HomeMy WebLinkAbout03-25P_ZOPPA STUDIO LLC_BURNHAM STREETReference Maps;
3
m
CD
0
M
0
0
a
a
0
N
M
0
0
M
0
0
N
N
rn
c
v
3
v
v
•d
c
I
0
in
N/F
Alexander J. Terlizzi
EXIS77NG 7REE LINE
I G.T.D.
170.51�-
N/F
Michael & Patricia Delasco
2028'
118.3
3 FUTURE PARALLEL
PARKING SPACES ON
PERVIOUS PAVERS,
PROP. TREE LiNE PHASE 11 (SEE DETAIL)
EXiS77NG FENCE
07°0,2' D
0"E
28
CLEAR & GRUB
T T _9 G.T.D.
" � 2.
25' REAR YARD 72.6 72.6 kil
METAL B��
72.9 6" B.C.L.C. ,''(SEE DETAIL)
PS
14'R
N/F
Alexander J. Terlizzi
POVj
i
2'R
a �
W....t \....
I
o <,�� I
r1l
ai v N j J
Z r\ \
It17
N 5 \
��
�',...
2tR ...lam
/ \
C0
cr _ \
C) Q /Y
X 0 }... {
}...
N
ES
Q
N \ /
'R
20'
10'x10' CONC. DUMPSTER PAD
W/CHAIN LiNK FENCE & GATE
WITH PRIVACY SLATS
1. "Topographic Map Prepared For Alexander Terlizzi Burnham Street South
Windsor, Ct." 1"=40' 3-24-85 Rev. 3-27-87 by Palmberg & Russo
2. "As -Built Plan Prepared For Max Allison Associates 12 Sea Pave Road South
Windsor, Connecticut" 1"=20' 12-12-90 Rev. 11-12-91 Class A-2 by J.R. Russo &
Associates, Joseph R. Russo, L.S.
v
N
Notes:
-`-
1. Parcel is not located in a flood hazard zone, Panel No. 090036 0007 B.
BUILDING MOUNTED LIGHT 15'
MOUNTING HEIGHT (VERIFY)
2. Parcel is not located in inland wetlands, the site was examined by Michael
�-
MCGRAW-EDISON WLMON-4
F. Gragnolati.
400 WATT HPS LAMP TYP. OF 7
3. Elevations and bearings are based on reference map #2.
7 FUTURE PARALLEL
4. Underground utility, structure and facility locations noted hereon have
PARKING SPACES ON
been compiled, in part, from record mapping supplied by the respective
`ter PERVIOUS PAVERS,
utility companies or governmental agencies, from parole testimony and
PHASE 11 (SEE DETAIL)
from other sources. These locations must be considered as approximate
in nature. Additionally, other such features may exist on the site, the
existence of which are unknown to J.R. Russo & Associates. The size,
location and existence of all such features must be field determined and
verified by the appropriate authorities prior to construction. Call Before
You Dig 1-800-922-4455.
5. Additional erosion control measure are to be installed as directed by town
staff if field conditions necessitate.
6. Soil erosion and sediment control contact person: Mike Zoppa 289-5881.
7. Foundation dimensions as shown on this plan are for site design purposes
only. Foundation contractor will use Architectural plans for layout and
OBTAIN GRADING
construction of the building(s) foundation.
RIGHTS AS REQUIRED
8. Site work shall conform to Town of South Windsor Standard Specifications
where applicable.
9. A Street Excavation permit(s) and drain layers permits are required for
work within the Town R.O.W. for Sea Pave Road.
IF
PARKING SCHEDULE
'I
Mechanical Maintenance Co.:
parking Required
1 space per 700 s.f. or 2 spaces per 3 employees
on largest shift, whichever is greater
15,000/700 = 21 spaces
GAS ME7FR
Parking Provided
10 - 9'x18' spaces
1 - 15'x1,B' HDCP spaces
EXiS77NG BLDG.
10 - 10'x2l' future spaces on cone. pavers
FF=74.2
21 Total Spaces
IV
10
124
13
13
131
LOCATION MAP
1 "=200'
South Windsor
East Hartford
Map Lot
Name & Address
Map Lot
Name & Address
6 8
Carmine J. & Richard P. Napolitano
50 103
Charlotte P. Skenar
52 John Street
75 Bates Drive
East Hartford, Ct. 06108
East Hartford, Ct. 06108
7 15
South Windsor Conn. Congregation
104
Robert L, & Janet S. Fournier
59 Lovell Avenue
81 Bates Drive
Windsor, Ct. 06095
East Hartford, Ct. 06108
16
Peter S. Gutska
105
Stolan & Rejeanne Pelletier
EROSION
& SEDIMENT CONTROL PLAN KEY
23 scitieo Road
82 Bates Drive
SIGN DATA
Somersville, Ct. 06072
East Hartford, Ct. 06108
HVAC EQUIPMENT PAD
PS
PERMANENT SEEDING
17
C & D Properties LLC
106
Daniel M. & Barbara 0. Michaud
SCREENED WITH 4' HIGH Required: Maximum 24 s.f., 10 ft. high
26 Sea Pave Road
76 Bates Drive
STOCKADE FENCE NTH GATE Provided: 6'x4' (24 s.f.), 4 ft. high
TS
TEMPORARY SEEDING
18
South Windsor, Ct. 06074
Joseph John Associates, LLC
124
East Hartford, Ct. 06108
Maxwell J. &Frances M. Atwater
N
r`
245 Hamilton Street
21 Temple Drive
:ELECTRICAL TRANSFORMER AS
CE
CONSTRUCTION ENTRANCE
Hartford, Ct. 06106
East Hartford, Ct. 06108
19
125
Sandra S. Lembo
: REQUIRED BY UTILITY PROVIDER :
GSF
GEOTEXTILE SILT FENCE
21
Mechanical Maintenance Co.
539 Burnham Street
37 Sea Pave Road
East Hartford, Ct. 06108
23
outh Windsor, Ct. 06074
Michael & Patricia Delasco
126
Jacqueline &George E. Parsons, Jr.
531 Burnham Street
HAYBALE CHECK DAM
-t
:v<i:S:•`i �:::+:;:::::::::::;�::::i::::`i:Sri:i?:::$::: �::::
" � 4t• i
N \
l
...................:..::::............:::...:.............................�..,............ .:.....�.....:•::::.:. .......... .� PINE ::�:•:•:�:�
4116"
57±
Ldl •
W , ,� UNDERGROUND PRIMARY ELEC., 'I540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. OW74
C, Il 20 R ..(� R NSF35' FRONT YARD �1, o TELE., CABLE SERVICE FORMPERMANENT SETTLING BASIN ,.IV .� AREA CODE 66o/s44.z51t
BOT. EL=68.0, MOD. RiP RAP ,:• EXIST. TRANS. AS DIRECTED BY
12" THICK ON M{RAFl 500X 7 20 R y 3 PS ono N 1�'` N UTILITY PROVIDERS
00 rr. EXiST. ELEC. CERTMIED MAIL
FABRIC , N .0 TS N RMER
N n _ G.T.D. ' U II G.T.D. ' NSFO
72 CO `� 7 ►` TEMPORARY- _ _ _ 73.5 a>. G 68 PERMANENT SETTLING BASIN
;... ,• ° TOPSOIL
STOCKPILE 72, _ , BOT. EL=68.0, MOD. RIP RAP
FE ' 12 THICK ON MIRAFl 50OX
FL=69.7 '' ONE WAY , _» I o _ EXIT QNLY ' "�o»
: NO2 56 05 E c0 - Y MORE FABRIC
CL&P g/ `Lei R73.5 i 20tR/ 73.5 FE
J
POLE CE/,--`---__ ..... ...... - - 10R� HYD.
EXIS77NG EDGE OF PVMT. - ` LE '
_ CB _. -74_ I �� # 7F=73.2
----ii TF�73.0 - - W------'--iN---=-W------W----- �W� --- W------W-----'1�----- �.
I ,
Seta -'?pie Road '
» 74- -
NOT AN EXIT" SIGN TO FACE _ _..._..._..._..._..._
WEST & "ENTER HERE" SIGN TO - sMH -;;^ "STOP" -.SIGN- TO FACE WEST &
II - -
FACE SEA PAVE ROAD FL= 64.0E SEA
rF=74.2 - - ° - _- " - „ "DO NOT ENTER" 'SIGN- TO --FACE
- - - - PAVE ROAD '
----ti-- G------ G------ G ---- G--- -- G------ 1
7F=72.9-•-..._..74-- FL=73.3
l� II
II - ii'_..._72--_
_ .... IP FOUND
72- •-. - - - SANITARY LATERAL MUST CONNECT TO J "
FE rvinTrkln \/ AMLJ/tl r OrC 'rf%U Al rAll�IAICCI? _70
CAI-J 111r17 MM1Vf1VL-F_ 1-CR 1 VVr1\ 1-,1V11IL-L1%. , �-
FL=69.7 REBUILD MH INVERT TO RECEIVE LATERAL FL=69.0
<,•..ta AT FL=64.0f
' • 1'CY€U''J`� e�'�c.,.:747'i-ii�>l'L UJC�E4ti?� � ,,.,- ;a,'i+��ik��e ><. r
2 y
1540 SULUVAN AVENUE • SOUTH WINDSOR, CT 06074 <•"" dt�i N. �¢ � � '
r i� }, 9 4•,
hO�ox•r"uN 7EUPHONF, t86016AA-25A1 a + "
a rl Zoppa Stildio Site ° �"Yk 1.,�
!'o ! f?•f -a6d L %V&0_t May 19, 2003
June 10, 2003
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Paget
AREA CODE 660164M2511 �.h
6. We recommend a bond in the amount of $2,000 be submitted to the Planning &. ing WINE.
Commission to a ilsure compliance with the Erosion. and Sedimentation Control :1 ..:. P b �r 1 � ?.-� ; 4 �''
J. R. Russo & Associates ; t 7
1 Shoham Road May 19, 2003 Measures.
East Wir(..oi, CT OYJSS
Attu: Dana Steele Certified # �"
PX,: 7-a Studios Very truly yours,
i r
23 Seapave Road
South. Windsor, c C
Dear Mn Steele;
The South Windsor Water Pollution Control Authority, at its regular meeting of June 10, 2003 gave
approval for the connection to the Town's sewetage system of a commercial buildios at 23 Seapave Road,
South Wfixisor, Connecticut as more specifically shown on plans entitled "Zoppa Stedio, LLC -Site Plaa•'
prepared by J. R. lbisso & Associates, Fiat Windsor, CT, Project No. 200340, Drawiog Nols)1, dated 4-
4-03, with no seviaions and subject to the following conditions:
1. Subject to confo rnny with the MIX: requirement..
2. Payrnent of MDC sewer otnlet charges.
3. Tcahnical approval of the Town Env
inccting Department
4. State of Connecticut D.E.P. approval.
5. Final Authority approval and acceptacv., of the auutary sewerage connection mill be given once
TL•c sewer line has been iasWI cd and inspected by the Town semi; and WSW upon the wriiien
verification of the Town staff that said sanitary sewer line was installed iu substanrial conlbrtrence
with the design plans previously approved by the Authority, and mating all Tours regulations and
appropriate tcemlinical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
•aoscpu,...a,-;ray ..uauttn.,
Watc; Pollution Coro of Authority
Cc: Matthew Galligar, Town Manager
lvlichael J. Gantick, Director a€Public Works
JefTDoolinle, Town ESsgiav r
Marcia Banach, Director of Planning
John Collinsr Chief Building Inspector
Zoppa Studios, LLC
HAYBALE CHECK DAM
0
I
CONC. CURB
11111
STOP �J
I
.Zoppa Studio LLC,
49013rlmham Street
South Windsor, C Y 06029
1?csu-lvfr. Zoppa
:
The Inland Wetlands Agency/Conservation 0olilit1i9S10n tiuough staff approved application #t03-
25P - Zoppa Studio - Lot #2 Seapave Road - Conservation application for the construction of a
6200 sq. ft. industrial building, parting, storrawater structures and associated improvements on
property located on Lot #2 Seapave Road, 1, Industrial zone. This app-toval is subject to the
following conditions:
1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be
submitted to this Commission. 'i'his must be completed within 65 days of approval prior
to any construction activity on the site. plans submitted to planning & foning
Commission shall be considered having met this reluirvinent.
2. The application shall indtaunify and hold harmless the Town of South Windsor against
any liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on May 1.9, 2i108. 1t is the
landowners)/applimt(s) responsibility to track expiration dates and notify the
Commission of a renewal request at least 65 days prior to expiration.
4. All approvals required must be obtained and submitted prior to any activity on the site.
5. A contact person shall be identified on the plans.
INLAND WETLANDS AGENCY/
CONSERVATION COMIvfISS€Old
Jeffrey H. FolggKnvirownental Planner/Conservation Officer
cc: Chief Building Official
Town Engineer
SOijTH WINDSOR
pLA.NM_ING DEPT.
GRAPHIC SCALE
10 20 40
( IN FEET)
1 inch = 20 ft.
so 1
�r 7 lea _ W.. _--------
M.l
June 3, 2003
Mr. Dana Stccle
J.R. Russo & Associates
I Shoham Road
EastWindsor,CT 06108
Re: Appl #03-25P, 7_bppa Studios
Dear Mr. Steele:
oc �
t.w
.n rt..-•-... l+..._.....r.. .t .... AS.... 77 7rtrll Sn o,.,.rn.,n .rri4}t
We are pleased to advise you Ilene ilie Pit_.uu-:uttl, rin6 wrruer:�siv,r volu<r V.. l..Qy modifications the: above referenced application for a Site Plan of Development.
This approval is for the construction of a 15,000 sf facility to be lntown as Zoppa Studios on property located on
the westerly side of Sea Pave Road (Lots 2 and 3),1-291 zone as sliosvn on plans prepared by J. R. Russo &
Associates, Job No. 2003-00-1, datedApril 4, 2003, as revised. This approval is subject to the following
modifications:
1. Prior to ulmmeneenieut of any site work, a meeting must be held with Town Staff.
2. I+o building permit will be issued until the final mylars have been ailed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Comrttissionr including a bond in the amount of $2,000.00.
4. -An as -built plan -is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning
Regulations.
S. Footing drains are required if the building has a basement.
6. A landscape bond in the amount of $2,000-00 is required and must be submitted prior to filing of mylars.
7. All plans used in the field by the developer must bear die stamp and authorized signature of the Town of
So'.111. Wind-
8. Tbis approval does not constitute approval of the sanitary sewer, which can only be granted by the Water
Pollution Control Authority.
9. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate
has been issued (per CGS § 14-311),
30. TMelbuilding street number must be included.on the final plan.
11. Engineering comments dated 5/27/03 be addressed to the Town Engineer's satisfaction.
12, Mechanical units to be located on the northerly side of the building and screened subject to stiff approval.
13. If the type of printing function changes in the future so that it requires the use of hazardous chmiticals, the
owner must return to the Planning and Zoning Commission for an additional approval.
Black and white tnutsparent mtylars of Sheet #1 with the above modifications, together vtnth three blu t
copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and
The letters of approval of this COIntylissicn as well as the Inland Wetlands Agency/Conservation Cominissio ..
must be reproducal on the mylars.
After the mylars have been signets by the Commission, they will be returned to you for filing in the Office of the
Town Clerk. Alter filing these plans, a copy of the receipt must b. submitted to the Planning Department.
Sincerely,
Keryin McCann, Chairman
Planning and Zoning Commission
KMcC/kab
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of'Pollution Control
Fire Marshal
This survey and map has been prepared in accordance with Sections 20-300b-1 thru 20-300b-20 of the
Regulations of Connecticut State Agencies - "Minimum. Standards for Surveys and Maps in the State of
Connecticut" as endorsed by the Connecticut Association of Land Surveyors, Inc. It is a Improvement
Location JTlryey based o31 s Dependent Resur"v'8X Ccriaforiiririg to HvriZC�iitai slid VertlCai Ai::ura: y Class A-2
& T- 2.
This document and copies thereof are valid only, if they bear the signature and embossed seal of the
designated professional. Unauthorized alterations render any declaration hereon null and void.
31 Pleasant View Drive
East Hartford,
Ct. 06108
Somers, Ct. 06071
131
Raymond G. &
Constance Couture
24
Alexander r J. Terlizzi
585 Burnham
Street
sa 12 Bayd ' e Avenue
East Hartford
Ct. 06108
Waterford, Ct. 06 385
132
Zenon & Jean
Fr szer y
25
Gerald Ludwig
577 Burnham
Street
511 Old Post Road
East Hartford,
Ct. 06108
Tolland, Ct. 06084
133
Janice M. Levesque
26
Jetrea Realty
567 Burnham
Street
100 Corporate Drive
East Hartford,
Ct. 06108
Windsor, Ct. 06095
134
Donna Bulduc
27
Alexander J. Terlizzi
559 Burnham
Street
12 Bayside Avenue
East Hartford,
Ct. 06108
Waterford, Ct. 06385
135
Dung V. Huynh & Hai Nguyen
LEGEND:
-o-
UTILITY POLE
c
WATER GATE
a
GAS GATE
O
EXISTING SANITARY MANHOLE
0
EXISTING CATCH BASIN
-�
SIGN
HYDRANT
-UG-
PROP. UNDERGROUND UTILITIES
- G -
PROP. GAS LINE
- -G--
U.G. GAS LINE
- - W - -
U.G. WATER LINE
- w -
PROP. WATER LINE
EXISTING STORM SEWER
EXISTING SANITARY SEWER
- - -2 - -
EXISTING CONTOUR
256
PROP. CONTOUR
EXISTING SPOT GRADE
256-0
PROP. SPOT GRADE
•
EXISTING I.P.
■
EXISTING MONUMENT
O
PROP. I. P.
o
PROP. MONUMENT
PROP. BUILDING' MOUNTED LIGHT
M N10
STAKED HA YBALES OR SILT FENCE
F
551 Burnham Street
East Hartford, Ct. 06108
136
Trong N. & Le Linhda Vu
22 Temple Drive
East Hartford, Ct. 06108
137
David C. & Carol C. Stimson
12 Syracuse Drive
East Hartford, Ct. 06018
203
Betty & Andres Bermudez, Jr.
•t rt-t T)---,, „T ri-1.
iVi LGxJµLL,l Vll lily
DATA BLOCK
East Hartford, Ct. 06108
ZONE: 1-291 CD
REQUIRED
PROVIDED
LOT AREA
5 ACRES
1.08 AC. (PREV. APPROVED
SUBDIVISION 3-27-87)
LOT WIDTH
150'
200.00'
STORIES/HIEGHT
5 - 60'
1 STORY
IMPERVIOUS COVERAGE
65%
63±%
MIN. YARD SETBACKS AS
SHOWN ON SUB.
PLAN DATED 3-27-87
FRONT YARD
35'
36'f
SIDE YARD
10'
57't
REAR YARD
25'
47'f
TO THE BEST OF MY KNOWLEDGE AND BELIEF THiS
MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON.
a` pF• CC01�NN ��►
�a�rnulenanh •
fy:py-
REV. 7-2-03 APPROVAL LETTERS ADDED
REV. 6-13-03 ADDED APPROVAL LETTER, NOTES 8 & 9.
REV. 5-22-03 ADD SIGN DATA, FLAG POLE, REVISE PARKING, SAN. LAT.
Site Plan
Site Location: Lot 2 -- 23 Sea Pave Road
South Windsor, Connecticut
Prepared For
Zoppa Studio, LLC
490 Burnham Street
South Windsor, Connecticut 06074
289-•5881
J.R. RUSSO & ASSOCIATES
Land Surveyors & Professional Engineers
1 SHOHAM ROAD
EAST WINDSOR CONNECTICUT 06088
(860) 623-0569
FAX: (860) 623-2485
BY SCALE DATE SHEET CHECKED NO.
JAJ 1 "=20' 1 4-4-03 1 of 6 1 JRR 1 2003-003
L
20
N/F
Michael & Patricia Delasco
GRAPHIC SCALE
20 410
f�
QJ
of
EXISTING 77ZEE LINE
1
.1
y
raal
i17
Il
1
W
t
Q
o
e
N/F
Alexander J. Terlizzi
N02028' 15"E
G.T.D.
72.6
1
N/F
I Alexander J. Terlizzi
EXIS77NG FENCE
N07002' 00" -'
81 0'
777- G.T.D. -
72.6 0
rri
C�1
N
r-
E
72 - -
4"
P/NI
AW
� e, � e. � e: %!{t\'i/{1� �%/tl��f �! fr'T.• 11 �'.i/{1\; �{I�.� {I�.>y e. � e. y e'•.%/I1�,A{1\. �I��s! e. � t.y e'•.�!{I\' j/h\'�{ r -7,i
OR EXIST ELEC.
1
Uj P
735
ONE
AY i i • .. S
-- --- --
:z ......
/ 73.5 ` 200.00' I / 73.5 E f FE
CL&P �. -' %`` FL=69 3
POLE____---__ ............. --- -74--• ----------
EXIS77NG EDGE OF PI/MT. 74 _ " ' ,� POLE #
7F=73.2
CB !
--- li TF=W73.0 -'--- W------ W---.-�---=- W-- -------�•�- W�----- W------- W------ -----
,. -Sf70T LIGHT FOR _/ Se tx -Pave _ R o as
I. FLAG POLE - - _ _ _ _ _ _ - •- _ I I - - -74
SMH &
II 7F=74.2 _ II ----•-....._.
t i FL= 64.0E
----I�-CBG------ G------ G---- —..- G.--- - -- G- ---.-G==--- G------ G-- - I - - - - -
-x- _ --74-...._ . - -Ca - -
7F=72.9 FL=73.3
II tl
It
I I IP FOUND
L PROPOSED NON —ILLUMINATED BUSINESS SIGN
FE SEE ZONING DATA TABLE (SHEET 1) FE
FL=69.7 FL=69.0
80
2 PLY 1/2" DIA. REINFORCEI
RUBBER HOSE
TREES GREATER THAN 2 1/:
GUY WIRES - THREE SPACEI
ANCHORED W/2"x4N2.5' CEI
SET CROWN OF ROOTBALL A'
FINISH GRADE BEFORE MULCI
PLANTING SOIL MIXTURE
TREE PLANTING
NOT TO SCALE
THREE 10 GAL. GALV. SOFT STEEL -
GUY WIRE ANCHORED W/2"x4'x2'-6"
CEDAR STAKE SPACED EQUALLY
SET CROWN OF ROOTBALL AT
SURROUNDING FINISH GRADE. -�
IF IN HEAVY CLAY SOILS SET
AT 1" ABOVE FINISH GRADE BEFORE
MULCHING.
c
0 GA. GALV. SOFT STEEL GUY WIRE
STAKES NOTCHED FOR WIRE
TREES 2 1/2" CAL. OR LESS HARDWOOD
STAKES -TWO 2"&'xV OPPOSITE AND SET
INTO SUBGRADE
TREE WRAPPING TO SECOND BRANCH
HEIGHT W/50% OVERLAP
SEE LAYOUT FOR SURFACE TREATMENT
3" SHREDDED BARK MULCH
ROLL BACK TOP THIRD OF BURLAP
COMPACTED PLANTING SOIL MIXTURE
UNDISTURBED SUBGRADE
INSTALL TREE PLUMB, PRUNE
ALL DAMAGE OR BROKEN BRANCHES
2 PLY 1/2" DIA. REINFORCED RUBBER HOSE
3" SHREDDED BARK MULCH
STAKES 90' TO GUY WIRES -- "-6" EARTH SAUCER
ROLL BACK TOP THIRD PLANTING SOIL MIXTURE
OF BURLAP 12" 6" COMPACTED PLANTING SOIL MIXTURE
UNDISTURBED SUBSURFACE
EVERGREEN TREE PLANTING
NOT TO SCALE
SET CROWN OF ROOTBALL AT
LEVEL GRADE WITH HIGHEST
POINT OF SAUCER
3" SHREDDED BARK MULCH
COMPACTED PLANTING SOIL NOT TO COVER CROWN OF
MIXTURE TO PREVENT BALL AT BASE OF PLANT STEM
SETTLEMENT PLANTING SOIL MIXTURE
6'
1/2" DIA. CRUSHED STONE ADDED
IN AREAS WITH POORLY DRAINED 6"
SOILS
SCRUB PLANTING
NOT TO SCALE
PL.;_ZJSCHEDULP
SYM. OTY. BOTANICAL. & COMMON NAME SIZE
3 Pyrus Calleryana 'Bradford' (Bradford Pear) 2 1/2"-3" Cat. B&B
2 Malus 'Snowdrift' (Snow Drift White Crabapple) 1 1/2"-0 B&B
7 Acer Rubrum (Red Maple) 2 1/2"-3" Cat. B&B
*6 6 Picea Abies (Norway Spruce) 5'-6' B&B
3 Acer Platanoides 'Crimson King' (Norway Maple) 2 1/2"-3" cal. B&B
12 Cotoneaster Apiculato (Cranberry Cotoneaster) 5 Gal. 18"-24"
12 Azalea 'Delaware Valley' (Del. Valley White Azalea) 3 gal. 18"-2e
{ 2 Picea Glauca 'Corsica' (Dwarf Alberta Spruce) 3 gal. 18"-2e
Seeding For Drainge Swales
Bird's -foot Trefoil (Empire) w/inoculant
Crown Vetch (Chemung) w/inoculant
Creeping Red Fescue (Wintergreen)
SeedingFor All Disturbed Areas
0.20 Lbs/1,000 s.f.
0.35 Lbs/1,000 s.f.
0.35 Lbs/1,000 s.f.
Creeping Red Fescue 20 Lbs/Acre 0.50 Lbs/1,000 s.f.
Redtop (Streeker, Common) 2 Lbs/Acre 0.05 Lbs/1,000 s.f.
Perennial Rye Grass 20 Lbs/Acre 0.50 Lbs/1,000 s.f.
NOTE: NO TREES OR LARGE SHRUBS
SHALL BE PLANTED WITHIN 10 FEET
OF SANITARY OR STORM SEWER LINES
REV. 6-13-03 RELOCATED TREES, ADDED NOTE PER TOWN ENGINEER
REV. 5-22-03 ADD SIGN & FLAG POLE WITH SPOT LIGHT
( IN FEET )
1 inch = 20 ft.
N/F
Michael & Patricia Delasco
GRAPHIC SCALE
20 0 10 20 40 80
( IN FEET )
1 inch = 20 ft.
I
1
NIF r N/F
Alexander J. Terlizzi Alexander J. Terlizzi
FOOTCANDLE LABEL (TYP) —�
cvncnnrn ccarnr
LAl.JIIIYV I LIvVL
198.39 'N07.02' D�!/ri,, .�\i��% .O"
�-Cz")i�
tCcN
LOGO
it
i
4"
0 M 00 PIN
IM co CV
i•d O
BUILDING MOUNTED LIGHT 15'
MOUNTING HEIGHT (VERIFY)
McGRAW—EDISON WLMON-4
400 WATT HPS LAMP TYP. OF 7
EXISTING EDGE OF PVMT. 74- C� POLE
— CB 7F=73.2
W------ W-- _ --- W------ ----- WW ------ W------� -----
tt ..
Sets -Pave -•Road tt
SMH
ti 7F=74.2
----tt--- G— G— y G— FL= 64.0E tt
CB
7F=72.9 ...___-74...._-- FL=73.3
' _..
tt tt
tt _�tr.._-•72---
+ IP FOUND — ` , • i t
r^ --
-70 FE
FL=69.7 FL=69.0
REV. 6-13-03 SUBMIT FOR FILING.
REV. 5-22-03 CHANGE BUILDING 1
OUNTED LIGHT TO FULL CUTOFF STYLE
Photometric Plan
Site Location: Lot 2 — 23 Sea Pave Road
South Windsor, Connecticut
Prepared For
Zoppa Studio, LLC
490 Burnham Street
.30U M rrinusur, wnnecticut U0V / 1+
289-5881
J.R. RUSSO
& ASSOCIATES
*}>
Land Surveyors
& Professional Engineers
1:
CON Fry•.y�
Yam-
; ••< ...::.1.:;.
1 SHQHAM ROAD
........N
EAST WINDSOR, CONNECTICUT 06088
••G"�V
.� p.
(860) 623-0569
* ' * "
FAX: (860) 623-2485
' o .1
BY
SCALE
SHEET
ICHECKED
NO.
' 1
�E
,_ • ,,�� ���.��
JAJ
I 1"=20'
JDATE
4-4-03
3
of 6
1 JRR
2003-003
GEOTEXTILE SILT FENCE (GSF)
HALE BALE BARRIER (HB)
TEMPORARY SOiL PROTECTION (TSP)
MULCH FOR SEED (MS)
PERMANENT SEEDING (Continued)
IT
CHECKLIST FOR EROSION CONTROL PLAN
SPECIFICATIONS
Materials
Geotextile fabric: shall be a pervious sheet of polypropylene, nylon,
polyester, ethylene or similar filaments and shall be certified by
the manufacturer or supplier as conforming to the requirements
shown in Figure GSF-1 in the Connecticut Guidelines For Soil
Erosion and Sediment Control latest edition. The geotextile shall
be non -rotting, acid and alkali resistant and have sufficient
strength and permeability operations. Filamanets in the
geotextile shall be resistant to absorption. The filament network
must be dimensionally stable and free of any chemical
treatment or coating that will reduce its permeability. The
geotextile shall also be free of any flaws or defects which will
alter its physical properties. Torn or punctured geotextiles shall
not be used.
Supporting posts: shall be at least 42 inches long made of either
1.5 inch square hardwood stakes or steel posts with projections
for fastening the geotextile possessing a minimum strength of
0.5 pound per linear foot.
Placement
For toe of slope: Locate 5-10 feet down gradient from the toe of
slope, generally on the contour with maintenance and sediment
removal requirements in mind. When the contour can not be
followed install the fence such that perpendicular wings are
created to break the velocity of water flowing along the fence.
See Figure GSF-2 in the Connecticut Guidelines For Soil Erosion
and Sediment Control for spacing requirements.
Swales: Locate "U" shape across swale such that the bottom of
both ends of the fence are higher that the top of the lowest
section of the fence_
Catch Basin in Swale on Slopes: Locate 2 "U" shapes across swale
as above: one immediately up slope from the catch basin and
the other immediately down slope from the catch basin.
Catch Basins in Depressions: Encircle catch basin.
Culvertinlets: Locate in a "U" shape approximately 6 feet from
the culvert in the direction of the incoming flow.
CulvertOutlets: Locate across the swale at least 6 feet from the
culvert outlet.
installation
Trench excavation: Excavate a trench a minimum of 6 inches deep
and 6 inches wide on the up slope side of the fence location.
For slope and swale installations, extend the ends of the trench
sufficiently up slope such that bottom end of the fence will be
higher than the top of the lowest portion of the fence.
When the fence is not to be installed on the contour, excavate
wing trpnchag _pnrorc nt thn- ...-ria,- 'J.i- an , "J-� GSF - 11.
the Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
When excavation is obstructed by an occasional stone or tree
roots, provide a smooth transition between the trench bottom
and the obstruction.
Support Posts: Drive support posts on the down slope side of the
trench to a depth of at least 12 inches into original ground.
Never install sunDort nosts more fhnn 1n fppt nnnrt Inc+nll
support posts closer than 10 feet apart when concentrated flows
are anticipated or when steep contributing slopes and soil
conditions are expected to generate larger volumes of sediment.
For catch basins in hollows, drive posts at each corner of the
catch basin. Whenever the geotextile filter fabric that is used
exceeds the minimum material specifications contained in this
measure, the spacing of the stakes shall be per manufacturer's
recommendations.
Geotextile Filter Fabric: Staple or secure the geotextile to the
support posts per manufacture's instruction such that at least 6
inches of geotextile lies within the trench, the height of the
fence does not exceed 30 inches and the geotextile is taut
between the posts. When the trench is obstructed by stones,
tree roots, etc. allow the geotextile to lay over the obstruction
such that the bottom of the geotextile points up slope.
In the absence of manufacture's instructions, space wire staples
on wooden stakes at a maximum of 4 inches apart and
alternate their position from parallel to the axis of the stake to
perpendicular.
Do not staple the geotextile to living trees.
Provide reinforcement for the fence when it can be exposed to
high winds.
When joints in the geotextile fabric are necessary, splice
together only at at support posts, and securely seal.
Backfill & Compaction: Backfill the trench with tamped soil or
aggregate over the geotextile. When the trench is obstructed
by a stone, tree root, etc. make sure the bottom of the
geotextile lies horizontal on the ground with the resulting flap on
the up slope side of the geotextile and bury the flap with 6
inches of tamped soil, or aggregate.
MAINTENANCE
inspect the silt fence at least once a week and within 24 hours
of the end of a storm with rainfall amount of 0.5 inch or
greater to determine maintenance needs. When used for
dewatering operations, inspect frequently before, during and after
pumping operations.
Remove the sediment deposits or, if room allows, install a
secondary silt fence up slope of the existing fence when
sediment deposits reach approximately one half the height of
the existing fence.
Replace or repair the fence within 24 hours of observed failure.
Failure of the fence has occurred when sediment fails to be
retained by the fence because:
(a) the fence has been overtopped, undercut or bypassed by
runoff water,
(b) the fence has been moved out of position (knocked
over), or
(c) the geotextile has decomposed or been damaged.
Maintain the fence until the contributing area is stabilized.
After the contributing area is stabilized determine if sediment
contained by the fence requires removal or regrading and
stabilization. If the depth is greater than or equal to 6 inches,
regrading or removal of the accumulated sediment is required.
No removal or rearadina is required if sediment depth is less
than 6 inches.
Remove the fence by pulling up the support posts and cutting
the geotextile at ground level. Regrade or remove sediment as
needed, and stabilize disturbed soils.
SPECIFICATIONS
Materials
Hay Bales: shall be made of hay or straw with 40 pounds
minimum weight and 120 pounds maximum weight held together
by twine or wire.
Stakes for Anchoring Hay Bales: shall be a minimum of 36 inches
long and made of either hardwood with dimensions of of least
1.5 inches square or steel posts with a minimum weight of 0.5
pound per linear foot.
Placement
Toe of Slope: Locate 5-10 feet down gradient from the toe of
slope, generally on the contour. When the contour can not be
followed, stagger the bale installation and install perpendicular
wings (spaces as shown in Figure HB-1 in the Connecticut
Guidelines For Soil Erosion and Sediment Control latest edition)
to break the velocity of water flowing behind the bales. The
barrier should be located with sufficient distance from the toe
of the slope to allow access by equipment for removal of
accumulated sediments.
Catch Basins in Depression or Low Spots: Encircle catch basin or yard
drain.
installation
Trench excavation: Excavate a trench as wide as the bales and at
least 4 inches deep. Each end of the trench should be winged
upslope so that the bottom of the last bale is higher than the
top of the lowest hay bale in the barrier.
Hay Bale Placement: Place bales in a single row in the trench,
IellgihwlJe, with ends al adjacent bales tightly UUUttlrly one
another and the bindings oriented around the sides rather than
along the tops and bottoms of the bales (to avoid premature
rotting of the bindings).
Staking Hay Bales: Anchor each bale with at least 2 stakes,
driving the first stake in each bale toward the previously laid
bale to force the bales together. Stakes must be driven a
minimum of 18 inches into the ground. Fill any gaps between
the bales with hay or straw to prevent water from escaping
between the bales.
Backfill & Tamped: Backfill the bales with the excavated trench
material to a minimum depth of 4 inches on the uphill side of
the bales. Tamp by hand or machine and compact the soil.
Loose hay or straw scattered over the disturbed area
immediately uphill from the hay bale barrier tends to increase
barrier efficiency.
MAINTENANCE
Inspect the hay bale barrier at least once a week and within 24
hours of the end of a storm with a rainfall amount of 0.5
inches or greater to determine maintenance needs. For dewater
operations, inspect frequently before, during and after pumping
operations.
Remove the sediment deposits or install a secondary barrier
upslope from the existing barrier when sediment deposits reach
approximately one half the height of the barrier.
Replace or repair the barrier within 24 hours of observed failure.
Failure of the barrier has occurred when sediment fails to be
retained by the barrier because:
(a) the barrier has been overtopped, undercut or bypassed
by runoff water,
(b) the barrier has been moved out of position, or
(c) the hay bales have deteriorated or been damaged.
Maintain the hay bale barrier until the contributing area is
stabilized.
After the upslope areas have been permanently stabilized, pull
the stakes out of the hay bales. Unless otherwise required, no
removal or regrading of accumulated sediment is necessary.
The hay bales may then be left in place or broken up for
ground cover.
TEMPORARY SEEDING (TS)
SPECIFICATIONS
Site Preparation
Install needed erosion control measures such as diversions,
grade stabilization structures, sedimentation basins and grassed
waterways in accordance with the approved plan.
Grade according to plans and allow for the use of appropriate
equipment for seedbed preparation, seeding, mulch application
and mulch anchoring.
Seedbed Preparation
Loosen the soil to a depth of 3-4 inches with a slightly
roughened surface. If the area has been recently loosened or
disturbed, no further roughening is required. Soil preparation
can be accomplished by tracking with a bulldozer, discing
harrowing, raking or dragging with a section of chain link fence.
Apply ground limestone and fertilizer according to soil test
recommendations (such as those offered by the University of
Connecticut Soil Testing Laboratory or other reliable source).
If soil testing is not feasible on small or variable sites, or where
timing is critical, fertilizer may be applied at the rate of 300
pounds per acre or 7.5 pounds per 1,000 square feet of
10-10-10 or equivalent.
Seeding
Apply seed uniformly by hand, cyclone seeder, drill, cultipacker
type seeder or hydroseeder at a minimum rate for the selected
seed identified in Figure TS-2 in the Connecticut Guidelines For
Soil Erosion and Sediment Control latest edition. Increase
seeding rates by 10% when hydroseeding.
Mulching
See guidelines in the Mulch For Seed measures.
MAINTENANCE
Inspect temporary seeding area at least once a week and within
24 hours of the end of a storm with a rainfall amount of 0.5
inch or greater for seed and mulch movement and rill erosion.
Where seed has been moved or where soil erosion has occurred,
determine the cause of the failure and repair as needed.
SPECIFICATIONS
Materials
Mulches within this specification include, but are not limited to:
1. Hay: The dried stems and leafy parts of plants cut and
harvested, such as alfalfa, clovers, other forage legumes and the
finer stemmed, leafy grasses. The average stem length should
not be Iess thnn 4 inrhp-, Hny thnt rnn ha windblown Qhaulld
be anchored to hold it in place.
2. Straw: Cut and dried stems of herbaceous plants, such as
wheat, barley, cereal rye, or brome. The average stem length
should not be less than 4 inches. Straw that can be windblown
should be anchored to hold it in place.
3. Wood Chips: Chipped wood material from logs, stumps, brush or
trimmings including bark, stems and leaves having a general
maximum size of 0.5 inch by 2 inches and free of excessively
fine or long stringy particles as well as stones, soil and other
debris. No anchoring is required. If seeding is performed where
wood chips have been previously applied, prior to the seeding
the wood chips should be removed or tilled into the ground and
additional nitrogen applied. Nitrogen application rate is
determined by soil test at time of seeding.
4. Bark Chips, Shredded Bark: Tree bark shredded as a by product
of timber processing having a general maximum size of 4 inches
and free of excessively fine or long stringy particles as well as
stone and other debris. Material use is the same as wood
chips.
If subsequent seeding is performed where cellulose dense
I..b.e /.. I--.,- I.--- .J_L.7__ L__I._1 !__` L_.'_ L---
liluwllca w.g. IvuvvJ, exU1-_IwVI, woaucnll Z$, uarrccnlps) nave been
applied, then prior to seeding either remove the mulch or till it
into the ground with the application of nitrogen.
Cellulose fiber is not recommended for use, except as a tackifier
for other mulch materials. .
Tackifiers within this specification include, but are not limited to:
Water soluble materials that cause mulch particles to adhere to
one another, generally consisting of either a natural vegetable
gum blended with gelling and hardening agents or a blend of
hydrophilic polymers, resins, viscosifiers, sticking aids and gums.
Emulsified asphalts are specifically prohibited for use as tackifiers due to
their potential for causing water pollution following its application.
Nettings within this specification include, but are not limited to:
Prefabricated openwork fabrics made of cellulose cords, ropes,
threads, or biodegradable synthetic material that is woven,
knotted or molded in such a manner that it holds mulch in
place until temporary soil protection is no longer needed.
Site Preparation
Prinr to mNilr-hinn ramnlar+aa +h,m ranmred nrnrlinn rl tall
y, .I. v..1.1 y. _,J ai.0 install
and/or repair other sediment control measures needed to
control water movement within the area to be mulched.
Application
Spreading: Spread mulch material uniformly by hand or machine
resulting in 100% coverage of the disturbed soil.
When spreading hay mulch by hand, divide the area to be
mulched into approximately 1,000 square feet and place 2 to 3
bales of hay in each section to facilitate uniform distribution.
(Hay/ .Cltl aw 2-3 LVI IO/acr e,
J
When spreading woodchips on slopes, it is particularly important
not to spread the chips too thick. Excessive application tend to
slip or slump when saturated. (Wood Chips/Shredded Bark 6 cu.
yds./1,000 s.f.)
Anchoring: Apply tackifiers and/or netting either with the mulch
or ll11111vulu Lvly IvIlawlllg Illulll applil:atlVll. Expect the need for
tackifiers or netting along the shoulders of actively traveled
roads, hill tops and long open slopes not protected by wind
breaks.
When using netting the most critical aspect is to ensure that
the netting maintains substantial contact with the mulch and
the mulch, in turn, maintains continuous contact with the soil
surface. Without such contact, the material is useless and
erosion can be expected to occur. Install in accordance with
manufacturer's recommendations.
MAINTENANCE
inspect temporary soil protection area at least once a week and
within 24 hours of the end of a storm with a rainfall amount of
0.5 inch or greater for mulch movement and rill erosion.
Where soil protection falls below 100%, reapply soil protection
within 48 hours. Determine the cause of the failure. If mulch
failure was the result of wind consider applying a tackifier or
netting. If mulch failure was caused by concentrating water,
install additional measures to control water and sediment
movement, repair erosion damage, reapply mulch with anchoring.
DUST CONTROL (DC)
SPECIFICATIONS
Mechanical Sweeping
Use mechanical sweeping on paved areas where dust and fine
materials accumulate as a result of truck traffic, pavement saw
cutting spillage, and wind or water deposition from adjacent
disturbed areas. Sweep daily in heavily traveled areas.
Water
Periodically moisten exposed soil surfaces on unpaved travelways
to keep the travelway damp.
Non Asphaltic Soil Tackifier
Non -asphaltic soil tackifier consists of an emulsified liquid soil
stabilizer of organic, inorganic or mineral origin, including, but
not limited to the following: modified resins, calcium chloride,
complex surfactant copolymers or high grade latex acrylics. The
solutions shall be non -asphaltic, non toxic to human, animal
and plant life, non corrosive and nonflammable. Materials used
shall meet local, state and federal guidelines for intended use.
All materials are to be applied according to the manufacturer's
recommendations and all safety guidelines shall be followed in
storing, handling and applying materials.
MAINTENANCE
Repeat application of dust control measures when fugitive dust
becomes evident.
SPECIFICATIONS
Materials
Types of Mulches within this specification include, but are not
limited to:
1. Hay: The dried stems and leafy parts of plants cut and
harvested, such as alfalfa, clovers, other forage legumes and the
.11, .I s+be1i1111ed, leafy graJJeJ. The average S>t;III leilyk. 1 should
not be less than 4 inches. Hay that can be! windblown should
be anchored to hold it in place.
2. Straw: Cut and dried stems of herbaceous plants, such as
wheat, barley, cereal rye, or brome. The average stem length
should not be less than 4 inches. Straw that can be windblown
should be anchored to hold it in place.
3. Cellulose Fiber: Fiber origin is either virgin wood,
post-industrial/pre-consumer wood or post consumer wood
complying with materials specification (collect .ively referred to as
"wood fiber"), newspaper, kraft paper, cardboard (collectively
referred to as "paper fiber") or a combination of wood and
paper fiber. Paper fiber, in particular, shall not contain boron,
which inhibits seed germination. The cellulose fiber must be
manufactured in such a manner that after the addition to and
agitation in slurry tanks with water, the fibers in the slurry
become uniformly suspended to form a homogeneous product.
C..{�e.�n.. i.r�. .L .. L.....I r.�...1,. ......... .... .. ..... J.L._ ___..._J LI__ __..1_L _1_11
Subsequent o hydr uulIC 5pr uying Vn uIC yr VunU, Lne 1ilulCn 5171a11
allow for the absorption and percolation of moisture and shall
not form a tough crust such that it interferes with seed
germination or growth. Generally applied with tackifier and
fertilizer. Refer to manufacturer's specifications for application
rates needed to attain 80%-95% coverage without interferina
with seed germination or plant growth. vNot recommended as a
mulch for use when seeding occurs outside of the recommended
seeding dates.
Tackifiers within this specification include, but are not limited to:
Water soluble materials that cause mulch particles to adhere to
one another, generally consisting of either a natural vegetable
gum blended with gelling and hardening agents or a blend of
hydrophilic polymers, resins, viscosifiers, stickling aids and gums.
Good for areas intended to be mowed. Cellulose fiber mulch
may be applied as a tackifier to other mulches, provided the
application is sufficient to cause the other mulches to adhere to
one another. Emulsified asphalts are specifically (prohibited for use as
tackifiers due to their potential for causing water polluition following its
application.
Nettings within this specification include, but ,are not limited to:
Prefabricated openwork fabrics made of cellulose cords, ropes,
threads, or biodegradable synthetic material that is woven,
knotted or molded in such a manner that it holds mulch in
place until vegetation growth is sufficient to stabilize the soil.
Generally used in areas where no mowing is planned.
Site Preparation
Grade according to plans and allow for the use of appropriate
equipment for seedbed preparation, seeding, imulch application
and mulch anchoring.
Application
Timing: Applied immediately following seeding. Some cellulose
fiber may be applied with seed to assist in marking where seed
has been sprayed, but expect to apply a second application of
cellulose fiber to meet the requirements of Mulch For Seed in the
Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
Spreading: Mulch material shall be spread uniformly by hand or
machine resulting in 807o-95% coverage of the disturbed soil
when seeding within the recommended seeding dates.
Applications that are uneven can result in excessive mulch
smothering the germinating seeds. For hay or straw anticipate
an appiicativn rate V1 2 tons per acre. For cellulose fiber follOW
manufacture's recommended application rates to provided 80
%-95% coverage.
When seeding outside the recommended seeding dates, increase
mulch application rate to provide between 95%-100% coverage
of the disturbed soil. For hay or straw anticipate an application
rate to 2.5 to 3 tons per acre.
When spreading hay mulch by hand, divide the area to be
mulched into approximately 1,000 square feet: and place 1.5-2
bales of hay in each section to facilitate uniform distribution.
For cellulose fiber mulch, expect several spray passes to attain
adequate coverage, to eliminate shadowing, and to avoid
slippage.
Anchoring: Expect the need for mulch anchoring along the
shoulders of actively traveled roads, hill tops and long open
slopes not protected by wind breaks.
When using netting, the most critical aspect is to ensure that
the netting maintains substantial contact with the underlying
mulch and the mulch, in turn, maintains continuos contact with
the soil surface. Without such contact, the material is useless
and erosion can be expected to occur.
MAINTENANCE
Inspect mulch for seed area at least once a week and within 24
hours of the end of a storm with a rainfall amount of 0.5 inch
or greater until the grass has germinated to determine
maintenance needs.
Where mulch has been moved or where soil erosion has
occurred, determine the cause of the failure and repair as
needed.
PERMANENT SEEDING (PS)
SPECIFICATIONS
Time Of Year
Seeding dates in Connecticut are normally April 1 through June
15 and August 15 through October 1. Spring seedings give the
best results and spring seedings of all mixes with legumes is
recommended. There are two exceptions to the above dates.
The first exception is when seedings will be made in the areas
of Connecticut known as the Coastal Slope and the Connecticut
River Valley. The Coastal Slope includes the coastal towns of
New London, Middlesex, New Haven, and Fairfield counties. In
these areas, with the exception of crown vetch (when crown
vetch is seeded in late summer, at least 35;0 of the seed
should be hard seed (unscarified), the final fall seeding dates
can be extended and additional 15 days. The second exception
is frost crack or dormant seeding, the seed is applied during
the time of year when no germination can be expected, normally
November through February. Germination will take place when
weather conditions improve, mulching is extremely important to
protect the seed from wind and surface erosion and to provide
erosion protection until the seeding becomes established.
Site Preparation
Grade in accordance with the Land Grading measure which is in
the Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition.
Install all necessary surface water controls.
For areas to be mowed remove all surface stones 2 inches or
larger. Remove all other debris such as wire, cable tree roots,
pieces of concrete, clods, lumps, or other unsuitable material.
Seed Selection and Quantity
Select a seed mixture appropriate to the intended use and soil
conditions from Figure PS-2 and Figure PS-3 in the
Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition or use mixture recommended by the NRCS.
Seedbed Preparation
Apply topsoil, if necessary, in accordance with the Topsoiling
measure which is in the Connecticut Guidelines For Soil Erosion
and Sediment Control latest edition.
Apply ground limestone and fertilizer according to soil test
recommendations (such as those offered by the University of
Connecticut Soil Testing Laboratory or other reliable source).
Where soil testing is not feasible on small or variable sites, or
where timing is critical, fertilizer may be applied at the rate of
300 pounds per acre or 7.5 pounds per 1,000 square feet of
10-10-10 or equivalent and limestone at 4 tons per acre or
200 pounds per 1,000 square feet.
Work lime and fertilizer into the sail to n denth of .i to 4
-r ...
inches with a disc or other suitable equipment.
Inspect seedbed just before seeding. If the soil is compacted,
crusted or hardened, scarify the area prior to seeding.
Seed Application
Apply selected seed at rates provided in Figure PS-3 (in the
Connecticut Guidelines For Soil Erosion and Sediment Control
latest edition) uniformly by hand, cyclone seeder, drill,
cultipacker type seeder or hydroseeder (slurry including seed,
fertilizer). Normal seeding depth is from 0.25 to 0.5 inch.
Increase seeding rates by 10% when hydroseeding or frost crack
seeding. Seed warm season grasses during the spring period
only.
Mulching
See guidelines in the Mulch For Seed measures.
MAINTENANCE
Inspect temporary soil protection area at least once a week and
within 24 hours of the end of a storm with a rainfall amount of
0.5 inch or greater during the first growing season.
Where seed has been moved or where soil erosion has occurred,
determine the cause of the failure and repair as needed.
SOIL ERSOION & SEDIMENT CONTROL NOTES
1_ All enil prneinn nnA cpriimpnt rnn+rnl wnrLe chill ho Anna in c+rin+
.. .... _.... ... --.-.. ,. _ .......,..-,., ...,.111 . .. 11 ....,... -_ ..... 1.. -1. 1-1
accordance with the Connecticut Guidelines For Soil Erosion and Sediment
Control latest edition.
2. Any additional erosion/sediment control deemed necessary by town
staff during construction, shall be installed by the developer. In addition,
the developer shall be responsible for the repair/replacement and/or
maintenance of all erosion control measures until all disturbed areas are
stabilized to the satisfaction of the town staff.
3. The contractor shall notify the town engineer at the beginning and
the end of each step of the construction procedure and shall not
proceed with the next step until the town engineer has inspected the
work.
4. All soil erosion and sediment control operations shall be in place prior
to any grading operations and installation of proposed structures or
utilities and shall be left in place until construction is completed and/or
area is stabilized.
5. All entrances to the project site are to be protected by construction
entrance (CE) pads, conforming to the Connecticut Guidelines For Erosion
and Sediment Control latest edition. Stone shall conform to Ct. D.O.T.
Farm R14A, Intagt pdi+irm AA ni D1 Nin 4 g+nna-The rF pad lg in ka
maintained at all times during the construction period.
6. In all areas, removal of trees, bushes and other vegetation as well as
disturbance of the soil is to be kept to an absolute minimum while
allowing proper development of the site. During construction, expose as
small an area of soil as possible for as short a time as possible.
7. All fill areas shall be compacted sufficiently for their intended purpose
and as required to reduce slipping, erosion or excess saturation.
Fill intended to support buildings, structures, conduits, etc., shall be
compacted in accordance with local requirements or codes.
8. Topsoil is to be stripped and stockpiled in amounts necessary to
complete finished grading of all exposed areas requiring topsoil. The
stockpiled topsoil is to be located as designated on the plans and ringed
with hay bale barrier or geotextile silt fence. The stockpiled topsoil shall
be temporarily seeded if it is to remain more than 30 days.Topsoil shall
not be placed while in a frozen or muddy condition, when the subgrade is
excessively wet, or in a condition that may otherwise be detrimental to
proper grading or proposed sodding or seeding.
9. There is to be no stockpiling of soil within a ten foot limit of
adjoining properties. Any and all fill material is to be free of brush,
rubbish, timber, logs vegetative matter and stumps in amounts that will
be detrimental to constructing stable fills. Maximum side slopes of
exposed surfaces of earth to be 3:1 or as otherwise specified by local
authorities.
%FcFON° y,aO
��t•Og
�•
'� ��
=h49*: J
9 ' No. 08048 : ew
PROJECT: Lot 2 Sea Pave Road
LOCATION: South Windsor, CT
PROJECT DESCRIPTION: Construction of a 15,000 sf building with associated parking and utilities.
PARCEL AREA. 1.08 acres
RESPONSIBLE PERSONNEL: Mike Zoppa, 289-5881
EROSION AND SEDIMENT CONTROL PLAN PREPARER J.R. Russo & Associates
CHECKLIST.
Work Description
Erosion & Sediment
Control Measures
Location
Date Installed
Initials
Date Removed
Initials
Install haybales and
As shown on
silt fence.
plan.
Install siltation
As shown on
barriers at CBs.
plan.
Install construction
As shown on
exit pad.
plan.
MAINTENANCE OF MEASURES:
Location Description or Number Date Initials
i
Project Dates:
Date of arroundbreakine for project:
Date of final stabilization:
NARRATIVE
This project is located on the west side of Sea Pave Road north of the intersection with Burnhan
Street in South Windsor, Connecticut. The proposed activity is the construction of a 15,000 s.f.
building with associated parking and utilities.
The suggested schedule of construction is as follows:
1. Install construction exit pad and haybale check dams.
2. Clear and grub.
3. Strip topsoil and stockpile sufficient quantities for landscaping and lawn areas.
Ring stockpiles with silt fence (GST) and stabilize with temporary vegetative cover (TS).
4. Import required fill, compact and rough grade site.
5. Excavate and install building foundation. Begin construction of building.
6. Install drainage and utilities as shown on the Mans, including imnrovempntc to pYic+inn
1 a r - ._ .., ....., ," t,
drainage swale. Construct settling basins.
7. Complete grading of pavement areas, pave binder course. Install curbing.
8. Fine grade remaining disturbed areas and establish vegetation. Plant landscaping
vegetation, mulch and fertilize.
9. Pave surface course of pavement, apply line striping and install signage.
10. Remove silt fence after permanent vegetation has been established.
Construction of this site is anticipated to begin after the approval of these plans.
The contractor shall keep the area of disturbance to a minimum and establish exposed soils as
soon as practical. All soil and erosion control measures shall be installed and maintained in
.Dance with these 1...nS d J.L._ "Gui_I_I•___ J:_._ S61 r 1)
a�%oruwluv wiul LIICJC pIUIIA gnu Lne bUlUellrle5 IUr JOII trosion and Sediment Control . The
contractor shall notify the Engineer of any discrepancies.
The developer shall be responsible for the repair/replacement/maintenance of all erosion control
measures until all disturbed areas are stabilized to the satisfaction of the town staff. Sediment
deposits should be periodically removed from the upstream sides of Sediment Barriers. This
material is to be spread and stabilized in areas not subject to erosion, or to be used in areas
which are not to be paved or built on. Sediment Barriers are to be replaced as necessary to
provide proper filtering action. Sediment Barriers are to remain in place and be maintained to
insure efficient siltation control until all areas above the erosion checks are stabilized and
vegetation has been established.
All fill areas shall be compacted sufficiently for their intended purpose and as required to reduce
slipping, erosion or excess saturation. Fill intended to support buildings, structures, conduits, etc,
shall be compacted in accordance with local requirements or codes.
All entrances to the project site are to be protected by stone tracking pads of ASTM C-33, size
no. 2 or 3, or Ct. D.O.T. 2" crushed gravel. The stone tracking pad is to be main- tained at all
times during the construction period.
Topsoil is to be stripped and stockpiled in amounts necessary to complete finished grading of all
exposed areas requiring topsoil. The stockpiled topsoil is to be located as designated on the
plans and ringed with Sediment Barrier. The stockpiled topsoil shall be temporarily seeded if it is
to rpmnin mnrp thnn 3n rinvc Tnnenil chnll nr%+ ho nlnnorl whiles in n fry, -AA- ,. . A.*I:.
�... .. .... _ ........ -_ v... v. . v.. -, v- ,I'.- 111 V II VG 11 VI IIIUVV VVIIVILIVII,
when the subgrade is excessively wet, or in a condition that may otherwise be detrimental to
proper grading or proposed sodding or seeding.
There is to be no stockpiling of soil within a ten foot limit of adjoining properties. Any and all fill
material is to free of brush, rubbish, timber, logs, vegetative matter and stumps in amounts that
will be detrimental to constructing stable fills. Maximum side slopes of exposed surfaces of earth
to be 3:1 or as otherwise specified by local authorities.
REV 6-13-03 SUBMIT FOR FILING. NO CHANGE THIS SHEET
REV 5-22-03 NO CHANGE THIS SHEET
Soil Erosion & Sediment Control Notes
Site Location: Lot 2 - 23 Sea Pave Road
South Windsor, Connecticut
Prepared For
Zoppa Studio, LLC
490 Burnham Street
South Windsor, Connecticut 06074
289-5881
. AR. RUSSO & ASSOCIATES
z;.
. t t.. Land Surveyors & Professional Engineers
`-
�-
,-
€ r.
-,
`C.. I.
, :•,.• 1 SHOHAM ROAD
.Gr y. :E.:;:,
�::::::...:•.
EAST WINDSOR. CONNECTiCUT 06088
:> (860) 623-0569
FAX: (860) 623-2485
BY SCALE I DATE I SHEET CHECKED NO.
DPS/LF AS SHOWN 4-4-03 4 of 6 JRR �2003-003
1. EXCAVATE A TRENCH
4" DEEP & THE WIDTH
OF A STRAW BALE.
TRENCH
PACKED
STRAW
j/
3. WEDGE LOOSE STRAW PLAN
BETWEEN BALES TO CREATE
A (:nNT1N1I(111Q RARRIm
END VIEW
COMPACTED
SIDE VIEW
NOTE: HAYBALES TO BE EMBEDDED 4" IN EXISTING GROUND
BUTTED END TO END/STAKED SECURELY.
CE & STAKE STRAW
TWO STAKES PER
4. BACKFILL & COMPACT THE
EXCAVATED SOIL AS SHOWN
^"'UPHILL SIDE OF THE
TO PREVENT PIPING.
ROUND
S TAKED HA YBALE SEDIMENTA TION BARRIER
NOT TO SCALE
Stone On Filte
Fabric
Marafi 1401
" Thick Min.
ANTI —TRACKING EXIT PAD DETAIL (CE)
NOT TO SCALE
10,
X X ____x X—
CONC. PAD
10' (BROOM FINISH)
3'
3" BIT. APRON
PLAN
GROUT POSTS IN
CAST -IN -PLACE SLEEVES
(TYP. OF 6)
CHAIN LINK FENCE
6' HIGH W/ PRIVACY SLATS
3" BIT. CONC. CLASS "A" CONC.
4" PROCESSED STONE BASE 6"x6" #6 WIRE MESH
(CT -DOT M.05.01)
•J 81i
8" COMPACTED
12" GRAVEL BASE
(CT -DOT M.02.03)
SEC TION A —A
CONC. DUMPS TER PAD DETAIL
14VI IV SCALE
ANGLE 10' UPSLOPE
FILTER FOR STABILITY AND
FABRIC SELF CLEANING.
FLOW —►- /
BOTTOM OF
DRAINAGEWAY
I 1
I 1
I J I
1 �I I
I 1t 1
I I
I 1
I I
I I
I I
PLAN VIEW
GENERAL NOTE REGARDING DETAILS:,
ALL MATERIALS SHALL CONFORM TO
CT DOT FORM 814, LATEST EDITION,
I IAII ACC tl1YUCOIA111e0 klnTcn
v�.�.Lvv v � � �e��•rr�.�� �rV � cv.
BACKFILL THE TRENCH
AND COMPACT THE
EXCAVATED SOIL.
COMPACTED
BACKFILL--
LLL _
LLLLLL.. �q R� CCLLLLLLLL-
LLLLLLLL " LLLLLLLLL A
/1 LLLLLL LLLLLLLLL LLLLLLL
LLLL LLLLLLLLL LLLL
L LLLLLLLLL LL
L L LL
POINTS "A" SHOULD BE
HIGHER THAN POINT "B"
ELEVATION
SOURCE: U.S. DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE, STORRS, CONNECTICUT
SEDIMENTATION BARRIER (SILT FENCE) DETAIL
NOT TO SCALE
1 1/2" BIT. CONCRETE CLASS II (CT —DOT M.04)
1 1/2" BIT. CONCRETE CLASS I (CT —DOT M.04)
�— 4" PROCESSED AGGREGATE BASE (CT —DOT M.05.01)
+ .A .... O• . -
�-12" GRANULAR BASE (CT —DOT M.02.03)
COMPACTED SUBGRADE
BITUMINOUS CONCRETE PA VEMEN T SEC TI ON
NOT TO SCALE
CONTRACTOR TO DETERMINED
CURRENT WORDING FOR
HANDICAP SIGN WHEN
CONSTRUCTION TAKES
PLACE.
INTERNATIONAL SYMBOL
r
OF ACCESSIBILITY
k
HAtMWPM
PARKING
ALL LETTERS TO BE
STATE PERM]
HELVETICA MEDIUM
(SIZE & PROPORTION
VMi
WILL BE FINE
TO MEET ANSI -117.1
>
SEC. 428
(� ACCESSIBLE
r
�ioT s EINE
0
I
i�
3" x 3" CONC. —
FILLED STEEL TUBE
TOPSOIL
COMPACTED
SUBGRADE
PROCESSED
TRAPROCK BASE
1" WASHED
GRAVEL
FASTEN SIGN TO POST
WITH STAINLESS STEEL
TAMPERPROOF SCREWS
OR SCREWS.
1" RAD. TYP.
HANDI CAP SIGN & BOLLARD
NOT TO SCALE
Reflective Paint
rking Space
T YPI CAL HANDICAP SYMBOL
NOT TO SCALE
20"
METAL BOLLARD
N07 70 SCALE
SMOOTH ALL
EXPOSED EDGES
8" CONCRETE
FILLED METAL POST
PAINT WITH PRIMER
AND 2 COATS YELLOW
OR WHITE PAINT
POURED CONCRETE
ANCHOR
1
HANDICAP PARKING SPACE
NOT TO SCALE
�"'#I F CONIyF �
�;•••
,co
REV. 6-13-03 SUBMIT FOR FILING NO CHANGE THIS SHEET
REV. 5-22-03 NO CHANGE THIS SHEET
BY
TACILF
Detail Sheet
Site Location: Lot 2 -- 23 Sea Pave Road
South Windsor, Connecticut
Prepared For
Zoppa �S'tudio, LLC
490 Burnham Street
South Windsor, Connecticut 06074
289--5881
JSSO & ASSOCIATES
.'ul vcyVl a cx. 1- I VIC.SJIVIIUi engineers