Loading...
HomeMy WebLinkAbout03-31P_TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP SUBDIVISION_CHAPEL ROADTerra Technologies Group, LLC SUBDIVISION PLAN jraiAPEL AD—D 0 U T 0 -1-1 0 -1 r) prepared by: o®sign O rofesslonals. Inc. a civil engineers . planners . surveyors landscape architects • CIS • CPS 165 South Sat*Hite Road South Windsor, CT 06074 (860) 291-8755 FAX (860) 291-8757 MAP Lor N/F 500' ABUTTER LIST 8 10 247 LEFOLL BLVD. YOST/N/CH, JOHN R. & CARLA M. 11 2" LEFOLL BLVD. HUFF, JORN R/CHARD 12 273 LEFOLL BLVD. SEDNARZ, MICI M£L J. & BARSARA L. 13 12 BETTY DR. GOSSEU,, HARRY S. & ✓EN/FER S. 14 6 BETTY DR. MOLOCKO, LEO JR. & ELAINE A 15 250 LEFOLL BLVD. MACCHI, FRANK J. 16 258 LEFOLL BLVD. RA/KEN, BRUCE J. 17 284 LEFOLL BLVD. WILSON, R/CHARD f. & LAV/NA M. 18 270 LEFOLL BLVD. OVA RV' STANL£Y W. & BEATRICE A. 19 171 MARGARET DR. SMIM ANNA M, 31 109 MARGARET DR. OLIVE/RA, ANTON/0 A. 32 117 MARGARET DR. KINDER, DAVIO L. 33 131 MARGARET DR. LACY, JOHN A & SON14 34 141 MARGARET DR. RANGACHARI, RAJAGOPALAN & B/NA 35 151 MARGARET DR. MED/NA, RAFAEL III & EVONNE J. 36 159 MARGARET DR. LAUSERTE, PAULA M, 37 15 RUGBY LN. CORREAL£, DEREK J. 38 23 RUGBY LN, EVANS, BERNARD E. & DIANE M, 39 31 RUGBY LNN, LAUGHLAN, JAMES V. & BR/GI77E A. 40 45 RUGBY LN. ABELI STANLEY W. & KAREN M. 41 57 RUGBY LN. AREN T, HARRY H. & KAR£N H. 42 77 RUGBY LNN, F/ORI, FRANC/S 3' PAMELA 43 88 RUGBY LN. YESCHICK, STEV£N W. & DEBORAH A. 44 74 RUGBY LNN, LUXEMBURG, MAURY A & DOWELL, SUSAN 45 60 RUGBY LN, JOHNSTON& BRUCE & ANNMAR/E M. 46 52 RUGBY LN. ZINN, GLENN F. & BONNIE SUE 47 40 RUGBY LN. BATES, #2L14M J. & KIM M. 48 28 RUGBY LA: MULLIGAN, STEPHEN D. 51 987 CHAPEL RD. BURNS, LORINDA L. 52 PO BOX 270 *'CONK. LICHT 8' POWER CO. HARTFORD, CT 05141 60 R032 CHAPEL RD MURRAY, BARBARA C. 9 18 988 CHAPEL RD. CLOGSON, BEVERLY & LAURAN 19 972 CHAPEL RD. SHAK/R, TEVEN T. & KATNLEEN J. NOTES: THESE DRAWINGS ARE THE PROPERTY OF DESIGN PROFESSIONALS, INC,., AND HAVE BEEN PREPARED SPECIFIGALLY FOR THE ONNEWAPPLICANT FOR THIS PROXaT. THEY ARE NOT TO BE USED FOR ANY OTHER PURPOSE OR BY ANY OTHER PERSON OR PERSONS NOR REPRODUCED IN ANY MANNER WITHOUT THE E>IPRESS WRITTEN PERMISSION OF DESIGN PROFESSIONALS, INC. THESE PLANS ARE INVALID UNLESS THEY BEAR THE ORIGINAL 51"ATURE AND IMPRESSION OF THE PROFE55IONAL ENGINEER OR SURVEYOR. THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-30OB-1 THRU 20-30OB-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORCED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS INC. THIS PLAN WAS COMPILED FROM OTHER MAPS , RECORD RESEARCH AND/OR OTHER SOURCES OF INFORMATION. IT IS NOT TO BE CONSTRUED AS HAVING BEEN OBTAINED AS THE RESULT OF A FIELD SURVEY, AND IS SUBJECT TO SUCH CHANGE AS AN ACCURATE FIELD SURVEY MAY DISCLOS TO TH ND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON. 12882 RICHARD P. MARTEL LIC. No. ArrLIUAIV I : TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC C/O MARK ZWEIFLER 17 ROSE AVENUE WEST HARTFORD, CONNECTICUT 06110 TEL: 860-953-6102 TAVH N DD 2(�) q V — 00 R KEY MAP SCALE: 1"=100' 2 LLC L-A (C U (C(DONN , T49 C -, T Zoning Data Block �INGLE FAMILY RESIDENCES RR (RURAL RESIDENTIAL) & RR-0 (RURAL RESIDENTIAL OVERLAY) FEM REQUIRED/ALLOWED PROVIDED LOT 1 PROVIDED LOT 2 PROVIDED LOT 3 3 40,000 S.F. 55,594 S.F. (MIN.) 52,570 S.F. (MIN.) 57,595 S.F. (MIN.) th 175 ft. min. 278.6 ft. 175.5 ft. 175.5 ft. th 200 ft. min. 275.92' 275.92' 318.47' erage 10% 6.5% 6.9% 6.3% )us Coverage 50%* 10.1 % 10.6% 9.7% Stories 2 1 /2 max. 2 1 /2 max. 2 1 /2 max. 2 1 /2 max. Height 30 ft. 30' (MAX.) 30' (MAX.) 30' (MAX.) and 50 ft. 50' (MIN.) 50' (MIN.) 50' (MIN.) Ird 50 ft. 50' (MIN.) 50' (MIN.) 50' (MIN.) rd 20 ft. 20' (MIN) 20' (MIN) 20' (MIN) pace ** V 5,1 1.5.a OF THE RR/1-291 ZONE REQUIRES A MAXIMUM LIMIT OF 50% 'IOUS COVERAGE ZEQUIRED FOR SUBDIVISIONS WITH LESS THAN SIX (6) PROPOSED LOTS. Y SHEET INDEX 31 � 1 COVER SHEET/LOCATION ZONING & DATA BLOCKS 2 PLOT PLAN 3 TOPOGRAPHIC PLAN 4 EROSION CONTROL PLAN OWNER: ESTATE OF EVELYN F. JOHNSON C/0 GARY N. JOHNSON 770 BURNHAM STREET SOUTH WINDSOR, CONNECTICUT 06074 PLAN / a a CO ` :po No. 47 , CQ �n REV: SEPTEMBER 12, 2005 RE\/: JUNE 20, 2005 DA17E: MAY 20, 2005 SHEET 1 DPI PROJ. # 1?01 s�Rv�i�✓JOBS/1-ro I/rto I -► .dwg o 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 02-00�•av AREA CODE S60 r 644-2511 CERTIFIED MAIL June 30, 2003 Ms. Judy Schuler Design Professionals, Inc. 165 South Satellite Road South Windsor, CI' 06074 Re: 03-31 P, Terra Technologies Group, LLC & Chapel Road Group, LLC Dear Mrs. Schuler: We are pleased to advise you that the Planting & Zoning Commission at its June 24, 2003, meeting approved with modifications application 403-31P, terra Technologies Group, LLC & Chapel Road Group, LLC to create 3 lots on 3.7+ acres to be know as Chapel Road Subdivision property located on the southerly side of Chapel Road, across from Rugby Lane, RR/RR-O zone as StiOwim On tans-ri:-arixi `u"- Design PP0£eS3i0nais, ire. r0 cvi ni 7vi gnu uateu June 2v, P P P Y b� + p J 2003, as revised. This approval is subject to the following modifications: 1. This approval is for 3 lots, numbered 1-3. 2. Drainage and construction for this subdivision is subject to the approval of the Town Engineer. 3. All lots shall be serviced by the Town of South Windsor sanitary sewer system and are subject to the approval of the Water Pollution Control Authority. 4. Water shall be supplied to this subdivision by public water. 5. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $1000 for wetland plantings and conservation easement monumentation. 6 1 k a meeting most be held W;0, T-t Ctaff 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. All easements for conservation purposes, drainage or utilities, that may be required in connection with the approval of this subdivision, must be submitted on standard Town easement form where appropriate, to this Commission prior to filing the mylars and issuance of building permits. All deeds for open space, public improvements and roadways must be submitted prior to request for Town acceptance; all deeds must be in accordance with the policy for accepting deeds and must be approved by the Engineering Department and Town Attorney. 9. Footing drains are required for each house. Prior to the building of any structure on a lot, a topographic map, drawn to a scale of 1 " = 40', shall be submitted for each lot in the subdivision, showing proposed contours, elevations and the location of the footing drains. No building permits will be issued until the proposed contours, floor elevations and location of footing drains have been approved by the Town Engineer. 10. If, for any reason, finished grading and other individual lot site work is not completed, the Town Engineer shall determine the amount of a cash bond to ensure final grading and site work. This cash bond must be submitted prior to issuance of a Certificate of Occupancy. 11. Quantity estimates must be submitted to the Town Engineer (on the enclosed form) for the fdeter ubdi n bondin All bonds shall' , of m, t the closed bond ywy.,e,-. of determining uuvw..a.w, vv.wwg. +zu vv,.,.., g.w„ �.....,, policy and shall be posted prior to filing the final plans in the Town Clerk's office. If the developer chooses to submit a Letter of Credit for a one-year term, said Letter of Credit must be renewed on a yearly basis until completion of the development. If a new Letter of Credit has not been received within 30 days before the expiration datli, the Commission may, at its option, call the Letter it is holding. 12. A drainage assessment fee in the amount of S 150 shall be submitted to this Commission. 13. The Town Engineer's review comments dated June 17, 2003, must be addressed to the Town Engineer's satisfaction. 14. A Street Trees Easement is required along Chapel Road frontage. Trees to be preserved andior plantui wit hie the casement are to be finalized with +u e r--Warder :. 15. The 90' x 90' buildable square for Lot 2 must be shown outside of the easement area. 16. The conservation easement must be monumented as required by IWA/CC regulations. 17. The applicant must submit documentation that a driveway can be constructed on the State DDT's drainage right-of-way. 18. No building permits will be issued until all modifications have been complied with, and the final plans have been filed in the Town Clerk's office. Black and white transparent mylars of Sheets #2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk by October 11, 2003. After filing these plans, a copy of the receipt must be submitted to the Planning Department, Sincerely, Kevin McCann, Chairman Planning and Zoning Commission Enclosures cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Mark Zweifler lL1121►3 1. ALL MONUMENTATION FOUND OR SET IS DEPICTED HEREON. 2. PROPERTY IS IN FLOOD ZONE X — AREA DETERMINED TO BE OUTSIDE 500—YEAR FLOOD PLAIN AS PER FIRM COMMUNITY PANEL NUMBER 090036 010D REV. FEBRUARY 23, 2001. 3. HORIZONTAL DATUM — NAD'27. 4. LOCATION OF DEPICTED ZONE LINE IS APPROXIMATE. 5. INLAND WETLANDS FIELD DELINEATED BY JOHN P. IANNI, HIGHLAND SOILS LLC IN MARCH 2O03 AND FIELD LOCATED BY DESIGN PROFESSIONALS, INC. IN APRIL 2003. o_<x 1. UNLESS OTHERWISE NOTED, EXISTING UTILITY REVISIONS Z LOCATIONS AS SHOWN, ARE BASED ON AVAILABLE m INFORMATION. ALL EXISTING UTILITIES SHOULD BE FIELD VERIFIED PRIOR TO CONSTRUCTION. 2. ALL UTILITIES ARE TO BE STAKED IN THE FIELD 3 9/25/03 ADD Y/PCA APPROVAL LETTER MHA BY A LICENSED LAND SURVEYOR PRIOR TO 2 9/12/03 REVISE PER PZC AND IWA/CC APPROVAL MHA CONSTRUCTION. t 6/20/0-3 REVISE PER TOWN COMMENTS MHA 3. THIS PLAN IS INVALID UNLESS 1T BEARS THE IMPRESSION SEAL AND ORIGINAL SIGNATURE OF THE PROFESSIONAL ENGINEER/SURVEYOR. NO. DATE DESCRIPTION BY PROPOSED 10' STREET TREE EASEMENT IN FAVOR OF THE TOWN OF SOUTH WiNDSOR� 4�- N-1' 0g, T� 6�276y. N/F BARBARA C. MURRAY MAP REFERENCES: 1. PRELIMINARY RIGHT OF WAY SURVEY STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION RIGHT OF WAY MAP TOWN OF SOUTH WINDSOR VIETNAM VETERAN MEMORIAL HIGHWAY FROM JOHN FITCH BOULEVARD EASTERLY TO THE MANCHESTER TOWN LINE— SCALE 1"= 80' NUMBER 132-07 SHEET 4 OF 4 DATE 1-00 2. TOWN OF SOUTH WINDSOR MAP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNECTICUT INTERSTATE ROUTE 291 (LIMITED ACCESS HIGHWAY) SCALE 1 "=40' MAY 1, 1990 — ROBERT W. GUBALA. 3, RIGHT OF WAY MAP CHAPEL ROAD FROM U.S. ROUTE 5 EASTERLY TO BURNHAM STREET SOUTH WINDSOR, CT. PROJECT 1174.09 DATE JUNE 7, 1991, SCALE 1"=40' REV 6/92 SHEET 4 OF 4 BY A—N CONSULTING ENGINEERS, INC. 4. MANCHESTER — SOUTH WINDSOR R/W PROPERTY PURCHASE — SOUTH WINDSOR MANCHESTER HENRY M. JOHNSON ET AL — THE CONNECTICUT POWER COMPANY ENGINEERING DIVISION SCALE 1" = 100' 1-6-56 FILE E55229—Q 5. TOWN OF SOUTH WiNDSOR MAOP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNECTICUT RECONSTRUCTION OF CHAPEL ROAD, SCALE 1"=40' REV 8/88 BY THE TRANSPORTATION CHIEF ENGINEER BUREAU OF HIGHWAYS; r �/ N 0���_/� �ry/� O p�'N or 9 L OT 579595 S.F. 1.32 AC. % ry PROPOSED 20' VEGETAiiVE� EASEMENT IN FAVOR OF THE / TOWN OF SOUTH WINDSOR l NF R l MO �K / / y APPROX. PO ING LIMIT (PER AP REF. MON. Sg ,� MON. S89'~ 96.0 PROPOSED CONSERVATION EASEMENT IN FAVOR OF THE TOWN OF SOUTH WiNDSOR N/F STATE OF CONNECTICUT 1-291 APPLICANT: TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC C/O MARK ZWEi FLER 17 ROSE AVENUE WEST HARTFORD, CONNECTICUT 06110 TEL: 860-953-6102 THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES — "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. IT IS AN INDEPENDENT RESURVEY CONFORMING TO HORIZONTAL ACCURACY CLASS A-2. TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON. RICHARD P. MARTEL 12882 LIC. No. STOP SIGN 4 ­21.22, �-�•�.,,, `807 06"CU 3 OTAE 87q RVE) Ton _7 55 GRAPHIC SCALE 44D 0 20 40 80 ( IN FEET } 1 inch = 40 ft. c w 4 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CT 06074 ~OS01.0) TELEPHONE (860) 644-2511 July 31, 2003 Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 Attn: Judy Schuler RE: Terra Technologies Group Chapel Road Subdivision, South Windsor, CT Dear Ms. Schuler: The South Windsor Water Pollution Control Authority, at its special meeting ofluly 22, 2003, gave approval for the connection to the Town's sewerage system of a residential subdivision, as more specifically shown on plans entitled "Topographic Plan— Terra Technologies Group, LLC & Chapel Group, LLC" prepared by Design Professionals, Inc., Project No. 1701, Drawing No(s) 3, dated 5-20-03, revised 6-20-03, and subject to the following conditions: I. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once The sewer line has been installed and inspected by the Town staff, and based upon the written Verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer constnictiou- This approval letter must be superimposed on the final approval plans. Very truly yours, Water Pollution Control Authority JJC:dd Cc: Matthew Galligan, Town Manager Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer Marcia Banach, Director of Planning John Collins, Chief Building Inspector Terra Technologies Group, LLC APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) /1.27 AC. MON. S8 '45'53"E PROPOSED 20' VEGETATiV` EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR �lA i tG oic S_0t llll!'U&ol L § ^� 1540 SULUVAN AVENUE • SOUTH WINDSOR, CONN. 00074 \?spy ca>r' AREA CODE 8501 644-2511 June 30, 2003 Certified #70001670000I89221899 Design Professionals, Inc. Attn: Peter DaMallie 165 South Satellite Road South Windsor, CT 06074 nw+ C VF+ --AA — •pi A41 A�lAILVLVNVU&, 3VULUCCty Vi %-axpel MORO, Amu EOUlneny of Rugby Lane, RR/RR-O, Rurd Residential 3md Rural Residential Overlay zone Dear Mr. DeMallie: At the June 18, 2003 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #03-31P — Tara Technologies — Chapel Road — Inland Wetland/Conservation Commission application for a three -lot residential subdivision and associated improvement sort property located southerly of Chapel Road, and southerly of Rugby lEanrt RR/RR-fl R..rotA.e;.ta..�;�1 .i'D...+,IDS..:.ie..a:..1n..�1............. •ram:-----------t'---�----' >----•+.....,�>..ww w.w,,,w,.,w au,u nwa+,cao>,ucitua+ vvgrny LV11G. LA1J GJTpIU Vtl175 SU[7JCGL to the following conditions: 1. One blueprint copy of the entire set ofpians and this letter reproduced thereon, must be submitted to this Commission- This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on June 18, 2008. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required mivz hi- nhtni,.i l and � vs, ;,id. t r^ . +w , a: '.,. sL _ v- — ...., a^.y 'o.,.,:i�� tin we Elie. 5. A contact person snail be identified on the plans. 6. The Conservation Easement boundary shall be marked with the required monuments with disks or similar signs. 7. Notes shall be placed on the house deeds regarding the conservation easement- 8. Planting easements shall be placed between lots I and 2, lots 2 and 3, and on the easterly side of lot 1. Y. Town start approval will be necessary on the wetland enhancements, the planting easement and the conservation easement. 10. We recommend a bond in the amount of S 1,000. Be submitted to the Planning & Zoning Commission to ensure establishment of the markers for the casements and establishment of the plantings in the planting easements. Very truly yours, iNL&ND WETLANDS AGENCY/ CONSERVATION COMMISSION P C� �7 ) Philiv 210mey, Vice Chairperson PF:dr cc: Terra Technologies APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) '—PROPOSED 10' STREET TREE EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR N/F CONNECTICUT UGHT do POWER OWNER: ESTATE OF EVELYN F. JOHNSON C/0 GARY N. JOHNSON 770 BURNHAM STREET SOUTH WINDSOR, CONNECTICUT 06074 ® Tel. 860.291 • 8755 ® Fax 860.291 - 8757 fesign Iff r'ofessionalsg inc, ® civil engineers • planners surveyors a landscape architects • gis • gps 165 SOLIth Satellite Road, South Windsor, Connecticut 00074 PLOT PLAN DESIGN. • PRD/JS I DRAWN tJS I CHECKED., GBS/ JOB NO.: 1701 1 DATE. MG 20, 2003 DRAWING NO.: server/jobs/1701/1701-2. dwa LEGEND O IRON PIN TO BE SET O EXISTING IRON PIN ■ MONUMENT TO BE SET ❑ EXISTING MONUMENT ----- EXISTING PROPERTY LINE PROPOSED PROPERTY LINE RESURVEY PREPARED FOR: TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC (CHAPjjEo lROAD SOUTH `s UNDSORLp CONN EC'B U CUT SHEET 2, 11 IF SEEDING SCHEDULE ALL DISTURBED AREA NOT PAVED OR LANDSCAPED SHALL BE LOAMED WITH A 4" MINIMUM OF TOPSOIL, SEED AS INDICATED BELOW. CONDITION SOIL WITH FERTILIZER APPLIED AT THE RATE OF 300 POUNDS PER ACRE OR 7.5 POUNDS PER 1,000 SQUARE FEET USING 10-10-10 OR EQUIVALENT. IN ADDITION, 300 POUNDS OF 38-0-0 PER ACRE OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOPDRESSING. APPLY GROUND LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS MAGNESIUM OXIDE) AT THE RATE OF 3 TONS PER ACRE OR 135 POUNDS PER 1000 SQ. FT. PERMANANT VEGETATION COVER SEEDING DATES: APRIL 1 TO JUNE 1 AND AUGUST 15 TO SEPTEMBER 1 USE THE FOLLOWING MIXTURE: KENTUCKY BLUEGRASS 45% CREEPING RED FESCUE 45% PERENNIAL RYEGRASS 10% APPLY 1 POUND PER 1,000 SQ. FT. OR 45 POUNDS PER ACRE. WOOD CHIPS SHOULD BE APPLIED AT A RATE OF 500-900 POUNDS PER 1,000 SQ. FT. OR 10-20 TONS PER ACRE. TEMPORARY VEGETATIVE COVER SEEDING DATES: MARCH 1 TO JUNE 15 AND AUGUST 1 TO OCTOBER 1 ANNUAL RYEGRASS 100% APPLY ONE POUND PER 1,000 SQ. FT. OR 40 POUNDS PER ACRE WITH ANCHORED HAY MULCH AT 2 TONS PER ACRE. Construction Sequence South Windsor 1. Coordinate all work with Town of South Windsor staff. 2. Install tree protection for trees to be saved. 3. Install erosion control measures. Contact Town for inspection. 4. Remove and store existing trees to be saved from areas to be disturbed. 5. Locate all existing utilities and take necessary measures to insure adequate protection of existing utilities during construction, 6. Loam and seed disturbed areas as soon as practical during the construction process. 7. Begin construction of individual houses. Work to proceed as follows: a) Strip topsoil stockpile in berm(s) downslope of disturbed area; use topsoil berm(s) to control runoff from houses. b) Grade areas, install fill as required, install foundation, and grade to driveway sub -grade. c) Install utilities. d) Loam and seed sideslopes and disturbed areas as soon as practical during the construction process. e) Construct house. f) Install pavement for driveways. 8. All slopes and areas disturbed by construction shall be graded smooth and 4 inches of topsoil applied. The areas shall then be seeded or sodden, fertilized, mulched, watered, and maintained until hardy grass growth is established in all areas. All earthen areas will be grassed. 9. Reestablish all non -vegetated areas in accordance with Permanent Erosion Control requirements. 10. Maintain all existing erosion controls throughout the construction process, and add additional measures as conditions warrant. 11. Final clearing of erosion and sedimentation controls. 12. Remove tree protection and temporary erosion control measures. GENERAL NOTES: MITIGATION SHRUB PLANTINGS ZONE SCIENTIFIC NAME COMMON NAME Wetland Aronia arbutifolia Red chokeberry Clethra alnifolfa Sweet pepperbush flex verticillata Winterberry Vaccinium corymbosum Highbush blueberry Viburnum recognitum Arrowwood NOTES: 1. WETLANDS SHRUBS AVAILALE FROM NEW ENGLAND WETLAND PLANS, INC., AMHERST, MA (413) 256-1752. 2. ACTUAL SPECIES SELECTION WILL DEPEND UPON AVAILABILITY AT LOCAL/REGIONAL NURSERIES. 3. 20 OF EACH SPECIES TO BE PLANTED, FOR A TOTAL OF 100 SHRUBS. 4. MITIGATION PLANTINGS SHALL BE SUPERVISED BY THE CONSULTING WETLANDS SCIENTIST AND TOWN ENVIRONMENTAL PLANNER. F T 77 c9 /Nyir1 S,� S PROPOSED 10' STREET TREE \\ EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR� N/F BARBARA C. MURRAY 1. ALL CONSTRUCTION TO CONFORM TO TOWN OF SOUTH WINDSOR AND/OR UTILITY COMPANY(S) F44R STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION. 566 3. FIELD CHANGES SHALL HAVE PRIOR APPROVAL OF THE TOWN OF SOUTH WINDSOR AND/OR AGENT AND THE 66 DESIGN ENGINEER. 4. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. 5. MAXIMUM SLOPE OF FILL TO BE 3:1 EXCEPT WHERE NOTED ON THE PLANS. ALL FILL MATERIAL TO BE CLEAN MATERIAL, "CLEAN FILL" MEANS UNCONTAMINATED NATURAL SOIL OR ROCK WHICH IS INERT IN TERMS OF LEACHING AND POSES NO THREAT, PRESENT OR FUTURE, OF POLLUTION TO SURFACE WATERS OR GROUNDWATERS. MOREOVER, CLEAN FILL TYPICALLY EXCLUDES, BUT IS NOT LIMITED TO THE EXCLUSION OF: DEMOLITION OR CONSTRUCTION WASTE MATERIALS OR DEBRIS, COMBUSTIBLE OR NOT COMBUSTIBLE, INCLUDING CONCRETE, ASPHALT, PAVING MATERIALS, OR BY-PRODUCTS; YARD WASTES, INCLUDING BRANCHES, LIMBS, BRUSH, SHRUBS, TREES, PARTS OF TREES, TREE STUMPS AND SIMILAR MATERIALS GROWN ON OR EMINATING FROM LAND; NONPUTRESIBLE SOLID WASTES, COMBUSTIBLE OR NON-COMBUSTIBLE; AND BULKY RUBBISH OR REFUSE, INCLUDING PUTRESIBLE SOLIDS, SEMI -SOLIDS OR LIQUIDS. 6. ALL STUMPS TO BE CHIPPED ON SITE. STUMPS NOT CHIPPED SHALL BE REMOVED FROM SITE, NOT BURIED. 7. EXISTING UTILITIES AS DEPICTED ON THIS PLAN ARE TAKEN FROM AVAILABLE INFORMATION. THE CONTRACTOR IS TO HAVE EXISTING UTILITIES FIELD VERIFIED PRIOR TO CONSTRUCTION. BEFORE EXCAVATING, CONTACT "CALL BEFORE YOU DIG" AT 1-800-922-4455. 8. FOUNDATION TO BE EQUIPPED WITH SUMP PUMP AS REQUIRED. FOUNDATION DRAIN TO BE EQUIPPED WITH A CHECK VALVE. FOUNDATION DRAIN SHALL BE INSTALLED TO PROVIDE POSITIVE FLOW TO CATCH BASIN WHERE FEASIBLE. ESTIMATED START DATE FOR CONSTRUCTION - SUMMER 2003 ESTIMATED COMPLETION DATE FOR THE PROJECT - SPRING 2004 RESPONSIBLE PERSON(S) FOR IMPLEMENTA TION OF SEDIMENTA 77ON AND EROSION CONTROL IS OWNER/APPL/CANT. Z•{x II II 1. UNLESS OTHERWISE NOTED, EXISTING UTILITY Z LOCATIONS AS SHOWN, ARE BASED ON AVAILABLE m INFORMATION. ALL EXISTING UTILITIES SHOULD BE FIELD VERIFIED PRIOR TO CONSTRUCTION. 2. ALL UTILITIES ARE TO BE STAKED IN THE FIELD BY A LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. 3. THIS PLAN IS INVALID UNLESS IT BEARS THE IMPRESSION SEAL AND ORIGINAL SIGNATURE OF THE PROFESSIONAL ENGINEER/SURVEYOR. PROPOSED CONSERVATION EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR N/F STATE OF CONNECTICUT 1-291 APPLICANT: TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC C/O MARK ZWEIFLER 17 ROSE AVENUE WEST HARTFORD, CONNECTICUT 06110 TEL: 860-953--6102 REVISIONS THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. IT IS AN INDEPENDENT RESURVEY CONFORMING TO HORIZONTAL ACCURACY CLASS A-2. TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON. 12882 RICHARD P. MARTEL LIC. No. 2 9/12/03 REVISE PER PZC & IWA/CC APPROVAL MHA 1 6/20/03 REVISE PER TOWN COMMENTS MHA I NO. DATE DESCRIP77ON BY STOP SIGN TF A/ 2 N /A, (75` �17 y � w� 762 I'I 2 4 21. R�25 06 (7.OTAC TO 5.87 , CURVC) #s270 Fie NOTES: 1. ALL MONUMENTATION FOUND OR SET IS DEPICTED HEREON. 2. PROPERTY IS IN FLOOD ZONE X - AREA DETERMINED TO BE OUTSIDE 500-YEAR FLOOD PLAIN AS PER FIRM COMMUNITY PANEL NUMBER 090036 010D REV. FEBRUARY 23, 2001. 3. HORIZONTAL DATUM - NAD'27. 4. LOCATION OF DEPICTED ZONE LINE IS APPROXIMATE. 5. INLAND WETLANDS FIELD DELINEATED BY JOHN P. IANNI, HIGHLAND SOILS LLC IN MARCH 2O03 AND FIELD LOCATED BY DESIGN PROFESSIONALS, INC. IN APRIL 2003. MAP REFERENCES: 1. PRELIMINARY RIGHT OF WAY SURVEY STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION RIGHT OF WAY MAP TOWN OF SOUTH WINDSOR VIETNAM VETERAN MEMORIAL HIGHWAY FROM JOHN FITCH BOULEVARD EASTERLY TO THE MANCHESTER TOWN LINE- SCALE 1"= 80' NUMBER 132-07 SHEET 4 OF 4 DATE 1-00 2. TOWN OF SOUTH WINDSOR MAP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNECTICUT INTERSTATE ROUTE 291 (LIMITED ACCESS HIGHWAY) SCALE 1"=40' MAY 1, 1990 - ROBERT W. GUBALA. 3. RIGHT OF WAY MAP CHAPEL ROAD FROM U.S. ROUTE 5 EASTERLY TO BURNHAM STREET SOUTH WINDSOR, CT. PROJECT 1174.09 DATE JUNE 7, 1991, SCALE 1"=40' REV 6/92 SHEET 4 OF 4 BY A-N CONSULTING ENGINEERS, INC. 4. MANCHESTER - SOUTH WINDSOR R/W PROPERTY PURCHASE - SOUTH WINDSOR MANCHESTER HENRY M. JOHNSON ET AL - THE CONNECTICUT POWER COMPANY ENGINEERING DIVISION SCALE 1" = 100' 1-6-56 FILE E55229-Q 5. TOWN OF SOUTH WINDSOR MAOP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNECTICUT RECONSTRUCTION OF CHAPEL ROAD, SCALE 1"=40' REV 8/88 BY THE TRANSPORTATION CHIEF ENGINEER BUREAU OF HIGHWAYS. APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) F TF 6 //NV�719 96 //V ��ls 'v%' 17 77 S O6 7, s 6 90• l so. / 0' R. Y. /dry �= 5 74'41" i� R=825�06 (LOT 1, / O- 75.52* TOTA Tan= `I I i 60.4526 ,..� 98.74' TO MON. MON. S8 ''53"E CHAIN LINK FENCE PROPOSED 20' VEGETATIVE EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 n. LAWN / STREETS / CROSS-COUNTRY PAVED AREAS TOPSOIL & SOD OR SEED BASE AND PAVEMENr -PER PAVEMENT DETAIL. APPROVED GRANULAR NON - ORGANIC BACKFlII MATERIAL PLACED AND COMPACTED IN 48 MIN. d •:. ; 12 MIN. 6" MIN, ONE FOOT (1) (MAX.) LIFTS. "-----,AND (CT DOT M.03.02-2 FINE AGGREGATE) 8" DUCTILE IRON PIPE I 3 __j SECTION WATER MAIN TRENCH SECTION NOT TO SCALE N.T.S. 1/6 OR 1/8 BEND (22.5' OR -ff45') �D PLAN VIEW 1 /4 BEND (90') 3 WA D I + TRENCH WIDTH ' I r 6' MIN.- TRENCH SHALL BE EXCAVATED TO FIRM MATERIAL IMMEDIATELY -i� PRIOR TO PLACING T CONCRETE SECTION PLAN VIEW CONCRETE ANCHORS FOR USE WITH 16" AND SMALLER WATER MAINS & SANITARY FORCE MAINS THRUST RESTRAINT - THRUST BLOCK METHOD (not to scale) NOTES: 1. ANCHORS BASED ON MAXIMUM ALLOWABLE WATER PRESSURE OF 123 PST. 2. SHOULD ONLY BE USED WHEN SOIL CONDITIONS ARE STABLE. IF IN QUESTION. THE WATER COMPANYS INSPECTOR WLL MAKE THE DETERMINATION. PLAN VIEW S230 �03 7"4 APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) '-PROPOSED 10' STREET TREE EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR N/F CONNECTICUT LIGHT & POWER OWNER: ESTATE OF EVELYN F. JOHNSON C/O GARY N. JOHNSON 770 BURNHAM STREET SOUTH WINDSOR, CONNECTICUT 06074 Tel. 860.291 • 8755 Fax 860.291.8757 esign rofessionatls, Inc. civil engineers • planners surveyors O landscape architects • gis • gps 165 South Satellite Road, South Windsor, Connecticut 06074 TOF'OO G�APH�IC PLAN' DESIGN.•, JAS DRAWN.• JAS I CHECKED.- GBS/ ✓og No.: 1701 1 DA TE.• May 20, 2003 DRAWING NO.: server/iobs/1701/1701_3. dwo LEGEND O IRON PIN TO BE- SET ® EXISTING IRON PIN ■ MONUMENT TO BE SET ❑ EXISTING MONUMENT ru> EXISTING UTILITY POLE - F2)_ EXISTING CATCH BASIN AND PIPE -W- PROPOSED WATER LATERAL -F- PROPOSED FOUNDATION DRAIN -s- PROPOSED SANITARY LATERAL -ETC- PROPOSED CABLE, ELECTRIC & TELEPHONE SERVICE --,300-- EXISTING CONTOUR ---®- PROPOSED CONTOUR x312.25 PROPOSED SPOT GRADE ELEVATION x312.25 EXISTING SPOT GRADE ELEVATION SURFACE DRAINAGE DIRECTION EXISTING TREE LINE PROPOSED TREE LINE ----- EXISTING PROPERTY LINE PROPOSED PROPERTY LINE RESURVEY PREPARED FOR: TERRA TECHNOLOGIES GROUT; LLC & CHAPEL ROAD GROUP, LLC CRABf�IEL ROAD SOUTH WUMSO s, ICONRTIECM CUT SHEET 3, 0 M .T�3 SEEDING SCHEDULE ALL DISTURBED AREA NOT PAVED OR LANDSCAPED SHALL BE LOAMED WITH A 4" MINIMUM OF TOPSOIL, SEED AS INDICATED BELOW. CONDITION SOIL WITH FERTILIZER APPLIED AT THE RATE OF 300 POUNDS PER ACRE OR 7.5 POUNDS PER 1,000 SQUARE FEET USING 10-10-10 OR EQUIVALENT, IN ADDITION, 300 POUNDS OF 38-0-0 PER ACRE OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOPDRESSING. APPLY GROUND LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS MAGNESIUM OXIDE) AT THE RATE OF 3 TONS PER ACRE OR 135 POUNDS PER 1000 SO. FT. PERMANANT VEGETATION COVER SEEDING DATES: APRIL 1 TO JUNE 1 AND AUGUST 15 TO SEPTEMBER 1 USE THE FOLLOWING MIXTURE: KENTUCKY BLUEGRASS 45% CREEPING RED FESCUE 45% PERENNIAL RYEGRASS 10% APPLY 1 POUND PER 1,000 SQ. FT. OR 45 POUNDS PER ACRE. WOOD CHIPS SHOULD BE APPLIED AT A RATE OF 500-900 POUNDS PER 1,000 SQ. FT. OR 10-20 TONS PER ACRE. TEMPORARY VEGETATIVE COVER SEEDING DATES: MARCH 1 TO JUNE 15 AND AUGUST 1 TO OCTOBER 1 ANNUAL RYEGRASS 100% APPLY ONE POUND PER 1,000 SQ. FT. OR 40 POUNDS PER ACRE WITH ANCHORED HAY MULCH AT 2 TONS PER ACRE. Construction Sequence South Windsor 1. Coordinate all work with Town of South Windsor staff. 2. Install tree protection for trees to be saved. 3. Install erosion control measures. Contact Town for inspection. 4. Remove and store existing trees to be saved from areas to be disturbed. 5. Locate all existing utilities and take necessary measures to insure adequate protection of existing utilities during construction. 6. Loam and seed disturbed areas as soon as practical during the construction process. 7. Begin construction of individual houses. Work to proceed as follows: a) Strip topsoil stockpile in berm(s) downslope of disturbed area; use topsoil berm(s) to control runoff from houses. b) Grade areas, install fill as required, install foundation, and grade to driveway sub -grade. c) Install utilities. d) Loam and seed sideslopes and disturbed areas as soon as practical during the construction process. e) Construct house. f) Install pavement for driveways. 8. All slopes and areas disturbed by construction shall be graded smooth and 4 inches of topsoil applied. The areas shall then be seeded or sodden, fertilized, mulched, watered, and maintained until hardy grass growth is established in all areas. All earthen areas will be grassed. 9. Reestablish all non -vegetated areas in accordance with Permanent Erosion Control requirements. 10. Maintain all existing erosion controls throughout the construction process, and add additional measures as conditions warrant. 11. Final clearing of erosion and sedimentation controls. 12. Remove tree protection and temporary erosion control measures. GENERAL NOTES -.- CONSTRUCTION NOTES 1. ALL EROSION CONTROL MEASURES WILL BE CONSTRUCTED IN ACCORDANCE WITH THE "GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" BY THE CONNECTICUT COUNCIL FOR SOIL AND WATER CONSERVATION. 2. ALL EROSION CONTROL MEASURES ARE TO BE MAINTAINED OR REPLACED DURING CONSTRUCTION AS NECESSARY. 3. CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHOWN ON THESE PLANS. THIS RESPONSIBILITY INCLUDES IMPLEMENTATION AS WELL AS MAINTENANCE. ANY PROPOSED CHANGES TO THIS PLAN MUST BE APPROVED BY THE ENGINEER AND/OR THE PROPER LOCAL TOWN AGENCY. 4. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CONSTRUCTION, WHEREVER POSSIBLE. 5. AREAS TO BE LEFT BARE FOR MORE THAN 15 DAYS SHALL BE TREATED WITH AIR DRIED WOOD CHIP MULCH OR SEEDED WITH PERENNIAL RYE-GRASS UNTIL FINAL GRADING AND STABILIZATION IS TO TAKE PLACE. 6. ADDITIONAL EROSION CONTROL MEASURES SHALL BE INSTALLED DURING CONSTRUCTION IF DEEMED NECESSARY OR ORDERED BY THE PROJECT ENGINEER OR THE PROPER LOCAL TOWN AGENT. 7. FROZEN MATERIAL SHALL NOT BE USED FOR FILL NOR SHALL FILL BE PLACED OR COMPACTED ON FROZEN GROUND. F T CB 77 J SJcyT ��(24 770� 7S </N�\ i 770 7$ PROPOSED 10' STREET TREE 12SOx ,5 EASEMENT IN FAVOR OF THE TOWN OF SOUTH WINDSOR R 0 139 9 7 T°n0, $ f <j ANTI -TRACKING PAD V"^'2' J T VIVE VIN ' FILTER FABRIC (TYP.) 4� SILT FENCE (TYP.) 1. ALL MONUMENTA11ON FOUND OR SET IS DEPICTED HEREON. 2. PROPERTY IS IN FLOOD ZONE X - AREA DETERMINED TO BE OUTSIDE 500-YEAR FLOOD PLAIN AS PER FIRM COMMUNITY PANEL NUMBER 090036 010D REV. FEBRUARY 23, 2001. 3. HORIZONTAL DATUM - NAD'27. 4. LOCATION OF DEPICTED ZONE LINE IS APPROXIMATE. 5. INLAND WETLANDS FIELD DELINEATED BY JOHN P. IANNI, HIGHLAND SOILS LLC IN MARCH 2O03 AND FIELD LOCATED BY DESIGN PROFESSIONALS, INC. IN APRIL 2003. MAP REFERENCES: 1. PRELIMINARY RIGHT OF WAY SURVEY STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION RIGHT OF WAY MAP TOWN OF SOUTH WINDSOR VIETNAM VETERAN MEMORIAL HIGHWAY FROM JOHN FITCH BOULEVARD EASTERLY TO THE MANCHESTER TOWN LINE- SCALE 1"= 80' NUMBER 132-07 SHEET 4 OF 4 DATE 1-00 2. TOWN OF SOUTH WINDSOR MAP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNEC11CUT INTERSTATE ROUTE 291 (LIMITED ACCESS HIGHWAY) SCALE 1"=40' MAY 1, 1990 - ROBERT W. GUBALA. 3. RIGHT OF WAY MAP CHAPEL ROAD FROM U.S. ROUTE 5 EASTERLY TO BURNHAM STREET SOUTH WINDSOR, CT. PROJECT 1174.09 DATE JUNE 7, 1991, SCALE 1"=40' REV 6/92 SHEET 4 OF 4 BY A-N CONSULTING ENGINEERS, INC. 4. MANCHESTER - SOUTH WINDSOR R/W PROPERTY PURCHASE - SOUTH WINDSOR MANCHESTER HENRY M. JOHNSON ET AL - THE CONNECTICUT POWER COMPANY ENGINEERING DIVISION SCALE 1" = 100' 1-6-56 FILE E55229-Q 5. TOWN OF SOUTH WINDSOR MAOP SHOWING LAND ACQUIRED FROM EVELYN F. JOHNSON BY THE STATE OF CONNECTICUT RECONSTRUCTION OF CHAPEL ROAD, SCALE 1"=40' REV 8/88 BY THE TRANSPORTATION CHIEF ENGINEER BUREAU OF HIGHWAYS. APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) SUMP t z`O X. 12 PIN 0 yh /4 Fce pUMp TO REMAIN o �> J,Vl, 799 N/F BARBARA C. MURRAY , ,� R , FRq 70>S i �� APPROX. /LOC TIO) , ®� S pR0 V S ��6 7$ 0 ; s S / cr>`O JV !J S 7�A 66 e 7 76 $ 1 Y 6 J ♦ f � / E �E�9 r� ;i / ♦ ♦ ♦ I1 I O° 7.00 L TI N M UZ� ` ` ♦ ♦ ♦ I �i /ry 9 O. CS/CMACyr / 0 k ♦ /l w rn `V . J Yao 0 INI,MA ,� o ^� / 9p• o M N / FF ERq • 70 LOT J TOh, �79 p0(J\s �VOT9 0 CqR.' 7x$0 F a 0, M 1>41 5'7,595 S.F. 2 . � �0 7.06 r fo% \ / . _ A NG PA, o - \ ,cam o ♦ - ~ - 6 N2�\ST NE � PROPOSED ' $00. �(EGETATIVE / !M°j �, / `� ♦ ♦ 77 - ^ �o o • TE IF RIC (TY EASEMENT IN FAVOIP -OE THE 10� h ♦ N I 2 %�� TOWN OF SOUTH WINDSOR. ^ ^ ♦ ♦ ftb 00 \ CEO-> BIT. RO#5209 STOP SIGN �O �/ �+� FCe DRY % \2 7 2 Mq 1�/ �►T J T� 77>6 11 \ � JN�((72 A)7 /��r' �FJ.• �2 s2 Al � / 764 87 • '1 0� �•CJ �16.94 9NFT#$27FC 03 </ F 7 O� 708 86 , oQ - Wass / O / L MO . R% ' . '� LOT 2 WF#7 � ;/ oQ . ----�'J; 52,588 S.F. _ M0) n, t i I h R. Y �+�5APPROX .R0 ING LIMITS ` PROPOSED 0' M / A N{PER AP REF. 2) EASEMENT INFAV R O THE WF#9 ♦ , F� �R MON. ,��$ yyF#4 ' WF#5 TOWN OF SOUTH,'WINDSOR 3�ti ♦ ` EQ EjyO l / 2„W ` EASEMENT LIMITS `�'N ,� 1. ALL CONSTRUCTION TO CONFORM TO TOWN OF SOUTH WINDSOR AND/OR UTILITY COMPANY(S) S663�. MON. �, S89� (PER MAP REF. 2), , SILT FENCE�- STANDARDS AND SPECIFICATIONS 23 ,1�2 /�- 96.00 i �� ( ) OT 1 r FROACFNF/� J�!/ 7� � 11 ♦ �' TO' 72j yOUq< 7 $ �• �' cqR �90 o SF ,�, orF`8 S ' $0 6, 1F p 2g , ., ' '♦ 9 1 S� �� ��. 2. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION. 862328,E / 4 #3 /N ��'�#10 ,�, 5 5 A,' S.F. • �. �,♦ X g0 / ' ti /, 3. FIELD CHANGES SHALL HAVE PRIOR APPROVAL OF THE TOWN OF SOUTH WINDSOR AND/OR AGENT AND THE 7138 ,� ? 3.4j, yyF# � M , , `,t 1' ♦' � j�o� /�'o 6 g M Zq 7 / v 1� 80, IT OF ry DESIGN ENGINEER. (TOTAL s o To 0 /.fir / '`�� �. UUP� D REVIEW 1.2 AC. �� 4. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. e TO71 R 18.1 y 7, 50' R.Y. 5. MAXIMUM SLOPE OF FILL TO BE 3:1 EXCEPT WHERE NOTED ON THE PLANS. ALL FILL MATERIAL > 1 C 265"kt43(C TO BE CLEAN MATERIAL, "CLEAN FILL" MEANS UNCONTAMINATED NATURAL SOIL OR ROCK WHICH IS INERT # 5' C r°n_-1 EASES�R / -12• '� WF#11 ;IN ( � � ' IN TERMS OF LEACHING AND POSES NO THREAT, PRESENT OR FUTURE, OF POLLUTION TO SURFACE WATERS PROPOSED CONSERVATION EASEMENT IN H'�IN C7 2'7J TOT MEN R�g2 20'4' ,' r ,' ,' If J OR GROUNDWATERS. MOREOVER, CLEAN FILL TYPICALLY EXCLUDES, BUT IS NOT LIMITED TO THE EXCLUSION FAVOR OF THE TOWN OF SOUTH WINDSOR NA FENC£ A�) T"177'�6I 2 WF#12 Q ; 5 , " OT 41 (LOT 1 • / / �`� 0 c - OF: DEMOLITION OR CONSTRUCTION WASTE MATERIALS OR DEBRIS, COMBUSTIBLE OR NOT COMBUSTIBLE, /23 A�) R=825 osl, TOTAL INCLUDING CONCRETE, ASPHALT, PAVING MATERIALS, OR BY-PRODUCTS; YARD WASTES, INCLUDING BRANCHES, WF 1,. 1=185 5, �� Tan-75.57'9 �� LIMBS, BRUSH, SHRUBS, TREES, PARTS OF TREES, TREE STUMPS AND SIMILAR MATERIALS GROWN ON OR `� 21 '22� `, , �60.26' ...i 98.74' TO MON. EMINATING FROM LAND; NONPUTRESIBLE SOLID WASTES, COMBUSTIBLE OR NON-COMBUSTIBLE; AND BULKY R�25.0643 (TOTAL RUBBISH OR REFUSE, INCLUDING PUTRESIBLE SOLIDS, SEMI -SOLIDS OR LIQUIDS. Tpn057$85, CURVE) MON. S8 '45'53"E CHAIN LINK FENCE 6. ALL STUMPS TO BE CHIPPED ON SITE. STUMPS NOT CHIPPED SHALL BE REMOVED FROM SITE, NOT BURIED. 74 ' , 7. EXISTING UTILITIES AS DEPICTED ON THIS PLAN ARE TAKEN FROM AVAILABLE INFORMATION. THE N/V STATE OF CONNECTICUT 1-291 / PROPOSED 20' VEGETATIVE CONTRACTOR IS TO HAVE EXISTING UTILITIES FIELD VERIFIED PRIOR TO CONSTRUCTION. BEFORE EASEMENT IN FAVOR OF THE EXCAVATING, CONTACT "CALL BEFORE YOU DIG" AT 1-800-922-4455. /� TOWN OF SOUTH WINDSOR 8. FOUNDATION TO BE EQUIPPED WITH SUMP PUMP AS REQUIRED. FOUNDATION DRAIN TO BE EQUIPPED WITH A CHECK VALVE. FOUNDATION DRAIN SHALL BE INSTALLED TO PROVIDE POSITIVE FLOW TO CATCH BASIN WHERE FEASIBLE. ESTIMATED START DATE FOR CONSTRUCTION - SUMMER 2003 ESTIMATED COMPLETION DATE FOR THE PROJECT - SPRING 2004 RESPONSIBLE PERSON(S) FOR IMPLEMENTA 77ON OF SEDIMENTA TION AND EROSION CONTROL IS OWNER/APPLICANT. z � x II II 1. UNLESS OTHERWISE NOTED, EXISTING UTILITY LOCATIONS AS SHOWN, ARE BASED ON AVAILABLE m INFORMATION. ALL EXISTING UTILITIES SHOULD BE FIELD VERIFIED PRIOR TO CONSTRUCTION. 2. ALL UTILITIES ARE TO BE STAKED IN THE FIELD BY A LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. 3. THIS PLAN IS INVALID UNLESS IT BEARS THE IMPRESSION SEAL AND ORIGINAL SIGNATURE OF THE PROFESSIONAL ENGINEER/SURVEYOR. 2 9/12/03 1 6/20/03 NO. DATE REVISIONS PER PZC & IWA/CC APPROVAL REVISE PER TOWN COMMENTS DESCRIP77ON APPLICANT: TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC C/O MARK ZWEIFLER 17 ROSE AVENUE WEST HARTFORD, CONNECTICUT 06110 TEL: 860-953-6102 THIS PLAN IS FOR SEDIMENTATION AND GRAPHIC SCALE 40 0 2D 40 80 MHA EROSION CONTROL ONLY, AND IS NOT TO IN FEET ) MHA g E USED FOR UTILITIES CONSTRUCTION . 1 inch = 40 ft. BY OWNER: ESTATE OF EVELYN F. JOHNSON C/O GARY N. JOHNSON 770 BURNHAM STREET SOUTH WINDSOR, CONNECTICUT 06074 77 03e, .,. & R� 011 &0 6" CT D.O.T. 2" STONE TO BE PLACED Z OVER FILTER FABRIC Met RO SEE SEDIMENT AND EROSION SHEET FOR PAVEMENT WIDTHSL..e &R) sb • Y THRU STREET EDGE OF PAVEMENT'' ANTI -TRACKING APRON not to scale 1. SET POSTS AND ANGLE POSTS EXCAVATE A 6%6" TRENCH 5• UPSLOPE POST UPSLOPE FROM POSTS. SILT FOR STABILITY FENCING AND SELF- CLEANING. WTI --/ r 12" MIN. 2. STAPLE THE SILT FENCING TO THE END OF THE POST 3. ATTACH FILTER FABRIC TO 4. BACKFILL THE THE WOODEN POSTS AND EXTEND TRENCH AND COMPACT FABRIC IT INTO THE TRENCH THE EXCAVATED SOIL. COMPACTED BACKFILL CONSTRUCTION OF SYNTHETIC FILTER BARRIER APPROX. AREA SUBJECT TO SLOPE LIMITS (SEE MAP REFERENCE #5) I -PROPOSED 10' STREET TREE EASEMENTIN FAVOR OF THE TOWN OF SOUTH WINDSOR N/F CONNECTICUT LIGHT do POWER A rt Tel. 860.291 •875R00alrAMn n ® � Fax 860.291.8757 D 0OO esign EROO 800b %`,tomIrRoL PLM rofessionals, inc. DESIGN. JAS DRAWN.• JAS CHECKED. • GBS/Rf civil engineers • planners surveyors landscape architects • gis • gps JOB NO.: 1701 DATE.• May 20, 200J 16°5 South Satellite Road, South Windsor, Connecticut 06074 DRAWING NO.: server/iobs/1701/1701_4. dWa LEGEND _ Q IRON PIN TO BE SET 0 EXISTING IRON PIN ■ MONUMENT TO BE SET 0 EXISTING MONUMENT COL.) EXISTING UTILITY POLE �®_ EXISTING CATCH BASIN AND PIPE -w- PROPOSED WATER LATERAL - F - PROPOSED FOUNDATION DRAIN -S- PROPOSED SANITARY LATERAL -ETC- PROPOSED CABLE, ELECTRIC & TELEPHONE SERVICE --300-- EXISTING CONTOUR -- M- PROPOSED CONTOUR x312.25 PROPOSED SPOT GRADE ELEVATION x312.25 EXISTING SPOT GRADE ELEVATION SURFACE DRAINAGE DIRECTION - - - -» PROPOSED SILT FENCE EXISTING TREE LINE vv��v PROPOSED TREE LINE ---- EXISTING PROPERTY LINE PROPOSED PROPERTY LINE RESURVEY PREPARED FOR: TERRA TECHNOLOGIES GROUP, LLC & CHAPEL ROAD GROUP, LLC C HAPIE L ROAD SOUTH WINDS0 4 CONNIEC'I UCtUT SHEET 4 4 III 2 111 Y `3 S O O &0- LU W Z C to CL Z) LLj O r^ vJ C/DZ w AM