0.936‑1.71) 1.42 (1.04‑1.98) 1.60 (1.13‑2.30) 1.79 (1.21‑2.65) 2.08 (1.34‑3.18) 2.31 (1.46‑3.61) 30-min 0.751 (0.584‑0.965) 0.913 (0.709‑1.17) 1.18 (0.911‑1.52) 1.40 (1.08‑1.81) 1.70 (1.27‑2.31) 1.93 (1.41‑2.68) 2.16 (1.54‑3.12) 2.43 (1.64‑3.59) 2.82 (1.82‑4.31) 3.13 (1.98‑4.89) 60-min 0.942 (0.732‑1.21) 1.15 (0.891‑1.48) 1.48 (1.15‑1.91) 1.76 (1.36‑2.28) 2.14 (1.60‑2.91) 2.43 (1.78‑3.38) 2.73 (1.94‑3.94) 3.07 (2.07‑4.54) 3.56 (2.30‑5.44) 3.95 (2.50‑6.18) 2-hr 1.22 (0.954‑1.56) 1.48 (1.15‑1.89) 1.90 (1.48‑2.43) 2.24 (1.74‑2.90) 2.72 (2.04‑3.69) 3.08 (2.27‑4.27) 3.46 (2.48‑5.00) 3.91 (2.64‑5.74) 4.58 (2.98‑6.97) 5.15 (3.27‑7.99) 3-hr 1.40 (1.10‑1.79) 1.70 (1.33‑2.16) 2.18 (1.70‑2.79) 2.58 (2.00‑3.32) 3.13 (2.36‑4.23) 3.54 (2.62‑4.89) 3.97 (2.87‑5.74) 4.50 (3.05‑6.59) 5.31 (3.45‑8.04) 5.99 (3.81‑9.27) 6-hr 1.76 (1.39‑2.23) 2.14 (1.68‑2.70) 2.75 (2.16‑3.49) 3.26 (2.54‑4.16) 3.96 (3.00‑5.33) 4.48 (3.33‑6.17) 5.04 (3.66‑7.26) 5.74 (3.89‑8.34) 6.81 (4.44‑10.3) 7.73 (4.93‑11.9) 12-hr 2.14 (1.70‑2.69) 2.62 (2.08‑3.30) 3.42 (2.70‑4.32) 4.07 (3.20‑5.17) 4.97 (3.79‑6.66) 5.64 (4.22‑7.73) 6.36 (4.65‑9.13) 7.27 (4.95‑10.5) 8.67 (5.68‑13.0) 9.89 (6.33‑15.1) 24-hr 2.50 (1.99‑3.12) 3.10 (2.48‑3.88) 4.10 (3.26‑5.15) 4.92 (3.89‑6.22) 6.06 (4.65‑8.08) 6.89 (5.20‑9.43) 7.81 (5.76‑11.2) 8.98 (6.14‑12.9) 10.8 (7.12‑16.1) 12.5 (8.01‑18.9) 2-day 2.81 (2.26‑3.49) 3.55 (2.85‑4.42) 4.76 (3.80‑5.94) 5.76 (4.58‑7.23) 7.14 (5.52‑9.49) 8.14 (6.19‑11.1) 9.26 (6.91‑13.3) 10.8 (7.37‑15.4) 13.2 (8.69‑19.5) 15.4 (9.91‑23.2) 3-day 3.06 (2.47‑3.79) 3.87 (3.12‑4.80) 5.20 (4.17‑6.47) 6.30 (5.02‑7.88) 7.81 (6.07‑10.4) 8.91 (6.80‑12.2) 10.1 (7.60‑14.6) 11.8 (8.10‑16.8) 14.6 (9.60‑21.4) 17.0 (11.0‑25.5) 4-day 3.29 (2.66‑4.06) 4.15 (3.35‑5.13) 5.56 (4.47‑6.90) 6.73 (5.38‑8.40) 8.35 (6.50‑11.0) 9.51 (7.28‑12.9) 10.8 (8.13‑15.5) 12.6 (8.66‑17.9) 15.5 (10.3‑22.8) 18.2 (11.7‑27.2) 7-day 3.90 (3.16‑4.79) 4.87 (3.95‑5.99) 6.45 (5.21‑7.96) 7.77 (6.24‑9.64) 9.58 (7.48‑12.6) 10.9 (8.36‑14.7) 12.4 (9.29‑17.5) 14.3 (9.88‑20.2) 17.5 (11.6‑25.6) 20.4 (13.2‑30.3) 10-day 4.51 (3.68‑5.53) 5.54 (4.51‑6.79) 7.22 (5.85‑8.88) 8.61 (6.93‑10.7) 10.5 (8.23‑13.7) 11.9 (9.15‑16.0) 13.5 (10.1‑18.9) 15.5 (10.7‑21.8) 18.7 (12.4‑27.3) 21.6 (14.0‑32.1) 20-day 6.50 (5.33‑7.91) 7.58 (6.21‑9.24) 9.36 (7.63‑11.4) 10.8 (8.77‑13.3) 12.9 (10.1‑16.6) 14.4 (11.0‑18.9) 16.0 (11.9‑22.0) 17.9 (12.5‑25.0) 20.9 (14.0‑30.2) 23.5 (15.3‑34.6) 30-day 8.21 (6.75‑9.96) 9.32 (7.65‑11.3) 11.1 (9.11‑13.6) 12.6 (10.3‑15.5) 14.7 (11.5‑18.8) 16.3 (12.5‑21.2) 17.9 (13.3‑24.2) 19.8 (13.8‑27.4) 22.4 (15.0‑32.2) 24.7 (16.1‑36.2) 45-day 10.4 (8.55‑12.5) 11.5 (9.48‑13.9) 13.4 (11.0‑16.2) 14.9 (12.2‑18.2) 17.1 (13.4‑21.6) 18.7 (14.3‑24.2) 20.4 (15.0‑27.2) 22.1 (15.5‑30.5) 24.4 (16.4‑34.8) 26.1 (17.1‑38.2) 60-day 12.2 (10.1‑14.7) 13.4 (11.0‑16.1) 15.3 (12.6‑18.5) 16.9 (13.8‑20.6) 19.1 (15.0‑24.1) 20.9 (16.0‑26.7) 22.5 (16.6‑29.8) 24.1 (17.0‑33.2) 26.1 (17.6‑37.2) 27.6 (18.0‑40.1) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain NOAA Atlas 14, Volume 10, Version 3 Location name: South Windsor, Connecticut, USA* Latitude: 41.8266°, Longitude: -72.6009° Elevation: 70 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.03 (3.13‑5.18) 4.88 (3.79‑6.29) 6.28 (4.85‑8.10) 7.44 (5.72‑9.66) 9.04 (6.74‑12.3) 10.2 (7.48‑14.2) 11.5 (8.16‑16.6) 12.9 (8.69‑19.1) 15.0 (9.68‑22.9) 16.6 (10.5‑26.0) 10-min 2.86 (2.22‑3.67) 3.46 (2.69‑4.45) 4.45 (3.44‑5.74) 5.27 (4.06‑6.85) 6.40 (4.78‑8.70) 7.25 (5.30‑10.1) 8.14 (5.78‑11.8) 9.14 (6.16‑13.5) 10.6 (6.86‑16.2) 11.8 (7.45‑18.4) 15-min 2.24 (1.74‑2.88) 2.72 (2.11‑3.49) 3.49 (2.70‑4.50) 4.14 (3.18‑5.37) 5.02 (3.74‑6.82) 5.69 (4.16‑7.90) 6.39 (4.54‑9.22) 7.18 (4.83‑10.6) 8.30 (5.38‑12.7) 9.23 (5.84‑14.4) 30-min 1.50 (1.17‑1.93) 1.83 (1.42‑2.35) 2.36 (1.82‑3.04) 2.79 (2.15‑3.63) 3.40 (2.53‑4.62) 3.85 (2.82‑5.35) 4.33 (3.07‑6.25) 4.87 (3.27‑7.19) 5.63 (3.65‑8.62) 6.26 (3.96‑9.79) 60-min 0.942 (0.732‑1.21) 1.15 (0.891‑1.48) 1.48 (1.15‑1.91) 1.76 (1.36‑2.28) 2.14 (1.60‑2.91) 2.43 (1.78‑3.38) 2.73 (1.94‑3.94) 3.07 (2.07‑4.54) 3.56 (2.30‑5.44) 3.95 (2.50‑6.18) 2-hr 0.609 (0.477‑0.778) 0.738 (0.576‑0.943) 0.948 (0.738‑1.22) 1.12 (0.868‑1.45) 1.36 (1.02‑1.84) 1.54 (1.13‑2.13) 1.73 (1.24‑2.50) 1.96 (1.32‑2.87) 2.29 (1.49‑3.48) 2.57 (1.63‑4.00) 3-hr 0.467 (0.367‑0.595) 0.565 (0.443‑0.720) 0.725 (0.567‑0.928) 0.858 (0.666‑1.10) 1.04 (0.785‑1.41) 1.18 (0.870‑1.63) 1.32 (0.954‑1.91) 1.50 (1.01‑2.19) 1.77 (1.15‑2.68) 2.00 (1.27‑3.09) 6-hr 0.293 (0.231‑0.371) 0.356 (0.281‑0.451) 0.459 (0.360‑0.583) 0.544 (0.425‑0.695) 0.661 (0.501‑0.889) 0.747 (0.556‑1.03) 0.841 (0.611‑1.21) 0.957 (0.649‑1.39) 1.14 (0.741‑1.71) 1.29 (0.823‑1.98) 12-hr 0.177 (0.141‑0.223) 0.217 (0.172‑0.274) 0.283 (0.224‑0.358) 0.337 (0.265‑0.429) 0.412 (0.314‑0.552) 0.467 (0.350‑0.641) 0.528 (0.386‑0.757) 0.603 (0.410‑0.871) 0.719 (0.471‑1.08) 0.821 (0.525‑1.25) 24-hr 0.104 (0.083‑0.130) 0.129 (0.103‑0.161) 0.170 (0.135‑0.214) 0.205 (0.162‑0.259) 0.252 (0.193‑0.336) 0.287 (0.216‑0.392) 0.325 (0.240‑0.466) 0.374 (0.255‑0.538) 0.451 (0.296‑0.672) 0.520 (0.333‑0.788) 2-day 0.058 (0.047‑0.072) 0.073 (0.059‑0.091) 0.099 (0.079‑0.123) 0.119 (0.095‑0.150) 0.148 (0.115‑0.197) 0.169 (0.128‑0.231) 0.192 (0.143‑0.277) 0.223 (0.153‑0.320) 0.274 (0.181‑0.406) 0.320 (0.206‑0.482) 3-day 0.042 (0.034‑0.052) 0.053 (0.043‑0.066) 0.072 (0.057‑0.089) 0.087 (0.069‑0.109) 0.108 (0.084‑0.143) 0.123 (0.094‑0.168) 0.140 (0.105‑0.202) 0.163 (0.112‑0.233) 0.202 (0.133‑0.297) 0.236 (0.152‑0.354) 4-day 0.034 (0.027‑0.042) 0.043 (0.034‑0.053) 0.057 (0.046‑0.071) 0.070 (0.056‑0.087) 0.086 (0.067‑0.115) 0.099 (0.075‑0.134) 0.112 (0.084‑0.161) 0.131 (0.090‑0.186) 0.161 (0.106‑0.237) 0.189 (0.122‑0.282) 7-day 0.023 (0.018‑0.028) 0.028 (0.023‑0.035) 0.038 (0.031‑0.047) 0.046 (0.037‑0.057) 0.057 (0.044‑0.074) 0.064 (0.049‑0.087) 0.073 (0.055‑0.104) 0.085 (0.058‑0.120) 0.104 (0.069‑0.152) 0.121 (0.078‑0.180) 10-day 0.018 (0.015‑0.023) 0.023 (0.018‑0.028) 0.030 (0.024‑0.037) 0.035 (0.028‑0.044) 0.043 (0.034‑0.057) 0.049 (0.038‑0.066) 0.056 (0.042‑0.078) 0.064 (0.044‑0.090) 0.078 (0.051‑0.113) 0.090 (0.058‑0.133) 20-day 0.013 (0.011‑0.016) 0.015 (0.012‑0.019) 0.019 (0.015‑0.023) 0.022 (0.018‑0.027) 0.026 (0.020‑0.034) 0.029 (0.022‑0.039) 0.033 (0.024‑0.045) 0.037 (0.026‑0.052) 0.043 (0.029‑0.062) 0.048 (0.031‑0.072) 30-day 0.011 (0.009‑0.013) 0.012 (0.010‑0.015) 0.015 (0.012‑0.018) 0.017 (0.014‑0.021) 0.020 (0.016‑0.026) 0.022 (0.017‑0.029) 0.024 (0.018‑0.033) 0.027 (0.019‑0.038) 0.031 (0.020‑0.044) 0.034 (0.022‑0.050) 45-day 0.009 (0.007‑0.011) 0.010 (0.008‑0.012) 0.012 (0.010‑0.015) 0.013 (0.011‑0.016) 0.015 (0.012‑0.020) 0.017 (0.013‑0.022) 0.018 (0.013‑0.025) 0.020 (0.014‑0.028) 0.022 (0.015‑0.032) 0.024 (0.015‑0.035) 60-day 0.008 (0.006‑0.010) 0.009 (0.007‑0.011) 0.010 (0.008‑0.012) 0.011 (0.009‑0.014) 0.013 (0.010‑0.016) 0.014 (0.011‑0.018) 0.015 (0.011‑0.020) 0.016 (0.011‑0.023) 0.018 (0.012‑0.025) 0.019 (0.012‑0.027) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi APPENDIX ‘C’ PRE AND POST DEVELOPMENT ANALYSIS Site Pre-Development vs Post-Development (Peak Discharge Rate in CFS) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Flow Peak Flow Peak Flow Point Storm (inches)(cfs)(cfs)(cfs) 2 3.10 0.979 0.712 -0.267 5 4.10 1.247 0.915 -0.332 10 4.92 1.469 1.168 -0.301 25 6.06 1.774 1.472 -0.302 100 7.81 2.243 1.893 -0.350 Notes: Site Pre-Development vs Post-Development (Storm Volume in Cubic Feet) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Volume Peak Volume Peak Volume Point Storm (inches)(cu-ft)(cu-ft)(cu-ft) 2 3.10 1,410 983 -427 5 4.10 1,796 1,297 -499 10 4.92 2,115 1,643 -472 25 6.06 2,554 2,131 -423 100 7.81 3,230 2,899 -331 Table 2: Peak Volume 1. Proposed Peak flows at Design Point A are a summation of the detention pond release (P2) and drainage basin P1 2. Per 2024 CT Stormwater Quality Manual Standard 2 - Peak Runoff Attenuation during the 2-yr, 24-hr post-development peak flow rate is to be 50% of the 2-yr, 24-hr pre-development peak flow. Due to the small drainage area, all the proposed development is captured and the surrounding area is unable to be contained and decrease the peak flow even further. The infiltration basin is self-containing during the 2-yr storm. A waiver is being requested. Table 1: Peak Runoff A A 1 - E1 3 - P1 4 - P2 5 - Pond P2 6 - Total P 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Project: 1018 - Hydraflow.gpw Tuesday, 10 / 22 / 2024 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ ------- 0.979 ------- 1.247 1.469 1.774 ------- 2.243 E1 3 Rational ------ ------- 0.712 ------- 0.907 1.068 1.289 ------- 1.631 P1 4 Rational ------ ------- 0.953 ------- 1.212 1.428 1.724 ------- 2.181 P2 5 Reservoir 4 ------- 0.000 ------- 0.108 0.173 0.238 ------- 0.309 Pond P2 6 Combine 3, 5 ------- 0.712 ------- 0.945 1.217 1.498 ------- 1.914 Total P Proj. file: 1018 - Hydraflow.gpw Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 0.979 1 24 1,410 ------ ------ ------ E1 3 Rational 0.712 1 23 983 ------ ------ ------ P1 4 Rational 0.953 1 16 914 ------ ------ ------ P2 5 Reservoir 0.000 1 30 0 4 68.93 840 Pond P2 6 Combine 0.712 1 23 983 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 2 Year Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.247 1 24 1,796 ------ ------ ------ E1 3 Rational 0.907 1 23 1,251 ------ ------ ------ P1 4 Rational 1.212 1 16 1,164 ------ ------ ------ P2 5 Reservoir 0.108 1 29 93 4 69.15 1,054 Pond P2 6 Combine 0.945 1 23 1,344 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 5 Year Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 5 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.469 1 24 2,115 ------ ------ ------ E1 3 Rational 1.068 1 23 1,474 ------ ------ ------ P1 4 Rational 1.428 1 16 1,371 ------ ------ ------ P2 5 Reservoir 0.173 1 29 232 4 69.31 1,215 Pond P2 6 Combine 1.217 1 23 1,706 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 10 Year Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 6 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.774 1 24 2,554 ------ ------ ------ E1 3 Rational 1.289 1 23 1,779 ------ ------ ------ P1 4 Rational 1.724 1 16 1,655 ------ ------ ------ P2 5 Reservoir 0.238 1 29 433 4 69.52 1,448 Pond P2 6 Combine 1.498 1 23 2,212 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 25 Year Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 7 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 2.243 1 24 3,230 ------ ------ ------ E1 3 Rational 1.631 1 23 2,251 ------ ------ ------ P1 4 Rational 2.181 1 16 2,094 ------ ------ ------ P2 5 Reservoir 0.309 1 29 753 4 69.83 1,823 Pond P2 6 Combine 1.914 1 23 3,004 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 100 Year Tuesday, 10 / 22 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydraflow Rainfall Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 10 / 22 / 2024 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 24.0619 3.7000 0.7218 -------- 3 0.0000 0.0000 0.0000 -------- 5 30.4729 3.7000 0.7201 -------- 10 36.3724 3.8000 0.7233 -------- 25 44.5411 3.9000 0.7268 -------- 50 49.5765 3.8000 0.7237 -------- 100 57.2298 4.0000 0.7308 -------- File name: 1018 - South Windsor.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs)5 min1015202530354045505560 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.05 3.64 2.91 2.45 2.13 1.90 1.72 1.58 1.46 1.36 1.27 1.20 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.42 4.63 3.70 3.12 2.72 2.42 2.19 2.01 1.86 1.73 1.62 1.53 10 7.54 5.45 4.36 3.67 3.20 2.85 2.58 2.36 2.19 2.04 1.91 1.80 25 9.09 6.58 5.26 4.43 3.86 3.44 3.11 2.85 2.64 2.46 2.30 2.17 50 10.27 7.42 5.93 5.00 4.36 3.88 3.51 3.22 2.97 2.77 2.60 2.45 100 11.49 8.32 6.66 5.61 4.89 4.35 3.94 3.60 3.33 3.10 2.91 2.74 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) ame: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - South Windsor.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 3.10 0.00 4.10 4.92 6.06 6.89 7.81 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rational Equation: Q = CCfIA (ConnDOT Equation 6.1)Project:Proposed Dog Daycare & GroomingC=Runoff Coefficient260 Nutmeg Road South, South Windsor, CTCf=Frequency Factor (ConnDOT Table 6-2)I=Intensity (taken from ConnDOT Table B-2.1)Calculations By:MSLA=Area (acres)Date:Q= Runoff Flow (CFS)Rev:25 Yr 50 Yr 100YrCf1.10 1.20 1.25Basin CharacteristicsRunoff Coefficients & Frequency FactorsIntensity (in/hr) Flow (CFS)C2C5C10C25C50C100A E1 1.7924 0.25 0.25 0.25 0.28 0.31 0.32 2.30 2.90 3.30 3.80 4.20 4.70 1.0 1.3 1.5 1.9 2.3 2.7A P1 0.9623 0.33 0.33 0.33 0.36 0.39 0.41 2.30 2.90 3.40 3.90 4.30 4.80 0.7 0.9 1.1 1.4 1.6 1.9AP2 0.8316 0.41 0.41 0.41 0.45 0.49 0.51 2.80 3.50 3.90 4.50 5.00 5.40 0.9 1.2 1.3 1.7 2.0 2.3T(min)Q5Q10 I5Q50(Not to exceed 1.0)--Q2I2 I10 I25Q100 I100RATIONAL METHOD DEVELOPED RUNOFF COMPUTATIONS9/20/2024DesignPoint Basin(s)Q25Area, A(acres) I50D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls Character of SurfaceRunoff Coefficient SourceCharacter of SurfaceRunoff Coefficient SourceProject:Asphalt, Concrete, & Water Surface0.95CONN DOT Table 6-5Forest (Hydrologic Type B Soil)0.18McCuen, 1989 Table 7-2Roof Surface0.95CONN DOT Table 6-4Forest (Hydrologic Type D Soil)0.25McCuen, 1989 Table 7-3Industrial Impervious Area0.75CONN DOT Table 6-4Lawns Sandy Soil (Steep 7%+)0.18McCuen, 1989 Table 7-3Calcs By: MSLParks & Cemeteries 0.25CONN DOT Table 6-4Lawns Sandy Soil (2% to 7%)0.16McCuen, 1989 Table 7-3Date: 9/20/24Unimproved Areas0.30CONN DOT Table 6-4McCuen, 1989 Table 7-3Revised : --Gravel0.43McCuen, 1989 Table 7-2Basin AreaAsphalt, Concrete, & Water Surface Roof SurfaceIndustrial Impervious AreaParks & CemeteriesUnimproved Areas GravelForest (Hydrologic Type B Soil)Forest (Hydrologic Type D Soil)Lawns Sandy Soil (Steep 7%+)Lawns Sandy Soil (2% to 7%)Basin ID(acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres)E1 1.79 0.160.80 0.31 0.52 0.25P1 0.96 0.160.18 0.31 0.30 0.33P2 0.83 0.16 0.110.00 0.00 0.53 0.41Note: Composite RunoffCoefficientRATIONAL METHOD COMPOSITE RUNOFF COEFFICIENTSProposed Dog Daycare & Grooming260 Nutmeg Road South, South Windsor, CTD:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls Overland Flow: (Maximum 150 FT)Project:Proposed Dog Daycare & GroomingTt=Travel Time (Hr) P2= 2 Year, 24-hour Ranfall (in)260 Nutmeg Road South, South Windsor, CTn=Manning's Roughness (TR-55 Table 3-1) s=slope (ft/ft)L=Flow Length (ft)Calculations By:MSLDate:Shallow Concentrated Flow:Unpaved: V=16.1345(s)0.5Tt=Travel Time (min)Paved: V=20.3284(s)0.5V=Velocity (ft/s)Common Manning n Values for overland flowTt = L / 60Vs=slope (ft/ft)Woods 0.400 Light UnderbrushPavement 0.011Open Channel\Swale Flow:Lawns 0.410 Bermuda GrassTt=Travel Time (min)V=Velocity (ft/s)a=cross-section area (ft2)Dense Grass 0.240 Lovegrass, Bluegrass, Buffalo,Grama & Nativen=Manning's Roughness s=slope (ft/ft)pw=wetted perimeter (ft)L=Flow Length (ft) r= hydraulic radius (a/pw)Tt = L / 60VMinimum allowable Tc = 5.00 min.TotalnL(ft)S(%)To(min)Paved (Y or N) L(ft)S(%) V(ft/s)T1(min) n Area (s.f.)Wet. Perim. (ft)S(%) V(full flow)(ft/s) L(ft)Ts(min)Dia. (in) L(ft)S(%) V(full flow)(ft/s)Tp(min)T(min)A E1 0.4101004.00 16.60N 2701.56 2.01 2.240.00 N 2420.21 0.73 5.50Subtotal 16.60 Subtotal 7.74Subtotal Subtotal24.33A P1 0.4101005.40 14.72N 2851.05 1.66 2.87 N 2420.21 0.73 5.50Subtotal 14.72 Subtotal 8.37Subtotal Subtotal23.09A P2 0.4101004.75 15.50N661.52 1.99 0.55 Subtotal 15.50 Subtotal 0.55Subtotal Subtotal16.05TIME OF CONCENTRATION COMPUTATIONS Design Point9/20/2024Basin(s)Overland Sheet Flow Shallow Flow Swale Flow Pipe Flow(Conn DOT Equations 6.C.4 & C.C.5)(TR-55 Equation 3-3)}(TR-55 Equation 3-4)D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls APPENDIX ‘D’ DETENTION SYSTEM DESIGN Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 10 / 22 / 2024 Pond No. 1 - Infiltration Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 67.40 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 67.40 40 0 0 0.20 67.60 200 22 22 0.40 67.80 359 55 77 0.60 68.00 515 87 164 0.80 68.20 633 115 279 1.00 68.40 708 134 413 1.20 68.60 781 149 562 1.40 68.80 855 164 725 1.60 69.00 932 179 904 1.80 69.20 1,012 194 1,098 2.00 69.40 1,093 210 1,309 2.20 69.60 1,177 227 1,536 2.40 69.80 1,263 244 1,779 2.60 70.00 1,351 261 2,041 2.80 70.20 1,442 279 2,320 3.00 70.40 1,535 298 2,618 3.20 70.60 1,630 316 2,934 3.40 70.80 1,727 336 3,270 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 4.00 0.00 0.00 0.00 Span (in)= 4.00 0.00 0.00 0.00 No. Barrels = 1 000 Invert El. (ft)= 68.92 0.00 0.00 0.00 Length (ft)= 18.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 0.00 0.00 0.00 10.00 Crest El. (ft)= 0.00 0.00 0.00 70.00 Weir Coeff.= 3.33 3.33 3.33 2.60 Weir Type = --- --- --- Broad Multi-Stage = No No No No Exfil.(in/hr)= 5.290 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Stage (ft) 0.00 67.40 1.00 68.40 2.00 69.40 3.00 70.40 4.00 71.40 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 10 / 22 / 2024 Pond No. 1 - Infiltration Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 67.40 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 67.40 40 0 0 0.20 67.60 200 22 22 0.40 67.80 359 55 77 0.60 68.00 515 87 164 0.80 68.20 633 115 279 1.00 68.40 708 134 413 1.20 68.60 781 149 562 1.40 68.80 855 164 725 1.60 69.00 932 179 904 1.80 69.20 1,012 194 1,098 2.00 69.40 1,093 210 1,309 2.20 69.60 1,177 227 1,536 2.40 69.80 1,263 244 1,779 2.60 70.00 1,351 261 2,041 2.80 70.20 1,442 279 2,320 3.00 70.40 1,535 298 2,618 3.20 70.60 1,630 316 2,934 3.40 70.80 1,727 336 3,270 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 4.00 0.00 0.00 0.00 Span (in)= 4.00 0.00 0.00 0.00 No. Barrels = 1 000 Invert El. (ft)= 68.92 0.00 0.00 0.00 Length (ft)= 18.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 0.00 0.00 0.00 10.00 Crest El. (ft)= 0.00 0.00 0.00 70.00 Weir Coeff.= 3.33 3.33 3.33 2.60 Weir Type = --- --- --- Broad Multi-Stage = No No No No Exfil.(in/hr)= 5.290 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 67.40 0.00 --- --- --- --- --- --- 0.00 0.000 --- 0.000 0.20 22 67.60 0.00 --- --- --- --- --- --- 0.00 0.024 --- 0.024 0.40 77 67.80 0.00 --- --- --- --- --- --- 0.00 0.044 --- 0.044 0.60 164 68.00 0.00 --- --- --- --- --- --- 0.00 0.063 --- 0.063 0.80 279 68.20 0.00 --- --- --- --- --- --- 0.00 0.078 --- 0.078 1.00 413 68.40 0.00 --- --- --- --- --- --- 0.00 0.087 --- 0.087 1.20 562 68.60 0.00 --- --- --- --- --- --- 0.00 0.096 --- 0.096 1.40 725 68.80 0.00 --- --- --- --- --- --- 0.00 0.105 --- 0.105 1.60 904 69.00 0.02 ic --- --- --- --- --- --- 0.00 0.114 --- 0.130 1.80 1,098 69.20 0.14 ic --- --- --- --- --- --- 0.00 0.124 --- 0.265 2.00 1,309 69.40 0.20 oc --- --- --- --- --- --- 0.00 0.134 --- 0.336 2.20 1,536 69.60 0.26 oc --- --- --- --- --- --- 0.00 0.144 --- 0.401 2.40 1,779 69.80 0.30 oc --- --- --- --- --- --- 0.00 0.155 --- 0.457 2.60 2,041 70.00 0.34 oc --- --- --- --- --- --- 0.00 0.165 --- 0.507 2.80 2,320 70.20 0.38 oc --- --- --- --- --- --- 2.33 0.177 --- 2.878 3.00 2,618 70.40 0.41 oc --- --- --- --- --- --- 6.58 0.188 --- 7.174 3.20 2,934 70.60 0.44 oc --- --- --- --- --- --- 12.08 0.200 --- 12.72 3.40 3,270 70.80 0.47 oc --- --- --- --- --- --- 18.60 0.212 --- 19.28 Infiltration Basin Project: 260 Nutmeg Road South Basin Description: Rear Yard Infiltration Basin   Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume              (sq. ft)        Avg. End Avg. End Conic Conic                              (cu. ft) (cu. ft) (cu. ft) (cu. ft)  67.400 16.41 N/A N/A 0.00 N/A 0.00 67.600 171.15 0.200 18.76 18.76 16.04 16.04 67.800 333.54 0.200 50.47 69.23 49.57 65.61 68.000 493.89 0.200 82.74 151.97 82.22 147.83 68.200 619.98 0.200 111.39 263.36 111.15 258.98 68.400 696.97 0.200 131.70 395.05 131.62 390.60 68.600 769.11 0.200 146.61 541.66 146.55 537.15 68.800 843.50 0.200 161.26 702.92 161.20 698.35 69.000 920.15 0.200 176.37 879.28 176.31 874.66 69.200 999.07 0.200 191.92 1071.21 191.87 1066.53 69.400 1,080.25 0.200 207.93 1279.14 207.88 1274.41 69.600 1,163.68 0.200 224.39 1503.53 224.34 1498.75 69.800 1,249.38 0.200 241.31 1744.84 241.26 1740.01 70.000 1,337.34 0.200 258.67 2003.51 258.62 1998.63 70.200 1,427.56 0.200 276.49 2280.00 276.44 2275.07 70.400 1,520.04 0.200 294.76 2574.76 294.71 2569.78 70.600 1,614.78 0.200 313.48 2888.24 313.43 2883.22 70.800 1,711.78 0.200 332.66 3220.90 332.61 3215.83 APPENDIX ‘E’ INFILTRATION FEASIBLITY REPORT Infiltration Feasbility Report September 27, 2024 INFILTRATION FEASIBILITY REPORT Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 PROPOSED DOG DAYCARE AND GROOMING MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT September 27, 2024 Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 TABLE OF CONTENTS 1. Location of Infiltration practices ............................... 1 2. Existing Topography ...................................................... 1 3. Test Pit Location ........................................................... 1 4. Season High Water Table Elevation ............................ 2 5. Infiltration Rate Study ................................................ 2 6. Profile Description ....................................................... 2 Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 This project proposes a system that require infiltration to function properly. The system is identified on the plans as Infiltration Basin #1 1. Location of Infiltration practices Filtration is proposed in the following areas: • The infiltration basin, Infiltration Basin #1, is proposed in the southern portion of the property. 2. Existing Topography Existing topography in the proximity of Infiltration Basin #1 is approximately 2-3% slope. 3. Test Pit Location Three test pits were dug on the property, with one being in the vicinity of the Infiltration Basin. One field permeability test was completed in the vicinity of the Infiltration Basin. See grading and drainage plans as well as details. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 4. Season High Water Table Elevation Infiltration Basin #1: Bottom of Filtration Section Elevation = 67.33 High Contour Elevation (Existing) = 69.6 Groundwater Elevation = 64.93 Bedrock = None Found Bottom of Test Pit = 64.02 Separation to Bottom of Test Pit = 2.40’ 5. Infiltration Rate Study Infiltration rates for the Infiltration Basin were calculated by from field testing using a double ring infiltrometer. Testing was done in conformance with the 2024 Stormwater Quality Manual, Chapter 10, subsection Soil Evaluation Guidance. From the deep test pits, it was noticed the soil had a Sandy characteristics. The test came back with a 10.58 in/hr. Using a safety factor of 2 from the slower of the field tests, the infiltration rate utilized in the drainage analysis is as follows: • Infiltration Basin #1 = 5.288 in/hr 6. Profile Description Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: Test Pit #:1 Test Pit #:2 Location: Near Wetland Flag 8 Location:Near Wetland Flag 9-10 Roots @ (in.): 19 Roots @ (in.): 16 Redox @ (in.): n/a Redox @ (in.): n/a Ground Water @ (in.): 30 Ground Water @ (in.): 35 Ledge @ (in.): n/a Ledge @ (in.): n/a Total Depth @ (in.): 60 Total Depth @ (in.): 48 Comments: Comments: From (Inches) To (Inches)Soil Descrption From (Inches) To (Inches)Soil Descrption 05Topsoil / Leaf Litter 04Topsoil / Leaf Litter 510Brown Fine-Coarse Sand 48Brown Fine-Coarse Sand 10 60 Light Brown Fine Sand w/ Cobbles 824Light Brown Fine Sand 24 48 Light Brown Sand & Cobbles SITE INVESTIGATION - DEEP HOLE STRATA TEST REPORT Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Strata Test Strata Test Friday, September 6, 2024 Michael Lambert Sunny, +/-75F 1018 - Test Pit Report.xlsx Page 1 of 2 Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: SITE INVESTIGATION - DEEP HOLE STRATA TEST REPORT Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Friday, September 6, 2024 Michael Lambert Sunny, +/-75F Test Pit #:3 Test Pit #: Location:Near Wetland Flag 18-19 Location: Roots @ (in.):14 Roots @ (in.): Redox @ (in.):n/a Redox @ (in.): Ground Water @ (in.):56 Ground Water @ (in.): Ledge @ (in.):n/a Ledge @ (in.): Total Depth @ (in.):67 Total Depth @ (in.): Comments:Comments: From (Inches) To (Inches)Soil Descrption From (Inches) To (Inches)Soil Descrption 04Topsoil / Leaf Litter 411Brown Fine-Coarse Sand 11 28 Light Brown Fine Sand 28 67 Brown Sand & Cobbles Strata Test Strata Test 1018 - Test Pit Report.xlsx Page 2 of 2 Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: Perm Test #: Method: Location Description: Testing Depth (in.): Soil Type / Horizon Tested: Hydrologic Soil Group: Time Elapsed Time Inner Ring Reading Reading Drop (Hr:Min) (Min.) (mm) (mm) 0:00 0 / min 0:02 2.0 22 22 11 / min 0:04 2.0 32 10 5/ min 0:06 2.0 40 8 4/ min 0:08 2.0 48 8 4/ min 0:10 2.0 57 9 4.5 / min 0:12 2.0 64 7 3.5 / min 0:14 2.0 73 9 4.5 / min 0:16 2.0 80 7 3.5 / min 0:18 2.0 86 6 3/ min 0:20 2.0 93 7 3.5 / min 0:25 5.0 109 16 3.2 / min 0:26 1.0 0 / min 0:30 4.0 21 21 5.25 / min 0:45 15.0 85 64 4.27 / min 1:00 15.0 137 52 3.47 / min Average = 4.48 mm/min 0.45 cm/min 26.86 cm/hr 10.58 in/hr Brown-Fine Coarse Sand A Infiltration Capacity (mm / min) FIELD INFILTRATION TESTING 1 Double Ring Infiltrometer NW of Test Pit #3 Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Infiltration Test Friday, September 6, 2024 Michael Lambert Sunny, +/-75F 6" 1018 - Permiability Test.xlsx Page 1 of 1 APPENDIX ‘F’ WATER QUALITY CALCULATIONS Project: Proposed Dog Daycare & GroomingProject #: 1018260 Nutmeg Road South, South Windsor, CTDate: 9/21/2024By: MSLRev: --Subcatchment IDTotal Area (acres)Roadway/ Pavement (ac)Roof (ac)Impervious % (Pavement)Impervious % (Total)Roadway/ Pavement (ac)Roof (ac)Impervious % (Pavement)Impervious % (Total)Impervious % (Total)P2 0.826 0.000 0.000 0.0% 0.0% 0.160 0.107 19.4% 32.3% 32.3%Chapter 4, Standard 1 of Connecticut Stormwater Quality Manual, March 30, 2024WQv = Water Quality Volume (acre-feet)R = Volumemetric Runoff Coefficient = 0.05+0.009 (I)I = Percent Impervious CoverA = Site Area in Square FeetSubcatchment IDTotal Area (acres)Pavement Impervious Area (ac)Impervious % (Pavement)Runoff Coefficient "R"WQv (ft3)WQv (ft3)WQv (ft3)WQv (ft3)P2 0.826 0.160 19.4% 0.2243 874211 787 998Water Quality Flow Calculations:Appendix D of 2024 Connecticut Stormwater Quality ManualWQf = (qu)(A)(Q)WQf = Peak Discharge for water quality event (cfs)qu = unit peak discharge (cfs/mi2/in)A = drainage area (square miles)Q = runoff volume (WQv/A) (watershed inches)Q = { WQV (cubic feet) / Drainage Area (acres) } * 12 inches/foot * 1 acre / 43,560 square feetCN = 1000 /[10 + 5*P +10*Q - 10*(Q2 +1.25*Q*P)1/2]P = Design precipitation, inches (1.3 inches for 100% of the WQV and 0.65 inches for 50% of the WQV)Ia = 200/CN -2WQf = (qu)(A)(Q)Subcatchment IDP (inches) Q (inches)WQv (ft3)Total Area (acres)CN Ia Ia/P Tc (min) Tc (hr) quA (mi2)WQf (cfs)P2 1.3 0.292 874 0.826 83.7 0.388 0.299 16 0.27 375 0.001291 0.141Minimium % of WQv10%Maximum % of WQv25%Bottom Surface AreaChapter 13 - Sediment Forebay of Connecticut Stormwater Quality ManualA = -Q / W ln(1-E) = 0.066 * %WQVA = minimum required surface area of sediment forebay (square feet)Q = discharge from drainage area (cubic feet per second) = %WQV / 86,400 seconds%WQV = percent of the water quality volume required for sediment forebay design (cubic feet)W = 0.0004 feet per second particle settling velocity for siltE = sediment removal efficiency (assume 0.9 or 90%)Subcatchment IDMin %WQVmin (ft3)A (min WQv) (ft2)Max %WQVmax (ft3)A (max WQv) (ft2)Provide Volume (ft3)Provided Area (ft2)P210% 87.43 5.77 25% 218.57 14.43211 14RequiredProvided - Sediment ForebayProvided - Infiltration BasinProvided - TotalSediment Forebay SizingDrainage Area & Water Quality CalculationsHSG 'A' SoilsWater Quality Calculations:WQv = (1.3") (R) (A) / 12HSG 'B' Soils1018 - WQVv.xlsx Project: Proposed Dog Daycare & Grooming Project #: 1018 260 Nutmeg Road South, South Windsor, CT Date: 9/21/2024 By: MSL Rev: Chapter 10 - Static Method of 2024 Connecticut Stormwater Quality Manual T d = drain time (hours) V = design infiltration volume (cubic feet) K = design infiltration rate (inches per hour) A = average surface area of infiltration system (sq.ft) Subcatchment ID System Volume (ft3) Infiltration Soil Classification Infiltration Rate (in/hr) System Surface Area (sqft) Td (hours) Less than 48 hrs? P2 787 A - Sand 5.29 715 2.50 Yes Field Infiltration Testing Test #1 10.58 in/hr Slowest Rate 10.58 in/hr 50% of Field Testing 5.29 in/hr Stormwater Infiltration System Sizing Calculations Static Method Calculations: T d = (V / K * A )* 12 in/ft 1018 - WQVv.xlsx Sediment Forebay Volume Project: 260 Nutmeg Road South Basin Description: Parking Lot Forebay  Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume              (sq. ft)        Avg. End Avg. End Conic Conic                              (cu. ft) (cu. ft) (cu. ft) (cu. ft)  67.400 14.05 N/A N/A 0.00 N/A 0.00 67.600 26.00 0.200 4.00 4.00 3.94 3.94 67.800 40.20 0.200 6.62 10.62 6.57 10.51 68.000 56.66 0.200 9.69 20.31 9.64 20.15 68.200 75.39 0.200 13.20 33.52 13.16 33.31 68.400 96.37 0.200 17.18 50.69 17.13 50.44 68.600 119.62 0.200 21.60 72.29 21.56 72.00 68.800 145.12 0.200 26.47 98.76 26.43 98.43 69.000 172.89 0.200 31.80 130.57 31.76 130.20 69.200 202.92 0.200 37.58 168.15 37.54 167.74 69.400 235.21 0.200 43.81 211.96 43.77 211.51 69.600 269.76 0.200 50.50 262.46 50.46 261.97 69.800 306.57 0.200 57.63 320.09 57.59 319.56 70.000 345.64 0.200 65.22 385.31 65.18 384.74 70.200 386.98 0.200 73.26 458.57 73.22 457.97 APPENDIX ‘G’ COLLECTION SYSTEM Rational Equation: Q = CCfIA (ConnDOT Equation 6.1)Project:260 Nutmeg Road SouthC=Runoff CoefficientSouth Windsor, CTCf=Frequency Factor (ConnDOT Table 6-2)I=Intensity (taken from ConnDOT Table B-2.1)Calculations By:MSLA=Area (acres)Date:Q= Runoff Flow (CFS)Rev:25 Yr 50 Yr 100YrCf1.10 1.20 1.25Basin CharacteristicsRunoff Coefficients & Frequency FactorsIntensity (in/hr) Flow (CFS)C2C5C10C25C50C100RoofRoof 0.115 0.95 0.95 0.95 1.00 1.00 1.00 4.60 5.50 6.00 6.70 7.30 7.80 0.47 0.56 0.61 0.72 0.78 0.84Q10 I5Q100 I100RATIONAL METHOD DEVELOPED RUNOFF COMPUTATIONS10/20/2024DesignPoint Basin(s)Q25(Not to exceed 1.0)Q5T(min)Q50Area, A(acres) I50--Q2I2 I10 I25D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Character of SurfaceRunoff Coefficient SourceCharacter of SurfaceRunoff Coefficient SourceProject: 260 Nutmeg Road SouthAsphalt, Concrete, Roofs & Water Surface0.95CONN DOT Table 6-5Forest (Hydrologic Type A Soil)0.14McCuen, 1989 Table 7-2South Windsor, CTIndustrial Impervious Area0.75CONN DOT Table 6-4Forest (Hydrologic Type B Soil)0.18McCuen, 1989 Table 7-3Residential Single Family Area0.50CONN DOT Table 6-4Lawns Sandy Soil (Steep 7%+)0.18McCuen, 1989 Table 7-3Calcs By: MSLParks & Cemeteries 0.25CONN DOT Table 6-4Lawns Sandy Soil (2% to 7%)0.16McCuen, 1989 Table 7-3Date: 10/20/24Unimproved Areas0.30CONN DOT Table 6-4McCuen, 1989 Table 7-3Revised : --CONN DOT Table 6-4Basin AreaAsphalt, Concrete, Roofs & Water SurfaceIndustrial Impervious AreaResidential Single Family AreaParks & CemeteriesUnimproved Areas 0Forest (Hydrologic Type A Soil)Forest (Hydrologic Type B Soil)Lawns Sandy Soil (Steep 7%+)Lawns Sandy Soil (2% to 7%)Basin ID(acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres)Roof 0.11 0.110.00 0.95Note: Composite RunoffCoefficientRATIONAL METHOD COMPOSITE RUNOFF COEFFICIENTSD:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Overland Flow: (Maximum 150 FT)Project:260 Nutmeg Road SouthTt=Travel Time (Hr) P2= 2 Year, 24-hour Ranfall (in)South Windsor, CTn=Manning's Roughness (TR-55 Table 3-1) s=slope (ft/ft)L=Flow Length (ft)Calculations By:MSLDate:Shallow Concentrated Flow:Unpaved: V=16.1345(s)0.5Tt=Travel Time (min)Paved: V=20.3284(s)0.5V=Velocity (ft/s)Common Manning n Values for overland flowTt = L / 60Vs=slope (ft/ft)Woods 0.400 Light UnderbrushPavement 0.011Open Channel\Swale Flow:Lawns 0.410 Bermuda GrassTt=Travel Time (min)V=Velocity (ft/s)a=cross-section area (ft2)Dense Grass 0.240 Lovegrass, Bluegrass, Buffalo,Grama & Nativen=Manning's Roughness s=slope (ft/ft)pw=wetted perimeter (ft)L=Flow Length (ft) r= hydraulic radius (a/pw)Tt = L / 60VMinimum allowable Tc = 5.00 min.TotalnL(ft)S(%)To(min)Paved (Y or N) L(ft)S(%) V(ft/s)T1(min) n Area (s.f.)Wet. Perim. (ft)S(%) V(full flow)(ft/s) L(ft)Ts(min)Dia. (in) L(ft)S(%) V(full flow)(ft/s)Tp(min)T(min)Roof Roof Imprevious Area - Assume 5 min. Subtotal 0.00 Subtotal Subtotal Subtotal 5.00TIME OF CONCENTRATION COMPUTATIONS Design Point10/20/2024Basin(s)Overland Sheet Flow Shallow Flow Swale Flow Pipe Flow(Conn DOT Equations 6.C.4 & C.C.5)(TR-55 Equation 3-3)}(TR-55 Equation 3-4)D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Storm Sewer Profile ;gj ::::, 0 oE Elev. (ft) •~o 0 .-0 ~r---c,; g u::i co c!:, 'C u::i _2!E> w Cl E 82 .00 79 .00 76 .00 73.00 -------/ -------- 70.00 71 RR 1Lf-8"@ 4 .5170 67.00 0 10 ----HGL---EGL -..------ 20 Reach (ft) .5 -s ' co .-~a a:> '<to ~ r---. 0 .--'r---N w . + -oui 0 ~ E > Cl) C>E I Proj . file : 1018 -Roofleader.stm 82 .00 79 .00 76 .00 73 .00 70.00 67 .00 30 Storm Sewers Reference: ConnDOT Drainage Manual Section 11.13Type A (Tailwater < 1/2 pipe rise)Type B (Tailwater > 1/2 pipe rise)Type CScour Type 1Scour Type 2L={[1.80(Q-5)]/Sp1.5 }+10 L={[3.0(Q-5)]/Sp1.5 }+10 L={[3.0(Q-5)]/Sp1.5 }+10 D50= (0.0125Rp2/TW) x (Q/Rp2.5)1.33D50= (0.0082Rp2/TW) x (Q/Rp2.5)1.33W1=3SpW1=3SpW=3Sp C=3Sp+6F C=3Sp+6FW2=3Sp + 0.7L W2=3Sp + 0.4L or 1-ft above tailwater or 2/3 pipe riseB=2SP+6F B=2SP+6FF=0.5 RpF=RpType A & B Riprap Aprons (Table 11.11) Scour Hole Riprap Specs (pg. 11.13-5)Outlet Velocity Riprap Spec Modifiedd50< 0.42 ft0-8 fps Modified Intermediate0.42 ft < d50 < 0.67 ft8-10 fps Intermediate Standard0.67 ft < d50 < 1.25 ft10-14 fps Standard Special Design1.25 ft < d50Outlet Protection:Pipe SpanAprons Type 1 Scour Hole Type 2 Scour HoleRp Sp Q V Tw Tw/Rp Apron(Table 11-12.1)W1 W2 C B F C B F(ft) (ft) (cfs) (fps) (ft) Type L (ft) (ft) (ft) Riprap (ft) (ft) (ft)d50Riprap (ft) (ft) (ft)d50RiprapRoof 0.67 0.67 0.84 2.41 0.83 1.25A 10 2.00 6.00 Mod 4 3 0.33 0.00 Int 6 5 0.67 0.00 IntFES #1 0.33 0.33 0.238 2.88 0.3 0.90A 10 1.00 5.00 Mod 2 2 0.17 0.00 Int 3 3 0.33 0.00 IntNote: Selected riprap design is highligted. Riprap Protection for Pipe OutletsStorm LineOutlet VelocityTailwater DepthPipe FlowPipe Rise APPENDIX ‘H’ OPERATION AND MAINTENANCE MANUAL O&M Manual STORMWATER MANAGEMENT OPERATION AND MAINTENANCE (O&M) MANUAL FOR: PROPOSED DOG DAYCARE AND GROOMING LOCATED AT: MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT Prepared for: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, CT 06074 Prepared by: Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 O&M Manual Stormwater Management Operation and Maintenance (O&M) Manual TABLE OF CONTENTS I. Compliance with Stormwater Facility Maintenance Requirements .......................................................................................... 1 II. Inspection & Maintenance – Annual Reporting ........................... 1 III. Preventative Measures to Reduce Maintenance Costs ............. 1 IV. Access ............................................................................................ 2 V. Safety ............................................................................................. 2 VI. Field Inspection Equipment ........................................................... 2 VII. Inspecting Stormwater Management Facilities ........................... 3 A. Inspection Procedures .................................................................................................. 3 B. Inspection Report .......................................................................................................... 3 VIII. Maintenance Requirements ........................................................... 3 Catch Basins ........................................................................................................................... 3 IX. Control of Invasive Species ......................................................... 4 Appendices Appendix A – Annual Inspection and Maintenance Submittal Form Appendix B – Inspection Checklist Appendix C – Long-Term Maintenance Log Appendix D – Invasive Species List O&M Manual ~ 1 ~ Stormwater Management Operation and Maintenance (O&M) Manual I. Compliance with Stormwater Facility Maintenance Requirements The owner of the subject property is responsible for ensuring that stormwater facilities installed on the property are properly maintained and that they function as designed. In some cases, this maintenance responsibility may be assigned to others through special agreements. Any transfer of responsibility for inspection and maintenance activities or transfer of ownership shall be documented in writing. The contract documents will require the contractor to designate a person responsible for maintenance of the sedimentation control features during construction. Long- term operation and maintenance for the stormwater management facilities are presented below. II. Inspection & Maintenance – Annual Reporting Requirements for the inspection and maintenance of stormwater facilities, as well as reporting requirements, are included in this Stormwater Management Operation and Maintenance (O&M) Manual. Verification that the Stormwater facilities have been properly inspected and maintained; copies of the annual report should be documented on site for future reporting upon request. Copies of the Inspection and Maintenance forms for each of the stormwater facilities are located in Appendix B and C. A standard annual reporting form is provided in Appendix A. III. Preventative Measures to Reduce Maintenance Costs The most effective way to maintain your water quality facility is to prevent the pollutants from entering the facility in the first place. Common pollutants include sediment, trash & debris, chemicals, dog wastes, runoff from stored materials, illicit discharges into the storm drainage system and many others. A thoughtful maintenance program will include measures to address these potential contaminants and will save money and time in the long run. Key points to consider in your maintenance program include: • Educate property owners/residents to be aware of how their actions affect water quality, and how they can help reduce maintenance costs • Keep properties, streets and gutters, and parking lots free of trash, debris, and lawn clippings • Ensure the proper disposal of hazardous wastes and chemicals • Plan lawn care to minimize the use of chemicals and pesticides • Sweep paved surfaces and put the sweepings back on the lawn • Be aware of automobiles leaking fluids. Use absorbents such as cat litter to soak up drippings – dispose of properly O&M Manual ~ 2 ~ • Re-vegetate disturbed and bare areas to maintain vegetative stabilization. • Clean out the upstream components of the storm drainage system, including inlets, storm sewers, and outfalls • Do not store materials outdoors (including landscaping materials) unless properly protected from runoff IV. Access All stormwater management facilities located on the site have a designated access location. Refer to the Site Plan – Grading & Drainage Plan for access locations. V. Safety Keep safety considerations at the forefront of inspection procedures at all times. Likely hazards should be anticipated and avoided. Never enter confined space (outlet structure, manhole, etc) without proper training or equipment. A confined space should never be entered without at least one additional person present. If a toxic or flammable substance is discovered, leave the immediate area and contact the local authority at 911. Potentially dangerous (e.g., fuel, chemicals, hazardous materials) substances found in the areas must be referred to the local authority immediately for response. The emergency contact number is 911. Vertical drops may be encountered in areas located within and around the facility. Avoid walking on top of retaining walls or other structures that have a significant vertical drop. If a vertical drop is identified within the pond that is greater than 48” in height, make the appropriate note/comment on the maintenance inspection form. If any hazard is found within the facility area that poses an immediate threat to public safety, contact the local authority immediately. VI. Field Inspection Equipment It is imperative that the appropriate equipment is taken to the field with the inspector(s). This is to ensure the safety of the inspector and allow the inspections to be performed as efficiently as possible. Below is a list of the equipment that may be necessary to perform the inspections of all Stormwater Management Facilities: • Protective clothing and boots • Safety equipment (vest, hard hat, confined space entry equipment • Communication equipment O&M Manual ~ 3 ~ • Operation and Maintenance Manual for the site including stormwater management facility location maps • Clipboard • Stormwater Facility Maintenance Inspection Forms (See Appendix B) • Manhole Lid Remover • Shovel Some of the items identified above need not be carried by the inspector (manhole lid remover, shovel, and confined space entry equipment). However, this equipment should be available in the vehicle driven to the site. VII. Inspecting Stormwater Management Facilities The quality of stormwater relies heavily on the proper operation and maintenance of permanent best management practices. Stormwater management facilities must be periodically inspected to ensure that they function as designed. The inspection will determine the appropriate maintenance that is required for the facility. A. Inspection Procedures All stormwater management facilities are required to be inspected by a qualified individual. Inspections should follow the inspection guidance found in Appendix B of this manual. B. Inspection Report The person(s) conducting the inspection activities shall complete the appropriate inspection report for the specific facility. Inspection reports are located in Appendix B. VIII. Maintenance Requirements Stormwater management facilities must be properly maintained to ensure that they operate correctly and provide the water quality treatment for which they were designed. Routine maintenance performed on a frequently scheduled basis can help avoid more costly rehabilitative maintenance that results when facilities are not adequately maintained. The Long-Term Inspection and Maintenance Log provides a record of maintenance activities. Maintenance Logs for each facility type are provided in Appendix C. Catch Basins • Catch basins may require frequent maintenance. Depending on the location, this may require several cleanings of the sumps each year. At a minimum, it is recommended that catch basins be inspected at least twice annually, once following snowmelt and once following leafdrop. And cleaned as indicated by inspection. • Sediment should be removed when it approaches half the sump depth. O&M Manual ~ 4 ~ • If floating hydrocarbons are observed during an inspection, the material should be removed immediately by skimming, absorbent materials, or other method, and disposed in conformance with applicable state and federal regulations. • Cleaning may require vacuum-truck instead of “clam shell” to avoid damage to hood. • Damaged hoods should be replaced when noted by inspection. IX. Control of Invasive Species During maintenance activities, check for the presence of invasive plants and remove in a safe manner as described on the following pages. They should be controlled as described in Appendix D. Invasive plants are introduced, alien, or non-native plants, which have been moved by people from their native habitat to a new area. Some exotic plants are imported for human use such as landscaping, erosion control, or food crops. They also can arrive as "hitchhikers" among shipments of other plants, seeds, packing materials, or fresh produce. Some exotic plants become invasive and cause harm by: • becoming weedy and overgrown; • killing established shade trees; • obstructing pipes and drainage systems; • forming dense beds in water; • lowering water levels in lakes, streams, and wetlands; • destroying natural communities; • promoting erosion on stream banks and hillsides; and • resisting control except by hazardous chemicals. APPENDIX ‘I’ STORMWATER WATERSHED AREA MAPS T2242 LF0.2%NUTMEG ROAD SOUTHE11.79AT1270 LF1.56%To100 LF4.0%DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Figures\1018 - Drainage - Watershed Areas.dwg LAYOUT: Drainage11x17 PLOT DATE: Oct 03, 2024 - 10:57pmOPERATOR: swsoc 34 MISTY LANE MONROE, CT 06468 T (860) 670-6308 LambertCivil@Gmail.com Project #: Date: Scale:WSNEDESIGN CIVIL LAMBERT LLC 1 OF 2Sept. 20, 2024 1018 1" = 50' PRE -DEVELOPMENT WATERSHED AREA MAP 260 Nutmeg Road South South Windsor, CT T2242 LF0.2%NUTMEG ROAD SOUTHG.T.D.FFE=75.10FFE=75.10FFE=75.10FFE=75.10FFE=75.10FFE=75.10G.T.D. G.T.D. G.T.D.G.T.D.G.T .D . G.T. D . G.T.D . G.T.D . G.T.D .P20.94AT1285 LF1.05%To100 LF5.4%P10.84To100 LF4.75%T166 LF1.52%DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Figures\1018 - Drainage - Prop-Watershed Areas.dwg LAYOUT: Drainage11x17 PLOT DATE: Oct 22, 2024 -10:40pm OPERATOR: swsoc 34 MISTY LANE MONROE, CT 06468 T (860) 670-6308 LambertCivil@Gmail.com Project #: Date: Scale:WSNEDESIGN CIVIL LAMBERT LLC 2 OF 2Oct. 22, 2024 1018 1" = 50' POST -DEVELOPMENT WATERSHED AREA MAP 260 Nutmeg Road South South Windsor, CT NOV 05 Z024 SOUTH WINDSOR PLANNING DEP'E ////////// T ELEVATION /////’/ Bov O+l—9H+I m N2 i,16 8 T2 F‘LJ-HVI’\LI UTURE KWNQRBN DOG KENN l’l’V-HVILLJ UVLNHVKJ Dbl—IEUULL QD<NY WIDTH HaGHT smL HBGHT LOCATED 6v_On 7—0”oK—o”FACTORY 31—0”4’_Ol)3—0”FACTORY //////////// AT LINE 5 .5 .mowaz_>> Hm<m zo52§m3 N dzzmx ooo Um§(z humaml Fm<m B .momoz; musEmao m2<z «~ow\3\2 2m $; EE mu mZO_‘_.<>mn_m n_<m3._.03ml_.m >m<Z:>=n_mm zocoaEmzoo ._<zE m2 mm: Sz on moo ”mmmEDZ EVODO tm”mwmEDZ 5w duser‘ies Specifications Luminaire Width:13 3/4 Weight: 10" Height: (2:1 rm 68/8” :wzcm: Depth: DSXW‘l LED D-Series Size 1LEDWaHLuminaire 4M BAA BABA BaCk Box (BBW,EZOWC) Cataiug Number Notes Type Introduction The D-Series WaH iuminaire is a stylish,fully integrated LED solution for building-mount applications.it features a sleek,modern design and is carefully engineered to provide hung-lasting, energy-efficient lighting with a variety of optical and control options for customized performance. With an expected service life of over 20 years of nighttime use and up to 74%in energy savings over comparable 250W metal halide luminaires, the D-Series Wall is a reliable,low-maintenance lighting solution that produces sites that are exceptionally illuminated. EXAMPLE:DSXW1 LED 20C 1000 40K T3M MVOLT DDBTXD Accessories Ordered anaehippedseparaieiy irgm engmei nsxwniw u D$XWIVG U DSXWilS U Mauserside shield lime per armament rpm; Vandal guard musmy LlfHD/V/A L/EHH/VE CQMMERCIAL OUTDOOR NOTES 2t 3 4 o 20C 1000 is not available with PIR PIRH PIR1FC3V or PIRHIFC3V. MvOLT driver apemes an any liné voiza'ge tram 120 277v (50/50 Hz). singie ruse (sri requires izo,277 or 347 voltage ope-om Doubie ruse (or)requrres 203 240 or 430 veirage aprion Only availabie wit'h 20c,700mA or roOUmAXNox averiaoie with Pm orFIRH. aack box ships iosreiied on nxrure.Cannot oe neid insreiiea.Cannot oe ordered as an accessory. Photocontrol (PE)requires 120,2054 Z40,277 or 347 voltage option.Not available with motion/ambient light sensors (PIR or PIRH). Rererence Motion Sensor tabie on page 3. One Llthonia Way 'Conyers,Georgia 30012 'Phone ia800a705aSERVU378)-tau-.wli‘hjii a t :ii’r o zorarzngzr Acuny mono;ttgnnng,inc Aii ngnta reserved conduit Same as entry oio ELcw. applications. Cold weather Not avariaoiet-2OC)rated witn’saw Not compatrbie mounting option with Not avaiiaoie wztn rusing.Not ayatiabie With 347 or 4ao voltage options. Emergency components located in back oox housing.Emergency mode tES fries Iocated on product page at Not available wrth SPD to Not available With ezowc 12 Not available with EZOWC. l‘l Also zvallable as a separate accessory;see Accessories iniormatiun. DSXWTVLED Rev 3/26/24 Voltage (antral Uptiansve(urrent (olortemyerature 21bs1vwkg)Width:13-3/”53W (Mam)Weight:5Ibsrakg) Depth:4"EZOWC (102cm Weight:10Ibs(45kg; Height:6'3/811[152ml D H e For 3/4“NPT sideremry comm (saw anly) DSXWILED 10C TOLEDS 350m 30K 3000K T25 iypelIShart MVOLT’Shippedinduded Shippedinstalled l0”?530engine)70020ClULtDX (two 1000 engined 530m 40K 700mA 50K 1000mm)AMspt 4000K 5000K Amber Vl‘OSphO’(unvaried rzM IypeIIMemum T35 TypelllShan HM iypeIHMedium r4M rypeIVMemum TFTM lurwardihrow 120* 208‘ 24o! 277i 347“ (blank)gmatemoummg Wfkgl BBW Surfawmuumed bMk bux (iur mndmw‘l’Yl’ PE Pnoineieamceu,hurmmypeh DMG (Hm dimming wirE:pulled outside fixture (formewilhanexiernaltanlrol,ordered separmly) PIR 180°motion/ambient llqhiienSor <15’mtg hi V PIRH mowonon/ammem righisensur:15730'mrghr 7 Medium 430 w PIRIFC3V Motion/ambremsenmr,8715'mnummq heightamhiemsemorenabledaliitU PIRH1FGV Mouan/ambrenlsensur TS 30 mounimg herqhlambienisenmrenahledalik EZOWC tmergenty battery batkup lintluder externaltamponenrendosure),(AHIIeIUmmplianr“ OtherOptiuns Shippedinstalled Shippedseparaiely" Finish (reamed! DDBXD Darkbrorrze DSSXD Eandslone DWHGXD Texluredwhile SF SingleluieiiZMUorWVW”BSW Birdrdelerrenlspikes DBLXD Blatk DDB'IXD iexlureddarkbronze DSSTXD iexturedsarrdSione OF Duuhleiuse(208,2400r480Vl’r'"VG Vandalguard DNAXD Naluralalummum DBLBXD iexluredblack HS Houxersideshreld"DDL Driiuseddroplens DWHXD White DNATXD iextured natural aluminum SPD Separatesuige piotettinn 1 L/rHaN/A One L11hon1a Way -Conyers,Gecrg1a 30012 I Phone:17800770575ERV (7378)U vwwhthoma com DSXW1 LED L/EH77NE ©20132024 Acum/Brands L1gh11ng,111C All v1gh1s veserved Rev 3/26/24 COMMEROAL OUTDOOR Performance Dat Lumen Output Lumen values ave lmm phmomem: Dtive (unenl gym“. (mA) tes's performed in accordance whh IESNA LM-W-oa.Comm lactory Iar per€ormance dam an any :onligumians nm shown here. DisL nun lumens a lPw Lumens LPW lumen;LPw us 1,415 u o 1 1 1u9 15m ‘o o 1 ‘n7 Lsxu o ‘o 1 11s 594 o c ‘1 69 106 11011051 35W 13w 12M 1,349 o o 1 m4 1:443 o u 1 111 1 453 o n 1 111 851 o o 1 66 7135 1399 a o 1 103 1503 o o 1 11s 1:511 o u 1 116,884 o o 1 6813M?1:135 o n 1 1117 1:488 o o 1 114 1 497 11 o 1 11s 876 0 o 1 6714M1,357 a 11 1 104 1 153 11 o 1 112 1,467 11 13 1 11}ass 1)o 1 66111M1,411 o 11 1 109 1:515 a 11 1 117 1515 11 o 1 117 s92 o o 1 69 530M 19w 125 2,053 1 11 1 ma z ms 1 11 1 116 211111 1 o 1 117 1 264 o o 1 6712M1,957 1 o 1 m3 2,102 1 0 1 111 2'11;1 0 1 111 1'205 o o 1 631352,011 1 11 1 107”2,131 1 0 1 115 2,194 1 0 1 115 1:250 o u 1 6613M2,010 1 0 1 106 2,15?1 11 1 114 2 171 1 11 1 114 1 237 a 0 1 6514M1,970 1 0 1 104 2,115 1 0 1 111 2,129 1 o 1 112 1,212 0 0 1 64111M2047oa1100219x10111622121o11161260oo166 mm 15W 125 2,623 1 o 1 101 2,016 1 0 1 108 2,014 1 0 1 109 1:544 o o 1 5912M2,499 1 0 1 96 2,684 1 0 1 101 2,701 1 11 1 104 1 472*0 0 1 571152,591 1 0 1 10o 2,705 1 0 1 1117 200,27,1 0 1 100 1,527 a 0 1 5911M2,567 1 o 1 99 2,757 1 0 1 106 2 774 0 1 107 1 512 0 U 1 5814M2,515 1 0 1 97 2,701 1 0 1 104 2,710 0 1 105 1,401 0 0 1 57111M2,614 1 0 1 101 2 000 1 o 1 100 2025 1 0 1 109 1'539 o o 1 59 mom 39w 125 1,605 1 0 1 94 1,957 1 0 1 101 1,902 1 0 1 102 2,235 1 o 1 5712M1,512 1 0 1 90 3,771 1 o 1 97 1,794 1 0 1 97 2,130 1 o 1 5513s3,644 1 0 1 ,93 0,913 1 0 1 101)5,930 1 0 1 101 2,210 1 ‘0 1 5711M3,607 1 0 1 92 V3071 1 0 1 99 3,090 1 0 1 100 2,187 1 0 1 5614M1,514 1 0 2 91 1 796 1 0 2 97 1 019 1 o 2 90 2 143 1 0 1 55161M1,671 1 0 1 94 1,945 1 0 1 101 1,969 1 0 1 102 2,223 1 0 1 57 201 12011011 mm 23w 125 2,020 1 0 1 121 1,020 1 0 1 112 1,047 1 0 1 112 1 777 1 0 1 7712M2,600 1 0 1 117 2,006 1 o 1 125 2904 1 0 1 126 1,691 1 o 1 741152,709 1 0 1 121 2,994 1 0 1 130 1,014 1 0 1 111 1,757 o o 1 7611M2,760 1 0 1 120 2,965 1 0 1 129 2901 1 0 1 110 1 739 1 o 1 7614M2,704 1 0 1 110 2,905 1 0 1 126 2,922 1 0 1 127 1,704 1 o 1 74111M2011101122101910111110101011321,771 0 0 1 77 530m 35W 125 4,079 1 0 1 117 4,100 1 0 1 125 4,407 1 0 1 126 2,504 1 0 1 7212M1,007 1 0 1 111 4174 1 0 1 119 4,201 1 0 1 120 2,107 1 0 1 6811s4,011 1 0 1 i115 4,111 1 0 1 124 4,159 1 o 1 12s 72,477 1 o 1 7111M1,991 1 0 2 114 4200 1 0 2 121 4115 1 0 2 121 2451 1 0 1 7014M19121021124,201 1 0 2 120 4,227 1 0 2 121 2,402 1 0 1 691F1MW4,066 1 0 2 116 4,166 1 0 2 125 4,194 1 0 2 126 2,496 1 0 1 71 700M 46w 125 5,100 1 0 1 111 5,572 1 0 1 121 5607 1 0 1 122 3065 1 o 1 6712M4,945 1 0 2 100 5,109 1 0 2 11s 5,141 1 0 2 116 2,921 1 o 1 6411$5,111 1 0 2 112 5,510 1 0 2 110 5544 1 0 2 121 3,031 1 0 1 6611M5,070 1 o 2 110 5 454 1 0 2 119 5,407 1 0 2 119 3000 1 0 1 6514M4,975 1 0 2 100 5,141 1 0 z 116 5 116 1 0 2 117 2,919 1 0 1 64111M517110211255541021215,509 1 0 2 112 3,055 1 0 1 66 mom 73W 11s 7,104 1 0 2 99 7,716 2 0 2 106 7,704 2 0 2 107 4,429 1 0 1 6112M6,005 1 0 2 94 7 171 2 0 2 101 7419 2 0 2 102 4,221 1 0 1 50 i115 7,125 '1 0 2 90 7,651 1 0 2 105 7,690 1 0 2 105 4,300 1 0 1 6011M7,052 1 0 2 97 7,571 2 0 2 104 7,620 2 0 2 104 4 135 1 o 2 s914M6,909 1 0 2 95 7,410 1 0 2 102 7 466 1 0 2 102 4,248 1 o 2 58111M7,102 1 0 2 90 7,712 1 0 2 106 7,761 1 0 2 106 4,415 1 0 2 60 ESO 14 W ”‘13 0 07 0 06 0.061.0!Sin "10W (H9 0J1 D 09 0.0810E7un’‘17w u‘zs 0.14 0.13 n.11 1000 40W 0.37 0.21 0.19 0.16 -- 150 24W 0.2}0.13 0.12 0.10 -- 70!)47 W 0.44 0.25 0.22 0.19 0.15 0.11 Electrical Load (urremWa""fnc‘x;""‘110v zuav 240v 277v 347v 480v 11)”( 1ST 110T 530,'36w 0.3}1119 1117 UM --20( Projected LED Lumen Maintenance 1000 74W 0.59 0.40 0.15 0.30 0.13 0.17 50°F 13m (ererences me exuapo1a1ed perfmmance projemons ior me Dsxw1 LED 20c 1000 p1a1favm 1n a 15°C amhiem,based on 10,000 hours ol LED (estmg (tes‘Ed pe1 IESNA LMr was and pvajacted pey 1E5NA M21 .1 1).Motlon Sensnr Detaull Semngs triggered Dueratinnwmm5migh1am(wh 111119 am-d PIR r11 PIRH 3V (17%)Output 10V (100%)Output ‘EnahIEd @ 5K 5min 1 1$e(5min “PIMFGVmHRmFUV 1 3V(37%)0u1pu1 1011(100961011111111 Enahled@1F(#jmm iser‘l 5min To ca1cu1a1e LLF use 1112 1umen mamtenance faaor m1 corresponds w me desived number o1 aperar‘mg ho'urs be1uw.For ow 111m memenance values,contact iaaary, o zs,auo 511,000 101mm) mM m avg;w opem m Fancy ‘Fm use when mminn xensm 15 usad as dusk m dawn mnlml Pho To see compiete photometric repons or download .1es mes \‘or this product,visit L11honia Llgh1ing’s D-Series WaH Size 1 homepage. Iso1oo1cand1e plots 1or111e DSXW1 LED 20C 100040K Dusmnces are 1n umts oi msunung 11219111 (15')Dxsmbukmn uverlay cumparlson Io 250W metal hahde l 0,11: I 0.51:: 1.0 11:1 LEGEND DSXWI . 0.5 1c TWFZr 0.5 f: 10‘w smmu 1m; Twn =o 72 nsxw1 =u 95 No 775WP r. EsNA1 LM 7 1 §rzM 135 Dsxw1 LED 20c Aux 10011 r3M Twrz 250M Mae.15‘Mounrmé H11E5NA LM 7v M 1. HS -Hausa-side shields BSW -Bird-deterrem syikes13M(I911)VG -Vandal guard DDL -Diffused dlop lens FEATURES &SPEC!FICATIONS INTENDED USE The emgy sawngs Iang Hem easy re msran desrgm ems a seneswan 51m make 1r me sman chmce ior buudznglmounred doorway and pathway dummy.1m near1y any racmry CONSTR UCHON Ywrypiece die-cast a1um1num housmg has mtegral heat smk (ms to omimize 1hermal managemem mrough canduaive and camecuve :aohng Modu1ar deugn a11uws 1m ease of marmenance.The LED dmar .a mourned ro ma doom;mermauy .so1are 11 1mm ma 119m angmas 1m 10w aparamg ramparamre and 1ong 1.1a Housing 1s comp1e1e1ysea1ed agamsc momma and anwonmama!comammans (IP65). FINISH Euanor pans are prmaned by a 11no1nmsed Super Durable TGIC rhermosar powder coat 1inrsh 1ha1 prowdes supervor resistance to common and weathermg AugWy controHed mumnsrage process ensures a m mmum3 mlls 1h1ckness 1o:a Imrsn that can wnhstand exueme chmare changes wnnom crzanng or oeehng.Ava11ab1e m lexxurad and non—1sxrurad nmsnes. onrlcs Precrsronrmowed pmpnemy acryhc 1enses provxde multrp1e photomemc d1smbuuons 1arlored spam .cally 1o oundmg mounted applrcan‘ons igm engmes are avarlable 1n 3000 K (70 mm CR1),14000K170rrin.CR1)av 5000 K (70 rrnn.CRO conhguranons. ELECrRxCAL Lignr engrne(s)cons1sr of (onignemcacy LEDs mourned 1o a meal-core dram board 1o maxzrn‘rze near drssrparron and promoae Iong Me (135/100 000 hrs a1 25m)c1ass 1 elecrronrc drrvers nave a power 1aoaor >10%,111D 40%,and a m1n1rnurn z 51w surge mung When ordenng me 5P0 opnon.a separue surge prorecrron deuce 1s msraued wrrnm rhe Iornrnarre wnreh meers a m1n1rnurn Category C Low (per ANSI/IEEE C62 41 2) lN§1ALLATION roeuded dnrrersa1 mounrrng bracker anaones secureu to any 4"round or square ounsc box 1or qurck and easy mstaHanon Lummaire has a sloned gaskm wrreway and attaches 1o xne mountmg bracket vra common resrs1an1 screws LISTINGS CSA cer1111ed to 1.1.5,and Canadian standards.Rated far A0°C m1n1mum amb1ent. GOVERNMENT PROCUREMENT BAA —Buy Amer1ca(n)AC1 “roducl qua1111es as a domesuc end product under the Euy Amer1can Aa as 1mp1ememed 1n me FAR and DFARS.Produu also q as manufactured 1n xhe Unwed Srares under DOT Buy Arnerrca regu1az1orrs BABA—Bu1ld America Buy Amenca Prcdun quamies as pfoduced 1n the Unhed Slates under the de11n11ions ofrhe Bu1ld Amer1ca,Buy America AC mease re1erro www acurryorands corn/1 omen r1 for addrrrona1 rnrorrnarion WARRANTY Fweeyear hmrted warramy This 1s me oniy warranty provrded and no other statements rn (hrs spemGcation sheet create any warranty of any krrrd A11 other express and 1mplied warrant‘res are d1scla1rned Comp1ete warranty terms located at:tyww acurtybra vr /suppartrwa r tyrtar v r r r Noce:Actua1 penormanae may drrrer as a resuu orendeuser envrronrnerrt and appnearron A11 ya1ues are desrgn or typrcai yarues measured under laboratory aondrtrons at 25 “c Specrrrcatrons subrect to change wrtnout notrce, LlfHDN/A LlGHf/IVE COMMERCIAL OUTDOOR One L1thon1a Way 'Conyers,Georgia 30012 I Phone 1e800-705-SERV(7370)‘wwi‘.rrhon‘rr r 3m ©201372024 Aeurty Brands Lrgntrng,rna A11 rrgnrs resened DSXW1 VLED Rev 3/20/24 H en 111211 Rown ) etrlc Dlag ms 7'm u s 1 r ‘ Lambert Civil Design, LLC 860-670-6308 34 Misty Lane Monroe, CT 06468 Project Narrative Map 60 Block 33 Lot 7 260 Nutmeg Road South 260 Nutmeg Road South, LLC proposes to construct a dog-daycare and grooming facility to be located at 260 Nutmeg Road South. The project includes work on Tax Map 60, Block 33, Lot 7 located in the Town of South Windsor. The property is 1.38 acres with 0.26 acres of wetlands located at the southeastern side of the property. The wetlands were flagged by Ian Cole, LLC. The proposed project is seeking a Wetland permit from the Inland Wetland Commission; as well as a Site Plan and Special Exception permit from the Planning and Zoning Commission. The proposed facility is to be 5,132 square feet with a large fenced in outdoor play area for the dog-daycare. The building is to be located near the central point of the property with the parking lot to the east and fenced in play area to the west. The proposed parking lot will be constructed for 12 parking spaces, including 1 ADA-accessible space near the front entrance. A dumpster is to be located at the rear of the parking lot and is to be a fenced in encloser to provide a screening from the street. The parking lot is to drain to the south into a stone trench and sediment forebay before being routed to an infiltration basin. The basin will also receive runoff from the play area as well as the roof leaders of the building will be routed into the basin. The building will have utilities services from the public utilities located within Nutmeg Road South. Floor drains are proposed within the building and will be discharged into a 1,000-gallon oil/water separator. Approval and permitting will be coordinated with the South Windsor WPCA and the CT DEEP. The project will be built out in 2 phases. Phase 1 will consist of the front section of the building, parking lot and stormwater features. The outdoor play area will also be fenced in and will be expanded to encompass the rear building section. Phase 2 will be the construction of the rear building section. PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 11-5-24 TO: Michael Maniscalco, Walter Summers, Jeff Doolittle, Molly Keays, Melissa Pierce, Kevin Cooney, Tony Manfre, Autum Burke, Dave Turkington, Andrea Cofrancesco, Vincent Stetson, David Gesualdi, Marc Melanson, Scott Roberts, Michele Lipe FROM: Justin F. Russo, PLA, Assistant Planner The Planning & Engineering Departments have received plans for the following projects: Appl 24-44P, 260 Nutmeg Road South LLC Dog Daycare and Grooming Location: 260 Nutmeg Road South Site Plan Subdivision No. Acres 1.38 Zone I Industrial Commercial Residential No. Lots/Units 1 Water: Public Private Well Sewerage: Public Septic System Construct a 5,183 sf facility for dog daycare and grooming Project Description: Future Town-owned property involved? Yes No new street(s) new detention area new open space/recreation area active passive Planning Department notes: Visit https://www.southwindsor-ct.gov/planning-department/pages/planning-and-zoning- commission-applications to review pending applications Please comment by 11-18-24 and return to the Planning Department. Town of SOUTH WINDSOR Building Department 1540 Sullivan Ave. South Windsor, CT 06074 Tel. (860) 644-2511 Ext 2230 November 6, 2024 PZC Application 24-44P 260 Nutmeg RD LLC 260 Nutmeg Rd Dog Daycare & Grooming The application has been reviewed under the 2022 CT State Building Codes. I have the following issues with the application. 1) Are there going to be any EV Charging stations? 2) There are no width dimensions or elevations for the sidewalks. 3) There are no details on the curb ramp. 4) Need to show that the Accessible entrance meets the requirements for approach. 5) There are 2 doors on the west side that require a landing. If that is a means of egress from the building, there needs to be a sidewalk that leads to a public way. 6) Need to show on the plans where the utilities are going to enter the building. Be advised that this is a review for the Planning and Zoning application only and not for any other permits. If you have any questions, please feel free to contact me. Marc Melanson Building Official 1540 Sullivan Avenue, South Windsor, CT 06074 phone 860-644-2511, ext. 2229 e-mail justin.russo@southwindsor-ct.gov Memo To: Michael S. Lambert, PE From: Justin F. Russo, PLA, Assistant Planner Date: 11/19/24 Re: Appl #24-44P, 260 Nutmeg Road South LLC Dog Daycare & Grooming Planning Review Comments The following are the Planning Department comments. Building Department comments are attached. Engineering comments will be sent separately. Please make the necessary revisions and submit three COMPLETE sets of full-size revised plans and 10 sets of 11”x17” plans by 12/4/24 to be sent out with the agenda (tentatively scheduled for 12/10/24). Narrative Comments a. Special Exception review criteria, found in Section 8.4(B) of our Zoning Regulations, should be addressed in the narrative. There is particular concern related to the proposed traffic impact, as well as the environmental impact to water, soils, wildlife, and people from dog waste. Additionally, the applicant should address how muddy conditions in the outdoor play area will be mitigated to prevent increased sediment deposition in the infiltration basin. b. The narrative should address the days and hours of operation, the number of employees, and the number of dogs anticipated. There appears to be conflict between the use in the narrative and the use on Drawing C1. Is there an overnight boarding component proposed and how many dogs can be accommodated? c. The construction phasing must be more detailed and should be shown on the plans. A critical aspect of phasing is whether the individual phases can function on their own if one phase is never completed. More information regarding how the front and rear sections of the buildings work should be submitted, ideally in the form of architectural floor plans. Site Plan Comments 2. Drawing S1 (survey) a. The survey must bear the stamp and signature of a licensed professional surveyor. 3. Drawing C1 (layout & landscaping plan) a. The actual lot depth should be provided in the Zoning Information Table on Drawing C1. b. The zoning notes on Drawing C1 must be updated to show that the variance granted by ZBA for application #2680-06 was to allow for a 10’ rear yard setback. Thus, the rear yard setback in the Zoning Information Table must be changed to 10’ required and 57.8’ provided. c. The side yard setback in the Zoning Information Table must be changed to 86.8’. d. The grantee of the sewer easement in the Existing Easements Table must be updated to Town of South Windsor. South Windsor Planning Department Appl #24-44P, 260 Nutmeg Road South LLC Dog Daycare & Grooming Special Exception 1540 Sullivan Avenue, South Windsor, CT 06074 phone 860-644-2511, ext. 2229 e-mail justin.russo@southwindsor-ct.gov e. Parking requirements are calculated based on Table 6.4.3B of our Zoning Regulations. To accurately calculate the required parking for this use, the applicant should use the formula for both Industrial and Manufacturing, and Business Offices <50,000 sq ft of GFA. f. The Landscaping Information Table on Drawing C1 shows that 8 street trees are provided, but that is not indicated anywhere on the plan. Please show the locations of the street trees on the plan and clearly indicate the species and size. Due to close proximity to sensitive natural areas, the applicant must propose trees native to the northeastern US. Suggested species include: Quercus alba, Gleditsia triacanthos var. inermis, Acer rubrum. g. The Landscaping Information Table on Drawing C1 shows that 180 square feet of landscaping will be provided in the parking area, but species, size and quantities are not specified. Due to close proximity to sensitive natural areas, the applicant must propose perennials and groundcovers native to the northeastern US, and clearly indicate the sizes and quantity to be planted. Some suggested species include: Arctostaphylos uva-ursi, Phlox subulata, Echinacea purpurea, Rudbeckia fulgida. h. The Plant List on Drawing C1 shows three tree species but only two to be planted. Furthermore, the plan does not specify where each species will be planted. Please provide clarification. i. Will there be any foundation plantings around the building? The applicant should consider a mix of shrubs, perennials, and groundcovers native to the northeastern US that will provide aesthetic quality and environmental benefits to the site. Some suggested shrub species include: Viburnum dentatum ‘Blue Muffin’, Aronia arbutifolia, Ilex glabra ‘Densa’. j. There is an existing Sycamore tree within the Town right-of-way beyond the northwest corner of the property line. Efforts must be made to preserve this tree and protect it from construction damage and soil compaction. 4. Drawing C2 (grading & drainage plan) a. It appears that the proposed 70 and 71 contours are crossing in several areas around the proposed infiltration basin. Please revise the proposed contours to tie into existing grade. b. The proposed 72 and 70 contours at the midpoint of the channel between the sediment forebay and the infiltration basin are too close, showing a very steep slope. Please revise. c. Top of curb and bottom of curb spot elevations should be distinguished so staff can understand curb heights and accurately calculate proposed slopes. 5. Drawing C3 (utility plan) a. The linear foot label of the sanitary pipe runs should be updated to be accurate. Namely the 11 LF, 7 LF, and 21 LF 6” lines. 6. Drawing L1 (photometric plan) a. Provide cut sheets showing the proposed light fixture. Per Section 6.3.3(C) of our Zoning Regulations, lights must be top downward, full cutoff, or fully shielded or recessed. b. Due to close proximity to sensitive natural areas, the applicant must modify the distribution of A5 to eliminate or substantially reduce light spill into the woodland and wetland. c. Please consider changing the color temperature of the light from 4000K to 3000K. A warmer color temperature has less impact on our native flora and fauna and helps to maintain a darker sky. Appl #24-44P, 260 Nutmeg Road South LLC Dog Daycare & Grooming Special Exception 1540 Sullivan Avenue, South Windsor, CT 06074 phone 860-644-2511, ext. 2229 e-mail justin.russo@southwindsor-ct.gov 7. Drawing ES1 (soil erosion & sediment control plan) a. Please clearly indicate the individual tree symbols that will be removed. b. The symbol for erosion control blanket/hydroseeding with tackifier should be shown on all 3:1 slopes or greater. c. The Project Information under the Soil Erosion and Sediment Control Narrative identifies this lot as being 4.15 acres. Please revise to show the actual size of 1.38 acres. d. The estimated construction schedule should be clarified to show the approximate start and finishing times of phase 1 and 2. e. Notes on this drawing frequently reference the incidental removal of invasive plant species. It is important to properly dispose of invasive plants and a separate note on the drawing should reflect this. Any invasive plants removed prior to flowering should be left out to dry and then disposed after death. Any invasive plants removed during and after flowering should be bagged and disposed off site through means of lawful incineration. 8. Drawing ES2 (erosion control notes and details) a. The loam & seed detail must be updated to reference the 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. 9. Drawing D1 (construction details) a. Staking/guying of newly planted trees is generally discouraged and should be limited to areas exposed to high winds (such as coastal regions). The tree planting detail should be revised to eliminate staking/guying. b. It is a better practice to remove at least 2/3 of the burlap on a newly planted tree or shrub, if not to remove it completely. Both tree and shrub planting details should be revised to reflect this. 10. Drawing DB1 a. Please provide the manufacturer of the seed mixes shown in the Seed Mix & Fabric Legend. If you have any questions, please do not hesitate to contact me. Respectfully, Justin F. Russo, PLA, Assistant Planner MEMORANDUM To: Michele Lipe, Director of Planning From: Jeff Doolittle, P.E., Town Engineer Date: November 25, 2024 Re: App 24-44P – Proposed Dog Daycare and Grooming – 260 Nutmeg Road I have reviewed the above Plans and have the following comments: 1. There is an existing Type “C” catch basin in middle of the proposed driveway entrance. The catch basin appears to be located at a low point in the roadway, and it has two inlet pipes and one outlet pipe. The piping along the roadway changes direction at this catch basin. The catch basin cannot be relocated. Also, changing the existing catch basin to a Type “C-L” is not acceptable because it would be exposed to unnecessarily high volumes of traffic traveling over the top, which would result in severe levels of drainage structure deterioration. Shift the driveway so it is not over this catch basin. 2. Revise Site Plan Note No. 8 on Sheet C1 to “Wetlands are present per the Town of South Windsor.” Note that the Town of South Windsor does not have an official wetland map, so remove any reference to such a map. 3. Call out an ADA sidewalk ramp on Sheet C1 and include a detail for the ramp in the Construction Details. 4. Call out curbing for parking lot in plans. Is the curbing along the sidewalk integral with the sidewalk? Include a detail showing curbing along sidewalk. 5. Call out the cross hatched area along front edge of parking lot (facing the roadway) or include the cross hatching in the Legend. 6. Revise all references of CTDOT FORM 818 dated 2020 to CTDOT FORM 819 dated 2024. 7. Call out CTDOT HMA S0.375 for both the wearing course and the binder course in the Standard Duty Asphalt Paving Detail on Sheet D1. 8. Call out 6 inches of CTDOT Processed Aggregate Base for the base course shown in the Standard Duty Asphalt Pavement Detail. 9. Call out 5½ inches of CTDOT Subbase for the subbase course shown in the Standard Duty Asphalt Pavement Detail. 10. Call out CTDOT Class PCC04460 concrete in the Concrete Sidewalk detail on Sheet D1. Remove reference to the compressive strength and percent air entrainment shown in the detail, as these properties are included in CTDOT FORM 819. 11. Call out service wye connection to sanitary sewer main from building’s sanitary service on the Utility Plan (Sheet C3), as shown on the Sanitary Service Detail on Sheet D2. 12. Call out the type of proposed surface for the fenced in yard on Sheet C1, as well as other surfaces within the proposed lot clearing limits. 13. Clearly show the sewer easement. Eight (8) trees located every 40 feet are shown in the Landscaping Information table on Sheet C1. There shall not be any large trees within the sewer easement. 14. Sheet ES1 provides project information that refers to phases of development, where Phase 1 is for the front building and parking lot construction and phase 2 is for the rear building. Clearly call these phases out on Sheet C1. 15. Show all proposed grading on Sheet C1, particularly north of the fenced in area because the sheet flow arrows don’t match up with existing contour lines. 16. Provide larger outlet pipe from proposed infiltration basin, as a 4-inch HDPE will likely clog up. A 10 or 12-inch pipe might be more suitable. Call this out on Sheet C2. 17. Show elevation of emergency overflow spillway within the proposed infiltration basin on Sheet C2. Please let me know if there are any questions. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com December 4, 2024 Hand Delivery Michele Lipe, Director of Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Site Plan Application #24-44P 260 Nutmeg Road South South Windsor, Connecticut 06074 Project Number: 1018 Dear Ms. Lipe: On behalf of 260 Nutmeg Road South, LLC, please find enclosed documents for Planning and Zoning Application #24-44P, for the proposed Dog Daycare and Grooming Facility at 260 Nutmeg Road South. Enclosed are the response letters to the comments provided by the Planning Department, Engineering Department, and Building Official. The Site Plans have been revised to address all the comments from the Town staff. All the documents have been electronically uploaded to the Town’s Online Application Portal. We look forward to working with you in the processing of this application. Respectfully, Lambert Civil Design, LLC Michael Lambert, PE Principle Engineer Enclosures 1 copy of Response Letter to Building Official 1 copy of Response Letter to Planning Department 1 copy of Response Letter to Engineering Department 3 sets of revised Site Plans (24”x36”) 10 copies of revised Site Plas (11”x17”) 4 copies of revised Project Narrative 2 copies of revised Stormwater Management Report Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com December 2, 2024 Marc Melanson, Building Official Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Site Plan Application #24-44P 260 Nutmeg Road South South Windsor, Connecticut 06074 Project Number: 1018 Dear Mr. Melanson: We are in receipt of the review letter from Town of South Windsor Building Department, dated November 6, 2024. The letter contained comments relative to the review of the Site Plans associated with the Application #24-44P, for the Proposed Dog Daycare and Grooming facility at 260 Nutmeg Road South. On behalf of 260 Nutmeg Road South, LLC, we have revised the site plans to accommodate the comments from the Town letter. Below are the written responses to the comments; with the responses in bold font. 1. Are there going to be any EV Charging stations? No EV Charging stations are proposed at this time. Per the South Windsor Zoning regulations, the threshold for requiring the EV Charging Station is 15 parking spaces. The proposed site plan only provides 12 spaces. 2. There are no width dimensions or elevations for the sidewalks. Dimensions have been added to the sidewalk on Sheet C1, Layout & Landscaping Plan 3. There are no details on the curb ramp. A detail of the curb ramp has been added to Sheet D1. 4. Need to show that the Accessible entrance meets the requirements for approach. The ADA accessible path has been added to Sheet C2, Grading & Drainage Plan. 5. There are 2 doors on the west side that require a landing. If that is a means of egress from the building, there needs to be a sidewalk that leads to a public way. The doors are for locations for the staff to exit the building into the outdoor dog play area. A sidewalk has been added from the doors to the sidewalk at the front of the building. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com 6. Need to show on the plans where the utilities are going to enter the building. All the utilities will be entering the building on the northwestern side of the building. Sheet C3, Utility Plan has been included in this submission back to the Planning Department. The plans have been updated and revised copies of the plans are included in this submission back to the Planning Department. An electronic copy of the revised plans has been uploaded to the Town’s application website. We look forward to the Planning & Zoning Commission meeting on December 10th. Respectfully, Lambert Civil Design, LLC Michael Lambert, PE Principle Engineer Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com December 2, 2024 Jeff Doolittle, PE, Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Site Plan Application #24-44P 260 Nutmeg Road South South Windsor, Connecticut 06074 Project Number: 1018 Dear Mr. Dootlittle: We are in receipt of the review memo from Town of South Windsor Planning Department dated November 25, 2024. The letter contained comments relative to the review of the Site Plans associated with the Application #24-44P, for the Proposed Dog Daycare and Grooming facility at 260 Nutmeg Road South. On behalf of 260 Nutmeg Road South, LLC, we have revised the site plans to accommodate the comments from the Town letter. Below are the written responses to the comments; with the responses in bold font. 1. There is an existing Type “C” catch basin in middle of the proposed driveway entrance. The catch basin appears to be located at a low point in the roadway, and it has two inlet pipes and one outlet pipe. The piping along the roadway changes direction at this catch basin. The catch basin cannot be relocated. Also, changing the existing catch basin to a Type “C-L” is not acceptable because it would be exposed to unnecessarily high volumes of traffic traveling over the top, which would result in severe levels of drainage structure deterioration. Shift the driveway so it is not over this catch basin. The site plan has been updated to realign the driveway curb-cut to avoid the catch basin. 2. Revise Site Plan Note No. 8 on Sheet C1 to “Wetlands are present per the Town of South Windsor.” Note that the Town of South Windsor does not have an official wetland map, so remove any reference to such a map. The note was updated to remove any reference of Town of South Windsor Inland Wetlands Map. 3. Call out an ADA sidewalk ramp on Sheet C1 and include a detail for the ramp in the Construction Details. The ADA ramp has been called out on Sheet C1 and a detail has been added to Sheet D1. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com 4. Call out curbing for parking lot in plans. Is the curbing along the sidewalk integral with the sidewalk? Include a detail showing curbing along sidewalk. Curbing has been called out on the plan. The areas along the sidewalk will be intergral concerete and the remaining curb area will be bituminous. 5. Call out the cross hatched area along front edge of parking lot (facing the roadway) or include the cross hatching in the Legend. The cross-hatch is the mulch area around the tree. A call out has been added to the plans. 6. Revise all references of CTDOT FORM 818 dated 2020 to CTDOT FORM 819 dated 2024. All references to the CTDOT Form has been updated accordingly. 7. Call out CTDOT HMA S0.375 for both the wearing course and the binder course in the Standard Duty Asphalt Paving Detail on Sheet D1. The Detail has been updated accordingly. 8. Call out 6 inches of CTDOT Processed Aggregate Base for the base course shown in the Standard Duty Asphalt Pavement Detail. The Detail has been updated accordingly. 9. Call out 5½ inches of CTDOT Subbase for the subbase course shown in the Standard Duty Asphalt Pavement Detail. The Detail has been updated accordingly. 10. Call out CTDOT Class PCC04460 concrete in the Concrete Sidewalk detail on Sheet D1. Remove reference to the compressive strength and percent air entrainment shown in the detail, as these properties are included in CTDOT FORM 819. The Detail has been updated accordingly. 11. Call out service wye connection to sanitary sewer main from building’s sanitary service on the Utility Plan (Sheet C3), as shown on the Sanitary Service Detail on Sheet D2. A call out has been added to Sheet C3. A call out was also added to the connection to the existing sanitary main. The connection will be done via sanitary sewer chimney. A detail from the Town of South Winsor Engineering Public Improvement Specs has been added to Sheet D1 12. Call out the type of proposed surface for the fenced in yard on Sheet C1, as well as other surfaces within the proposed lot clearing limits.) Various surfaces throughout the proposed development are now labeled on Sheet C1. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com The plans have been updated per the Engineering Department, Planning Department, and Building Department comments. The electronic copy of the revised plans has been uploaded to the Town’s application website for this application. We look forward to the Planning & Zoning Commission meeting on December 10th. Respectfully, Lambert Civil Design, LLC Michael Lambert, PE Principle Engineer Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com December 2, 2024 Justin Russo, Assistant Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Site Plan Application #24-44P 260 Nutmeg Road South South Windsor, Connecticut 06074 Project Number: 1018 Dear Mr. Russo: We are in receipt of the review memo from Town of South Windsor Planning Department dated November 19, 2024. The letter contained comments relative to the review of the Site Plans associated with the Application #24-44P, for the Proposed Dog Daycare and Grooming facility at 260 Nutmeg Road South. On behalf of 260 Nutmeg Road South, LLC, we have revised the site plans to accommodate the comments from the Town letter. Below are the written responses to the comments; with the responses in bold font. Narrative Comments a. Special Exception review criteria, found in Section 8.4(B) of our Zoning Regulations, should be addressed in the narrative. There is particular concern related to the proposed traffic impact, as well as the environmental impact to water, soils, wildlife, and people from dog waste. Additionally, the applicant should address how muddy conditions in the outdoor play area will be mitigated to prevent increased sediment deposition in the infiltration basin. The Project Narrative has been revised to address all the items mentioned and better meet the requirements in Section 8.4(B) of the Zoning Regulations. b. The narrative should address the days and hours of operation, the number of employees, and the number of dogs anticipated. There appears to be conflict between the use in the narrative and the use on Drawing C1. Is there an overnight boarding component proposed and how many dogs can be accommodated? The Project Narrative has been revised to address all the items mentioned. There was an error on Sheet C1 and there is no proposed overnight boarding component of the project/business. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com c. The construction phasing must be more detailed and should be shown on the plans. A critical aspect of phasing is whether the individual phases can function on their own if one phase is never completed. More information regarding how the front and rear sections of the buildings work should be submitted, ideally in the form of architectural floor plans. A Phase 1 Site Plan has been added to the Site Plan set. Site Plan Comments 2. Drawing S1 (survey) a. The survey must bear the stamp and signature of a licensed professional surveyor. The survey map now bears the stamp/signature from the surveyor. 3. Drawing C1 (layout & landscaping plan) a. The actual lot depth should be provided in the Zoning Information Table on Drawing C1. The lot depth has been updated. b. The zoning notes on Drawing C1 must be updated to show that the variance granted by ZBA for application #2680-06 was to allow for a 10’ rear yard setback. Thus, the rear yard setback in the Zoning Information Table must be changed to 10’ required and 57.8’ provided. The Zoning Table has been updated accordingly. c. The side yard setback in the Zoning Information Table must be changed to 86.8’. The Zoning Table has been updated accordingly. d. The grantee of the sewer easement in the Existing Easements Table must be updated to Town of South Windsor. The Existing Easement table has been updated accordingly. e. Parking requirements are calculated based on Table 6.4.3B of our Zoning Regulations. To accurately calculate the required parking for this use, the applicant should use the formula for both Industrial and Manufacturing, and Business Offices <50,000 sq ft of GFA. The Parking Information Table has been updated to show parts of the building as Business Office and the remaining as Industrial and Manufacturing. f. The Landscaping Information Table on Drawing C1 shows that 8 street trees are provided, but that is not indicated anywhere on the plan. Please show the locations of the street trees on the plan and clearly indicate the species and size. Due to close proximity to sensitive natural areas, the applicant must propose trees native to the northeastern US. Suggested species include: Quercus alba, Gleditsia triacanthos var. inermis, Acer rubrum. Street trees have been added to the plans. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com g. The Landscaping Information Table on Drawing C1 shows that 180 square feet of landscaping will be provided in the parking area, but species, size and quantities are not specified. Due to close proximity to sensitive natural areas, the applicant must propose perennials and groundcovers native to the northeastern US, and clearly indicate the sizes and quantity to be planted. Some suggested species include: Arctostaphylos uva-ursi, Phlox subulata, Echinacea purpurea, Rudbeckia fulgida. Additional landscape shrubs have been added to the plans along the building foundation, parking lot, and stormwater system. h. The Plant List on Drawing C1 shows three tree species but only two to be planted. Furthermore, the plan does not specify where each species will be planted. Please provide clarification. The landscaping plan has been updated to indicate what each tree and shrub is intended to be. i. Will there be any foundation plantings around the building? The applicant should consider a mix of shrubs, perennials, and groundcovers native to the northeastern US that will provide aesthetic quality and environmental benefits to the site. Some suggested shrub species include: Viburnum dentatum ‘Blue Muffin’, Aronia arbutifolia, Ilex glabra ‘Densa’. Landscaping has been added at the building foundation. j. There is an existing Sycamore tree within the Town right-of-way beyond the northwest corner of the property line. Efforts must be made to preserve this tree and protect it from construction damage and soil compaction. Callouts have been added on multiple sheets to indicate this tree is to remain and be protected during construction. 4. Drawing C2 (grading & drainage plan) a. It appears that the proposed 70 and 71 contours are crossing in several areas around the proposed infiltration basin. Please revise the proposed contours to tie into existing grade. b. The proposed 72 and 70 contours at the midpoint of the channel between the sediment forebay and the infiltration basin are too close, showing a very steep slope. Please revise. c. Top of curb and bottom of curb spot elevations should be distinguished so staff can understand curb heights and accurately calculate proposed slopes. The grading contours have been updated as noted. Curb stop grades have been updated to indicate both Top of Curb (TC) and Bottom of Curb (BC). 5. Drawing C3 (utility plan) a. The linear foot label of the sanitary pipe runs should be updated to be accurate. Namely the 11 LF, 7 LF, and 21 LF 6” lines. Pipe labels have been updated and are accurate to the full length. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com 6. Drawing L1 (photometric plan) a. Provide cut sheets showing the proposed light fixture. Per Section 6.3.3(C) of our Zoning Regulations, lights must be top downward, full cutoff, or fully shielded or recessed. Cut sheet for the light has been added to Sheet L1. The light fixture is to be full-cut off, dark sky compliant. b. Due to close proximity to sensitive natural areas, the applicant must modify the distribution of A5 to eliminate or substantially reduce light spill into the woodland and wetland. A5 has been eliminated as required. c. Please consider changing the color temperature of the light from 4000K to 3000K. A warmer color temperature has less impact on our native flora and fauna and helps to maintain a darker sky. Lights have been adjusted to be 3000k. 7. Drawing ES1 (soil erosion & sediment control plan) a. Please clearly indicate the individual tree symbols that will be removed. Tree removal has been added to Sheet ES1. b. The symbol for erosion control blanket/hydroseeding with tackifier should be shown on all 3:1 slopes or greater. The blanket has been updated to cover all slopes 3:1 and greater. c. The Project Information under the Soil Erosion and Sediment Control Narrative identifies this lot as being 4.15 acres. Please revise to show the actual size of 1.38 acres. The General Information note on the size of the property has been updated. d. The estimated construction schedule should be clarified to show the approximate start and finishing times of phase 1 and 2. The estimated construction schedule has been updated to indicate the start and end dates for each phase. e. Notes on this drawing frequently reference the incidental removal of invasive plant species. It is important to properly dispose of invasive plants and a separate note on the drawing should reflect this. Any invasive plants removed prior to flowering should be left out to dry and then disposed after death. Any invasive plants removed during and after flowering should be bagged and disposed off site through means of lawful incineration. A separate note regarding invasive plant removal has been added to Sheet ES1 . 8. Drawing ES2 (erosion control notes and details) a. The loam & seed detail must be updated to reference the 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. In comments from the Inland Wetlands Department, the SESC seed mixture was removed from the Loam & Seed detail to only indicate 1 type of seed mixture. Lambert Civil Design, LLC 34 Misty Lane P: (860) 670-6308 Monroe, CT 06468 LambertCivil@gmail.com 9. Drawing D1 (construction details) a. Staking/guying of newly planted trees is generally discouraged and should be limited to areas exposed to high winds (such as coastal regions). The tree planting detail should be revised to eliminate staking/guying. b. It is a better practice to remove at least 2/3 of the burlap on a newly planted tree or shrub, if not to remove it completely. Both tree and shrub planting details should be revised to reflect this. The Tree and Shrub details have been updated accordingly. 10. Drawing DB1 a. Please provide the manufacturer of the seed mixes shown in the Seed Mix & Fabric Legend. The Manufacturer of the seed mix has been added to the Legend on Sheet DB1. The plans have been updated per the Planning Department and Building Department comments. The electronic copy of the revised plans has been uploaded to the Town’s application website for this application. We look forward to the Planning & Zoning Commission meeting on December 10th. Respectfully, Lambert Civil Design, LLC Michael Lambert, PE Principle Engineer Lambert Civil Design, LLC 860-670-6308 34 Misty Lane Monroe, CT 06468 Project Narrative Map 60 Block 33 Lot 7 260 Nutmeg Road South 260 Nutmeg Road South, LLC proposes to construct a dog-daycare and grooming facility to be located at 260 Nutmeg Road South. The project includes work on Tax Map 60, Block 33, Lot 7 located in the Town of South Windsor. The property is 1.38 acres with 0.26 acres of wetlands located at the southeastern side of the property. The wetlands were flagged by Ian Cole, LLC. The proposed project is seeking a Wetland permit from the Inland Wetland Commission; as well as a Site Plan and Special Exception permit from the Planning and Zoning Commission. Julie’s Barks and Bubbles will be relocating from their current location on Ellington Road to this development. The hours of operation will match the existing business with Monday to Friday, 7:00am to 5:00pm. The company is run and operated by the owner with no other employees. Throughout the day, there anticipates to be on average 15-20 dogs in the daycare program and 8-10 dogs for the grooming services. The traffic generated from the operation is minimal, anticipated 25-30 trips entering and exiting the site throughout the morning and similar trips through the afternoon. For the daycare program, the dogs are dropped off and picked up at a later date. For the grooming services, it is a mixture of drop off and pick up later on in the day; or the customers have the option to self-wash their dogs at the facility. For the building, there will be an open floorplan and a mixture between grooming and daycare services. Floor drains are proposed to allow maintenance of the floors to be easier. The floor drains will be connected to an oil/water separator to allow any dog hair/fur and other materials to be captured before discharge into the public sewers. The proposed facility is to be 5,132 square feet with a large fenced in outdoor play area for the dog-daycare. The building is to be located near the central point of the property with the parking lot to the east and fenced in play area to the west. The proposed parking lot will be constructed for 12 parking spaces, including 1 ADA-accessible space near the front entrance. A dumpster is to be located at the rear of the parking lot and is to be a fenced in enclosure to provide a screening from the street. For the outdoor dog area will be a fenced in yard will be a black-coated vinyl fence with either privacy slates or fabric wind screen. The surface area is to be pea stone gravel / wood mulch. This material is the same material used at their current location and has minimal issues with muddy conditions. There is no anticipation for an increase of sediment washing from the play area into the swale and infiltration basin. Any dog waste/fecal matter that occurs will be picked up either immediately or as soon as the dogs reenter the facility. The employee does a walkthrough of the area to ensure all waste is picked up and disposed of properly. The parking lot is to drain to the south into a stone trench and sediment forebay before being routed to an infiltration basin. The basin will also receive runoff from the play area as well as the roof leaders of the building will be routed into the basin. Through the development of the proposed project, the wetlands will be protected and undisturbed. The area of development is designed to be collected and directed to an infiltration basin. The basin is designed to collect the runoff and infiltrate into the ground during lower storm events. The bottom of basin is designed to be 2-ft above Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 the seasonal high-water table. The basin is also designed to provide a 100% TSS removal, 98% Phosphorus removal, and 100% Nitrogen removal. The building will have utilities services from the public utilities located within Nutmeg Road South. Floor drains are proposed within the building and will be discharged into a 1,000-gallon oil/water separator. Approval and permitting will be coordinated with the South Windsor WPCA and the CT DEEP. The project will be built out in 2 phases. Phase 1 will consist of the front section of the building, parking lot and stormwater features. The outdoor play area will also be fenced in and will be expanded to encompass the rear building section. Phase 2 will be the construction of the rear building section. A Phase 1 Site Plan has been added to the Site Plan set for visual aid on what will be completed during Phase 1. Overall, the location is best suited for this project. The site development plans meet all the zoning requirements. The proposed facility is over 900 feet from the closest residential structure and should have no disturbance to the industrial/commercial uses along Nutmeg Road South. The building, parking area and fenced-in dog yard are centrally located on the property to the best of our ability and have limited disturbance to the abutting properties. The building will have a similar industrial look to the exterior of the building to match the surrounding properties. The fencing will also have a privacy aspect incorporated into it so as to not cause any disturbance between the dogs and vehicles/pedestrians. There are anticipated to be minimal environmental impacts as the proposed development does not encroach into the wetlands and has the proposed development drain into a stormwater detention system for treatment and infiltration per the 2024 CT Stormwater Quality Manual. The dog waste will be picked up in a timely fashion to minimize any potential for waste entering the infiltration basin and wetlands. The company also requires a license from the Connecticut Department of Agriculture and must meet their safety and health requirements. From this use, the added traffic on Nutmeg Road South will be minimal to negligible. The use of the project also entails no additional tractor-trailers driving on the roadway and idling on the property so noise levels from the vehicles will be minimal. SITE 1 2 3 5 6 7 8 9 10 11 12 15 13 14 4 16 SITE 1 2 3 5 6 7 8 9 10 11 12 15 13 14 4 16 Sheet Index: PROPOSED DOG DAYCARE AND GROOMING KEY MAP SCALE: 1"=200' Applicant: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, Connecticut 06074 Property Owner: Map 60 Block 33 Lot 7 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, Connecticut 06074 Consultants: Engineering Lambert Civil Design, LLC 34 Misty Lane Monroe, Connecticut 06468 Tel. (860) 670-6308 Email LambertCivil@Gmail.com Surveying All Seasons Land Surveying, LLC 44 Fair Street Wallingford, Connecticut 06492 Tel. (860) 274-5053 Email: Dan@AllSeasonsLandSurveying.com S1 Property & Topographic Survey Map C1 Layout & Landscaping Plan C2 Grading & Drainage Plan C3 Utility Plan L1 Photometric Plan ES1 Soil Erosion & Sedimentation Control Plan ES2 Soil Erosion & Sediment Control Details D1 Construction Standards & Details D2 Construction Standards & Details DB1 Detention Basin Details PH1 Phase 1 Plan #1018 Revision Table October 23, 2024 First Submittal Set DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Cover.dwg LAYOUT: 00 PLOT DATE: Dec 02, 2024 - 10:43pm OPERATOR: swsocTax Map 60 Block 33 Lot 7 260 Nutmeg Road South South Windsor, Connecticut Hartford County DESIGN CIVIL LAMBERT LLC VICINITY MAP SCALE: 1"=1,000' 00 INTERSECTIONS NEARS TO SITE To North, 1,410-LF to Nutmeg Road South & Governors Highway To South, 1,820-LF to Nutmeg Road South & South Satellite Road November 16, 2024 Inland Wetland Staff Comments01 December 2, 2024 Planning & Engineering Staff Comments02 LAND SURVEYING - LAND PLANNING 44 Fair Street Phone: (860) 274-5053 Wallingford, CT 06492 dan@allseasonslandsurveying.com 1 John Street allseasonslandsurveying.com Millerton, NY 12546 1 inch = 30 feet 30 0 15 30 60 SITE LOCATION MAP © NUTME G R O A D S O U T H 5 6 1 60'43.5 ' 50'40' FRONT YA R D S E T B A C K SIDE YARD SETBACKPROPOSED STOP SIGN AND STOP BAR PROPOSED CLEARING LIMIT Existing Sanitary Sewer Easement in Favor of the Town of South Windsor Existing 25 ft Street Tree Easement in Favor of the Town of South Windsor RE A R Y A R D S E T B A C K SIDE YARD SETBACK100 FT UPLAND REVIEW AREA PROPOSED DUMPSTER ENCLOSURE 40'60' PROPOSED ADA RAMP Existing Sanitary Sewer Easement in Favor of the Town of South Windsor EXISTING DOUBLE YELLOW CENTERLINE PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED AWNING ENTRANCE PROPOSED STONE TRENCH 90.25' PROPOSED SAWCUT (TYP.) Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t R5'R5'8' 18' 24' 18' 9'8'36' 86.8'57.8'PROPOSED FREE STANDING SIGN EXISTING SYCAMORE TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION PROPOSED CONCRETE SIDEWALK BLACK VINYL COATED FENCE WITH PRIVACY SLATES OR FABRIC WINDSCREEN PROPOSED GRASS PROPOSED BITUMINOUS ASPHALT PROPOSED B ITUM INOUS CAPE COD CURB PROPOSED GRASS PROPOSED GRASS PROPOSED GRASS PROPOSED PEA STONE SURFACE PROPOSED MULCH BED R15' R20' R39' R29' 24'45.1 'PROPOSED CONCRETE S IDEWALK & MONOL ITH IC CURB 3' 3' PROPOSED PEA STONE EGRESS PATH PROPOSED 5'x5' CONCRETE LANDING PAD SITE PLAN NOTES: 1.The purpose of this plan is to illustrate the proposed dog daycare and grooming facility. The project consists of a 5,183-SF building, associated parking lot, and outdoor area for the dogdaycare. 2.Owner: 260 Nutmeg Road South, LLC 3.Street #: 260 Nutmeg Road South Road 4.Area of Parcel: 60,086 S.F. , 1.38 Acres 5.Parcel is zoned: I (Industrial) 6.Present use: Vacant 7.Proposed use: Dog Daycare and Grooming 8.Wetlands were flagged by Ian Cole and field located by the surveyor. 9.Examination of the Federal Emergency Management Agency (FEMA) for the Town of South Windsor, Connecticut, Hartford County, Map Number 09003C0378F, Panel Number 378 of 675, Effective Date 09/26/2008 indicates that the subject parcel is located in Zone X. 10.Site to be serviced by public Water and Sewer. 11.Location of any utility information shown on this plan is to be considered approximate. All existing utilities are from best available information, contractor to verify all locations, dimensions, and elevations prior to construction. Lambert Civil Design, LLC makes no claim to the accuracy or completeness of utilities shown. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. Contractor to notify Engineer of any discrepancies. 12.Boundary and topographic information hereon is based on a field survey performed by All Seasons Land Surveying, LLC in June 2024. 13.Vertical Datum is NAVD 1988. Horizontal Datum is NAD 1983. 14.All distances, unless otherwise indicated, are US Survey Feet horizontal distances. 15.All work in connection with this plan shall be completed within five years of the date of approval, or the approval is no longer valid. 16.All site work shall conform to specifications as outlined in C.D.O.T. Form 819, dated 2024 and amended to date. 17.Any regulated activity in a designated Inland Wetland not a part of this plan shall require a separate Inland Wetland Permit. 18.All areas disturbed by construction to be restored with 4" of loam and seeded. 19.All exterior light fixtures shall be full cutoff fixtures with recessed lenses. 20.Underground fuel tanks are prohibited. 21.Town of South Windsor Planning and Engineering Departments to be notified at (860)-644-2511 extension 2344 and 2345, 24 hours before site grading begins. 22.Floor drains are proposed. Approval will be required from South Windsor WPCA and permits from Connecticut DEEP. ZONING INFORMATION ITEM REQUIRED PROVIDED ZONE I I PROPOSED USE Dog Grooming and Boarding LOT AREA 30,000 SF 60,086 SF LOT FRONTAGE 100 FT 285.98 FT LOT DEPTH 150 FT 337.4 FT FRONT YARD SETBACK 35 FT 36 FT SIDE YARD SETBACK 10 FT 86.8 FT REAR YARD SETBACK 1 10 FT 1 57.8 FT 1 MAX. LOT COVERAGE 50%8.8% MAX. IMPERVIOUS COVERAGE 65%21% MAX. BUILDING HEIGHT 40 FT < 40 FT Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Site Layout.dwg LAYOUT: C1 PLOT DATE: Dec 02, 2024 - 10:52pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff Comments34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02LAYOUT & LANDSCAPING PLAN Zoning Notes: 1.Variance was granted to allow 10 ft side yard setback in place of 25 ft rear yard. Variance granted at ZBA meeting on May 4, 2006 (Application #2680-06). PARKING INFORMATION USE REQUIREMENT REQUIRED PROVIDED PROPOSED BUILDING: BUSINESS OFFICE 1,000 SF (GFA) 4.5 SPACE / 1000 SF GFA 4.5 12 PROPOSED BUILDING: INDUSTRIAL/MANUFACTURING 4,183 SF (NET) 1 SPACE / 700 SF 5.9 HANDICAP PARKING -1 TOTAL # OF SPACES AS REQUIRED BY TENANTS 10.4 12 (INCLUDING H.C.) 1.THE ABOVE LIST DOES NOT INCLUDE ANY SPECIES LISTED ON THE CONNECTICUT INVASIVE PLANT LIST AND NO PLANT ON THIS LIST SHALL BE PLANTED ON SITE. 2.INTERIOR LANDSCAPED AREAS TO BE INSTALLED WITH LANDSCAPE BED WITH NON-COMBUSTIBLE MULCH. EXISTING EASEMENTS Grantor Grantee Type of Easement Date Filed Vol / Pg Hale Realty LLC Town of South Windsor Street Tree 03/09/2001 1192 / 244 Hale Realty, LLC Town of South Windsor Sewer 03/09/2001 1192 / 241 Hale Realty, LLC Lot 7 Drainage & Maintenance 05/31/2001 1217 / 171 PLANT LIST SYM.QYT.SCIENTIFIC NAME COMMON NAME CONDITION STREET TREES 7 ACER RUBRUM RED SUNSET B & B, 3" CAL. SHADE TREES 2 CRATAEGUS CRUS-GALLI COCKSPUR HAWTHORNE B & B, 3" CAL. SHRUBS 5 RHODODENDRON CANADENSE RHODONDERON 3 GAL, HEAVY, FULL 7 RUDBECKIA HIRTA BLACK-EYE CONEFLOWER 3 GAL, HEAVY, FULL 14 VIBURNUM CASSINOIDES WITHEROD VIBURNUM 3 GAL, HEAVY, FULL LANDSCAPING INFORMATION ITEM REQUIREMENT SITE CONDITIONS REQUIRED PROVIDED STREET TREES 1 TREE EVERY 40 FT 286 LF FRONTAGE 8 TREES 7 TREES + 1 existing sycamore LANDSCAPE OF PARKING AREA WITH FEWER THAN 30 PARKING SPACES 5% OF INTERIOR PARKING AREA +1 TREE FOR EACH 10 SPACES 3,532 SF PARKING AREA + 12 PARKING SPACES 177 SF + 2 TREES 180 SF + 2 TREES WETLAND & UPLAND REVIEW AREA INFORMATION ITEM AREA % PROPERTY 60,086 SF 100% WETLANDS ON PROPERTY 11,245 SF 18.7% of Lot Area UPLAND REVIEW AREA 34,030 SF 56.6% of Lot Area WETLAND DISTURBANCE 0 SF N/A UPLAND REVIEW AREA DISTURBANCE 27,010 SF 79.4% of URA LOT DISTURBANCE 41,220 SF 68.6% of Lot Area 10' 5' Know what's below. before you dig.Call R G.T.D.FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 74.56G.T.D.G.T.D.G.T.D.G.T.D.G.T.D. G.T.D. G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.PT #1 TP #3 TP #1 TP #2 G.T. D. G.T. D. G.T. D. G. T . D . G. T . D . G. T . D . G.T.D.73.7673.95 74.12 74.30 74.06TC:72.96BC:72.4671.9372.0 5 72.5 0 TC:7 3 . 4 7 BC: 7 2 . 9 7TC:74.46BC:73.9673.77 73.95 73.79 TC:74.52 BC:74.02 TC:74.58 BC:74.08 75.01 75.06 74.57 74.56 74.32 72.3 9 TC:75.64 BC:75.14 TC:75.19 BC:74.69 TC:74.80 BC:74.30 TC:74.47 BC:73.97 72.52 72.74 TC:74.08 BC:73.58 67.40 67.45 67.33 68.30 69.00 69.30 69.60 69.29 69.49 70.40 70.60 70.40 70.40 70.40 74.56 74.56 74.56 74.56 74.54 74.05 75.44 74.12??? 71.32 71.52 71.21 70.83 70.83 70.84 TC:75.94 BC:75.44 TC:75.99 BC:75.49 74.9274.6 7 74.6 3 74.7 3 74.9 2 74.8 2 75.01 7 4 . 5 8 Existing Sanitary Sewer Easement in Favor of the Town of South Windsor NUTMEG ROAD SOUTH PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED STONE TRENCH Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Existing Sanitary Sewer Easement in Favor of the Town of South Windsor Existing 25 ft Street Tree Easement in Favor of the Town of South Windsor 100 FT UPLAND REVIEW AREA PROPOSED 2-FT WIDE SWALE FROM SEDIEMTN FOREBAY TO INFILTRATION BASIN PROPOSED 2-FT WIDE SWALE 74 74 72 70 70707072INV=68.92 (4" SE) INV=68.74 (4" NW) 17 LF @ 1.00% PROP. 4" HDPE INV=70.00 (8" S) INV=69.00 (8" N) 22 LF @ 4.35% PROP. 8" HDPE 6869 70 72 74 68 70 70 68 69 70 70727471 EXISTING SYCAMORE TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C2 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Site Development.dwg LAYOUT: C2 PLOT DATE: Dec 02, 2024 - 10:49pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02GRADING & DRAINAGE PLAN CONSTRUCTION NOTES: 1.The purpose of this plan is to show the proposed grading and drainage systems for this project. 2.All work on the subject property and within the Town of South Windsor right-of-way shall be constructed in accordance with the Town of South Windsor's Construction Standards and Details, latest edition. In the absence of a specific town specification, contractor shall follow the standard specifications for road and bridge construction, CT DOT Form 819, dated 2024 and amended to date. 3.All work within the CTDOT right-of way shall be constructed in accordance with the CTDOT's standard specifications for road and bridge construction, approved and adopted 2024. 4.All manholes shall be 4' diameter concrete structures, unless noted otherwise. All area drains shall be 2' diameter structures. 5.All drainage pipes shown shall be HDPE, unless otherwise noted. 6.The contractor shall be responsible for verifying and determining the location, size, and elevation of all existing utilities, shown or not shown on these plans. Prior to the start of any construction, the engineer shall be notified in writing of any utilities found interfering with the proposed construction, and appropriate remedial action taken before proceeding with the work. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. 7.All drainage pipe shall be installed following manufacturer's installation instructions. 8.All disturbed areas are to be loamed and seeded. 9.See the erosion control plan for the location of the temporary erosion control devices. 10.See details for drainage specifications. 11.Material stockpiles shall be on level sites with silt fence installed around the pile. stockpiles must be seeded and mulched if stored more than 14 days. 12.This project disturbs less than 1-acre of land, therefore, it will not be required to obtain national pollutant discharge elimination system (NPDES) permit coverage as issued by the environmental protection agency (EPA). 222.2 225.37 200 200 NUTME G R O A D S O U T H FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 PROPOSED WATER SHUTOFF VALVE PROPOSED DOMESTIC WATER SERVICE LATERAL PROPOSED FIRE SERVICE LATERAL PROPOSED TAP AT WATER MAIN PROPOSED TRANSFORMER PAD PROPOSED OIL/WATER SEPARATOR TANK (1,000 GALLON) INV IN/OUT = 71.83 PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED UNDERGROUND UTILITIES (ELECTRICAL, CABLE, TELEPHONE) INV 6"=71.58 INV 6"=71.58 INV 6"=71.58 INV 6"=72.48 INV 6"=72.25 PROP. CHIMNEY #1 INV=70.58 (6" SE) INV=59.44 (8" W) INV 6"=72.95 28 LF @ 4.89% 6" SAN48 LF@ 2 . 0 8%6" SAN 12 LF @ 2.16% 6" SAN 31 LF @ 2.09% 6" SAN 20 LF @ 2.10 % 6" SA N EXISTING SYCAMORE TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION PROP. EX. PROPOSED 45° BEND AND CLEAN OUT TO GRADE (CAP TO BE INSTALLED WITHIN 6" OF SURFACE WHEN WITHIN DOG PLAY AREA) PROPOSED WYE CONNECTION Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: C3 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Utility.dwg LAYOUT: C3 PLOT DATE: Dec 02, 2024 - 10:47pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02UTILITY PLAN CONSTRUCTION NOTES: 1.The purpose of this plan is to show the proposed utilities for this project. 2.All work on the subject property and within the Town of South Windsor right-of-way shall be constructed in accordance with the Town of South Windsor's construction standards and details, latest edition. In the absence of a specific town specification, contractor shall follow the standard specifications for road and bridge construction, CT DOT Form 819, dated 2024 and amended to date. 3.The contractor shall be responsible for verifying and determining the location, size, and elevation of all existing utilities, shown or not shown on these plans. Prior to the start of any construction, the engineer shall be notified in writing of any utilities found interfering with the proposed construction, and appropriate remedial action taken before proceeding with the work. Prior to any excavation on site, the contractor shall contact "CALL BEFORE YOU DIG," 1-800-922-4455. 4.All workmanship and materials incorporated into the construction of the water lines shall conform to all the local precinct's standards, specifications, rules, and regulations. 5.All workmanship and materials incorporated into the construction of the electric and telephone lines shall conform with the standards of the local provider. 6.Contractor shall coordinate with local provider relative to final layout of underground utilities. 7.All drainage pipe shall be installed following manufacturer's installation instructions. 8.Contractor to verify size of water service lines with architect prior to the start of construction. 9.Final layout of underground utilities to be approved by local provider prior to construction. Utility Company Providers: Water - Metropolitan District Hartford (MDC), 860-278-7850 Electrical - Eversource Sewer - Town of South Windsor WPCA NUTME G R O A D S O U T H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.6 0.5 0.3 0.2 0.6 0.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 1.0 1.4 1.5 1.0 0.6 0.2 2.1 2.3 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.9 1.7 2.6 2.9 2.6 1.6 0.7 0.2 4.7 5.9 1.8 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 1.2 2.1 3.5 4.5 4.2 3.1 1.6 7.4 4.4 0.6 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.8 1.8 3.0 4.2 4.7 5.0 5.9 5.4 2.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.8 1.6 2.6 3.9 6.9 3.8 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 0.8 0.0 8.9 5.7 1.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 2.6 4.6 1.7 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 8.2 6.4 3.1 1.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.9 5.4 5.8 3.0 1.1 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 2.6 3.2 3.4 2.1 0.9 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 2.1 2.2 1.6 1.0 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.6 1.0 1.4 1.1 0.7 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.5 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 A2@9' A3@9' A4@15' A6@15' A7@15' A8@9' A1@9' PHOTOMETRIC PLAN NOTES: 1.The purpose of this plan is to illustrate the photometric/foot-candles of the proposed building wall packs. Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: L1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Photometric Plan.dwg LAYOUT: L1 PLOT DATE: Dec 02, 2024 - 10:45pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02PHOTOMETRIC PLAN NUTME G R O A D S O U T H G.T.D.FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 FFE=75.10 G.T.D.G.T.D.G.T.D.G.T.D.G.T.D. G.T.D. G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T. D. G.T. D. G.T.D. G. T . D . G. T . D . G. T . D . G.T.D.727 4 7 6 7 8 7070 72 7274 74 72 70 68 70 72 70 70 70 68 70727474EXISTING SYCAMORE TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: ES1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - SESC Plan.dwg LAYOUT: ES1 PLOT DATE: Dec 02, 2024 - 10:48pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02SOIL EROSION & SEDIMENT CONTROL PLAN STORMWATER MANAGEMENT MAINTENANCE SCHEDULE SOUTH WINDSOR, CONNECTICUT The following are the required maintenance and monitoring procedures. Riprap and Discharge Aprons - Shall be cleared of all sediment deposits and invasive plant species and are to be inspected for rip-rap damage and deterioration. These procedures to be conducted yearly between May I and before September 15. Emergency Spillway - Shall be cleared of all sediment deposits and invasive plant species and are to be inspected for riprap damage and deterioration. These procedures to be conducted yearly between May 1 and September 15. Repairs shall be executed immediately. Catch Basins - All basin rim areas and sumps shall be cleaned of all sediment, trash and debris. These procedures to be conducted yearly anytime after May I and before September 15. Swales - all swales be cleared of all sediment deposits, invasive plant species and debris. Any erosion shall be repaired. These procedures to be conducted annually. Swales shall be inspected two times a year and after significant rainfall events. Additional maintenance, beyond schedule maintenance, may be required based upon inspections. Water Quality Basin - Basin shall be cleared of all sediment deposits, invasive plant species and debris. These procedures to be conducted yearly between May 1 and September 15. Basin shall be inspected two times a year and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections. Slopes - Slope erosion control blankets and vegetation shall be inspected twice a year and after significant rainfall events. Additional maintenance, beyond schedule maintenance, may be required based upon inspections. Any hills or channeling shall be repaired immediately Parking Lot Sweeping - Use mechanical sweeping on paved areas where dust and fine materials accumulate. These procedures to be conducted yearly anytime after May I and September 15. All sediment deposits, trash and debris shall be removed to a location off-site and disposed of in an environmentally acceptable manner. GENERAL NOTES: 1.Additional notes and details are located on Sheet ES2. 2.At all times during construction, the Developer/Contractor shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer/Contractor shall also be responsible for installing and maintaining all erosion control facilities shown herein. 3.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way and future pavement shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. watering, seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Town Engineer. 4.All inlets shall be cleaned prior to occupancy. 5.All slopes greater than 3:1 shall be protected with Erosion Control Blankets (S150 by North American Green or approved equal) or Hydroseeded with Tackifier 6.All erosion control measures shall remain intact and operational until the site has been stabilized and vegetation is thoroughly established. This may occur after completion of construction, therefore it is critical for the Developer, Contractor and\or Owner to understand the erosion control responsibilities and maintain the erosion control measures. 7.To minimize erosion of the sandy soils, vegetation shall be established immediately following completion of grading within each area. Vegetation may consist of temporary seeding or final loam and seed. 8.If areas of work are not addressed by this plan or sediment and erosion issues arise in areas not covered by this plan, then the plan shall be augmented in the field. Contractor shall be responsible to insure no sediment or erosion problems encroach upon abutting property. This may require additional barriers, swales and bales. 9.All erosion and sediment control measures shall conform to the 2024 Connecticut Guidelines for Soil Erosion and Sediment Control manual. PROP. TEMPORARY STOCKPILE (TYP.) (SEE DETAIL) LOCATION MAY VARY DURING CONSTRUCTION. CONTRACTOR TO KEEP STOCKPILE AS FAR FROM WETLANDS AS POSSIBLE. SILT FENCE INLET PROTECTION STAKED BALES CHECK DAM WATTLE\SOCK or STONE EROSION CONTROL BLANKET TEMPORARY WATER BAR (WB) or DIVERSION CHANNEL (TD) *SYMBOLS DEPICTED IN LEGEND AND PLAN ARE NOT DRAWN TO SCALE. SEE DETAILS FOR SPECIFIC INFORMATION EROSION CONTROL SYMBOL LEGEND The following are the required maintenance and monitoring procedures Swales - All swales shall be mowed and be cleared of all sediment deposits, invasive plant species and debris. These procedures shall be conducted monthly. Swales shall be inspected weekly and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections. Catch Basins - All basin rim areas and sumps shall be cleaned of all sediment, trash and debris. These procedures shall be conducted monthly. Basins shall be inspected weekly and after significant rainfall events. Additional maintenance, beyond scheduled maintenance, may be required based upon inspections Slopes - Stablized slopes are essential to preventing sediment movement. Any channels of concentrated flow, such as hills, shall be fixed immediately. Additional control measures, such as bales, riprap, sediment fence and erosion fabric or hydroseed with tackifier may be required. Slopes shall be inspected weekly and after significant rainfall events. Sediment Barriers & Hay Bales - Shall be inspected weekly and after significant rainfall events. Repairs shall be made immediately. Additional barriers and bales may be required depending upon the area of work. If conditions exist which can not be addressed with this plan, then additional barriers shall be implemented to prevent sediment from leaving the site. Street Sweeping - Sediment from the construction site, which has accumulated on the existing streets shall be cleaned up immediately . Contractor to inspect daily Wind Blown Sediment: Shall be minimized. Unpaved travel ways shall be sufficiently watered to minimize wind blown sediment. Other unpaved surfaces shall be watered, temporary vegetated, roughing with disc or other measures in the Connecticut Guidelines for Soil Erosion and Sediment Control manual. TEMPORARY STORMWATER MANAGEMENT MAINTENANCE SCHEDULE (DURING CONSTRUCTION) PROP. INLET PROTECTION AT ALL INLETS (TYP.) (SILTSAC) (SEE DETAIL) PROP. EROSION CONTROL BLANKET OR HYDROSEEDED WITH TACKIFIER ON SLOPES GREATER THAN 3:1 (TYP.) (REFER TO DETAIL) PROP. SILT FENCE (TYP.) PROP. PAVEMENT SAWCUT (TYP.) SOIL EROSION AND SEDIMENT CONTROL NARRATIVE: A.PROJECT INFORMATION 1.Project Description - The project site consist of one 1.38 acre parcel on Nutmeg Road South in South Windsor, CT . 2.Area Proposed Disturbance Due to Construction Activities - 0.95± Acres Total. 3.Phases of Development - Phase 1 Phase 1 - Front Building and Parking Lot Construction Phase 2 - Rear Building 4.Estimated Start of Construction (Phase 1)- Spring 2025. 5.Estimated Construction Completion Date (Phase 1) - Fall 2025. 6.Estimated Start of Construction (Phase 2)- Spring 2028. 7.Estimated Construction Completion Date (Phase 2) - Fall 2028. B.EROSION CONTROL NOTES 1.The purpose of this plan is to depict the required onsite temporary construction erosion control measures. 2.All measures in the plan shall meet as a minimum the best management practices set forth in 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. 3.Whenever practical, natural vegetation shall be retained, protected or supplemented. The stripping of vegetation shall be done in a manner that minimizes soil erosion. 4.Appropriate erosion and sediment control measures shall be installed prior to land disturbance. 5.The area of disturbance shall be kept to a minimum. Disturbed areas remaining idle for more than 30 days shall be stabilized. 6.Measures shall be taken to control erosion within the project area. Sediment in runoff water shall be trapped and retained within the project area using approved measures. 7.All temporary erosion and sediment control measures shall be maintained in functioning condition until final site stabilization is accomplished. 8.All temporary erosion and sediment control measures shall be removed after final site stabilization. Trapped sediment and other disturbed soil areas resulting from the removal of temporary measures shall be permanently stabilized within 30 days unless conditions dictate otherwise. 9.The Town of South Windsor shall reserve the right to require further erosion control practices during construction should they find it necessary. 10.The responsible party shall install, inspect, report, operate, and maintain all stormwater management and erosion control measures required by these plans. 11.Temporary erosion control measures shall be installed in strict accordance with project plans. In addition, similar measures shall be installed where and when the field condition, or field operation of the individual site contractor, may warrant. 12.All disturbed areas designated to be turf, shall receive a minimum application of 4 inches of loam (compacted thickness), prior to final seeding and mulching. 13.In the event that, during construction of any portion of this project, a winter shutdown is necessary, the contractor shall stabilize all incomplete work and provide for suitable methods of diverting runoff in order to eliminate sheet flow across frozen surfaces. 14.Dust shall be controlled by the use of water as necessary throughout the construction period, in accordance with 2024 Connecticut Guidelines for Soil Erosion & Sediment Control. 15.In no way are those temporary erosion control measures indicated on these plans to be considered all inclusive. The contractor shall use judgement in installing supplementary erosion control measures where and when specific site conditions and/or construction methodologies may warrant. 16.Graded areas shall be vegetated to insure erosion control by seeding, mulching, and fertilizing. Disturbed areas shall be planted with suitable plant materials. 17.Grading shall not exceed a ration of 3 horizontal to 1 vertical without special erosion control measures. netting or similar material shall be provided on slopes with a ration greater than 3:1 while ground cover is being established. C.RESPONSIBILITY 1.The responsibility for implementing and maintaining the Soil Erosion and Sedimentation Control Plan rests with the OWNER OF RECORD where any development of the parcel gives cause to erosion and sedimentation. It is also to be said that the OWNER OF RECORD shall be held responsible for informing all concerned regarding responsibility of the SE&SC plan and seeing that the plan becomes a part of the deed in the event the title of the property is transferred. The costs of all drainage erosion and sedimentation control measures will therefore rest with the OWNER OF RECORD. 2.Contact Person: David Turkington Contact Phone: (860) 841-3779 222.2 225.37 200 200 PROP. CONSTRUCTION ENTRANCE INVASIVE PLANT REMOVAL: 1.Any invasive plants found on the site shall be removed and disposed of properly. 2.Any invasive plants removed prior to flowering should be left out to dry and then disposed after death. 3.Any invasive plants removed during and after flowering should be bagged and disposed off site through means of lawful incineration EXISTING TREE TO BE REMOVED (TYP.) Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: ES2DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - SESC Details.dwg LAYOUT: ES2 PLOT DATE: Dec 02, 2024 - 10:48pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff Comments34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02EROSION CONTROL NOTES & DETAILS NOT TO SCALE PUBLI C R O A D CONSTRUCTION ENTRANCE DETAIL N.T.S. CT DOT 2" FILTER FABRIC 50' M I N . 4" min. TAMP DIRT O V E R M A T / B L A N K E T 3'MIN. 4" OVERLAP 2:1 SLOPE2:1 SLOPE6'3'12" WATER T A B L E BERM STAPLES EROSION BLANKET & REINFORCEMENT MAT SLOPE INSTALLATION N.T.S. TYPICAL SLOPE SOIL STABILIZATION WET SLOPE LINING NOTES: 1.SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS AND GRASS. MATS/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 2.LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. MATS/BLANKETS SHOULD BE INSTALLED VERTICALLY DOWN SLOPE. 1 1 2"12"6"4'12"FILTER CLOTH 4 ' ABOVE SOURCE OF WATE R NON-WOVEN GEOTEXTILE FILTER FABRIC UNDER TYPICAL TREATMEBNT 80% GERMINATION - 25-30% KENTUCKY BLUE GRASS GENERIC SEED MIXTURE - 30-35% RED FESCUE 90% GERMINATION - 30-40% PERENNIAL RYE GRASS MIXTURES 85% GERMINATION *4" min. *ALL LANDSCAPE/PLANTING AREAS SHALL RECEIVE LOAM AND SEED. LOAM & SEED DETAIL N.T.S. * 4" MIN. LOAM & SEED (COMPACTED TO REQUIRED THICKNESS WITH LOAM ROLLER) ACCEPTABLE, COMPACTED, GRADED SUBGRADE Angle 10° upslope for stability and self cleaning. 1. Set posts and excavate a 6"x6" trench, set post downslope. 2. Staple the wire mesh fencing to end post 3. Attach filter fabric to the wire fencing and extend it to the trench. 4. Back fill the trench and compact the excavated soil POSTS POSTS POSTSPOSTS Wire Fencing Filter Fabric Compacted Back Fill 12" Min. Depth 100°00'00" SEDIMENTATION BARRIER DETAIL N.T.S. BAG DETAILINSTALLATION DETAIL DE P T H = D WIDT H = W LE N G T H = L ROAD BROOKFIELD, CT 06904. (203)313-9002 1. AVAILABLE FROM ACF ENVIRONMENTAL 48 OLD GRAYS BRIDGE NOTES: SILTSACK INLET CONTROL DEVICE N.T.S. SILTSACK DUMP STRAP DUMP STRAP 2 EACH DUMP STRAP EXPANSION RESTRAINT (1/4" NYLON ROPE, 2" FLAT WASHERS) 1"REBAR FOR BAG REMOVAL FROM INLET 1"REBAR FOR BAG REMOVAL FROM INLET MIN. SLOPE MIN. SLOPE 2 1 SLOPE OR LESS SOIL STOCKPILE DETAIL N.T.S. NOTES: 1.AREA CHOSE FOR STOCKPILING SHALL BE DRY AND STABLE. 2.MAXIMUM SLOPE OF STOCKPILE SHALL BE 2:1. 3.UPON COMPLETION OF SIOL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH EITHER SILT FENCING OR STARWBALES, THEN STABILIZED WITH VEGITATION OR COVERED WITH POLYETHYLENE SHEETING. 4.TO BE USED WHERE TOPSOIL IS NECESSARY FOR REGRADING AND VEGETATING DISTURBED AREAS. TOPSOIL IS APPLIED TO SUBSOILS THAT ARE DRAUGHTY (HAVING LOW AVAILIABLE MOISTURE FOR PLANTS), STONEY SALTY, HAVE LOW PERMEABILITY, OR ARE EXTREMELY ACID. IT IS ALSO USED TO BACKFILL AROUND SHRUB AND TREE TRANSPLANTS. PRESERVATION OF EXISTING TOPSOIL IS BENEFICIAL FOR ALL TYPES OF LAWN OR ORNAMENTAL PLANTINGS. 5.TEMPORARY STOCKPILING STABILIZATION MEASURES INCLUDE VEGETATIVE COVER, MULCH NONVEGETATIVE COVER, AND PERIPHERAL SEDIMENT TRAPPING BARRIERS. THE STABLIZATION, MEASURE(S) SELECTED SHOULD BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS AND REQUIRED PERIOD OF USE. 6.SEE EROSION AND SEDIMENT CONTROL PLAN FOR LOCATIONS. STABILIZE ENTIRE PILE WITH VEGETATION OR COVER WITH POLYETHYLENE SHEETING HAY BALES OR SILT FENCE BALE WIDTH A A 18" MIN. SECTION A-A 5' - 10' MIN. TO TOE OF SLOPE 4" 4" STRAW BALE BARRIER DETAIL N.T.S. EXISTING GRADE WEDGE LOOSE STRAW BETWEEN BALES TO CREATE A CONTINUOUS BARRIER BALES TO BUTT TOGETHER 2-2"x2"x3' STAKE S (TYP.) STORMWATER RUNOFF FLOW NOTES: 1.BALE BARRIER INSTALLATION SHALL FOLLOW THE CONTOUR OF THE LAND. THE LAST BALES SHALL WING UPSLOPE TO ENSURE PROTECTION. 2.BALE BARRIERS SHALL BE UTILIZED TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DRAINAGE AREAS ONE ACRE IN SIZE OR LESS. MAX. SLOPE BEHIND A BARRIER MUST BE LIMITED TO 2H:1V. 3.BALE BARRIERS SHALL BE INSPECTED PERIODICALLY, AFTER STORM EVENTS GREATER THAN 1" OF RAINFALL AND SHALL BE REMOVED AND REPLACED AFTER 3 MONTHS EXCEPT AS OTHERWISE DIRECTED BY THE ENGINEER OR ENFORCEMENT OFFICIAL. BALES SHALL NOT BE REMOVED UNTIL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. COMPACT BACKFILL (UP GRADIENT) EXCAVATE 4" DEEP AND WIDTH OF BALE EXISTING GRADE R DIRTBAG LENGTH WIDTH SIDE VIEW TOP VIEW AGGREGATE OR STRAW UNDERLAYMENT DIRTBAG SILT CONTROL SYSTEM N.T.S. NOTES: 1.AVAILABLE FROM ACF ENVIORMENTAL 48 OLD GRAYS BRIDGE ROAD, BROOKFIELD, CT 06904. (203)313-9002 HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE SEWN IN SPOUT WATER FLOW FROM PUMP PUMP DISCHARGE HOSE OPENING ACCOMODATES UP TO 4" DISCHARGE HOSE BAG PLACED ON AGGREGATE OR STRAW HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS EROSION CONTROL NOTES WINTER CONSTRUCTION NOTES CONSTRUCTION SEQUENCE PERMANENT PAVEMENT PATCH DETAIL N.T.S.6"A A W D 3' 4' 4' 4' 5'+ 5' CONCRETE SIDEWALK N.T.S. LONGITUDINAL SECTION CROSS SECTION A-A PLAN VIEW PREMOLDED 1 4" EXPANSION JOINT, 20'-0" O.C. CONTRACTION JOINT (TYP.) PROCESSED STONE BASE 6" IN DEPTH AFTER COMPACT, SPEC. M.05.01 & 3.04.03APPROVED COMPACTED SUBGRADE CONCRETE WALK NOTE: MINIMUM CROSS SLOPE TO BE 1/4" TO 1' UNLESS OTHERWISE DIRECTED. BROOM FINISH WSEE DRAWINGD SEE W/D CHART CONCRETE WALK PROCESSED STONE BASE SURFACE COURSE CLASS "F" CONCRETE. SURFACE TO BE BROOM FINISHED 4,000 PSI 7% ENTRAINED AIR CLASS "F" CONCRETE NO REINFORCING WIRE 3" WIDTH VARIES 4'-0" MIN. 3"6"5"JOINTS SPACED 20'-0" O.C. DIVIDED INTO RECTANGLES AS DIRECTED 5"APPLY SEALER PER SEC. 8.18 TO SURFACE Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: D1DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Details.dwg LAYOUT: D1 PLOT DATE: Dec 02, 2024 - 10:43pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff Comments34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02CONSTRUCTION DETAILS NOT TO SCALE ELEVATION TREE PLANTING INSTALLED IN OPEN AREAS N.T.S. 12" MIN. 12" MIN. 18" MAX. TREE WRAPPING APPLIED STARTING FROM BASE TO FIRST BRANCH FINISEDH GRADE 6" EARTH SAUCER MULCH LAYER 2" CLEARANCE FROM STEM CROWN OF ROOT BALL SET AT SAME ELEVATION OR 1" HIGHER THAN FINISHED GRADE ROOT BALL, TYP.; REMOVE BURLAP FROM AT LEAST 2/3 OF ROOTBALL (OR REMOVED COMPLETELY). CUT ROPES AT TOP OF BALL TOTALLY REMOVE WIRE AND NONBIODEGRADABLE MATERIAL PLANTING SOIL MIX UNDISTURBED EARTH LOOSEN SUBSOIL TO ASSURE POSITIVE DRAINAGE UNDISTURBED EARTH OR COMPACTED SUBSOIL ELEVATION SHRUB PLANTING DETAIL N.T.S. 6" MIN. SEE NOTE 1 BALL DIA. "D" NOTE: 1.AT 'D' LESS THAN 3 FEET IS EQUAL TO 1/2 'D'. 6INCHES MINIMUM, AT 'D' OVER 3 FEET WIDTH IS EQUAL TO 18". MULCH LAYER 4' EARTH SAUCER FINISHED GRADE ROOT BALL, TYP.; REMOVE BURLAP FROM AT LEAST 2/3 OF ROOTBALL, OR TO BE REMOVED COMPLETELY PLANTING SOIL MIX UNDISTURBED EARTH LOOSEN SUBSOIL TO ASSURE POSITIVE DRAINAGE UNDISTURBED EARTH OR COMPACTED SUBSOIL STOP BAR DETAIL N.T.S. 30" X 30" R1-1 STOP SIGN DETAIL N.T.S. 24.0 SF 1'-8"3'-4"7'-2" ENTRANCE SIGN DETAIL N.T.S. NOTES 1.SEE SITE PLAN FOR ACCESSIBLE SPACE LOCATIONS 2.PROVIDE 2 COATS OF PAINT ON ALL SURFACES. 18' - 0" 10' - 0" 4" WHITE PAINT LINES AT 2' O.C. PAINTED AT 45° ANGLE PAINTED WHITE SYMBOL ON BLUE BACKGROUND IN ACCORDANCE WITH FEDERAL STANDARDS ACCESSIBLE SIGN WITH BOLLARD BASE (TYP.) VAN SPACE FLUSH CONDITIONS 8'-0"8-0" ACCESSIBLE PARKING SPACE DETAIL N.T.S. 7.0' NOTES: LOCATE AT EDGE OF PARKING SPACE UNLESS ACCOMPANIED BY "VAN" LETTERING LC 6" (TYP.) 2.5' R 6.5' ACCESSIBLE PARKING SYMBOL N.T.S. 5.5" CTDOT SUBBASE COURSE COMPACTED SUBGRADE 1.5" BIT. CONC. WEARING COURSE (CTDOT HMA S0.375) 1.5" BIT. CONC. BINDER COURSE (CTDOT HMA S0.375) 6" CT DOT PROCESS AGGREGATE BASE COURSE STANDARD DUTY ASPHALT PAVING DETAIL N.T.S. TYP. SAN TYP. WATER WATER SERVICE TYP. SERVICE CROSSING 18" MIN. SANITARY SERVICE NOTE: MAINTAIN 18" VERTICAL SEPARATION BETWEEN ALL WATER, SANITARY AND STORM MAINS\SERVICES. 18" MIN. 3' MIN. 5' 18" MIN. SANITARY SERVICE LOT 8 SANITARY SERVICE 18" MIN. TYP. STORM N.T.S. 2'24"STONE TRENCH (PEA GRAVEL)PROPOSED IMPERVIOUS DRIVE GRASS FILTER SLOPE FLOW PRETREATMENT FILTER STRIP N.T.S. GEOTEXTILE FILTER FABRIC FLOW CLEANOUT DETAIL N.T.S. NON-PAVED INSTALLATION AT FINISHED GRADE FITTING CLEAN OUT ADAPTOR AND PLUG 6 PVC CLEANOUT RISER 45° SWEEP 6" PVC PIPE 6" SPOOL 5" PVC 6" PVC PIPE -SANITARY LATERAL 6" PVC PIPE -SANITARY LATERAL 45° SWEEP WYE 6"x6"x6" PVC PIPE Note: 1.Refer to Site Plan for Size of Sanitary Lateral. Adjust Size of 45° Sweep Wye Accordingly if Sanitary Lateral is Larger than 6". Cleanout Riser to Remain at 6" PVC unless otherwise noted. NON-PAVEMENT AREA CONCRETE SIDEWALK WITH INTEGRAL CURBING N.T.S. 6" 1'-0" MIN. 6" 6" EQUALEQUAL PAVEMENT 6" X 6" #10 W.W.F. 1/4" TOOLED JOINT WIDTH VARIES - SEE SITE PLAN 1/4" TOOLED JOINT 6" 4" COMPACTED AGGREGATE BASE NOTE: EXPANSION JOINT 20' O.C. MAXIMUM. 1/4" TOOL JOINT 4' O.C. OR AS DIRECTED. CONCRETE TO BE 3000 P.S.I. WASH (2% MAX) SANITARY SEWER CHIMNEY CONNECTION N.T.S. 260 NUTMEG ROAD SOUTH4" STREET LETTERING BUSINESS LOGO (TO BE DESIGNED) PROPOSED GROUND 7' TALL, 6"x6" PRESSURE TREATED POST*4" min.*AREA WITHIN DOG FENCED IN PLAY AREA DOG PLAY AREA STONE SURFACE DETAIL N.T.S. 4"-5" MIN. PEA STONE GRAVEL ACCEPTABLE, COMPACTED, GRADED SUBGRADE BITUMINIOUS CAPE CAP CURBING DETAIL N.T.S. DRAINAGE TEST PIT LOGS Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: D2DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Details.dwg LAYOUT: D2 PLOT DATE: Dec 02, 2024 - 10:43pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff Comments34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02CONSTRUCTION DETAILS NOT TO SCALE STORM CLASS 'C' TRENCH DETAIL N.T.S. ROCK EXCAVATIONEARTH EXCAVATION NOTES: 1.FOR UNSHEETED TRENCH WHERE PIPE O.D. IS 6" OR LESS THAN, PAYMENT WIDTH (W) = 2'-6"; WHERE PIPE O.D. IS GREATER THAN 6" BUT LESS THAN OR EQUAL TO 36" THEN, W = O.D. + 2'-0"; WHERE PIPE O.D. IS GREATER THAN 36" THEN, W = O.D. + 3'-0". 2.IF SUITABLE GRANULAR PIPE BEDDING MATERIAL IS AVAILABLE FROM ON SITE EXCAVATIONS, IT SHALL BE UTILIZED PROVIDED IT CONFORMS WITH THE "STANDARD SPECIFICATIONS", AND IS APPROVED BY THE ENGINEER. NO PAYMENT SHALL BE MADE FOR THIS MATERIAL. 3.TYPICAL FOR PIPE MATERIALS SPECIFIED, AS CAST IRON (C.I.), CONCRETE PIPE, DUCTILE IRON PIPE OR STEEL PIPE. 4.SHEETING OR SHORING OF TRENCH WALLS, WHERE UNSUITABLE CONDITIONS EXIST, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 5.FOR ROCK REMOVAL DEPTHS (H) GREATER THAN 10', INCREASE PAYMENT WIDTH (W) BY 6". REMOVAL DEPTH SHALL BE MEASURED FROM THE TOP OF EXPOSED SURFACE. APPROVED SELECT BACKFILL MATERIAL, COMPACTED IN 12" LIFTS, BANK RUN GRAVEL, GRADATION "C" FORM 816, CLASS II MATERIAL, COARSE SAND OR FINE GRAVEL SUITABLE FOR BACKFILL MARKER TAPE FINISHED GRADE FOR BACKFILL CLASS II MATERIAL STORM SEWER PIPE 3 4" (MAX. SIZE) CRUSHED STONE TO SPRING LINE, CLASS I MATERIAL (SEE NOTE 2) PROVIDE A STABLE BASE AT LEAST 2000 PSI BEARING SOILS FOR A MINIMUM OF FOUR FEET (4') BELOW PIPE 6 1 VERTICAL 1/8 OF O.D. (6" MIN.) W (SEE NOTE 1) 1/8 OF O.D. (4" MIN.)O.D.1'-0" TYP.H(DEPTHVARIES)L=W ROCK L=W+(H/3) EARTH =MEAN PARTICLE SIZEd50 15 8 5 INTERMEDIATE MODIFIED 50 (INCHES) d DESIGNATION RIPRAP 6" 6" 12" 12" RIPRAP INTERMEDIATE MODIFIED STANDARD SPECIAL DESIGN DESIGNATION GRANULAR BEDDING SHALL CONFORM TO MINIMUM BEDDING THICKNESS (INCHES) 1005" #10 15-45 #40 #100 #200 0-5 0-10 5-25 3/4"- 1/4"25-60 1 1/2"55-100 3 1/2"100 TABLE R3 GRADATION FOR GRANULAR BEDDING U.S. STANDARD SIEVE SIZE CONN. DOT. GRADING A BY PASSING PERCENT WEIGHT TABLE R1 VARIES, SEE THICKNESS BEDDING DEPTH SEE TABLE R2 TABLE R2 CLASSIFICATION OF RIPRAP TABLE R1 THICKNESS REQUIREMENTS FOR GRANULAR BEDDING CONN. DOT SPECIFICATION M.02.01 GEOTEXTILE 36 18 12 (INCHES) DEPTH RIPRAP SPECIFICATIONS & GRADATIONS SHALL STANDARD CONFORM TO CONN. DOT. M.12.02 RIPRAP INSTALLATION DETAIL N.T.S. SANITARY CLASS 'B' TRENCH DETAIL N.T.S. ROCK EXCAVATIONEARTH EXCAVATION NOTES: 1.FOR UNSHEETED TRENCH WHERE PIPE O.D. IS 6" OR LESS THAN, PAYMENT WIDTH (W) = 2'-6"; WHERE PIPE O.D. IS GREATER THAN 6" BUT LESS THAN OR EQUAL TO 36" THEN, W = O.D. + 2'-0"; WHERE PIPE O.D. IS GREATER THAN 36" THEN, W = O.D. + 3'-0". 2.IF SUITABLE GRANULAR PIPE BEDDING MATERIAL IS AVAILABLE FROM ON SITE EXCAVATIONS, IT SHALL BE UTILIZED PROVIDED IT CONFORMS WITH THE "STANDARD SPECIFICATIONS", AND IS APPROVED BY THE ENGINEER. NO PAYMENT SHALL BE MADE FOR THIS MATERIAL. 3.TYPICAL FOR ALL FLEXIBLE PIPE MATERIALS, I.E. PVC, CCP, POLYETHLYENE, FRP, AND ABS TRUSS. 4.SHEETING OR SHORING OF TRENCH WALLS, WHERE UNSUITABLE CONDITIONS EXIST, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 5.FOR ROCK REMOVAL DEPTHS GREATER THAN 10', INCREASE PAYMENT WIDTH (W) BY 6". REMOVAL DEPTH SHALL BE MEASURED FROM THE TOP OF EXPOSED SURFACE. APPROVED SELECT BACKFILL MATERIAL, COMPACTED IN 12" LIFTS, BANK RUN GRAVEL, GRADATION "C" FORM 816, CLASS II MATERIAL, COARSE SAND OR FINE GRAVEL SUITABLE FOR BACKFILL 6" DETECTABLE UTILITY WARNING TAPE PLACED 18-IN ABOVE PIPE FINISHED GRADE COARSE SAND M.03.01.2 OR FINE GRAVEL M.01.01-NO. 8 (FORM 816) TAMPED A.O.B.E. MAX. 1' ABOVE PIPE SANITARY SEWER PIPE 3 4" (MAX. SIZE) CRUSHED STONE TO TOP OF PIPE (SEE NOTE 2)PROVIDE A STABLE BASE AT LEAST 2000 PSI BEARING SOILS FOR A MINIMUM OF FOUR FEET (4') BELOW PIPE 6 1 VERTICAL W (SEE NOTE 1) IF PIPE O.D. < 6" = 6" IF PIPE O.D. > 6" = 12" O.D. 1'-0" TYP.H(DEPTHVARIES)L=W ROCK L=W+(H/3) EARTH GEOTEXTILE FILTER FABRIC 6" MIN. LAP OUTLET PROTECTION DETAIL N.T.S. CROSS SECTION 3' to 4'FLOW45° DISTANCE PER PLAN 90° 45° BEND SANITARY SEWER MAIN SERVICE WYE or SADDLE ON EXISTING MAINS 2"x4" WOOD MARKER WITH TOP PAINTED GREEN AND LABELED SEWER PLUG PVC SANITARY SEWER SERVICE 1/4" MIN. PER FOOT FOR 4" SERVICE 1/8" MIN. PER FOOT FOR 6" SERVICE STONE FOUNDATION SUPPORT AROUND WYE CONNECTION SAN. MAIN TRENCH (SEE DETAIL) SAN. MAIN TRENCH (SEE DETAIL) SANITARY SERVICE DETAIL N.T.S. G.T.D.74.56G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.G.T.D.PT #1 TP #3 TP #1 TP #2 G.T. D. G.T. D. G.T. D. G. T . D . G. T . D . G. T . D . G.T.D.73.7673.95 74.12 74.30 74.06TC:72.96BC:72.4671.9372.0 5 72.5 0 74.56 74.32 72.3 9 72.52 BC:73.58 67.40 67.45 67.33 68.30 69.00 69.30 69.60 69.29 69.49 70.40 70.60 70.40 70.40 70.40 74.56 74.56 74.56 74.56 71.32 71.52 71.21 70.83 70.83 70.84 68 69 70 70 68 69 70 7274 7 4 72 71 70 70717 2 70 70 70 72 74 72707071706970 70 69 68 69 70 INV=68.92 (4" SE) INV=68.74 (4" NW) INV=70.00 (8" S) INV=69.00 (8" N) 17 LF @ 1.00% PROP. 4" HDPE 22 LF @ 4.35% PROP. 8" HDPE 3:1 INTERIOR SLOPES 3:1 EXTERIOR SLOPES PROP. NEW ENGLAND WET MIX ON BOTTOM OF BASIN PROP. NEW ENGLAND WILDLIFE AND CONSERVATION MIX ON DISTURBED AREAS SURROUNDING BASIN PROP. NEW ENGLAND EROSION CONTROL / RESTORATION MIX ON BASIN SIDES AND TOP PROP. SLIT FENCEPROP. EMERGENCY SPILLWAY 3:1 EXTERIOR SLOPES 2:1 EXTERIOR SLOPES PROP. STRAWBALES PROP. STRAWBALES Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: DB1DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Detention Basin Detials.dwg LAYOUT: DB1 PLOT DATE: Dec 02, 2024 - 10:45pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02SILT FENCE INLET PROTECTION STAKED BALES CHECK DAM WATTLE\SOCK or STONE EROSION CONTROL BLANKET TEMPORARY WATER BAR (WB) or DIVERSION CHANNEL (TD) *SYMBOLS DEPICTED IN LEGEND AND PLAN ARE NOT DRAWN TO SCALE. SEE DETAILS FOR SPECIFIC INFORMATION EROSION CONTROL SYMBOL LEGEND SEED MIX & FABRIC LEGEND BOTTOM OF POND ELEV.= TOP OF BERM ELEV.= WEIR ELEV.= 4 1 SPILLWAY ELEV. BOTTOM OF POND TOP OF BERM ELEV. 5' MODIFIED RIP-RAP SPILLWAY DETAIL N.T.S. 10' MODIFIED RIP-RAP DEPTH = 12" MODIFIED RIP-RAP DEPTH = 12" NON-WOVEN FILTER FABRIC ALL SLOPES GREATER THAN 3:1 TO BE STABILIZED IMMEDIATELY FOLLOWING CONSTRUCTION USING MATTING OR HYDROSEED WITH TACKIFIER 69.44 68.92 70.80 TOP ELEV. = SEDIMENT FOREBAY PAVEMENT OVERLAND FLOW MIN . 3 :1 INTER IOR SLOPE 25 YEAR ELEV. = WQV ELEV. = BASIN SCHEMATIC N.T.S. 68.862 YEAR ELEV. = BOTTOM ELEV. = 67.40 STONE INFILTRATION TRENCH 69.73100 YEAR ELEV. =70.00 SPILLWAY ELEV. = SLOPE -> 1.0% MIN. 222.2 225.37 200 200 67.40 70.0 70.8 0 1"=10' 10'5'5'10' DETENTION BASIN DETAILS G.T.D.FFE=75.10 TC:74.11 BC:73.61 FFE=75.10 G.T.D.G.T.D.G.T.D.G.T.D.G.T.D. G.T.D. G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.G.T .D . G.T.D.G.T.D.G.T.D.PT #1 TP #3 TP #1 TP #2 G.T. D. G.T. D. G.T. D. G. T . D . G. T . D . G. T . D . G.T.D.73.7673.95 74.12 74.30 74.0672.4671.9372.0 5 72.5 0 72.9 7TC:74.46BC:73.9673.77 73.95 73.79 TC:74.52 BC:74.02 TC:74.58 BC:74.08 75.01 75.06 74.59 74.56 72.3 9 TC:75.64 BC:75.14 TC:75.19 BC:74.69 TC:74.80 BC:74.30 TC:74.47 BC:73.97 72.52 72.74 67.40 67.45 67.33 68.30 69.00 69.30 69.60 69.29 69.49 70.40 70.60 70.40 70.40 70.40 74.56 74.54 74.05 75.44 74.1271.32 71.52 71.21 70.83 70.83 70.84 TC:75.94 BC:75.44 TC:75.99 BC:75.49 74.9274.7 3 74.9 2 FFE=75.10 G.T.D.G.T.D.G.T.D.G.T.D.74.6 7 74.6 3 74.8 2 7 4 . 5 8 75.01 Existing Sanitary Sewer Easement in Favor of the Town of South Windsor NUTMEG ROAD SOUTH PROPOSED SEDIMENT FOREBAY PROPOSED INFILTRATION BASIN PROPOSED STONE TRENCH Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Exi s t i n g D r a i n a g e D i t c h a n d M a i n t e n a n c e E a s e m e n t Existing Sanitary Sewer Easement in Favor of the Town of South Windsor Existing 25 ft Street Tree Easement in Favor of the Town of South Windsor 100 FT UPLAND REVIEW AREA PROPOSED SWALE FROM SEDIEMTN FOREBAY TO INFILTRATION BASIN PROPOSED 2-FT WIDE SWALE 74 74 72 70 70707072INV=68.92 (4" SE) INV=68.74 (4" NW) 17 LF @ 1.00% PROP. 4" HDPE INV=70.00 (8" S) INV=70.00 (8" N) INV=69.00 (8" N) 22 LF @ 4.35% PROP. 8" HDPE 6869 70 72 74 68 70 70 68 69 70 70727471 EXISTING SYCAMORE TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION PROPOSED PARKING AREA STONE BASE (AGGREGATE AND SUBBASE COURSES)44 LF@ 4.44%PROP. 8" HDPEINV=72.00 (8" S) PROPOSED DUMPSTER ENCLOSURE PROPOSED GRASS PROPOSED GRASS PROPOSED GRASS PROPOSED GRASS PROPOSED PEA STONE SURFACE PROPOSED GRAVEL PROPOSED PEA STONE SURFACE PROPOSED BITUMINOUS ASPHALT PROPOSED B ITUM INOUS CAPE COD CURBPROPOSED CONCRETEMONOLITH IC CURB PROPOSED PEA STONE EGRESS PATH PROPOSED 5'x5' CONCRETE LANDING PAD Sheet #: Approved By: Date:Drawn By: Revisions:Project #: Descriptions:Scale: Date: Sheet Description: APPLICANT: PROJECT NAME: PH1 0 1"=20' 20'10'10'20'DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\DWG\1018 - Site Development-Phase 1.dwg LAYOUT: PH1 PLOT DATE: Dec 02, 2024 - 10:51pm OPERATOR: swsocOctober 23, 2024 MSL MSL 101811/16/2024Inland Wetland Staff CommentsKnow what's below. before you dig.Call R 34 Misty Lane Monroe, CT 06468 Tel: (860) 670-6308 LambertCivil@gmail.com----------------Tax Map 60 Block 3 Lot 7 260 Nutmeg Road South South Windsor, Connecticut PROPOSED DOG DAYCARE AND GROOMING--------#W S N E NOT VALID UNLESS EMBOSSED SEAL OR STAMP IS AFFIXED HERETO #30715 Reg. No.Michael S. Lambert P.E. DESIGN CIVIL LAMBERT LLC OWNER: 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 06074 260 NUTMEG ROAD SOUTH, LLC 691 GOVERNORS HIGHWAY SOUTH WINDSOR, CT 060740112/02/2024Planning & Engineering Staff Comments02PHASE 1 PLAN CONSTRUCTION NOTES: 1.The purpose of this plan is to show the anticipated Phase 1 of the project. 2.The front portion of the building will be constructed as well as all the utilities, driveway and portions of the parking lot. The remaining parking lot will be graded out and constructed as a gravel surface in order to allow Phase 2, pending site condition inspections, to topcoat the aggregate base and pave area. The dumpster is to be installed and maintained during Phase 1 of the project. 222.2 225.37 200 200 Stormwater Management Report October 23, 2024 December 2, 2024 STORMWATER MANAGEMENT REPORT Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 PROPOSED DOG DAYCARE AND GROOMING MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT October 23, 2024 Revised December 2, 2024 Prepared For: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, CT 06074 Prepared By: Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 860.670.6308 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 December 2, 2024 TABLE OF CONTENTS Introduction .......................................................................... 1 A. Project Description ..................................................................................................................... 1 B. Existing Site Conditions ............................................................................................................ 1 C. Proposed Site Conditions .......................................................................................................... 1 Storm drainage analysis & design ...................................... 1 A. Methodology ............................................................................................................................... 1 B. Pre-Development Drainage Conditions .................................................................................. 2 C. Post-Development Drainage Conditions ................................................................................ 2 D. Stormwater Water Quality Treatment .................................................................................... 3 E. Stormwater Conveyance System ............................................................................................. 3 F. Summary ..................................................................................................................................... 4 Erosion & Sediment Control Provisions ............................ 6 A. Temporary Erosion Control Measures .................................................................................... 6 B. Construction Sequence .............................................................................................................. 6 C. Permanent Erosion Control Measures .................................................................................... 7 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 1 ~ Introduction A. Project Description The applicant is seeking to develop the vacant parcel into a Dog Daycare and Grooming facility. The property will be developed with a single driveway curb cut, parking spaces, and outdoor fenced in area for the dog daycare. B. Existing Site Conditions The parcel has been vacant since the construction of Nutmeg Road South. The land surrounding the property has developed and been zoned Industrial I. The property is located on the eastern side of Nutmeg Road South, at the eastern portion of the ‘S’ turn in the roadway. C. Proposed Site Conditions The proposed development will have a commercial building constructed for the use of a dog daycare and grooming facility. The building will be located at the center of the site with parking to the east of the building and a fenced in outdoor yard for the dog daycare on the west side. The development with have a single driveway at the northside of the property with parking spaces on either side of the driveway. The building will be served by public water from Nutmeg Road South and public sanitary sewer runs within the property along Nutmeg Road South. Storm drainage analysis & design A. Methodology The primary method of predicting the surface water runoff rates utilized in this report is a computer program entitled Hydraflow Hydrographs Extension for Autodesk Civil 3D. The Hydraflow program forecasts the rate of surface water runoff based upon several factors, including information on land use, vegetation, watershed areas, soil types, time of concentration, rainfall data, storage volumes and hydraulic capacities of structures. The program predicts the amount of runoff as a function of time. The NOAA National Weather Service was used to determine the rainoff from the specific project location. This website supply information of the rainfall on an intensity (in/hr) and depth (inch) for the known precipitation. Rainfall events with recurrence frequencies of 2, 10, 25, and 100-yr Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 2 ~ during a 24-hr duration were used a data in the Hydraflow analysis. This information can be found in Appendix B. Soil types in the watershed were determined from the Natural Resources Conservation Service of Web Soil Survey, prepared by the United States Department of Agriculture, Soil Conservation Service. The soils over the property are show as Udorthents-Urban Land, and typically has a moderate rate of exfiltration. The soils map can be found in Appendix A. The time of concentration was calculated for the analysis using the TR-55 method. Deep test pits were performed on the property within at the northeast and southern corner of the property. Along with the deep test pits, permeability test was completed to determine the exfiltration rate from the detention systems. For the permeability rates, a safety factor of 50% was taken into consideration for the exfiltration rate. The soil test results can be found in the Infiltration Feasibility Report found in Appendix E. B. Pre-Development Drainage Conditions In order to evaluate the impact of the proposed development, one (1) Point of Analysis (POA) was analyzed to demonstrate that the peak rates of runoff would not increase from the site improvements. The primary POA, Design Point A, is located at the southern boundary line of the project area as the existing property slopes north to south and west to east, away from Nutmeg Road South. The site flows towards the wetlands and watercourse along the southern property boundary with slopes ranging from 2.0% to 10%. Flows from the site flow towards the wetlands along the eastern property boundary as well as the swale along the southern property boundary. The wetlands and swale are interconnected and the swale discharges to the north through a culvert under the abutting property’s driveway. The existing conditions model was used to determine existing flow conditions. The existing conditions flow can be found in Appendix C. C. Post-Development Drainage Conditions The same POA from the Pre-Development scenario was used in the Post-Development analysis. Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 3 ~ The overall drainage patterns remain the same as minimal areas from the site flow into Nutmeg Road South and the remaining areas continue the flow to the east and south. Runoff from the development area’s impervious is captured within the infiltration basin with the pavement area directed to a sediment forebay. The grass areas and roof drainage will be directed directly into the basin. D. Stormwater Water Quality Treatment The stormwater management plan is designed have the pavement area drain into a sediment forebay for pretreatment and then flow into the infiltration basin. The proposed roof and grass areas will either overland flow and be collected and directed into the infiltration basin via pipe networks. The WQV is the initial flush of stormwater that contains most of the sediment and pollutants as defined in the CT DEP 2024 Stormwater Quality Manual. The WQV will be retained by a sediment forebay prior to entering the infiltration basin. The primary treatment of the stormwater runoff for water quality is infiltration through the infiltration basin bottom. CT DEEP requires treatment practices to store and/or infiltrate the the Water Quality Volume through incorporated Best Management Practices. The WQV is based upon the impervious area and the required depth of runoff, depending on location and proximity to a wetland or other critical area. The Water Quality Volume calculations are included in Appendix F. Overall, the stormwater management plan has been designed in accordance with concepts and recommendations found in the CT 2024 Stormwater Quality Manual. E. Stormwater Conveyance System The project site is designed with a Low Impact Design and allows the parking lot and majority of the grass area to be diverted overland sheet flow into swales or a stone infiltration system. The only conveyance system would be for the roof leaders to be collected and discharged directly into the infiltration basin. The roof leader system has been analyzed using the Rational Method to Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 4 ~ convey the 100‐year design storm. The pipe sizing calculations are included in Appendix G of this report. F. Summary The goal of the stormwater management system is two-fold, to ensure peak rates of runoff do not have a negative impact on down gradient properties or storm drainage systems and to maintain water quality by promoting infiltration and renovation of the stormwater on site by utilizing concepts and recommendations from the CT DEEP 2024 Stormwater Quality Manual. Peak rates of runoff flow and volume from this site have been mitigated by installing a stormwater systems to detain and treat the proposed stormwater runoff from the site. The subject site complies with the Town of South Windsor’s Stormwater Management and Erosion Control Regulations and CT DEEP 2024 Stormwater Quality Manual in regards to stormwater treatment and runoff reduction. Proposed stormwater best management practices (BMP) are designed in accordance with the 2024 CT Stormwater Quality Chapter 13 – Structure Stormwater BMP Design Guidance. In addition, stormwater discharges, in terms of peak rate of runoff and total volume, are consistent with the Town of Farmington and 2024 CT Stormwater Quality Manual Standard 1. The results are reported below in Table 1 and 2. Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 5 ~ Table 1: Peak Runoff Site Pre-Development vs Post-Development (Peak Discharge Rate in CFS) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Flow Peak Flow Peak Flow Point Storm (inches) (cfs) (cfs) (cfs) A 2 3.10 0.979 0.712 -0.267 5 4.10 1.247 0.915 -0.332 10 4.92 1.469 1.168 -0.301 25 6.06 1.774 1.472 -0.302 100 7.81 2.243 1.893 -0.350 Table 2: Peak Volume Site Pre-Development vs Post-Development (Storm Volume in Cubic Feet) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Volume Peak Volume Peak Volume Point Storm (inches) (cu-ft) (cu-ft) (cu-ft) A 2 3.10 1,410 983 -427 5 4.10 1,796 1,297 -499 10 4.92 2,115 1,643 -472 25 6.06 2,554 2,131 -423 100 7.81 3,230 2,899 -331 Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 6 ~ Erosion & Sediment Control Provisions A. Temporary Erosion Control Measures Temporary erosion and sediment control measures are indicated on the design plans, construction details, general notes and within the drainage report. Although not integral to this stormwater report, due to the size of the proposed development both temporary and permanent erosion control measures will also be specified within the project’s Stormwater Pollution Prevention Plan (SWPPP). All erosion control measures specified are designed to reduce or eliminate potential soil migration and water quality degradation, both during and after the construction period. The following temporary erosion control measures will be implemented; • Silt Fence and/or Silt Logs • Catch Basin Filters – Silt Sock or Dandy Bags • Erosion Control Blankets on slopes 3:1 and steeper • Riprap Aprons & Spillway Stabilization • Turf Establishment - Hydroseeding with mulch and tackifiers These temporary erosion control measures are also discussed in the project’s Operation and Maintenance plan contained in the appendices of this report. In addition to the above-listed erosion control measures, references are made throughout the project documents to the 2024 Connecticut Guidelines for Soil Erosion and Sediment Control for additional measures, as necessary. B. Construction Sequence A site-specific construction sequence sensitive to limiting soil loss due to erosion and associated water quality degradation was prepared specifically for this project and is shown on the project plans. As pointed out in the erosion control notes, it is important for the contractor to recognize that proper judgment in the implementation of work will be essential if erosion is to be limited and protection of completed work is to be realized. Moreover, any specific changes in sequence and/or field conditions affecting the ability of specific erosion control measures to adequately serve their intended purpose should be reported to this office by the contractor. Furthermore, Proposed Dog Daycare and Groom 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report December 2, 2024 ~ 7 ~ the contractor is encouraged to supplement specified erosion control measures during the construction period where and when in his/ her best judgment, additional protection is warranted. C. Permanent Erosion Control Measures Similar to temporary erosion control measures, all permanent erosion control measures are indicated on the design plans, construction details, general notes, drainage report, SWPPP and O & M project documents. The following permanent erosion control measures will be implemented; • Bituminous Paved Roadway and parking lots • Closed drainage system (catch basins & piping) • Erosion Control Blankets • Inlet & Outlet Protection - Riprap Stabilization • Stormwater Basins with multi-stage outlets • Spillway Stabilization • Turf Establishment - Hydroseeding with mulch and tackifiers Each of the above-mentioned permanent erosion control measures are designed in a project- specific manner within both state and local regulatory compliance standards. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report September 27, 2024 December 2, 2024 APPENDICES TABLE OF CONTENTS APPENDICES TITLE A FIGURES #1 Key Map #2 Aerial Photo #3 Site Photos #4 Soil Map #5 Natural Diversity Database Map #6 FEMA FIRMette B PRECIPITATION C PRE AND POST DEVELOPMENT ANALYSIS D DETENTION SYSTEM DESIGN E INFILTRATION FEASIBILITY REPORT F WATER QUALITY CALCULATIONS G COLLECTION SYSTEM H OPERATION AND MAINTENANCE MANUAL I STORMWATER WATERSHED AREA MAPS #1 Existing Watershed Area #2 Proposed Watershed Area #3 Proposed Collection System Watershed Area APPENDIX ‘A’ FIGURES SITE KEY MAP SCALE: 1"=500' Town of South Windsor Geographic Information System (GIS) Date Printed: 9/17/2024 Approximate Scale: 1 inch = 200 feetMAP DISCLAIMER - NOTICE OF LIABILITY This map is for assessment purposes only. It is not for legal description or conveyances. All information is subject to verification by any user. The Town of South Windsor and its mapping contractors assume no legal responsibility for the information contained herein. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Stormwater Management Report October 23, 2024 SITE PHOTOS Site Photo – Google Street View Looking South – Nov 2023 Site Photo – Google Street View Looking North – N ov 2023 Hydrologic Soil Group—State of Connecticut, Western Part (260 Nutmeg Road South) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 1 of 446332204633250463328046333104633340463337046334004633220463325046332804633310463334046333704633400699100699130699160699190699220699250699280699310699340699370699400 699100 699130 699160 699190 699220 699250 699280 699310 699340 699370 699400 41° 49' 39'' N 72° 36' 9'' W41° 49' 39'' N72° 35' 55'' W41° 49' 32'' N 72° 36' 9'' W41° 49' 32'' N 72° 35' 55'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,470 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 1, Sep 15, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—State of Connecticut, Western Part (260 Nutmeg Road South) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 306 Udorthents-Urban land complex B 2.8 35.7% 308 Udorthents, smoothed B 5.0 64.3% Totals for Area of Interest 7.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—State of Connecticut, Western Part 260 Nutmeg Road South Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—State of Connecticut, Western Part 260 Nutmeg Road South Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2024 Page 4 of 4 Wilson Wapping Oakland Burnham Burnside Lydallville Windsorville Talcottville Highland Park Mayberry Village Manchester Green East Windsor Hill South Windsor Windsor Manchester East Windsor East Hartford Vernon Ellington Hartford Windsor Locks I 84I 291 US Hwy 5I 91Route 5Rye St Tolland T p k e State Hw y 3 0 Wilbur C r o s s H w yState Hwy 159Route 7 4 I 384 Middle Tpke Route 83State Hwy 74Main S t Rout e 1 9 4 John Fitch BlvdStro n g R d State H wy 83Avery StUS Hwy 6 Tolland S tPalisado AveSulliv a n A v e Griffin R d Middle Rd Center StScantic RdEast RdPinney StClark StBurnside Ave Graham RdWindsor AveAbbott RdEllington Rd State H w y 1 9 4 Cha p e l R d US Hwy 44AKennedy Rd De m i n g S t Talcottville RdKing StBurnham St Silver Ln Plea s a n t V a l l e y R d Dart Hill Rd Nevers RdHartford Rd Hilliard St Port e r S tWapping RdFoster StFelt RdState Hwy 286Barber Hill RdUS H wy 44 Taylor StTripp RdPhelps R d Adams StBroad StOak St Bissel l B r g River St Hartford TpkeWeston StRoberts S t Kelly R d Frog Hollow Rd Ro c k v i l l e R d Chamberlain Rd Gov e r n o r s H w ySta te Hw y 75 O a k l a n d R d State Hw y 1 9 1 Miller RdTro y R d Oakland StSmith St Summit StFoster RdNiederwerfer RdHighland St New b e r r y R d Skinner RdGoodw i n S t Rout e 3 0 Abbe Rd Woodbridge St Forbes S tProspect StHany LnCapen S t Henry St Plantation Rd Elm StWoodland StVibe r t R d Hayden S t a t i o n R d Olcott St Scott DrPierce RdFerry L n Parker StSpruce StSpencer StLong Hill StGreen RdHilton DrSchool StLong Hill RdStoughto n R d Pierson LnAutumn StPine StLydall StSlater StGovernor St Union StPark A v e West RdClark R d Garth Rd Ferguson RdThrall RdBe e l z e b u b R d State Hwy 305 Burg e s s R d Batchelder RdMcKee StOmelia R d Hayes Ave Elm Hill RdS e r v i c e R dDeerfie ld Rd Winderm e r e A v e Hale RdClover StHoll StPlymouth StWindsorville RdHillside StWoolam R d Maple St Park St Croft Dr Ryan Dr River Dr Love Ln Forest StHigh St Bucklan d Hill s Dr Sand Hill RdBrook StFord R d Lawrence RdBissell St Fair v i e w D rLancaster DrVernon StAlden RdNutmeg RdStandish St Rood Ave Bryan DrPond RdLenox StAyers Rd Jenn i n g s R d Sate l l i t e R d Trumbull LnPrestige Pa r k R d Benton StClint o n D r Palm e r D r Farn h a m R d Ma c k t o w n R d Laurel S t Hamilton DrMorris R d Barry Rd Cooper Hill St Debbie Dr Swan Dr Robert Dr Huntington Dr Lefoll BlvdQry B r o o k D r Brent Rd Lyness StSt John St K e n t D r Berle Rd Birc h H i l l D r C e m e t e r y R d Rimfield Dr Pavilion DrNorton RdCedar St Birch R d Gerald DrOrc h a r d H i l l D rFoster Street ExtGail LnColby Dr Mack StGrant RdWilson Ave Diane DrKent LnTudor LnBrookfield StRidgewood RdIdent RdYale DrCipolla DrLindsay LnLoom i s R d Cherry St Nort h v i e w D r Buckland RdGarnet LnIsland Rd Meadow R d Earl StCentral Ave Parking Lo t Wood Dr Wel les Rd Marg a r e t D r Pheasant WayValley St Old Town RdGorski DrQuail XingCor n e r s t o n e D r Seneca Dr B a t s o n D r Bolt o n S t Utopia Rd Wood Pond Rd Lake St T h o m a s S t Progress DrBeldon RdFarmstead DrTu m b l e b r o o k D r Collins Xing Benedict Dr Sally D r Wheeler RdHigh Pa th Rd Wickham Park Trebbe DrKr a w s k i D r Redst o n e R d Elro StRichmond Dr Russell St Bentley DrMaskel RdNeill Rd Hocka n u m B l v d Gree n S t Pitkin S t Elida Ct Laur e l L n Temple DrJoseph LnValley V i e w D r Bretton Rd Lisa Dr Campbell Ave Pine Knob D r Ketchbrook Ln Filley St Ivy LnFoley StCardinal WayJudg e L n Remington Rd Tracy Dr Eva CirDiscovery RdJoshua H l Justin DrDurant StSherwood DrCambridge St Eva Dr All e n D r Dempsey Rd Bis s e l l F e r r y R d Windshire DrElmer St Leverich Dr Arnold Dr Skyline DrCollimo r e R d Sc h a n k R d Naek R d Strickland St Winton Rd Joanne Dr Glenwood StJea n R dJefferson StWoodlawn CirTerrace Ave Kimbe r l y D r Allen Ridge DrCharter Oak St Vintage Ln Rene Ct Beacon Hi ll R d John St Hollis RdGerber RdScantic Meadow RdOld K e n n e d y R d Sa x t o n L n Robert RdArdsley Ln Andreis TrlGarden StAmato DrAustin CirRiverside DrTower Rd Shay St J o h n D r Glenwo o d R d Welling t o n R d Lilac StO x f o r d L n Sele DrAnn StAlna Ln Williams St N u t m e g D r Rossetto DrLocust StLynch Dr Nook Farms Rd Shady LnEagle Dr Amy Dr Aut u m n D r Blinn St Dover RdField DrRuby DrPearl DrLilley StTomel DrPatria RdKu p c h u n o s D r Jay C i r Wind RdWilliam StHearthstoneWalker TerMatthew LnBidw e l l R d Fairwa y Dr Canterbury LnCarroll RdI 91McKee StCenter StMeadow Rd Nutmeg RdRoute 30 Park Ave Bissell B r g School StMain StEllington RdWilbur Cross HwyMain St I 91Ser v i c e R d I 84 Slater StI 91I 84 US Hwy 6Broad StI 84 I 291 I 384 Wi n d s o r v i l l e R d I 384 Ellingt o n R d Miller Rd Kin g S t Goodwin St Exit 1 Exit 5 Exit 33 Exit 61 Exit 60 Exit 4 Exit 62 & 60 Exit 58 Exit 65 Exit 3 Exit 39&41 Exit 63 Exit 40 Exit 34 Exit 54 §¨¦84 §¨¦384 §¨¦291 §¨¦91 £¤5 £¤44A SV191 SV74 SV159 SV30 SV194 SV286 SV218 SV75 SV83 SV178 SV305 Natural Diversity Data Base June 2024 Areas NOTE: This map shows known locations of State and Federal Listed Species and Critical Habitats. Information on listed species is collected and compiled by the Natural Diversity Data Base (NDDB) from a variety of data sources . Exact locations of species have been buffered to produce the generalized locations. This map is intended for use as a preliminary screening tool for conducting a Natural Diversity Data Base Review Request. To use the map, locate the project boundaries and any additional affected areas. If the project is within a hatched area there may be a potential conflict with a listed species. For more information, use DEEP ezFile https://filings.deep.ct.gov/DEEPPortal/ to submit a Request for Natural Diversity Data Base State Listed Species Review or Site Assessment. More detailed instructions are provided along with the request form on our website. https://portal.ct.gov/deep-nddbrequest Use the CTECO Interactive Map Viewers at http://cteco.uconn.edu to more precisely search for and locate a site and to view aerial imagery with NDDB Areas. QUESTIONS: Department of Energy and Environmental Protection (DEEP) 79 Elm St, Hartford, CT 06106 email: deep.nddbrequest@ct.gov Phone: (860) 424-3011 SOUTH WINDSOR, CT 0 10.5 Miles ± Critical Habitat State and Federal Listed Species Town Boundary National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 9/17/2024 at 9:21 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 72°36'22"W 41°49'50"N 72°35'44"W 41°49'23"N Basemap Imagery Source: USGS National Map 2023 APPENDIX ‘B’ PRECIPITATION NOAA Atlas 14, Volume 10, Version 3 Location name: South Windsor, Connecticut, USA* Latitude: 41.8266°, Longitude: -72.6009° Elevation: 70 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.336 (0.261‑0.432) 0.407 (0.316‑0.524) 0.523 (0.404‑0.675) 0.620 (0.477‑0.805) 0.753 (0.562‑1.02) 0.853 (0.623‑1.18) 0.958 (0.680‑1.38) 1.08 (0.724‑1.59) 1.25 (0.807‑1.91) 1.38 (0.876‑2.16) 10-min 0.476 (0.370‑0.612) 0.577 (0.448‑0.742) 0.742 (0.574‑0.957) 0.879 (0.676‑1.14) 1.07 (0.796‑1.45) 1.21 (0.883‑1.68) 1.36 (0.964‑1.96) 1.52 (1.03‑2.25) 1.76 (1.14‑2.70) 1.96 (1.24‑3.07) 15-min 0.560 (0.436‑0.720) 0.679 (0.527‑0.873) 0.873 (0.676‑1.13) 1.03 (0.796‑1.34) 1.26 (0.936‑1.71) 1.42 (1.04‑1.98) 1.60 (1.13‑2.30) 1.79 (1.21‑2.65) 2.08 (1.34‑3.18) 2.31 (1.46‑3.61) 30-min 0.751 (0.584‑0.965) 0.913 (0.709‑1.17) 1.18 (0.911‑1.52) 1.40 (1.08‑1.81) 1.70 (1.27‑2.31) 1.93 (1.41‑2.68) 2.16 (1.54‑3.12) 2.43 (1.64‑3.59) 2.82 (1.82‑4.31) 3.13 (1.98‑4.89) 60-min 0.942 (0.732‑1.21) 1.15 (0.891‑1.48) 1.48 (1.15‑1.91) 1.76 (1.36‑2.28) 2.14 (1.60‑2.91) 2.43 (1.78‑3.38) 2.73 (1.94‑3.94) 3.07 (2.07‑4.54) 3.56 (2.30‑5.44) 3.95 (2.50‑6.18) 2-hr 1.22 (0.954‑1.56) 1.48 (1.15‑1.89) 1.90 (1.48‑2.43) 2.24 (1.74‑2.90) 2.72 (2.04‑3.69) 3.08 (2.27‑4.27) 3.46 (2.48‑5.00) 3.91 (2.64‑5.74) 4.58 (2.98‑6.97) 5.15 (3.27‑7.99) 3-hr 1.40 (1.10‑1.79) 1.70 (1.33‑2.16) 2.18 (1.70‑2.79) 2.58 (2.00‑3.32) 3.13 (2.36‑4.23) 3.54 (2.62‑4.89) 3.97 (2.87‑5.74) 4.50 (3.05‑6.59) 5.31 (3.45‑8.04) 5.99 (3.81‑9.27) 6-hr 1.76 (1.39‑2.23) 2.14 (1.68‑2.70) 2.75 (2.16‑3.49) 3.26 (2.54‑4.16) 3.96 (3.00‑5.33) 4.48 (3.33‑6.17) 5.04 (3.66‑7.26) 5.74 (3.89‑8.34) 6.81 (4.44‑10.3) 7.73 (4.93‑11.9) 12-hr 2.14 (1.70‑2.69) 2.62 (2.08‑3.30) 3.42 (2.70‑4.32) 4.07 (3.20‑5.17) 4.97 (3.79‑6.66) 5.64 (4.22‑7.73) 6.36 (4.65‑9.13) 7.27 (4.95‑10.5) 8.67 (5.68‑13.0) 9.89 (6.33‑15.1) 24-hr 2.50 (1.99‑3.12) 3.10 (2.48‑3.88) 4.10 (3.26‑5.15) 4.92 (3.89‑6.22) 6.06 (4.65‑8.08) 6.89 (5.20‑9.43) 7.81 (5.76‑11.2) 8.98 (6.14‑12.9) 10.8 (7.12‑16.1) 12.5 (8.01‑18.9) 2-day 2.81 (2.26‑3.49) 3.55 (2.85‑4.42) 4.76 (3.80‑5.94) 5.76 (4.58‑7.23) 7.14 (5.52‑9.49) 8.14 (6.19‑11.1) 9.26 (6.91‑13.3) 10.8 (7.37‑15.4) 13.2 (8.69‑19.5) 15.4 (9.91‑23.2) 3-day 3.06 (2.47‑3.79) 3.87 (3.12‑4.80) 5.20 (4.17‑6.47) 6.30 (5.02‑7.88) 7.81 (6.07‑10.4) 8.91 (6.80‑12.2) 10.1 (7.60‑14.6) 11.8 (8.10‑16.8) 14.6 (9.60‑21.4) 17.0 (11.0‑25.5) 4-day 3.29 (2.66‑4.06) 4.15 (3.35‑5.13) 5.56 (4.47‑6.90) 6.73 (5.38‑8.40) 8.35 (6.50‑11.0) 9.51 (7.28‑12.9) 10.8 (8.13‑15.5) 12.6 (8.66‑17.9) 15.5 (10.3‑22.8) 18.2 (11.7‑27.2) 7-day 3.90 (3.16‑4.79) 4.87 (3.95‑5.99) 6.45 (5.21‑7.96) 7.77 (6.24‑9.64) 9.58 (7.48‑12.6) 10.9 (8.36‑14.7) 12.4 (9.29‑17.5) 14.3 (9.88‑20.2) 17.5 (11.6‑25.6) 20.4 (13.2‑30.3) 10-day 4.51 (3.68‑5.53) 5.54 (4.51‑6.79) 7.22 (5.85‑8.88) 8.61 (6.93‑10.7) 10.5 (8.23‑13.7) 11.9 (9.15‑16.0) 13.5 (10.1‑18.9) 15.5 (10.7‑21.8) 18.7 (12.4‑27.3) 21.6 (14.0‑32.1) 20-day 6.50 (5.33‑7.91) 7.58 (6.21‑9.24) 9.36 (7.63‑11.4) 10.8 (8.77‑13.3) 12.9 (10.1‑16.6) 14.4 (11.0‑18.9) 16.0 (11.9‑22.0) 17.9 (12.5‑25.0) 20.9 (14.0‑30.2) 23.5 (15.3‑34.6) 30-day 8.21 (6.75‑9.96) 9.32 (7.65‑11.3) 11.1 (9.11‑13.6) 12.6 (10.3‑15.5) 14.7 (11.5‑18.8) 16.3 (12.5‑21.2) 17.9 (13.3‑24.2) 19.8 (13.8‑27.4) 22.4 (15.0‑32.2) 24.7 (16.1‑36.2) 45-day 10.4 (8.55‑12.5) 11.5 (9.48‑13.9) 13.4 (11.0‑16.2) 14.9 (12.2‑18.2) 17.1 (13.4‑21.6) 18.7 (14.3‑24.2) 20.4 (15.0‑27.2) 22.1 (15.5‑30.5) 24.4 (16.4‑34.8) 26.1 (17.1‑38.2) 60-day 12.2 (10.1‑14.7) 13.4 (11.0‑16.1) 15.3 (12.6‑18.5) 16.9 (13.8‑20.6) 19.1 (15.0‑24.1) 20.9 (16.0‑26.7) 22.5 (16.6‑29.8) 24.1 (17.0‑33.2) 26.1 (17.6‑37.2) 27.6 (18.0‑40.1) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain NOAA Atlas 14, Volume 10, Version 3 Location name: South Windsor, Connecticut, USA* Latitude: 41.8266°, Longitude: -72.6009° Elevation: 70 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.03 (3.13‑5.18) 4.88 (3.79‑6.29) 6.28 (4.85‑8.10) 7.44 (5.72‑9.66) 9.04 (6.74‑12.3) 10.2 (7.48‑14.2) 11.5 (8.16‑16.6) 12.9 (8.69‑19.1) 15.0 (9.68‑22.9) 16.6 (10.5‑26.0) 10-min 2.86 (2.22‑3.67) 3.46 (2.69‑4.45) 4.45 (3.44‑5.74) 5.27 (4.06‑6.85) 6.40 (4.78‑8.70) 7.25 (5.30‑10.1) 8.14 (5.78‑11.8) 9.14 (6.16‑13.5) 10.6 (6.86‑16.2) 11.8 (7.45‑18.4) 15-min 2.24 (1.74‑2.88) 2.72 (2.11‑3.49) 3.49 (2.70‑4.50) 4.14 (3.18‑5.37) 5.02 (3.74‑6.82) 5.69 (4.16‑7.90) 6.39 (4.54‑9.22) 7.18 (4.83‑10.6) 8.30 (5.38‑12.7) 9.23 (5.84‑14.4) 30-min 1.50 (1.17‑1.93) 1.83 (1.42‑2.35) 2.36 (1.82‑3.04) 2.79 (2.15‑3.63) 3.40 (2.53‑4.62) 3.85 (2.82‑5.35) 4.33 (3.07‑6.25) 4.87 (3.27‑7.19) 5.63 (3.65‑8.62) 6.26 (3.96‑9.79) 60-min 0.942 (0.732‑1.21) 1.15 (0.891‑1.48) 1.48 (1.15‑1.91) 1.76 (1.36‑2.28) 2.14 (1.60‑2.91) 2.43 (1.78‑3.38) 2.73 (1.94‑3.94) 3.07 (2.07‑4.54) 3.56 (2.30‑5.44) 3.95 (2.50‑6.18) 2-hr 0.609 (0.477‑0.778) 0.738 (0.576‑0.943) 0.948 (0.738‑1.22) 1.12 (0.868‑1.45) 1.36 (1.02‑1.84) 1.54 (1.13‑2.13) 1.73 (1.24‑2.50) 1.96 (1.32‑2.87) 2.29 (1.49‑3.48) 2.57 (1.63‑4.00) 3-hr 0.467 (0.367‑0.595) 0.565 (0.443‑0.720) 0.725 (0.567‑0.928) 0.858 (0.666‑1.10) 1.04 (0.785‑1.41) 1.18 (0.870‑1.63) 1.32 (0.954‑1.91) 1.50 (1.01‑2.19) 1.77 (1.15‑2.68) 2.00 (1.27‑3.09) 6-hr 0.293 (0.231‑0.371) 0.356 (0.281‑0.451) 0.459 (0.360‑0.583) 0.544 (0.425‑0.695) 0.661 (0.501‑0.889) 0.747 (0.556‑1.03) 0.841 (0.611‑1.21) 0.957 (0.649‑1.39) 1.14 (0.741‑1.71) 1.29 (0.823‑1.98) 12-hr 0.177 (0.141‑0.223) 0.217 (0.172‑0.274) 0.283 (0.224‑0.358) 0.337 (0.265‑0.429) 0.412 (0.314‑0.552) 0.467 (0.350‑0.641) 0.528 (0.386‑0.757) 0.603 (0.410‑0.871) 0.719 (0.471‑1.08) 0.821 (0.525‑1.25) 24-hr 0.104 (0.083‑0.130) 0.129 (0.103‑0.161) 0.170 (0.135‑0.214) 0.205 (0.162‑0.259) 0.252 (0.193‑0.336) 0.287 (0.216‑0.392) 0.325 (0.240‑0.466) 0.374 (0.255‑0.538) 0.451 (0.296‑0.672) 0.520 (0.333‑0.788) 2-day 0.058 (0.047‑0.072) 0.073 (0.059‑0.091) 0.099 (0.079‑0.123) 0.119 (0.095‑0.150) 0.148 (0.115‑0.197) 0.169 (0.128‑0.231) 0.192 (0.143‑0.277) 0.223 (0.153‑0.320) 0.274 (0.181‑0.406) 0.320 (0.206‑0.482) 3-day 0.042 (0.034‑0.052) 0.053 (0.043‑0.066) 0.072 (0.057‑0.089) 0.087 (0.069‑0.109) 0.108 (0.084‑0.143) 0.123 (0.094‑0.168) 0.140 (0.105‑0.202) 0.163 (0.112‑0.233) 0.202 (0.133‑0.297) 0.236 (0.152‑0.354) 4-day 0.034 (0.027‑0.042) 0.043 (0.034‑0.053) 0.057 (0.046‑0.071) 0.070 (0.056‑0.087) 0.086 (0.067‑0.115) 0.099 (0.075‑0.134) 0.112 (0.084‑0.161) 0.131 (0.090‑0.186) 0.161 (0.106‑0.237) 0.189 (0.122‑0.282) 7-day 0.023 (0.018‑0.028) 0.028 (0.023‑0.035) 0.038 (0.031‑0.047) 0.046 (0.037‑0.057) 0.057 (0.044‑0.074) 0.064 (0.049‑0.087) 0.073 (0.055‑0.104) 0.085 (0.058‑0.120) 0.104 (0.069‑0.152) 0.121 (0.078‑0.180) 10-day 0.018 (0.015‑0.023) 0.023 (0.018‑0.028) 0.030 (0.024‑0.037) 0.035 (0.028‑0.044) 0.043 (0.034‑0.057) 0.049 (0.038‑0.066) 0.056 (0.042‑0.078) 0.064 (0.044‑0.090) 0.078 (0.051‑0.113) 0.090 (0.058‑0.133) 20-day 0.013 (0.011‑0.016) 0.015 (0.012‑0.019) 0.019 (0.015‑0.023) 0.022 (0.018‑0.027) 0.026 (0.020‑0.034) 0.029 (0.022‑0.039) 0.033 (0.024‑0.045) 0.037 (0.026‑0.052) 0.043 (0.029‑0.062) 0.048 (0.031‑0.072) 30-day 0.011 (0.009‑0.013) 0.012 (0.010‑0.015) 0.015 (0.012‑0.018) 0.017 (0.014‑0.021) 0.020 (0.016‑0.026) 0.022 (0.017‑0.029) 0.024 (0.018‑0.033) 0.027 (0.019‑0.038) 0.031 (0.020‑0.044) 0.034 (0.022‑0.050) 45-day 0.009 (0.007‑0.011) 0.010 (0.008‑0.012) 0.012 (0.010‑0.015) 0.013 (0.011‑0.016) 0.015 (0.012‑0.020) 0.017 (0.013‑0.022) 0.018 (0.013‑0.025) 0.020 (0.014‑0.028) 0.022 (0.015‑0.032) 0.024 (0.015‑0.035) 60-day 0.008 (0.006‑0.010) 0.009 (0.007‑0.011) 0.010 (0.008‑0.012) 0.011 (0.009‑0.014) 0.013 (0.010‑0.016) 0.014 (0.011‑0.018) 0.015 (0.011‑0.020) 0.016 (0.011‑0.023) 0.018 (0.012‑0.025) 0.019 (0.012‑0.027) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Back to Top Maps & aerials Small scale terrain Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi APPENDIX ‘C’ PRE AND POST DEVELOPMENT ANALYSIS Site Pre-Development vs Post-Development (Peak Discharge Rate in CFS) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Flow Peak Flow Peak Flow Point Storm (inches) (cfs) (cfs) (cfs) 2 3.10 0.979 0.712 -0.267 5 4.10 1.247 0.915 -0.332 10 4.92 1.469 1.168 -0.301 25 6.06 1.774 1.472 -0.302 100 7.81 2.243 1.893 -0.350 Notes: Site Pre-Development vs Post-Development (Storm Volume in Cubic Feet) 24-Hr Existing Proposed Change in Design Design Rainfall Peak Volume Peak Volume Peak Volume Point Storm (inches) (cu-ft) (cu-ft) (cu-ft) 2 3.10 1,410 983 -427 5 4.10 1,796 1,297 -499 10 4.92 2,115 1,643 -472 25 6.06 2,554 2,131 -423 100 7.81 3,230 2,899 -331 Table 2: Peak Volume 1. Proposed Peak flows at Design Point A are a summation of the detention pond release (P2) and drainage basin P1 2. Per 2024 CT Stormwater Quality Manual Standard 2 - Peak Runoff Attenuation during the 2-yr, 24-hr post-development peak flow rate is to be 50% of the 2-yr, 24-hr pre-development peak flow. Due to the small drainage area, all the proposed development is captured and the surrounding area is unable to be contained and decrease the peak flow even further. The infiltration basin is self-containing during the 2-yr storm. A waiver is being requested. Table 1: Peak Runoff A A 1 - E1 3 - P1 4 - P2 5 - Pond P2 6 - Total P 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Project: 1018 - Hydraflow.gpw Tuesday, 12 / 3 / 2024 Hyd.Origin Description Legend 1 Rational E1 3 Rational P1 4 Rational P2 5 Reservoir Pond P2 6 Combine Total P Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ ------- 0.979 ------- 1.247 1.469 1.774 ------- 2.243 E1 3 Rational ------ ------- 0.712 ------- 0.907 1.068 1.289 ------- 1.631 P1 4 Rational ------ ------- 0.999 ------- 1.271 1.498 1.808 ------- 2.288 P2 5 Reservoir 4 ------- 0.000 ------- 0.064 0.156 0.215 ------- 0.288 Pond P2 6 Combine 3, 5 ------- 0.712 ------- 0.915 1.168 1.472 ------- 1.893 Total P Proj. file: 1018 - Hydraflow.gpw Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 0.979 1 24 1,410 ------ ------ ------ E1 3 Rational 0.712 1 23 983 ------ ------ ------ P1 4 Rational 0.999 1 16 959 ------ ------ ------ P2 5 Reservoir 0.000 1 160 0 4 68.86 778 Pond P2 6 Combine 0.712 1 23 983 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 2 Year Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.247 1 24 1,796 ------ ------ ------ E1 3 Rational 0.907 1 23 1,251 ------ ------ ------ P1 4 Rational 1.271 1 16 1,221 ------ ------ ------ P2 5 Reservoir 0.064 1 30 46 4 69.09 992 Pond P2 6 Combine 0.915 1 23 1,297 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 5 Year Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 5 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.469 1 24 2,115 ------ ------ ------ E1 3 Rational 1.068 1 23 1,474 ------ ------ ------ P1 4 Rational 1.498 1 16 1,438 ------ ------ ------ P2 5 Reservoir 0.156 1 29 170 4 69.24 1,139 Pond P2 6 Combine 1.168 1 23 1,643 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 10 Year Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 6 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 1.774 1 24 2,554 ------ ------ ------ E1 3 Rational 1.289 1 23 1,779 ------ ------ ------ P1 4 Rational 1.808 1 16 1,736 ------ ------ ------ P2 5 Reservoir 0.215 1 29 352 4 69.44 1,355 Pond P2 6 Combine 1.472 1 23 2,131 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 25 Year Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Summary Report 7 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 2.243 1 24 3,230 ------ ------ ------ E1 3 Rational 1.631 1 23 2,251 ------ ------ ------ P1 4 Rational 2.288 1 16 2,196 ------ ------ ------ P2 5 Reservoir 0.288 1 29 648 4 69.73 1,699 Pond P2 6 Combine 1.893 1 23 2,899 3, 5 ------ ------ Total P 1018 - Hydraflow.gpw Return Period: 100 Year Tuesday, 12 / 3 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydraflow Rainfall Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 12 / 3 / 2024 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 24.0619 3.7000 0.7218 -------- 3 0.0000 0.0000 0.0000 -------- 5 30.4729 3.7000 0.7201 -------- 10 36.3724 3.8000 0.7233 -------- 25 44.5411 3.9000 0.7268 -------- 50 49.5765 3.8000 0.7237 -------- 100 57.2298 4.0000 0.7308 -------- File name: 1018 - South Windsor.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs)5 min1015202530354045505560 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.05 3.64 2.91 2.45 2.13 1.90 1.72 1.58 1.46 1.36 1.27 1.20 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.42 4.63 3.70 3.12 2.72 2.42 2.19 2.01 1.86 1.73 1.62 1.53 10 7.54 5.45 4.36 3.67 3.20 2.85 2.58 2.36 2.19 2.04 1.91 1.80 25 9.09 6.58 5.26 4.43 3.86 3.44 3.11 2.85 2.64 2.46 2.30 2.17 50 10.27 7.42 5.93 5.00 4.36 3.88 3.51 3.22 2.97 2.77 2.60 2.45 100 11.49 8.32 6.66 5.61 4.89 4.35 3.94 3.60 3.33 3.10 2.91 2.74 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) ame: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - South Windsor.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 3.10 0.00 4.10 4.92 6.06 6.89 7.81 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rational Equation: Q = CCfIA (ConnDOT Equation 6.1)Project:Proposed Dog Daycare & GroomingC=Runoff Coefficient260 Nutmeg Road South, South Windsor, CTCf=Frequency Factor (ConnDOT Table 6-2)I=Intensity (taken from ConnDOT Table B-2.1)Calculations By:MSLA=Area (acres)Date:Q= Runoff Flow (CFS)Rev:25 Yr 50 Yr 100YrCf1.10 1.20 1.25Basin CharacteristicsRunoff Coefficients & Frequency FactorsIntensity (in/hr) Flow (CFS)C2C5C10C25C50C100A E1 1.7924 0.25 0.25 0.25 0.28 0.31 0.32 2.30 2.90 3.30 3.80 4.20 4.70 1.0 1.3 1.5 1.9 2.3 2.7A P1 0.9623 0.33 0.33 0.33 0.36 0.39 0.41 2.30 2.90 3.40 3.90 4.30 4.80 0.7 0.9 1.1 1.4 1.6 1.9AP2 0.8316 0.43 0.43 0.43 0.47 0.51 0.54 2.80 3.50 3.90 4.50 5.00 5.40 1.0 1.2 1.4 1.8 2.1 2.4(Not to exceed 1.0)I2 I10 I25Q100 I100T(min)Q5Q10 I5Q50RATIONAL METHOD DEVELOPED RUNOFF COMPUTATIONS9/20/2024DesignPoint Basin(s)Q25Area, A(acres) I5012/2/2024Q2D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls Character of SurfaceRunoff Coefficient SourceCharacter of SurfaceRunoff Coefficient SourceProject:Asphalt, Concrete, & Water Surface0.95CONN DOT Table 6-5Forest (Hydrologic Type B Soil)0.18McCuen, 1989 Table 7-2Roof Surface0.95CONN DOT Table 6-4Forest (Hydrologic Type D Soil)0.25McCuen, 1989 Table 7-3Industrial Impervious Area0.75CONN DOT Table 6-4Lawns Sandy Soil (Steep 7%+)0.18McCuen, 1989 Table 7-3Calcs By: MSLParks & Cemeteries 0.25CONN DOT Table 6-4Lawns Sandy Soil (2% to 7%)0.16McCuen, 1989 Table 7-3Date: 9/20/24Unimproved Areas0.30CONN DOT Table 6-4McCuen, 1989 Table 7-3Revised : 12/02/24Gravel0.43McCuen, 1989 Table 7-2Basin AreaAsphalt, Concrete, & Water Surface Roof SurfaceIndustrial Impervious AreaParks & CemeteriesUnimproved Areas GravelForest (Hydrologic Type B Soil)Forest (Hydrologic Type D Soil)Lawns Sandy Soil (Steep 7%+)Lawns Sandy Soil (2% to 7%)Basin ID(acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres)E1 1.79 0.160.80 0.31 0.52 0.25P1 0.96 0.160.18 0.31 0.30 0.33P2 0.83 0.17 0.110.00 0.00 0.55 0.43Note: Composite RunoffCoefficientRATIONAL METHOD COMPOSITE RUNOFF COEFFICIENTSProposed Dog Daycare & Grooming260 Nutmeg Road South, South Windsor, CTD:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls Overland Flow: (Maximum 150 FT)Project:Proposed Dog Daycare & GroomingTt=Travel Time (Hr) P2= 2 Year, 24-hour Ranfall (in)260 Nutmeg Road South, South Windsor, CTn=Manning's Roughness (TR-55 Table 3-1) s=slope (ft/ft)L=Flow Length (ft)Calculations By:MSLDate:Shallow Concentrated Flow:Unpaved: V=16.1345(s)0.5Tt=Travel Time (min)Paved: V=20.3284(s)0.5V=Velocity (ft/s)Common Manning n Values for overland flowTt = L / 60Vs=slope (ft/ft)Woods 0.400 Light UnderbrushPavement 0.011Open Channel\Swale Flow:Lawns 0.410 Bermuda GrassTt=Travel Time (min)V=Velocity (ft/s)a=cross-section area (ft2)Dense Grass 0.240 Lovegrass, Bluegrass, Buffalo,Grama & Nativen=Manning's Roughness s=slope (ft/ft)pw=wetted perimeter (ft)L=Flow Length (ft) r= hydraulic radius (a/pw)Tt = L / 60VMinimum allowable Tc = 5.00 min.TotalnL(ft)S(%)To(min)Paved (Y or N) L(ft)S(%) V(ft/s)T1(min) n Area (s.f.)Wet. Perim. (ft)S(%) V(full flow)(ft/s) L(ft)Ts(min)Dia. (in) L(ft)S(%) V(full flow)(ft/s)Tp(min)T(min)A E1 0.4101004.00 16.60N 2701.56 2.01 2.240.00 N 2420.21 0.73 5.50Subtotal 16.60 Subtotal 7.74Subtotal Subtotal24.33A P1 0.4101005.40 14.72N 2851.05 1.66 2.87 N 2420.21 0.73 5.50Subtotal 14.72 Subtotal 8.37Subtotal Subtotal23.09A P2 0.4101004.75 15.50N661.52 1.99 0.55 Subtotal 15.50 Subtotal 0.55Subtotal Subtotal16.05TIME OF CONCENTRATION COMPUTATIONS Design Point9/20/2024Basin(s)Overland Sheet Flow Shallow Flow Swale Flow Pipe Flow(Conn DOT Equations 6.C.4 & C.C.5)(TR-55 Equation 3-3)}(TR-55 Equation 3-4)D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Detention\1018 - Rational Peak Flows DOT.xls APPENDIX ‘D’ DETENTION SYSTEM DESIGN Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 2 / 2024 Pond No. 1 - Infiltration Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 67.40 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 67.40 40 0 0 0.20 67.60 200 22 22 0.40 67.80 359 55 77 0.60 68.00 515 87 164 0.80 68.20 633 115 279 1.00 68.40 708 134 413 1.20 68.60 781 149 562 1.40 68.80 855 164 725 1.60 69.00 932 179 904 1.80 69.20 1,012 194 1,098 2.00 69.40 1,093 210 1,309 2.20 69.60 1,177 227 1,536 2.40 69.80 1,263 244 1,779 2.60 70.00 1,351 261 2,041 2.80 70.20 1,442 279 2,320 3.00 70.40 1,535 298 2,618 3.20 70.60 1,630 316 2,934 3.40 70.80 1,727 336 3,270 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 4.00 0.00 0.00 0.00 Span (in)= 4.00 0.00 0.00 0.00 No. Barrels = 1 000 Invert El. (ft)= 68.92 0.00 0.00 0.00 Length (ft)= 18.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 0.00 0.00 0.00 10.00 Crest El. (ft)= 0.00 0.00 0.00 70.00 Weir Coeff.= 3.33 3.33 3.33 2.60 Weir Type = --- --- --- Broad Multi-Stage = No No No No Exfil.(in/hr)= 5.290 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Stage (ft) 0.00 67.40 1.00 68.40 2.00 69.40 3.00 70.40 4.00 71.40 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 2 / 2024 Pond No. 1 - Infiltration Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 67.40 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 67.40 40 0 0 0.20 67.60 200 22 22 0.40 67.80 359 55 77 0.60 68.00 515 87 164 0.80 68.20 633 115 279 1.00 68.40 708 134 413 1.20 68.60 781 149 562 1.40 68.80 855 164 725 1.60 69.00 932 179 904 1.80 69.20 1,012 194 1,098 2.00 69.40 1,093 210 1,309 2.20 69.60 1,177 227 1,536 2.40 69.80 1,263 244 1,779 2.60 70.00 1,351 261 2,041 2.80 70.20 1,442 279 2,320 3.00 70.40 1,535 298 2,618 3.20 70.60 1,630 316 2,934 3.40 70.80 1,727 336 3,270 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 4.00 0.00 0.00 0.00 Span (in)= 4.00 0.00 0.00 0.00 No. Barrels = 1 000 Invert El. (ft)= 68.92 0.00 0.00 0.00 Length (ft)= 18.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 0.00 0.00 0.00 10.00 Crest El. (ft)= 0.00 0.00 0.00 70.00 Weir Coeff.= 3.33 3.33 3.33 2.60 Weir Type = --- --- --- Broad Multi-Stage = No No No No Exfil.(in/hr)= 5.290 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 67.40 0.00 --- --- --- --- --- --- 0.00 0.000 --- 0.000 0.20 22 67.60 0.00 --- --- --- --- --- --- 0.00 0.024 --- 0.024 0.40 77 67.80 0.00 --- --- --- --- --- --- 0.00 0.044 --- 0.044 0.60 164 68.00 0.00 --- --- --- --- --- --- 0.00 0.063 --- 0.063 0.80 279 68.20 0.00 --- --- --- --- --- --- 0.00 0.078 --- 0.078 1.00 413 68.40 0.00 --- --- --- --- --- --- 0.00 0.087 --- 0.087 1.20 562 68.60 0.00 --- --- --- --- --- --- 0.00 0.096 --- 0.096 1.40 725 68.80 0.00 --- --- --- --- --- --- 0.00 0.105 --- 0.105 1.60 904 69.00 0.02 ic --- --- --- --- --- --- 0.00 0.114 --- 0.130 1.80 1,098 69.20 0.14 ic --- --- --- --- --- --- 0.00 0.124 --- 0.265 2.00 1,309 69.40 0.20 oc --- --- --- --- --- --- 0.00 0.134 --- 0.336 2.20 1,536 69.60 0.26 oc --- --- --- --- --- --- 0.00 0.144 --- 0.401 2.40 1,779 69.80 0.30 oc --- --- --- --- --- --- 0.00 0.155 --- 0.457 2.60 2,041 70.00 0.34 oc --- --- --- --- --- --- 0.00 0.165 --- 0.507 2.80 2,320 70.20 0.38 oc --- --- --- --- --- --- 2.33 0.177 --- 2.878 3.00 2,618 70.40 0.41 oc --- --- --- --- --- --- 6.58 0.188 --- 7.174 3.20 2,934 70.60 0.44 oc --- --- --- --- --- --- 12.08 0.200 --- 12.72 3.40 3,270 70.80 0.47 oc --- --- --- --- --- --- 18.60 0.212 --- 19.28 Infiltration Basin Project: 260 Nutmeg Road South Basin Description: Rear Yard Infiltration Basin   Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume              (sq. ft)        Avg. End Avg. End Conic Conic                              (cu. ft) (cu. ft) (cu. ft) (cu. ft)  67.400 16.41 N/A N/A 0.00 N/A 0.00 67.600 171.15 0.200 18.76 18.76 16.04 16.04 67.800 333.54 0.200 50.47 69.23 49.57 65.61 68.000 493.89 0.200 82.74 151.97 82.22 147.83 68.200 619.98 0.200 111.39 263.36 111.15 258.98 68.400 696.97 0.200 131.70 395.05 131.62 390.60 68.600 769.11 0.200 146.61 541.66 146.55 537.15 68.800 843.50 0.200 161.26 702.92 161.20 698.35 69.000 920.15 0.200 176.37 879.28 176.31 874.66 69.200 999.07 0.200 191.92 1071.21 191.87 1066.53 69.400 1,080.25 0.200 207.93 1279.14 207.88 1274.41 69.600 1,163.68 0.200 224.39 1503.53 224.34 1498.75 69.800 1,249.38 0.200 241.31 1744.84 241.26 1740.01 70.000 1,337.34 0.200 258.67 2003.51 258.62 1998.63 70.200 1,427.56 0.200 276.49 2280.00 276.44 2275.07 70.400 1,520.04 0.200 294.76 2574.76 294.71 2569.78 70.600 1,614.78 0.200 313.48 2888.24 313.43 2883.22 70.800 1,711.78 0.200 332.66 3220.90 332.61 3215.83 APPENDIX ‘E’ INFILTRATION FEASIBLITY REPORT Infiltration Feasbility Report September 27, 2024 INFILTRATION FEASIBILITY REPORT Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 PROPOSED DOG DAYCARE AND GROOMING MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT September 27, 2024 Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 TABLE OF CONTENTS 1. Location of Infiltration practices ............................... 1 2. Existing Topography ...................................................... 1 3. Test Pit Location ........................................................... 1 4. Season High Water Table Elevation ............................ 2 5. Infiltration Rate Study ................................................ 2 6. Profile Description ....................................................... 2 Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 This project proposes a system that require infiltration to function properly. The system is identified on the plans as Infiltration Basin #1 1. Location of Infiltration practices Filtration is proposed in the following areas: • The infiltration basin, Infiltration Basin #1, is proposed in the southern portion of the property. 2. Existing Topography Existing topography in the proximity of Infiltration Basin #1 is approximately 2-3% slope. 3. Test Pit Location Three test pits were dug on the property, with one being in the vicinity of the Infiltration Basin. One field permeability test was completed in the vicinity of the Infiltration Basin. See grading and drainage plans as well as details. Proposed Dog Daycare and Grooming 260 Nutmeg Road South, South Windsor, Connecticut Infiltration Feasbility Report September 27, 2024 4. Season High Water Table Elevation Infiltration Basin #1: Bottom of Filtration Section Elevation = 67.33 High Contour Elevation (Existing) = 69.6 Groundwater Elevation = 64.93 Bedrock = None Found Bottom of Test Pit = 64.02 Separation to Bottom of Test Pit = 2.40’ 5. Infiltration Rate Study Infiltration rates for the Infiltration Basin were calculated by from field testing using a double ring infiltrometer. Testing was done in conformance with the 2024 Stormwater Quality Manual, Chapter 10, subsection Soil Evaluation Guidance. From the deep test pits, it was noticed the soil had a Sandy characteristics. The test came back with a 10.58 in/hr. Using a safety factor of 2 from the slower of the field tests, the infiltration rate utilized in the drainage analysis is as follows: • Infiltration Basin #1 = 5.288 in/hr 6. Profile Description Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: Test Pit #:1 Test Pit #:2 Location: Near Wetland Flag 8 Location:Near Wetland Flag 9-10 Roots @ (in.): 19 Roots @ (in.): 16 Redox @ (in.): n/a Redox @ (in.): n/a Ground Water @ (in.): 30 Ground Water @ (in.): 35 Ledge @ (in.): n/a Ledge @ (in.): n/a Total Depth @ (in.): 60 Total Depth @ (in.): 48 Comments: Comments: From (Inches) To (Inches)Soil Descrption From (Inches) To (Inches)Soil Descrption 05Topsoil / Leaf Litter 04Topsoil / Leaf Litter 510Brown Fine-Coarse Sand 48Brown Fine-Coarse Sand 10 60 Light Brown Fine Sand w/ Cobbles 824Light Brown Fine Sand 24 48 Light Brown Sand & Cobbles SITE INVESTIGATION - DEEP HOLE STRATA TEST REPORT Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Strata Test Strata Test Friday, September 6, 2024 Michael Lambert Sunny, +/-75F 1018 - Test Pit Report.xlsx Page 1 of 2 Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: SITE INVESTIGATION - DEEP HOLE STRATA TEST REPORT Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Friday, September 6, 2024 Michael Lambert Sunny, +/-75F Test Pit #:3 Test Pit #: Location:Near Wetland Flag 18-19 Location: Roots @ (in.):14 Roots @ (in.): Redox @ (in.):n/a Redox @ (in.): Ground Water @ (in.):56 Ground Water @ (in.): Ledge @ (in.):n/a Ledge @ (in.): Total Depth @ (in.):67 Total Depth @ (in.): Comments:Comments: From (Inches) To (Inches)Soil Descrption From (Inches) To (Inches)Soil Descrption 04Topsoil / Leaf Litter 411Brown Fine-Coarse Sand 11 28 Light Brown Fine Sand 28 67 Brown Sand & Cobbles Strata Test Strata Test 1018 - Test Pit Report.xlsx Page 2 of 2 Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 Project: Date: Location: Witnesses: Applicant: Weather: Perm Test #: Method: Location Description: Testing Depth (in.): Soil Type / Horizon Tested: Hydrologic Soil Group: Time Elapsed Time Inner Ring Reading Reading Drop (Hr:Min) (Min.) (mm) (mm) 0:00 0 / min 0:02 2.0 22 22 11 / min 0:04 2.0 32 10 5/ min 0:06 2.0 40 8 4/ min 0:08 2.0 48 8 4/ min 0:10 2.0 57 9 4.5 / min 0:12 2.0 64 7 3.5 / min 0:14 2.0 73 9 4.5 / min 0:16 2.0 80 7 3.5 / min 0:18 2.0 86 6 3/ min 0:20 2.0 93 7 3.5 / min 0:25 5.0 109 16 3.2 / min 0:26 1.0 0 / min 0:30 4.0 21 21 5.25 / min 0:45 15.0 85 64 4.27 / min 1:00 15.0 137 52 3.47 / min Average = 4.48 mm/min 0.45 cm/min 26.86 cm/hr 10.58 in/hr Brown-Fine Coarse Sand A Infiltration Capacity (mm / min) FIELD INFILTRATION TESTING 1 Double Ring Infiltrometer NW of Test Pit #3 Proposed Dog Daycare & Grooming 260 Nutmeg Road South, South Windsor, CT 260 Nutmeg Road South, LLC Infiltration Test Friday, September 6, 2024 Michael Lambert Sunny, +/-75F 6" 1018 - Permiability Test.xlsx Page 1 of 1 APPENDIX ‘F’ WATER QUALITY CALCULATIONS Project: Proposed Dog Daycare & Grooming Project #: 1018 260 Nutmeg Road South, South Windsor, CT Date: 9/21/2024 By: MSL Rev: 12/2/2024 Subcatchment ID Total Area (acres) Roadway/ Pavement (ac) Roof (ac)Impervious % (Pavement) Impervious % (Total) Roadway/ Pavement (ac)Roof (ac)Impervious % (Pavement) Impervious % (Total) Impervious % (Total) P2 0.827 0.000 0.000 0.0% 0.0%0.174 0.107 21.0% 33.9% 33.9% Chapter 4, Standard 1 of Connecticut Stormwater Quality Manual, March 30, 2024 WQv = Water Quality Volume (acre-feet) R = Volumemetric Runoff Coefficient = 0.05+0.009 (I) I = Percent Impervious Cover A = Site Area in Square Feet Subcatchment ID Total Area (acres) Pavement Impervious Area (ac) Impervious % (Pavement) Runoff Coefficient "R" WQv (ft3) WQv (ft3) WQv (ft3) WQv (ft3) P2 0.827 0.174 21.0% 0.2389 933 211 839 1,050 Water Quality Flow Calculations:Appendix D of 2024 Connecticut Stormwater Quality Manual WQf = (qu)(A)(Q) WQf = Peak Discharge for water quality event (cfs) qu = unit peak discharge (cfs/mi 2 /in) A = drainage area (square miles) Q = runoff volume (WQv/A) (watershed inches)Q = { WQV (cubic feet) / Drainage Area (acres) } * 12 inches/foot * 1 acre / 43,560 square feet CN = 1000 /[10 + 5*P +10*Q - 10*(Q2 +1.25*Q*P)1/2] P = Design precipitation, inches (1.3 inches for 100% of the WQV and 0.65 inches for 50% of the WQV) Ia = 200/CN -2 WQf = (qu)(A)(Q) Subcatchment ID P (inches) Q (inches) WQv (ft3) Total Area (acres)CN Ia Ia/P Tc (min) Tc (hr) qu A (mi2)WQf (cfs) P2 1.3 0.311 933 0.827 84.4 0.371 0.285 16 0.27 375 0.001293 0.151 Minimium % of WQv 10% Maximum % of WQv 25% Bottom Surface Area Chapter 13 - Sediment Forebay of Connecticut Stormwater Quality Manual A = -Q / W ln(1-E) = 0.066 * %WQV A = minimum required surface area of sediment forebay (square feet) Q = discharge from drainage area (cubic feet per second) = %WQV / 86,400 seconds %WQV = percent of the water quality volume required for sediment forebay design (cubic feet) W = 0.0004 feet per second particle settling velocity for silt E = sediment removal efficiency (assume 0.9 or 90%) Subcatchment ID Min %WQVmin (ft3)A (min WQv) (ft2)Max %WQVmax (ft3)A (max WQv) (ft2) Provide Volume (ft3) Provided Area (ft2) P2 10% 93.27 6.16 25% 233.17 15.39 211 14 Pollutant Load Reduction: Proposed BMP: Infiltration Basin Table 4.3 of 2024 Connecticut Stormwater Quality Manual Water Quality Parameter New Development Total Suspended Solids (TSS) 90% Total Phosporus (TP) 60% Total Nitrogen (TN)40% Provided Treatment: 839 ft3 R = 0.2389 A = 0.827 acres Depth = 1.17 inches BMP Capacity = 1.0 inches TSS = 100% TP = 98% TN = 100% Required Provided - Sediment Forebay Provided - Infiltration Basin WQv = (Depth) (R) (A) / 12 Depth = WQv * 12 / [(R) (A)] Provided - Total Sediment Forebay Sizing Drainage Area & Water Quality Calculations HSG 'A' Soils Water Quality Calculations: WQv = (1.3") (R) (A) / 12 HSG 'B' Soils 1018 - WQVv.xlsx Project: Proposed Dog Daycare & Grooming Project #: 1018 260 Nutmeg Road South, South Windsor, CT Date: 9/21/2024 By: MSL Rev: 12/2/2024 Chapter 10 - Static Method of 2024 Connecticut Stormwater Quality Manual T d = drain time (hours) V = design infiltration volume (cubic feet) K = design infiltration rate (inches per hour) A = average surface area of infiltration system (sq.ft) Subcatchment ID System Volume (ft3) Infiltration Soil Classification Infiltration Rate (in/hr) System Surface Area (sqft) Td (hours) Less than 48 hrs? P2 839 A - Sand 5.29 715 2.66 Yes Field Infiltration Testing Test #1 10.58 in/hr Slowest Rate 10.58 in/hr 50% of Field Testing 5.29 in/hr Stormwater Infiltration System Sizing Calculations Static Method Calculations: T d = (V / K * A )* 12 in/ft 1018 - WQVv.xlsx Sediment Forebay Volume Project: 260 Nutmeg Road South Basin Description: Parking Lot Forebay  Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume              (sq. ft)        Avg. End Avg. End Conic Conic                              (cu. ft) (cu. ft) (cu. ft) (cu. ft)  67.400 14.05 N/A N/A 0.00 N/A 0.00 67.600 26.00 0.200 4.00 4.00 3.94 3.94 67.800 40.20 0.200 6.62 10.62 6.57 10.51 68.000 56.66 0.200 9.69 20.31 9.64 20.15 68.200 75.39 0.200 13.20 33.52 13.16 33.31 68.400 96.37 0.200 17.18 50.69 17.13 50.44 68.600 119.62 0.200 21.60 72.29 21.56 72.00 68.800 145.12 0.200 26.47 98.76 26.43 98.43 69.000 172.89 0.200 31.80 130.57 31.76 130.20 69.200 202.92 0.200 37.58 168.15 37.54 167.74 69.400 235.21 0.200 43.81 211.96 43.77 211.51 69.600 269.76 0.200 50.50 262.46 50.46 261.97 69.800 306.57 0.200 57.63 320.09 57.59 319.56 70.000 345.64 0.200 65.22 385.31 65.18 384.74 70.200 386.98 0.200 73.26 458.57 73.22 457.97 APPENDIX ‘G’ COLLECTION SYSTEM Rational Equation: Q = CCfIA (ConnDOT Equation 6.1)Project:260 Nutmeg Road SouthC=Runoff CoefficientSouth Windsor, CTCf=Frequency Factor (ConnDOT Table 6-2)I=Intensity (taken from ConnDOT Table B-2.1)Calculations By:MSLA=Area (acres)Date:Q= Runoff Flow (CFS)Rev:25 Yr 50 Yr 100YrCf1.10 1.20 1.25Basin CharacteristicsRunoff Coefficients & Frequency FactorsIntensity (in/hr) Flow (CFS)C2C5C10C25C50C100RoofRoof 0.115 0.95 0.95 0.95 1.00 1.00 1.00 4.60 5.50 6.00 6.70 7.30 7.80 0.47 0.56 0.61 0.72 0.78 0.84Q10 I5Q100 I100RATIONAL METHOD DEVELOPED RUNOFF COMPUTATIONS10/20/2024DesignPoint Basin(s)Q25(Not to exceed 1.0)Q5T(min)Q50Area, A(acres) I50--Q2I2 I10 I25D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Character of SurfaceRunoff Coefficient SourceCharacter of SurfaceRunoff Coefficient SourceProject: 260 Nutmeg Road SouthAsphalt, Concrete, Roofs & Water Surface0.95CONN DOT Table 6-5Forest (Hydrologic Type A Soil)0.14McCuen, 1989 Table 7-2South Windsor, CTIndustrial Impervious Area0.75CONN DOT Table 6-4Forest (Hydrologic Type B Soil)0.18McCuen, 1989 Table 7-3Residential Single Family Area0.50CONN DOT Table 6-4Lawns Sandy Soil (Steep 7%+)0.18McCuen, 1989 Table 7-3Calcs By: MSLParks & Cemeteries 0.25CONN DOT Table 6-4Lawns Sandy Soil (2% to 7%)0.16McCuen, 1989 Table 7-3Date: 10/20/24Unimproved Areas0.30CONN DOT Table 6-4McCuen, 1989 Table 7-3Revised : --CONN DOT Table 6-4Basin AreaAsphalt, Concrete, Roofs & Water SurfaceIndustrial Impervious AreaResidential Single Family AreaParks & CemeteriesUnimproved Areas 0Forest (Hydrologic Type A Soil)Forest (Hydrologic Type B Soil)Lawns Sandy Soil (Steep 7%+)Lawns Sandy Soil (2% to 7%)Basin ID(acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres) (acres)Roof 0.11 0.110.00 0.95Note: Composite RunoffCoefficientRATIONAL METHOD COMPOSITE RUNOFF COEFFICIENTSD:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Overland Flow: (Maximum 150 FT)Project:260 Nutmeg Road SouthTt=Travel Time (Hr) P2= 2 Year, 24-hour Ranfall (in)South Windsor, CTn=Manning's Roughness (TR-55 Table 3-1) s=slope (ft/ft)L=Flow Length (ft)Calculations By:MSLDate:Shallow Concentrated Flow:Unpaved: V=16.1345(s)0.5Tt=Travel Time (min)Paved: V=20.3284(s)0.5V=Velocity (ft/s)Common Manning n Values for overland flowTt = L / 60Vs=slope (ft/ft)Woods 0.400 Light UnderbrushPavement 0.011Open Channel\Swale Flow:Lawns 0.410 Bermuda GrassTt=Travel Time (min)V=Velocity (ft/s)a=cross-section area (ft2)Dense Grass 0.240 Lovegrass, Bluegrass, Buffalo,Grama & Nativen=Manning's Roughness s=slope (ft/ft)pw=wetted perimeter (ft)L=Flow Length (ft) r= hydraulic radius (a/pw)Tt = L / 60VMinimum allowable Tc = 5.00 min.TotalnL(ft)S(%)To(min)Paved (Y or N) L(ft)S(%) V(ft/s)T1(min) n Area (s.f.)Wet. Perim. (ft)S(%) V(full flow)(ft/s) L(ft)Ts(min)Dia. (in) L(ft)S(%) V(full flow)(ft/s)Tp(min)T(min)Roof Roof Imprevious Area - Assume 5 min. Subtotal 0.00 Subtotal Subtotal Subtotal 5.00TIME OF CONCENTRATION COMPUTATIONS Design Point10/20/2024Basin(s)Overland Sheet Flow Shallow Flow Swale Flow Pipe Flow(Conn DOT Equations 6.C.4 & C.C.5)(TR-55 Equation 3-3)}(TR-55 Equation 3-4)D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Collection System\1018 - Rational Peak Flows DOT.xls Storm Sewer Profile ;gj ::::, 0 oE Elev. (ft) •~o 0 .-0 ~r---c,; g u::i co c!:, 'C u::i _2!E> w Cl E 82 .00 79 .00 76 .00 73.00 -------/ -------- 70.00 71 RR 1Lf-8"@ 4 .5170 67.00 0 10 ----HGL---EGL -..------ 20 Reach (ft) .5 -s ' co .-~a a:> '<to ~ r---. 0 .--'r---N w . + -oui 0 ~ E > Cl) C>E I Proj . file : 1018 -Roofleader.stm 82 .00 79 .00 76 .00 73 .00 70.00 67 .00 30 Storm Sewers Reference: ConnDOT Drainage Manual Section 11.13Type A (Tailwater < 1/2 pipe rise)Type B (Tailwater > 1/2 pipe rise)Type CScour Type 1Scour Type 2L={[1.80(Q-5)]/Sp1.5 }+10 L={[3.0(Q-5)]/Sp1.5 }+10 L={[3.0(Q-5)]/Sp1.5 }+10 D50= (0.0125Rp2/TW) x (Q/Rp2.5)1.33D50= (0.0082Rp2/TW) x (Q/Rp2.5)1.33W1=3SpW1=3SpW=3Sp C=3Sp+6F C=3Sp+6FW2=3Sp + 0.7L W2=3Sp + 0.4L or 1-ft above tailwater or 2/3 pipe riseB=2SP+6F B=2SP+6FF=0.5 RpF=RpType A & B Riprap Aprons (Table 11.11) Scour Hole Riprap Specs (pg. 11.13-5)Outlet Velocity Riprap Spec Modifiedd50< 0.42 ft0-8 fps Modified Intermediate0.42 ft < d50 < 0.67 ft8-10 fps Intermediate Standard0.67 ft < d50 < 1.25 ft10-14 fps Standard Special Design1.25 ft < d50Outlet Protection:Pipe SpanAprons Type 1 Scour Hole Type 2 Scour HoleRp Sp Q V Tw Tw/Rp Apron(Table 11-12.1)W1 W2 C B F C B F(ft) (ft) (cfs) (fps) (ft) Type L (ft) (ft) (ft) Riprap (ft) (ft) (ft)d50Riprap (ft) (ft) (ft)d50RiprapRoof 0.67 0.67 0.84 2.41 0.83 1.25A 10 2.00 6.00 Mod 4 3 0.33 0.00 Int 6 5 0.67 0.00 IntFES #1 0.33 0.33 0.238 2.88 0.3 0.90A 10 1.00 5.00 Mod 2 2 0.17 0.00 Int 3 3 0.33 0.00 IntNote: Selected riprap design is highligted. Riprap Protection for Pipe OutletsStorm LineOutlet VelocityTailwater DepthPipe FlowPipe Rise APPENDIX ‘H’ OPERATION AND MAINTENANCE MANUAL O&M Manual STORMWATER MANAGEMENT OPERATION AND MAINTENANCE (O&M) MANUAL FOR: PROPOSED DOG DAYCARE AND GROOMING LOCATED AT: MAP 60 BLOCK 3 LOT 7 260 NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT Prepared for: 260 Nutmeg Road South, LLC 691 Governors Highway South Windsor, CT 06074 Prepared by: Lambert Civil Design, LLC 34 Misty Lane Monroe, CT 06468 O&M Manual Stormwater Management Operation and Maintenance (O&M) Manual TABLE OF CONTENTS I. Compliance with Stormwater Facility Maintenance Requirements .......................................................................................... 1 II. Inspection & Maintenance – Annual Reporting ........................... 1 III. Preventative Measures to Reduce Maintenance Costs ............. 1 IV. Access ............................................................................................ 2 V. Safety ............................................................................................. 2 VI. Field Inspection Equipment ........................................................... 2 VII. Inspecting Stormwater Management Facilities ........................... 3 A. Inspection Procedures .................................................................................................. 3 B. Inspection Report .......................................................................................................... 3 VIII. Maintenance Requirements ........................................................... 3 Catch Basins ........................................................................................................................... 3 IX. Control of Invasive Species ......................................................... 4 Appendices Appendix A – Annual Inspection and Maintenance Submittal Form Appendix B – Inspection Checklist Appendix C – Long-Term Maintenance Log Appendix D – Invasive Species List O&M Manual ~ 1 ~ Stormwater Management Operation and Maintenance (O&M) Manual I. Compliance with Stormwater Facility Maintenance Requirements The owner of the subject property is responsible for ensuring that stormwater facilities installed on the property are properly maintained and that they function as designed. In some cases, this maintenance responsibility may be assigned to others through special agreements. Any transfer of responsibility for inspection and maintenance activities or transfer of ownership shall be documented in writing. The contract documents will require the contractor to designate a person responsible for maintenance of the sedimentation control features during construction. Long- term operation and maintenance for the stormwater management facilities are presented below. II. Inspection & Maintenance – Annual Reporting Requirements for the inspection and maintenance of stormwater facilities, as well as reporting requirements, are included in this Stormwater Management Operation and Maintenance (O&M) Manual. Verification that the Stormwater facilities have been properly inspected and maintained; copies of the annual report should be documented on site for future reporting upon request. Copies of the Inspection and Maintenance forms for each of the stormwater facilities are located in Appendix B and C. A standard annual reporting form is provided in Appendix A. III. Preventative Measures to Reduce Maintenance Costs The most effective way to maintain your water quality facility is to prevent the pollutants from entering the facility in the first place. Common pollutants include sediment, trash & debris, chemicals, dog wastes, runoff from stored materials, illicit discharges into the storm drainage system and many others. A thoughtful maintenance program will include measures to address these potential contaminants and will save money and time in the long run. Key points to consider in your maintenance program include: • Educate property owners/residents to be aware of how their actions affect water quality, and how they can help reduce maintenance costs • Keep properties, streets and gutters, and parking lots free of trash, debris, and lawn clippings • Ensure the proper disposal of hazardous wastes and chemicals • Plan lawn care to minimize the use of chemicals and pesticides • Sweep paved surfaces and put the sweepings back on the lawn • Be aware of automobiles leaking fluids. Use absorbents such as cat litter to soak up drippings – dispose of properly O&M Manual ~ 2 ~ • Re-vegetate disturbed and bare areas to maintain vegetative stabilization. • Clean out the upstream components of the storm drainage system, including inlets, storm sewers, and outfalls • Do not store materials outdoors (including landscaping materials) unless properly protected from runoff IV. Access All stormwater management facilities located on the site have a designated access location. Refer to the Site Plan – Grading & Drainage Plan for access locations. V. Safety Keep safety considerations at the forefront of inspection procedures at all times. Likely hazards should be anticipated and avoided. Never enter confined space (outlet structure, manhole, etc) without proper training or equipment. A confined space should never be entered without at least one additional person present. If a toxic or flammable substance is discovered, leave the immediate area and contact the local authority at 911. Potentially dangerous (e.g., fuel, chemicals, hazardous materials) substances found in the areas must be referred to the local authority immediately for response. The emergency contact number is 911. Vertical drops may be encountered in areas located within and around the facility. Avoid walking on top of retaining walls or other structures that have a significant vertical drop. If a vertical drop is identified within the pond that is greater than 48” in height, make the appropriate note/comment on the maintenance inspection form. If any hazard is found within the facility area that poses an immediate threat to public safety, contact the local authority immediately. VI. Field Inspection Equipment It is imperative that the appropriate equipment is taken to the field with the inspector(s). This is to ensure the safety of the inspector and allow the inspections to be performed as efficiently as possible. Below is a list of the equipment that may be necessary to perform the inspections of all Stormwater Management Facilities: • Protective clothing and boots • Safety equipment (vest, hard hat, confined space entry equipment • Communication equipment O&M Manual ~ 3 ~ • Operation and Maintenance Manual for the site including stormwater management facility location maps • Clipboard • Stormwater Facility Maintenance Inspection Forms (See Appendix B) • Manhole Lid Remover • Shovel Some of the items identified above need not be carried by the inspector (manhole lid remover, shovel, and confined space entry equipment). However, this equipment should be available in the vehicle driven to the site. VII. Inspecting Stormwater Management Facilities The quality of stormwater relies heavily on the proper operation and maintenance of permanent best management practices. Stormwater management facilities must be periodically inspected to ensure that they function as designed. The inspection will determine the appropriate maintenance that is required for the facility. A. Inspection Procedures All stormwater management facilities are required to be inspected by a qualified individual. Inspections should follow the inspection guidance found in Appendix B of this manual. B. Inspection Report The person(s) conducting the inspection activities shall complete the appropriate inspection report for the specific facility. Inspection reports are located in Appendix B. VIII. Maintenance Requirements Stormwater management facilities must be properly maintained to ensure that they operate correctly and provide the water quality treatment for which they were designed. Routine maintenance performed on a frequently scheduled basis can help avoid more costly rehabilitative maintenance that results when facilities are not adequately maintained. The Long-Term Inspection and Maintenance Log provides a record of maintenance activities. Maintenance Logs for each facility type are provided in Appendix C. Catch Basins • Catch basins may require frequent maintenance. Depending on the location, this may require several cleanings of the sumps each year. At a minimum, it is recommended that catch basins be inspected at least twice annually, once following snowmelt and once following leafdrop. And cleaned as indicated by inspection. • Sediment should be removed when it approaches half the sump depth. O&M Manual ~ 4 ~ • If floating hydrocarbons are observed during an inspection, the material should be removed immediately by skimming, absorbent materials, or other method, and disposed in conformance with applicable state and federal regulations. • Cleaning may require vacuum-truck instead of “clam shell” to avoid damage to hood. • Damaged hoods should be replaced when noted by inspection. IX. Control of Invasive Species During maintenance activities, check for the presence of invasive plants and remove in a safe manner as described on the following pages. They should be controlled as described in Appendix D. Invasive plants are introduced, alien, or non-native plants, which have been moved by people from their native habitat to a new area. Some exotic plants are imported for human use such as landscaping, erosion control, or food crops. They also can arrive as "hitchhikers" among shipments of other plants, seeds, packing materials, or fresh produce. Some exotic plants become invasive and cause harm by: • becoming weedy and overgrown; • killing established shade trees; • obstructing pipes and drainage systems; • forming dense beds in water; • lowering water levels in lakes, streams, and wetlands; • destroying natural communities; • promoting erosion on stream banks and hillsides; and • resisting control except by hazardous chemicals. APPENDIX ‘I’ STORMWATER WATERSHED AREA MAPS NUTMEG ROAD SOUTHE11.79AT2242 LF0.2%T1270 LF1.56%To100 LF4.0%DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Figures\1018 - Drainage - Watershed Areas.dwg LAYOUT: Drainage11x17 PLOT DATE: Dec 02, 2024 - 10:27pmOPERATOR: swsoc 34 MISTY LANE MONROE, CT 06468 T (860) 670-6308 LambertCivil@Gmail.com Project #: Date: Scale:WSNEDESIGN CIVIL LAMBERT LLC 1 OF 2Sept. 20, 2024 1018 1" = 50' PRE -DEVELOPMENT WATERSHED AREA MAP 260 Nutmeg Road South South Windsor, CT NUTMEG ROAD SOUTHG.T.D.FFE=75.10FFE=75.10FFE=75.10FFE=75.10FFE=75.10FFE=75.10G.T.D. G.T.D. G.T.D.G.T.D.G.T .D .G.T .D .G.T .D .G.T.D.G.T.D.G.T. D . G.T. D .G.T.D.G.T.D.G.T. D . G.T. D .G.T.D.G.T.D.G . T . D .G.T.D.G.T.D.G.T.D.G.T.D.P20.83AP10.96T2242 LF0.2%T1285 LF1.05%To100 LF5.4%To100 LF4.75%T166 LF1.52%DRAWING NAME: D:\Lambert Civil Design\Projects\1018 - Turkington - South Windsor\Reports\Figures\1018 - Drainage - Prop-Watershed Areas.dwg LAYOUT: Drainage11x17 PLOT DATE: Dec 02, 2024 -10:05pm OPERATOR: swsoc 34 MISTY LANE MONROE, CT 06468 T (860) 670-6308 LambertCivil@Gmail.com Project #: Date: Scale:WSNEDESIGN CIVIL LAMBERT LLC 2 OF 2Oct. 22, 2024 1018 1" = 50' POST -DEVELOPMENT WATERSHED AREA MAP 260 Nutmeg Road South South Windsor, CT Rev:Dec 2, 2024 MEMORANDUM To: Michele Lipe, Director of Planning From: Jeff Doolittle, P.E., Town Engineer Date: December 5, 2024 Re: App 24-44P – Proposed Dog Daycare and Grooming – 260 Nutmeg Road I have reviewed the above Plans and all the previous Engineering comments have been addressed except for the following: 1. Sheet ES1 provides project information that refers to phases of development, where Phase 1 is for the front building and parking lot construction and phase 2 is for the rear building. Clearly call these phases out on Sheet C1. 2. The 4-inch HDPE pipe from proposed infiltration basin is too small and will likely get clogged. Provide a larger outlet pipe, such as a 10 or 12-inch pipe with a 4” diameter orifice plate on the inlet end. Call this out on Sheet C2. 3. Show a spot elevation for the emergency overflow spillway from the proposed infiltration basin on Sheet C2. Please let me know if there are any questions. 1 Appl #24-44P, 260 Nutmeg Road South LLC Dog Daycare and Grooming – 260 Nutmeg Road South Public Hearing 12/10/24 Planning Department Report 1. This is a request for a special exception to 4.1.1A and site plan of development for a 5,183 sf facility for dog daycare and grooming, on property located at 260 Nutmeg Road South, I zone. 2. This application is subject to the review criteria of Section 8.4(B) which in clude that: • The proposal is consistent with the goals and objectives of the Plan of Conservation and Development; • The application has met the requirements of the zoning regulations; • The land is physically suited to the proposed use; • Minimal, if any, adverse environmental impacts are created; • No traffic or other hazards will be created; • The impacts on the capacity of the present and proposed utilities, street, drainage systems, sidewalks, and other elements of the infrastructure will be minimal ; • There will be minimal or no adverse effects on existing uses in the area; • Surrounding property values will be conserved; • The character of the neighborhood will be maintained or minimally disrupted ; • The general welfare of the community will be served; • There is a balance between neighborhood acceptance and community needs; • Historic factors are adequately protected; or due consideration to preservation of historic factors has been demonstrated; • The overall physical appearance of the proposed development is compatible with surrounding development and the Commission’s goals for the neighborhood/corridor ; • The architectural design is aesthetically pleasing and blends well into the surrounding area. 3. The specific criteria for Dog Grooming Facilities in Section 7.23 include: • Existing building must be free-standing; • Current building not suited for manufacturing; • Site location should not be disruptive to surrounding areas; 2 • Outdoor activities with animals must be within enclosed fenced areas. 4. The applicant’s narrative addresses our Special Exception criteria. It also provides a detailed description of how the business operates, how the site will be developed, and the anticipated impacts to traffic and the environment. 5. The narrative mentions that the business will be run and operated by the owner with no other employees, and that at one time there may be up to 30 dogs on the premises. I raise concern about the timely removal of dog waste if there is only one person to manage 30 dogs. 6. In 2006 this property was granted a 15’ variance to allow a 10’ rear yard setback (where 25’ is required) for new construction. The southwest property line is being designated as the rear yard. All building setbacks appear to comply. 7. Zoning requirements appear to have been met in the zoning information table on Drawing C1. Impervious surface is proposed to be 21%; 65% allowed. Proposed parking counts are shown as meeting our requirements, but without architectural floor plans it is difficult to verify how building square footage is being allocated. 8. The applicant has shown that the project will be broken out into 2 phases. A critical aspect of construction phasing is whether the individual phases can function on their own if one phase is never completed. Phase 1 will be constructed, and all operations will commence in the smaller building footprint. As demand of the services increase and expansion of the business becomes necessary, Phase 2 will be constructed. 9. Light levels in areas immediate to the proposed wall mounted fixtures appear to exceed the recommendations provided in Section 11.3 Appendix C of our Zoning Regulations. The applicant has made a good effort to keep light levels from spilling out to the wetland but should modify the intensity of the fixtures to provide an average light level of 0.8 footcandles. 10. The Inland Wetlands Agency and Conservation Commission approved this application at their 11/20 meeting with standard approval conditions including requiring the submission of a maintenance plan for the outdoor play area addressing how waste will be handled and kept out of the adjacent wetland area, and recommendation of $5,000 for erosion and sedimentation control and $7,500 for the establishment of stormwater structures. 11. A meeting with the Architectural Design and Review Committee is scheduled for 12/5. Staff will report back with updates. 12. WPCA approval is required. Engineering comments are as follows (read comments by Town Engineer). If this site plan modification is approved, Planning Staff has incorporated comments into the approval conditions. PLANNING DEPARTMENT CERTIFIED MAIL #7022 2410 0000 6508 8164 December 12,2024 Michael Lambert Lambert Civil Design.LLC 34 Misty Lane Monroe.CT 06468 Dear Mr.Lambert: Re:Appl.24-44P.260 Nutmeg Road South,LLC Dog Daycare and Grooming. We are pleased to advise you that the Planning &Zoning Commission voted on December 10. 2024 to approve with modifications the above referenced application for a special exception to Article 4.1.1A and a Site Plan ofDevelopment. This approval is for a 5,183 sf facility for dog daycare and grooming.on property located at 260 Nutmeg Road South,I zone.as shown on plans prepared by Lambert Civil Design.LLC and All Seasons Land Surveying.LLC.Proiect No 1018 dated October 23.2024,as revised December 2,2024.This approval is subject to‘the tbllowingimodifications: 1.Prior to commencement ofany site work.a meeting must be held with Town Staff 2.No building permit will be issued until the final mylars have been tiled in the Town Clerk‘s office. This application is subject t0 the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of $5.000 to ensure compliance with the erosion and sediment control measures and $7.500 to ensure establishment of storm water system 4.A landscape bond in the amount of $5.000 is required and must be submitted prior to the issuance ofa certificate ofoccupancy if work is not completed. An as—built plan is required prior to issuance ofa Cettificate ofCompliance per Section 9.1 .3 of the Zoning Regulations. 6.All plans used in the field by the developer must bear the stamp and authorized signature of the Town ofSouth Windsor. 7.This approval does not constitute approval ofthe sanitary sewer.which can only be grantedbytheWaterPollutionControlAuthority. 8.No building permits will be issued until the Office ofState Traffic Administration certificate has been issued (per CGS §l4—3l l )..The building street number must be included on the final plan.10‘Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11.All free—standing signs and/or building signs require the issuance ofa sign pemtit before they are erected. I2.Engineering comments dated 12—5—24 shall be incorporated into the final plans.l3.The applicant is referred back to the Architectural and Design Review Committee for final approval ofcolors and materials. 14,The applicant shall submit a maintenance plan for the outdoor play area with the final plans. 1540 Sullivan Avenue.South Windsnr,CI DEDM i Tel (860)644-2511 Ext 2325 l Planning@SouthWindsar»CT.gnv b4 UI Black and white transparent mylars of Sheet C1 with the above modifications.together with three print copies of the entire set of plans (including architectural elevations and landscaping plans),must be submitted to this Commission to be stamped and signed.The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission.they will be retumed to you for tiling in the Offlce 0fthe Town Clerk.After tiling these plans,a copy 0fthe receipt must be submitted to the Planning Department. The attached Special Exception form must be completed and filed in the Town Clerk’s office. The special exception will take effect upon filing. Sincerely, Stephen Wagner,Chairman Planning and Zoning Commission SW/js cc:Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal 260 Nutmeg Road South.LLC I.Stephen Wagner.Chairman of the South Windsor Planning &Zoning Commission.hereby certify that on December 10,2024,the Planning and Zoning Commission granted to 260 Nutmeg Road South.LLC a Special Exception to Article 4.1.1A of the Zoning Regulations to allow a 5,183 sf facility for dog daycare and grooming,on property located at 260 Nutmeg Road South,I zone,as shown on plans prepared by Lambert Civil Design,LLC and All Seasons Land Surveying,LLC,Project Noi 1018,dated October 23,2024,as revised December 2.2024. This approval is subject to the following modifications: Prior to commencement of any site work,a meeting must be held with Town Staff. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of $5,000 to ensure compliance with the erosion and sediment control measures and $7.500 to ensure establishment of storm water system A landscape bond in the amount 0f $5.000 is required and must be submitted prior to the issuance of a certificate ofoccupancy ifwork is not completed. An as-built plan is required prior to issuance ofa Certificate ofCompliance per Section 9.1.3 ot‘the Zoning Regulations. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. No building permits will be issued until the Office of State Traffic Administration certificate has been issued (per CGS §14—31 1). The building street number must be included on the final plan.10.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11 1'),, IbQJ—. .All free—standing signs and/or building signs require the issuance ofa sign permit before they are erected. .Engineering comments dated 12-5—24 shall be incorporated into the final plans.1.).The applicant is referred back to the Architectural and Design Review Committee for final approval of colors and materials. l4.The applicant shall submit a maintenance plan for the outdoor play area with the final plans. GIS PIN #65 1 00260 A certain piece or paroe!of land,with the improvement thereon,situated in the Town of South Windsor,County of Hartford and State of Connecticut.known as No.260 Nutmeg Road South and being Lot No.7 on a map entitled ”Re-Subdivision Pian "Constitution Landing“Prepared For:Hale Realty,LLC Nutmeg Road South,ConnecticutAvenue And Talbot Lane South Windsor.Connecticut Messier &Associates,lnc.Surveyors -Engineers Manchester.CT‘(860)646—6013 Putnam,CT,(860)928- 1171 Planning —-Survey 'Design -Constmction Date:08/99 Scale:1":100 Ft Sheet 3 Oi 8 Rev Date 02/28/01 Revised Misc,“ which map is on file in the Town Clerk's Oince in the said Town of South Windsor,to which reference may be had;said premises being more particularly bounded and described as totlows,to wit Commencing at a point marking the property herein descn'bed's southerly boundary oi land now or formerly of Roger W.Talbot,Sr.and Lot 5 as shown on said map;thence running N 10°40‘53'W a distance of 396.62 feet along Lot 6 as shown on said map to a point intersecting with Nutmeg Road South;thence following westerly the arc of a curve running N 57°21'19“ E with a distance of 330 feet along Nutmeg Road South;thence running S 02"36'03"E a distance of 100,18 feet along land now or formerly of Roger W.Talbot,Sh;thence running S 65°07‘i8"E a distance of 333.23 feet along land now or formerly of Roger W.Talbot,Sr.to the point and piece of beginning. Said parcel contains 1.37941—acres (60,0871 square feet) OWNER OF RECORD:260 Nutmeg Road South,LLC Dated at South Windsor,Connecticut this 12‘“day of December.2024. In accordance with CGS Section 8—3d r/«t a Chair an Step n Wa rncr Planning &Zoning Commission Received for record this day of ,20 :at South Windsor.Connecticut ATTEST: y Julie’s Barks and Bubbles 260 Nutmeg Road South,South Windsor,CT Outdoor Pen Maintenance Plan Outdoor dog pen will be inspected daily for hazards and safety of dogs.This will consist of: Making sure the fence is securely in place and hardware is intact. o Inspecting gates and locking mechanisms to ensure they are functional and secure. o Filling in holes that have been dug and replenish material if necessary. o Making sure water bowls are clean and filled. n Monitoring dogs upon departure and petwaste picked up immediately after letting them in. o Pet waste will be picked up and placed in a lined trash can with lid. Upon closing: n Outdoor pen will be checked again for hidden waste and properly disposed of. o Trash can with linerwill be removed and disposed of in dumpster. Annual Maintenance: a Pea gravel is to be refreshed at least once per yearto ensure a minimum 4"depth to subgrade. Anthony Manfre Superintendent of Pollution Control January 8,2025 Michael Lambert Lambert Civil Design LLC 34 Misty Lane, Monroe,CT 06468 RE:260 Nutmeg Road South WPCA Approval Dear Mr.Michael Lambert, The South Windsor Water Pollution Control Authority,at its Regular Meeting on January 7,2025,gave approval for a connection to the town’s sewage system for 260 Nutmeg Road South.The proposed plan for the property is to develop a dog daycare facility at 260 Nutmeg Road South,more specifically shown on plans entitled,”Proposed Dog Daycare and Grooming,260 Nutmeg Road South,South Windsor, Connecticut”,prepared by Lambert Civil Design LLC,34 Misty Lane,Monroe CT 06468:Sheet C3,”Utility Plan”,dated October 23,2024. The approval is subject to the following conditions: 1.Technical approval by the Engineering Department; 2.The sewer line is installed in substantial conformance with the design plans; 3.Final Authority approval and acceptance of the sanitary sewerage connection is conditioned upon the installed sewer line having been inspected by the Town staff,and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority and meeting all regulations and appropriate technical specifications relating to sanitary sewer construction. 4.Payment of the following charges which shall be updated and due at the time of connection,the rates for which will be in effect until June 30,2025: a.Connection charge based on 1.12 buildable acres at the current rate. b.Capacity charge based on the size and quantity of the water meter(s). This approval letter must be superimposed on the final approval plans. Very truly yours, Anthony Manfre,Superintenent of Pollution C trol cc:Jeffery Doolittle,Town Michele Lipe,Director of Planning Marc Melanson,Chief Building Official Town Hall 1540 Sullivan Avenue,South Windsor,CT 06074 i Tel (860)644~2511 ext.2247 i anthony.manfre@SouthWindsor-CT.gov I a/‘xMnlcR'r CIVIL 1)1‘:s1(;N LLc January 8,2025 Electronic Delivery Jeff Doolittle,PE,Town EngineerTownofSouthWindsor 1 540 Sullivan Avenue South Windsor,CT 06074 RE: 260 Nutmeg Road South South Windsor,Connecticut 06074ProjectNumber:1018 Dear Mr.Dootlittle: We are in receipt of the review memo from Town of South Windsor Planning Department dated December5,2024.The letter contained comments relative to the review of the Site Plans associated with the Site PlanApplication#24—44P,for the Proposed Dog Daycare and Grooming facility at 260 Nutmeg Road South. On behalf of 260 Nutmeg Road South,LLC,we have revised the site plans to accommodate the commentsfromtheTownletter.Below are the written responses to the comments;with the responses in bold font. 1.Sheet ES1 provides project information that refers to phases of development,Where Phase 1 is forthefrontbuildingandparkinglotconstructionandphase2isfortherearbuilding.Clearly callthesephasesoutonSheetC1. The note has been added to Sheet C1 to indicate the site is to be developed into two phases.ThelayoutshownonSheetC1isthecompletionofbothstages. 2.The 4-inch HDPE pipe from proposed infiltration basin is too small and will likely get clogged.Provide a larger outlet pipe,such as a 10 or 12—inch pipe with a 4"diameter orifice plate on theinletend.Call this out on Sheet C2. The plans were updated to indicate a 10"with a cap on the inlet side.The cap is to have the 4"diameter orifice drilled into the bottom of the pipe invert. 3.Show a spot elevation for the emergency overflow spillway from the proposed infiltration basinonSheetC2. The spot elevation has been added to the emergency spillway.The spot elevation is show onSheetC2andDBL Lambert Civil Design,LLC 34 Misty Lane P:(860)670-6308 Monroe,CT 06468 LambertCivil@gmail.com The plans have been updated per the Engineering Department comments.We look forward to the working with you during the construction of this project. Respectfully, Lambert Civil Design,LLC WWW Michael Lambert,PE Principle Engineer Lambert Civil Design,LLC 34 Misty Lane P:(860)670-6308 Monroe,CT 06468 LambertCivil@gmail.com I AAA/unawr CEIVII , 131‘:SI(;N LLC January 16,2025 Marc Melanson,Building OfficialTownofSouthWindsor 1540 Sullivan Avenue South Windsor,CT 06074 RE:Site Plan Application #24-44P 260 Nutmeg Road South South Windsor,Connecticut 06074 Project Number:1018 Dear Mr.Melanson: We are in receipt of the review letter from the Town of South Windsor Building Department dated January13,2025.The letter contained comments relative to the review of the Site Plans associated with Application #24-44P for the Proposed Dog Daycare and Grooming facility at 260 Nutmeg Road South. On behalf of 260 Nutmeg Road South,LLC,we have revised the site plans to accommodate the commentsfromtheTownletter.Below are the written responses to the comments,with the responses in bold font. 1.There are no dimensions for the sidewalks. Dimensions have been added to Sheet C1,Site Layout.The widest portion of the sidewalkadjacenttotheparkingis10ftfromthefaceofthecurbtothebackofthewalk.The southern portion of the sidewalk adjacent to the parking is 5ft from the face of the curb to the back of thewalk.The walkway up to the front door is 3ft wide.The entrance landing is 5ft deep by 7.75ftwide. The spot elevations on the plans are difficult to read and therefore,I cannot determine the slope of the sidewalk. The plans have been updated to include a sidewalk insert at a scale of 1"=5’and additional spot grades and slopes have been added. The sidewalk at the top of the curb ramp is required to be level and 60”deep. A flat,60"deep section has been added to the top of the curb ramp as requested. Please put in the details the different slopes for the ADA sidewalks.If it is greater than 1:20,then it would be considered a ramp. As responded before,the plan insert shows the additional spot grades and slopes of thesidewalkandADAaccesspath. Lambert Civil Design,LLC 34 Misty Lane P:(860)670-6308 Monroe,CT 06468 LambertCivil@gmail.com 5.There is nothing that shows the detail at the building entrance. Within the plan insert,additional spot grades have been added to the plans showing theentrance. 6.Need to show that the Accessible entrance meets the requirements for approach. Within the plan insert,additional spot grades have been added to the plans showing theentrance 7.Please show the detail of the ADA parking signage on the plans. Signage details have been added to sheet D1 for the signage and sign mounting. The plans have been updated,and revised copies of the plans are included in this submission back to thePlanningDepartment.We look forward to closing out this application with the Planning Department Respectfully, Lambert Civil Design,LLC Wéméat Michael Lambert,PE Principle Engineer Lambert Civil Design,LLC 34 Misty Lane P:(860)670-6308 Monroe,CT 06468 LambertCivil@gmail.com