Loading...
HomeMy WebLinkAbout03-88P_KORE FITNESS_SULLIVAN AVENUE & PATRIA ROADLETTERS OF APPROVAL PATRIA LEGEND -- PROPERTY LINE • 1 P EXISTING IRON PIN O I. R 5/8 " IRON ROD TO BE SET ��,c NpR1N MPQ ,�A5 OCR ��.. 11�q/ t 1�® 4,0 LOT I' V.364 P. 247 ROAD LOTS I, 2., 4 NOTE: ARE TO BE COMBINED AS ONE LOT EDGE OF PAVEMENT TOTAL AREA 215009. 53 S. F 4.94 AC. w D Z w Q `wl Z � w Q a a _ LL J o J w w � 35' B.L. - _8 8v -26'-02" cMS R=25,001 11 3ov.�a� T = 24.33' C M S �d !� W south. `l &IdAdi a u �1�%n s � 1540 SULLIVAN AVENUE SOUTH WINOSOR, CONN. 06074 sly Mtv AREA COQE 203/644.2511 December 20, 1988 Attorney William Grace 479 Buckland Road South Windsor, CT 06074 RRt Application #88-17W - Al Glass & Mirror (Robert Lavey) Dear Sirs At the December 19, 1988 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-17W - IWA/CC permit for the construction of an industrial building located on the south side of Sullivan Avenue, ea�t of Patria Rnad. I zone. t.. ... ... ..___ -•---• - - - The following modifications must be adhered to for this permit to be valid: 1. Black and white transparent mylars of sheets # 4 of 7 with the above modifications and this letter reproduced thereon together with two blueprint copies of the entire set o= plans, must be submitted to this Commission to be stamped and signed. This must be completed and reviewed prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4. The permit is valid for one year and shall expire December 19, 1989. 5. All approvals required must be obtained and submitted prior to any activity on the site. 6. A contact person shall be identified directly on the plans. 7. A pre -construction meeting must be held with Town Staff prior to construction. 8. Erosion and sedimentation measures shall utl ayt+iyo.+ •-o all disturbed areas These areas must be loamed and Seeded. 9. We recommend a bond in the amount of $5000.00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 10. Right to work approval from Sperry Wood Partnership submitted to IWA/CC prior to any activity on the site. 11. Antitracking pad as depicted on sheet 4 be incorporated on sheet 2 of plans. 12. Stockpiling as agreed to on December 15, 1988 depicted on plans.l 13. Silt fencing be added to run boundry, detention basin, Patria Road and before detention basin prior to construction activities. very truly yours, John M. Moran, Jr., eiiairman Inland Wetlands Agency/ Conservation Commission JM4J r . / palm Enclosure cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Official Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, Planning i Sorting ROBERT LAVEY P.O. BOX 101 EAST WINDSOR HILL CONNECTICUT, 06028 203 - 289 - 3 481 4 %urn aie SgaM `l! a ld6o't u 1540 SULLIVAN AVENUE • SOUTH WIADSOR. CONN. 06074 •�ti AREA CODE ; 03/644.2511 o��y 11 January 1989 Atty. William E. Grace 479 Buckland Road South Windsor, CT 06074 re: Appl. #88-17P, Robert Lavey/A-1 Vlass a Mirror Co., Depot Square Site Plan Gentlemen: We are pleased to advise that the Planning end Zoning Commission voted at its January 10, 1989 meeting to api,rove the captioned application for a site plan of developmentin accordance with Drawings 1 - 7 of 7 dated 3-3-88, revised through 11-23-88, prepared by Meehan Associates, Project No. 1170370, and with the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued Intil the final mylars have been filed in the Town Clerk's Office. 3. This application is subject to the :onditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $3,000. 4. An as -built plan is required prior to issuance of a ro r;f;cAra of n_c_c_upa__n_ev per Section 4.13.10 of the Zoning Regulations. r j 5. A landscape bond in the amount of $10,000 is required and must be submitted prior to filing cf mylars. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. Concrete pads and screening required for both dumpsters. 8. Driveway radius for both Patria Drive entrances should be 25'. 9, Address support of detention basin "outlet tee." ,,,,,. r ;narAll proportionate share of State storm drainage system per DOT/Town recomn.endations (along property frontage). 11. Show limits of construction, especially along Saur property; tight grades as proposed 12. Land surveyor stamp and seal needed on plot plan. 13. Clarification of disposition of ex..sting drainage easement between Lots 3 & 4 needed; Basemen: onto Sperry Wood property at detention basin outlet needed. 14. Lot lines between Lots 1, 21 3, ani 4 must be removed. 15. Improve landscaping parallel to railroad right-of-way. Black and white transparent mylars of Sheet #1 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the COMFIIiSbiOn, they will be returned to you for filing in the Office Cf the Town Clerk within 90 days. After filing these plans, a cop) of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION ymond F. Hallowell, Jr. Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters Inland Wetlands Agency/Conservation Commission PZC File Engineer Applicant BEING LOTS 1,2,3 & 4 ON A MAP ENTITLED "PATRIA INDUSTRIAL PARK SULIVAN AVENUE SOUTH WINDSOR SCALE 1" = 40' DECEMBER 1967 WILLIAM J. CARRINGTON REG. L.S." I HEREBY DECLARE TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF THAT THE SHOWN ON THE PLOT PLAN ARE WITHIN A FLOOD HAZARD EA AS SHOWN ON DEVELOPMENT HUD FEDERAL INSURANCEADMINIS RATON MAP COMM.COMMNO. 090036 PANEL NO. 0006E THIS MAP IS SUBSTANTIALLY CORRECT. FOUNDATION LOCATED AS SHOWN. NO ZONING VIOLATIONS NOTED WITH RESPECT TO BUILDING LOCATIONS. UNLE�jS THE MAP ARS THE THE DECLARATION TYPE SEAL AND ORIGINAL ITED HEREON IS ONSIDERED GNATTURE OF THEIDSURVEY �R/ENGINEEREWHO E NAME IMPRESSION TYPE AND REGISTRATION NUMBER APPEAR BELOW. I HEREBY DECLARE TO ROBERT W. LAVEY, BARBARA E. LAVEY AND PAUL R. LAVEY THAT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT. THIS MAP AND SURVEY WERE PREPARED IN ACCORDANCE WITH THE STANDARDS OF A CLASS A-2 SURVEY AS DEFINED IN THE "RECOMMENDED STAI`IDARDS FOR SURVEYS AND Tr I Tuc QTATP- r`)F rnNNErTICUT" AS PREPARED AND ADOPTED BY THE CONNECTICUT iVINr3 IIV : t IL_ .j i r . ASSOCIATION OF LAND SURVEYORS, INC., ON SEPTEMBER 13, 1984. RICHARD MEEHAN L.L.S. 12330 MEEHAN ASSOCIATES Consulting E ngineers - Surveyors, P.C- 387 North Mi 1n Slice' • Manchester, CT 06040 643 - 2520 PLAIN rmc_rHnc.v rvr DEPOT SQUARE, NORTH AND SOUTH LOTS 251 SULLIVANAVENUE AND D PA F IA ROAD SOUTH WINDSOR.,CT. � PLOT PLAN SCALE: I " = 40' DESIGN: FILE NO. SHEET NO FT A V Fi 8703,70 I_._. OF 7 DRA . . . . 19- 120