Loading...
HomeMy WebLinkAboutWPCA Avery Street Sewer Repairs (2)1540 SULLIVAN AVENUE o SOUTH WINDSOR.CT 06074 TELEPHONE (860)644-2511 September 15,2015 Matthew B.Galligan,Town Manager Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 RE:Avery Street Sewer Repairs WPCA Approval Dear Mr.Galligan: The South Windsor Water Pollution Control Authority,at its regular meeting on September 1,2015,gave approval to the application as presented for the relocation and replacement of approximately 321 feet of 10 inch sanitary sewer pipe,the installation of four (4)new sewer manholes,and associated work in Final Plans for the Reconstruction of Avery Street in South Windsor,CT,as more specifically shown on plans entitled“Reconstruction of Avery Street”,Drawing Title “Roadway Plan”,Project No.:132-131, Drawing No.:PLN—l,Sheet No.:22;Drawing No.:PLN-2,Sheet No.:23;Drawing No.: PRO—1,Sheet No.:28;and Drawing No.:PRO—2,Sheet No.:29. This approval letter must be superimposed on the final approval plans. Very truly yours, )Ric .vard Aries,Chairman Water Pollution Control Authority cc:Michael J.Gantick,Director of Public Works Jeff Doolittle,Assistant Director of Public Works/Town Engineer Michele Lipe,Director of PlanningChrisDougan,Chief Building Inspector TOWN OF SOUTH WINDSORWATERPOLLUTIONCONTROLAUTHORITY‘APPLICATION FORM Application N0.: Date Received q i <90i§Date Scheduled F r Q‘l ,5; Applicant l am d m5 Qm M wu‘(Jar Address i Ikq'o $u 1 I K dean #LWTelephoneN0.:'cw u veil )Owner of Record on Land Records Owner’s Address 7SVD SH H‘luc‘n #vb Property Description:[iv-UV)w‘w bf RM“/Q//t7 Q00 ”may c./l-Mar M é K #WV 5K1”;k‘ Assessor’s Map #Parcel #P’Vol.Page Cu/wa /3ProjectTitle:‘72?wagrmLhO”h Ci!(W014 fivdbLI/Inquiries t0 be Directed t0:(Name,Address,Telephone No.) ”Td 9.x)15x.,hi‘zzy/I Approvals Previously Received (Check)IWA P&Z ZBA Purpose of Application:(Check all that apply) 1.Sewer Extension/Connection --Residential Use a.Subdivision b.Single Unit c.Other Explain d.Type of Approval:Concept Final 2.Sewer Extension/Connection --Industrial/Commercial User a.New Connection b.Request to Increase Flow Ratec.Change in Nature of Waste Discharged.Other Explaine.Type ofApproval:Concept Final 3.Appeal of Sewer User Charge a.Residentialb.Industrial/Commercial 4.Sewer Assessment a.Establish Sewer Assessment b.Appeal of Sewer Assessment c.Change in Use of Property 5.Regulatory Appeal ,Explain 6.Other 1 Explain (La?!6"]q ape“r r2 f §é¢wer my 1}»behaeea /(,g M7 (QQ any (3‘d}/0 0 it /)~\J~é/‘\4 $~0di¢Cou-l“t3~1"/§g/zg HK 1cant’s Signature Date Owner’s Signature Date (See Reverse Side for Application Submittal Procedures)