Loading...
HomeMy WebLinkAbout50 TALBOT LANESouth Windsor Jk T -s� CARLA'S PASTA SOUTH WINDSOR, CON N ECTICUT FUEL CELL INSTALLATION SITE: CARLA'S PASTA 50 TALBOT LANE SOUTH WINDSOR, CT ENGINEER: INNOVATIVE CONSTRUCTION & DESIGN SOLUTIONS, LLC 419A WHITFIELD STREET GUILFORD, CT 06437 (203) 453-8596 PROJECT MANAGER: DOOSAN FUEL CELL AM ERICA, INC. DONALD EMANUEL 195 GOVERNOR'S HIGHWAY SOUTH WINDSOR, CT 016074 (860) 727-2010 PROJECT SITE MAP I DRAWING INDEX C't ® Y � r.. � t" s � C.� CS1.0 COVER SHEET GA1.0 FUEL CELL YARD GENERAL ARRANGEMENT SITE PLAN D1.0 PARTIAL DEMOLITION PLAN S1.0 STRUCTURAL CONCRETE PLAN S1.1 STRUCTURAL DETAILS M1.0 MECHANICAL GENERAL NOTES, SPEC & LEGENDS M2.0 MECHANICAL PIPING PLAN M3.0 MECHANICAL DETAILS M3.1 MECHANICAL DETAILS M4.0 MECHANICAL PIPING AND INSTRUMENTATION DIAGRAM M4.1 MECHANICAL PIPING AND INSTRUMENTATION DIAGRAM E1.0 ELECTRICAL ONE LINE DIAGRAM E2.0 ELECTRICAL PARTIAL PLANS E3.0 ELECTRICAL THREE -LINE DIAGRAM E3.1 ELECTRICAL DETAILS AND DIAGRAMS E4.0 ELECTRICAL SPECIFICATIONS REFERENCE DOCUMENTS FCMAN70865 REV-E DOOSAN INSTALLATION MANUAL PRMAN696001 DOOSAN PRODUCT DATA AND APPLICATIONS GUIDE GRID INDEPENDENT WIRING APPLICATION GUIDE (PROVIDED BY DOOSAN) DESIGN CODES CONNECTICUT STATE BUILDING CODE 2018 AS AMENDED 2017 NATIONAL ELECTRICAL CODE (NFPA 70) 2015 INTERNATIONAL BUILDING CODE 2015 INTERNATIONAL MECHANICAL CODE 2015 INTERNATIONAL PLUMBING CODE 2015 NATIONAL FUEL GAS CODE (NFPA 54) I F- W d O O W U W N U U z W 2 W �� N 0 C � w z Q 0 _ ®U) s� 0 w _ aiyinlunnu{wuu�aa J z U J J i� 0 V z 0 H o 4. UUJ cc� 0 o fn ¢._ � � o z q z o > 0 a o a a_ S� ~ LL U LL z ••IZ v o z a U ry v) Z 0 W Q Z I— 3: w U) = U W Q�Q W Cn O W ry U) ry Q � w J _! W J > ry Z W O ® LL J Q O L-) Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: N.T.S. DSF Drawing No.: ■ U J U) z 0 f- 0 U) z U) z Cr Cr h- z 0 U w 1 0 z z N f- 0 0 01 ---------------------------------------------------------------------- - i a 1 10'-01, 35'REQUIRED SET BACK 44'-0" CONTRACTOR SHALL VERIFY PROPERTY LINE PRIOR TO CONSTRUCTION TALBOT LANE\\\\ \ \ \ \ \ \ \ �fREE \ 10i EXISTING FENCE TO BE RELOCATED/REUSED DRILL, GROUT AND ANCHOR FENCE POST INTO EXISTING SLAB WITH MINIMUM EMBEDMENT OF 24 INCHES. TYPICAL PROVIDE OPENING IN FENCE FOR CABLES. COORDINATE EXISTING ELECTRICAL r \ PRIMARY. (V.I.F.) SEE NOTE 2 \ i \ t r \ \ \ \ EXISTING HEAT RECOVERY \\ PIPING TRENCH \\ \ -___----_-_ \ \ \ \ r \\ \ REQUIREMENTS WITH DOOSAN. EXISTING SWITCHGEAR t _ TO REMAIN FOR RE -USE TREE SEE DRAWING E2.0 { Q z HRM/RMS o (� � CABINET N BA TO E ! o z w NK - ����__. ry ACOUSTICAL BARRIER I 11'-2" 10'-0" n O 00 kV N �` E)C1Sv NG p �q) AUTOSEAL COMBINATION BLANKET I - w GIDS-2 XFMR GIDS-I-DS-GEN--- _ SEE NEW GAS SERVICE n�1 J:L MD2 AABBC-13 EXT. BY ACOUSTICAL SOLUTIONS FASTENED TO INSIDE NOTE 6 PC= __.. OF FENCE. --' —�—' `-EXISTING FENCE TO REMAIN PROVIDE - o �! CONDENSATE 5 q RE -GRADE AS REQ D. TO DRAIN i PROVIDE REMOVABLE UTILITY KEY s { S1.1 AWAY FROM COOLING MODULE RECEIVER RAILINGS. ` AND LOCKSET SEE NOTE 7 i w, IV 0 _F --- --------- _J ! t z LLI U w TIE DOWN t t t I - RELOCATED z I� O ! 4 BRACKET I i s `Q LIGHT BY LL O i� i NEW S1.1 TYP. OF 4 j E OTHERS } I{ ,; �� / Q f �� z i s PURECELL 400 i ` 00 0 N ] o ' COOLING f ; i FUEL CELL v z¢ i r MODULE _�, SEE ii = �v t NOTE & i i �— I— - w z 2 U \ � .... l 1 �,� , I 11 jJ ti 'r J� � � Q / i a u f r•. O < U C�nn > (� t O '�YI+ a SPARE Nz < _ J D_ } w i =--- - �.� �.a, U \ — I J xz PROVIDE HEAVY DUTY 27'-4" FENCE POST FOOTING 6 WITH ACOUSTICAL EDGING TO RETAIN FUEL CELL GRAVEL BLANKET (TYPICAL) S1.1 W� 39'-6" 6'-0" O.C. SPACING (MAX. 8'-0" O.C.) NEW CONCRETE PAD 7 FENCE POST PORTABLE COORDINATE EXACT LOCATION OF S1.1 FOOTING TYPICAL FOOTINGS WITH FENCE SHOP /GENERATOR DRAWINGS PRIOR TO //� ��AREA/� CONSTRUCTION. TYPICAL i 1�.,11I_/l1 l 13'-0" 8' HIGH CHAIN LINK FENCE WITH PRIVACY SLATS AND ACOUSTICAL LINER II 40'-6" U HIGH CHAIN LINK FENCE 1 i 1 SCALE: %" = V-0" SITE NOTES: 1. CONTRACTOR SHALL VERIFY ALL SITE DIMENSIONS, EASEMENTS, 1. PRIOR TO THE CONTRACTOR SUBMITTING A BID, THE CONTRACTOR MUST VISIT EASEMENT LOCATIONS ETC. THE SITE TO THOROUGHLY UNDERSTAND / INVESTIGATE THE EXISTING 2. CONTRACTOR SHALL HAND DIG IN ALL LOCATIONS WHERE POWER CONDITIONS OF THIS SITE. CONDUITS, CONTROL CONDUITS, AND PIPING CROSS THE UNDERGROUND PRIMARY FEEDERS, WATER LINES AND GAS LINES. 2. CONTRACTOR'S PRICE SHALL BE ALL INCLUSIVE FOR SITE DEMOLITION / PREPARATION AND FINAL GRADING AROUND THE FUEL CELL YARD. 3. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" AND A PRIVATE UTILITY LOCATOR SERVICE PRIOR TO START OF WORK. 3. THE CONTRACTOR SHALL CLEAR AREA OF FUEL CELL YARD AS REQUIRED AND DISPOSE OF ALL TREE, BRUSH, ROCKS, SOIL ETC. PROPERLY. 4. PROVIDE A MINIMUM CLEARANCE OF 5'-0" AROUND FUEL CELL. 5. EXISTING UTILITIES ARE PRESENT ON THIS SITE. CONTRACTOR SHALL 4. THE OVERALL SCOPE IS CLEARLY DEFINED WITHIN THE CONTRACT DRAWINGS TO EXERCISE EXTREME CAUTION WHEN EXCAVATING AND DIGGING TRENCHES. REFLECT THE INSTALLATION OF THE FUEL CELL, ELECTRICAL EQUIPMENT, AND ANCILLARY FUEL CELL COMPONENTS. 6. COORDINATE NEW GAS SERVICE AND GAS METER PAD SIZE AND INSTALLATION REQUIREMENTS WITH EVERSOURCE MANAGER JACK 5. THERE ARE NOT"ANY PROPOSED CHANGES TO THE EXISTING SITE DRAINAGE. CANNONE (860) 292-2270 PRIOR TO CONSTRUCTION. 6. CONTRACTOR SHALL BE RESPONSIBLE TO RE -GRADE AS NECESSARY TO ALLOW 7. BUILD AND INSTALL MAINTENANCE PLATFORM TO COVER CM, HG/LG, AND FOR LEVEL FUEL CELL AREA AND PROPER DRAINAGE. CONTRATOR SHALL WATER MAKE UP PIPING TO PROTECT PIPING AND INSULATION. PLATFORM RE -SEED GRASS IN WORK AREA. SHALL HAVE REMOVABLE GRATING TO ALLOW ACCESS TO VALVES BELOW / AND REMOVABLE RAILINGS AS INDICATED. PLATFORM MUST NOT OBSTRUCT ✓ FUEL CELL DOOR SWING CLEARANCE. PROVIDE DETAILED SHOP DRAWING OF PLATFORM. SEE DETAILS ON DWG. S1.1 8. PROVIDE UNISTRUT SUPPORT AS REQUIRED FOR IN -LINE NITROGEN RACK / FIRE SUPRESSION AND SPARE BOTTLE BANK. SERVICE HW f FEED STORAGE TANK WATER TANK 120P AIR COMPRESSOR 27 N OH DOOR Of w O 0 0 Poll EXISTING UTILITY PAD MOUNTED TRANSFORMER EXISTING -------co UTILITY METER BOILER o ROOM PAD O S O O O AIR 0 m COMPRESS raw t tLuu < 0 w > a a. m LL p z EXISTING SWITCHBOARD "MSB' SL4 I 1FT I PP2P SECT, 1 & 2 ELE����OI1�1 XFMRS ABO\t -�, OP4FCL__JDP46 r—z,—......... .... t.. _ _ KEY FLAN a] l w a- LLCL w CD iU) a) k C) N 0 0 ,T, a Z 0 ® ..,` y�J� ••......•••' N, M V S ON W O o i.7 w � ter• a, N Q O V N a O Q r J W� W 0 W W F_ L VJ W �- rn �/ ♦ U z W W2 OW 0W a W W _J V Z J J W J :D �< Q J Q UAW � p = Q L _I 7W L W LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: GA1 ■ I- w a � O LL w s� can C) 0) cD o N +- � Q N O `��NNINIIIIIIU111////y V V 'I'— c, b t, u Z kn -! �r C7 a w tn N Q O U 4) a O a O ti U ct O U Z 0 W Z Q Z :2 Q �- W _I U �- Q=Q O O W W _ U Q Q �J � _t W Q Z W F-- QQU ry U J J Q F- W O ::) m ,_,_ _I Q F- O LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: D1 ■ 0 € i 35' REQUIRED SET BACK t t I i ! i I I t � m W z i Uhl W W i L3C 0, 1 D 01 i k ! i TREE 10'-6" i 1 i' 2" 10'-0" t VERIFY IN FIELD k 10 I' ii ui iM ! CRUSHED STONE t i i I 1 S1.1 i i COORDINATE EXACT LOCATIONS WITH —� MANUFACTURERS EQUIPMENT SUBMITTAL: TYPICAL t i I FENCE POST WITH ACOUSTICAL BLf-\t>KE I FOOTING. TYPICAL 6'-6"± O.C. SPACING (MAX. 8'-0" O.C.) COORDINATE EXACT LOCATION OF FOOTINGS WITH FENCE SHOP DRAWINGS PRIOR TO CONSTRUCTION. TYPICAL i k 13 COOLING MODULE S1.1 PIER TYPICAL COOLING MODULE 13'-1 " CRUSHED STONE _ TREE a Q l�9.I RELOCATED FENCE POST O i ! SEE DWG. GA1.0 (TYPICAL) o i i Q ! ! O z I i p f I L---------------------------------------- ...__ W !� 00115 / 2 NL I ---------------------- _ ! i _ A � 5" THICK REINFORCED CONCRETE j W MAINTENANCE APRON (PITCH AWAY -, OJ 0 FROM FUEL CELL SEE NOTE 14) E ! ' cn z U iU ________.,_.._______-__---__ CJ J t ! CONDENSATE S1.1 ! RELIEVER NEW PURECELL 400 i i i r i . FUEL CELL SLOPE REINFORCED THICKENED del NOTE 14 1 j SLAB UNDER FUEL CELL j j j : N CJ Ci t !€ €t U I !i U i! O ii I( ¢° W J 1 t TYP. = i i S1.1 i ti Q> z i( w v j I ! t _______ _C�---.___ ___—_ _ ____ ____ _---_ _---________ __. ____ -----� --- --_. --� _._----_..---.__—.. _._---__. .__._ _______--- _—�___—_----_ } /-0 - + 39'-6" CONCRETE PAD CONCRETE PLAN - FUEL CELL YARD SCALE: %6" = 1,4, 1 5:-2 : 0 W W U z O U RELOCATED LIGHT BY OTHERS101 FOOTING TYPICAL { GENERAL NOTES: 1. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS, TO THE BEST OF OUR KNOWLEDGE, COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE 2018 j CONNECTICUT STATE BUILDING CODE, AND AMENDMENTS TO THE 2017 INTERNATIONAL BUILDING CODE. 1 2. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE 2017 INTERNATIONAL BUILDING CODE WITH THE STATE OF CONNECTICUT AMENDMENTS AND ALL APPLICABLE FEDERAL AND STATE CODES, STANDARDS, REGl.1LA I IONS AND LAWS. 3. CONTRACTOR SHALL VERIFY THAT ALL UNDERGROUND PIPING AND ELECTRICAL CONDUITS ARE IN PLACE PRIOR TO POURING CONCRETE SLAB. 4. ALL EXISTING CONSTRUCTION AND UTILITIES SHALL BE SAFEGUARDED AND PROTECTED FROM DRAINAGE OR SETTLEMENT DURING EXCAVATION AND CONSTRUCTION. 5. THE SUB GRADES SHALL BE PROOF COMPACTED BY AT LEAST FIVE PASSES OF A VIBRATORY COMPACTOR HAVING A STATIC WEIGHT OF AT LEAST 2 TONS. 6. CONTRACTOR SHALL PROVIDE DETAILED SHOP DRAWINGS FOR FENCING INSTALLATION. COORDINATE POST SLEEVE SIZE AND EMBEDMENT AND LOCATION WITH FENCING CONTRACTOR. FENCING SHOP DRAWINGS SHALL BE SUBMITTED TO STRUCTURAL ENGINEER FOR REVIEW. CONCRETE NOTES: 1. ALL CONCRETE CONSTRUCTION SHALL CONFORM TO AMERICAN CONCRETE INSTITUTE'S "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318 - LATEST EDITION) & "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE RTRI JrTI 1RES" (ACI 315 - LATEST EnITIOn!) 2. ALL CONCRETE SHALL HAVE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 4000 PSI (UNLESS NOTED ON DRAWINGS). 3. REINFORCEMENT SHALL CONFORM TO ASTM "SPECIFICATION FOR DEFORMED & PLAIN BILLET -STEEL BARS FOR CONCRETE REINFORCEMENT" -A615 GRADE 60, MINIMUM YIELD STRENGTH OF 60,000 PSI. I 4. ANCHOR BOLT STEEL SHALL CONFORM TO ASTM SPECIFICATION A36 OR A307. 5, Al I FXPO.q Fn C ORNF'RC RI-IAI i NA\/E 3/d" CHAI""FER I [Nil l=QS %in pn r-AN PLANII. 3 6. ALL EXTERIOR CONCRETE SHALL HAVE AIR -ENTRAINING ADMIXTURE PROVIDING 4% TO 6% TOTAL AIR CONTENT. 7. ALL EXPOSED CONCRETE SURFACES SHALL BE CURED IMMEDIATELY AFTER FINISHING. CONCRETE SHALL BE KEPT CONTINUOUSLY MOIST FOR A MINIMUM OF 7 DAYS OR APPLY TWO COATS OF CURING COMPOUND WITH A SECOND COAT APPLIED AT RIGHT ANGLE TO FIRST COAT. ALTERNATE METHODS MAY BE USED WITH PRIOR APPROVAL. 8. WELDING OF REINFORCEMENT (INCLUDING TACK WELDS) SHALL NOT BE PERMITTED UNLESS NOTED ON PLAN. 9. DETAILING OF REINFORCEMENT SHALL BE PERFORMED USING STANDARD END I HOOKS AND WITH LAP SPLICE & EMBEDMENT LENGTHS ONLY AS INDICATED ON DRAWINGS. 10. ALL EXTERIOR SLAB SURFACES SHALL HAVE A WOOD FLOAT FINISH. a 11. SLAB FLATNESS TOLERANCE SHALL BE 1/4 INCH IN 10 FEET. 12. SLAB LEVEL TOLERANCE SHALL BE 1/4 INCH PER 10 FEET. 13. SLAB SHALL HAVE A MINIMUM OF 7 DAYS CURE BEFORE ANY LOADS ARE i APPLIED. 14. AFTER SETTING DOWN THE POWER MODULE APPLY RTV CAULKING TO THE PERIMETER OF THE BASE FRAME, SEALING THE BASE FRAME TO THE PAD. 15. ALLOWABLE BEARING PRESSURE = 4000 PSF. 16. ALL REBAR SUPPORTS SHALL CONFORM TO SPECIFICATIONS OF THE (`(lN(`C�CTC DCIAIC(l�/`IAIl� AI-= AKInSTCCL IvIoOTITU I C rrrvv LVIVnPLv.VVnI r1:1: AMrRIIAN CONCRETE INSTITUTE (ACI) ACI-50-66, ACI-315, AND ACI-315R. REBAR AND WIRE MESH SHALL BE SUPPORTED BY DAYTON SUPERIOR INDIVIDUAL HIGH CHAIR - HC OR APPROVED EQUAL. 'rp" KEY PLAN i F— ! w` n [ LL W U i �Q coco j Imo: I CIO N 0 ! ,j \N\�1p111I N�$ .. 8�v� 0 'C;3 V• U` P-� W O oU l� O ti U W ® z W � . ■ W � Q C/) U Q COW Uw QV J ::) L.L n � : W J 0140 U ry Z W F— Z U C/) ° W O LJL I : , t F LO s I 4 Project No.: Drawn By: KFH Date- Design By: 02/06/19 KFH ` 2 Scale: Check By: L AS NOTED DSF C Drawing No.: si ■ G z c 5 c COORDINATE METER ASSEMBLY PAD REQUIREMENTS WITH GAS COMPANY SEE NOTE 6 ON DRAWINGS GA1.0 ;n 4x4 - W4.Ox4.0 (@-11/2") iE--X # x iE x_xX—X-�( 5 t (V � `J 2 w IN FROM #4,S @12„ TO UTILITY EACHWAY I• FUEL CELL 1 12" MIN.CRUSHED STONE 12 1/2" , 2'-6" 12 1/2" � COMPACTED SUBGRADE _'� r GAS METER PAD SECTION n SCALE: N.T.S. PIPING PLATFORM ELEVATION SCALE: N.T.S. PLATFORM REQUIREMENTS: 1. SUPPORT 1,000 LBS. (3 TECHNICIANS + EQUIPMENT) 2. GALVANIZED STEEL, ALUMINUM AND FIBERGLASS MATERIALS ARE ACCEPTABLE. OF PIPING AND CONDUITS BELOW PLATFORM 1" CONDUIT MAY OFFSET TO AVOID ANR CIIq BASE COURSE (3" MIN) :L ALSO SEE TYPICAL ASPHALT ASPHALT COURSE — PATCH DETAIL 8 IF DISTANCE FROM EDGE OF NEW ASPHALT EXISTING THICKNESS PLUS 1" (3" MIN. THICKNESS) PRIME WITH MC-70 NEAT CUT LINE (TYP.) ASPHALT COURSE EXISTING PATCH TO EXISTING ASPHALT PATCH IS LESS THAN (3) FEET. CONTRACTOR SHALL SAWCUT THICKNESS PLUS 1" EXISTING PAVEMENT AT EDGE OF EXISTING EXISTING ASPHALT SURFACE - (3" MIN. THICKNESS) PATCH AND REMOVE AND REPLACE SAWCUT FULL DEPTH OF PAVEMENT BETWEEN TO PATCH SECTIONS SELECT BACKFILL - �p EXISTING ASPHALT IN NEAT � DRIVEWAY BASE Q70AIr_`uT I IAIEr' v I InI Vl7 1 LINI EXCAVATION LIMIT ABOVE TOP OF PIPE ¢ w MIN EXISTING ASPHALT PATCH. MAY VARY ACCORDING TO SOIL TYPE & °C IF EXISTS SAFETY REGULATIONS BUT SHALL BE KEPT p TO A MINIMUM. NO OVER EXCAVATION WILL uv BE- ALLOWED. ` COMPACTED BACKFILL PER BASE COURSE EXISTING r., ----------------------- - ADDITIONAL BEDDING FOR 12" MAX SPECIFICATION MEASURED AT THICKNESS (3" MIN.) PLASTIC PIPE — — — — — — — TOP OF PIPE STABILIZATION OF SUB — I BASE COURSE IF REQUIRED STABILIZATION MATERIAL (A$ REQUIRED) _ �r� `- — NEW olo� no n,r lr,l II, �� tll. IiVIVUUI I 1' MIN. SAWCUT OF DAMAGED SEC TIc�N OF EXISTING PAVEMENT EXISTING PAVEMENT 1' RAW QAyArrl IT nC VVVI VI EXISTING PAVEMENT `� -- BEDDING PIPING / CONDUIT INSTALLATION AND DRIVEWAY REPAIR SCALE: N_T_S �� TYPICAL ASPHALT I =� PATCH DETAIL _ 3/8" JOINT SEALANT - (TOOL SURFACE) n � A ' co BOND BREAKER COMPRESSIBLE TAPE MATERIAL 3 CONTROL JOINT DETAIL SCALE: N.T.S. Y4" CRUSHED STONE COMPACTED SUBGRi DOOSAN TIE DOWN —i BRACKET FC69802 zoowLu �'- PL AN ®AIE,n/ (PLAN VIEW) FUEL CELL I SS THREADED ROD - 1"0 (REMOVABLE FROM ANCHOR) BRACKET PLUG I DOOSAN TIE DOWN BRACKET FC69802 CONCRETE SLAB SHIM AS REQUIRED ao SS DROP IN ANCHOR, INTERNALLY THREADED DLING MODULE \C. PIER BEYOND DETAIL 13 NEW CONCRETE SLAB (SEE PLAN) SCALE: N.T.S. 10" EXISTING GRADE I I----------„ I I i t I I 8" DIAMETER PVC PIPE FILLED WITH CRUSHED STONE CRUSHED STONE ----�- , 0 N 3'-0" h^ ONDESATE REIE CNLVER DETAIL 1 � 7 SCALE: N.T.S. CONC.CURB BEYOND 4x4 - W4.Ox4.0 (@-11/2") jE''";IE`' if if if 3E if iE 1E 3E iE�E=�f=ar 10" I #5'S @ 12"O.C. 12" MIN. COMPACTED----r\\r//j�/ GRANULAR FILL �• A\r` COMPACTED SUBGRADE 1 SLAB SECTION SCALE: Y2" =1'-0" op d N GRATING } 0- ; w U) ;w N —ANGLES TO SUPPORT GRATE ON STEP REMOVABLE \ -- ANGLE LEGS RAILING �01 4'-72„ -0' C12 I PIPING PLATFORM PLAN SCALE: N.T.S. i ACOUSTICAL BLANKET j� z O i U O J ry GALVANIZED CHAIN LINK FENCE O LL z I J w w 4" DIAMETER, GROUP 1A: o (ASTM 1043) SCHEDULE 40 j GALVANIZED STEEL PIPE, ASTM F1083 HIGH STRENGTH GRADE (50,000 PSI YIELD STRENGTH). FINISHED GRADE FENCE POST- SLEEVE STEEL PIPE WITH EPDXY GROUT NOTES: 1. FOR GENERAL NOTES, CONCRETE NOTES, AND SOIUSUBGRADE NOTES SEE DRAWING S1.0. COOLING MODULE LEG I HILTI EXPANSION ANCHORS I N MIN. 4" LAYER OF CRUSHED STONE ;N�mm X _4Z COMPACTED SUBGRADE 0 12" O CONCRETE PIER (4000 PSI @ 28 DAYS) MIN. 3" LAYER OF 4" CRUSHED STONE CONCRETE PIER DETAIL SCALE: N.T.S. GALVANIZED CHAIN LINK FENCE 2 3/8" DIAMETER GALVANIZED j STEEL FENCE POST. RE -USE EXISTING WHEREVER POSSIBLE. ! PROVIDE NEW AS NEEDED. FINISHED GRADE ,,- C I I d-I � p � w � m _z w 4 10" DIA. CONCRETE PIER (4000 PSI @ 28 DAYS) MIN. 3" LAYER OF %4" CRUSHED STONE (D_FENCE PO�TDETAIL SCALE: N.T.S. NEW CONCRETE SLAB (SEE PLAN) FUEL CELL x4 - W4.Ox4.0 SEISMIC TIE DOWN o #4'S @ 12"O.C. ( @ - 1 1/2") SEE DETAIL 4 FIN. GRADE V7== i4 • r- #5'S @ 12"O.C. 10" y 6" 12" MIN. COMPACTED GRANULAR FILL COMPACTED SUBGRADE aSLAB SECTION CALE: %" =V-0" z w m z w 12" DIA. CONCRETE PIER - ( 4000 PSI @ 28 DAYS) MIN. 3" LAYER OF %" CRUSHED STONE 12" FENCE POST WITH ACOUSTICAL BLANKET DETAIL SCALE: N.T.S. A �;al z z w i� w w z z rz w 0 a F w x 5 z z w ll) ill 4 z f- w iri 0 b z c� aS' 0 i z z 0 U a 0 z z_ LL a a U w w z z w r- iL 0 T EJ ui 0 Lu N z w q 0 v z 0 z z SCOPE OF WORK 1. INSTALL ALL HOODS AND DRIP EDGES, WITH DOOSAN FURNISHED FASTENERS. 2. ANCHOR COOLING MODULE LEGS TO CONCRETE PAD. 3. FURNISH AND INSTALL ALL EQUIPMENT, PIPING, INSTRUMENTATION AND CONTROLS AS SHOWN ON THE M-SERIES DRAWINGS UNLESS OTHERWISE NOTED. FUEL CELL SHALL BE PROVIDED BY DOOSAN FUEL CELL AMERICA (DOOSAN). 4. FURNISH AND INSTALL 1" THREADOLET AND 1" FULL PORT BALL VALVE FOR LG SUPPLY FLOW METER (BY OTHERS). 5. FURNISH AND INSTALL W THREADOLET AND THERMOWELL FOR LG SUPPLY AND RETURN TEMPERATURE SENSORS (BY OTHERS). 6. INSULATE PIPING FOR HEAT CONSERVATION AND COVER FOR WEATHER PROTECTION AS PER DRAWINGS. 7. INSULATE ABOVE GROUND COOLING MODULE PIPING FOR PERSONNEL PROTECTION AND COVER FOR WEATHER PROTECTION. 8. DOOSAN SHALL FURNISH DOW FROST GLYCOL FOR COOLING MODULE AND FILL PIPING. 9. COMPLETE GAS PIPING FROM A NEW UTILITY GAS SERVICE. 10. VENT REGULATOR BLEED LINE TO 15FT AWAY FROM ANY AIR INTAKES. 11. INSTALL NITROGEN GAS BOTTLE RACK / SPARE BOTTLE RACK AND MANIFOLD SYSTEM. CONNECT 10 BOTTLES. 12. FURNISH AND INSTALL NITROGEN PIPING FROM MANIFOLD TO FUEL CELL PER DRAWINGS. 13. COMPLETE CITY WATER MAKEUP PIPING TO FUEL CELL FROM EXISTING CUSTOMER SUPPLY BY INTERCEPTING THE EXISTING MAKEUP WATER LINE IN THE PIPING TRENCH. 14. HEAT TRACE AND INSULATE ABOVE GROUND WATER PIPING. REFER TO DRAWING E-3.1 DETAIL 2 FOR SPECIFIC APPLICATIONS. 15. WATER DISCHARGE -PIPE TO CONDENSATE RECEIVER IN FUEL CELL YARD AS SHOWN. 16. BREAK ALL PIPELINES AT FUEL CELL EQUIPMENT AND FLUSH CLEAN IN ACCORDANCE WITH FUEL CELL INSTALLATION MANUAL. 17. BREAK ALL PIPELINES AT EQUIPMENT AND BLANK. PRESSURE TEST WITH AIR OR N2 AND HOLD FOR 24HRS AND PROVIDE A REPORT. COORDINATE WITH OWNER AND LOCAL BUILDING INSPECTOR TO WITNESS TESTS AS NECESSARY. 18. BUILD AND INSTALL MAINTENANCE PLATFORM TO COVER CM, HG, AND LG PIPING TO PROTECT PIPING AND INSULATION. INCLUDE REMOVABLE OSHA RAILS AND ACCESS TO VALVES BELOW. PLATFORM AND RAILS SHALL BE GALVANIZED (OR EQUAL) FOR WEATHER RESISTANCE. 19. LABEL ALL PIPELINES PER CUSTOMER STANDARDS. IF CUSTOMER STANDARDS ARE NOT AVAILABLE THEN LABEL IN ACCORDANCE WITH ANSI/ASME A13.1. 20. PAINT PIPELINES AND/OR INSULATION IN ACCORDANCE WITH CUSTOMER STANDARDS IF CUSTOMER STANDARDS ARE NOT AVAILABLE THEN PAINT THEM WHITE. 21. BALANCE ALL WATER FLOWS PER SPECIFICATIONS AND PROVIDE DOOSAN WITH A FINAL REPORT. 22. FACILITY STAFF REPORTED THAT LOW WATER PRESSURES ARE COMMON FOR THIS FACILITY. CONTRACTOR SHALL INVESTIGATE THE AVAILABLE DOMESTIC WATER PRESSURE DURING A TYPICAL DAY TO CONFIRM WHETHER OR NOT THE EXISTING PWS LINE REQUIRES INCREASED PRESSURE FROM THE EXISTING WATER PRESSURE BOOSTER PUMP (THE ORIGINAL FUEL CELL INSTALLATION). IF SUFFICIENT PRESSURE IS AVAILABLE, REMOVE THE EXISTING BOOSTER PUMP; OTHERWISE, TEST THE EXISTING BOOSTER PUMP FOR PROPER OPERATION AND CONNECT TO THE PWS FEED TO THE NEW FUEL CELL. PROVIDE A TEST REPORT TO ENGINEER AND DOOSAN FOR REVIEW AND ANALYSIS TO VERIFY SUFFICIENT DDr-CCI IRE iS AVAILABLE FOR NORKAAI FI IEI (r;FI I r)PPRATW)m GENERAL NOTES 1. THE MECHANICAL CONTRACTOR SHALL BE FAMILIAR WITH ALL CONTRACT DOCUMENTS FOR ALL TRADES AND SHALL COORDINATE WITH OTHER CONTRACTORS. 2. DRAWINGS ARE DIAGRAMMATIC ONLY, FINAL ROUTING OF PIPING AND EQUIPMENT LOCATIONS SHALL BE DETERMINED IN THE FIELD. ADDITIONAL OFFSETS, ELBOWS, ETC., SHALL BE PROVIDED AND INSTALLED WITHOUT ADDITIONAL COST TO THE OWNER. 3. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INCIDENTAL ACCESSORIES NECESSARY TO MAKE THE FUEL CELL COMPLETE AND READY FOR OPERATION. 4. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES. 5. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 6. FURNISH AND INSTALL PIPING AS SIZED ON THE PLANS. REFER TO P&ID FOR PIPING CONNECTIONS, INSTRUMENTATION AND VALVE REQUIREMENTS. CONFIRM FLOW DIRECTIONS FOR SUPPLY AND RETURN LINES PRIOR TO INSTALLATION OF ANY WORK. 7. NATURAL GAS INSTALLATION SHALL COMPLY WITH LOCAL CODES. INSTALL LOCKABLE MANUAL GAS SHUTOFF VALVE WITH A 1/2" NPT PRESSURE TAP FOR TEST GAUGE CONNECTION AT UNIT. "APPLIES TO" MEDIA FLOW DIRECTION SIZE DESIGNATOR FLOW LABEL (S = SUPPLY, R = RETURN) nn ATrMl Al IVIf11 =1`11 ML "APPLIES TO" MEDIA FLOW DIRECTION P&ID PIPING SCHEDULE 4"-LGS-CU SERVICE DESIGNATOR MATERIAL CONNECTIONS FLUID INSULATION JACKET NOTES COOLING MODULE CM -CS A53 GR B ERW SCH 40 STEEL WELDED / 40% GLYCOL- 60% DI WATER 2" FIBERGLASS ALUMINUM OUTSIDE, FIBERGLASS JACKET UNDERGROUND GLYCOL BY DOOSAN OR ASTM B88 TYPE L COPPER BRAZED UNDERGROUND HG-CS A53 GR B ERW SCH 40 STEEL WELDED 40% PROPYLENE GLYCOL REFER TO M3.1 DETAILS ALUMINUM OUTSIDE, PVC ALL SERVICE JACKET INSIDE GLYCOL BY CONTRACTOR; HIGH GRADE 1" FIBERGLASS (< 2" ID). nnl l� KITM A^-rr1% 11 ABOVE GROUND HIGH GRADE HG-CS A53 GR B ERW SCH 40 STEEL GROOVED 40% PROPYLENE GLYCOL 2" FIBERGLASS (> 1.5" ID) ALUMINUM OUTSIDE, PVC ALL SERVICE JACKET INSIDE GLYCOL DT UUIN 1 MAU I UIs. UNDERGROUND LG-CS A53 GR B ERW SCH 40 STEEL WELDED 40% PROPYLENE GLYCOL 2" FIBERGLASS ALUMINUM OUTSIDE, PVC ALL SERVICE JACKET INSIDE GLYCOL BY CONTRACTOR; LOW GRADE ABOVE GROUND LG-CS A53 GR B ERW SCH 40 STEEL GROOVED o 40 /o PROPYLENE GLYCOL �" Flo=owl ncc i� ��� rn� IBERGL rSS k> ILJJ1 211, FIBERGLASS (> 1.5 ID) ALUMINUM OUTSIDE, PVC ALL SERVICE JACKET INSIDE GLYCOL BY CONTRACTOR; LOW GRADE ABOVE GRADE PIPING SHALL HAVE ALUMINUM OUTSIDE, ALL POTABLE WATER PWS ASTM B88 TYPE K COPPER BRAZED POTABLE WATER 2" FIBERGLASS SERVICE JACKET INSIDE. BELOW GRADE SHALL BE PITTWRAP SEE ALTERNATE, SECTION 6.3 CW PLUS JACKETING OR EQUAL WASTE WATER WW-CU ASTM B88 TYPE K COPPER BRAZED WASTE WATER 1" FIBERGLASS ALUMINUM OUTSIDE, PVC ALL SERVICE JACKET INSIDE. NATURAL GAS NG-CS A53 GR B ERW STEEL WELDED NATURAL GAS N/A BELOW GRADE PIPING SHALL HAVE AN EPDXY ADHESIVE & POLYETHYLENE COATING SEE ALTERNATE, SECTION 5.5 BELOW GRADE PIPING SHALL HAVE AN EPDXY ADHESIVE & INITROGEN GAS I N2-CU I ASTM B88 TYPE K COPPER I BRAZED I COMPRESSED NITROGEN I N/A I POLYETHYLENE COATING I _� PIPING & DUCTWORK SPECIFICATIONS 1. REFER TO P&ID PIPING SCHEDULE FOR APPLICABILITY OF PIPING MATERIALS. 2. QUALITY ASSURANCE: 2.1. ASME COMPLIANCE: COMPLY WITH ASME B31.9, "BUILDING SERVICES PIPING," FOR MATERIALS, PRODUCTS, AND INSTALLATION. SAFETY VALVES AND PRESSURE VESSELS SHALL BEAR THE APPROPRIATE ASME LABEL. ALL PRESSURE VESSELS TO COMPLY WITH THE ASME BOILER AND PRESSURE VESSEL CODE, SECTION Vill, DIVISION 1. 2.2. ALL EQUIPMENT INSTALLATION SHALL COMPLY WITH AND FOLLOW ALL MANUFACTURERS INSTALLATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO, TRAINING QUALIFICATIONS, INSTALLATION MANUALS, REQUIRED CLEARANCES, AND REQUIRED CERTIFICATIONS. SCHEDULE ON THIS DRAWING. 6.2 ALL UNDERGROUND PIPING EXCEPT FOR GAS AND N2 PIPING SHALL BE INSULATED AND WATER -PROOFED IN ACCORDANCE WITH THE DETAILS ON THIS DRAWING OR APPROVED EQUAL. 6.3 ALTERNATE FOR UNDERGROUND MAKE UP WATER: PERMA-PIPE PREINSULATED TYPE K SERVICE PIPE WITH INTEGRATED HEAT TUBE FASTENED TO SERVICE PIPE WITH ALUMINIZED TAPE WITH SS BANDING. COMMISSIONING REQUIREMENTS 1. THE CONTRACTOR SHALL INCLUDE AS PART OF THE BID (OR AS A SUBCONTRACT) COMMISSIONING SERVICES FOR ALL HEAT RECOVERY AND ASSOCIATED AUTOMATION SYSTEMS. COMMISSIONING OF THE FUEL CELLS AND THE SUPPORTING SYSTEMS (COOLING MODULE, NITROGEN PURGE SYSTEM, AND HEAT RECOVERY MONITORING SYSTEM) SHALL BE BY OTHERS. THE PURPOSE OF THE COMMISSIONING SERVICES IS TO: Z rnDDr=Q DIDING N CDEf'IFI( ATIO• J V VI 3.1. �I ` REFER TO THE APPLICABLE DETAIL DRAWING FOR PIPING CONNECTIONS, INSTRUMENTATION AND VALVE REQUIREMENTS. 1.1. VERIFY THAT APPLICABLE EQUIPMENT AND SYSTEMS ARE INSTALLED ACCORDING TO THE MANUFACTURER'S 3.2. CONFIRM FLOW DIRECTIONS FOR SUPPLY AND RETURN LINES PRIOR TO INSTALLATION OF ANY WORK. RECOMMENDATIONS AND TO INDUSTRY ACCEPTED MINIMUM STANDARDS AND THAT THEY RECEIVE ADEQUATE 3.3. ALL PIPING SHALL BE TYPE K COPPER, ASTM B-88, WITH CAST COPPER BRAZED FITTINGS. BRAZED JOINTS SHALL BE JOINED OPERATIONAL CHECKOUT BY INSTALLING CONTRACTORS. USING AWS A5.8, BAg1, SILVER SOLDER. 1.2. VERIFY AND DOCUMENT PROPER PERFORMANCE OF EQUIPMENT AND SYSTEMS. 3.4. INSULATE PIPING AS PER THE P&ID SCHEDULE. 1.3. VERIFY THAT O&M DOCUMENTATION LEFT ON SITE IS COMPLETE. 3.5. FOR EXTERIOR APPLICATIONS PROVIDE WITH EMBOSSED ALUMINUM (20 MIL) JACKETS AND WEATHER PROOF SEAL. 1.4. VERIFY THAT THE OWNER'S OPERATING PERSONNEL AND DOOSAN ARE ADEQUATELY TRAINED. 3.6. PROVIDE DIELECTRIC CONNECTIONS AT ALL CONNECTIONS TO DISSIMILAR MATERIALS (I.E., COPPER AND STEEL). 3.7. ROUTE PIPING SUCH THAT IT DOES NOT IMPEDE ACCESS TO ANY EQUIPMENT. 2. SCOPE OF WORK 3.8. SUPPORT PIPING AS SHOWN ON THE APPLICABLE DETAIL DRAWING. 2.1. INSPECT ALL INSTALLED WORK AND VERIFY THAT IT IS READY FOR START-UP / OPERATION. 3.9. SUPPORT NON ROOFTOP PIPING WITH LIGHT -DUTY CLEVIS HANGERS SUSPENDED FROM THE CEILING USING THREADED ROD 2.1.1. PROVIDE DOCUMENTATION TO SUPPORT THIS BY PROVIDING REVIEW AND APPROVAL OF: ATTACHED TO A STRUCTURAL BEAM FLANGE OR SIDE BEAM BRACKET. PROVIDE VIBRATION ISOLATORS AS NECESSARY TO 2.1.1.1. TEST REPORTS PREVENT STRUCTURE -BORNE NOISE. WHERE HANGING FROM THE THE CEILING IS NOT PRACTICAL, SUPPORT PIPE FROM 2.1.1.2. MFR PRE -START-UP CHECKLISTS THE FLOOR USING A THREADED ROD AND A PIPE CLAMP ANCHORED TO THE CONCRETE VIA A CEILING FLANGE. INSTALL 2.1.1.3. CUSTOM GENERATED PRE -FUNCTIONAL CHECKLISTS (THIS IS REQUIRED IF EQUIPMENT DOES NOT HAVE MFR CLAMP OR CLEVIS OVER INSULATION WITH PIPE PROTECTION SADDLES. PROVIDED CHECKLISTS) 3.10. PITCH ALL PIPING TOWARDS ITS EQUIPMENT SOURCE TO PROVIDE SELF -DRAINING TO THE MAXIMUM EXTENT POSSIBLE. 2.2. REVIEW AND APPROVAL OF ALL START-UP REPORTS. PROVIDE 3/4" DRAIN BALL VALVES WITH CAPPED HOSE END CONNECTIONS AT ALL SYSTEM HIGH AND LOW -POINTS AND AS 2.3. REVIEW AND APPROVAL OF TEST AND BALANCE REPORT. SHOWN ON THE DRAWINGS. 2.4. REVIEW AND APPROVAL OF OPERATIONS AND MAINTENANCE MANUAL. 2.5. DEVELOP FUNCTIONAL TEST PROCEDURES TO VERIFY OPERATION THE FOLLOWING EQUIPMENT AND SYSTEMS MEET 4. STEEL PIPING SPECIFICATION: THE INTENDED DESIGN: 4.1. REFER TO THE APPLICABLE DETAIL DRAWING FOR PIPING CONNECTIONS, INSTRUMENTATION AND VALVE REQUIREMENTS. 2.5.1. PUMPS 4.2. CONFIRM FLOW DIRECTIONS FOR SUPPLY AND RETURN LINES PRIOR TO INSTALLATION OF ANY WORK. 2.5.2. VARIABLE FREQUENCY DRIVES 4.3. ALL NEW PIPING SHALL BE SCHEDULE 40, CUT GROOVED STEEL, ASTM A-53 Tp. S, DUCTILE IRON GROOVED -END FITTINGS 2.5.3. ALL NEW CONTROL DEVICES (AUTOMATION CONTROLLERS, CONTROL VALVES, RELAYS, CSRs, ISOLATORS, AND COUPLINGS, VICTAULIC OR APPROVED EQUAL. GASKETS SHALL BE SUITABLE FOR HVAC SERVICE EXCEPT FOR HEAT SENSORS, TRANSMITTERS) MEDIUM PIPING WHICH SHALL REQUIRE EHP GASKETS. FOR ANY PIPE AND FITTINGS LESS THAN 3", TYPE K COPPER, ASTM 2.6. PREPARE WEEKLY LOGS (DURING TESTING) AND DOCUMENT ANY DEFICIENCIES WITH PROPOSED RESOLUTION B-88, WITH CAST COPPER BRAZED JOINT FITTINGS MAY BE SUBSTITUTED. JOINTS SHALL BE BRAZED USING APPROPRIATE 2.7. REVIEW TRAINING PLAN FOR OWNER PERSONNEL AND DOOSAN SILVER SOLDER. 2.8. PREPARE COMPLETE COMMISSIONING REPORT DOCUMENTING ALL OF THE ABOVE 4.4. INSULATE PIPING AS PER THE P&ID SCHEDULE. 4.5. FOR EXTERIOR APPLICATION PROVIDE WITH EMBOSSED ALUMINUM (20 MIL) JACKETS AND WEATHER PROOF SEAL. 4.6. PROVIDE DIELECTRIC CONNECTIONS AT ALL CONNECTIONS TO DISSIMILAR MATERIALS (I.E., COPPER AND STEEL). 4.7. SUPPORT PIPING AS SHOWN ON THE APPLICABLE DETAIL DRAWING. 4.8. SUPPORT NON ROOFTOP PIPING WITH LIGHT -DUTY CLEVIS HANGERS SUSPENDED FROM THE CEILING USING THREADED ROD ATTACHED TO A STRUCTURAL BEAM FLANGE OR SIDE BEAM BRACKET. PROVIDE VIBRATION ISOLATORS AS NECESSARY TO PREVENT STRUCTURE -BORNE NOISE. WHERE HANGING FROM THE THE CEILING IS NOT PRACTICAL, SUPPORT PIPE FROM THE FLOOR USING A THREADED ROD AND A PIPE CLAMP ANCHORED TO THE CONCRETE VIA A CEILING FLANGE. INSTALL CLAMP OR CLEVIS OVER INSULATION WITH PIPE PROTECTION SADDLES. 4.9. PITCH ALL PIPING TOWARDS ITS EQUIPMENT SOURCE TO PROVIDE SELF -DRAINING TO THE MAXIMUM EXTENT POSSIBLE. PROVIDE 3/4" DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT ALL SYSTEM HIGH AND LOW -POINTS AND AS SHOWN n10 TUC MMAIn/l Alr]C IJIV IT ILLL.JI\nVV11VVV. 5. NATURAL GAS PIPING SPECIFICATION: 5.1. NATURAL GAS INSTALLATION SHALL COMPLY WITH NFPA 54-2012 FUEL GAS CODE. INSTALL MANUAL, LOCKABLE GAS SHUTOFF VALVE WITH A 1/2" NPT PRESSURE TAP FOR TEST GAGE CONNECTION AT FUEL CELL. 5.2. NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE ASTM A 53/A 53M, TYPE E OR S, GRADE B WITH BEVELED ENDS. FITTINGS SHALL BE SCHEDULE 40 WROUGHT STEEL BUTT WELDED FITTINGS, ASTM A2 34. JOIN PIPING USING TAPES, GASKETS, AND BOLTS AND NUTS: SUITABLE FOR NATURAL GAS AND AS RECOMMENDED BY PIPING MANUFACTURER AND THE NATIONAL FUEL GAS CODE, ANSI Z223.1. 5.3. VERIFY GAS PRESSURE AT EACH FUEL CELL IS AT LEAST 10" W.G. TO SUPPORT THE MINIMUM PRESSURE REQUIRED WHILE GAS IS FLOWING. 5.4. MAXIMUM ALLOWABLE PRESSURE IS 14" W.G. PROVIDE LOCK -OUT PRESSURE REGULATOR AS SHOWN ON THE MECH DWGS. 5.5. ALTERNATE UNDERGROUND GAS PIPING: POLYETHYLENE ASTM D2513; YELLOW MDPE 2406/2708 GAS DISTRIBUTION AND GAS SERVICE PIPING. PIPING MUST TRANSITION TO STEEL PIPE INSTALLED IN A PVC SLEEVE PRIOR TO EXITING THE GROUND. INSTALLATION OF MDPE GAS PIPING SHALL BE IN ACCORDANCE TO MANUFACTURER'S WRITTEN INSTRUCTIONS AND NFPA 54. 6. UNDERGROUND PIPING 6.1 ALL UNDERGROUND PIPING SHALL BE ALL -WELDED (STEEL) OR ALL -BRAZED (COPPER) CONSTRUCTION, SEE PIPING 8. SUBJECT PIPING SYSTEM TO HYDROSTATIC TEST PRESSURE THAT IS NOT LESS THAN 1.5 TIMES THE DESIGN PRESSURE. TEST PRESSURE SHALL NOT EXCEED MAXIMUM PRESSURE FOR ANY VESSEL, PUMP, VALVE, OR OTHER COMPONENT IN SYSTEM UNDER VERIFY THAT STRESS DUE TO PRESSURE AT BOTTOM OF VERTICAL RUNS DOES NOT EXCEED EITHER 90 PERCENT OF SPECIFIED MINIMUM YIELD STRENGTH OR 1.7 TIMES "SE" VALUE IN APPENDIX A OF ASME B31.9, "BUILDING SERVICES PIPING." AFTER HYDROSTATIC TEST PRESSURE HAS BEEN APPLIED FOR AT LEAST 10 MINUTES, EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR 0=01 nrlAln- rnhADnAICAITC Anln DGDGAT I-IYnPr).gTATIr TFCT I INIT11 THF=Pr= ARF W) I PAKS I\Lr Li1V IIVV VVlvll- VIVL-IV 1 V, /-1 1- - 1 COORDINATE FILLING & PRESSURIZING OF LG WITH OWNER. BLANK OFF THE FIELD -INSTALLED PIPING AT THE POWER MODULE AND COOLING MODULE BEFORE PRESSURE TESTING IS CONDUCTED. DOOSAN MAY REQUEST TO WITNESS THE PRESSURE TEST. ALL COOLING AND HEAT RECOVERY PIPING SHALL BE THOROUGHLY CLEANED BEFORE PLACING IN OPERATION TO REMOVE ALL DIRT, PIPING COMPOUND, MILL SCALE, OIL AND ALL OTHER MATERIAL FOREIGN TO THE FLUID BEING CIRCULATED. THE POWER MODULE AND COOLING MODULE MUST BE ISOLATED WHEN FLUSHING THE PIPING. DO NOT FLUSH EITHER THE COOLING OR POWER MODULES. FLUSHING THROUGH EITHER MODULE MAY RESULT IN DAMAGE TO THE POWER MODULE AND COOLING MODULE. FLUSHING PROCEDURE SHOULD CONFORM TO THE DESIGN SPECIFICATIONS. IN ADDITION, THESE FLUSHING REQUIREMENTS ARE UNIQUE TO THIS FUEL CELL PRODUCT: • DOOSAN PERSONAL SHALL BE NOTIFIED OF THE FLUSHING SCHEDULE FOR ALL PIPING. • DUE TO THE ISOLATION OF THE POWER MODULE AND COOLING MODULE DURING FLUSHING, A TEMPORARY BYPASS MAY BE NECESSARY AT THE SUPPLY AND RETURN CONNECTIONS TO PERMIT CIRCULATION THROUGH THE ENTIRE PIPING SYSTEM. • THE POWER MODULE WILL NOT BE AVAILABLE TO HEAT THE FLUSHING FLUID AS IT IS CIRCULATED DURING FLUSHING. THE BUILDING BACKUP HEATING, OR OTHER TEMPORARY HEATING SOURCE, WILL NEED TO BE USED. 4ALL INSTRUMENTS, SUCH AS FLOWMETERS, THERMOWELLS, AND GAUGES, MUST BE MOVED FROM THE FLOW STREAM AS THE PIPES ARE BEING FLUSHED. • IF THE PIPING SYSTEM IS NOT TO BE FILLED IMMEDIATELY AFTER FLUSHING, THEN THE PIPING SYSTEM MUST BE DRAINED AND DRIED OUT WITH COMPRESSED AIR TO REMOVE ALL LIQUID. 9. COORDINATE WITH OWNER REGARDING POLICY OF DAILY WORK SITE CLEANUP, ADVANCED NOTICE FOR LOUD AND DISRUPTIVE WORK, AND SECURITY / SIGN -IN REQUIREMENTS. PROVIDE ALL MANUFACTURERS SAFETY DATA SHEETS (MSDS) FOR ALL MATERIALS BEING USED ON SITE FOR RECORD TO THE OWNER PRIOR TO SITE ARRIVAL OF RELATED MATERIALS. NO MATERIALS ARE TO BE LEFT REMAINING AT THE CLOSE OF PROJECT AND ARE TO BE REMOVED FROM THE SITE WHEN NO LONGER REQUIRED FOR THE WORK BEING DONE. 10. CONTRACTOR SHALL WARRANTEE ALL WORKMANSHIP FOR A PERIOD OF ONE-YEAR FROM THE SUBSTANTIAL COMPLETION OF WORK. ALL MATERIALS SHALL BE SUBJE^i I Tv TIJI=_ IM1n14uFACTURER'S vVI lN1NAIvITEE I "IINlI RI�I I 1=0R nIf1T I ECR TI-IA<\I A PERIOD OF ONE-YEAR FROM SUBSTANTIAL COMPLETION. 11. TEST & BALANCE SHALL BE PROVIDED FOR ALL WATER FLOW RATES AS SHOWN. PROVIDE ALL TEST AND BALANCE SERVICES IN ACCORDANCE WITH THE NEBB OR AABC . 12. THE CONTROL FOR THE FUEL CELL HEAT RECOVERY SYSTEM ARE DETAILED ON DRAWINGS M4.0 AND M4.1 (P&IDS). THE CONTROLS SHALL CONSIST OF LOCAL CONTROLLERS AND INSTRUMENTS TO PROVIDE A FULLY FUNCTIONAL STAND ALONE FUEL CELL CONTROL SYSTEM. NOTE THAT THERE IS NOT ANY EXISTING CARLA'S CONTROL SYSTEM TO INTERFACE WITH. 13. THE CONTRACTORS SHALL PROVIDE ELECTRONIC SUBMITTALS OF ALL INSTALLATION METHODS, MATERIALS AND ACCESSORIES FOR REVIEW AND APPROVAL. SUBMITTALS SHALL BE ASSEMBLED AND SUBMITTED PRIOR TO ANY INSTALLATION WORK, AND SHOULD INCLUDE: A. PUMPS B. PIPING AND TUBING MATERIALS C. PIPE AND TUBING SUPPORTS D. PIPING SPECIALTIES AND VALVES E. HEAT EXCHANGER F. VARIABLE FREQUENCY DRIVES G. NATURAL GAS REGULATOR H. PIPING/INSULATING MATERIALS I. PIPE SHOP DRAWINGS J. AUTOMATION, INSTRUMENTATION, AND FIELD CONTROL DEVICES K. PIPE HEAT TRACING SYSTEM L. AS-BUILTS OF ALL ABOVE SUBMITTALS AT COMPLETION OF PROJECT; INCLUDING AN OPERATION & MAINTENANCE MANUAL. MECHANICAL SYMBOLS SYMBOL DESCRIPTION GATE VALVE (NORM OPEN) NC GATE VALVE (NORM CLOSED) 1 U I BALL VALVE (NORM OPEN) 1(1 BALL VALVE (NORM CLOSED) 1 V 1 GAS COCK U" PRESSURE RELIEF VALVE AIR RELIEF VALVE HOSE BIB PRESSURE REGULATOR BUTTERFLY VALVE (NORM OPEN) I.C�7I BUTTERFLY VALVE (NORM CLOSED) CALIBRATED BALANCE VALVE CONTROL VALVE (SEE VALVE SCH) Cj REDUCER E HOSE COUPLING DIELECTRIC UNION ./ FLOW ARROW rvU>� FLEXIBLE CONNECTOR V THERMOWELL Q8" THERMOMETER O 4" PRESSURE GAUGE PI - PRESSURE GAUGE - ASHCROFT 1009 SERIES 4" DIAL, STAINLESS STEEL CASE, RANGE 0-30" H2O FOR GAS, 0-100 PSIG FOR LIQUID, UNLESS OTHERWISE INDICATED. PS PRESSURE SWITCH FT FLOW METER (FOR HRM) TT TEMPERATURE SENSOR (FOR HRM) U.O.N. UNLESS OTHERWISE NOTED FC FUEL CELL MUW MAKE-UP WATER 4- c0 o p N 0 Q N ^1.4 Cl Q 42 0 E rr C7 a w � U U N a O ti U � ILL z O W v J U pz W Q z W JAx W I- W Cl) Cn C) Q Q=Q UU � J _ W � tea.. z0_ w ♦o W/ < W v J L.1_ r Q �, ^ U J W ,� W W py z W Q Q O U z U I--- w � O < W 1� -J W Q z WCD _ V Project No.: I Drawn By: KFH Date: I Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: ■ 35' REQUIRED SET BACK 1" MAKEUP l----------------------------------------------------------------------------- J IIl u l Ill u l ulul alai ulul 'Ilul Iul CONNECT PWS TO EXISTING PWS IN TRENCH, EXTEND TO -.-FUEL CELL AS `- SHOWN. ------------------------------� HEAT RECOVERY PIPING TRENCH L------------------_ . 21/," LGS EXISTING PWS W W O J FIE i I I I I I I I I I I I I ! I I I I I ! I 1 I I I ! 1 I I FUEL CELL UTILITY PAD I ! Il ! ! ! I NOTE: Ili ii I ! 1 1 COORDINATE ALL PIPING WITH II II I I E-------------------•__.______________ _____ __________J i ELECTRICAL CONDUITS; PIPING SHALL BE INSTALLED IN TRENCH BELOW III II I C i �(�1= ELECTRICAL CONDUITS. III II I ---— IIIr�-r--------- - -- - - - - - - - - - - - - - - -=_.III I ---------ram I I----- -- -- r-------------- - III I {�-_------------- 1 NOTE: I I I I �o I I fl t i i Il�y _ i PROVIDE INSULATION, JACKET & HEAT i GAS �, A TRACE ON ALL EXTERIOR PIPING LESS ��� 14 I 8 (� i i }[ 1f i 1 ! I I I I j I THAN 5'-0" BELOW GRADE, EXCEPT GAS & NITROGEN. It_ __ --.-__________________---------r7 3/° AC UNIT CONDENSATE DRAIN PIPED TO CONDUIT IIII !" Ab-2" GAS LINE r i =� p I I I r� �'p I i RECIEVER. COORDINATE PIPE LOCATION WITH FUEL ii-1%".Nz._CU LINE --� -"-- ' I I CELL TO ALLOW PROPER OPERATION OF DOOR WITHOUT Y� � Q= I I OBSTRUCTION (TYP.) �_ � gy-= '- A--__----____-__- /d" FIPT 21- rE I Aii ln! a TWDAnGn Gi�rM�iuwni�= u U U U U -——- - 2. 2. 2. 2• (TIp° HO HI io a co 4) NCONNECTION POINT p 01INSULATION FUEL CELL 2" PIPING WITH 2' . ' 2" CLASS 150LB CS - TYPICAL FOR Cl & CO. THREADED FLANGE I 2" PIPING WITH 2" INSULATION p 1" DRAIN mFinwFD WATFRI I rvni�ni �r�n i i o i COOLING v ! 1 { i i r ri�.r�� rvR Ll a w. ( ! I PIPE TO CONDENSATE RECIEVER t I f { 1" MODULE I I ! 3/4" WATER MAKEUP. PROVIDE BALL) i I TYP.pIS 150LB THREADED FLANGE .,. I I ! I ( 2) VALVI_ 6HU I-UFI- AIVU HU.St.tilti.--_---_ __� I Ii I ! i PURECEtL 4n0 FUEL CELL_._ ------__-..- I I ALL ENCLOSURE I { t { PENETRATIONS MUST BE I I II II ,, GAS SHUT-OFF VALVE, UL LISTED AND LOCKABLE. AS SEALED WEATHERTIGHT J...nr.n,rnrYrnr a REQ'D. BY ANSI/CSA TO BE READILY ACCESSIBLE. ' { LI I z)'' , ! W W: a (?� 1/2" NPT ANALYSIS PORT WITH SHUT-OFF VALVE AND CAP. cloo06 "� GAS REGULATOR, MAXITROL 210E 10-22" WC SET @ 14" WC. Y I— 4.500_C_FH (a�2 PSI INLET. SEE -DWG M4.0TYPICAL _ ______________________________1 I _ 09--------------_--____--_------.---------------------------------------------J MECHANICAL PLAN - FUEL CELL YARD SCALE: %6' = V-0" OH DOOR O O O EXISTING DOMESTIC WATER SERVICE 2 %" LG SUPPLY — 2 %2' LG RETURN ---\ SUPRESSION SERVICE AIR COMPRESSOR P-LG LG GLYCOL EXPANSION FEEDER 11 TANK...______ FEED WATER BOILER ROOM 0 Q W v W J O m REFRIGERATION ROOM EXISTING SWITCHBOARD "MSB' MOUNT P-LG, GYCOL FEEDER, LG EXP. TANK AND HX-LG HIGH ON WALL. SEE DRAWING M4.1 FOR PIPING. PARTIAL MECHANICAL PLAN SCALE: %6' = 1'-0" W 19 (AIR TANK` PAD AIR COMPRESS. IY z P-LG SPEED—\ v SELECTOR 00 SWITCH z STEAM MANIFOLD ELEC. ROOM LP119 IF KEY PLAN 0 0 0n ` I O 01 1, _.. ii 1 i fLL 1�N ! i jIJJf O 0!CL W i Z) U) U i w ca CO po io z ���A✓���� a�0��`G��a gg r rn L3 0 o O o rn O r� v � � 0 a a 0 ti 1r , V P® Vd ® W Qz2 i- W Cn U)U z V U_ W Q � �0 ' ' ' �tl 1 1 1 n/ W75 Q J U CL W O Z) W LL J C) LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: M200 µs a U) z O 0 Q z a 4" 0-100 PSIG PRESSURE GUAGE 8" THERMOMETER I- FULL PORT BALL (TYP. OF 4) W / vn, T irn iron I Il.l V/iLVCA I,I T r-. / 21' CU a, C cl� O 40 MESH IN -LINE STRAINER WITH BLOW DOWN w Q LGR >—{ CWS Q Yz" n — O-1 HEAT FO -j XCHANGER 4" 0-100 PSIG PRESSURE GUAGE a, 0 I = Fo m Uu w 1/2" CU ) CU CU LGS �{ ie 9 X_ T7 PHW o LLJ w L k T I fZ J 2 CU Lu Lu \T' 40 MESH IN -LINE PROVIDE 1Y" x 2" BRASS 90' ELLS FOR a SIZE AS INDICATED %4" FULL PORT BALLDIELECTRIC PROTECTION (TYP. OF 4) > ON PLAN VALVE WITH HOSE STRAINER WITH END CAP &CHAIN BLOW DOWN 1Y" NPT ON CONNECTIONS Q o BRASS BODY IN -LINE PROVIDE OPTIONAL STUDS & MOUNTING BRACKET � STRAINER TO FUEL CELL TO DOMESTIC WATER o Wg1NINlll11111///// w IN -LINE STRAINER DETAIL ro--� DOUBLE WALL_ HEAT EXCHANGER DETAIL UJ z:_ W k. *� i � %SCALE: NTS v % 0 Li § Gzi: g_40! Wf UJ z — — — — — — — — — — — — — — — — — — — — NOTE: PROBE MUST BE RETRACTED DURING PIPE FLUSHING. � M °� �-% o — — — PRESSURE GAUGE � °O J r---------� FUTURE WATER FLOW METER r �� \ FUTURE TEMPERATURE SENSOR AND (SEE DWG M1 SPECIFICATIONS) o a o SUPPLIED BY DOOSAN W Z �i WEATHERPROOF HOUSING U •= Z ozz -------- - O SUPPLIED BY DOOSAN OPTIONAL N _ Q I I (OPTIONAL) TEMPERATURE GAUGE o `o O w SWAGELOK FITTING (SS-300-1-4BT, OR SIMILAR I I (SEE M1 SPECIFICATIONS) �/ 3 0 `✓ • '>r cd ❑ I I Z J Tn RAAT(`I-I CFNIR(1R rIIAMFTPPI , / Q �_^_ Q .."....,. "y 1" FULL PORT BALL VALVE w I I °O 0 STANDARD 3/4" NPT EXTERNAL, 1/2" NPT INTERNAL a w U CONSULT DOOSAN FOR LATEST METER r�-I I THREAD THERMOWELL, INSERT TO 1/2 PIPE 1/2"x1/4" BRASS BUSHING (IF .� o chi U- & SENSOR PIPING PROVISIONS. L —�r�� DIAMETER REQUIRED) w 1 CLOSE LINE SIZE TEE WITH 1 FPT BRANCH Q) > NIIPPI F4 nD 1" TUDGAr)_(1_I PT INSTRUMENTS MAY BE FURNISHED BY ,nnr, , .,,.,, r-nr nnnn,n„ STANDARD 3/4" NPT .... r ., �.-.. i A SUB VENDOR. 1/2" BALL VALVE THERMOWELL, INSERTS OR 3/4" THREAD-0-LET LINE SIZE TEE WITH 3/4" z y FPT BRANCH OR 3/4" TO 1/2 PIPE DIAMETER o THREAD-O-LET LINE SIZE TEE WITH 3/4" FPT 3/4"x1/2" NPT BRASS BUSHING p ! p PIPE PIPE BRANCH •� a cc MIN. 5x PIPE DIA. MIN. 10x PIPE DIA. + y j I PIPELu a WATER METER PROBE MUST BE INSTALLED IN UPPER 180° OF PIPE, FOR HORIZONTAL PIPE. V J N Z ANY f`IRC:I hAFFRFNTIAI I CCATION IS ACCEPTABLE. FOR VERTICAL PIPE. _ UJ 7 �tTRFLOWMETER DETAIL TEMPERATURE SENSOR AND THERMOWELL DETAIL (DZERMOMETER AND WELL DETAIL PR��SURE GAUGE CONNECTION DETAIL --: NTS 6 E: NTS �., o SCALE: NTS SCALz ti cD z I ® i NATURAL GAS SHUT-OFF VALVE. NITROGEN TUBING AND NATURAL AS LINE (MUST NOT BLOCK OPENING OF ACCESS DOORS) NATURAL GAS ANALYSIS PORT. J C , rri AC UNIT i %" DRAIN, PITCH TO NATURAL GAS REGULATOR SEE P&ID v o INTERNAL i DRYWELL OR SANITARY DRAWING M4.0 o DRAIN LINE I DRAIN — U) - - ® i �CO LI - LO HI HO CI� ® • ® �FI I O o o v U O��u w lIIH u V) 7 'J 1 0 L o n W -� wI wo � J O�------------------------------ --_ o o O o O Q z n ------------------- _ - Ui Q u _ FUNNEL OR REDUCER ( W WITH LARGER END UP ���EATION SHOWING PIPING OPENINGS ( � = U 31Q LINE REGULATOR -BRASS -SET AT 55 PSI W , 9 8 (3Q LOADING REGULATOR BRASS(2) DOME REGULATOR- BRASS OSET ATL 00 PSI ED BY LOADING REGULATOR < Q /� c 3'-ttlz -9' 3 u ( (D PRESSURE SWITH - 11PISG SETPOINT (DECREASING) 1 1 INTERFACE AREA. ( D RELIEFVALVE- BRASS- 100 PSI i�i� �'1 LPL f 3'-6 2" _ — 3'-1 16" _ 3'-16" _ 3'-76" 4'-4" PIPING CONNECTIONS J MUST CLEAR DOOR SWING <--' ( (D RELIEF ♦ ^ Y A 7 VALVE -BRASS v J O W Q z_ TO PROCESS PIPE ftEIIEF VAWES ry lip FEMALE NPT , TO B07HEft3)AFE LO nON (BY FTAI ( - / ..3, TUBE L /\ STAI\'LESS STEEL$ \!/ - ``C ` : 7 .CfS WALL iH:tlCiESS` UJ ` L INTERFACE AREA. PIPING CONNECTIONS MUST CLEAR DOOR SWING 1 Q °fie i W u IN�� }}iS�TI f W ♦ ♦ ♦ • • • • • • • • / TYPICALYN O _ � COLi � C __ V�uz•Xir s%•HI1Lcx7EQ'LY C C ❑ - ALL f0 BOT1Ui8 NUSTBEACINE � ❑ u IN I� ❑ - _ N ------�-----J-----J L-----J L-----J L---- -----J L-----J -----J L J LJ C c 4 MU-1 SIZE 300 CYLINDERS �Im SIN (0 °CYLINDERS TOTAL) M Project No.: Drawn By: M N KFH UNISTRUT POST BASE Date: Design By: i • ♦ • • • • ♦ • ♦ ♦ ♦ • • • ♦ ANCHOR BOLTED TO SLAB 02/06/19 KFH - I ( \ \ \ ,• � \ Scale: Check DS F [ 1 1 Drawing No.: ELEVATION - WALL MOUNTED GAS MANIFOLD PANEL AIRGAS PART No.V69 ES1465 3'-1 16" T-1 16" 3'-1 6" 3'-1 6" 3'-1 6" 3'-1 6" _ 3'-1 6" NOTE: NITROGEN MANIFOLD PROVIDED BY DOOSAN 0. 3.0 DOOR SWING C�EA RAE P N�CLAN NITROGEN BOT7"LES, MANIFOLD AND BOTTLE MOUNTING FRAME DETAIL 2 SCALE: NTS � SCALE: NTS c PIPE THRU EXTERIOR WALL SCALE: NTS POLYURETHANE FOAM INSULATION FOUNDATION WALL RUBBER SEALING ELEMENT PROVIDE FIRESTOP PRESSURE PLATES STAINLESS STEEL TIGHTENING LUGS PIPE CORE DRILLED PENETRATION SIZED FOR PIPE PASSING THROUGH WALL CARRIER PIPE AS SPECIFIED FITTING COVER WITH HAND - LAMINATED FRP OVER WRAP I FRP CASING I AS SPECIFIED 900 EXPANSION ELBOW DETAIL SCALE: NTS INSULATION SCHEDULE 40 CARBON STEEL CARRIER PIPE OR AS SPECIFIED WITH 0.1" OF FIBERGLASS REINFORCED POLYESTER (FRP) CLADDING ON THE EXTERIOR. SINGLE RANDOM LENGTH SINGLE RANDOM PIPE W/ FRP CLADDING SCALE: NTS ADJUSTABLE CLEVIS HANGER PROVIDE INSULATION S' "-' — AND INSERT FOR ALL P (8" MIN. LENGTH) 1" MAX. HANGER ROD PIPE (TYP.) U-BOLT - SAME MATERIAL INSULATION (VAPOR AS PIPE (TYP.) — BARRIER TYPE IS a BOLTS, NUTS & WASHERS REQUIRED FOR LOW (TYP.) TEMPERATURE PIPE --- ) PROVIDE HIGH COMPRESSIVE STRENGTH INSULATION (9 PCF MIN. DENSITY) UNDER INSULATION SHIELD INSULATION SHIELD AT HANGER WELD SADDLE ADJUSTABLE CLEVIS HANGER 1/2" DIA. HANGER RODS WITH 36" MAX. SPACING ON EACH CHANNEL BAND I b/6" 91 UAUL CHANNEL OR 2"x2"x1/4" f ANGLE SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. (453 KG) UNIFORM LOAD TYPICAL PIPE HANGERS NOTE: ALL EXTERIOR PIPE HANGERS SHALL BE GALVANIZED /ELD JOINTS AS NECESSARY IZE BRACKET (CHANNEL, ANGLE, TC.) AS NECESSARY TO SUPPORT JADING ED HEAD MECHANICAL ANCHOR FOR CONCRETE R LAG SHIELD ANCHOR WALL -MOUNT PIPE SUPPORT SCALE: NTS a RED HEAD MECHANICAL ANCHOR FOR CONCRETE OR LAG SHIELD ANCHOR I" I1AXI'riuM PIPE/-1 u»IN67 EW—t—OR 15PA011IVC7 NOM. SIZE IN. THRU 3/4 1 1 1/4 1 1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24 PIPE FT. 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32 TUBING FT. 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - - NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE. PIPE SUPPORT DETAIL 9 SCALE: NTS INSULATION SCHEDULE 40 CARBON STEEL CARRIER PIPE OR AS SPECIFIED WITH 0.1" OF FIBERGLASS REINFORCED POLYESTER (FRP) CLADDING ON THE EXTERIOR. 1 PRE -FABRICATED FITTING W/ FRP CLADDING SCALE: NTS SCHEDULE 40 CARBON STEEL CARRIER PIPE OR AS SPECIFIED WITH 0.1" OF FIBERGLASS REINFORCED POLYESTER (FRP) CLADDING ON THE EXTERIOR. STEEL ANCHOR PLATE (TO BE POURED IN CONCRETE BY INSTALLING CONTRACTOR AFTER SYSTEM HAS BEEN TESTED) CIRCUMFERENTIAL WELD INSULATION AROUND PIPE ANCHOR DETAILS 2 SCALE: NTS FIELD WELD TO BE TESTED UNISTRUT OR EQUAL SUPPORT BRACKET UNISTRUT PIPING CLAMPS WALL -MOUNT PIPE SUPPORT 7 SCALE: NTS UNDERGROUND CM/ LG PIPING SPECIFICATION • CARRIER PIPE: SCHEDULE 40 A-53 GRADE B ERW CARBON STEEL CLADDING.DDIVIGN TRAIGT 1^ITCRD ICLAIOSH0"%, 11-VS li0VSSO'_IVIUL I IPLC LAYERS OF FIBERGLASS REINFORCED PLASTIC (FRP) 90-100 MILS THICK WOUND DIRECTLY ON THE CARRIER PIPE OR OVER THE SPRAY -IN POLYURETHANE FOAM INSULATION. • FITTINGS: PREFABRICATED FITTINGS UTILIZING BUTT WELD FITTINGS, WITH HAND LAMINATED GLASS MATT SATURATED WITH RESIN AND CATALYST TO A MINIMUM THICKNESS OF 100 MILS APPLIED DIRECTLY ONTO THE STEEL CARRIER PIPE AND FITTINGS. SCHEDULE 40 CARBON STEEL CARRIER PIPE 12" OR AS SPECIFIED WITH 0.1" OF FIBERGLASS • ANCHORS: PREFABRICATED UTILIZING 3/8" STEEL PLATE WELDED TO THE REINFORCED POLYESTER (FRP) CLADDING CARRIER PIPE. THE ANCHOR PLATE SHALL BE 6"LARGER THAN THE PIPE AND ON THE EXTERIOR. POURED IN CONCRETE BY THE INSTALLING CONTRACTOR. • FIELD JOINTS: FIELD JOINTS SHALL CONSIST OF HAND LAY-UP FIBERGLASS a Q�� INSULATE NOTES: HEAT SHRINK SLEEVE 1. WELD THE CARRIER; PIPE. 2. TEST AS REQUIRED. 3. COVER WITH A HEAT SHRINK SLEEVE. 4. INSULATE FIELD JOINT W/ FRP CLADDING SCALE: NTS 5'-0" MINIMUM TO PROTECT PIPING FLUID. BELOW FROST LINE SCH. 40 A-53 GR.B ERW CARBON STEEL CARRIER PIPE WITH 0.1" OF FIBERGLASS REINFORCED POLYESTER (FRP) CLADDING ON THE EXTERIOR. (TYPICAL) MAT SATURATED WITH A RESIN AND CATALYST. THICKNESS SHALL BE 100 MILS THICK IDENTICAL TO THE STRAIGHT LENGTH SECTIONS: • INSULATION SHALL BE 2" THICK POLYURETHANE FOAM WITH FRP CASING NOTES_ 1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION 2. CONTRACTOR MAY HAVE TO MODIFY PIPE LENGTHS IN FIELD. 3. PRIOR TO ANY MODIFICATIONS CONTRACTOR MUST NOTIFY MANUFACTURER IN WRITING. 4. ALL DIMENSIONS ARE FROM CENTER OF FITTING TO CENTER OF FITTING, CENTER OF FITTING TO END OF CARRIER PIPE OR END OF CARRIER PIPE TO END OF CARRIER PIPE. 5. ALL ANCHORS TO BE POURED IN CONCRETE BY THE INSTALLING CONTRACTOR (CONCRETE SUPPLIED BY OTHERS) 6. FOR ADDITIONAL INFORMATION REFER TO CONTRACT DRAWINGS. CONCRETE SLAB OR FINISHED GRADE PIPING MARKING TAPE SHALL BE PLACED 12" BELOW FINISHED GRADE ABOVE ALL PIPING. CLEAN FILL 6" SAND OR FINE GRAVEL LESS THAN 1/2" DIA. ABOVE PIPE VARIES 1T S1�1 SCAL TRENCH DETAIL SYMBOL: DESCRIPTION: w' dip LL - 0'U w N rn o tB N 0 Q > ��`\"`N�pHI I I I�11 Illl�lllplip��i '#. - Af- $d;GLn ,''��ryri�nli�au'ina��a�®�•��` u 7' r _ -o N �° O Q :~•C 0 Uj h q O U N a O ti U �O vJ z UJ �n �/ J w � U Q = Q w _ p � / — _JL.. �Ow Q - to f'y U _I w J Z Q z UJ = Q Q C) U J w 0 UJ 73 � CO H I� LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: DSF Drawing No.: M301 GAS LINE FROM UTILITY METER SEE M2.0 TI I GAS ISOLATION VALVE AT SERVICE ► I I I I I I I I I T 2" GAS LINE PROVIDE 1/2" NPT ANALYSIS PORT--►H (5 APOLLO GAS BALL VALVE 80-100-27 LOCKABLE GAS COCK SHUTOFF VALVE AS REQUIRED BY CSA INTERNATIONAL TO BE READILY ACCESSIBLE. MAXIMUM GAS FLOW RATE 4,500 SCFH AT 10 TO 22 INCHES WATER COLUMN (IWC) T (NATURAL GAS) FI (NITROGEN) NI PRESSURE PI r GAUUGE I � I 1. (0-100 PSIG) SEE DETAIL 4 DWG M3.0 b %II NPT CONNECTION PT. INSIDE POWER PLANT 440kW FUEL CELL POWER PLANT MODEL 400 WO A WI DRAIN (DE IONIZED WATER) PIPE TO FLOOR DRAIN IN I MECHANICAL ROOM. 2 1/2" HO SEE DWG. M2.0 SEE I NOTE 9 DWG. M4.1 2 1/2" HI I 2" LO I 2" LI I 2" CO BY DOOSAN FUEL CELL YARD - - - AC UNIT I- 1/4 ---r-------- I I rpI I I N2 PRESSURE SWITCH 1100 PSIG SET POINT. /-TYPE K COPPER 1 1/2" UP TO 80 EQUIVALENT FT. OF PIPING,2" PIPE FOR 80-330 EQUIVALENT FT. OF PIPING, 2 PSI MAX.RESSURE DROP - - - VENT PIPING FOR RELIEF VALVES, PIPE DOWN TO SAFE LOCATION. (TYP. 2) PRESSURE RELIEF VALVE SET AT 100 PSI I LP PRESSURE REGULATOR SET TO I PROVIDE 990 LBS/HR AT 55 PSIG, AT THE MODULE INTERFACE. PRESSURE RELIEF VALVE SET AT 300 PSI J! I HP PRESSURE REGULATOR NO NO PRE -FABRICATED NITROGEN PURGE MANIFOLD AND FRAME ASSEMBLY uu uu I NITROGEN BOTTLE BANK (300 SCF EACH) ----------- IT COND. DRAIN BY MECH. CONTRACTOR U.O.N. m 11 HEAT TRACE AND 2" INSULATION - ------ V-7-7-71111------------ -------- 05 3 AMTROL MODEL 747 --\ 1/2" AUTOMATIC HIGH POINT VENT VALVE BALL VALVE T b 2" INSULATION (EXTERIOR PIPIT` I _u HEAT TRACE AND 1" INSULATION _ TO CONDENSATE RECEIVER HOSE BIB 2- - - ----- --------•-------- I-3 HIGH GRADE PRIMARY PRESSURE RELIEF VALVE RELIEF PRESSURE SET TO 125 PSI, PIPE WITH FULL OUTLET SIZE TO GROUND. SIZED PER 1.1 MMBH 2-1/2" - LGR - CSJH ---- t!---t------------ 0-------- �H BALL DRAIN VALVE WITH 3/4" HOSE END CONNECTION AT LOW POINT. TYPICAL - 2" - CMS -CS --- -- --------- ►-------- LOW GRADE PRIMARY PRESSURE RELIEF VALVE 2" INSULATION ALL PIPING RELIEF PRESSURE SET TO 125 PSI, PIPE WITH U.O.N. (TYPICAL) FULL OUTLET SIZE TO GROUND. SIZED PER 2.2 MMBH PRESSURE TEST COOLING LOOP PNEUMATICALLY, WITH SI VALVES CLOSED TO POWER MODULE. FLUSH ALL PIPING SYSTEMS IN ACCORDANCE WITH PROCE DESCRIBED IN THE MODULE 400 INSTALLATION MANUAL. - GAUGE (0-100 PSIG) 3RASS FLANGE CONNECTION & DIELECTRIC IF CONNECTING TO STEEL PIPE (TYP.) .ING MODULE FILL I XAI-r L1 dl)0/_ nn\A/FROST DOnDV1 GnlG r ILL VVIII-fU/O LJV VVI Iwvl GLYCOL/60% DEIONIZED WATER MIXTURE BY DOOSAN I 2" INSULATION (EXTERIOR PIPING) FOR PERSONAL PROTECTION. PROVIDE HEAT TRACE AS REQUIRED TER FROM BLDG. DOMESTIC WATER FROM POTABLE WATER SYSTEM IN MECHANICAL ROOM CONTRACTOR SHALL INVESTIGATE THE AVAILABLE - DOMESTIC WATER PRESSURE DURING A TYPICAL DAY TO CONFIRM WHETHER OR NOT THE EXISTING PWS LINE REQUIRES INCREASED PRESSURE FROM THE EXISTING WATER PRESSURE BOOSTER PUMP (THE OPIGINAL FL IEL rFl I INgTAl I ATION). IF SUFFICIENT PRESSURE IS AVAILABLE, REMOVE THE EXISTING BOOSTER PUMP; OTHERWISE, TEST THE EXISTING BOOSTER PUMP FOR PROPER OPERATION AND CONNECT TO THE PWS FEED TO THE NEW FUEL CELL. RPZ WATTS MODEL LF009 I CONTRACTOR SHALL ADD PRESSURE REDUCER IF NECESSARY BASED UPON INCOMING WATER I PRESSURE FROM THE UTILITY. I iI 1" WATER HAMMER -'� I ARRESTOR FNW X119 OR EQUAL I EXP TANK I I I FROM POTABLE AMTROL WATER SYSTEM ST-5 OR EQUAL I FOR CONTINUATION SEE DWG. M2.0. I fo SYSTEM. NOMINAL 55 PSI AT FUEL CELL POWER PLANT. (40 PSI MINIMUM, 65 PSI MAXIMUM) I I I I i i I ----------------------------------------------------------------------------------------------------� --,__-J t � I I I I I I I I ------------------------- ------------- ►---------------------------------------------------F 1I I I II I I I I I i ------------------------- -----------�--------------------------------------------------t I I II J I I I I I I _ I z O �I? m I 0 Q i CD I Ll U) p I Z TO CUSTOMER HIGH GRADE HEAT RECOVERY INTERFACE FOR CONTINUATION SEE DWG. M4.1 W m O z 3- a z z a U J us z O H O U z O z O U w O z z 0 N r a FOR CONTINUATION SEE DWG. M4.0 PUMPS IDENTIFICATION PUMP MOTOR MOTOR CONTROL NOTES TAG NO. SERVICE LOCATION TYPE MFR MODEL NO. GPM HEAD (FT) IMP. RPM HP RPM VOLTAGE O TYPE CONTROL STATUS DIA (IN) P-LG LOW GRADE LOOP SEE M2.0 IN -LINE TACO 1911 60 60 4.10 3500 2 3500 460 3 VFD SPEED SWITCH N/A YASKAWA Z1000 VFD OR EQUAL ' DOUBLE WALL BRAZED PLATE HEAT EXCHANGER IDENTIFICATION MFR / MODEL LOW GRADE WATER DOMESTIC WATER SIZE TAG NO. SERVICE LOCATION MFR MODEL GPM EWT (°F) I LWT (°F) AP (PSI) FLUID GPM EWT (°F) LWT ff) AP (PSI) CAPACITY (MBH) DIM (D X W X H) CONN SIZE (IN) MATERIAL HX-LG DOMESTIC ME ROOM AL KELVION DW5x20-120 (1y MPT) 60 110.0 80.0 6.8 40% PROPYLENE GLYCOL 41.5 i 50.0 90.1 2.9 830.4 20.8 X 4.88 X 11.79 1%y" MPT 304 CONNECTOR / 316L PLATE / COPPER BRAZE i PROVIDE OPTIONAL STUDS & MOUNTING BRACKET #18 TSP (TYP. OF 2) TLS ! i TEMPERATURE SENSOR (TYPICAL FOR 2) SEE DETAIL 6 DWG. M3.0 (2) #18 TSP i HEAT RECOVERY MONITORING ISYSTEM INSTRUMENTATION I WIRED TO EXTERNAL HRM HRM ISYSTEM I - - - FUEL CELL YARD BUILDING PIPE TO GRADE (TYP. FOR 2) LOW GRADE SECONDARY PRESSURE RELIEF VALVE RELIEF PRESSURE SET TO 125 PSI, PIPE WITH FULL OUTLET SIZE TO GROUND. SIZED PER 2.2 MMBH EXISTING DOMESTIC HOT WATER TANK EXISTING FV • EXISTING HOT WATER TANK DOMESTIC WATER MAKE-UP LINE SEQUENCE OF OPERATION UPON PLACING THE FUEL CELL INTO SERVICE, THE FOLLOWING SHALL OCCUR: • PUMPS P-LG AND DW-HEX SHALL BE ACTIVE TO PREHEAT DOMESTIC WATER TO THE EXISTING STORAGE HOT WATER TANK. •• DURING THE DAY DURING LOW HEAT UTILIZATION TIMES, THE PUMP SHALL RUN AT A REDUCED SPEED AS DETERMINED BY FLOW BALANCE (GPM LATER). NOTE, VFD SPEED SET BY DIGITAL INPUT SELECTOR SWITCH OUTSIDE THE MECHANICAL ROOM. •• IN THE EVENING DURING CLEANING/SANITIZING OPERATION, THE VFD SHALL RUN AT FULL SPEED AFTER THE SELECTOR SWITCH (WITH ADJ. TIMER OF 1 TO 8 HOURS) IS ENERGIZED BY STAFF. THE ANALOG SPEED Or-vVILL BE DETERMINED BY FLOVBLAVhE (6U GPM) V A . I T 1 1 2 1 Lo NC L-0 NC Lo NC Lo NC = P-LG 41c VFD LOW SPEED -DAYTIME NC HIGH SPEED-SANITIZING/CLEANING SW O NC EXP GLYCOL AXIOM SPEED FEEDER SELECTOR TANK 45 PSI MODEL DMF300 SWITCH MAX 19 GALLON STORAGE ]► NC NC Lo Lo (9 U DOUBLE WALL HX-LG HEAT EXCHANGER LOW GRADE SECONDARY PRESSURE RELIEF VALVE RELIEF PRESSURE SET TO 125 PSI, PIPE WITH FULL OUTLET SIZE TO GROUND. SIZED PER 2.2 MMBH BUILDING 2" CWS ► - - NC NC NC Lo LC)NC NO I_0 FULL SIZE BYPASS LINE TYPICAL 1 L•QNC %4 DRAIN VALVE 2"-CWR-CU NO ITJ H w a O L o :� . ,z p W'Cl) ''V L III rn C o N O Q � NN111111IIIIIIII////// CiA •�� � .'� ss O:0 01. �M E uti _ N Q `= c E N q 0 v O i; ti CU �/� I.y NQ L.L. CD rO Z 0 `W 0 <C z 5 z C) U Q - _J 0- _Q Z F— U)0W QZ r = W Q �� -� W J U� W % ` W Q < U U) V J Z W O:D 06 L- V -' z L.1. C) — 0— LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KF H Scale: Check By: AS NOTED DSF Drawing No.: M4m 1 (2) 5" C. UNDERGROUND EVERSOURCE PAD MOUI TRANSFORMER 2,500 kV/ PRI: 13.8 SEC: 480Y/277V 10 SETS OF [ 4 #600 kCMIL AND (2) 4" SPARE CONDU UTILITY METER #891794282 4/0 INSULATED CU GND. IN 1 1/2" C. TO SPRINKLER WATER SERVICE. 4/0 INSULATED CU GND. IN 1 1/2" C. TO GAS SERVICE. #500 kCMIL INSULAT CU GND IN 2"C. TO BUILDING STEEL BUILDING FUEL CELL YARD EXISTING EVERSOURCE UNDERGROUND FEEDER C. STUBBED UP5'-O" TRANSFORMER AINIMUM 36" BFG. SECTION 1 6 1 4000AF J 2400AT I P.T. TAP I SECTION 2 SECTION 3 C.T.'s (3) P.T. TAP I ARD US FC-MD1, 800A TYPE 3R INTEGRAL DISCONNECT SWITCH FACTORY MOUNTED ON OUTSIDE WALL OF FUEL CELL. SQD MODEL: H367R 3J POWER PLANT SPECIFICATIONS TABLE A PROTECTIVE SETTINGS AS PER IEEE 1547/UL 1741 HRM SENSOR LEGEND RATED OUTPUT-BASELOAD POWER MODE 440 kW / 440 kVA ANSI C37 PROTECTION MAGNITUDE MAGNITUDE TIME TIME SETTING FL LOW GRADE LOOP FLOW METER RATED OUTPUT -MAXIMUM POWER MODE 440 kW/440 kVA DEVICE FUNCTION PARAMETER SETTING PARAMETER (RANGE) TLS LOW GRADE LOOP SUPPLY TEMP NUMBER NUMBER (RANGE) NUMBER TLR LOW GRADE LOOP RETURN TEMP OUTPUT TYPE 480VAC, 60 HZ, 3 PHASE, 3 WIRE - --- -- -- -------- - UNDER 88% 120 CYCLE'S 27 VOLTAGE 41.26 (88-98) 41.27 (30-120) LEGEND FUEL CELL OUTPUT CIRCUIT BREAKER TRUTH TABLE CIRCUIT POWER PLANT MODE BREAKER - --- - - OFF / IDLE GRID CONNECT (GC) GRID INDEPENDENT (GI) MCB001 OPEN CLOSED CLOSED MCB002 CLOSED CLOSED OPEN 3A 3B 27 - FAST UNDER VOL I AGE 41.19 50% (5"u-98) 41.20 10 CYCLES (6-10) -- 1 1(' HT INIIIG:ATFS EXISTING; BOLD INDICATES NEW I OVER VOLTAGE 0 (102-110) 59 41.24 41.25 60 CYCLES (30-60) 59 FAST OVER VOLTAGE 41.17 41.18 10 CYCLES (6-10) 120% (102-120) 81 SLOW UNDER 41 15 41 16 32 SECONDS 58 HZ FREQUENCY (59.8-57) (0.16 - 300) 81 UNDER 41.11 57 HZ 41.23 10 CYCLES FREQUENCY (59.5-57) (6-10) o A OVER AA A n 60.5 HZ AA 10 CYCLES 01 4 1. I U + I .LL FREQUENCY (59.8-60.5) (6-10) RECLOSING TIME OPEN TO 300 SECONDS 79 DELAY RELAY TRIP 36.14 (1-1000) NOTE: THESE ARE SETTINGS INTERNAL TO THE FUEL CELL MAIN SWITCHBOARD "MS13" (EXISTING) SECTION 4 SECTION 5 REPLACE EXISTING 600A BREAKER WITH NEW PULL GFP 800AF/750AT BREAKER SUITABLE FOR SET EXISTING 600AF/400AT BREAKER TO 600AF/600AT BACKFEED. PROVIDE WARNING LABEL PER NEC 2017 ART. 705.12. B.2.3. b. 3C 3D 3E 3F 3G 3H 5A 5B 5C 1 I 2 3 4 5 6 7 8 I I 1 2 3 400AT 800AT 800AT 400AT / 400AT 400AT 400AT 600AT l 800AT 1200AT 1200AT O O GENERAL NOTES: 1. REFER TO DRAWING GA1.0 FOR SITE PLAN. 2. REFER TO DETAILS ON SHEET E3.0 FOR 3-LINE DIAGRAMS AND SEQUENCE OF OPERATION. REFER TO E3.1 FOR DETAILS. 3. REFER TO DWG E4.0 FOR TESTING, GROUNDING AND BASIC ELECTRICAL REQUIREMENTS. 4. PROVIDE SIGNAGE AS REQUIRED BY CODE AND AS INDICATED ON DWG E2.0 5. CONSULT DOOSAN MODEL 400 INSTALLATION DESIGN GUIDE (FUEL CELL POWER PLANT) AIVD S 1 AIVUARD IIVS 1 /A m 1 IVIN DKAVVIIVGS FVI- I ECHIVII�.AL REFERENCE. r CERTIFICATION: POWER PLANT IS CERTIFIED TO: ANSI/CSA AMERICA FC 1 - 2014 (FORMALLY ANSI Z21183) "AMERICAN NATIONAL STANDARD FOR STATIONARY FUEL CELL POWER SYSTEM" INCLUDING, A. UL1741 "INVERTERS, CONVERTERS, CONTROLLERS AND INTERCONNECTION SYSTEM EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY RESOURCES." B. IEEE 1547 "STANDARD FOR INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS." C. NFPA 70 NATIONAL ELECTRIC CODE (FOR INTERFACES TO CUSTOMER WIRING AND WIRING BETWEEN MODULES). "F" DESIGNATES FRAME SIZE "T" DESIGNATES TRIP SETTING TYPICAL 5E 5F 619 619 5 6 6 6 Q�800AF 800AF 800AF 750AT Q � 800AT Q � 800AT 3 #500 kCMIL 2 SETS OF: 2 SETS OF: 2 SETS OF: t & 2 #1G IN 4"C. [3 #500 kCMIL [4 #500 kCMIL ,z & 2 #2/OG IN 4"C.] & 2 #1/OG IN 4"C.1 [3 #600 KCMIL& 1 #2 O DP4P DP46 DP47 - GND. iiN 4" C j 200 C 400 C z 200 C z 200 C 250 C O DP45 O DP4P4 HP P HP P Y HP P Y HP P HP P i O 480-208/120 150 kVA DRY REFRIGERATION REFRIGERATION FRICK FRICK FRICK COMP. #4 COMP. #5 COMPRESSOR COMPRESSOR COMPRESSOR TYPE XFMR b PP46 PP47 4 #1/0 & 1 #6G (HIGH STAGE #1) (HIGH STAGE #2) (HIGH STAGE #1) - W J IN 2"C. z w i Q 480-208/120 Li 480-208/120 DP2P 75 kVA DRY 112.5 kVA DRYI FC UTL MTS-#1 TYPE XFMR TYPE XFMR MANUAL TRANSFER/ 3 #3/0 & 1#6G IN 480-208/120 2"C• 112.5 kVA DRY I Y PE XFMR �szn_�nQi��n 30 kVA DRY 4 #600 kCMIL & TYPE XFMR � 1 #1/0 G IN 4"C. - �_ P252 P251 J J zz > > J R4P4 BUILDING & OFFICES 2 SETS OF: [3 #350 KCMIL & 1 #1/0 GND. IN 4" C.] GIDS-1 800A SW. 600A FUSE NEMA 3R 2 SETS OF: [3 #600 KCMIL & 1 #110 GND. IN 4" C.] GI CONNECTION -- - - �= 480/277:480/277 NEMA fff 13R �__� EMERGENCY POWER TRANSFORMER 500 kVA -MD1 CLASS L FUSE o MCB002O-LMCB001 ,FC vijJL ' 0 2 SETS OF: i ° [3 #600 KCMIL & 1 #1/O GND. IN 4" C.] FC-MD2, 800A TYPE 3R - ° UL1741 I DISCONNECT SWITCH I FUEL CELL (FC-1) FUNC. I PRINGLE BOLTED PRESSURE SW. 27 MODEL: QA0833B120480KCT MODEL 400 3#500KCMIL & 1 #1/0 GND. IN4'C. _ _ SEE NOTE 1A. AUX PWR. 440KW FUEL CELL 59 I (MUST BE LESS THAN 25) - TRANSFER 79 -� SWITCH 81 INVERTER I AIITRfI(_GAI QnTT1 G RDAIL[ FOR 1EIVIPORARY I CA I NGO SEESEI I INGS Vol I �wv�.I• vv I K r.r-. v#_%11q1% GENERATOR I IBLOCK METER I I INTERNALLOADS INTABLE A HOOK-UP (2) 400:5 Lo- - - - - _ - _ _ 8650C I I a a GE 110-401 _ _fWION SERIES I 0000co F DS-GEN� I - - - - - - LCM R CC_ _ _ _ _ FUEL CELL STACKS _ _ I I- _= - - I NtMA 3K i 480: 120 PT - - SAFETY I I (2)GE JVM-OC CAT 6 TO RMS SWITCH- - - - i _ - _ _ _ _ _ K FC-MD2 I PANEL P2FC-2 120 VAC FROM NEMA 4 JUNCTION BOX 400ASW i 800 A SIZE AS REQUIRED 400A FUSE _ _ _ _ SEE NOTE 1A. - - - - NGO METER AND DISC. ET RA _ 3#6 & 1#10 G IN VC. #18 TWSP, 2#14, #14G AND ETHERNET CAT 5E IN VC. JB I AIR COOLING MODULE (CM-1) 120V PWR (2#12, #12G-1"C) L- - - MOTOR RATED TOGGLE TYPE 3R INTEGRAL DISCONNEC DISCONNECT SWITCH SWITCH FACTORY MOUNTED ON SIDE OF COOLING MODULE GIDS-2 800A SW. 600A FUSE NEMA3R I w BY-PASS SWITCH I w a (600A) I N 0- DP4FC DP4FC-2 I U w I w i 480-208/120 30 kVA DRY i TYPE XFMR I 200 C HP P I � J P2FC-1 v CN wa FRICK -� I COMPRESSOR i I (HIGH STAGE #1) I FACILITY BACKUP DISTRIBUTION - - I- SS OF: � 2 SETS OF: 2 SETS ET KCMIL & [4 #350 KCMIL & 1 #1/0 GND. IN 3"C.] 1 #1/0 GND. IN 4" C.] ( NEW CONDUCTORS IN EXISTING 4" C.) I 2 SETS OF: [4 #350 KCMIL & 1 #1/0 GND. IN 3"C.] 24VDC HEAT 2#12&#12GINVC (TRANSFORMER HEATER) ETHERNET CAT 5E IN 1"C. (300' DISTANCE MAX.) WIRELESS RMS PANEL C)) INTERNET MODEM 3/4" C ETHERNET CAT 5e HRM PANEL 2#12, #12G-1"C l :E O O OOPP2P1 �PP2P2 J PP2P3 J WJ P246 w 3#12 & 1#12 G IN Y4'C. BLDG UTILITIES P-LG PROVIDE NEW 20A, 3P BREAKER AS REQUIRED - I I z P247 o � I O DP4P2I O DP4P1I O i OY P4P2 L4P2 O O J J J z O Y J i vuurxr 0 400AT 1 800AF J 800AT D 441 ., �N I I.J a w m Q L41 O J U Alj 480-208/120 75 kVA DRY z L43 TYPE XFMP DP21 U w NEW BLDG & w PROCESS LTG rn QJ PP2P PP2P 2 w SECT. SECT. vp1 2 J� U w z 0 �L w SL4 J Q J w FOR PUMP P-LG ' SCOPE OF WORK. i CONTRACTOR SHALL REMOVE INTERNAL ASSEMBLY BOX" 1. PROVIDE AND INSTALL ALL NEW ELECTRICAL WORK INDICATED ON DRAWINGS ENCLOSURE ELECTRICAL PULL BOX OF EXISTING FC SERVICE DISC. ' LABEL I UNLESS OTHERWISE NOTED. INCLUDING BUT NOT LIMITED TO THE FOLLOWING: " A. INSTALL NEW "FC-MD2" 800 AMP FUSED DISCONNECT SWITCH IN NEMA 3R J ENCLOSURE PROVIDED BY DOOSAN. INSTALL NEW ION 8650C METER AND KIRK KEY INTERLOCK SWITCH AS INDICATED ON THIS DRAWING. PROVIDE WARNING LABEL PER NEC 2017 ART. 692.17. EXISTING-2SETS OF [3#500KCMIL & 1 #1/0 GND. IN4"C.] B. PROVIDE NEW 400A /400A FUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE CONTRACTOR SHALL INSPECT AND EVALUATE FOR TEMPORARY GENERATOR HOOKUP. GENERATOR CONNECTORS AND CABLES CONDUCTORS AND CONDUIT FOR RE -USE. SHALL BE PROVIDED BY DOOSAN. C. PROVIDE NEW "GIDS-1" 800 AMP/ 80DAMP FUSED DISCONNECT SWITCH IN NEMA PROVIDE NEW CONDUCTORS AND CONDUIT FROM PULL BOX TO NEW LOCATION /- EXISTING PANEL TO BE 1 REMOVED AND RELOCATED. / SEE DWG E2.0 FOR NEW PANEL LOCATION. P2FC2 100A MCB 208/12OV, 3P PROVIDE 2P, 20A GFP NEMA 3R CIRCUIT BREAKER FOR HEAT TRACE 2 # 12 & # 12 G IN VC FL S TLR .I. #18 TWSP, 1#14G IN 3/4"C WIREWAY 3R (TYPICAL FOR 3) SEE DWGS M2.0 & M2.1 FOR SENSOR LOCATIONS 2 SETS OF [3 #500 KCMIL & 1 #1/0 GND. IN 4" C.] 3R ENCLOSURE. D. PROVIDE NEW "GIDS-2" 800 AMP/ 600AMP FUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. E. PROVIDE NEW 500kVA TRANSFORMER AS SPECIFIED. F. REPLACE EXISTING 600A CIRCUIT BREAKER IN MAIN SWITCHBOARD "MDS" WITH NEW 800A BREAKER AS SPECIFIED. G. PROVIDE ALL POWER WIRING IN CONDUIT FROM CUSTOMER SWITCHGEAR TO FUEL CELL DISCONNECT - PROVIDE MEGGER TEST REPORT. H. PROVIDE ALL POWER WIRING IN CONDUIT FROM CUSTOMER SWITCHGEAR TO GRID INDEPENDENT DISCONNECT - PROVIDE MEGGER TEST REPORT. I. FURNISH AND INSTALL CM POWER WIRING IN CONDUIT FROM DISCONNECT SWITCH ON CM TO FC INTERFACE AND LEAVE 15FT OF WIRE IN THE FUEL CELL FOR DOOSAN TO TERMINATE. J. FURNISH AND INSTALL NITROGEN PRESSURE SWITCH WIRING AND CONDUIT GROUNDING NOTES: FROM NITROGEN MANIFOLD TO THE FUEL CELL AND LEAVE 15FT OF WIRE IN THE j FUEL CELL FOR DOOSAN TO TERMINATE. FURNISH AND INSTALL CONDUIT TO 1. THE FUEL CELL GROUND LUG INSIDE DISCONNECT PRESSURE SWITCH. SWITCH FC-MD1 SHALL BE CONNECTED TO AN EXTERNAL K. FURNISH AND INSTALL SELF REGULATED HEAT TRACE WITH AMBIENT #1/0 COPPER EQUIPMENT GROUNDING CONDUCTOR FROM THERMOSTAT CALIBRATED TO TO 40oF. POWER SOURCE FOR HEAT TRACE SHALL MAIN SWITCHBOARD'S GROUNDED CONDUCTOR PER NEC BE AS INDICATED ON DETAIL 2/E3.1. REFER TO MECHANICAL DRAWINGS FOR ART 692.44, IN ORDER TO PROVIDE THE REQUIRED SINGLE PIPING LAYOUT / HEAT TRACE REQUIREMENTS AND COORDINATE WITH POINT GROUND PER NEC ART 250.24.A & D. MECHANICAL CONTRACTOR. L. FURNISH AND INSTALL PULL BOXES AS REQUIRED PER NEC. 2. NOTE THAT THE FUEL CELL GROUND LUG INSIDE FC-MD1 M. CONTRACTOR SHALL PROVIDE TYPED PANEL SCHEDULES FOR ALL PANELS IS BONDED TO ALL METALLIC NON -CURRENT CARRYING EFFECTED BY NEW WORK. METAL PARTS BOTH INSIDE THE FUEL CELL AND ALSO AT N. FURNISH AND INS I ALL NLVV 2UA, 208V, 2 PULE, GFP BKEAKEK IN tAIS 1 IN(3 PANEL EXTERNAL FUEL CELL ASSEMBLIES SUCH AS THE P2FC-2 FOR HEAT TRACE CIRCUIT. DETAIL 2/E3.1. COOLING MODULE, SO ALL FUEL CELL PARTS ARE CONNECTED TO THE EQUIPMENT GROUNDING 2. REFERENCE DRAWING E2.0 FOR PLAN LOCATIONS AND REQUIRED SIGNAGE. ALL CONDUCTOR AS REQUIRED BY ART. 250.110. SIGNAGE SHALL BE ON 3 PLY PHENOLIC NAMEPLATES. 3. NOTE ALSO THAT THERE IS TO BE NO OTHER GROUNDING 3. ALL FITTINGS SHALL BE THREADED OR COMPRESSION TYPE. NO SET-SREW FITTINGS ELECTRODE AT THE FUEL CELL OR ANY OF ITS EXTERNAL SHALL BE USED. SUBASSEMBLIES SUCH AS THE COOLING MODULE. ALL OF THE SUBASSEMBLIES ARE TO BE CONNECTED TO THE 4. CONDUIT SUPPORTS SHALL BE "U" BOLT TYPE, KINDORF OR APPLETON CLAMPS, EQUIPMENT GROUNDING CONDUCTOR INCLUDED WITH MINIMUM 1/2" DIAMETER THREADED RODS SHALL BE USED THE CIRCUIT CONDUCTORS FROM THE FUEL CELL PER ART. 250.134.13, WHERE THE FUEL CELL GROUND LUG IN 5. ARMORED CABLES OR FLEX STEEL CONDUITS ARE NOT PERMITTED TO BE USED. FC-MD1 CARRIES THESE GROUND WIRES BACK TO THE WHERE TERMINATING TO EQUIPMENT THAT MOVES OR VIBRATES (IE. GROUNDED SERVICE CONDUCTOR AT THE MAIN TRANSFORMERS) USE SEALTITE. SWITCHBOARD. 6. COLLECT AND PROVIDE APPLICABLE AND REQUESTED FIELD DATA TO THE ENGINEER 4. ANY SUBASSEMBLY ELECTRICAL PANELS CONNECTED TO PERFORMING ARC FLASH STUDY. AFFIX ARC FLASH LABELS, SUPPLIED BY THE ARC THE FUEL CELL SHALL BE GROUNDED TO THE EQUIPMENT FLASH STUDY PROVIDER ,TO APPLICABLE EQUIPMENT. GROUNDING CONDUCTOR FROM THE FUEL CELL PER ART 250.148 AND SHALL NOT HAVE THEIR OWN GROUND ELECTRODE. wl, OHO wQ Z) �L U) 0 rn co a +- c0 o 0 N \`�aa\aN�� uil�rlrrra nyN���� . aA V ► sy 4 V � 3� g W `y `O i �01. QL . •Gjyyy \l a\ E .0 U ,.� O M �, U ci 3 -o oN 4° O r. o� O a O ti U O�--- rylo Z V r) W Z W W Z J J 1 Cn O W W No W 0� z Q -JUJ O J J z W Q Q < U v ry COUJ � U J �- W Q J W O LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: NTS DSF Drawing No.: ■ i co U) a 0 4�_ TREE,—� 1" C. UG. (TO CABINET HEATER) 1" C. UG. —_ NOTE: (TO CABINET A/C) COORDINATE ALL UNDERGROUND CONDUIT 1" C. UG. 1 I i� ' GIDS-2 WITH MECHANICAL PIPING. CONDUIT SHALL (ETHERNET TO RMS) !' 800AS/600AF BE INSTALLED ABOVE ALL PIPING. 1" C. UG. 1 i I 1 DISC. SW. gll (120V. TO RMS) I i 11 1�11 `i `--------- NEW GAS PAD <-------------- ------------ 1" 1" C. UG. �° (CONTROL)_ _ CM POWER) -- __ r---_ ------------------------F_T� DISC. SW. "CM'� I _ - 4 i "Fry-MD2" FUEL CEL6L� DISCONNECT DANGER ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION 7C MD2" UTILITY DISCONNECT SWITCH DS-GEN 400A /400AF DISC. SW. TEMP. GENERATOR HOOKUP GIDS-1 800AS/ 600AF DISC. SW. MTD ON UNISTRUT RACK. TYP. 2 #12 & #12G IN VC. TO 20A CB FOR XFMR HEATER f— (2) 4"C. — 500 kVA XFMR -------------------- -j WNEW HEAT TRACE. PROVIDE PILOT LIGHT ON CIRCUIT FOR VISUAL INDICATION GI ® PURECELLOO THAT HEAT TRACING IS ENERGIZED. FUEL CELL PILOT LIGHT MUST BE VISIBLE FROM COOLING . PIPING INTERFACE. SEE DETAIL FC-MD1' `�` ON DWG. E3.1 I N � ODULE PROVIDE STANTION MOUNTED LIGI FIXTURE WITH GFCI WEATHERPRO RECEPTACLE AND SWIITCH. TYP. 2 PLACES. SEE DETAIL 8/E3.1 RELOCATED PANEL P2FC-2 100A, 120/208V, 30, 4W. PRO\ CIRCUIT BREAKERS AS REQ'I UNISTRUT RACK AS REQUIRE � j f ll1 __i EXISTING (4) 4"C. & (2) 2"C. r- --- �_ 2"C. TO P2FC-2 1 1 FC- MD2 I :_ 2"C. TO TEL/DAT 111 1 x- 2-4"C. TO GIDS-e I 1 i 1 i 2-4" TO FC-MD21 (2) 4"C. 1 -------- -- I'---------- ----tea 1 t 1" C. UG. EXISTING 11 CONTRA( (2) 4"C. 1 HEAT TRACE (208V.) SPARE C! 1 I 2 #12 & #12G IN 1" C. TO 20A QUAZITFf BREAKER IN PANEL P2FC-2 1J CAT6 IN 1" C. TO RMS 1/l1 (2) 4"C. STANTION MTD LIGHT 2 #12 & #12G IN 1" C. TO 20A C.B. IN PANEL P2FC-2 "FC-MD1" FUEL CELL DISCONNECT DANGER ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION 480 VOLT, 3 PHASE, 3 WIRE RATED OUTPUT: 440 kW, 440 kVA "FC MD1" UTILITY NGO METER ISOLATION SWITCH ELECTRICAL PLAN - FUEL CELL YARD SCALE: %6' = V-0" E/REPLACE 'PROVIDE —CONTRACTOR SHALL REMOVE INTERNAL ASSEMBL Y OF EXISTING SWITCHGEAR FOR RE -USE AS PULL BOX. LABEL "ELECTRICAL P_vJJ_B4O, .=--' TO METER MOUNT PULL BOX ON SIDE OF EXISTING ENCLOSURE. PROVIDE BARRIERS BETWEEN SEPARATE CIRCUIT CONDUCTORS AS REQ'D ,,ARE (4) 4"C. & (2) 2"C. )R SHALL LOCATE EXISTING DUITS FOR RE -USE. PROVIDE LL BOX AS REQUIRED. RELOCATED SITE LIGHTING BY OTHERS. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL SECOND LIGHTING FIXTURE ON RELOCATED POST FACING FUEL CELL YARD. NEW LIGHTING FIXTURE SHALL MATCH EXISTING. NOTE: CLEAN, EVALUATE AND INSPECT EXISTING 4" CONDUITS AND CONDUCTORS FOR RE -USE. CONTRACTOR SHALL TRACE 4" CONDUITS BACK TO MAIN ELECTRICAL ROOM AND LOCATE OUTSIDE. FIRE SUPRESSION SERVICE 3 #12 & #12G IN 3/4" C. TO PANEL DP4FC-2. f PROVIDE NEW 20A, 3P, 480V BREAKER AS REQUIRED. AIR COMPRESSOR I OH DOOR w w O LITY — ( fl O U) m w d U.I O > U O Q NEW NEW GLYC( PUMP rt FEED TANK P-LG FEED WATER BOILER ROOM REFRIGERATION ROOM EXISTING CONDUITS TO FUEL CELL YARD TO BE REUSED (8) 4"C. AND (4) 2"C. SECT. 3 EXISTING SWITCHBOARD "MSB' SECT. 5 TANK 2 #12 & #12G N 3/4" C. TO PANEL P2FC-1. PROVIDE NEW 20A, 1 P, 120V BREAKER AS REQUIRED. AIR TANK`, �120PSI PAD i AIR COMPRESS. Q � W W z w m U LL O z 17- Q STEAM MANIFOLD FUEL CELL DISCONNECT POWER SOURCE OUPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE. REPLACE EXISTING 600A BREAKER (POS. 5D) WITH NEW GFP 800AF/750AT BREAKER SUITABLE FOR BACKFEED. ELEC. ROOM rP119� I PP2P SECT. 1 SECT. 1 XFMRS ABOVE 2 ( SL4 DP41 T DP21 DP4FC---; DP46 t rr��16 t I l i t i i i t ! t i i t i i t i i i i i t I E i l l l !! i i l i l l i { ! 1 1 t! i t! t t DP4FC-2 446-A P2FC-1 446-B PARTIAL ELECTRICAL ROOM PLAN SCALE: %6' = 1'-0" I KEY PLAN I F(D ---' . .. ... ....... c� J aj 0 a z O 2 C ti z 0 Lu 1 i. cc 0- O u �'1 INSTALL JUMPER; UV CONTROL NOT USED CONFIGURATION OVERVIEW: THE PURECELL MODEL 400 AT CARLA'S PASTA TALBOT LANE IS A 440KW/440 KVA "DUAL MODE" FUEL CELL THAT CAN OPERATE EITHER GRID -INTERACTIVE OR GRID -INDEPENDENT (GI MODE). ITS 3 PHASE, 3 WIRE 480 VOLT AC GRID OUTPUT TERMINALS ARE CONNECTED TO CARLA'S PASTA 4000 AMP MAIN SWITCHBOARD MSB BY AN 800 AMP BREAKER. ITS 3 PHASE, 3 WIRE GRID -INDEPENDENT (GI) TERMINALS ARE CONNECTED TO THE MANUAL TRANSFER SWITCH MTS-1 FOR A DEDICATED POWER DISTRIBUTION PANEL BOARD DP4FC NORMALLY V HATS-1 IS IN THE "NORMAL" POSITION AND GRID POWER SUPPLIES LOAD PANEL DP4FC. IF GRID POWER IS LOST, MTS-1 WILL BE MANUALLY TRANSFERRED TO "EMERGENCY" FUEL CELL POWER STARTUP: DURING STARTUP, THE PURECELL MODEL 400 CONSUMES APPROXIMATELY 158KW (APPROX. 70 KW AVERAGE) OF 480 VOLT 3 PHASE POWER FOR 5 HOURS THROUGH ITS GRID OUTPUT TERMINALS, WHICH ALSO SERVE AS INPUT TERMINALS DURING STARTUP. IDLE MODE: ONCE STARTUP IS COMPLETE THE FUEL CELL TRANSITIONS TO AN IDLE STATE WHERE IT IS POWERING ITS OWN INTERNAL AUXILIARIES BUT ITS OUTPUT BREAKER IS OPEN. NORMALLY THE FUEL CELL IS SETUP TO AUTOMATICALLY TRANSITION FROM THIS STATE TO GRID CONNECTED MODE AFTER A FEW SECONDS GRID -CONNECTED OPERATION: ONCE STARTED IN GRID -CONNECTED OPERATING MODE, THE FUEL CELL DELIVERS UP TO 440 KW CONTINUOUSLY THROUGH ITS OUTPUT TERMINALS TO CARLA'S PASTA MAIN SWITCHBOARD MSB, WHERE IT IS DISTRIBUTED TO ALL OF THE BUILDING LOADS. MOST OF THE POWER IS CONSUMED BY THE BUILDING LOAD BUT AT PERIODS OF LOW BUILDING LOAD, SOME OF THE POWER MAY BE EXPORTED TO EVERSOURCE IN GRID CONNECTED MODE, LOAD PANEL DP4FC CONTINUES TO BE POWERED BY THE UTILITY THROUGH MTS-1 "NORMAL" TERMINALS. MTS-1 HAS FUEL CELL POWER AT ITS EMERGENCY TERMINALS FROM THE GRID -INDEPENDENT OUTPUT TERMINALS OF THE FUEL CELL BUT THE MTS IS IN THE "NORMAL" POSITION WITH GRID POWER SUPPLYING THE LOAD PANEL DP4FC THE FUEL CELL IS INVERTER BASED AND WILL AUTOMATICALLY SYNCHRONIZE TO THE UTILITY GRID. LOSS OF UTILITY SUPPLY: UPON LOSS OF UTILITY SUPPLY, THE FUEL CELL INTERNAL GRID PROTECTION WILL DETECT THE UTILITY LOSS AND TRIP THE FUEL CELL OUTPUT BREAKER MCB001. THE FUEL CELL WILL THEN AUTOMATICALLY RECONFIGURE FOR GRID -INDEPENDENT MODE, OPEN MCB002 AND RECLOSE MCB001 (VIA AN MCB002 INTERLOCK) TO BEGIN GRID -INDEPENDENT OPERATION GRID INDEPENDENT OPERATION: THE FUEL CELL WILL AUTOMATICALLY RECONFIGURE FOR GRID -INDEPENDENT MODE IN ABOUT 10 SECONDS. CUSTOMER LOAD PANEL DP4FC WILL MOMENTARILY LOSE POWER UNTIL THE FUEL CELL ENTERS GRID -INDEPENDENT OPERATION MODE AND AN OPERATOR MANUALLY SWITCHES MTS_69 TO THE "EMERGENCY" POSITION. IT MIGHT TAKE A FEW MINUTES FOR AN OPERATOR TO GET TO THE MTS GRID RESTORATION: UPON RETURN OF THE UTILITY SUPPLY, THE FUEL CELL WILL CONTINUE TO OPERATE IN GI MODE FOR THE 5 MINUTE RECONNECT DELAY TIME AND THEN AUTOMATICALLY RETURN TO GRID CONNECTED MODE. CUSTOMER LOAD PANEL DP4FC WILL CONTINUE TO BE POWERED BY THE FUEL CELL'S GI OUTPUT TERMINALS UNTIL THE MTS-1 IS MANUALLY SWITCHED BACK TO ITS "NORMAL" POSITION. FUEL CELL TEMPORARY GENERATOR: IF THE FUEL CELL IS OUT -OF -SERVICE DURING A GRID OUTAGE, IT HAS A TEMPORARY GENERATOR HOOKUP PANEL IN THE NGO METER CABINET BETWEEN ITS GRID CONNECTED OUTPUT AND THE CUSTOMER SWITCHBOARD, INTERLOCKED SUCH THAT THE FUEL CELL CAN BE ISOLATED FROM THE GRID AND THEN STARTED BY A TEMPORARY GENERATOR WHERE IT WILL INITIALLY RUN IN IDLE MODE AND THEN CAN TRANSITION TO GRID INDEPENDENT MODE TO SUPPLY POWER TO LOAD PANEL DP4FC. ONCE THE GRID IS RESTORED AND THE TEMPORARY GENERATOR IS DISCONNECTED, THE FUEL CELL MAY ALSO RETURN TO GRID CONNECTED MODE SHUTDOWN: UPON OPERATOR SELECTION OF A MANUAL SHUTDOWN, OR AUTOMATIC SHUTDOWN DUE TO CERTAIN INTERNAL POWER PLANT PROTECTION EQUIPMENT, THE POWER PLANT WILL CEASE PRODUCING ELECTRICAL POWER. ITS INTERNAL OUTPUT BREAKER MCB_001 WILL OPEN AND THE GAS SUPPLY WILL SHUT OFF. AT THIS POINT THE POWER PLANT BEINGS AN AUTOMATIC "COOL DOWN" DURING WHICH THE CSA COOLANT TEMPERATURE IS REDUCED FROM ITS 350 DEGREE OPERATING TEMPERATURE BACK TO ITS 130 DEGREE STANDBY TEMPERATURE. COOL DOWN IS ACCOMPLISHED BY REJECTING HEAT TO THE POWER PLANT COOLING MODULE. DURING THIS COOL DOWN, THE POWER PLANT WILL CONSUME ABOUT 6 TO 25 KW OF PARASITE POWER FOR ITS COOLING PUMPS, ELECTRIC HEATERS, AND CONTROLS. SERVICING: OCCASIONALLY, WHEN SERVICING THE FUEL CELL, EXTERNAL GRID POWER MUST BE DISCONNECTED BY OPENING ITS MAIN DISCONNECT SWITCH MD001. UV TRIP COIL SEQUENCE OF OPERATION DURING NORMAL OPERATION MCB001 AND MCB002 ARE CLOSED, ALLOWING INTERCONNECTED OPERATION OF THE FUEL CELL INVERTER WITH UTILITY POWER. DE- ENERGIZING THE UV TRIP COIL OF MCB001 ISOLATES THE INVERTER FROM THE UTILITY. FROM NORMAL OPERATION, THE UV TRIP COIL WILL DE -ENERGIZE AND OPEN MCB001 IF: THE UTILITY INTERACTIVE PROTECTION FUNCTIONS ARE NOT SATISFIED (PCS001 D03). THE SAFETY COMPONENTS THAT MAKE UP THE LOCK -OUT RELAY ARE NOT SATISFIED (KLOR). THE EXTERNAL CONTACT OPENS AND DE -ENERGIZES CRO10A. IN GRID INDEPENDENT MODE WITH MCB002 OPEN AND ITS AUX CONTACT CLOSED, MCB001 IS PERMITTED TO CLOSE WHEN ITS UV TRIP COIL IS ENERGIZED THROUGH THE PCS001 D03 AND KLOR CONTACTS. FUEL CELL UV TRIP COIL FOR MCB001 MCB002 MCB001 FUEL CELL OUTPUT POWER I 12 I 11 C1�UVC202 +24VDC (24V UPS) TBPCDC34 31 32 0 /\PCS001 Q D03 KLOR CRO10A 2 3 53 54 21 24 RETURN (OV UPS) 24VDC, Isc=4A (24V UPS ISOLATED) CRO10A I NOTES 1. FOR SERIAL # 9582 AND UP, TERMINF BLOCK NUMBERS ARE 31 & 32. 2. INVERTER PROTECTION RETURN 3. LOCK -OUT RELAY (OV ISOLATED) 4. MCB002 BREAKER INTERLOCK MCB_INV UV TRIP CIRCUIT LOGIC 480/277V 3 PHASE, 4 WIRE SERVICE Y IY Y IY SFRVI r'1= SW1TrHRC)Apn I� I 4000 AF SECTION 3 SECTION 5 _ i 2400 AT i i SERVICE BREAKER UTILITY r---- -- � SERVICE' ' METER E1 i #891794282 I GI NI CI BI A A B C G N __ __ GIDS-2 - 800A _ 600A DISCONNECT CLASS L FUSES SWITCH A B C_ G_ N 480/277:480/277 I 3W - 4W I . . 1�.�.�.J I EMERGENCY POWER I TRANSFORMER 7 500 kVA L GIDS-1 - 800A 600A DISCONNECT CLASS L SWITCH FUSES THREE LINE DIAGRAM N.T.S. SCALE: NTS ' I H1 I I • CT MODEL: GE 110-401 400:5 I I I (TYP. OF 2) I I I I I I I I I i I I I I 1 i i I G ' �-0 1 '�� 400A i CLASS L =-oyo—f FUSES i �j IF G -NORMAL AUXILIARY POWER - O 800AF C 750AT B Af 480:120 PT (IYP. OF 2) I GE JVM-OC 8A o • 1 _ I I TEMP. GENERATOL DS-GEN DISC. SWITCH A FUEL CELL FC-MD-Al DISCONNECT SWITCH 1 800A CLAS -FUSESL -- -- --� FUSES I I Lv I I I I 111 i 112 132 I 131 i I TEST SWITCH P1 P2 P3 C1+ C1 C3 C3+ ------------- FUEL CELL (FC-1) TBCUST go I MODEL 400 FUEL CELL 100 I 1 INVERTER OUTPUT LOAD FOLLOWING 110 4-20mm SIGNAL 120 UNDER VOLTAGE TRIP 310 JI [FACTORY COIL MCB001 320 (JUMPER I I FUEL CELL IS A UL1741 APPROVED PACKAGE. THIS BLOCK DIAGRAM IS FOR REFERENCE ONLY. /—MILBANK METER SCOCKET CABINET WITH PREWIRED TEST SWITCH No. UC7444-0-141-NOE CUSTOMER DG I METER M1 DG METER ION 8650C I CH V1 o V2 I I —o V3 -� VREF I i 111 . 112 121 122 � I 131 132 I I 3A L+ N- os ETHERNET I CAT 6 ETHERNET TO RMS / HRM CABINET. CONFIGURE PORT FORWARD FOR UTILITY USER ACCESS. — PROVIDE DEDICATED 15 AMP, 120V CIRCUIT F71 w Il � O O Q i 0 L N rn o o N +r N Q N � \.\``Q��`Gv� �r �►���%'yam `� .,QL co, o U N O d- C7 0 CIS a w 0 N Q O tn N a .4Z a O ti U ry p VJ dry V 0 z Qz: LW o W W U U Z_ Q = Q J D 0_ W C/) O W W V) r J W J J I- z W J Q Q U Q 0 O LL1 LL W � J W O LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: NTS DSF Drawing No.: 30 J FACTORY PROVIDED MANUALu IouU114114 CU 1 SWITCH FC-MD1 LINE!] I OA OB IOC A B C LOAD GND n GC INTERFACE SEE DETAIL 8 FOR CONDUIT STUB UP LOCATIONS • • • ° • • WIRING INTERNAL TO FUEL CELL POWER MODULE GI INTERFACE SEE DOOSAN APPLICATIONS DRAWING FOR DETAILS OF FIELD ° INSTALLED GI TERMINAL BOX. SEE DETAIL 7 (THIS SHEET) FOR CONDUIT STUB UP LOCATIONS. 0 GI COVER PLATE SEE DETAIL A FOR GI BUSBAR CONNECTIONS BEHIND THIS COVER PLATE • 0 • • O O INTERNAL O O GROUND BUSBAR O O OUTPUT POWER INTERFACE SCALE; NTS SECTION A - A GI BUSBARS NTS �A PHASE C BUS BAR D.313" DIAM. 156" DIAM. 1 SECTION B-B GI TERMINAL DIMENSIONS (SEE GI CONNECTION NOTE 2) NTS r\I /%/1L IL Ir/%TI 0"O\ Ie% GRID INDEPENDENT (GI) CONNECTIONS DETAIL SCALE: NTS ELEVATION WITH GI COVER PLATE REMOVED (2) 4" CONDUITS UP INTO BOTTOM OF DISCONNECT SWITCH FC-MD1. STUB UP NOTE: WITHIN HATCHED AREA. HEAT TRACE IS REQUIRED ON ALL PIPING EXPOPSED TO AMBIENT CONDITIONS STARTING AT THE PIPE RISE EXISTING FROM THE BOTTOM OF THE TRENCH, NOT ON PIPE PANEL WHEN BURIED AT 5'-0" DEEP. TYPICAL N N 1,6-b o Ih EXISTING PANEL P2FC2 SPARE y ICJ o� 20A, 208V, 2P, GFP CB -- 2 #10 & #12GND. IN 1"C 4 1/2" 13" (2) 4" CONDUITS UP INTO BOTTOM OF FIELD T-5" 13" INSTALLED GI TERMINAL BOX. STUB UP WITHIN HEAT TRACE THERMOSTAT WITH PILOT LAMP AND STATUS HATCHED AREA. GI TERMINAL BOX SUPPLIED BY DRY CONTACT OUTPUT TO INDICATE CIRCUIT IS DOOSAN AND ASSEMBLED BY CONTRACTOR. REFER ENERGIZED. ENVIRONMENTAL TECHNOLOGY, INC. MODEL TO DOOSAN APPLICATION DWGS. FOR DETAILS. SST-2 OR APPROVED EQUAL AMBIENT TEMPERATURE THERMOSTAT FOR HEAT TRACE SHALL ENERGIZE AT 40OF DSCALE:NTS GC/GI CONDUIT STUB UP LOCATION DETAIL ALARM SIGNAL TO HRM CONNECTOR P14 (FMA) TERMINALS #33 & 34 (2 #14, #14 G IN Y4"C) JB T ---� TERMINAL BLOCK LAYOUT MAY VARY BASED ON POWER MODULE 120 VOLT %" DEIONONIZED WATER DRAIN SERIAL NUMBER. LEAVE 15 FEET OF COILED AND LABELED CONTROL POWER PIPING AND INSULATION BY WIRE INSIDE THE POWER MODULE OPENING "CC" FOR FINAL CONNECTION MECHANICAL CONTRACTOR TERMINATION BY DOOSAN. LEAVE 25 FEET OF COILED AND LABELED (TYPICAL) 120 AND 230 VAC POWER WIRES INSIDE OPENINGS "R" AND "CM" FOR FINAL TERMINATION BY DOOSAN. � SELF- R N HTSX SELF- REGULATING ------------ HEAT TRACE CABLE OR APPROVED EQUAL Lq O S E (TYPICAL) STANCHION MOUNTED LIGHT ETHERNET PORT J355AA o FIXTURE WITH GLOBE, GUARD FOR REMOTE MONITORING SYSTEM Y4' CHIMNEY CONDENSATE AND 100W. A-19 LAMP CONNECTION UO DRAIN 3/4" RIGID GALVANIZED O o STEEL CONDUIT. I/O TERMINAL BLOCK TBPCDC34 13O CUSTOMER SIGNAL WIRE o O------------ ALIGN BOTTOM TWO GANG CONNECTIONS SEE INSTALLATION OF FIXTURE WITH 84" QOD CAST DEVICE BOX. O •— END KIT TYPICAL ARn\/G MNIICUGn QI oR 045 MANUAL SECTION 6 FOR INSTRUCTIONS S E (TYPICAL) �__' — """" "" I_ON CONNECTING TO TERMINAL (0) SINGLE POLE TOGGLE SWITCH NUMBERS 1 - 40. TERMINATION BY 34" PROCESS WATER SUPPLY GFI DUPLEX RECEPTACLE gum W/ WEATHERPROOF COVER DOOSAN SERVICE O UOESEREHI ° WITH WEATHERPROOF COVER. (PDS) AT FUEL CELL 1" RIGID GALVANIZED STEEL rnnl INIr,' nnnnl n F g An vn/, pn\A/PR CONDUIT. PROVIDE UNISTRUT WIRING PASS -THROUGH. FINAL SUPPORT AS REQUIRED. U TERMINATION BY DOOSAN SERVICE. 0 0 S E PASS -THROUGH FOR RMS 120 VAC 0 FINISHED SLAB POWER WIRING. FINAL TERMINATION 0 0 0 00 3/4' PROCESS WATER SUPPLY BY DOOSAN SERVICE. 0 (PDS) AT BUILDING a o CONNECT GROUND WIRE FROM o00 ° 0------------ NITROGEN RACK. TERMINATION BY DOOSAN SERVICE. S E LOCATED BEHIND PANEL 4, SEE INSTALLATION MANUAL FIGURE 4-1 STANCHION MOUNTED LIGHT/RECEPTACLE SIGNAL WIRE CONNECTIONS WORK BY DOOSAN 2 HEAITRACDETAIL SCALE: NTS SCALE: NTS SCALE: VARIES GRADE ---ASPHALT (SEE DETAIL 15/S1.1) Z ELECTRICAL CABLE MARKING TAPE SHALL BE PLACED 12" BELOW FINISHED GRADE ABOVE em ALL ELECTRICAL CONDUITS. io SUITABLE BACK FILL (SEE NOTE) SAND 1" RGS (CONTROL) —1 J 1" RIGID GALVANIZED STEEL (RGS) CONDUIT (SPARE) 4" RGS NOTE: 1. SUITABLE BACKFILL SHALL NOT CONTAIN SHARP STONES, ASHES, CINDERS, SHELL, FROZEN MATERIAL. LOOSE DEBRIS OR STONE LARGER THAN 2" IN DIAMETER. 2. UNDERGROUND CONDUIT CAN BE SCHEDULE 40 PVC WITH RGS STUBBED UP TO CONNECTION POINT (TYPICAL) UNDERGROUND CONDUIT TRENCH DETAIL SCALE: NTS INTERNAL 24 VOLT DC �— LOOP ISOLATOR CUSTOMER WIRING INTERFACE EXTERNAL SIDE TB CUST 11 1 O 2 O 3 O 4 INTERNAL 24 VOLT DC - O 5 O 6 LOOP ISOLATOR 7 O O 8 INTERNAL 24 VOLT DC 17.7 O 9 10 v LOOP ISOLATOR 11 O O 12 �= 13 INTERNAL 24 VOLT DC �-- O 14 O LOOP ISOLATOR 15 - - O 16 O 17 INTERNAL 24 VOLT DC �-- --- O O 18 LOOP ISOLATOR O 19 INTERNAL 24 VOLT DC �� CR305D 24V RETURN __C INTERNAL 24 VOLT DC CRO14AD 24V RETURN INTERNAL 24VDC+ CRO14AE 24V RETURN—♦ INTERNAL 24 VOLT DC - CR014AF 24V RETURN OINTERNAL CR284A 24 VOLT DC CRO14AG 24V RETURN INTERNAL 24 VOLT DC SEL 547 PROTECTION RELAY PCS DI #8 �-- K023 \ VENT FAN CONTROL K023 \ HG HEAT READY STATUE K023 \ LHEAT READY -STATUS K023 \ GI MODE STATUS O 20 O 21 O 22 O 23 O 24 25 +24V__ r--' �- O-------- PS700 J NITROGEN PRESSURE SWITCH - O------- 26 N.O. ----I � 27 L CLOSED -NORMAL --- O O 28 O 29 O 30 O 31 FACTORY O 32 JUMPER O 33 O 34 35 O 36 O 37 38 v 39 O O 40 O 41 O 42 O 43 SPARE STATUS O 44 FUEL CELL MODEL 400 TB CUST I/O TERMINAL BLOCK CONNECTIONS SCALE: NTS a W O O Q O C:w N v�i p �U o CU o� Q y! 4 bO M 3 'G ¢ 112 (1) O a 0 ti U ry rO v, Z VJ W Z :2 <' 3: W U) U Q = Q Q Q n z) 0 U) O W �, o - U) r v z < - W IIII I W J ry Z WLLJ J U - J w I- O w : M C) LO Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: 301 u 9) z 0 D 0 z BASIC ELECTRICAL REQUIREMENTS A. NOTES 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS SECTION. 2. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL DIVISIONS. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 3. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK AND THE SUBCONTRACTORS WORK TO COMPLY WITH OWNER'S SCHEDULE AND THE PROJECT COMPLETION DATE. 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTOR'S BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. B. GENERAL REQUIREMENTS 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE COMPLETE ELECTRICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY POWER COMPANY SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE POWER COMPANY AND WITH DOOSAN AS REQUIRED. FURNISH AND INSTALL EQUIPMENT THAT IS RATED FOR AVAILABLE FAULT CURRENT LEVELS. FURNISH AND INSTALL "CABLE LIMITERS" IF NECESSARY TO LIMIT FAULT CURRENT. FIELD VERIFY THE EXACT TYPE, SIZE, LOCATION, REQUIREMENTS, ETC. OF EXISTING POWER AND TELEPHONE FACILITIES PRIOR TO SUBMISSION OF BID. 2. ALL MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW. RECONDITIONED OR RE-CERTIFIEDEQUIPMENT SHALL NOT BE USED UNLESS SPECIFICALLY APPROVED BY DOOSAN. EQUIPMENT SHALL BE UNDERWRITERS LABORATORIES LISTED FOR IT'S APPLICATION, AND BEAR THE UL LABEL. EQUIPMENT SHALL BE SIZED IN CONFORMITY WITH REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. 3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE PROVIDED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK OR WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE PROVIDED AS PART OF CONTRACT. 4. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS NOTED OTHERWISE. 5. ALL ELECTRICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 6. THE CONTRACTOR SHALL DO ALL CUTTING, CHASING, OR CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THIS DIVISION. ALL CUTTING SHALL HAVE PRIOR APPROVAL BY THE OWNER. ALL PATCHING IS TO MATCH SURROUNDING SURFACES. 7. EXISTING MANHOLE MAY HAVE STANDING WATER. PLAN ON PUMPING OUR THE WATER AS NECESSARY. COMPLY WITH APPLICABLE OSHA SAFETY REQUIREMENTS FOR WORKING IN A MANHOLE. 8. EXCAVATION: COORDINATE WITH EXISTING UNDERGROUND INSTALLATION. USE SERVICES OF CALL BEFORE YOU DIG OR SIMILAR. EXCAVATE WITH CARE AND BY HAND WHERE NECESSARY, ESPECIALLY EXCAVATING NEAR ELECTRICAL LINES AND GAS PIPING. 9. THE CONTRACTOR SHALL MAKE ALL FINAL ELECTRICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. C. TEMPORARY LIGHT AND POWER 1. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPORARY WIRING AND RELATED GROUND FAULT INTERRUPTION PROTECTION FOR LIGHT AND FOR ALL CONTRACTORS POWER REQUIREMENTS AND IS RESPONSIBLE FOR IT'S REMOVAL, D. CODES 1. ALL WORK SHALL BE PERFORMED IN A NEAT AND PROFESSIONAL MANNER AND CONFORM TO THE LATEST ADOPTED EDITION OF THE NATIONAL ELECTRICAL CODE, THE STATES, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES, AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THE CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED TO THE CONTRACTOR. 2. COMPLY WITH 2O18 STATE OF CONNECTICUT BUILDING CODE AND NEC 2017 AND APPLICABLE AMENDMENTS AND REQUIREMENTS OF THE CITY OF WEST HAVEN, COUNTY OF NEW HAVEN. E. LICENSES, PERMITS, INSPECTIONS AND FEES 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. 2. FURNISH TO OWNER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. F. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING, THROUGH SHOP DRAWING SUBMITTAL PROCESS, BY THE CONSTRUCTION MANAGER PRIOR TO ACCEPTANCE. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. THE CONTRACTOR SHALL PROVIDE SUBMITTALS FOR ALL EQUIPMENT TO DOOSAN/OWNER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (10) WORKING DAYS FOR DOOSAN AND ENGINEER REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE ARCHITECT/ENGINEER OFFICE AND SUB -CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. G. GUARANTEE 1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, REQUIREMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY THE OWNER. EXTENDED WARRANTIES ARE SPECIFIED WITH INDIVIDUAL EQUIPMENT. H. RECORD DRAWINGS 1. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: a. LOCATION OF JUNCTION BOXES AND RECEPTACLES. b. LOCATION OF ALL HOMERUNS SHOWING WIRE/CONDUIT SIZES. c. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. d. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT COMPLETION OF PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. 3. A COPY OF THESE ASBUILT DRAWINGS WILL BE GIVEN TO DOOSAN / OWNER. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATICAL AND INDICATE THE GENERAL LOCATION AND INTENT OF THE ELECTRICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE CONSTRUCTION MANAGER IN WRITING PRIOR TO SUBMITTAL OF BID. OTHERWISE,OWNER'S INTERPRETATION OF CONTRACT DOCUMENTS OR COMMENTS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. 2. THE LOCATION OF OUTLETS AND EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE AND SCHEMATIC IN NATURE. OWNER SHALL HAVE THE RIGHT TO RELOCATE ANY OUTLETS OR FIXTURES BEFORE THEY ARE INSTALLED WITHOUT ADDITIONAL COST. 3. HOMERUNS SHOWN ARE SCHEMATIC. ELECTRICAL CONTRACTOR MAY ORIGINATE HOMERUNS FROM DIFFERENT LOCATIONS. J. DEMOLITION 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF EQUIPMENT REMOVAL AND EXISTING WORK. COORDINATE WITH OWNER, EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. K. SLEEVES 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 4" ABOVE THE FLOOR. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL CONDUIT, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS IRON, WIRE, UNISTRUT, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO OTHER CONDUIT OR PIPING. HANGERS UPPER ATTACHMENT MUST BE SUPPORTED FROM THE TOP OF THE BAR JOIST. HANGING FROM METAL DECK IS NOT PERMITTED. WHERE INTERFERENCE OCCUR, IN ORDER TO SUPPORT CONDUIT, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, JUNCTION BOXES, ACCESS DOORS, OTHER EQUIPMENT SERVICE REQUIREMENTS AND/OR OTHER TRADES. BASIC ELECTRICAL MATERIALS AND METHODS M. SCOPE OF WORK 1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS,TRANSPORTATION NECESSARY FOR EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE ELECTRICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: a. A COMPLETE ELECTRICAL DISTRIBUTION SYSTEM INCLUDING THE INSTALLATION OF PANELBOARDS, SAFETY AN DISCONNECT SWITCHES, LIGHTING AND RECEPTACLES. IT IS THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO INCLUDE IN HIS BID FOR PROVIDING SERVICE EQUIPMENT NECESSARY TO OBTAIN SERVICE FROM LOCAL UTILITY COMPANY. REFER TO ELECTRICAL ONE -LINE DIAGRAM FOR ADDITIONAL INFORMATION. b. THE CONTRACTOR MUST ALSO INCLUDE IN BID ALL NECESSARY MATERIALS REQUIRED TO COMPLETE THE SYSTEM INCLUDING, BUT NOT LIMITED TO, FEEDERS, BRANCH CIRCUITS, JUNCTION BOXES, OUTLET BOXES, WIRING DEVICES, COVERPLATES, CONDUITS, ETC. c. METERING AND CURRENT TRANSFORMERS AS REQUIRED BY DRAWINGS, UTILITY COMPANY. d. THE WIRING OF MECHANICAL EQUIPMENT AS OUTLINED ON THE DRAWINGS AND IN THE SPECIFICATIONS. WORK SHALL INCLUDE WIRING OF ALL STARTERS, DISCONNECTS, AND POWER WIRING OF MECHANICAL EQUIPMENT EXCEPT AS SPECIFICALLY NOTED OTHERWISE. ALL LOW VOLTAGE (24 VOLT) TEMPERATURE CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR UNLESS NOTED SPECIFICALLY ON DRAWING. e. INSTALLATION OF LIGHT FIXTURES AND LAMPS AS SHOWN ON THE DRAWINGS INCLUDING ALL DEVICES, EQUIPMENT, ETC. REQUIRED FOR MOUNTING. f. TEMPORARY SERVICE AS INDICATED IN THE SPECIFICATIONS, INCLUDING IT'S REMOVAL. g. SMOKE/FIRE ALARM WIRING, DEVICES AND CONDUIT, AS SHOWN OR DESCRIBED ON DRAWINGS OR AS NECESSARY TO MEET STATE, LOCAL, INSURANCE AND FIRE DEPARTMENT REQUIREMENTS. h. INSTALLATION OF CONDUITS AND WIRING TO CONTROL PANEL, CABLES ARE NOT PERMITTED. SEE SECTION G FOR LOW VOLTAGE CONTROLS REQUIREMENTS. i. VERIFY FUEL CELL PHASE ROTATION MATCHES THE BUILDING ELECTRICAL SERVICE. MEASURE VOLTAGE ACROSS EACH PHASE OF MCB001AND VERIFY THAT EACH PHASE IS SIMILAR IN MAGNITUDE. j. CONDUCTOR MARKING SHALL BE IN ACCORDANCE TO NEC 408.3(E) REGARDING PHASE ROTATION. 2. THE FOLLOWING ITEMS OF ELECTRICAL CONSTRUCTION ARE NOT INCLUDED IN THIS CONTRACT: a. 24 VOLT TEMPERATURE CONTROL WIRING UNLESS NOTED OTHERWISE b. TELEPHONE INSTRUMENTS AND WIRING UNLESS NOTED OTHERWISE 3. BEFORE STARTING WORK, THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL AND MECHANICAL PLANS, SHOP DRAWINGS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE ELECTRICAL SYSTEM, MATERIALS AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. B. CONDUIT 1. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUITS SERVING ALL EQUIPMENT, INCLUDING BUT NOT LIMITED TO, LIGHTING, RECEPTACLES, HEATING AIR CONDITIONING, MECHANICAL EQUIPMENT, TELEPHONE, DATA AND ELECTRICAL EQUIPMENT. 2. ALL CONDUITS SHALL BE GALVANIZED RMC OR EMT UNLESS OTHERWISE SPECIFIED. ALL CONDUIT IS TO BE UL LABELED. WHERE CUT, ALL CONDUIT SHALL RECIEVE A SUPPLENTARY CORROSION PROTECTION COATING OF ZINC -RICH PAINT, ACRYLIC OR WEATHER -STABLE EPDXY -BASED RESIN, APPROVED FOR THIS PURPOSE. THE CONDUIT SHOULD BE PREPARED FOR COATING PER ASTM D6386. ALL FIELD CUT THREADS SHALL BE PROTECTED AGAINST CORROSION WITH CONDUCTIVE RUST -RESISTANT ZINC -RICH PAINT. EMT SHALL BE FOR INDOOR USE ONLY. EMT CONNECTORS SHALL BE STEEL COMPRESSION TYPE CONDUIT UNDER SLAB ON GRADE SHALL BE GALVANIZED RIGID STEEL, OR SCHEDULE 40 PVC WITH RIGID STEEL ELLS WHERE PERMITTED BY CODE. UNDERGROUND CONDUITS SHALL BE PVC SCH. 40, EXPOSED OUTDOOR CONDUITS SHALL BE RGS. PROVIDE METAL SWEEPS WHERE PVC CONDUIT EMERGES FROM GRAGE. ALL CONDUIT INSTALLATIONS SHALL BE COMPLIANT WITH OWNERS BUILDING STANDARD. MINIMUM SIZE OF CONDUIT SHALL BE 3/4 INCH. SPARE CONDUITS SHALL HAVE NYLON PULL WIRES INSTALLED IN THEM. 3. SUPPORT ALL CONDUIT, INCLUDING SEISMIC AND SWAY BRACING, IN ACCORDANCE WITH THE NEC AND LOCAL CODES. 4. GENERALLY, ALL CONDUIT SHALL BE CONCEALED EXCEPT FOR UNFINISHED AREAS, SUCH AS EQUIPMENT ROOMS. EXPOSED CONDUIT SHALL BE ALLOWED ONLY AS NOTED ON PLAN AND AS APPROVED BY DOOSAN. 5. LIQUID TIGHT FLEXIBLE CONDUIT (LTFC) a. LIQUID TIGHT FLEXIBLE CONDUIT AND, ASSOCIATED FITTINGS SHALL BE INSTALLED PER MANUFACTURER'S GUIDELINES WITH SPECIAL ATTENTION TO FITTING TORQUES. b. LIQUID TIGHT FLEXIBLE CONDUIT SHALL BE USED FOR THE FOLLOWING APPLICATIONS: FINAL CONNECTIONS TO MOTORS. FINAL CONNECTIONS TO VIBRATING EQUIPMENT. c. LIQUID TIGHT FLEXIBLE CONDUIT MUST BE THE SAME SIZE AS THE RMC OR EMT CONDUIT TO WHICH IT IS CONNECTED. BOTH THE (FLEXIBLE METAL CONDUIT AND IT'S FITTINGS ARE TO BE LISTED FOR GROUNDING. A GREEN GROUNDING CONDUCTOR SHALL BE INSTALLED. ALL CONNECTORS ARE TO BE OF A NEMA APPROVED TYPE. d. THE USE OF MC CABLE OR GREENFIEILD IS NOT PERMITTED.e. CONNECTION TO OUTDOOR EQUIPMENT MUST BE WEATHERPROOF( LIQUID TIGHT OR SEALTIGHT). 7. PROVIDE PULL -WIRE IN ALL EMPTY CONDUITS EXCEPT AS NOTED OTHERWISE ON DRAWINGS. 8. HOME RUNS AND MAIN CONDUIT RUNS ARE TO BE HELD TIGHT TO STRUCTURE ABOVE OR AS REQUIRED TO ALLOW PROPER SERVICE ACCESS AND OTHER TRADES WORK. 9. ALL CONDUITS MUST BE SIZED PER NEC AND LOCAL CODES. 10. ALL CONDUIT SUPPORTS, BOLTS, STRAPS, SCREWS ETC. SHALL BE GALVANIZED / CORROSION RESISTANT. C. OUTLET BOXES 1. ALL OUTLET BOXES SHALL BE GALVANIZED PRESSED STEEL OF THE, STANDARD KNOCKOUT TYPE. NO ROUND OUTLET BOXES SHALL, BE PERMITTED, EXCEPT AS SPECIFICALLY NOTED ON DRAWINGS BOXES SHALL NOT BE LESS THAN 4" SQUARE AND 1 1/2" DEEP. 2. ALL KNOCKOUT BOXES, UPON WHICH LIGHTING FIXTURES ARE TO BE INSTALLED, SHALL BE EQUIPPED WITH 3/8" FIXTURE STUDS. 3. EXTERIOR BOXES SHALL BE CAST RUST -(RESISTING METAL WITH GASKETED COVERS. 4. INSTALL BOXES RIGIDLY FROM BUILDING STRUCTURE AND SUPPORT INDEPENDENTLY OF THE CONDUIT SYSTEM. ALSO PROVIDE SUITABLE BOX EXTENSIONS TO EXTEND BOXES TO FINISHED FACE OF CEILINGS. ALL OUTLET BOXES TO BE PROVIDED WITH CADDY "QICK-MOUNT BOX SUPPORT" TO MINIMIZE THE DEFLECTION THAT OCCURS WHEN PLUGGING/UNPLUGGING INTO THESE DEVICES. 5. UNLESS OTHERWISE NOTED ON DRAWINGS OR OTHERWISE REQUIRED BY THE NATIONAL ELECTRICAL CODE, HANDICAP CODES OR LOCAL CODES, OUTLET HEIGHTS SHALL BE AS FOLLOWS: a. SWITCH HEIGHT 48" FROM FINISHED FLOOR TO CENTERLINE OF OUTLET. b. CONVENIENCE OUTLETS: 24" FROM FINISHED FLOOR TO CENTERLINE OF OUTLET. D. JUNCTION AND PULL BOXES 1. THE DRAWINGS INDICATE SCHEMATIC ROUTINGS FOR CONDUIT RUNS. CONTRACTOR SHALL FURNISH AND INSTALL ADDITIONAL BOXES WHERE REQUIRED BY FIELD CONDITIONS OR BY CODE. 2. BOXES AND COVERS SHALL BE GALVANIZED/PAINTED STEEL OF CODE GAUGE SIZE. 3. INSTALL BOXES RIGIDLY SUPPORTED FROM THE BUILDING STRUCTURE AND SUPPORTED INDEPENDENT OF THE CONDUIT SYSTEM. 4. ARRANGE CIRCUITS TO AVOID THE USE OF JUNCTION BOXES IN INACCESSIBLE LOCATIONS. 5. JUNCTION AND PULL BOXES MUST BE LABELED WITH CIRCUIT NUMBER IDENTIFICATION AND SYSTEM TYPE ON COVER. E. WIRING 1. CONDUCTORS FOR FEEDERS AND BRANCH CIRCUITS SHALL BE COPPER AND THE AWG SIZE AND TYPE AS SHOWN ON DRAWINGS. MINIMUM WIRE SIZE #12. THE CONDUCTORS SHALL BE 600 VOLT INSULATION TYPE THW, THWN OR THHN. 2. ON ALL 20 AMP BRANCH CIRCUITS, CONDUCTORS LARGER THAN #10 AWG SHALL BE REDUCED TO #10 AWG WITHIN 10 FEET OF PANEL BOARD AND DEVICE IN JUNCTION BOXES ON RATED TERMINAL STRIPS. 3. CONDUCTORS SHALL BE STRANDED. 4. ALUMINUM CONDUCTORS ARE NOT PERMITTED. 5. ALL WIRING SHALL BE IN CONDUIT, UNLESS SPECIFICALLY NOTED OTHERWISE (IE. LOW VOLTAGE PLENUM RATED WIRE) 6. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONDUCTOR WHEN REQUIRED AND SHALL SHALL BE INSTALLED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND LOCAL CODES. 7. THE USE OF MC CABLE, ETC. IS NOT PERMITTED. 8. WIRE CONNECTORS SHALL BE EQUAL TO "SCOTCH LOCK" FOR #8 AWG WIRE AND SMALLER AND EQUAL TO T & B "LOCKTIGHT" FOR #6; AWG AND LARGER. 9. ALL WIRING TO BE COLOR -CODED AS FOLLOWS: 120/208 VOLT SYSTEM 277/480 VOLT SYSTEM NEUTRAL - WHITE NEUTRAL - GREY PHASE A - BLACK PHASE A - BROWN PHASE B - RED PHASE B - ORANGE PHASE C - BLUE PHASE C - YELLOW GROUND- GREEN GROUND- GREEN F. WIRING DEVICES 1. CONTRACTOR SHALL FURNISH AND INSTALL SWITCHES AND RECEPTACLES, UNLESS NOTED OTHERWISE, AS NECESSARY FOR A COMPLETE INSTALLATION. COLOR OF DEVICES AND PLATES SHALL BE WHITE UNLESS OTHERWISE NOTED. THE DEVICES SHALL BE OF THE TYPES AND RATINGS LISTED, OR EQUALS BY HUBBELL, BRYANT OR PASS & SEYMOUR. WEATHERPROOF GFI RECEPTACLES SHALL BE INSTALLED WHERE SHOWN ON DRAWINGS OR AS REQUIRED BY CODE. 2. ALL WIRING DEVICES SHALL BE HEAVY DUTY GRADE, CONFIGURATION TO SUIT SERVICE. G. HEATING, VENTILATION, PROCESS AND CONTROLS WIRING 1. THE ELECTRICAL CONTRACTOR SHALL REFER TO MECHANICAL AND CONTROL DETAILS ON MECHANICAL DRAWINGS FOR ADDITIONAL. ELECTRICAL WORK TO BE INCLUDED IN HIS BID. 2. ELECTRICAL CONTRACTOR SHALL DO ALL POWER WIRING, LINE VOLTAGE WIRING, AND LINE VOLTAGE CONTROL WIRING INDICATED UNDER THE HEATING AND VENTILATION SPECIFICATIONS AND DRAWINGS. THIS CONTRACTOR SHALL ALSO DO ALL INTERCONNECTING LINE VOLTAGE WIRING BETWEEN RELAYS AND DEVICES AS REQUIRED. 3. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR FURNISHING AN INSTALLING CONDUIT FOR HVAC CONTROL WIRING. ELECTRICAL CONTRACTOR SHALL GROUP DEVICES TOGETHER AS NEEDED TO MINIMIZE THE QUANTITY OF CONTROL CONDUITS. SIZE CONDUITS IN ACCORDANCE WITH NEC. H. SAFETY AND DISCONNECT SWITCHES 1. SAFETY AND DISCONNECT SWITCHES SHALL BE HEAVY DUTY TYPE, QUICK -MAKE, QUICK -BREAK FUSED OR NON -FUSIBLE WITH RATINGS AND SIZES AS NOTED ON PLANS AND REQUIRED BY CODES. 2. AT SERVICE ENTRANCE, DISCONNECT SHALL BEAR THE MANUFACTURER'S LABEL INDICATING THE EQUIPMENT IS UL RATED FOR APPLICATION IN ACCORDANCE WITH ALL CODES. 3. MANUFACTURER SHALL BE GENERAL ELECTRIC, SQUARE D, EATON OR APPROVED EQUAL. I. GROUNDING 1. FURNISH AND INSTALL COMPLETE WIRED GROUNDING CONDUCTOR SYSTEM, #12 AWG MINIMUM, SIZED AND INSTALLED IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF THE NATIONAL ELECTRICAL CODE, STATE AND LOCAL CODES, AND AS NOTED IN THE SPECIFICATIONS AND AS INDICATED ON THE DRAWINGS. 2. ALL CONDUIT, INCLUDING FLEXIBLE CONDUIT, SHALL BE GROUNDED WITH A GREEN GROUNDING CONDUCTOR. 3. GROUNDING CONNECTIONS MADE TO THE WATER PIPING SYSTEM SHALL BE COORDINATED WITH THE PLUMBING CONTRACTOR AND A BONDING JUMPERS INSTALLED AROUND WATER METER PER CODES AND AS INDICATED ON DRAWINGS. 4. ALL DEVICES SHALL BE BONDED TO THE CONDUIT SYSTEM. USE A BONDING JUMPER BETWEEN THE OUTLET BOX AND THE DEVICE GROUNDING TERMINAL. METAL -TO -METAL CONTACT BETWEEN THE DEVICE YOKE AND THE OUTLET BOX IS NOT ACCEPTABLE AS A BOND FOR EITHER SURFACE MOUNTED BOXES OR FLUSH TYPE BOXES. ALL JUNCTION BOXES, OUTLET BOXES, AND PULL BOXES SHALL BE BONDED TO THE CONDUIT SYSTEM. 5. FOR PANEL FEEDERS, BOND THE GROUNDING CONDUCTOR TO THE CONDUIT, WHERE ENTERING AND LEAVING THE CONDUIT. THE GROUNDING CONDUCTOR SHALL BE COPPER WITH GREEN IDENTIFICATION AND SIZED PER N.E.C. 6. ALL ENCLOSURES AND NON -CURRENT CARRYING METAL PARTS ARE TO BE GROUNDED. CONDUIT SYSTEM IS TO BE ELECTRICALLY CONTINUOUS. ALL LOCKNUTS MUST CUT THROUGHENAMELED OR PAINTED SURFACES ON ENCLOSURES. WHERE ENCLOSURES ANDNON-CURRENT CARRYING METAL PARTS ARE ISOLATED FROM THE CONDUIT SYSTEM, USE BONDING JUMPERS WITH APPROVED CLAMPS. ALL GROUND CLAMPS SHALL BE "PENN-UNION" OR EQUAL, SIMILAR TO "GPL" TYPE. J. LIGHTING FIXTURES 1. THE CONTRACTOR SHALL INSTALL ALL LIGHTING FIXTURES AND LAMPS AS SHOWN ON THE DRAWINGS.CONTRACTOR IS TO REPLACE ALL NON -WORKING LAMPS PRIOR TO ACCEPTANCE BY DOOSAN/OWNER. K. SUBMITTALS 1. THE CONTRACTOR SHALL PROVIDE 5 COPIES OF (AS WELL AS ELECTRONIC) SUBMITTALS OF ALL INSTALLATION METHODS, MATERIALS AND ACCESSORIES FOR REVIEW AND APPROVAL.SUBMITTALS FOR EQUIPMENT SHALL SPECIFICALLY STATE "NEW° OR "RECONDITIONED" FOR EACH ITEM. RECONDITIONED EQUIPMENT SHALL REQUIRE SPECIFIC APPROVAL BY DOOSAN. SUBMITTALS SHALL BE ASSEMBLED AND SUBMITTED PRIOR TO ANY INSTALLATION WORK, AND SHOULD INCLUDE: • WIRE • CONDUIT • DISCONNECT SWITCH • SWITCHBOARD AND SWITCHGEAR - NEW AND MODIFICATIONS AND ACCESSORIES • ENCLOSURES • CURRENT TRANSFORMERS, POTENTIAL TRANSFORMERS AND TEST BLOCKS • HEAT TRACE • UTILITY METER • WIREWAY, PULL BOX L. TESTS AND ADJUSTMENTS 1. ACCEPTANCE TESTS: TEST THE FOLLOWING IN ACCORDANCE WITH APPLICABLE SECTIONS OF THE LATEST NETA-ACCEPTANCE TESTING STANDARD. PROVIDE SERVICES OF A QUALIFIED ELECTRICAL TESTING COMPANY AS REQUIRED. • TRANSFORMER • SWITCHBOARD • BREAKERS, RATED 250 A AND LARGER - BREAKERS SHALL BE TESTED USING PRIMARY INJECTION METHOD, WITH FINAL SETTINGS ADVISED BY THE ENGINEER IN A COORDINATION STUDY. • PROTECTIVE RELAYS -BENCH TEST WITH FINAL SETTINGS. ALSO PROVIDE WITNESS TESTING AS REQUIRED BY THE UTILITY COMPANY AND AHJ. ALSO INCLUDE THE SEL RELAYS PROVIDED IN THE FUEL CELLS. • CONDUCTORS- MV CONDUCTORS SHALL BE HI -POT TESTED. • PANELBOARDS • DISCONNECT SWITCHES • CT AND PTS. • GROUNDING- USE FALL OF POTENTIAL METHOD AND CONTINUITY CHECKS. 2. ALL CONNECTIONS N CTIONS AT PANELS AND SWITCHES ARE TO BE MADE, ALL SPLICES COMPLETE, ALL FUSES IN PLACE, AND ALL CIRCUITS CONTINUOUS FROM POINT OF SERVICE CONNECTION TO ITS FINAL DESTINATION, AND ALL COVERS AND PLATES INSTALLED PRIOR TO THE TIME OF FINAL INSPECTION BY OWNERS ENGINEER. 3. UPON COMPLETION OF THE WORK, ALL PARTS OF THE ELECTRICAL INSTALLATION SHALL BETESTED AND PROVED FREE OF UNWANTED GROUNDS AND OTHER DEFECTS. 4. ALL OVERLOAD DEVICES, INCLUDING EQUIPMENT FURNISHED UNDER OTHER CONTRACTS, SHALL BE SET AND ADJUSTED TO SUIT THE LOAD CONDITIONS. 5. TEST AND MAKE CORRECTIONS/ADJUSTMENTS FOR PHASE BALANCING. 6. PROVIDE FINAL REPORT TO CEP AT TIME OF PUNCH -OUT. M. CLEANING 1. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL EQUIPMENT, TO THE SATISFACTION OF OWNER. ALL DUST, DIRT, DEBRIS, AND FOREIGN MATTER SHALL BE REMOVED FROM ALL EQUIPMENT. I- w n. iE O O LL w Q L) can 0 rn o � N 0 Q � g%1 IIIIII11111/ ' NO 3m0:4 8wz'4 ff :o01 o a •moo U �%, � N 7E N� U -� -o M 4° O C7 a w d• Q O •U a O ti U I..L O I7� z Z O Q ui Z - Lu U U) U - < < LL 0. -1 U Z) I W U)Ow a W 0� U) W z w U Q Q U - U � w �- p U ::) H W W C) Project No.: Drawn By: KFH Date: Design By: 02/06/19 KFH Scale: Check By: AS NOTED DSF Drawing No.: 4■ YJ