HomeMy WebLinkAbout03-59P_PROPERTY OF ERNESTINE M. CHARBONNEAU_ABBE ROAD0
foo 5o GR'APHIC SCALE
0
( IN FEET )
1 inch = 100 ft.
�03-5`�
n
TOlAo'" OF O WiNC'SCRZ
459
SOrJTH WINDS®m
_ . 1 1 PUYWING DEPT.
THIS PLAN WAS COMPILED FROM OTHER MAPS, RECORD RESEARCH AND/OR 07HER SOURCES OF INFORMA710N. IT
IS NOT TO BE CONSTRUED AS HAVING BEEN OBTAINED AS THE RESULT OF A FIELD SURVEY, AND IS SUBJECT TO
SUCH CHANGE AS AN ACCURATE R7ELD SURVEY MAY DISCLOSE. IT CONFORMS TO 7HE CLASS "D" REQUIREMENTS
OF THE "CODE OF RECOMMENDED PRAC77CE FOR STANDARDS OF ACCURACY OF MAPS" OF THE CONNEC77CUT
TECHNICAL COUNCIL, INC.
Map Lot
Name & Address
Map Lot
Name & Address
7 1
Jillson Farms Associates
15 131
Town of South Windsor
P.O. Box 415
1540 Sullivan Avenue
East Windsor. Hill, Ct. 06028
South Windsor, Ct. 06074
3
Maynard & Ruth Briggs
139
Thomas & Janette L. Murtha
124 Long Hill Road
26 Marty Lane
South Windsor, Ct. 06074
South Windsor, Ct. 06074
4
Three 59 Burnham Street LLC
140
John H. & Claire M. Brault
359 Burnham Street
20 Marty Lane
East Hartford, Ct. 06118
South Windsor, Ct. 06074
5
141
John D. & Lorraine T. Sevigny
8 Marty Lane
8 1
George & Sofia Christoforakis
South Windsor, Ct. 06074
196 LeFoll Boulevard
South Windsor, Ct. 06074
142
Alexander Manuck
7 Marty LAne
2
Robert G. & Barbara H. Morris
South Windsor, C. t 06074
200 LeFoll Boulevard
South Windsor, Ct. 06074
143
Richard N. & Patricia A. Adams
15 Marty Lane
60
Barbara Murray
South Windsor, Ct. 06074
712 North King Street
South Windsor, Ct. 06074
144
Mark W. & Sally M. Nixon
21 Marty Lane
61
Jin Liu & Xiaonian Ma
South Windsor, Ct. 06074
785 Chapel Road
South Windsor, Ct. 06074
145
Paulino M. & Jennifer M. Valente
25 MArty Lane
62
Denise & Christopher Rosa
South Windsor, Ct. 06074
775 Chapel Road
South Windsor, Ct. 06074
146
Town of South Windsor
1540 Sullivan Avenue
64
William D. & Tamra L. Rome
South Windsor, Ct. 06074
795 Chapel Road
South Windsor, Ct. 06074
147
John J. Mills
153 Gail Lane
14 59
Beaton J. Case
South Windsor, Ct. 06074
656 Chapel Road
South Windsor, Ct. 06074
148
Debra J. Hughes
147 Gail Lane
60
William & Lori Mooney
South Windsor, Ct. 06074
664 Chapel Road
South Windsor, Ct. 06074
149
Robert J. & Barbara J. Trantolo
139 Gail Lane
79
Brian & Ann Douglas
South Windsor, Ct. 06074
190 Long Hill Road
South Windsor, Ct. 06074
150
David J. & Elizabeth L Cocola
131 Gail Lane
81
Thomas P. Julian & Laure Nicholas
South Windsor, Ct. 06074
122 Gail Lane
South Windsor, Ct. 06074
151
Steven & Kimberly M. Tenenbaum
123 Gail Lane
82
Laurie J. Tursi
South Windsor, Ct. 06074
130 Gail Lane
South Windsor, Ct. 06074
83
John A. & Susan R. Rose
138 Gail Lane
South Windsor, Ct. 06074
84
James P. & Heidi K Larkin
146 Gail Lane
South Windsor, Ct. 06074
85
Stephen W. & Marilyn C. Lewandowski
154 Gail Lane
South Windsor, Ct. 06074
86
William Loher
707 Chapel Road
South Windsor, Ct. 06074
87
Laurel M. Riding
699 Chapel Road
South Windsor, Ct. 06074
88
Carol L. Rossick
691 Chapel Road
South Windsor, Ct. 06074
89
Charles E. Manning, Jr.
170 Long Hill Road
South Windsor, Ct. 06074
90
Gary L. & Carol S. Schultz
160 Long Hill Road
South Windsor, Ct. 06074
91
Vi T. & Huyd Vu Hein
146 Long Hill Road
South Windsor, Ct. 06074
92
Helen A. Hilt
161 Long Hill Road
South Windsor, Ct. 06074
93
Raymond A. & Dianna E. Burnham
171 Long Hill Road
South Windsor, Ct. 06074
NOV 1 9 2003
SOUTH WINDSOR PLANNING DEPT
TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS
MAP IS SUBSTAN77ALLY CORRECT AS NOTED HEREON.
REV 11-18— 03 NO CHANGES THIS SHEET
REV. 10-22-03 NO CHANGES THIS SHEET
REV 10-13-03 NO CHANGES THIS SHEET
REV. 9-26-03 NO CHANGES THIS SHEET
00
0
0
M
0
N
N
C
C
0
.0
ra
U
00
0
0
ro
O
O
N
0)
U-
M
c
3
m
0
0
c�
S65°35' 35" E
SEE NOTE #5
CONSERVATION EASEMENT IN
FAVOR OF THE TOWN OF SOUTH
WINDSOR. LANDOWNER HAS THE
RIGHT TO MAINTAIN UNDERGROUND
UTILITIES WITHIN THIS EASEMENT i
:..
N/F
Jin Liu & Xiaonian Ma
Cq
State of Connecticut
1-291 �
3
/
-� EA SINE
Nt366
Cti �
/ o
/
/ �• N
/
/
Zj Lot "B"
a• Area = 116, 631 f s.f.
2.7f Ac.
Map References:
20 SANITARY SEWER
R. 0. W. IN FAVOR OF THE
1. Resubdivision Property Of Andre Charbonneau South Windsor, Connecticut TOWN OF SOUTH WINDSOR
Owner —Developer Andre L. Charbonneau Dated 9-4-90 B J. R. Russo & VOL. 156 PG. 47
p y � "20.10'
Associates. 242.23' (Lot)\ z � z
2. Town Of South Windsor Map showing land acquired from Andre L 70INSERVATION EASEMENT IN
Charbonneau by the State Of Connecticut Interstate Route 291 (Limited Access AV R OF THE TOWN OF SOUTH
Highway) May 1, 1990 Rev. 12-19-90 VAN OR. LANDOWNER HAS THE
ot. IGH(f' TO MAINTAIN UNDERGROUND
3. Building Location Map, Zoning Plot Plan Prepared For Andre L, Charbonneau
Chapel Road South Windsor, Connecticut Dated 3-2-94 Revised 7-12-94 No.
94013 Class A-2 By J. R. Russo & Associates Sheet 1 Of 2.
Notes:
1. Parcel Located in RR Zone.
2. Parcel not located in a flood hazard zone Panel. No. 090036 0007 B.
3. Wetlands delineated by George Logan, Certified Soil Scientist of REMA
Ecological Services in July 2003.
4. Underground utility, structure and facility locations noted hereon have
been compiled, in part, from record mapping supplied by the respective
utility companies or governmental agencies, from parole testimony and
from other sources. These locations must be considered as approximate
in nature. Additionally, other such features may exist on the site, the
existence of which are unknown to J. R. Russo & Associates. The size,
location and existence of all such features must be field determined and
verified by the appropriate authorities prior to construction. Call Before
You Dig 1-800-922-4455.
5. The Connecticut Department of Transportation has not yet finalized the
Right of Way mapping for 1-291.
DATA BLOCK LOT "A"
DRAINAGE EASEMENT IN
FAVOR OF THE STATE OF
CONNEC77CUT D.O. T. AS
PER DESIGN PLANS FOR
RECONS77?UC77ON OF
CHAPEL ROAD
co
C6
to
M
LO
51
"ROP. 20' R.O.W. FOR
UTILITIES, INGRESS &\,
EGRESS IN FAVOR OF*
LOT *Bw
4,
=29 50
�R=60.00 '
10.42'
S2330'OF
0=2950'
R= 40.00'•
L=20.84'
f
t
0
o NIF
o: W Maynard W. & Ruth A. Briggs
C� a
co
r
, rog" W
N8.0 .00
191.78
N/F
201.72' Vi T. & Huyd Vu Hein
_ o
80.96' — S66011 31 "E
a�
NF
I �Co
L1=35 2241 "
R= 65.00'
L=40.14'
N/F
A=3522'41" William Loher
R=85.00'
L=52.48' r
iC4
'Ilt
Lot "A" C0
Area = 64,582 s.f.
1.48 Ac.
N7g'51'15rw ' �` (: CA
l ol.38
ff .
CONSERVATION EASEMENT IN FAVOR OF THE
TOWN OF SOUTH WINDSOR. LANDOWNER HAS
THE RIGHT TO
UTILITIES WITHIN AIN THIS AEASEMENT UNDERGROUND
1
N•
S65003'59"E
N/F
Laurel M. Riding
LEGEND.
S89"
°44 E
N/F
Harold E. &
Carol 1. Rossick
• EXISTING I.P.
■ EXISTING MONUMENT
O PROP. I. P.
o PROP. MONUMENT
ZONE: RR
REQUIRED
PROVIDED
REV.
11-18-03 CONDITIONS OF APPROVAL
LOT AREA
40,000 s.f.
64,581t s.f.
Chapel Road
REV.
REV.
10-22-03 NO CHANGES THIS SHEET
10-13-03 NO CHANGES THIS SHEET
LOT WIDTH
175'
272.01'
REV.
10-3-03 NO CHANGES THIS SHEET
LOT DEPTH
200'
252.17'
�.'
REV.
9-26-03 NO CHANGES THIS SHEET
STORIES/HIEGHT
2 1 /2 - 30'
2 STORIES
Zj
Special Exceptior
LOT COVERAGE
10%
3.2±%
FRONT YARD
50'
132't
Resubd1.V'
Y SIDE YARD
20'
261f
°�
REAR YARD
50
52 f
Ann
DATA BLOCK LOT "B" (INTERIOR IOT)
ZONE: RR
REQUIRED
PROVIDED
LOT AREA
80,000 s.f.
116,631f s.f.
LOT WIDTH
262.50'
364't
LOT DEPTH
200'
215't
STORIES/HIEGHT
2 1 /2 — 30'
2 STORIES
LOT COVERAGE
10%
1.2±%
FRONT YARD
50'
78'f
SIDE YARD
20'
92'f
REAR YARD
50'
80'i
A VARIANCE OF SECTION 4.6.1.0 WAS APPROVED BY THE SOUTH
WINDSOR ZONING BOARD OF APPEALS ON JULY 10, 2003.
GRAPHIC SCALE
40 0 20 40 6o 160
( IN FEET )
1 inch = 40 ft.
TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS
MAP IS SUBS7AN77ALLJ6MpsAS NOTED HEREON.
M
Man References:
i71
3
00
C:)
O
1
M
CD
t)
i
W
c
C
0
wo
U
00
0
a
M
0
0
cV
a
U_
is
c
.3
L
d
t�
Q
x
1540 SULLIVAN AVENUE •SOUTH WINDSOR, CONN. 09074
`hosoeco`��
AREA CODE 860 r 64a2511
November 3, 2003
-
CERTIFIED MAIL
Mr. Robert Mannarino
Marmatino Builders, Inc.
1169 Ellington Road
South Windsor, CT W74
Rc: Appl 03.59P, Chapel Woods Resubdivision and Special Exception
Dear Mr. Mannarino:
We are pleased to advise you at its October 28, 2003, meeting the Planning & Zoning Commission approved
with modifications Appl #03-59P, Resubdivision and Special Exception to Section 4.6.1 on 4.1 acres to create
one conventional lot and one interior lot to be known as Chapel Woods on property located on the southerly
side of Chapel Road, easterly of Long Hill Road, RR zone as shown on plans prepared by I.R. Russo, Inc.,
project #2003-008 and dated 10/22/03," revised. This approval is subject to the following modifications:
I..This approval is for 2 lots, numbered 1 and 2.
2. Drainage and construction for this subdivision is subject to the approval of the Town Engineer.
3. All lots shall be serviced by the Town of South Windsor sanitary sewer system and are subject to the
approval of the Water Pollution Control Authority.
4. Water shall be supplied to this subdivision by public water.
5. A liability insurance policy shall be submitted to this Commission naming the Town of South Windsor as an
insured, with a combined single limit for bodily injury and/or property damage is pr NR t t of Sl. `00 �_
6. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission dated 10/23103, including a bond in the amount of S5,000.
7. Prior to eommrncement of any site work, a meeting must be held with Town Staff.
8. All plans used in the field by Air developer must bear the stamp and authorized signature of the Town of
South Windsor.
9. All easements for conservation purposes, drainage or utilities, that may be required in connection with the
approval of this subdivision, must be submitted on standard Town easement form where appropriate, to this
Commission prior to filing the mylars and issuance of building permits. All deeds for open space, public
improvements and roadways must be submitted prior to request for Town acceptance; all deeds must be in
accordance with the policy for accepting deeds and must be approved by the Engineering Department and
Town Attorney.
7Zn1 n oleS'o"14A °l(iir�
IS40 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 00074
y4oaot cotle� AREA CODE 860 r 844-2511
October 23, 2003
Certified #70020510000091151812
J.R. Russo & Associates
Attn: Jay Ursery
I Shoham Road
East Windsor, CT 06088
RE: Appl. #03-59P-Mannar(no guilders - 727 Chapel Road, RR, RR-O Residential
zones
Dear Mr. Ursery.
Agency/Conservation
At the October 15, 2003 regular meeting, the Inland Wetlands
Commission approved application #03-59P-Mannarine, Builders - 727 Chapel Road - inland
Weiland/Conservation Commission application to create a two -lot residential subdivision. RR,
RR-0 Residential zones. This approval is subject to the following conditions:
L One blueprint copy of the entire set of plans and this letter reproduced thereon, must be
submitted to this Commission. This must be completed within 65 days of approval prior
to any construction activity on the site. Plans submitted to Planning & Zoning
Commission shall be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against
any liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on October 15, 2008. It is the
landowner(s)lapplicant(s) responsibility to track expiration dates and notify the
Commission of a renewal request at least 65 days prior to expiration.
4. All approvals required must be obtained and submitted prior to any activity on the site.
5. A contact person shall be identified on the plans.
6. We recommend abond in the amount of $5,000 be submitted to the Planning & Zoning
Commission to ensure compliance with the Erosion and Sedimentation Control
Measures, and installation and establishment of themifigation area and plantings.
7. A split rail fence is to be erected at the conservation easement boundary.
r Mannarino Builders
October 23, 2003
Page 2
8. A conservation easement to be established at the eastern and northern potions of the site.
The easement is to be identified in the field with approved markers.
9. Construction fence is to be erected near the northern wetland prior to any constmction.
Very truly yours. .
INLAND WETLANDS AGENCYi
CONSERVATION COMMISS/SSII�ONN(�Jj(f�p� �
EI»��aTrcn,perso� n - ' -
EW:dr
cc: Marmarino Builders
Mr. George Logan
APPROX. LOCA77ON
EXIST. SAN. MH
TF= 116.21-
FL=105.3f
116
SEE N07E #5 1 \`
+ � 1
11411
438'
MyA
S65°35' 35"E
II
712
EXIST, SAN, MH II
77=112.9 I, II
FL=105.4
EMERGENCY VEHICLE I ` II
iI
N/F TURNAROUND
Jin Liu & Xiaonian Ma Ii
FOOLING DRAIN I)
OUTLET FL=116.0t 11/2 II
10. Footing drains are required for each house. Prior to the building of any structure on a lot, a topographic map,
drawn to a scale of V - 40% shall be submitted for each lot in the subdivision, showing proposed contours,
elevations and ilia location of the footing drains. No building permits will be issued until the proposed
contours, floor elevations and location of footing drains have been approved by the Town Engineer.
11. If, for any reason, finished grading and other individual lot site work is not completed, the Town Engineer
shall determine the amount of a cash bond to ensure final grading and site work This cash bond must be
submitted prior to issuance of a Certificate, of Occupancy.
Quantity estimates must be submitted to the Town Engineer (on the enclosed form) for the purpose of
determining subdivision bonding. All bonds shall conform to the enclosed bond policy and shall be posted
prior to filing the final plans in the Town Clerk's office.
If the developer chooses to submit a letter of Credit for a one-year term, in lieu of a surety bond, said Letter
of Credit must be renewed on a yearly basis until completion of the development. If a new Letter of Credit
has not been received within 30 days before the expiration date, the Commission may, at its option, call the
Letter it is holding.
12. A drainage assessment fee in the amount of S 100.00 shall be submitted to this Commission.
13. No building permits will be issued until all modifications have been complied with, and the fund plans have
been filed in the Town Clerk's office.
14. Engineering comments dated October 28, 2003 must be incorporated into the final plans.
special Exception has been granted for the creation of the interior lot and approval becomes effective upon the
filing of the enclosed special exception form in the Office of the Town Clerk.
Black and white transparent mylars of Sheets 02 with the above modi6cations, together with three blueprint
copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed.
The letters of approval of this Commission, as well as the W and Wetlands Agency/Conservation Commission,
must be reproduced on the mylars.
After mylars have been signed by the Commission, they wi11 be returned to you for filing in the Office of the
Town Clerk by February13,2003. After filing these plow, a copyofsbPJ..ag* Lwaaktp G�lJotlm•-• - ^.
Planning Department.
Sincerely,
Kevin McCann, Chairman
Planning and Zoning Commission
Enclosures
e;. Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
J. R. Russo, Inc.
1540 SULLIVAN AVENUE r SOUTH WINDSOR, CT 06074
lyaosonco�"vA TELEPHONE (860) 644.2511
November 13, 2003
J. R_ Russo & Associates, Inc.
I Shoham Road
East Windsor, CT 06089
Ann: Mr, Ursid
RE: 2-Lot Subdivision
Chapel Road
South Windsor, CT
Dear Mr. Ursirl:
be 5 003 gave
meeting ofNovem r 2
Control Authority, at id , 8 Water Pollution Con B
The South Windsor ry, regular
tie -lot satidMslon on 1
approval for the connection to the Towv's sewerage system of a residential Chapel
. Road, South Windsor, CT, as more specifically shown on plans entitled "Special Exception Use/Intcrlor
Lot, ResubdivIsleaTjot Plan", prepared by J. R. Rosso & Associates, lac., Project No. 2003.008, Drawing
No(s) 3,dated 8.6.03, revised 9.26-03, 10.3-03, 10-13-03, 10.22-03, and subject to the following
conditions:
1. Technical approval oftho Town Engineering Department.
2. • - Fiml Authority approval and acceptance of the sanitary sewerage connection will be given once
the sewer lino has been installed and inspected by the Town staff, and based upon the written
verification of the Town staff that said sanitary sewer line was Installed In substantial conformance
with the design plans previously so roved by the Authority, and meeting all Town regulations and
appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours, .
J00ph J. Chairman
Water Pollution Control Authority
JC:dd
Cc: Matthew Gaillgan, Town Manager
Michael J. Gantick, Director of Public Worsts
Jeff Doolittle, Town Engineer '
Marcia Baaach, Director of Plam,ing
Chris Dougan, Chief Building Inspector
Mumarino Builders, Inc.
20' SANITARY SEWER
R.O.W, IN FAVOR OF THE
TOWN OF SOUTH WINDSOR
VOL. 156 PG. 47
CONTRACTOR TO FIELD
VERIFY LOCATION &
ELEVATION OF EXIST.
WYE PRIOR TO START
OF CONSTRUCTION.
FL=105.6f
182'-6" SDR 35
S=5.2t%
FOOTING DRAIN
OUTLET FL=115.0f
PROP. 20' R.O.W. FOR I li
UTILITIES, INGRESS &
EGRESS IN FAVOR OF Ii
LOT 14B» ' II
DRAINAGE EASEMENT IN
FAVOR OF 7HE STA7F OF
CONNECTiCUT D, 0. T- AS
PER DESIGN PLANS FOR
RECONSTRUCTION OF
CHAPEL ROAD
EXIST. FLARED END ` j+
FL=110.6 114
116 - -
BENCH MARK _
EXIST. CB 118
7F=119.1
FL=112.6 15" 1
FL=109.8 36"
27" SAN. ij .
n
M
State of Connecticut
I-291
130'-6" SDR 35
S=2.0% MIN.
122 \
120 `
" � l
-7 RC=
D- 15
S66e11'31 "E
242.,23'\ (Lrot.)3
\
Lot "A"
Arore - RQ �i2> e• -F CJ-12A
PROP. UTILITY POLE,
CONTRACTOR TO COORDINATE
WITH UTILITY COMPANY
CONTRACTOR TO VERIFY FL
ELEVA11ON PRIOR TO START APPROX. LOCATION
OF CONSTRUCTION. CORE EXIST. SAN. MH s'
7F=124.1f- 126
BORE/CHIMNEY CONNECTION FL=105.0f
(SEE DETAIL) 1.
124 -POO
,. MAP CLOSING LINE
tttt ��ttr�1 ttttt■ tto .... / N85°47 03' W
394, 69'
_ 128
FL 27"=105111" / '� ♦ _ �� E$B
♦ ♦ LINE I 90'x90' BUILDABLE
♦♦TEMPORARY �0 REAR SQUARE (10,000 S.F.)
it CLEAN -OUT TOPSOIL- ♦ '
(SEE DETAIL) ♦ STOCKPILEI _ _
BSI
\\ �, ♦ j o N/F
�♦ a oI W Maynard W. & Ruth, A. Briggs
,`
co
1. Resubdivision Property Of Andre Charbonneau South Windsor, Connecticut
Owner -Developer Andre L. Charbonneau Dated 9-4-90 By J. R. Russo & Associates.
2. Town Of South Windsor Map showing land acquired from Andre L. Charbonneau
by the State Of Connecticut Interstate Route 291 (Limited Access Highway) May 1,
1990 Rev. 12-19-90
3. Building Location Map, Zoning Plot Plan Prepared For Andre L. Charbonneau
Chapel Road South Windsor, Connecticut Dated 3-2-94 Revised 7-12-94 No. 94013
Class A-2 By J. R. Russo & Associates Sheet 1 Of 2.
Notes:
1. Parcel Located in RR Zone.
2. Parcel not located in a flood hazard zone Panel. No. 090036 0007 B.
3. Wetlands delineated by George Logan, Certified Soil Scientist of REMA
Ecological Services in July 2003.
4. Underground utility, structure and facility locations noted hereon have
been compiled, in part, from record mapping supplied by the respective
utility companies or governmental agencies, from parole testimony and
from other sources. These locations must be considered as approximate
in nature. Additionally, other such features may exist on the site, the
existence of which are unknown to J.R. Russo & Associates. The size,
location and existence of all such features must be field determined and
verified by the appropriate authorities prior to construction. Call Before
You Dig 1-800-922-4455.
5. The Connecticut Department of Transportation has not yet finalized the
Right of Way mapping for I-291.
SAVED J� v BASEMENT WINDOWS IN 6. The driveway is required to have a 20' paved apron starting at the existing
THIS AREA MAY REQUIRE edge of pavement on Chapel Road.
WINDOW WELLS 132
132., 7. Street excavation permits must be taken out by the contractor before
t ` l30 installation of the driveway, water service and underground utilities.
e 44, 5g" W 8. W. P. C. A. approval is required prior to construction.
30" �FECH TO 80 ,
�\ BE REMOVED N g1 q8 132 9. Driveway configuration on final plot plan shall provide a turnaround area
for emergency and delivery vehicles.
- A'
10. A Connecticut D.O.T. encroachment permit will be required for connection to
50' BU7L0iNG LINE �' sanitary sewer for Lot "B".
FOOTING DRAIN OUTLET
FL=117.5
�
\
PROP. TREE
N/F
LINE (TYP)
`
�
Ma � � c„ Vi T. & Huyd Vu Hein
201. 72'
T
_,
S660 11 ' 31 "E
�- 4" ADS FOOTING
'1
126 DRAIN OUTLET
128
80'x125' BUILDABLE SQUARE
(10,000
^1 I
11
!
S.F.) VARIANCE GRANTED OF
SECTION
00
j oS I
i
- 10.3.7, WHICH REQUIRES A 90'00'
CO,
- - - _ 1 .134
BUILDABLE SQUARE, BY THE
SOUTH-
WINDSOR Z.B.A. ON JULY 10,
2003.
i ,
136
CHIMNEY
-,HATCHWAY
William Loher
FOOTING DRAIN OUTLET
FL=116.5
80 LF SPLIT RAIL FENCE
W/SIGNAGE PER
WETLANDS COMMISSION
PROP. WATER MAIN EXTENSION,
CONTRACTOR TO COORDINATE
W/WATER COMPANY
S05e03'59"E
I
134
N/F
Laurel M. Riding
N/F
Harold E. &
Carol L. Rossick
FRANTANTIS
-+-
UTILITY POLE
c
WATER GATE
e
GAS GA TE
O
EXIST. SANITARY MANHOLE
❑
EXISTING CATCH BASIN
-Q-
SIGN
-�
HYDRANT
- - w- -
U. G. WATER LINE
EXIST. SANITARY SEWER
EXISTING STORM SEWER
A
WETLAND LIMIT
-z
EXIS77NG CONTOUR
'
PROP. CONTOUR
EXIS77NG SPOT GRADE
256.D
PROP. SPOT GRADE
- S -
PROPOSED SANITARY SEWER
- W -
PROPOSED WA TER
-UG-
PROPOSED UNDERGROUND UTILITIES
•
EXISTING I.P.
■
EXISTING MONUMENT
0
PROP. I. P.
PROP. MONUMEN T
tttt. - � STAKED HAYBALES OR SiLT FENCE
AgB SOIL TYPE
, I APPROX. SOIL TYPE LINE
D UTILITY SERVICE `" w 522 sw w �-O BLOW -OFF
===15" RCP -• -- - \\ 1<i
PAVEMENT PATCH
0 B
8" SAN. (SEE DETAIL) REV. 11-18-03 CONDITIONS OF APPROVAL, LETTERS ADDED
\\ s REV. 10-22-03 TOWN ENGINEERS COMMENTS
\ s � REV. 10-13-03 REVISED WETLAND LINE
\\ J EXIST. WA7FR MAIN
\\ REV. 10-3-03 RELOCATE HOUSE ON LOT "B"
L N SNET
SAN.AN. LATERAL
• ; REV. 9-26-03 REVISED HOUSE FOOTPRINT ON LOT "A" & TREE LOCATION
5224 1
Special Exception Use/Interior
ACE EXIST, WATER
PROP. sAwcuT Resubdivision/Plot Plan
OLE DURING WATER N
MAIN INSTALLATION '� �
Annlirnn t
EROSION & SEDIMENT CONTROL PLAN KEY
PS PERMANENT SEEDING
TS TEMPORARY SEEDING
CE CONSTRUCTION ENTRANCE
GSF GEOTMLE SILT FENCE
TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS
MAP IS SUBSTAN77ALLY CORRECT AS -NOTED HEREON.
GRAPHIC SCALE Regulations of Connecticut State Agencies - "Minimum Standards for Surveys and Maps in the State of 0#: F C0!;''�
Connecticut" as endorsed by the Connecticut Association of Land Surveyors, Inc. It is a Property Survey.♦��i Q��R.
40 0 20 4o ao 160 Exterior subdivision boundary lines are based on a Resurvey. The boundary determination of the interior
lot lines are based on an Original Survey. This surveys conform to Horizontal and Vertical Accuracy co
Class A-2 & T-2.LA
-
�
9
( IN FEET )
1 inch = 40 ft.
MR
GEOTEXTI LE SILT FENCE (GSF)
CHECKLIST FOR EROSION CONTROL PLAN
SPECIFICATIONS
Materials
Geotextile fabric. shall be a pervious sheet of polypropylene, nylon,
polyester, ethylene or similar filaments and shall be certified by
the manufacturer or supplier as conforming to the requirements
shown in Figure GSF-1 in the Connecticut Guidelines For Soil
Erosion and Sediment Control latest edition. The geotextile shall
be non -rotting, acid and alkali resistant and have sufficient
strength and permeability operations. Filamanets in the
geotextile shall be resistant to absorption. The filament network
must be dimensionally stable and free of any chemical treatment
or coating that will reduce its permeability. The geotextile shall
also be free of any flaws or defects which will alter its physical
properties. Torn or punctured geotexti/es shall not be used.
Supporting posts: shall be at least 42 inches long made of either
1.5 inch square hardwood stakes or steel posts with projections
for fastening the geotextile possessing a minimum strength of
0.5 pound per linear foot.
Placement
Fortoeofslope: Locate 5-10 feet down gradient from the toe
of slope, generally on the contour with maintenance and
sediment removal requirements in mind. When the contour can
not be followed install the fence such that perpendicular wings
are created to break the velocity of water flowing along the
fence. See Figure GSF-2 in the Connecticut Guidelines For Soil
Erosion and Sediment Control for spacing requirements.
Swales: Locate "U" shape across Swale such that the bottom of
both ends of the fence are higher that the top of the lowest
section of the fence.
Catch Basin in Swale on Slopes: Locate 2 "U" shapes across Swale
as above. one immediately up slope from the catch basin and
the other immediately down slope from the catch basin.
Catch Basins in Depressions: Encircle catch basin.
Culvertlnlets: Locate in a "U" shape approximately 6 feet from
the culvert in the direction of the incoming flow.
Culvert Outlets: Locate across the Swale at least 6 feet from the
culvert outlet.
Installation
Trench excavation: Excavate a trench a minimum of 6 inches
deep and 6 inches wide on the up slope side of the fence
location. For slope and Swale installations, extend the ends of
the trench sufficiently up slope such that bottom end of the
fence will be higher than the top of the lowest portion of the
fence.
When the fence is not to be installed on the contour, excavate
wing trenches spaces at the intervals given on Figure GSF-2 in
the Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
When excavation is obstructed by an occasional stone or tree
roots, provide a smooth transition between the trench bottom
and the obstruction.
Support Posts: Drive support posts on the down slope side of the
trench to a depth of at least 12 inches into original ground.
Never install support posts more than 10 feet apart. Install
support posts closer than 10 feet apart when concentrated flows
are anticipated or when steep contributing slopes and soil
conditions are expected to generate larger volumes of sediment.
For catch basins in hollows, drive posts at each corner of the
catch basin. Whenever the geotextile filter fabric that is used
exceeds the minimum material specifications contained in this
measure, the spacing of the stakes shall be per manufacturer's
recommendations.
Geotextile Filter Fabric: Staple or secure the geotextile to the
support posts per manufacture's instruction such that at least
6 inches of geotextile lies within the trench, the height of the
fence does not exceed 30 inches and the geotextile is taut
between the posts. When the trench is obstructed by stones,
tree roots, etc. allow the geotextile to lay over the obstruction
such that the bottom of the geotextile points up slope.
In the absence of manufacture's instructions, space wire staples
on wooden stakes at a maximum of 4 inches apart and
alternate their position from parallel to the axis of the stake to
perpendicular.
Do not staple the geotextile to living trees.
Provide reinforcement for the fence when it can be exposed to
high winds.
When joints in the geotextile fabric are necessary, splice
together only at at support posts, and securely seal.
Backfil/& Compaction: Backfill the trench with tamped soil or
aggregate over the geotextile. When the trench is obstructed
by a stone, tree root, etc. make sure the bottom of the
geotextile lies horizontal on the ground with the resulting flap on
the up slope side of the geotextile and bury the flap with 6
inches of tamped soil, or aggregate.
MAINTENANCE
Inspect the silt fence at least once a week and within 24 hours
of the end of a storm with rainfall amount of 0.5 inch or
greater to determine maintenance needs. When used for
dewatering operations, inspect frequently before, during and after
pumping operations.
Remove the sediment deposits or, if room allows, install a
secondary silt fence up slope of the existing fence when
sediment deposits reach approximately one half the height of
the existing fence.
Replace or repair the fence within 24 hours of observed failure.
Failure of the fence has occurred when sediment fails to be
retained by the fence because:
(a) the fence has been overtopped, undercut or bypassed by
runoff water,
(b) the fence has been moved out of position (knocked
o ver), or
(c) the geotextile has decomposed or been damaged.
Maintain the fence until the contributing area is stabilized.
After the contributing area is stabilized determine if sediment
contained by the fence requires removal or regrading and
stabilization. If the depth is greater than or equal to 6 inches,
regrading or removal of the accumulated sediment is required.
No removal or regrading is required if sediment depth is less
than 6 inches.
Remove the fence by pulling up the support posts and cutting
the geotextile at ground level. Regrade or remove sediment as
needed, and stabilize disturbed soils.
HALE BALE BARRIER (HB)
SPECIFICATIONS
Materials
Hay Bales: shall be made of hay or straw with 40 pounds
minimum weight and 120 pounds maximum weight held together
by twine or wire.
Stakes for Anchoring Hay Bales. shall be a minimum of 36 inches
long and made of either hardwood with dimensions of at least
1.5 inches square or steel posts with a minimum weight of 0.5
pound per linear' foot.
Placement
ToeofSlope: Locate 5-10 feet down gradient from the toe of
slope, generally on the contour. When the contour can not be
followed, stagger the bale installation and install perpendicular
wings (spaces as shown in Figure HB-1 in the Connecticut
Guidelines For Soil Erosion and Sediment Control latest edition)
to break the velocity of water flowing behind the bales. The
barrier should be located with sufficient distance from the toe
of the slope to allow access by equipment for removal of
accumulated sediments.
Catch Basins in Depression or Low Spots: Encircle catch basin or
yard drain.
lnsfa/lafion
Trench excavation: Excavate o trench as wide as the bales and
at least 4 inches deep. Each end of the trench should be
winged upslope so that the bottom of the last bale is higher
than the top of the lowest hay bale in the barrier.
Hay Bale Placement: Place bales in a single row in the trench,
lengthwise, with ends of adjacent bales tightly abutting one
another and the bindings oriented around the sides rather than
along the tops and bottoms of the bales (to avoid premature
rotting of the bindings).
Staking Hay Bales: Anchor each bale with at least 2 stakes,
driving the first stake in each bale toward the previously laid
bale to force the bales together. Stakes must be driven a
minimum of 18 inches into the ground. Fill any gaps between
the bales with hay or straw to prevent water from escaping
between the bales.
Backfrll & Tamped. Backfill the bales with the excavated trench
material to a minimum depth of 4 inches on the uphill side of
the bales. Tamp by hand or machine and compact the soil.
Loose hay or straw scattered over the disturbed area
immediately uphill from the hay bale barrier tends to increase
barrier efficiency.
MAINTENANCE
Inspect the hay bale barrier at least once a week and within 24
hours of the end of a storm with a rainfall amount of 0.5
inches or greater to determine maintenance needs. For dewater
operations, inspect frequently before, during and after pumping
operations.
Remove the sediment deposits or install a secondary barrier
upslope from the existing barrier when sediment deposits reach
approximately one half the height of the barrier.
Replace or repair the barrier within 24 hours of observed failure.
Failure of the barrier has occurred when sediment fails to be
retained by the barrier because.
(a) the barrier has been overtopped, undercut or bypassed
by runoff water,
(b) the barrier has been moved out of position, or
(c) the hay bales have deteriorated or been damaged.
Maintain the hay bale barrier until the contributing area is
stabilized.
After the upslope areas have been permanently stabilized, pull
the stakes out of the hay bales. Unless otherwise required, no
removal or regrading of accumulated sediment is necessary. The
hay bales may then be left in place or broken up for ground
cover.
TEMPORARY SEEDING (TS)
SPECIFICATIONS
Site Preparation
Install needed erosion control measures such as diversions,
grade stabilization structures, sedimentation basins and grassed
waterways in accordance with the approved plan.
Grade according to plans and allow for the use of appropriate
equipment for seedbed preparation, seeding, mulch application
and mulch anchoring.
SeedbedPreparafion
Loosen the soil to a depth of 3-4 inches with a slightly
roughened surface. If the area has been recently loosened or
disturbed, no further roughening is required. Soil preparation
can be accomplished by tracking with a bulldozer, discing
harrowing, raking or dragging with a section of chain link fence.
Apply ground limestone and fertilizer according to soil test
recommendations (such as those offered by the University of
Connecticut Soil Testing Laboratory or other reliable source).
If soil testing is not feasible on small or variable sites, or where
timing is critical, fertilizer may be applied at the rate of 300
pounds per acre or 7.5 pounds per 1,000 square feet of
10-10-10 or equivalent.
Seedin
Apply seed uniformly by hand, cyclone seeder, drill, cultipacker
type seeder or hydroseeder at a minimum rate for the selected
seed identified in Figure TS-2 in the Connecticut Guidelines For
Soil Erosion and Sediment Control latest edition. Increase
seeding rates by 107 when hydroseeding.
Mu/thing
See guidelines in the Mulch For Seed measures.
MAINTENANCE
Inspect temporary seeding area at least once a week and within
24 hours of the end of a storm with a rainfall amount of 0.5
inch or greater for seed and mulch movement and rill erosion.
Where seed has been moved or where soil erosion has occurred,
determine the cause of the failure and repair as needed.
TEMPORARY SOIL PROTECTION (TSP)
SPECIFICATIONS
Materials
Mulches within this specification include, but are not limited to:
1. Hay. The dried stems and leafy parts of plants cut and
harvested, such as alfalfa, clovers, other forage legumes and the
finer stemmed, leafy grasses. The average stem length should
not be less than 4 inches. Hay that can be windblown should
be anchored to hold it in place.
2. Straw: Cut and dried stems of herbaceous plants, such as
wheat, barley, cereal rye, or brome. The average stem length
should not be less than 4 inches. Straw that can be windblown
should be anchored to hold it in place.
3. Wood Chips: Chipped wood material from logs, stumps, brush
or trimmings including bark, stems and leaves having a general
maximum size of 0.5 inch by 2 inches and free of excessively
fine or long stringy particles as well as stones, soil and other
debris. No anchoring is required. If seeding is performed where
wood chips have been previously applied, prior to the seeding
the wood chips should be removed or tilled into the ground and
additional nitrogen applied. Nitrogen application rate is
determined by soil test at time of seeding.
4. Bark Chips, Shredded Bark. Tree bark shredded as a by product
of timber processing having a general maximum size of 4 inches
and free of excessively fine or long stringy particles as well as
stone and other debris. Material use is the some as wood
chips.
If subsequent seeding is performed where cellulose dense
mulches (e.g. leaves, excelsior, woodchips, barkchips) have been
applied, then prior to seeding either remove the mulch or till it
into the ground with the application of nitrogen.
Cellulose fiber is not recommended for use, except as a tackifier
for other mulch materials.
Tackifers within this specification include, but are not limited to:
Water soluble materials that cause mulch particles to adhere to
one another, generally consisting of either a natural vegetable
gum blended with gelling and hardening agents or a blend of
hydrophilic polymers, resins, viscosifiers, sticking aids and gums.
Emulsified asphalts are specifically prohibited for use as tackifiers due
to their potential for causing water pollution following its application.
Neffings within this specification include, but are not limited to:
Prefabricated openwork fabrics made of cellulose cords, ropes,
threads, or biodegradable synthetic material that is woven,
knotted or molded in such a manner that it holds mulch in
place until temporary soil protection is no longer needed
Site Preparation
Prior to mulching, complete the required grading and install
and/or repair other sediment control measures needed to
control water movement within the area to be mulched.
Application
Spreading: Spread mulch material uniformly by hand or machine
resulting in 1009' coverage of the disturbed soil.
When spreading hay mulch by hand, divide the area to be
mulched into approximately 1,000 square feet and place 2 to 3
bales of hay in each section to facilitate uniform distribution.
(Hay/Straw 2-3 tons/acre)
When spreading woodchips on slopes, it is particularly important
not to spread the chips too thick. Excessive application tend to
slip or slump when saturated. (Wood Chips/Shredded Bark 6 cu.
yds.11, 000 s. f.)
Anchoring. Apply tackifiers and/or netting either with the mulch
or immediately following mulch application. Expect the need for
tackifiers or netting along the shoulders of actively traveled
roads, hill tops and long open slopes not protected by wind
breaks.
When using netting the most critical aspect is to ensure that
the netting maintains substantial contact with the mulch and
the mulch, in turn, maintains continuous contact with the soil
surface. Without such contact, the material is useless and
erosion can be expected to occur. Install in accordance with
manufacturer's recommendations.
MAINTENANCE
Inspect temporary soil protection area at least once a week and
within 24 hours of the end of a storm with a rainfall amount of
0.5 inch or greater for mulch movement and rill erosion.
Where soil protection falls below 100q; reapply soil protection
within 48 hours. Determine the cause of the failure. If mulch
failure was the result of wind consider applying a tackifier or
netting. If mulch failure was caused by concentrating water,
install additional measures to control water and sediment
movement, repair erosion damage, reapply mulch with anchoring.
DUST CONTROL (DC)
SPECIFICATIONS
Mechanical Sweep/ng
Use mechanical sweeping on paved areas where dust and fine
materials accumulate as a result of truck traffic, pavement saw
cutting spillage, and wind or water deposition from adjacent
disturbed areas. Sweep daily in heavily traveled areas.
Water
Periodically moisten exposed soil surfaces on unpaved travelways
to keep the travelway damp.
Non Asphalfic Soil Tac*Aier
Non -asphaltic soil tackifier consists of an emulsified liquid soil
stabilizer of organic, inorganic or mineral origin, including, but
not limited to the following: modified resins, calcium chloride,
complex surfactant copolymers or high grade latex acrylics. The
solutions shall be non -asphaltic, non toxic to human, animal
and plant life, non corrosive and nonflammable. Materials used
shall meet local, state and federal guidelines for intended use.
All materials are to be applied according to the manufacturer's
recommendations and all safety guidelines shall be followed in
storing, handling and applying materials.
MAINTENANCE
Repeat application of dust control measures when fugitive dust
becomes evident.
MULCH FOR SEED (MS)
SPECIFICATIONS
Materials
Types of Mulches within this specification include, but are not
limited to:
I. Hay. The dried stems and leafy parts of plants cut and
harvested, such as alfalfa, clovers, other forage legumes and the
finer stemmed, leafy grasses. The average stem length should
not be less than 4 inches. Hay that can be windblown should
be anchored to hold it in place.
2. Straw: Cut and dried stems of herbaceous plants, such as
wheat, barley, cereal rye, or brome. The average stem length
should not be less than 4 inches. Straw that can be windblown
should be anchored to hold it in place.
3. Cellulose Fiber. Fiber origin is either virgin wood,
post-industrial/pre-consumer wood or post consumer wood
complying with materials specification (collectively referred to as
"wood fiber'), newspaper, kraft paper, cardboard (collectively
referred to as 'paper fiber') or a combination of wood and
paper fiber. Paper fiber, in particular, shall not contain boron,
which inhibits seed germination. The cellulose fiber must be
manufactured in such a manner that after the addition to and
agitation in slurry tanks with water, the fibers in the slurry
become uniformly suspended to form a homogeneous product.
Subsequent to hydraulic spraying on the ground, the mulch shall
allow for the absorption and percolation of moisture and shall
not form a tough crust such that it interferes with seed
germination or growth. Generally applied with tackifier and
fertilizer. Refer to manufacturers specifications for application
rates needed to attain 809'-959' coverage without interfering
with seed germination or plant growth. Not recommended as a
mulch for use when seeding occurs outside of the recommended
seeding dates.
Tackifiers within this specification include, but are not limited to:
Water soluble materials that cause mulch particles to adhere to
one another, generally consisting of either a natural vegetable
gum blended with gelling and hardening agents or a blend of
hydrophilic polymers, resins, viscosifiers, sticking aids and gums.
Good for areas intended to be mowed. Cellulose fiber mulch
may be applied as a tackifier to other mulches, provided the
application is sufficient to cause the other mulches to adhere to
one another. Emulsified asphalts are specifically prohibited for use as
tackifiers due to their potential for causing water pollution following its
application.
Nettings within this specification include, but are not limited to:
Prefabricated openwork fabrics made of cellulose cords, ropes,
threads, or biodegradable synthetic material that is woven,
knotted or molded in such a manner that it holds mulch in
place until vegetation growth is sufficient to stabilize the soil.
Generally used in areas where no mowing is planned.
Site Preparation
Grade according to plans and allow for the use of appropriate
equipment for seedbed preparation, seeding, mulch application
and mulch anchoring.
Aggg of q
Timing. Applied immediately following seeding. Some cellulose
fiber may be applied with seed to assist in marking where seed
has been sprayed, but expect to apply a second application of
cellulose fiber to meet the requirements of MulchFor5eed in the
Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
Spreading: Mulch material shall be spread uniformly by hand or
machine resulting in 80q-959 coverage of the disturbed soil
when seeding within the recommended seeding dates.
Applications that are uneven can result in excessive mulch
smothering the germinating seeds. For hay or straw anticipate
an application rate of 2 tons per acre. For cellulose fiber
follow manufactures recommended application rates to provided
8090-9590 coverage.
When seeding outside the recommended seeding dates, increase
mulch application rate to provide between 957.-1007. coverage
of the disturbed soil. For hay or straw anticipate an application
rate to 2.5 to 3 tons per acre.
When spreading hay mulch by hand, divide the area to be
mulched into approximately 1,000 square feet and place 1.5-2
bales of hay in each section to facilitate uniform distribution.
For cellulose fiber mulch, expect several spray passes to attain
adequate coverage, to eliminate shadowing, and to avoid
slippage.
Anchoring. Expect the need for mulch anchoring along the
shoulders of actively traveled roads, hill tops and long open
slopes not protected by wind breaks.
When using netting, the most critical aspect is to ensure that
the netting maintains substantial contact with the underlying
mulch and the mulch, in turn, maintains continuos contact with
the soil surface. Without such contact, the material is useless
and erosion can be expected to occur.
MAINTENANCE
inspect mulch for seed area at least once a week and within 24
hours of the end of a storm with a rainfall amount of 0.5 inch
or greater until the grass has germinated to determine
maintenance needs.
Where mulch has been moved or where soil erosion has
occurred, determine the cause of the failure and repair as
needed.
PERMANENT SEEDING (PS)
SPECIFICATIONS
Time Of Year
Seeding dates in Connecticut are normally April 1 through June
15 and August 15 through October 1. Spring seedings give the
best results and spring seedings of all mixes with legumes is
recommended. There are two exceptions to the above dates.
The first exception is when seedings will be made in the areas
of Connecticut known as the Coastal Slope and the Connecticut
River Valley. The Coastal Slope includes the coastal towns of
New London, Middlesex, New Haven, and Fairfield counties. In
these areas, with the exception of crown vetch (when crown
vetch is seeded in late summer, at least 3511. of the seed
should be hard seed (unscarified), the final fall seeding dates
can be extended and additional 15 days. The second exception
is frost crack or dormant seeding, the seed is applied during
the time of year when no germination can be expected,
normally November through February. Germination will take
place when weather conditions improve, mulching is extremely
important to protect the seed from wind and surface erosion
and to provide erosion protection until the seeding becomes
established.
PERMANENT SEEDING (Continued)
Site Preparation
Grade in accordance with the Land Grading measure which is in
the Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
Install all necessary surface water controls.
For areas to be mowed remove all surface stones 2 inches or
larger. Remove all other debris such as wire, cable tree roots,
pieces of concrete, clods, lumps, or other unsuitable material.
Seed Selection and Quantify
Select a seed mixture appropriate to the intended use and soil
conditions from Figure PS-2 and Figure PS-3 in the
Connecticut Guidelines For Soll Erosion and Sediment Control
latest edition or use mixture recommended by the NRCS
SeedbedPfeparabbn
Apply topsoil, if necessary, in accordance with the Topsoiling
measure which is in the Connecticut Guidelines For Soil Erosion
and Sediment Control latest edition.
Apply ground limestone and fertilizer according to soil test
recommendations (such as those offered by the University of
Connecticut Soil Testing Laboratory or other reliable source).
Where soil testing is not feasible on small or variable sites, or
where timing is critical, fertilizer may be applied at the rate of
300 pounds per acre or 7.5 pounds per 1,000 square feet of
10-10-10 or equivalent and limestone at 4 tons per acre or
200 pounds per 1,000 square feet.
Work lime and fertilizer into the soil to a depth of 3 to 4
inches with a disc or other suitable equipment.
Inspect seedbed just before seeding. If the soil is compacted,
crusted or hardened, scarify the area prior to seeding.
SeedApp/ication
Apply selected seed at rates provided in Figure PS-3 (in the
Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition) uniformly by hand, cyclone seeder, drill,
cultipacker type seeder or hydroseeder (slurry including seed,
fertilizer). Normal seeding depth is from 0.25 to 0.5 inch.
Increase seeding rates by 109 when hydroseeding or frost crack
seeding. Seed warm season grasses during the spring period
only.
Mu/thing
See guidelines in the Mulch For Seed measures.
MAINTENANCE
Inspect temporary soil protection area at least once a week and
within 24 hours of the end of a storm with a rainfall amount of
0.5 inch or greater during the first growing season.
Where seed has been moved or where soil erosion has occurred,
determine the cause of the failure and repair as needed.
SOIL ERSOION & SEDIMENT CONTROL NOTES
1. All soil erosion and sediment control work shall be done in strict
accordance with the Connecticut Guidelines For Soil Erosion and Sediment
Control latest edition.
2. Any additional erosion/sediment control deemed necessary by the
engineer during construction, shall be installed by the developer. In
addition, the developer shall be responsible for the repair/replacement
and/or maintenance of all erosion control measures until all disturbed
areas are stabilized to the satisfaction of the town staff.
3. All soil erosion and sediment control operations shall be in place
prior to any grading operations and installation of proposed structures or
utilities and shall be left in place until construction is completed and/or
area is stabilized.
4. All entrances to the project site are to be protected by construction
entrance (CE) pads, conforming to the Connecticut Guidelines For Erosion
and Sediment Control latest edition. The CE pad is to be maintained at
all times during the construction period.
5. In all areas, removal of trees, bushes and other vegetation as well as
disturbance of the soil is to be kept to an absolute minimum while
allowing proper development of the site. During construction, expose as
small an area of soil as possible for as short a time as possible.
6. All fill areas shall be compacted sufficiently for their intended
purpose and as required to reduce slipping, erosion or excess saturation.
Fill intended to support buildings, structures, conduits, etc., shall be
compacted in accordance with local requirements or codes.
7. Topsoil is to be stripped and stockpiled in amounts necessary to
complete finished grading of all exposed areas requiring topsoil. The
stockpiled topsoil is to be located as designated on the plans and ringed
with hay bale barrier or geotextile silt fence. The stockpiled topsoil shall
be temporarily seeded if it is to remain more than 30 days. Topsoil shall
not be placed while in a frozen or muddy condition, when the subgrade is
excessively wet, or in a condition that may otherwise be detrimental to
proper grading or proposed sodding or seeding.
8. There is to be no stockpiling of soil within a ten foot limit of
adjoining properties or within the drip line of existing trees. Any and all
fill material is to be free of brush, rubbish, timber, logs vegetative
matter and stumps in amounts that will be detrimental to constructing
stable fills. Maximum side slopes of exposed surfaces of earth to be 3.1
or as otherwise specified by local authorities.
9. When construction activites have ceased or have temporary been
suspended for more than 7 days, or when final grades are reached in
nay portion of the site, stabilization practices shall be implemented within
3 days.
10. If field conditions warrant, the engineer may require additional
measures to those specified on this sheet, including but not necessarily
limited to sodding, erosion control blankets, turf reinforcement mats,
stone slope protection, and stone check dams.
c
PROJECT: 2 Lot Resubdivision
LOCATION: 727 Chapel Road, South Windsor, Ct.
PROJECT DESCRIPTION: Construction of is 2 lot residential resubdivision.
PARCEL AREA 4.1 f acres
RESPONSIBLE PERSONNEL Rob Mannarino 289-7055
EROSION AND SEDIMENT CONTROL PLAN PREPARER: J.R. Russo & Associates
CHECKLIST:
Work Description
Erosion & Sediment
Control Measures
Location
Date Installed
Initials
Date Removed
Initials
Install construction
As shown on
exit pad.
plan.
Install haybales and
As shown on
silt fence.
plan.
MAINTENANCE OF MEASURES:
Location Description or Number Date Initials
Project Dates:
Date of groundbreaking for project:
Date of final stabilization:
NARRATIVE
This project is located on the south side of Chapel Road approximately 200' from the
intersection of Gail Lane, South Windsor, Connecticut. The proposed activity is the
construction of a 2 lot residential resubdivision.
The suggested schedule of construction is as follows:
1. Install silt fence as shown of the plan.
2. Excavate and install building foundation.
3. Install utilities as shown on plan.
4. Strip topsoil and stockpile as shown.
5. Rough grade driveway and around the building. Install septic system.
6. Complete grading of driveway and pave binder course.
7. Complete construction of the building and complete paving.
8. Fine grade remaining disturbed areas and establish vegetation.
9. Remove silt fence after permanent vegetation has been established.
Construction of this site is anticipated to begin after the approval of these plans.
The contractor shall keep the area of disturbance to a minimum and establish exposed soils
as soon as practical. All soil and erosion control measures shall be installed and
maintained in accordance with these plans and the "Guidelines for Soil Erosion and Sediment
Control". The contractor shall notify the Engineer of any discrepancies.
The developer shall be responsible for the repair/replacement/maintenance of all erosion
control measures until all disturbed areas are stabilized to the satisfaction of the town
staff. Sediment deposits should be periodically removed from the upstream sides of
Sediment Barriers. This material is to be spread and stabilized in areas not subject to
erosion, or to be used in areas which are not to be paved or built on. Sediment Barriers
are to be replaced as necessary to provide proper filtering action. Sediment Barriers are to
remain in place and be maintained to insure efficient siltation control until all areas above
the erosion checks are stabilized and vegetation has been established.
Best management practices (BMP's) shall be utilized at the site to ensure that no liter,
debris, building materials, or similar materials are discharged to waters of the state. The
site shall be kept neat and clean after each work day. A construction waste dumpster shall
be provided for proper disposal of waste materials. A portable sanitary facility shall be
provided and maintained at the site during construction activities.
REV. 11-18-03 NO CHANGES THIS SHEET
REV 10-22-03 NO CHANGES THIS SHEET
REV 10-13-03 NO CHANGES THIS SHEET
REV. 9-26-03 NO CHANGES THIS SHEET
MIRAFI 140N -
FILTER FABRIC
OR EQUAL
(SEE NOTE)
12"
1/2 0.L
1/2 0.L
6" MIN.
rn
as
0
0
0
m
0
-0
U
«o
0
0
0
N
U)
a3
IL
CD
.3
3-
0
a
D GRADE
6" TO 12" ANGLE
FILTER FORSTABILITY AND
BELLOW GRADE FABRIC 1H SELF CLEANING.
N TRAPROCK
UNUEK BLNU
TYPICAL CLEANOUT
d
q d d .
. •a pe4.
PIPE
PIPE
^
0. D.
n,nc
♦+
SECTION
NOT TO SCALE
FINISHED GRADE
PAVEMENT, 7RAPROCK OR
LANDSCAPING TO MATCH EXIS77NG
APPROVED GRANULAR NON -
ORGANIC BACKFILL MATERIAL
PLACED AND COMPACTED IN
ONE FOOT (1) (MAX.) LIFTS.
WARNING TAPE PER CONN.
GENERAL STATUTE SEC77ON
16-345, AS AMENDED, PLACED
12" (MIN.) TO 24" (MAX.) ABOVE
TOP OF PIPE.
SAND BLANKET
12" SAND M
-P1PE, AS SPECIFIED 3/4" STONE
" BROKEN TRAPROCK
6" MIN.
MIRAFI 140N
FILTER FABRIC
OR EQUAL
1' 2'-6" [ 1'
PIPE - IN GROUND WATER
NOT TO SCALE
NOTE:
1. INSTALL CLAY STOPS WHERE NECESSARY.
2. FILTER FABRIC SHALL BE NONWOVEN CLASS 2, WITH PERMITTIVITY OF 0.5 TO 0.1 SEC-1
AND SEC-1 ADS OF 0.43 MM TO 0.22MM AND SHALL MEET AASHTO M288-96
TYPICAL SANITARY SEWER TRENCH SECTION
NOT TO SCALE
Stone On Filte
Fabric
Marafi 140(N)
Construction Exit Pad
N.T.S.
FLOW
BOTTOM OF
DRAINAGEWAY
I
1 I
I 3 I
o
I Li 1
I I
I i
r I
I 1
I
1 I
PLAN VIEW
z
N Mw
Q
BACKFILL THE TRENCH
AND COMPACT THE
EXCAVATED SOIL.
COMPACTED
BACKFILL—
A LLLLLLLL B B LLLLLLLL
LLLLLLL LLLLLLLLL LLLLLLL A
LLLL LLLLLLLLL LLLL
L LLLLLLLLL LL
L LLLL
POINTS "A" SHOULD BE
HIGHER THAN POINT "B"
ELEVATION
SOURCE: U.S. DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE, STORRS, CONNECTICUT
PLACEMENT & CONSTRUCTION OF
A SYNTHETIC FILTER BARRIER
NOT TO SCALE
UNDISTURBED
EXISTING
PAVEMENT-\
.,. ,-- 4" Thick Min.
TACK COAT EDGES OF EXISTING
PAVEMENT (M.04.01)
SAW CUT
1.5" COMPACTED CLASS 2 BIT. CONC.
SURFACE COURSE (OR MATCH EXIST.
IF GREATER.) M.04
1.5" COMPACTED CLASS 1 BIT. CONC.
% BINDER COURSE (OR MATCH EXIST.
/ IF GREATER.)
SAW CUT
a i q. q • q dj. 4
• d
12" COMPACTED
PROCESSED
TRAPROCK BASE
I (M.05.01)
12 min. I 12" min.
SEE TYPICAL TRENCH SECTION
NOTES:
1. All saw cut and sealed joints to be
wither parallel with, or perpendicular
to, the center -line of the pipe.
2. All materials are to meet Conn. D.O.T. Form 814, latest edition
PERMANENT PAVEMENT PATCHING DETAIL
NOT TO SCALE
VARIES OR AS DIRECTED
BY THE ENGINEER
STOPPER WHERE CONNECTION
IS NOT EXTENDED
2- #4 BARS
CLASS "A" CONCRETE
PIPE
EXISTING
PAVEMENT
EDGE OF TRENCH
6" TEE OR APPROVED
CONNECTION
2-#2 BARS 0 12"
c" ninr
SEWER LINE
SECTION C—C LENGTH OF LATERAL AS SHOWN
ON PLANS OR AS DIRECTED BY
THE ENGINEER.
EXISTING GROUND FOR DUCTILE IRON CHIMNEYS,
REPLACE 45 DEGREE WYE BRANCH
WITH TWO DUCTILE IRON WYES.
FL=113.5±
6" LATERAL TO HOUSE
�— 45 DEGREE WYE BRANCH
18" MIN.
SHEETING IF USED
c -c
ELEVATION SECTION
FL=105.1 t
NOTE: PRECAST CHIMNEY -
ARROW DOUBLE SEAL
SEWER CHIMNEY OR
EQUAL CAN BE USED
UPON APPROVAL OF
TOWN ENGINEER.
CHIMNEY CONNECTION DETAIL
NOT TO SCALE
AW CUT AND SEAL J❑INT WITH TACK COAT M 04.01
2' (COMPACTED) CLASS 2 BITUMIN❑US
—CONCRETE SURFACE COURSE (OR
MATCH EXISTING, IF GREATER) M 04
RUBBER 'KOR-N-TEE" CONNECTOR
W/ S.S. CLAMP AS MANUFACTURED
BY NPC SYSTEMS, INC., MILFORD,
N.H., OR APPROVED EQUAL
NEW 6" BUILDING
7" MIN. LATERAL
CORE BORED
OPENING
EXISTING RCP
SEWER MAIN
CORE BORED LATERAL DETAIL
NOT TO SCALE
v4 ' d q. °. • -.
4
7' (COMPACTED) PROCESSED TRAPROCK
e d
BASE.- M.05.01
q a
'-�r;'�'.`
::^ *::•;
:.z''.`.:..,i `:
6' (COMPACTED) PROCESSED GRAVEL
, :
' •` - "" `'' ?'`
SUBASE OVER COMPACTED SUBGRADE
��+�'' �� • ; :,.:' 1';'' ' `'w •+' ::
(TRENCH BACK FILL)M,02- GRADE, B
+•,::
(OR PROCESSED TRAPROCK)
AP"R❑VED BACK FILL PLACED
AND COMPACTED IN 12' LAYERS
(OR AS ❑THERWISE APPROVED)
12'
12'
NO STONE LARGER THAN 3'
MIN. TRENCH MIN.
WIDTH
VARIES
--I
SEE
TYPICAL
NOTES
TRENCH
j I
SECTI❑N
1. ALL SAW CUT AND SEALED JOINTS TO
BE EITHER PARALLEL WITH, OR PERPEN-
DICULAR TO, THE CENTERLINE OF
SECTION
THE PIPE.
REV.
11-18-03
NO
CHANGES
THIS
SHEET
2, ALL MATERIALS ARE TO MEET
REV.
10-22-03
REMOVED INSIDE DROP MH DETAIL
FORM 814A, AS AMENDED
REV,
10-13-03
NO
CHANGES
THIS
SHEET
REV.
10-3-03
NO
CHANGES
THIS
SHEET
REV.
9-26-03
NO
CHANGES
THIS
SHEET
TEMPORARY PAVEMENT PATCHING DETAIL
NOT TO SCALE