Loading...
HomeMy WebLinkAbout04-43P_SAND AND GRAVEL-LAND FILLING OPERATIONS_EVERGREEN WALKi '6a ` Q 0 O �t P z 0 Q W z 0 U J A N =1 0 d • q! II ` _ _ i a _l `1 V m m M O z O Z �o loc.:?I L!y i J ¢ y STq. yg p� gCOR�Y �� O / n v) f O / / I i 3 �I / .o d 1 �• -- Ing. If Irl I /r rr - -! r� rr ■ CID O 0) // N / 00 I � I / I I t O O Nunn I goo 1 5 0 D LEGEND ---200 --- EXISTING CONTOURS PROPOSED CONTOURS EXISTING TREE LINE PROPOSED CLEARING LIMIT (APPROX.) -� CONSTRUCTION HAUL ROUTE PROPERTY LINE , S PROPOSED SANITARY SEWER LINE , T PROPOSED TELEPHONE LINE yy PROPOSED WATER MAIN G PROPOSED GAS MAIN E PROPOSED ELECTRICAL SERVICE PROPOSED TYPE "C-L" CATCH BASIN PROPOSED TYPE "C" CATCH BASIN PROPOSED CURB w PROPOSED LIGHT Q PROPOSED STORM MANHOLE PROPOSED STORM DRAIN PROPOSED SANITARY MANHOLE PROPOSED HYDRANT PROPOSED BITUMINOUS CURB PROPOSED RETAINING WALL s EXISTING DECIDUOUS TREE FXICTING FVFP( RFFN TRFF EXISTING UTILITY POLE o ac EXISTING WATER GATE VALVE 7 G EXISTING TELEPHONE MANHOLE EXISTING HYDRANT 01 EXISTING CATCH BASIN CN k (S) EXISTING SANITARY MANHOLE (A l @ EXISTING STORM MANHOLE S EXISTING SANITARY SEWER LINE ` J 1 EXISTING TELEPHONE LINE W EXISTING WATER MAIN G EXISTING GAS MAIN 71 F F EXISTING ELECTRICAL SERVICE / TOWN WETLANDS LINE &7 f PROPOSED EROSION CONTROL MAT PROPOSED CONCRETE WALK 775 / X PROPOSED FENCE SF PROPOSED SILT FENCE �1 83 U PROPOSED HAY BALES PUD UNIT NUMBERS &07 v � r N DEVELOPED BY: v EVERGREEN WALK, LLC r � 109 ROSE LN. VIRGWIA BEACH, VA. 23451 � - (757) 422-5566 ' cn ( �O O i FUSS & O NEILL INC. �_..---•• _ consulting Engineers � _ � - •° hb• W 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www.F*andO.com rGv (vth i; m , PROPERTY OWNERS WITHIN 500) STREET INTERSE TO OEM V ;} � a� Q Owner 9001 Address MaplLot Mailing Address L different Land Use W � �• Ilk '' 151 Buckland Rd. Evergreen Walk, LLC 555 Main St. Manchester CT. 06040 Vacant O i 240 Buckland Rd. Croteau, Arlene C. 2715 Single Family nd FINAL PLANS TOWN OF SOUTH WINDSOR AUTHORIZED SIGNATURE .tu7 0 DATE: A) is )oL/ 252 Bucldand Rd. Ad & Guerra, LLC 989 Ellington Rd., S. Windsor, CT 06074 38/10 Single Family 260 Buckland Rd. Wolf & Guerra, LLC 989 Ellington Rd., S. Windsor, CT 06074 38/9 Vacant 296 Buckland Rd. Messiah Evan. Lutheran Ch. 3818 Single Family 300 Buckland Rd. Messiah Evan. Lutheran Ch. 3817 Commercial 326 Buckland Rd. Schiavone, Steven &Luca, Kawa 9 Clifton Dr., Simsbury, Ct 06070 38/6 Single Family 335 Buckland Rd. Town of South Windsor 1540 Sullivan Ave. S. Windsor CT.06074 38/14 Vacant 350 Buckland Rd. Asticon Investment Ltd. 17441 Ellington Rd. S.Windsor, CT. 06074 38/5 Vacant Evergreen Walk Master Association PUD: Unit 11 Evergreen Walk LLC 555 Main St., Manchester, CT 06040 Unit 12 Evergreen Walk LLC 555 Main St., Manchester, CT 06040 Unit 4 Evergreen Walk LLC 555 Main St., Manchester, CT 06040 Unit 5 Evergreen Walk LLC 555 Main St., Manchester, CT 06040 Unit 2 Evergreen Walk LLC 555 Main St., Manchester, CT 06040 PROJ. MANAGER: SEAL ,,```oc .`,��t.°• `n� Co: ems- }°•;A % .� •• No.2os5-E w '-s,,O,� •. �,Cs�S�J : ` �,- <,,sc°sos{ ,I^'c���o` ,.a:ra`aw SEAL SCALE: FUSS & O'NEILL INC' Consulting Engineers 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www.FandO.com Evergreen Walk LLC , SAND AND GRAVEL/LAND FILLING OPERATIONS AT EVERGREEN WALK SOUTH WINDSOR CONNECTICUT CHIEF DESIGNER: HORZ.: 1" = 20t7 REVIEWED BY: DATE VERT.: DATUM: HORZ.: VERT.: 2. 08/12/04 TOWN COMMENTS 200 00 200 GRAPHIC SCALE: 1. 06/10/04 GENERAL REVISIONS REVISIONS PROJ. No.: 2000481 L10 DATE: 06/11 /04 G1.0.1 0 W O j O O n (n FO d- O O Z Q J 0- _o J / FO O 0 N C U / =) -; Aa1408%23/'2004 MON 11:40 FAX 860 644 7280 South Windsor Toxxi Hall 71:� . aye -ate 1S40 SULOV.AN AVENGE • SOUTH WINDSOR, CONN. 06074 AREA CODE $60 / 644--)611 August 19, 2004 7004 11LO 0002 1059 9731 Mr. Alan Lamson FLB Architecture & Planning, Inc. 19 Silver Lane - East Hartford. CT n6l 1 R Ile: Appl *04-43P, Evergreen Walk Filing Permit Dear .Mr. Lan, son: We are pleased to advise you that the Planning & Zoning Commission voted on August 10, 2004 to approve with modifications the above referenced application for an Earth Filling Kermit. This approval is for earth filing to create a building pad for PUD unit #10 on property located at IS 1 Buckland Road, GD zone as shown on plans prepared by Fuss & O'Neill, Inc., Job No. 2000481Ll0,.dated June 11, 2004, as rdvised. This approval is subject to the following. modifications,- 1. Prior to commencement of any site work, a meeting must be held with Town Staff. -2. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 1 • The Town Engineer's review comments dated August 9,,2004, must be addressed to the. Town Engineer's satisfaction. Sincerely: s, 001!004 08123i2004 MON Lt:40 k&X 060 644 7260 south Windsor Town hall � t::n r -0t� deli&tom a �tY y' u 1640 SULLIVAN AVENUE • SOL, H WINDSOR. CONty. 4E074 ,�`a�QP•LA" 4 AREA CODE 860 t 644-251 i August 19, 2004 Q-002/004 Mr, Alan Lamson FLB Architecture & Planning 19 Silver Lane East Hartford, CT 06118 Re:Preconstructi'on Meeting — Appl 04-43P, Evergreen Walk- Sand. and Gravel/Land Filling .Operation - PUD Unit 010 —.August 17, 2004. Dear Mr. Larson: INT ATTENDANCE JeffDoolittle TOSW 1540 SullivanA'venue $60 644-2511 x245 Jeff Folger TOSW .1540 Sullivan Avenue 860 644-2511 x229 Bernie Drabek TOSW 1540 Sullivan Avenue 960 644-2511 x241 Mark Spazzarini Spazxarini Const: S4 Post Office Road 860 745-5683 ' Enfield, Cl' Michelle Carlson Fuss & 0"INTeill 146 Hartford Read 860 646-2459 x5269 Manchester, -CT T.he following iz-a brief suirimary of points discussed during the meeting: Erasion and Sedimentation Control I: All erosion and sedimentation oonirol measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, -prior to commencement of site workor if any prpblems/concerns arise during construction. 2. All topsoil stockpile areas to be protected (ringed with haybales or equal). • • 3, during construction of the road/driveway a crushed stone tracking pad is to be installed. and maintained to minimize tracking of dirt/gravel on to Buckland Road, Calcium chloride or water is to be used for dust control as required. Extend and renew the anti -tracking pad as .necessary to minimize the tracking of dirt into the road. Any dirt tracked auto Buckland Road will need to be swept up at the Town's direction. {xw_..:q:.;',; i .> ..3.:.. .. : , ...-.. ,.;:..-< ,'x..>x•'. s•, >,:'.a'1<',.>:i h.:��:, ':z,<:>aia''::" ;<£•', t?Y.°.i^`.`. A2"`f".?y 08/23/2004 MON .1.1:40 FAX 860 644 7280 South Windsor Town Fiala. Q 003,'004 Public Works f 1. Three complete sets of approvc:cifrevised plans to be provided to Town prior to start of construction. They will be stamped by the Planning .Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspcctions a.,d to -sting per Developers Checklist (requested, required) for the following: a. After site is staked out b. All drainage work r;_ Prenaratinn of suharadi-_ mmnartion fasts —as nor T)twelnnor'c f hrrlrRgf d. Preparation of subbase, six (6) inch lifts e. Placement of bituminous concrete, two (2) inch lavers maximum 3. Certification of gravel used for the building pads, as subbase and processed stone for base will he required from an approved testing company. 4. Certification of all products used storm pipe; structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 1. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 7. Any problems and/or questions regarding construction of this project will be directed to Mark Spamarini in the field at phone #729-7002. 8, All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 9. Job meetings will be held as needed, and can be called by the developer or Town. 10. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 11. Normal hours of operation 7:00 a.m. 5:00 p.m., no work on Sunday. 12. Extra care must be taken when compacting around structures such as catch basins and <..:.Y...:. <:: '.. manholes. These spots often become problem areas in the future due to settling, therefore, the tOW11 staff/inspectors will be requesting additional compaction tests in these areas, Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. 1 f `Y. Y. ... .:...w .,t> "...,«. xa ,xa ,. .f. ,:.,» �z, , :ss. >.� " <: :>,.: �c• 'b'.i' ..:.w "v N , . y •ra. x a 4 a 08/23/2004 40N 11:40 FAX 860 644 7260 South i?indsor To:kn Hall 2 004/004 Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Sci vices on a company letterhead. If the developer occupies or owns the building aficr construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numise ng shall comply with Town Ordinance 6-800 through 6-802. Barns, garages, and outbuildings, which are located on the same'preniises as a numbered structure, are excluded. 3. Erect temporary sign on the sate during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Buildi.n �epartmel�t .. . 1. A foundation permit is required prior to any work n the building pad. The building will be a threshold building requiring special inspections. Building department inspections will also be necessary during filling and compaction of the building pad.. Contact the Chief Building Office prior to beginning work on the building pad. 2. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with. Chief Building Official Sincerely, PROJ. MANAGER: SEAL SEAL SCALE: O FUSS & O'NEYI,L INC. Consulting Engineers ' 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www.FandO.com Evergreen Walk, LLC APPROVAL LETTERS L.A. Fitness at Evergreen Walk SOUTH WINDSOR CONNECTICUT CHIEF DESIGNER: HORZ.: 1" = 40' REVIEWED BY: DATE VERT.: DATUM: HORZ.: VERT.: 2. 08/12/04 TOWN COMMENTS 40 20 40 GRAPHIC SCALE 1. 1 06/10/04 1 GENERAL REVISIONS REVISIONS PROJ. No.: 2000481 L10 DATE: 08/24/04 G1.0.2 p 2) T 0 CD O -j 0 V) Fo 0 CD 0 Co CD �2 0 CD 3: m — ` - -�- ��.`�� / / \ �!! /�/i�i �Wi / / ?.4- ?�N- PUD 7 —A %.,� ��w`� �,� / -_\ �\ �,1/ 1 ; %� � i _ ___ \ bLL -bMLL I IN U. U. F -Z-- —A23— IN —22 ORAbGLEGEND , '-STONE FILTER BERM- -FI LEVEL AT EL. 128.0 _NISH �RADE CONTOUR,' IN, N`N —12,3— 24" TOP 'WIDTH co% IN 000.0 FINISH RADE SPO -,,lELEVATION" . iN) I —SF —S17--is F SF SF IN, SF # SITE TO BE,, GRADED IN AOCORDA&E. WITH THL 'A />> ��OPOSED CONTOURS, SPOT GRADES AND TOP "OF Y. Aklr' rl r-%/A,'rl^KICI -1-1 If- ^^Kl'rnA/%r^M e IF RAIVIE r-Lr- V/A 1 IVI-43. 1 nr- �,Ull I MM, I —129- 7� R INSURING A POSITIVP SURFACE FLOW TO ALL - . NLETS WITHOUT CREATINP FLAT OR LOW ARLAS WHICH --TCPSOIL STOCK PILE RESULT IN STANDI WATER: EXCEPT FOR RAIN` ? UNSUITABLE MATERIAL STOCK -PILE WILL E .--.140 GARDENSt.). IN, N` e 17 2 --17,9 0 61 7- 7 NI 128- -loe TEMPORARY-DEWATERING BASIN 1 0'13.W 3:1 SIDE SLOPES12 +129 129 +129 7 77, 2 7 -rA HM1-t mt)- i 50 - - - - __ \ t (f} a ` 1.31 N\ � "q — MANHTLE NO. 27 T.F. 135.0 INV. 126.25 IN T;,,. 4w 1 -7 INV. EXIST.18;1 OUT 4- —134— — — — — — — — MANHOLENO. 26, A-, 7 5 el� 7 INV. 1,32.1 IN 1NN INV. 130.0 OUT —736.- ly\ —17, lv. 09- -- '=' i;— IN, /* '136— TF 7,77 — — — — — — — — — — 11 INV. 128.1 t N\, J, IN, 125 L.F. 24" CPP N\ S 3.00% IN J< co ­P U D� UN IT, N'0�. 1 REMOVE EXISTING PIPE 7>- 4r! 4- 10r 00 nIr I 17j_ IN, BUILDING PAD _ _ i Nl c� F.F.1 38.0-II - -140— INV. IN 134.90 r INV. OOT\1,34.1 1,40— PUD UNIT NO. 5 -142- -142- —136 IN, NI IN. `IT'N\ N 0 10 P U-6 "U" N" 42-137— J .264 ACRE��— z- 0 oo 00) IN, C:> co 71 la$ 1-11 .11 Z�2 .... ......... . .... ...... 330 L.F, /110" IZ4' CPP� S 1.00% Ile 0­1 I'v ANTI-TRACKIN — — — — — — APRON 4u MANHOLE NO. 25 T.F. 13�-.O--'�' 7 5 Tul-I INV. 135.5 IN TF�= 149.2 INV. 135.4 OUT f 02,2" 4';YCP . .... . IN V= 145 Nil, ............ . I�W APPROX. LIMITS, OF BUCKLAND "N IN V­ 140�, 5'�o ROAD WIDENING' CONTRACT 0 N\ —OD �! (UNDERI . 86 L.F. 24" CPP CONSilfUC -ON) if N, S 8.14-7* 4 IN, N 1421 9,24'��qp� N\ IN, N, 142 "D 14 - — ­1 1 - ­­1111 11,11, . I IN. IN, ­0 1 -­B DSOR FOR R.O.W. N 11-7 - EA 8,577.29 Ldl 48 D=i'l 6 SIT L ­9 3. z C N09* 1 Vl VE 3-.52 ocr 11;8.51 uu I - -NO8'3 817 IN, RC 2' 7-4 Mf'N-. D- NOT-1349fEA NI CURB 21 : ­ — -_elp_ CgNC.__CURS — — — -L.�-=355-29 B=WCKLAND ROAD CONNECT TO CATCH BASIN LCH. .23 MID 17 INV. 142.5± EXIST m --rTUT WG — ------------ EL �ER EXIST. 12 m ING �N rIT337 A hil EXIST. 12 CURB WATER BUCKLAND ROAD WID NI CKLAND ROAD ^RIT, C ONC. CURB 1 0 N L WILL ET 22 BY OTHERS (UNDER Qp. S UCTION 1,5" RCP §NE T NET 26 BiT. CONC. CURB BIT. CONVURG -�NET 23 25 m 47NEl SNET 30 E+777=- -\-S-NE:T-27 SNLJI 0 PROJ. MANAGER: r or o N� Co.* -zl` Z:* /c .,44 e AL ;!w %� SEAL SCALE: FUSS & ONEILL INC. Consulting Engineers 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www.FandO.com Evergreen Walk, LLC GRADING AND DRAINAGE PLAN L.A. Fitness at Evergreen Walk SOUTH WINDSOR CONNECTICUT CHIEF DESIGNER: HORZ.: I"= 40'0 REVIEWED BY: DATE VERT.: DATUM: IHORZ.: 3 08/17/04 TOWN COMMENTS VERT.: 2. 08/12/04 TOWN COMMENTS 40 20 40 1. 06/10/04 TOWN COMMENTS REVISIONS GRAPHIC SCALE PROJ. No.: 200048 DATE: 05/19/04 CG.1.1 Z a j c W 0 U CD O O N lt 0 0 1-11 n / o_ J 0 0 0 N QL 0 0 SOUTH WINDSOR —,, STANDARD FRAME AND COVER ADJUST FRAME TO FIN. WITH BRICK (12" MAX.) STEEL -REINFORCED POLY- PROPYLENE OR ALUMINUM MANHOLE STEPS TO BE CAST IN PRECAST UNIT DURING CONSTRUCTION. THE PORTION OF ALUMINUM TO BE IMBEDDED IN CONC. SHALL HAVE PROTECTIVE COATING OF ZINC CHROMATE OR APPROVED BITUMAS71C MATERIAL PRIOR TO PRECAST. ALL JOINTS TO BE POINTED FLUSH AND FULL. 8" in l 1 3'-0" N n n 4'-O" n 8" U CONCRETE OR BRICK INVERT, 6" 6" 6'-4" DIA. STORM MANHOLE TOTAL LENGTH = 50'-0" '(TYP.) 3"-4" SECTION A - A SITE ENTRANCE DRIVE — A RAILROAD TIE ANTI —TRACKING SYSTEM 26' MIN. ITT EDGE OF PAVEMENT 2 1/2" BITUMINOUS CONCRETE—/ CLASS I WITH 2" LIP PLAN DEPTH T INVERT VARIES SEE PROFILES 6"MINA TF'R FARRI(` NOTES: 1. MAINTAIN ANTI —TRACKING PAVEMENT IN GOOD CONDITION THROUGH OUT CONSTRUCTION PERIOD. 2. ROADWAY SHALL BE SWEPT DAILY TO REMOVE ANY MATERIAL THAT MAY BE TRACKED ONTO THE PAVEMENT. ANTI -TRACKING APRON PRnPC1SFn f RAnF _— 'AVtMLNI btL,11UN UK LANDSCAPING (SEE PLANS) WARNING TAPE - MIN, 12" MAX. 24" ABOVE PIPE APPROVED BACKFILL PLACED AND COMPACTED IN 12" LAYERS (OR AS OTHERWISE APPROVED) NO STONE LARGER THAN 3" BACKFILL WITH SAND BEDDING OR SUITABLE NATIVE MATERIAL WITH NO STONE LARGER THAN 2" / AS DETERMINED BY THE (IN—RITF FNr[NFFR `BEDDING ON SUITABLE NATIVE MATERIAL OR 3/4" CRUSHED STONE BEDDING MATERIAL IN ROCK EXCAVATION OR IN UNSUITABLE MATERIAL AS DIRECTED BY THE ENGINEER. MATERIAL SHALL MEET D.O.T. M.02.1 / FOR 3/4" STONE. `BACKFILL TO SPRINGLINE OF PIPE WITH 3/4" STONE WHEN USING POLYTHYLENE OR CPP PIPE 1 " MIN. 12" 12" MIN, MIN. 0 00o00 000000oao 0 0 0 0 0 0 0 0 STORM TRENCH DETAIL 1. SET POSTS AND EXCAVATE A 6" X 6" TRENCH, SET POST DOWNSLOPE. 2. STAPLE THE WIRE MESH FENCING TO THE POSTS. WIRE FENCI FLOW _ " 10 TRENCH I 6 TO 8' 6" TO 8" 2"X4"X5' STAKES DRIVEN INTO GRADE 12" MIN,, SET 8' TO 10' APART, AND CANTED 10' INTO SLOPE 3. ATTACH FILTER FABRIC TO THE WIRE FENCING 4. BACKFILL THE TRENCH FILTER FA BRI AND EXTEND IT INTO AND COMPACT THE THE TRENCH 8". EXCAVATED SOIL. FOLD FABRIC UP SL BOTTOM OF DRAINAGEWAY O I PLAN COMPACTED A ELEVATION POINTS 'A' SHOULD BE HIGHER THAN POINT 'B' SILT FENCE SITE DEVELOPMENT SEQUENCE 1 ALL IDEPIIVAETLP EROSIVINI r,VIN 1\I J DEVICLS I1x\1 UDING SILT FE NllE -L' ANTI -TRACKING APRON MUST INSTALLED PRIOR TO THE START OF THE SITE S__RIPPING AND GRADING OPERATIONS. TEMPORARY SEDIMENTATION BASINS LOCATED NORTH AND SOUTH OF THE BUILDING PAD WILL BE FORMED PRIOR TO THE START OF GRADING AND FILLING OPERATION. SEE NOTE NO. 7 OF THE E & S CONTROL NOTES. ALL EROSION CONTROL DEVICE WILL BE MONITORED AND MAIN 1AINED UNTIL COMPLETION AND FINAL ACCEPTANCE OF GRADING AND FILLING OPERATION. 2. INSTALL THE 18" STORM PIPE AND CONNECT TO THE EXISTING 18" PIPE 3. BEGIN EARTHWORK. STABILIZE ALL EARTH WORK AFTER EXCA/ATION AND FILLS HAVE BEEN COMPLETED. SEE NOTE NO. 4 OF THE E & S CONTROL NOTES. THE SIDE SLOPE ALONG BUCKLAND ROAD SHALL BE COVERED WITH 4" MIN. TOF501L AND SEEDED AND MULCHED.. 4. NOTE: GRADES SHOWN ARE APPROXIMATELY 1 FOOT BELOW FINAL FINISHED GRADE FOR THE SITE DEVELOPMENT PLAN EXCEPT FOR THE SIDE SLOPE ALONG BUCKLAND ROAD WHICH IS THE FINISHED GRADE. EROSION & SEDIMENT CONTROL N/ RRATIVE Iht rULLUWING titUIMtNI & LNUJIUN UUNINUL NUItt AF't'LT IU INt. CONSTRUCTION OF THE PROPOSED L.A. Fitness at Evergreen Walk. EROSION CONTROL MEASURES ARE TO BE INSTALLED AS NOTED IN THE CONSTRUCTION SEQUENCE BELOW. 1.2 THE TOTAL PROJECT AREA IS APPROXIMATELY 5 ACRES NO WETLANDS OR UPLAND REVIEW AREA WILL BE DISTURBED DURING C01<STRUCTION. 1.3 SPECIAL CARE SHALL BE TAKEN TO PREVENT SEDIMENTS CAUSED BY EROSION FROM ENTERING ADJACENT WETLANDS. 1.4 GRADING OPERATION IS SCHEDULED TO BEGIN IN THE `.;UMMER OF 2004 AND COMPLETED IN APPROXIMATELY ONE MONTH, 1.5 ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED IN ACCORDANCE WITH STANDARDS AND SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTRO'-", 2002 OR LATEST EDITION AND TOWN OF SOUTH WINDSOR REGULATIONS. EROSION CONTROLS ARE TO COMPLY WITH THE PLANS AND PROJECT SPECI-1CATIONS. ALL EROSION CONTROL MEASURES ARE TO BE MAINTAINED /\ND UPGRADED BY THE CONTRACTOR AS REQUIRED TO ACHIEVE PROPER SEDIMENT CONTROL DURING CONSTRUCTION, MICHELLE CARLSON, PROJECT MANAGER FOR FUSS & O'NEILL CONSULTING ENGINEERS, INC, (850) 646-2469, SHALL BE CONTACTED FOR EROSION CONTROL INQUIRIES. ADDITIONAL CONTROL MEASURES WILL BE INSTALLED DLRING THE CONSTRUCTION PERIOD, IF DEEMED NECESSARY BY THE OWNER OR AGENTS OF THE TOWN OF SOUTH WINDSOR IN ACCORDANCE WI1H THE OCTOBER 1, 1993 STATE OF CONNECTICUT GENERAL PERMIT FOR STDRMWATER AND DEWATERING WASTE WATER FROM CONNECTICUT ACTIVITIES (CGS 22A-4306) AT NO ADDITIONAL COST TO OWNER. 1.6 THE CONSTRUCTION SEQUENCE IS NOTED ON THIS PLAIT SHEET. EROSION & SEDIMENT CONTROL NOTES 1, EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED PRIOR TO STUMP REMOVAL AND CONSTRUCTION. CONSTRUCTION ENTRANCE WILL BE INSTALLED BEFORE CONSTRUCTION TRAFFIC INTO AND OUT OF PROJECT AREA BEGINS. STABILIZATION OF ALL REGRADED AND SOIL STOCKPILE AREAS WILL BE INITIATED \ND MAINTAINED DURING ALL PHASES OF CONSTRUCTION. 2. SEDIMENT REMOVED FROM EROSION CONTROL STRUCTURES WILL BE DISPOSED OF IN A MANNER WHICH IS CONSISTENT WITH THE INTENT OF THIS PLAN. ALL HAYBALES OR SILT FENCE RETAINING SEDIMENT OVER 1/2 THEIR HEIGHT SHALL HAVE THE SEDIMENT REMOVED AND ALL DAMAGED EROSION CONTROLS REMOVED AND REFLACED. 3. THE CONTRACTOR WILL BE ASSIGNED THE RESPONSIBILITY FOR IMPLEMENTING THIS EROSION AND SEDIMENT CONTROL PLAN, THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, 14FORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMEIITS AND OBJECTIVES OF THE PLAN, AND NOTIFYING THE PROPER TOWN AGENCY OF ANY TRANSFER OF THIS RESPONSIBILITY. THE OWNER SHALL BE RESPONSIBLE FOR CONVEYING A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN IF THE TITLE TO T1E LAND IS TRANSFERRED, 4. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL DUST AND WIND EROSION THROUGHOUT THE LIFE OF HIS CONTRACT. DUST CONTROL SHALL INCLUDE, BUT IS NOT LIMITED TO, SPRINKLING OF WATER ON EXPOSED SOILS AND HAUL ROADS. CONTRACTOR SHALL CONTROL DUST TO PREVENT A HAZARD TO TRAFFIC ON ADJACENT ROADWA'S. 5. IF FINAL GRADING IS TO BE DELAYED FOR MORE THAN THIRTY (30) DAYS AFTER LAND DISTURBANCES CEASE, TEMPORARY VEGETATION OR MULCH SHALL BE USED TO STABILIZE SOILS. OUTSIDE OF THE GROWING SEASON, ONLY WOOD HULCH SHALL BE USED. 6. HAYBALES SHALL BE USED ONLY AS A TEMPORARY MEASUF;E. WHERE CONTROL MEASURES WILL BE REQUIRED FOR LONGER THAN SIXTY (60) DAYS, F LTER FABRIC SHALL BE USED. 7. WHERE DEWATERING IS NECESSARY, THERE SHALL NOT BE A DISCHARGE DIRECTLY INTO WETLANDS OR WATERCOURSES. PROPER METHODS AND DEVICES SHALL BE UTILIZED TO THE EXTENT PERMITTED BY LAW, SUCH AS PUMPING WATER INTO A TEMPORARY SEDIMENTATION BASIN, PROVIDING SURGE PROTECTION AT THE INLET AND THE OUTLET OF PUMPS, FLOATING THE INTAKE OF THE PUMP, OR OTHER METHODS TO MINIMIZE AND RETAIN THE SUSPENDED SOLIDS. IF A PUMPING OPERATION IS CAUSING TURBIDITY PROBLEMS, SAID OPERATION SHALL CEASE UNTIL SUCH TIME AS FEASIBLE MEANS OF C )NTROLLING TURBIDITY ARE DETERMINED AND IMPLEMENTED. MUST SUBMIT HIS DESIGN ALONG WITH THE LOCATIONS OF THE BASIN TO THE TOWN OF SOUTH WINDSOR PRIOR TO CONSTRUCTION. 8, INSPECTION. A CERTIFIED SOIL SCIENTIST OR LICENSED PROFESSIONAL ENGINEER SHALL INSPECT ALL DISTURBED AREAS OF THE CONSTRUCTION ACTIVITY THAT HAVE NOT BEEN FINALLY STABILIZED, STRUCTURAL CONTROL MEASURES, AN[, LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT LEAST ONCE EVERY WEEK AN) WITHIN 24 HOURS OF THE END OF A STORM THAT IS 1.0 INCH OR GREATER, INSPEC- ION REPORTS SHALL BE SUBMITTED TO THE OWNER WEEKLY AND TO THE PLANNING & ZONING COMMISSION MONTHLY. WHERE SITES HAVE BEEN FINALLY STABILIZED, S JCH INSPECTION SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH FOR THREE MCNTHS. PROJ. MANAGER: Fp' °�� =°'>> SEAL SCALE: Evergreen Walk, LLC CHIEF DESIGNER: ������ ��OF .`%C ,�< HORZ.: N.T.S. Ira FUSS & O'NEILL INC. Consulting Engineers J9 CONSERVATION PLAN DETAILS REVIEWED BY: DATE VERT.:� DATUM: HORZ.: + O 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 SAND AND GRAVEL/LAND FILLING OPERATIONS VERT.: ° W .�✓, S�E.As4 N� �r my860.646.2469 AT EVERGREEN WALK 1. 08/12/04 TOWN COMMENTS o No. DATE DESCRIPTION BY REVISIONS GRAPHIC SCALE www.FandO.com SOUTH WINDSOR CONNECTICUT PROJ. No.: 20D0481L10 DATE: 06/11 /04 CG. 1.3