HomeMy WebLinkAbout98-18PX_CONNECTICUT AVENUE ADDITION_NUTMEG ROADR ECE I VED
R E,�,j vEly
'Romp,
,4.5,S6C 1,q 77-1)
7 -0 -, VIV
Sa417-11
/IV//VZ) 15 0 /?
10 L-
JOSEPH MERRITT & CO.
S4A11-1r_'0A1 OX41/2-1-
'9
1e00r- OleAllv
V/v /Al
1911PV6 15DR 35
kyl
KEY MAP
SCALE: 1 IN = 200 FT
D,4V1,0,4. 9,qOI41N
ZVOT,5-: lez�_,"`70V5
145�1?0c. S-01VIE
mi
f
4�
I>
r
LEGEND
EXISTING SPOT GRADE
PROPOSED SPOT GRADE
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING SI'OHr-vl SYSTEM
F
SILT FENCE
...............
PROPOSED ROOF DRAIN
EXISTING FLNCE
7
f�j L
-k
-A
0!
1.
of mh
No� 8741 .-at
K
�j
�j
IL
NOTES:
1.
2
3
4
DO
6
7
8.
9.
10
APR 8 lgg&
8BUT11 WINDSOR PLAINVIS n-?
SOUTO WINDSOR PIANITAIS 0 T6
OWNERAPPLICANT: 121 CONNECTICUT AVFNIJE ASSOCIATES (,S60)2()]-()6()O
3 10 NUTMEG ROAD
SOU
INDSOR. CONNECTICUT 06074
NO ZONING VIOLATIONS IF BUILDING ADDITION ERECTED AS SHOWN.
ANYADDITIONAL SEDEMENT EROSION CONTROL MEASURES DEEMED NECESSARY BY
STAFF DURING THE CONSTRUCTION OF ANYSITE I,'vI PROVE M ENTS. SHALL BE
IMPLEilvIENTED BYTHE DEVELOPER. IN ADDITION, THE DEVELOPERSH.All RF
RESPONSIBLE FOR THE MAINTENANCE"'REPAIR REPLACEIMENT OF ALL REQUIRED
CONTROL NIEASURES UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED TO THE
SATISFACTION OF THE STAFF.
ALL CONSTRUCTION ISTO BE DONE IN ACCORDANCE WITH THE TOWN OF SOUTH
WINDSOR STANDARDS AND CONNECTICUT DOT FORM S 14.
BOUNDARY INFORMATION TAKEN FRO,\vI A PLANTITLED "RESUBDIVISION OF LAND
PROPERTY OF A.I. SAVIN & HARTFORD JEWISH FEDERATION SO. WINDSOR CONNl.
PAL.NIBERG & RUSSO LAND SURVEYORS & PROFESSIONAL ENGINEERS 522 COTTAGE
I- P I _'t X / 17 D n A r-1 T1 I � I I
OL-kJkJlvlf-ltl-U,(-UNNLCIICU-1- SCALE I"= 100' DATE 12-19-80 REV.9-5-85
LOT 27 ADDED".
THERE IS NO PROPOSED OUTDOOR STORAGE OF EQUIPNIENT OR MATERIALS PROPOSED
FORTHIS SITE LXCEPT FOR THE STORAGE OF FLAT BED TRAILERS IN THE AREA
INDICATED.
EXISTING TOPOGRAPHY TAKEN IN FIELD BY ED LALLY AND ASSOCIATES AND BY STAFF
OF CAPITOL STEEL OF HARTFORD, INC. ATTHE DIRECTION OF ED LALLY AND
ASSOCIATES.
PARKING SPACES TO BE MARKED WITH 4" WIDE HIGHWAY PAINT.
THIS SITE IS LOCATED ENTIRELYWITHIN RE--GULATED INLAND ETLANDS
W
WETLAND DELINEATIONS FROM THE OFFICIAL "INLAND WETLANDS AND
WATERCOURSES iNIAP OFTHETOWN OF SOUTI I WINDSOR".
ZONE: INDUSTRIAL. ZONE
REQUIRED
SUBMITTED
AREA
20,000 SQ. FT.
-
139,426 SQ. FT.
LOT W I DTI I
100 FT.
LOT DEPTH
150 FT.
8
6 5
NIAX. SIORIES
2 STORIES
2) STORIES
HEIGHI
40 FT.
31=
MAX. COVERAGE
65q0
60.930o
FRONTYARD
50 FT.
121 FT.
REAR YARD
25 FT.
240 FT.
SIDE YARD
10 FT.
29 FT.'54 FT.
PARKING
57 SPACES
57 SPACES
BIJILDING USE -- REINFORCING AND STRUCTURAL SAL-1, FABRICATION
13. STATISTICS
TOTAL BUILDING AREA:
30,000 SQ. FT.
EXISTING BUILDING:
27,120 SQ. FT.
PROPOSED ADDITION: 2.880
SQ. 17T
PARKING CALCULATIONS:
TOTAL PARKING REQUIRED:
57 SPACES
OFFICE:
4,500 SF X 4.5 SPACES'1,000 SF = 20.3, SPACES
INDUSTRIAL:
25.500 SF X I SPACE
700 SF = 36.4 SPACES
TOTAL PARKING SHOWN:
57 SPACES
EXISTING PARKING:
32 SPACES
PROPOSED PARKING:
25SPACES
MARCH 14, 1989 TOWN PLANNING& ZONING CON'liklISSION
SITE PLAN APPROVAL -- REVISION TO SITE PLAN
OCTOBER 17, 1988 INLAND WETLAND 8: WATERCOURSES COMMISSION
I WA/CC PERMIT -- REVISION 1-0 SITE PLAN
APRIL 8, 1986 TOWN PLANNING & ZONING COMMISSION
SITE PLAN APPROVAL
MARCH 19, 1986 INLAND WETLAND & WATERCOURSES COMMISSION
WETLAND PERMIT
I I I-RhRY CERRIT m4r 1711-S AMPAMI SURI-h-1 WhIll PRF
"Rhl) INAC(ORDANCT V7111 ]/IF ATANDARAS OFA (IAAAA?
�Sj. R VF YAN DF 17(l FORSTANDARDA
01 qC(I'RAC I - RITYS -4NI)3f.4lA4VOP7I.I) I)F(F%fBFR 10,
"'1 St 1111. 4%SO(j�117O
197.5 A.%A"F.%!I)FI) III N OF LANP
AUR Vh YORl� IN(
1D
t
4L No. 8741
*to %I. la and associates
16
SHEET 1
REVISION TO A SITE PLAN
PREPARED FOR
121 CONNECTICUT AVENUE ADDITION
310 NUTMEG RD SOUTH WINDSOR, CT 06074
TEL: (860) 291-9690
LOT 27 CONNECTICUT AVE.
SOUTH WINDSOR, CT
24*
DATE REVISION
A 123 PROSPECT HILL ROAD WINDSOR, CONN. 06095
SCALE: 1 IN 40 FT
MARCH 25, 1998 9
Placement and Construction of a Synthetic Filter Barrier
EROSION AND SEDIMENTATION CONTROL PLAN
Nl,- 454N IWI)R6
OA 60 LIC67
A/1 7
A//,,'-- D,4VI0,4. 9RO14IN
� - 7-.-, -� C,- <c (�, C: C', ;I- (' 7-, - -,- CL -Y _ )
117�6 /7/,
_V/1
77�
V
KEY MAP
SCALE-V = 200'
SEE SITE PLAN FOR DATA BLOCK
r
Z-/' 7',
CROSS SLOPE AS
PER CROSS SixWN
TOP OF GRATC=;_
CROSS SLOPE
PER CROSS SE(
PLAN TOP OF CRAT E -
DETAIL OF CURB INLET
PLAIN CURB TYPE
SCALE 3"=V-0"
PITCH 14 PER FT.
R-
BARS 4OgLC
_.J --*-*,-----
TO BE USED WHEN CURB INLE T IS CONSTRUCTED WHERE ?30
CURBING OF ANY TYPE EXISTS OR IS PROPOSEU.
0. to.
73 PITCH PER FT.
H
BAIRS 47LON
' 4 j ,,,*4 r r CAR G
__7
N
NOTE
WIHEN CATC-1,4 5ASJN Q SET IN CONCRETE PAVEMENT
THE W SLOrF ,-J THE TOP SURFACE SHALL BE
ALT N To BE USED WHEN CURB INLET IS CONSiRUCTEO IN A LINE OF
EP ATE CONSTF;tUCTICN WITH FULL PL�N ('0!4CF�ErECURS�,�,DOY&LFDCOW-RErEO518ING,OR STONE
C-U. E4CK TO BE USED AT LOCATIONS CURBINC., 6" HIGH.
C
QADIA-CENT TO ExIS TING OR PROPOSED
C
CURB 4 5 W-O'LONG
103/ls"- 10. 1
yj, C:101 :' , SLOPE AS
PCq05S5E_ DETAI Z OF CLM M ET
ABOVE
FE
=j CLA.1,S'AC1,NCFZE`TE
POVRI�D i�j FILACE OR
r),CRECAST CONCRETE UNIT.
!f
4
3 3
-IN -.7
21- 13 2, - I
'ALLY ORDERED
MINIMUM DEPTH UNLESS
SPECFIC
A OTHERWISE Ui,)DER TRAV
I'LWAY V- 7 ',�' �11DER UN -
TR,Vi:,ED AREAS 03
1) ru
0
6' 7 7 a a, 713,1� 2 13A g 01
cc;
DPAINAGE OPENINC-S!N 4 YALLS.
AT On IMMEDIATELY ABOVE THIS
C .. 5 ELEVATION
C 'Z
X
BRI�K, CLASS *A'CONCRETE,
91
�'N SANCYYSOLS APPLY DAMP -
PROOFW4G ON 4 WALL�S
MASONRY coNc,�E rc UNITS
AHFRE BrICK OR MASONRY
6
CONCRETV UNITS ARE USED,
V)
CC11FIELLING WILL BE PER -
MITTEL) mAx'mum CORBELTO
BE 3 1� NO PROJECTION SHALL
EXTEND INSIDE OF LIMITS
D BY )s N.
4-0.
31-0-
8.
5'-4"
C01.1"ETE OR
4-4- _=H
SECTION A -A
P �ECAST UNII SECTION B-B
W14CHE 9:1ECAST CONCRLTS UNIT IS USED FOR SUMP, THE TOP
OF THE VNIT 5$�ALL BE AT LEAST 6- BELOW THE BOTTOM OF
7 HE PIPE G1;1 LET T.NG FROM THE CATCH BASIN.
TYPE "C" CATCH BASIN
SOIL EROSION AND SEDIMENTATION CONTROL NARRATIVE
1. DEVELOPMENT TYPE: 7500 S.F. ADDITION TO AN EXISTING
INDUSTRIAL BUILDING ON 3.2 ACRE PARCEL OF I.P. ZONED
LAND SERVED BY TOWN SEWER, PUBLIC WATER, AND A STORM
WATER MANAGEMENT SYSTEM.
2. SCHEDULE: SEE THIS PLAN FOR THE STABILIZATION, CONSTRUCTION,
AND SEEDING PLAN.
3. SEE THIS PLAN FOR THE DESIGN CRITERIA AND CONSTRUCTION DETAILS
OF THE PROPOSED SOIL EROSION AND SEDIMENTATION CONTROL MEASURES.
4. SEE THIS PLAN FOR THE INSTALLATION AND APPLICATION PROCEDURES
AS WELL AS THE OPERATION AND MAINTENANCE PROGRAMS FOR THE SOIL
EROSION AND SEDIMENTATION CONTROL MEASURES.
5. MR. AHSAN UL HAQUE QF CAPITOL STEEL, INC. SHALL BE
RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF
THE EROSION CONTROLS AND FOR FINAL RESTORATION OF
THE SITE.
1�
011-1 CON
- 44
0
,04;AY,l
-0 <
r
87
0
1. Set posts and
Posts excavate a 6"x6"
trench, set post
Angle 10* downslope.
upslope for
stability and
self cleaning.
[�r)100-
It% - %'A 12" min.
=\70
depth
Filter 1' 3. Attach filter fabric
Fabric to the wire fencing
and extend it to
I I the trench.
2.
2*
Staple the
Wire
wire mesh
fencing
fencing to
end post.
T11 -=I In It,)
him 11
4.
Backfill the
trench and
compact the
excavated soil.
Co acted
M
BaMill
=-,I, I �a II Itz". JlPi III!- Ot= " U�� Z'5
I =III=,I1 il=nj= ':4
U I)
Bottom of
Drainageway
T_
I
>1
0
A
L&
ELEVATION
Points 'A' should be higher
than point 'B'.
PLAN VIEW
Placement and Construction of a Straw Bale Barrier
straw bale
trench 1. Excavate a trench stake 2. Place and stake
4" deep and the binding straw bales,
),11'. two stakes per
width of a straw wire or bale.
width of ba e bale. twine
4'.
0
packed ..:.
straw 3. Wedge loose straw
:13
plan between bales to
create a continuous
barrier.
compacted 4. Backfill and
backfill compact the
�'excavated soil
as shown on the
uphill side of
the barrier to
prevent piping.
X
0
LL.
%
PLA
ENOTTO
WAY
A
I.A
Elevation: Points A
should be higher than
Points B.
vL oV 610.
5TOP�A 5-7-i""Tuke
LOW
L-f
. tr_�eftffwll
U��. 7
A110012, WITHjW. I 11�1`AV
5rY,F_!5 MAC z5A-LF- .
Hay Bale Installation at Catch Basins
REFERENCE IS MADE TO THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT
CONTROL"(1985), AS AMMENDED, AND TO THE TOWN HIGHWAY ENGINEERING STANDARDS AND
SPECIFICATIONS. THE GUIDELINES ARE OBTAINABLE FROM THE CONNECTICUT COUNCIL ON
SOIL AND WATER CONSERVATION, STATE OFFICE BUILDING, HARTFORD, CONNECTICUT, 06106,
ANDSHOULD BEUSED AS A REFERENCE IN CONSTRUCTING THE EROSION AND SEDIMENT
CONTROLS INDICATED ON THESE PLANS.
H ..... HAY OR STRAW BALE EROSION CHECKS ARE TO BE INSTALLED AT THE BASE OF THE
INDICATED SLOPES WHEREVER THE HEIGHT OF THE DISTURBED SLOPE EXCEEDS EIGHT FEET
AND AT ALL OTHER LOCATIONS AS INDICATED ON PLANS. HAY BALES SHALL ALSO BE STAKED
AT ALL CATCH BASINS WHERE SEDIMENT MAY ENTER THE CATCH BASIN OR AS DIRECTED BY
THE TOWN ENGINEER. HAY BALE EROSION CHECKS SHALL ALWAYS BE PLACED IMMEDIATELY
AFTER A CUT SLOPE HAS BEEN GRADED AND BEFORE A FILL SLOPE -HAS BEEN CREATED.
DEPOSITS OF SEDIMENT AND SILT ARE TO BE PERIODICALLY REMOVED FROM THE UPSTREAM
SIDE OF THE EROSION CHECKS. THIS MATERIAL IS TO BE SPREAD AND STABILIZED IN
An�hc mnm SIM JECT TO EROSION, OR TO BE USED AS FILL IN AREAS WHICH ARENOT
V � -
SUBJECT TO EROSION, OR TO BE USED AS FILL IN AREAS WHICH ARE NOT TO BE PAVED OR
BUILT ON. HAY OR STRAW BALES ARE TO BE REPLACED AS NECESSARY TO PROVIDE PROPER
FILTERING ACTION. EROSION CHECKS ARE TO REMAIN IN PLACE AND BE MAINTAINED TO
INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE EROSION CHECKS ARE
STABILIZED AND VEGETATION HAS BEEN ESTABLISHED.
R ..... RIP -RAP AS SPECIFIED IS TO BE INSTALLED AT THESE POINTS AS ENERGY
DISSIPATION STRUCTURES. THE RIP -RAP IS TO BE INSTALLED BEFORE THE OUTLET
STRUCTURES ARE ACTIVATED, AND ALL ADJACENT AREAS ARE TO BE IMMEDIATELY SEEDED IF
IN SEASON, OR THE SOIL IS TO BE STABILIZED BY OTHER METHODS. THIS MAY REQUIRE
SODDING OR MULCHING OR OTHER MEASURES AS DEFINED IN THE "GUIDELINES"
F qVMTRRTT0 PTT.TRP RAPPTRR PRMCR AR SPECTFTED IS TO BE INSTALLED AT ALL
LOCATIONS AS INDICATED ON THE PLANS TOINTERCEPT SILT ANDSEDIMENT BEFOREIT
REACHES THE DRAINAGE SYSTEM, WETLANDSOR WATER COURSE. DEPOSITS OF SEDIMENT AND
SILT ARE TO BE PERIODICALLY REMOVED FROM THE UPSTREAM SIDE OF THE FENCE. THIS
MATERIAL IS TO BE SPREAD AND STABILIZED IN AREAS NOT SUBJECT TO EROSION, OR TO BE
USED AS FILL IN AREAS WHICH ARE NOT SUBJECT TO EROSION, OR TO BE USED Aq FILL IN
AREAS WHICH ARE NOT TO BE PAVED R
NECESSARY TO PROVIDE PROPER FILTERING ACTION. THE FENCE IS TO REMAIN IN PLACE
AND BE MAINTAINED TO INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE
THE INSTALLATION AND MAINTENANCE OF ROAD AND UTILITY RELATED EROSION CONTROLS
SHALL BE THE RESPONSIBILITY OF THE ROAD CONTRACTOR.
IN ALL AREAS, REMOVAL OF TREES, BUSHES AND OTHER VEGETATION AS WELL AS
DISTURBANCE OF THE SOIL IS TO BE KEPT TO AN ABSOLUTE MINIMUM WHILE ALLOWING
PROPER DEVELOPMENT OF THE SITE.
DURING CONSTRUCTION, EXPOSE AS SMALL AN AREA OF SOIL AS POSSIBLE FOR AS SHORT A
TIME AS POSSIBLE.
AFTER CONSTRUCTION, GRADE, RESPREAD TOPSOIL AND STABILIZE SOIL BY SEEDING AND
MULCHING SO AS TO PREVENT EROSION.
THE CONTRACTOR SHALL NOTIFY THE TOWN ENGINEER AT THE BEGINNING AND END OF EACH
STEP OF THE CONSTRUCTION PROCEDURE AND SHALL NOT PROCEED WITH THE NEXT STEP UNTIL
THE TOWN ENGINEER HAS INSPECTED THE WORK.
THE STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, AND INCIDENTAL CONSTRUCTION OF
CONNECTICUT D.O.T. FORM 813 ARE THE OFFICIAL SPECIFICATIONS FOR CONSTRUCTION IN
THE TOWN. DATUM IS M.D.C.
CONSTRUCTION SCHEDULE
1. INSTALL ALL EROSION ANDSEDIMENTATIONCONTROL MEASURES.
2. REMOVETREES, VEGETATION, STUMPS, BOULDERS LARGER THAN 1 CUBIC FOOT AND
UNACCEPTABLE SOIL MATERIAL WITHIN CONSTRUCTION AREA.
3. STRIP TOPSOIL IN AREAS TO BE CUT OR FILLED. STOCKPILE TOPSOIL, SEED,
MULCH, OR COVER WITH NETTING.
4. ROUGH GRADE SITE. - 1
5. INSTALL DRAINAGE AND OTHER UTILITIES. CONSTRUCT BUILDING.
6. INSTALL AND GRADE PAVEMENT BASE.
7. PAVE AND INSTALL CURBS.
8. GRADE, STABILIZE AND SEED SIDE SLOPES.
ESTABLISHING VEGETATION COVER ON DISTURBED AREAS.
1. SCARIFY SURFACE OF ALL AREAS TO BE TOPSOILED AND PLACE A MINIMUM OF 4" OF TOPSOIL ON ALL AREAS
TO BE SEEDED.
2. APPLY LIME AT A RATE OF TWO TONS OF GROUND LIMESTONE PER ACRE-. (100 LBS.X1000 SQ.FT.)
3. FERTILIZE
a) FOR SPRING SEEDING, APPLY 10-10-10 FERTILIZER AT A RATE OF 300 LBS. PER ACRE (7 LBS./1000
SQ. FT.) AND WORK I14TO SOIL. SIX TO EIGHT WEEKS LATER, APPLY AN ADDITIONAL 300 LBS. PER
ACRE ON THE SURFACE.
b) FOR FALL SEEDING, APPLY 10-10-10 FERTILIZER AT A RATE OF 600 LBS. PER ACRE (14 LBS./1000
SQ. FT.) AND WORK INTO SOIL.
4. SMOOTH AND FIRM SEEDBED, APPLY SEED UNIFORMLY AT THE RATE SPECIFIED FOR THE SEEDTYPE AND COVER
SEED WITH NOT MORE THAN 1/4" OF SOIL.
5. MULCH IMMEDIATELY WITH HAY FREE FROM WEEK SEEDS, AT A RATE OF 3 BALES PER 1000 SO. FT.
6. PERMANENT SEEDINGS, WHERE AN AREA WILL BE EXPOSED FOR MORE THAN ONE YEAR, OR WHERE FINAL GRADING
IS COMPLETE:
AREA WHERE SEED SEEDING MIXTURE BY WEIGHT RATE PER SEEDING DATES
MIX APPLIES 1000 SQ. FT.
ALL LAWN AREAS RED FESCUE 70% 2 LBS. APRIL 1-JUNE 15
KENTUCKY BLUEGRASS 20% OR
PERENNIAL RYEGRASS 10% AUG. 14-OCT. 15
ROAD CUTS & FILLS KENTUCKY TALL FESCUE 80% 1 1/2 LBS. APRIL 1-JUNE 15 OR
DIVERSION DITCHES ANNUAL RYEGRASS 20% AUG. 14-SEPT.30
VERY STEEP SLOPES CROWNVETCH 60% 1/2 LBS. APRIL 1-JUNE 15
OR
NO MAINTENANCE AREAS PERENNIAL RYEGRASS 40% 1/2 LBS. AUG. 14-SEPT.30
IF TREES ARE TO BE RETAINED, THE SEED MIX SHOULD BE ADAPTED FOR SHADY CONDITIONS.
7. TEMPORARY SEEDING: TO PROTECT THE SOIL OVER THE WINTER.
SEEDING MIXTURE RATE/1000 SQ. FT. SEEDING DATES
ANNUAL RYEGRASS OR 1 1/2 LBS. MAR. 15 TO JUNE 15
PERENNIAL RYEGRASS AUG. 15 TO OCT. 15
SUDAN GRASS OR MILLET 1 LB. AUG. 15 TO OCT. 15
WINTER RYE OR OATS 3 LBS. AUG. 15 TO OCT. 15
ANY ADDITIONAL SEDIMENT/EROSION CONTROL MEASURES DEEMED
NECESSARY BY STAFF DURING CONSTRUCTION PROCESS SHALL BE
IMPLEMENTED BY THE DEVELOPER. IN ADDITION, THE DEVELOPER
SHALL BE RESPONSIBLE FOR THE REPAIR/REPLACEMENT/MAINTEN-
ANCE OF ALL SEDIMENT/EROSION CONTROL MEASURES UNTIL ALL
DISTURBED AREAS ARE STABILIZED TO THE SATISFACTION OF
$TAFF.
NOTE: KEEP ALL UTILITY LINES AT LEAST 2.0" FROM ALL
PROPOSED MER ESTONES AND IRON PIN LOT CORNERS
SHEET 2
CONSTRUCTION AND EROSION CONTROL DETAILS
24*
IOSEPH MERRITT & CO.