Loading...
HomeMy WebLinkAboutWPCA Abbe Road - 4-Lot Subdivision on Abbe Road1540 SULLIVAN AVENUE -SOUTH WINDSOR.CONN.06074 AREA CODE 203/644-2511 June 20,1994 Mary I.Ahearn155AbbeRoadSouthWindsor,CT 06074 RE:4-Lot Subdivision on Abbe Road Dear Ms.Ahearn: The South Windsor Water Pollution Control Authority,at its regular meeting on February l,1994,approved the Sanitary Sewerage System involving the use of a low pressure system with grinder pumps for the 4—lot Subdivision on Abbe Road,as detailed on the plans entitled Mary I.Ahearn,155 Abbe Road,South Windsor,Plan #93008,Dated 2/10/94 Engineer,Lucek Engineering Associates,Inc. subject to the following conditions: 1.Town Engineering technical approval 2.Location of cleanout valves must be clearly shown on plans; 3.Final Authority approval and acceptance of the sanitaryhasbeensewerageconnectionwillbegivenoncethesewerbasedinstalledandinspectedbytheTownstaff,and uponsaidthewrittenverificationoftheTownstaffthatinsanitarysewerwasinstalledbythedeveloperin substantial conformance with the design plans previously TownapprovedbytheAuthority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction;amd June 20,Page 2 1994 4.This approval letter must be superimposed into the final approval plans. Very truly yours, ’/L‘\.‘>Mn ‘Laiihg J Joseph Carlno,ChairmanWaterPollutlonControl Authority Town of South Wlndsor cc:Jean E Zurbrlgan Town ManagerMlchaelJGantlckDlrector of Publlc Works~/ Jerry Iazetta,Town EnglneerMarciaBanach,Director of Planning John Collins,Chief Building Inspector John McCahill,Zoning Enforcement Officer