Loading...
HomeMy WebLinkAboutWPCA Avery Street Foran Subdivision1540 SULLIVAN AVENUE o SOUTH WINDSOR,CONN.06074 AREA CODE 203/644-2511 January 19,1999 Mr.Stephen Foran 1050 Avery StreetSouthWindsor,CT 06074 RE:Foran SubdivisionAveryStreetSOUTHWINDSOR,CT Dear Mr.Foran: The South Windsor Water Pollution Control Authority,at its regular meeting of January 5,1999,gave approval for the connection to the Town's sewerage system of a residential building lot atAveryStreet,as more specifically shown on plans entitled "Foran Subdivision ...Prepared forStephenForan-South Windsor,Connecticut"by Engitek,Inc.,Glastonbury,CT;Drawing No.A-98-45-K1,Key Map dated 10/15/98,no revisions;Drawing No.A-98-45-S1,SubdivisionMapdated10/15/98,revised 11/18/98;and Drawing No.A—98-45-D1,Details,Notes,Approvalsdated10/15/98,revised 11/18/98 and 12-22-98,and subject to the following conditions: 1.Technical approval of the Town Engineering Department. 2.Final Authority approval and acceptance of the sanitary sewerage connection will begivenoncethesewerlinehasbeeninstalledandinspectedbytheTownstaff,and baseduponthewrittenverificationoftheTownstaffthatsaidsanitarysewerlinewasinstalledinsubstantialconformancewiththedesignplanspreviouslyapprovedbytheAuthority,and meeting all Town regulations and appropriate technical specifications relating tosanitarysewerconstruction. 3;The system shall be a force main with grinder pump. 4.An electrical outlet shall be provided for emergency generator hookup. 5.A 25-foot right—of-way,with an easement in favor of the in formpropertyowner,aacceptabletotheSouthWindsorTownAttomey,shall be provided. 6.The application shall be subject to Town of Vernon approval and subject to ofsubjectpaymentthesewerassessmenttotheTownof Mr.Stephen Foran 2 January 19,1999 7.This approval letter must be superimposed on the fmal approval plans. Very truly yours, Water Pollution Control Authority THzrt cc:Matthew Galligan,Town Manager Michael J.Gantick,Director of Public WorksJerryIazzetta,Town Engineer Marcia Banach,Director of PlanningJohnCollins,Chief Building Inspector Engitek,Inc. WATER POLLUTION CONTROL AUTHORITYTOWNOFVERNON 14 PARK PLACE,VERNON.CONNECTICUT 06066 TEL:(860)872-8591 FAX:(860)872-2909 February 25,1999 Mr.C.F.Shaw,Superintendent,Water Pollution Control Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074-2786 Re:Foran Subdivision,South Windsor,CT Dear Fred: l have reviewed the plans you have provided this department under your cover letter dated January 26,1999 concerning the above referenced subdivision.My understanding is that it consists of 2 lots,one of which (lot 2)desires to connect to the sewer in the Chase Orchards Subdivision,more specifically,on Talcott Ridge Road. As you are aware,the sewer assessment for Chase Orchards was determined to be $2,350 per acre.The assessment for the Foran development,which is utilizing the Hockanum River Trunk Sewer,should be based on the same cost per acre as Chase Orchard.ln addition,there is a connection charge of $400.00. Please do not hesitate to call me if you have any questions regarding this matter. Very .rui, //i/ avud R.l ato cz Director Water Polluti rolot c:Neil M.Danahy,WPCA Business Manager lKr:3T "”-3 xi?W