Loading...
HomeMy WebLinkAbout03-01W_SITE PLAN LOTS 6 & 7_SANDRA DRIVE�Ir ��?j PLA L\ N L OT�Sj c� &. al r 1 c fir, alDrJL�eJ ..sal L�_i� ` J�1 nr� -- 9�,J J,� _i�_i�e1C� Lr1 u�r 009a) TAMM f IN'n) d�e�x SHEET TITLE Is Mill SHEET NO. Cover Sheet- ............................................ -1 of 7 PlotPlan. ................................................. of 7 Topographic Plan ......................................... 3 of 7 Landscape Plan ......................................... - 4 of 7 Soil Erosion & Sediment Control Notes ................. 5 of 7 Detail Sheet ............................................. 8 of 7 Detail Sheet ............................................. 7 of 7 Oxbow LOCATION MAP 1 "=200' J.R. RUSSO & ASSOCIATES Land Surveyors & Professional Engineers 1 SHOHAM ROAD EAST WINDSOR, CONNECTICUT 06088 (860) 623-0569 FAX: (860) 623-2485 RECEIVED JAN 2 2003 South Windsor INLAND WETLANDS AGENCY CONSERVATION COMMISSION �a*0'0 %%slitIM/3�reg0F., 06 Q NG.0 48 •: REVISED 9--18-02 N F N/ F N/ F Bettylou Cuastamachio Wasyl & Sharon M. Szestakow Gary C. & Leslie M. Lee N/F 15' SAN. SEWER EASMENT Robert J. & Joanne M. Myette IN FAVOR OF THE TOWN 60 OF SOUTH WINDSOR EXIST. SAN. MH 52 54 58 1 62 64 66 70 74 ,76 TF=77.07 56 ; 68 1 72 1 FL=55,02 1 1�_! N27°._39"E t' N27042'39"E t` _N26°48'S6"EI ! ; 314171' ` , 50.00' 'i 149.30I I -,- WATER EASEMENT /N FAVOR OF r) CONNECTICUT WATER COMPANY t 1 r WET AND ' 8 C #40 Sandra Drive I' Lot Area :' 155, 535174 s. f. F , , ; I a 3.57 Ac. O .' ' \ APPROX. LOCA77ON W I, I O r I Ile IEXST. 12 MAIN k I 1 II \ t iI I Z,0 w 52 _ t _ 25' REAR`co L1NE + 75' BUFFER LiNE - -, \ `' ,`• l% i t I t Ii I ��� 30' WIDE 50 DRAT .._ r NAG 1 E & MAINTENANCE __ _ • -kr EASEMENT IN FAVOR OF \ t TOWN OF SOUTH WINDSOR UMIT OF'#ETLANDS AS - - FL`4GGED BY SOIL SCIEDV-77ST - - 46 , i a , 5 � 0 52 t 54 • ' W NIF 0 � s � t 56 13 58 i Bancroft Brook, ro t L.L.C. T .S I ' LINE BEARING DISTANCE L1 N29'05'41 "E 6.83' " �1 L2 N51'37'54"E 43.05' L3 N28'38'55"E 20.43' R' 20' DRAINAGE EASEMENT ' IN FAVOR OF TOWN r L4 N19'58'57"E 44.77' OF SOUTH WINDSOR sl ,� ,�1,.�, �� L5 S81'37'46"E 4.74' EXIST. TREE LINE (TYP) t4 L6 S08'22'14"W 20 00' 10' SIDE LINE L7 S81'37'46"E 21.78' 244.33'� - 30" RCP - L8 S19'58'57"W 32.79' S30°25'53"W ;,77'�=- 64 L9 S28'38 55 W 28.80 L10 S51'37'54"W 40.63' EXIST. DMH 7F 63.2 FL=57.2 15" FL=49.7 IN 30" N/F FL=49,4 OUT Andre K. Charbonneau 40 D 20 GRAPHIC SCALE . 160 ( IN FEET ) 1 inch = 40 ft. 1540 SULLIVAN AVENUE # SOUTH WINDSOR, CT O6C74 TELEPHOIt: i860i 644-2511 September 17, 2002 Certified #7000 t 670000189221936 I.R. Russo & Associate, Amu Timothy A. Coon I Shoham Road East Windsor, C;.i' 06088 TIE: Appl, 002-371,- Charbonneatt Site - westerly of Sandra Drive, (Assessor's Nap #96, parcels 960 & 61)1 zoue Dear Mr. Coots: At the September 4, 2002 regular meeting, tine Inland Wetlands AgencyiConservation Corrimissiou approved application r02-37P - Charbonneau Site - Sandra Drive - Inland Wetland/Conservation Commission application for the construction of a 20,400 so. ft, industrial building, parking, stor-mwater structures and associated improvements on property located westerly of Sandra Drive (Assessors Map 996, parcels #60 & 61)1, Industrial zone. This approval is subject to the following conditions: I. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitrrd to this Commission. This must be completed wits in 65 days of approval prior to any construction activity on the site. Plains submitted to Planning &Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on September 4, 2007. It is the landowners)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. Ali approvals required must be obtained and submitted prior to any activity on the site, 5. A contact person shalt be identified on the plans. 6. Type ff sediment chamber be replaced with a type of sedimentipoflutant removal chauuber as approved by Town wetland staff. t, �NIF Andre L. & Andre K. Charbonneau Rt ::::.:;.;:•;: •::.::;.;:•:.:::::::•:: reel..:...:. ....!.>•:.:::.�::::!•::<.>:•>;•:::; .. •:..... •.reel. �:::. _ ...:::..:..............,:. ... ..:...........................,.......... .......................................w t :�.•:: � `reel � ^• '••�� I n..:: :........ .::.t:.::::::::::::::: ..:: :.:: ........ .....1::.::.•:;....•,...................:3.::::: :.::.�:: :.: reel::: :.... I II ;1:f:::?:::i::::: 1 ..:•:.: ..:: reel:. ::::.:::::!:.: r: 2 >:.... Ji'N'• :• • • •.. .. w.<w. �:::: � v: i': Nil:. �::: i. vi:<v: i:•:tiiiiii ri<•i:•:4:i•iiii:•ii:vi:: bii': i'.iw:::: n �::: is i:4iii:•'.J:!::::.i,i:: {:. .T �t , �I I . .......... I' I •�i' i 45 1 76 EXIST. CB • 1 /N 1N i�i�'�`3:1>iit�'• ���` 35' BULD G L E i I -- `I .. II - TF-6 8.1 ...::.:::::;>::::::.:�.;;:.!.�: f' I C` � � �• •-II-- _.I FL=628 15" -� 74 FL-63.0 /N 18 1 I II - I _ FL-62.7 - OUT -7 ! _f ELEC. 18" RCP 24.i RCP_ _ %_ _ _� _ ' _ ^ , _ (— EXIST. SAN. MH / �' G� / /_ _ _ _, �' ON PVC pl ton � II 7F=69.0 ' ^ ~ r C -}-"n- — FL=57.3 15" R6J ===IF====� �j 68� EXIST. SAN. MH FL=567 • ���` �� (�1a PJ / EXIST. SAN. MH / 7F=67.3 FL=57.5 L=131.99' EXIST. CB A = 27030' 00" �� o �� TF=66.9 R=275.00' \66y FL=62.3 FL=62.0 `` ... L=22.39' \ I EXIST. CB L-7F=65.7 EXIST. CB 7F=65 8 R=25.00' L=105.84 FL=60.9 FL=51.6 FL=61.8 A=110 ° 15' 29" R=55.00' EXIST, SAN. MH 7F=66,8 FL=57, 8 Clrarborluucnu Site September 17, 2002 Page 2 7. A drainage easement at least 30' chide to be granted from the outfalI pipe to the property line in favor of the T oivn, E. Current conditions of the downstrearn channel and surrounding areas be documented and three year checks on the stability of the coconut ioas be made. 9. Storinwater treautlent unit to be Ilea ned according to specifications. I0, We recommend a bond in the amount of S20,000 be submitted to the Planning & Zoining Commission to ensure stream bank stablization, 11. We recommend a bond in the amount of $5,000 be submitted to the Planning & zoning. Commission to ensure compliance with the Erosion and Sedimentation Control Measures. tirery truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COivII USSION Elizai r A. Warren, Chairperson EAVAr cc: Chief Building Official Town Engineer Mr. Andre Charbonneau x� Y i. 40 SULLIVAN AVENUE . SOUTH WINDSOR. CT 06074 y0a°R cir I EI.EPNONE (860) 644.2511 CERTIFIED MAIL September 16, 2002 Andre L. Charbonneau 125 Edwin Road Soutar Windsor, CT 060"r4 Re: Appi 902-37P, Charbonneau, Sandra Drive Lots 6&7 Dear Mr. Charbonneau: We are pleased to advise you that the Planning & Zoning Commission voted on September 10, 2002 to approve the above referenced application for a Site Plan of Development. This approval is for the construction of a 20,400 sq ft facility on property located on the southerly end of Sandra Drive, I Zone, as shown on plans prepared by S.R. Russo,. Job No. 2002-024, dated August 12, 2002, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with 'Town SlatT. 2. No building permit will be issued until the filial mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency!Coaservation Corunission, iucluding two a bonds in the amount ofa20,L'00.00 to ensure; stream bank stabilization and S5,000.00 for erosion anal sediment control. 4. Au as -built plan is required prior to issuance of a Certificate of Occupancy per Section a.1.10 of the Zoning Regulations. S. Landscape bond in the amount of 535,000.00 required and must be submitted prior to filing ofnuylars. 6. All plans used in the field by the developer must brar the stamp and authorizer) signature of the Town of South Windsor. 7. WPCA approval is required. S. 'PC building street number must be included on the filial plan. Reference Map: "Resubdivision Property Of Andre Charbonneau South Windsor, Connecticut Owner -Developer Andre L, Charbonneau & Andre K Charbonneau 125 Edwin Road South Windsor, Connecticut Phone 528-7551" 1"=40' 4-13-87 Rev. 9-1-87 Class A-2 by Palmberg & Russo, William R. Palmberg, L.S. Notes: 1. Parcel is not located in a flood hazard zone, Panel No. 090036 0006 B. 2. Portion of the parcel is located in inland wetlands as mapped by Michael F. Gragnolatti, Soil Scientist. 3. Elevations are based on M.D.C. datum. 4. Coordinates are based on C.G.S. datum. 5. Underground utility, structure and facility locations noted hereon have been compiled, in part, from record mapping supplied agencby the respective utility companies or governmental ies, from parole testimony and from other sources. These locations must be considered as approximate in nature. Additionally, other such features may exist on the site, the existence of which are unknown to J.R. Russo & Associates. The size, location and existence of all such features must be field determined and verified by the appropriate authorities prior to construction. Call Before You Dig 1-800-922-4455. 6. Soil erosion and sediment control contact person: Andre' Charb - F onnea 528 7.,51 . 7. Found ation dim ensions as shown on this plan an are for sit e design n purposes only. Foundation contractor will use Architectural plans for layout and construction 0 of building foundation. 8. All soil erosion and sediment control work shall be done in strict accordance with the latest edition of the Connecticut Guidelines for Erosion and Sediment Control. 9. Construction shall conform with the Town of South Windsor Public Improvement Specifications. 10. In accordance with Condition #19 of the original subdivision approval (#1255) on November 18, 1987, an additional 25-foot non -disturbance - Is urbance area has been added to the 50 foot buffer and 25-foot re ar ar yard g alon the west ern property bo boundary. . 11. An floor drains y ra>.ns installed within the building must be connected to an o>1 gnit se parator arator P rIo r to discharge to the sa nitary sewer. LEGEND: •+- UTILITY POLE C WATER GATE t➢ GAS GA TE D PROP. CA TCHBASIN DATA BLOCK: O PROP. STORM MANHOLE ❑ EXISTING CA TCH BASIN L Ot Area — 8.f,, 3 57 AC, -°- SiGN I--�"ri--., 1 35' Building Line -�,- H'rORAiJT - - E- - U.G. ELEC. LINE 10' Side Line - - c- - U.G. GAS LINE 25' Rear Line - - W- - U.G. WATER LINE Max. Building Coverage Allowed7.- 50 PROP. STORM SEWER Prop. Building Coverage % 13 =_____= EXISTING STORM SEWER Max. Impervious Coverage Allowed%- 65 s — PROP. SANITARY SEWER Prop. Impervious Coverage 27 - - EXISTING SANITARY SEWER WETLAND LIMIT EXISTING CONTOUR PARKING CALCULATION: -" —' PROP. CONTOUR <'p 7 EXIJTIIVG SPOT GRADE Use - Warehouse 0 • PROP. SPOT GRADE EXISTING I.P. Minimum Spaces Required - ■ EXISTING MONUMENT (1 space/1,250 SF) x 20,400 SF o PROP. I.P. + (1 space) x 9 employees o PROP. MONUMENT = 26 ® WETLAND FILL - - - -+ GEOTEXTILE SILT FENCE Spaces Provided = 27 STAKED HAYBALES 9. The Town Engineering's comments dated August 21, 2002 must be addressed to the satisfaction of the Toxin Engineer. 10. An explanatory note for the increased buffer referencing the previous subdivision approval should be added. 11. Planr•.ing Comments dated August 30, 2002 must be addressed. r9 'rha snnliraat unmet -I- to the Architectnml I)ecinrt 12evif�w Cnmmittooe fnr final review Iftha annrcin- has any conceals with the Committee's recommendation, then the applicant must return to the Planning and 7.oning Commission for final resolution. 13. Grading that occurs within the 75 foot non•erreroaciunctu area must be returned to an undisturbed, landscaped area. Bla6k and white transparent mylars of Sheet #2 with the above modifications, together with three blueprint copies of the entire set of pla s must be submitted to this Commission within 30 days to be stamped and signed. The letters of'approvai of this Commission as well as the Inland Wetlands Ag•ancy/Conservation Commission must be reproduced on the mylars. After the mylars have baen signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt rnust be submitted to the Planting Department. Sincerely, Merin McCann, Chairman Planning and Zoning Commission KMcC/kah cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal J.R. Russo 6-19-02 "0-t�'xauz�'z 1540 SULLIVAN AVENUE • SOU114.'NINDSOR, CT 06074 TEI.t=FNONE (860) 644-2.5_1 October 10, 2002 I. R. kws° Associates I Shoham Road East Windsor, CT 06n288 Attu: Mr. Lrrseii RE: Lots 6 8c 7 Sandra Drive-• Approval to Connect South Windsor, CT Dear?&. Urseri: The Souda Windsor Rater Pollution Control Authority, at its regular meeting of0ctobcr 1, 2002, gave approval for the co wcction to the Town's scwciage s_vst rauf a cuettrercial building to be located at Lot 6 & 7 Sandra Drive, South Windsor, CT, as more specifically shown on plans erti4ed"Topographic plan - I.ot 6 & 7, -Prepared by J. R. Russo Associates, East Windsor, CT, Project No. 202.024, Dra-Mag Nc(s)3 dated 6.19.02, revised 6.18.02, 8-12.02, 9-18-02, and subject to the following conditions: I. Approval for fire coareetion of tip to 9 bathrooms. 2. Technical approval of the Town Engintcring Depatvnent. 3. Final Authority approval and acceptance of the sanituy sewerage connection will be given once The sewer line has been installed and inspected by ibe Town staf{ and based upon the written Vcri: catiou of the Town staff :hat said sanitary sewer lire, wvs cstalled in substantial conformance wdth the design plans previously an roved by rile Audrorky, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. Connection charges in trio amount of 59,996.00 (S2,8001acre) bave becu calmlated for this site, and are due at the tiune of drain sayers permit application. This approval letter ITMI. be sup dutgosed on the :curl appio,-A plati<. Very truly yum, ....:t-t�J Carm, Chairman %ter pollution Contral Authority i7C:dd Cc: iliff.hew Culligan. Town Ma« afer 'Aiubacl J. Gautick, Director of Public Works fe1T'])oc litlle,'fnwn Eugineer Marcia Banach, Dirccwr of Planning John Collins, Chief Building Inspector Andre Cbarbonueau This survey and map has been prepared in accordance with Sections 20-300b-1 thru 20-300b-20 of the Regulations of Connecticut State Agencies - "Minimum Standards for Surveys and Maps in the State of Connecticut" as endorsed by the Connecticut Association of Land Surveyors, Inc. It is a Improvement Location Survey based on a Dependent Resurvey conforming to Horizontal & Vertical Accuracy Class A-2 & T-2. This document and copies thereof are valid only if they bear the live signature and embossed seal of the designated professional. Unauthorized alterations render any declaration hereon null and void - LOCATION MAP 1 "=200' Map Lot Name & Address 108 18 Douglas Eric Wetherll 55 Oxbow Lane South Windsor, Ct. 06074 19 Andre L, & Andre K. Charbonneau 125 Edwin Road South Windsor, Ct, 06074 2111 Rnrl D k �Tnnn+ 11( µ. re"0 40 Old Parish Drive South Windsor, Ct. 06074 21 Joanne M. Myette P.O. Box 538 South Windsor, Ct. 06074 22 Gary C. & Leslie M. Lee 18 Old Parish Drive South Windosr, Ct. 06074 24 Nancy Allison 11 Old Parish Drive South Windsor, Ct. 06074 25 Stephen C. & Patrcia A. Roback 44 Oxbow Lane South Windsor, Ct. 06074 34 Kristina S. & Brian E. Beckwith 21 Edgewood Drive South Windsor, Ct. 06074 35 Joseph M. Bouffard 1474 Main Street South Windosr, Ct. 06074 36 Andre L, & Andre K, Charbonneau 10 Abbe Road South Windsor, Ct. 06074 37 Wojciech Dawidczyk 53 Susan Drive Tolland, Ct. 06084 38 Linbob, LLC 80 Kimberly Drive South Windsor, Ct. 06074 k TO THE BEST OF MY KNOWLEDGE AND BELIEF THiS MAP IS SUBSTANTIALLY CORRECT AS N07E'D HEREON. YIs No. 8048 Map Lot Name & Address 96 6 Frances D. Bellizzi 1125 Main Street East Hartford, Ct. 06108 7 Paul F. Barbour 5 Old PArish Drive South Windsor, Ct. 06074 8 eettyivu Guastaznachio 2 Old Parish Drive South Windsor, Ct. 06074 9 Wasyl & Sharon M. Szestakow 6 Old Parish Drive South Windosr, Ct. 06074 11 Bancroft Brook LLC 102 Lakewood Circle Manchester, Ct. 06040 12 RLR Investments LLc P.O. Box 271 Wilmington, OH 45177-0271 58 Andre L, & Andre K Charbonneau 10 Abbe Road South Windsor, Ct. 06074 59 Andre K Charbonneau 125 Edwin Road South Windosr, Ct. 06074 97 18 Andre Charbonneau 55 Kimberly Drive South Windsor, Ct. 06074 19 Linbob, LLC 80 Kimberly Drive South Windsor, Ct. 06074 1 111-13-021 TAC I JRR I ADD WPCA APPROVAL LETTER NO I DATE BY I APPR. I REVISIONS Plot Plan Lot 6 & 7 40 Sandra Drive South Windsor, Connecticut Owner/Developer Andre L. & Andre K. Charbonneau 125 Edwin Road South Windsor, Connecticut 528— 7551 J.R. RUSSO & ASSOCIATES Land Surveyors & Professional Engineers BY ISCALE LF/TAC I 1 "=40' 1 SHOHAM ROAD EAST WINDSOR, CONNECTICUT 06088 (860) 623-0569 FAX: (860) 623-2485 DATE Snrrc T l.I• LUKtu NO. i 9-18-02 I 2 of 7 I JRR 1 2002-024 Reference Map: •: • \.:ryS;•: Siii;•S}::.:: <::. �:::.:::.. •::::. �::::::: .>S::l::::S>:.:uo;:::n:;a::•:;: n:: ;:•:::. �:. �:::•::::::::::: •:>: ?:4::.M.•v:: XNf:bF ...............?..f FL GGED BY_ OIL SCl NTtST .:.. ...� .:.::::::.:.:..:::.:�..... ...:::.�::::s.:�: •:::.::::.::�:::::: .....::::::::::.:.::..::::::::::..:::::::::::.::..........::..:::..� :::::::::::.:.:�:::::::::�. � � . �" � .. ::.�f1. AREA DRAIN . ;�': .t' - . ; :' .... .......5.. :. .... :::. n.:......, .................. .... ................ w.......•J::: ;ri!•:<vii:4iSiiS?v:.y. �:::::::. 30 WIDE : DRAINA GE i 0. r & MAINTENANCE ._ ,.:::.:::.........................:...::.:�.:.�:::.�..:......................::::::.� .:>.:�:::::::::.::.:..:....................::..:::.:::::::::::::::::.�::::..:...�...................::::.,...:. CONCRETE EASEMENT IN FAVOR \ :::;;:;:::';>:::>:>:>::>::;::<<:»>::>:::<>r;::><:>:::>>.......:................................... I DUMPSTE OF �. `:.. I R PAD TOWN OF SOUTH WINDSOR A2 - A6 j ;<:<:>:::<><<::>:;:::>::<::: >::>:::<::<:>:: }� ->.� SEE DETAIL , II - - CB • <:»»� <:.:�;::::>::>:<�:>:<>�<:>::.;.<;.::.:;; 1 TYPE CL ' - 1 :>: y::::::>' :k:;: . ° :.:::••.:::::?:: 126 - r ( VORTECH MODEL 20 0 10 RANCOR F111 , II I TF=66.10 0 .--. •_ .._ .._ .-._ ,�, - -. - ><€:<3>:.:: :..: :>::>:«<:> / S-0.5g , r � = OR EQUAL APPROVED BY ENGINEER �•' ::<:::; )::::: ............ FL 63.14 _ ' _ ._ FLARED END.'' II I & INLAND WETLAND AGENT 42 r.:::.::. t TF=67.20 46 48 - � - - -- �� - ::>�is:: Fz L 47:8� r3 r• -76 _II 5 54 ' � w ,- EX/S co T. CB 40 --15 RANCOR F111- Co rF sa. l .::.::.:.::.:.:; TC-68.7 1l O , - � FL 6 0 58� p ; r -�4 3. IN 18 F TRA NSFORMER _ L 62.7 OUT 7 �<�`<'_�'<�I`IIII>IIIIII>IIIIII;IIIII€IIIIIIIII>. I� , ON CONC.«:w»::»::<::;;:::>::>:;::>;::r<:::::::::::>:>?::::;<>s:::?::: TC�67.9 _ - _ 10 ELEC. ESUT PAD ---_.,<<;,... 100 STREAMBANK 1«'';>««:>::::>::>::::::::::>:>:::::: BC 67.4 ti 69.0 �-.� ,, \ �; 67.0 / to STABILIZATION ��: o BOTH SIDES _ TEMPORARY TOPSOIL ?` 7 a - - r = _ _ - - = - - _ - „ . � ,_ (� � / �� ,•: _ : � � 18" RCP (SEE DETAIL) STOCKPILE SURROUNDED `� �, 66 C' V1 �� !i RC _ -G==' ` 3�" I BY SILT FENCE �` -- �. ,,,, '� ' 00 TC�67.9 _ 2� - R " " , - , - $, (- EXIST. sAly MH 20' DRAINAGE EASEMENT ��i �.. _ _ BC=67.4 '1 - ^ ' pVC pl it ii II 69.0 SELECTIVELY THIN/TRIM TREES ALONG !N FAVOR OF TOWN �� �- -- -- ..�G.� _ - = - , 10� _ _ -0-{- N- I- FL=57.3 OF SOUTH W/NDSOR C .., - ° �I 15" RC STREAM TO ALLOW LIGHT 6 1_,...� TS - - - _w- L_ _ _ _ _ COORDINATE W/ SOIL SCIENTIST EXIST. TREE LINE (TYP) Ir AND TOWN WETLAND AGENT -� ' " _ '' �30RCP ti -'��° fZCP' � � � ' - EXIST SAN. MH TF=682 /2 ..times_ _\64 - � j -',- � �., i� FL=56 7 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 160 IV F-AIQ 1. W.^% i r-n LA I C r%ALJ 117'-6" PVC SDR-35 _ S=2.0% LEGEND: -a- Fil c m O O - -E-- --w-- -S - I UTILITY POLE WA TER GATE GAS GATE PROP. CA TCHBA SIN PROP. STORM MANHOLE EXISTING CATCH BASIN SIGN HYDRANT U.G. ELEC. LINE U.G. GAS LINE U.G. WATER LINE PROP. STORM SEWER EXISTING STORM SEWER PROP. SANITARY SEWER EXISTING SANITARY SEWER WETLAND LIMIT EXISTING CONTOUR PROP. CONTOUR EXISTING SPOT GRADE PROP. SPOT GRADE EXISTING L P. EXISTING MONUMENT PROP. 1. P. PROP. MONUMEN T WETLAND FILL GEOTEXTILE SILT FENCE STAKED HA YBALES EXIST. SAN. MH - TF=67.3 FL=57.5 EXIST. CB TF=66.9 FL=623 FL=62.0 EXIST. SAN. TF=66.8 FL=57.8 CONTRACTOR TO PERFORM TEST PIT TO CONFIRM LOCATION AND FLOWLINE OF EXIST. SAN. LATERAL & INSTALL SMH WITHIN R.O.W. OVER LATERAL TF=66.6f ESTIMATED FL=59.0t AT PROPERTY LINE EROSION & SEDIMENT CONTROL PLAN KEY PS PERMANENT SEEDING TS TEMPORARY SEEDING CE CONSTRUCTION ENTRANCE G S F GEOTMLE SILT FENCE H B HAY BALE BARRIER DC DUST CONTROL OP OUTLET PROTECTION 6-19-02 26'-15" HANCOR F111 S=0.5% INSTALL SILTATION BARRIER ON ALL EXIST. DOWNSTREAM CB'S (TYP) CONNECT TO EXIST. CB NEW FL=62.80 This survey and map has been prepared in accordance with Sections 20-300b-1 thru 20-300b-20 of the Regulations of Connecticut State Agencies - "Minimum Standards for Surveys and Maps in the State of Connecticut" as endorsed by the Connecticut Association of Land Surveyors, Inc. It is a Improvement Location Survev based on a Dependent ResurveX conforming to Horizontal & Vertical Accuracy Class A-2 & T-2. This document and copies thereof are valid only if they bear the live signature and embossed seal of the designated professional. Unauthorized alterations render a nV declaration her eon n u, n -I -;A TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP /S SUBSTANTIALLY CORRECT AS NOTED HEREON. is p g»3Ek8S:t;�Fbdlt• sd C �Jf�l�Ifi iPPafs a*a�dc � `.J' , C "S 0 , . C7 a,. 0 ..... XA ?L . • R'.0804 t _e 8048 No.7 ram•'• ,y,/ r. ;_ r':. Lam•°'(••''- �3�wb,T����:FX/''�l�Y�17J•:y:r,�.�'•: "Resubdivision Property Of Andre Charbonneau South Windsor, Connecticut Owner -Developer Andre L. Charbonneau & Andre K Charbonneau 125 Edwin Road South Windsor, Connecticut Phone 528-7551" 1"=40' 4-13-87 Rev. 9-1-87 Class A-2 by Palmberg & Russo, William R. Palmberg, L.S. Notes: 1. Parcel is not located in a flood hazard zone, Panel No. 090036 0006 B. 2. Portion of the parcel is located in inland wetlands as mapped by Michael F. Gragnolatti, Soil Scientist. 3. Elevations are based on M.D.C. datum. 4. Coordinates are based on C.G.S. datum. 5. Underground utility, structure and facility locations noted hereon have been compiled, in part, from record mapping supplied by the respective utility companies or governmental agencies, from parole testimony and from other sources. These locations must be considered as approximate in nature. Additionally, other such features may exist on the site, the existence of which are unknown to J.R. Russo & Associates. The size, location and existence of all such features must be field determined and verified by the appropriate authorities prior to construction. Call Before You Dig 1-800-922-4455. 6. Soil erosion and sediment control contact person: Andre' Charbonnea (528-7551). 7. Foundation dimensions as shown on this plan are for site design purposes only. Foundation contractor will use Architectural plans for layout and construction of building foundation. 8. All soil erosion and sediment control work shall be done in strict accordance an e with the latest edition of the Connecticut Guidelines for Erosion and Sediment Control. 9. Construction shall conform with the Town of South Windsor Pu blic Improvement Specifications. 10. In accordance with Condition #19 of the original subdivision approval (#1255) on November 18, 1987, an additional 25-foot non -disturbance area has been added to the 50-foot buffer and 25-foot rear yard along the western property boundary. 11. Any floor drains installed within the building must be connected to an oil /gTit separator prior to dischar e to the sanitary sewer. 3 9-18-02 TAC JRR P&Z & WETLANDS CONDITIONS OF APPROVAL, ADD PLOT PLAN 2 8-12-02 TAC JRR MOVE BUILDING 25' EAST 1 6-18-02 TAC JRR ENVIRONMENTAL PLANNER & ENGINEER'S COMMENTS NO DATE BY APPR. REVISIONS Topographic Plan Lot 6 & 7 40 Sandra Drive South Windsor, Connecticut Own er/Developer Andre L. & Andre K. rhWrbUnneILA,C, 125 Edwin Road South Windsor, Connecticut 528-7551 J.R. RUSSO & ASSOCIATES Land Surveyors & Professional Engineers i�. ' • 1 SHOHAM ROAD EAST WINDSOR, CONNECTICUT 06088 (860) 623-0569 FAX: (860) 623-2485 BY SCALE DAiE SHEET CHECKED NO. LF/TAC 1"=40' I 6-19-02 ' 3 of 7 ( JRR I �2002-024 Ak s 105 100 95 m 75 70 60 0 2 PLY 1/2" DIA. REINFORCED RUBBER HOSE TREES GREATER THAN 2 1/2" CAL ----- GUY WIRES - THREE SPACED EQUALLY ANCHORED W/2"x4N2.5' CEDAR STAKE SET CROWN OF ROOTBALL AT SURROUNDING FINISH GRADE BEFORE MULCHING PLANTING SOIL MIXTURE 10 GA. GALV. SOFT STEEL GUY WIRE y�STAKES NOTCHED FOR WIRE TREES 2 1/2" CAL. OR LESS HARDWOOD STAKES -TWO 2"x2"x8' OPPOSITE AND SET /"-INTO SUBGRADE TREE WRAPPING TO SECOND BRANCH HEIGHT W/50% OVERLAP �— SEE LAYOUT FOR SURFACE TREATMENT 7 -- 3" SHREDDED BARK MULCH -----ROLL BACK TOP THIRD OF BURLAP 6" COMPACTED PLANTING SOIL MIXTURE UNDISTURBED SUBGRADE TREE PLANTING NOT TO SCALE THREE 10 GAL. GALV. SOFT STEEL - GUY WIRE ANCHORED W/2"x4"x2'-6" CEDAR STAKE SPACED EQUALLY SET CROWN OF ROOTBALL AT SURROUNDING FINISH GRADE. —� 1F IN HEAVY CLAY SOILS SET AT 1" ABOVE FINISH GRADE BEFORE MULCHING. F STAKES 90' TO GUY WIRES ROLL BACK TOP THIRD OF BURLAP - INSTALL TREE PLUMB, PRUNE ALL DAMAGE OR BROKEN BRANCHES -2 PLY 1/2" DIA. REINFORCED RUBBER HOSE - 3" SHREDDED BARK MULCH 1-6" EARTH SAUCER PLANTING SOIL MIXTURE COMPACTED PLANTING SOIL MIXTURE - UNDISTURBED SUBSURFACE EVERGREEN TREE PLANTING � • d a a i a a :. ...... . a 0 d E 4 Q Q 4 Ci 4 a -a .... ........ ......... .... ...... ........ ............. a UK 4 � O EAR OF BUILDING ' � D D Q �- � Q I z' w .I W Q Z _J W � Z (n W O H W � -- O d Of 10 20 30 40 50 60 70 80 T YP/ CAL REAR BUFFER PROFILE - PROJECTED 5 N TS WETLAND PLANTING SCHEDULE (7) CLETHRA ALNIFOLIA SWEET PEPPERBUSH, 18"-24" (6) CORNUS FOEMINA RACEMOSA GRAYSTEM DOGWOOD, 18"-24" (7) ILEX VERTICILLATA WINTERBERRY HOLLY, 18"-24" (7) LINDERA BENZOIN ' COMMON SPICEBUSH, 18"-24" (6) VACCINIUM CORYMBOSUM HIGHBUSH BLUEBERRY, 18"-24" SHRUB_ PLANTING SCHEDULE (29) o JUNIPERUS CHINENSIS PFITZER JUNIPER 24"-30" CONTAINER (18) o VIBURNUM LENTAGO, NANNYBERRY 24"-30" CONTAINER (5) o RHODODENDRON (PJM) 24"-30" CONTAINER SEEDING SCHEDULE 2:1 SLOPES: FLAT PEA, LATHCO BY NEW ENGLAND SEED CO. OR EQUAL 40-60 LB/ACRE OTHER UPLAND AREAS: ATHLETIC MIX BY NEW ENGLAND SEED CO. OR EQUAL 200-250 LBS/ACRE MIMED PLAN I INGS OF WETLAND SHRUBS SPACED 6' O.C. (SEE SCHEDULE THIS SHEET) 100' STREAI STABILI; BOTH SELECTIVELY TRIM TREES i STREAM TO CLEAR OVER: COORDINATE W/ ENG AND TOWN WETLAND i I .1 YEARS 100 110 NOT TO SCALE 105 100 95 75 70 65 60 0 COMPACTED PLANTING SOIL MIXTURE TO PREVENT F SETTLEMENT 1/2" DIA. CRUSHED STONE ADDED IN AREAS WITH POORLY DRAINED SOILS SET CROWN OF ROOTBALL LEVEL GRADE WITH HIGHEST POINT OF SAUCER 3" SHREDDED BARK MULCH NOT TO COVER CROWN OF BALL AT BASE OF PLANT STEM PLANTING SOIL MIXTURE SHRUB PLANTING NOT TO SCALE 1 ------- ------.................... -................. ,.............................................. ....................... .................. ° Q ........ .. a ._..... a .... _4.. a a°-------------------- 4 4 Q i 4 4 p a - I \V/ /6-:S I a 1 o I a a REAR OF BUILDING 4 D 4 W' Q I zw O 0 z i _I 0:: Q J uj �... .............. ........................... .. ........................................... ........._................_... i ...... U W jjj CL O w 10 20 30 40 50 T YP/CAL REAR BUFFER PROF N TS i0 5 TREES C. MIN. ZSED RUCE DUCE 'INE NE M 'S 3 ONLY 60 70 80 90 lL E - PROJEC TED MA TURI T Y LEGEND. UTILITY POLE c WA TER GA TE e GAS GATE 0 PROP. CA TCHBA SIN O PROP. STORM MANHOLE ❑ EXISTING CATCH BASIN -n- SIGN -¢- HYDRANT - - E - - U.G. ELEC. LINE - - c - - U.G. GAS LINE - - w- - U.G. WATER LINE PROP. STORM SEWER -�� EXISTING STORM SEWER — s — PROP. SANITARY SEWER _ — = EXISTING SANITARY SEWER A WETLAND LIMIT EXISTING CONTOUR -v r-- PPnP,r nA/Tni IP 2WxO EXISTING SPLIT GRADE 26s.o PROP. SPOT GRADE • EXISTING I.P. • EXISTING MONUMENT 0 PROP. 1. P. u PROP. MUIIIUMENT WETLAND FILL - — — GEO TEXTILE SILT FENCE STAKED HA YBALES TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON, GRAPHIC SCALE ao _......(P 1--1/2" TO 2" CAL., B&B ,,'p} daf9dE8818j6Y�BJ 0 20 40 80 160 (1) PICEA OMORIKA, SERBIAN SPRUCE S 2Nl:_? 9-vil3l 100 110 ( IN FEET 1 inch = 40 ft. L GEOTEXTILE SILT FENCE (GSF) SPECIFICATIONS Materials Geotextile fabric: shall be a pervious sheet of polypropylene, nylon, polyester, ethylene or similar filaments and shall be certified by the manufacturer or supplier as conforming to the requirements shown in Figure GSF-1 in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. The geotextile shall be non -rotting, acid and alkali resistant and have sufficient strength and permeability operations. Filamanets in the geotextile shall be resistant to absorption. The filament network must be dimensionally stable and free of any chemical treatment or coating that will reduce its permeability. The geotextile shall also be free of any flaws or defects which will alter its physical properties. Torn or punctured geotextiles shall not be used. Supporting posts: shall be at least 42 inches long made of either 1.5 inch square hardwood stakes or steel posts with projections for fastening the geotextile possessing a minimum strength of 0.5 pound per linear foot. Placement. For toe of slope: Locate 5-10 feet down gradient from the toe of slope, generally on the contour with maintenance and sediment removal requirements in mind. When the contour can not be followed install the fence such that perpendicular wings are created to break the velocity of water flowing along the fence. See Figure GSF-2 in the Connecticut Guidelines For Soil Erosion and Sediment Control for spacing requirements. Swales: Locate "U" shape across swale such that the bottom of both ends of the fence are higher that the top of the lowest section of the fence. Catch Basin in Swale on Slopes: Locate 2 "U" shapes across swale as above: one immediately up slope from the catch basin and the other immediately down slope from the catch basin. Catch Basins in Depressions: Encircle catch basin. Culvert Inlets: Locate in a "U" shape approximately 6 feet from the culvert in the direction of the incoming flow. CulvertOutlets: Locate across the swale at least 6 feet from the culvert outlet. Installation Trench excavation: Excavate a trench a minimum of 6 inches deep and 6 inches wide on the up slope side of the fence location. For slope and swale installations, extend the ends of the trench sufficiently up slope such that bottom end of the fence will be higher than the top of the lowest portion of the fence. When the fence is not to be installed on the contour, excavate wing trenches spaces at the intervals given on Figure GSF-2 in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. When excavation is obstructed by an occasional stone or tree roots, provide a smooth transition between the trench bottom and the obstruction. Support Posts: Drive support posts on the down slope side of the trench to a depth of at least 12 inches into original ground. Never install support posts more than 10 feet apart. Install support posts closer than 10 feet apart when concentrated flows are anticipated or when steep contributing slopes and soil conditions are expected to generate larger volumes of sediment. For catch basins in hollows, drive posts at each corner of the catch basin. Whenever the geotextile filter fabric that is used exceeds the minimum material specifications contained in this measure, the spacing of the stakes shall be per manufacturer's recommendations. Geotextile Filter Fabric: Staple or secure the geotextile to the support posts per manufacture's instruction such that at least 6 inches of geotextile lies within the trench, the height of the fence does not exceed 30 inches and the geotextile is taut between the posts. When the trench is obstructed by stones, tree roots, etc. allow the geotextile to lay over the obstruction such that the bottom of the geotextile points up slope. In the absence of manufacture's instructions, space wire staples on wooden stakes at a maximum of 4 inches apart and alternate their position from parallel to the axis of the stake to perpendicular. Do not staple the geotextile to living trees. Provide reinforcement for the fence when it can be exposed to high winds. When joints in the geotextile fabric are necessary, splice together only at at support posts, and securely seal. Backfill & Compaction: Backfill the trench with tamped soil or aggregate over the geotextile. When the trench is obstructed by a stone, tree root, etc. make sure the bottom of the geotextile lies horizontal on the ground with the resulting flap on the up slope side of the geotextile and bury the flap with 6 inches of tamped soil, or aggregate. MAINTENANCE Inspect the silt fence at least once a week and within 24 hours of the end of a storm with rainfall amount of 0.5 inch or greater to determine maintenance needs. When used for dewatering operations, inspect frequently before, during and after pumping operations. Remove the sediment deposits or, if room allows, install a secondary silt fence up slope of the existing fence when sediment deposits reach approximately one half the height of the existing fence. Replace or repair the fence within 24 hours of observed failure. Failure of the fence has occurred when sediment fails to be retained by the fence because: (a) the fence has been overtopped, undercut or bypassed by runoff water, (b) the fence has been moved out of position (knocked over), or (c) the geotextile has decomposed or been damaged. Maintain the fence until the contributing area is stabilized. After the contributing area is stabilized determine if sediment contained by the fence requires removal or regrading and stabilization. If the depth is greater than or equal to 6 inches, regrading or removal of the accumulated sediment is required. No removal or regrading is required if sediment depth is less than 6 inches. Remove the fence by pulling up the support posts and cutting the geotextile at ground level. Regrade or remove sediment as needed, and stabilize disturbed soils. HALE BALE BARRIER (HB) SPECIFICATIONS Materials Nay Bales: shall be made of hay or straw with 40 pounds minimum weight and 120 pounds maximum weight held together by twine or wire. Stakes for Anchoring Hay Bales: shall be a minimum of 36 inches long and made of either hardwood with dimensions of at least 1.5 inches square or steel posts with a minimum weight of 0.5 pound per linear foot. Placement Toe of Slope: Locate 5-10 feet down gradient from the toe of slope, generally on the contour. When the contour can not be followed, stagger the bale installation and install perpendicular wings (spaces as shown in Figure HB-1 in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition) to break the velocity of water flowing behind the bales. The barrier should be located with sufficient distance from the toe of the slope to allow access by equipment for removal of accumulated sediments. Catch Basins in Depression or Low Spots: Encircle catch basin or yard drain. Installation Trench excavation: Excavate a trench as wide as the bales and at least 4 inches deep. Each end of the trench should be winged upslope so that the bottom of the last bale is higher than the top of the lowest hay bale in the barrier. Hay Bale Placement: Place bales in a single row in the trench, lengthwise, with ends of adjacent bales tightly abutting one another and the bindings oriented around the sides rather than along the tops and bottoms of the bales (to avoid premature rottinq of the bindings). Staking Hay Bales: Anchor each bale with at least 2 stakes, driving the first stake in each bale toward the previously laid bale to force the bales together. Stakes must be driven a minimum of 18 inches into the ground. Fill any gaps between the bales with hay or straw to prevent water from escaping between the bales. Backfill & Tamped: Backfill the bales with the excavated trench material to a minimum depth of 4 inches on the uphill side of the bales. Tamp by hand or machine and compact the soil. Loose hay or straw scattered over the disturbed area immediately uphill from the hay bale barrier tends to increase barrier efficiency. MAINTENANCE Inspect the hay bale barrier at least once a week and within 24 hours of the end of a storm with a rainfall amount of 0.5 inches or greater to determine maintenance needs. For dewater operations, inspect frequently before, during and after pumping operations. Remove the sediment deposits or install a secondary barrier upslope from the existing barrier when sediment deposits reach approximately one half the height of the barrier. Replace or repair the barrier within 24 hours of observed failure. Failure of the barrier has occurred when sediment fails to be retained by the barrier because: (a) the barrier has been overtopped, undercut or bypassed by runoff water, (b) the barrier has been moved out of position, or (c) the hay bales have deteriorated or been damaged. Maintain the hay bale barrier until the contributing area is stabilized. After the upslope areas have been permanently stabilized, pull the stakes out of the hay bales. Unless otherwise required, no removal or regrading of accumulated sediment is necessary. The hay bales may then be left in place or broken up for ground cover. TEMPORARY SEEDING (TS) SPECIFICATIONS Site Preparation Install needed erosion control measures such as diversions, grade stabilization structures, sedimentation basins and grassed w"lU%%lreTIU«rwaJ il .,vluulYIll1 11Ic upvlvvcu IV1. Grade according to plans and allow for the use of appropriate equipment for seedbed preparation, seeding, mulch application and mulch anchoring. Seedbed Preparation Loosen the soil to a depth of 3-4 inches with a slightly roughened surface. If the area has been recently loosened or disturbed, no further roughening is required. Soil preparation can be accomplished by tracking with a bulldozer, discing harrowing, raking or dragging with a section of chain link fence. Apply ground limestone and fertilizer according to soil test recommendations (such as those offered by the University of Connecticut Soil Testing Laboratory or other reliable source). If soil testing is not feasible on small or variable sites, or where timing is critical, fertilizer may be applied at the rate of 300 pounds per acre or 7.5 pounds per 1,000 square feet of 10-10-10 or equivalent. Seeding Apply seed uniformly by hand, cyclone seeder, drill, cultipacker type seeder or hydroseeder at a minimum rate for the selected seed identified in Figure TS-2 in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. Increase seeding rates by 10% when hydroseeding. Mulching See guidelines in the Mulch For Seed measures. MAINTENANCE Inspect temporary seeding area at least once a week and within 24 hours of the end of a storm with a rainfall amount of 0.5 inch or greater for seed and mulch movement and rill erosion. Where seed has been moved or where soil erosion has occurred, determine the cause of the failure and repair as needed. TEMPORARY SOIL PROTECTION (TSP) SPECIFICATIONS Materials Mulcheswithin this specification include, but are not limited to: 1. Hay: The dried stems and leafy parts of plants cut and harvested, such as alfalfa, clovers, other forage legumes and the finer stemmed, leafy grasses. The average stem length should not be less than 4 inches. Hay that can be windblown should be anchored to hold it in place. 2. Straw: Cut and dried stems of herbaceous plants, such as wheat, barley, cereal rye, or brome. The average stem length should not be less than 4 inches. Straw that can be windblown should be anchored to hold it in place. 3. Wood Chips: Chipped wood material from logs, stumps, brush or trimmings including bark, stems and leaves having a general maximum size of 0.5 inch by 2 inches and free of excessively fine or long stringy particles as well as stones, soil and other debris. No anchoring is required. If seeding is performed where wood chips have been previously applied, prior to the seeding the wood chips should be removed or tilled into the ground and additional nitrogen applied. Nitrogen application rate is determined by soil test at time of seeding. 4. Bark Chips, Shredded Bark: Tree bark shredded as a by product of timber processing having a general maximum size of 4 inches and free of excessively fine or long stringy particles as well as stone and other debris. Material use is the same as wood chips. If subsequent seeding is performed where cellulose dense mulches (e.g. leaves, excelsior, woodchips, barkchips) have been applied, then prior to seeding either remove the mulch or till it into the ground with the application of nitrogen. Cellulose fiber is not recommended for use, except as a tackifier for other mulch materials. Tackifiers within this specification include, but are not limited to: Water soluble materials that cause mulch particles to adhere to one another, generally consisting of either a natural vegetable gum blended with gelling and hardening agents or a blend of hydrophilic polymers, resins, viscosifiers, sticking aids and gums. Emulsified asphalts are specifically prohibited for use as tackifiers due to their potential for causing water pollution following its application. Nettings within this specification include, but are not limited to: Prefabricated openwork fabrics made of cellulose cords, ropes, threads, or biodegradable synthetic material that is woven, knotted or molded in such a manner that it holds mulch in place until temporary soil protection is no longer needed. Site Preparation Prior to mulching, complete the required grading and install and/or repair other sediment control measures needed to control water movement within the area to be mulched. Application Spreading: Spread mulch material uniformly by hand or machine resulting in 100% coverage of the disturbed soil. When spreading hay mulch by hand, divide the area to be mulched into approximately 1,000 square feet and place 2 to 3 bales of hay in each section to facilitate uniform distribution. (Hay/Straw 2-3 tons/acre) When spreading woodchips on slopes, it is particularly important not to spread the chips too thick. Excessive application tend to slip or slump when saturated. (Wood Chips/Shredded Bark 6 cu. yds./1,000 s.f.) Anchoring: Apply tackifiers and/or netting either with the mulch or immediately following mulch application. Expect the need for tackifiers or netting along the shoulders of actively traveled roads, hill tops and long open slopes not protected by wind breaks. When using netting the most critical aspect is to ensure that the netting maintains substantial contact with the mulch and the mulch, in turn, maintains continuous contact with the soil surface. Without such contact, the material is useless and erosion can be expected to occur. Install in accordance with manufacturer's recommendations. MAINTENANCE Inspect temporary soil protection area at least once a week and within 24 hours of the end of a storm with a rainfall amount of 0.5 inch or greater for mulch movement and rill erosion. VYnere soil protection fails below 1 VU%, reapply soil protection within 48 hours. Determine the cause of the failure. If mulch failure was the result of wind consider applying a tackifier or netting. If mulch failure was caused by concentrating water, install additional measures to control water and sediment movement, repair erosion damage, reapply mulch with anchoring. DUST CONTROL (DC) SPECIFICATIONS Mechanical Sweeping Use mechanical sweeping on paved areas where dust and fine matarinlg ncrliml�lrlta ns n recl�lt of tnirk trnffir� nnvement Snw cutting spillage, and wind or water deposition from adjacent disturbed areas. Sweep daily in heavily traveled areas. Water Periodically moisten exposed soil surfaces on unpaved travelways to keep the travelway damp. Non Asphaltic Soil Tackifier Non -asphaltic soil tackifier consists of an emulsified liquid soil stabilizer of organic, inorganic or mineral origin, including, but not limited to the following: modified resins, calcium chloride, complex surfactant copolymers or high grade latex acrylics. The solutions shall be non -asphaltic, non toxic to human, animal and plant life, non corrosive and nonflammable. Materials used shall meet local, state and federal guidelines for intended use. All materials are to be applied according to the manufacturer's recommendations and all safety guidelines shall be followed in storing, handling and applying materials. MAINTENANCE Repeat application of dust control measures when fugitive dust becomes evident. MULCH FOR SEED (MS) SPECIFICATIONS Materials Types of Mulches within this specification include, but are not limited to: 1. Hay: The dried stems and leafy parts of plants cut and harvested, such as alfalfa, clovers, other forage legumes and the finer stemmed, leafy grasses. The average stem length should not be less than 4 inches. Hay that can be windblown should be anchored to hold it in place. 2. Straw: Cut and dried stems of herbaceous plants, such as wheat, barley, cereal rye, or brome. The average stem length should not be less than 4 inches. Straw that can be windblown should be anchored to hold it in place. 3. Cellulose Fiber: Fiber origin is either virgin wood, post-industrial/pre-consumer wood or post consumer wood complying with materials specification (collectively referred to as "wood fiber"), newspaper, kraft paper, cardboard (collectively referred to as "paper fiber") or a combination of wood and paper fiber. Paper fiber, in particular, shall not contain boron, which inhibits seed germination. The cellulose fiber must be manufactured in such a manner that after the: addition to and agitation in slurry tanks with water, the fibers in the slurry become uniformly suspended to form a homogeneous product. Subsequent to hydraulic spraying on the ground, the mulch shall allow for the absorption and percolation of moisture and shall not form a tough crust such that it interferes with seed germination or growth. Generally applied with tackifier and fertilizer. Refer to manufacturer's specifications for application rates needed to attain 80%-95% coverage without interfering with seed germination or plant growth. Not recommended as a mulch for use when seeding occurs outside of the recommended seeding dates. Tackifiers within this specification include, but are not limited to: Water soluble materials that cause mulch particles to adhere to one another, generally consisting of either a natural vegetable gum blended with gelling and hardening agents or a blend of hydrophilic polymers, resins, viscosifiers, sticking aids and gums. Good for areas intended to be mowed. Cellulose fiber mulch may be applied as a tackifier to other mulches, provided the application is sufficient to cause the other mulches to adhere to one another. Emulsified asphalts are specifically prohibited for use as tackifiers due to their potential for causing water pollution following its application. Nettings within this specification include, but are not limited to: Prefabricated openwork fabrics made of cellulose cords, ropes, threads, or biodegradable synthetic material that is woven, knotted or molded in such a manner that it holds mulch in place until vegetation growth is sufficient to stabilize the soil. Generally used in areas where no mowing is planned. Site Preparation Grade according to plans and allow for the use of appropriate equipment for seedbed preparation, seeding, mulch application and mulch anchoring. Application Timing: Applied immediately following seeding. Some cellulose fiber may be applied with seed to assist in marking where seed has been sprayed, but expect to apply a second application of cellulose fiber to meet the requirements of Mulch For Seed in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. Spreading: Mulch material shall be spread uniformly by hand or machine resulting in 80%-95% coverage of the: disturbed soil when seeding within the recommended seeding dates. Applications that are uneven can result in excessive mulch smothering the germinating seeds. For hay or straw anticipate an application rate of 2 tons per acre. For cellulose fiber follow manufacture's recommended application rates to provided 80 %-95% coverage. When seeding outside the recommended seeding dates, increase mulch application rate to provide between 95% 100% coverage of the disturbed soil. For hay or straw anticipate an application rate to 2.5 to 3 tons per acre. When spreading hay mulch by hand, divide the area to be mulched into approximately 1,000 square feet and place 1.5-2 bales of hay in each section to facilitate uniform distribution. For cellulose fiber mulch, expect several spray passes to attain adequate coverage, to eliminate shadowing, and to avoid slippage. Anchoring: Expect the need for mulch anchoring along the shoulders of actively traveled roads, hill tops and long open slopes not protected by wind breaks. When using netting, the most critical aspect is to ensure that the netting maintains substantial contact with the underlying mulch and the mulch, in turn, maintains continuos contact with the soil surface. Without such contact, the material is useless and erosion can be expected to occur. MAINTENANCE Inspect mulch for seed area at least once a week and within 24 hours of the end of a storm with a rainfall arnount of 0.5 inch or greater until the grass has germinated to determine maintenance needs. Where mulch has been moved or where soil erosion has occurred, determine the cause of the failure and repair as needed. PERMANENT SEEDING (PS) SPECIFICATIONS Time Of Year Seeding dates in Connecticut are normally April 1 through June 15 and August 15 through October 1. Spring seedings give the best results and spring seedings of all mixes with legumes is recommended. There are two exceptions to the above dates. The first exception is when seedings will be made in the areas of Connecticut known as the Coastal Slope and the Connecticut River Valley. The Coastal Slope includes the coastal towns of New London, Middlesex, New Haven, and Fairfield counties. In these areas, with the exception of crown vetch (when crown vetch is seeded in late summer, at least 35% of the seed should be hard seed (unscarified), the final fall seeding dates can be extended and additional 15 days. The second exception is frost crack or dormant seeding, the seed is applied during the time of year when no germination can be expected, normally November through February. Germination will take place when weather conditions improve, mulching is extremely important to protect the seed from wind and surface erosion and to provide erosion protection until the seeding becomes established. Site Preparation Grade in accordance with the Land Grading measure which is in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. Install all necessary surface water controls. For areas to be mowed remove all surface stones 2 inches or larger. Remove all other debris such as wire, cable tree roots, pieces of concrete, clods, lumps, or other unsuitable material. Seed Selection and Quantity Select a seed mixture appropriate to the intended use and soil conditions from Figure PS-2 and Figure PS-3 in the C nnnarticl It C;I Iiriplinps Fnr Soil Frnsinn and SPriirrzent Cnntml _-....-.,...._. __.__....__ -• _-.. _. _-.-.. _.._---...._.._ --.._. _. latest edition or use mixture recommended by the NRCS. Seedbed Preparation Apply topsoil, if necessary, in accordance with the Topsoiling measure which is in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. Apply ground limestone and fertilizer according to soil test recommendations (such as those offered by the University of Connecticut Soil Testing Laboratory or other reliable source). Where soil testing is not feasible on small or variable sites, or where timing is critical, fertilizer may be applied at the rate of 300 pounds per acre or 7.5 pounds per 1,000 square feet of 10-10-10 or equivalent and limestone at 4 tons per acre or 200 pounds per 1,000 square feet. Work lime and fertilizer into the soil to a depth of 3 to 4 inches with a disc or other suitable equipment. Inspect seedbed just before seeding. If the soil is compacted, crusted or hardened, scarify the area prior to seeding. Seed Application Apply selected seed at rates provided in Figure PS-3 (in the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition) uniformly by hand, cyclone seeder, drill, cultipacker type seeder or hydroseeder (slurry including seed, fertilizer). Normal seeding depth is from 0.25 to 0.5 inch. Increase seeding rates by 10% when hydroseeding or frost crack seeding. Seed warm season grasses during the spring period only. Mulching See guidelines in the Mulch For Seed measures. MAINTENANCE Inspect temporary soil protection area at least once a week and within 24 hours of the end of a storm with a rainfall amount of 0.5 inch or greater during the first growing season. Where seed has been moved or where soil erosion has occurred, determine the cause of the failure and repair as needed. SOIL ERSOION & SEDIMENT CONTROL NOTES 1. All soil erosion and sediment control work shall be done in strict accordance with the Connecticut Guidelines For Soil Erosion and Sediment Control latest edition. 2. Any additional erosion/sediment control deemed necessary by town staff during construction, shall be installed by the developer. In addition, 1_ _ I I _ 1 LI_ _ /.__ , t /_ the developer shall be respon3iDle Tor the repair/replacement and/or maintenance of all erosion control measures until all disturbed areas are stabilized to the satisfaction of the town staff. 3. The contractor shall notify the town engineer at the beginning and the end of each step of the construction procedure and shall not proceed with the next step until the town engineer has inspected the work. 4. All soil erosion and sediment control operations shall be in place prior to any grading operations and installation of proposed structures or utilities and shall be left in place until construction is completed and/or area is stabilized. 5. All entrances to the project site are to be protected by construction entrance (CE) pads, conforming to the Connecticut Guidelines For Erosion and Sediment Control latest edition. Stone shall conform to Ct. D.O.T. Fnrm R14A� Integt erlitrnn� U 01 n1 Wn 4 gtnne Thn f(`,.F rnnrl ig to he maintained at all times during the construction period. 6. In all areas, removal of trees, bushes and other vegetation as well as disturbance of the soil is to be kept to an absolute minimum while allowing proper development of the site. During construction, expose as small all area of soil as possible fVl Us JIIVI l U 1il I uo pVJQluly. 7. All fill areas shall be compacted sufficiently for their intended purpose and as required to reduce slipping, erosion or excess saturation. Fill intended to support buildings, structures, conduits, etc., shall be compacted in accordance with local requirements or codes. 8. Topsoil is to be stripped and stockpiled in amounts necessary to complete finished grading of all exposed areas requiring topsoil. The stockpiled topsoil is to be located as designated on the plans and ringed with hay bale barrier or geotextile silt fence. The stockpiled topsoil shall be temporarily seeded if it is to remain more than 30 days.Topsoil shall not be placed while in a frozen or muddy condition, when the subgrade is excessively wet, or in a condition that may otherwise be detrimental to proper grading or proposed sodding or seeding. 9. There is to be no stockpiling of soil within a ten foot limit of adjoining properties. Any and all fill material is to be free of brush, rubbish, timber, logs vegetative matter and stumps in amounts that will v%% be detrimental to constructing stable fills. Maximum side slopes of0& exposed surfaces of earth to be 3:1 or as otherwise specified by localm qV authorities. wj CHECKLIST FOR EROSION CONTROL PLAN PROJECT: Lot 6 & 7 Sandra Drive LOCATION: South Windsor, CT PROJECT DESCRIPTION: Construction of a 20,400 sf warehouse building with associated parking and utilities. PARCEL AREA: 3.57 acres RESPONSIBLE PERSONNEL: Andre' Charbonneau, 528-7551 EROSION AND SEDIMENT CONTROL PLAN PREPARER: J.R. Russo & Associates CHECKLIST: Work Description Erosion & Sediment Control Measures Location Date Installed Initials Date Removed Initials Install haybales and As shown on silt fence. plan. Install siltation As shown on barriers at CBs. plan. Install construction As shown on exit pad. plan. MAINTENANCE OF MEASURES: Location Description or Number Date Initials Project Dates: Date of groundbrealang for project: Date of final stabilization: NARRATIVE This project is located on the west side of Sandra Drive south of the intersection with Kimberly Drive in South Windsor, Connecticut. The proposed activity is the construction of a warehouse building with associated parking and utilities. The project also includes repairs at an existing storm drain outfall on the southern portion of the property. The suggested schedule of construction is as follows: 1. Install perimeter sedimentation barriers and silt barriers at catch basins. 2. Install construction exit pad. 3. Clear and grub. 4. Strip stockpile topsoil and stockpile sufficient quantities for landscaping and lawn areas. Ring stockpiles with silt fence (CST) and stabilize with temporary vegetative cover (TS). 5. Import required fill, compact and rough grade site. 6. Excavate and install building foundation. Begin construction of building. 7. Install drainage and utilities as shown on the plans, including improvements to existing stormwater outfall. 8. Complete grading of pavement areas, pave binder course. Install curbing. 9. Fine grade remaining disturbed areas and establish vegetation. Plant landscaping vegetation, mulch and fertilize. 10. Pave surface course of pavement, apply line striping and install signage. 11. Remove silt fence after permanent vegetation has been established. Construction of this site is anticipated to begin after the approval of these plans. The contractor shall keep the area of disturbance to a minimum and establish exposed soils as soon as practical. All soil and erosion control measures shall be installed and maintained in accordance with these plans and the "Guidelines for Soil Erosion and Sediment Control". The contractor shall notify the Engineer of any discrepancies. The developer shall be responsible for the repair/replacement/maintenance of all erosion control measures until all disturbed areas are stabilized to the satisfaction of the town staff. Sediment deposits should be periodically removed from the upstream sides of Sediment Barriers. This material is to be spread and stabilized in areas not subject to erosion, or to be used in areas which are not to be paved or built on. Sediment Barriers are to be replaced as necessary to provide proper filtering action. Sediment Barriers are to remain in place and be maintained to insure efficient siltation control until all areas above the erosion checks are stabilized and vegetation has been established. All fill areas shall be compacted sufficiently for their intended purpose and as required to reduce slipping, erosion or excess saturation. Fill intended to support buildings, structures, conduits, etc, shall be compacted in accordance with local requirements or codes. All entrances to the project site are to be protected by stone tracking pads of ASTM C-33, size no. 2 or 3, or Ct. D.O.T. 2" crushed gravel. The stone tracking pad is to be main- tained at all times during the construction period. Topsoil is to be stripped and stockpiled in amounts necessary to complete finished grading of all exposed areas requiring topsoil. The stockpiled topsoil is to be located as designated on the plans and ringed with Sediment Barrier. The stockpiled topsoil shall be temporarily seeded if it is to remain more than 30 days. Topsoil shall not be placed while in a frozen or muddy condition, when the subgrade is excessively wet, or in a condition that may otherwise be detrimental to proper grading or proposed sodding or seeding. There is to be no stockpiling of soil within a ten foot limit of adjoining properties_. Any and all fill Iilal.cll�l IS I.V livu VI uluorl, luvvioll, uIlluvil IV1JQ1 veY�,LUUVC IIIULLUf urfU slurrlps In arnounts that Will De detrimental to constructing stable fills. Maximum side slopes of exposed surfaces of earth to be 3:1 or as otherwise specified by local authorities. 2 9-18-02 TAC I JRR I P&Z & WETLANDS CONDITIONS OF APPROVAL, ADD PLOT PLAN 1 7-18-02 TAC JRR ENVIRONMENTAL PLANNER & ENGINEER'S COMMENTS NO I DATE I BY APPR. REVISIONS Erosion & Sediment Control Notes Lot 6 & 7 4,4Sandra Drive Cni 1'I k ` tr-t,4,_,^r t�rlYtr%,n^4-i,,r ,'i' VVu1 L1 1 TV If 1%,A%J%.JI , %.IVI 11 IGV 1.I%.-U l Owner/Developer Andre L. & Andre K. har b Conne au 125 Edwin Road South Windsor, Connecticut 528- 7551 J.R. RUSSO ASSOCIATES {fi- r S Land Surveyors & Professional Engineers 8.. �. Y-y.- 1 SHOHAM ROAD EAST WiNDSOR, CONNECTICUT 06088 1. (860) 623-0569 FAX: (860) 623-2485 BY SCALE DATE SHEET CHECKED NO. TAC/LF AS SHOWN 6-19-02 5 of 7 JRR 200,2-02a 1. EXCAVATE A TRENCH STRAW BALE 4" DEEP & THE WIDTH OF A STRAW BALE, STAKE--,,, G TRENCH 1--j{i:.l `•: ��t_ji�� li� j�i.i:.�ii PACKED F',1V STRAW / 3. WEDGE LOOSE STRAW PLAN BETWEEN BALES TO CREATE A CONTINUOUS BARRIER. r, COMPACTED IA 2. PLACE & STAKE STRAW BALES, TWO STAKES PER BALE. 4. BACKFILL & COMPACT THE EXCAVATED SOIL AS SHOWN "J Tug UPHILL SIDE OF THE TO PREVENT PIPING. ROUND END VIEW SIDE VIEW NOTE: HAYBALES TO BE EMBEDDED 4" IN EXISTING GROUND BUTTED END TO END/STAKED SECURELY. S TAKED HA YBALE SEDIMENTATION BARRIER NOT TO SCALE Q �r-t�FS'•t.t• Stone On Filte Fabric Marafi 140(N) 4" Thick Min. ANTI -TRACKING EXIT PAD DETAIL (CE) SUBGI NOT TO SCALE am* REMOVE CS GRATE. PLACE FILTER FABRIC REPLACE GRATE TAKING CARE NOT TO DAMAGE FILTER FABRIC, ANCHOR W/STONE OR EARTH PILE. STONE _E FI L TER_ FABRIC SILT BARRIER AT CATCH BA SI N NOT TO SCALE GENERAL NOTE REGARDING DETAILS: ALL MATERIALS SHALL (;UN1-ORM T O CT DOT FORM 814, LATEST EDITION, UNLESS OTHERWISE NOTED. ANGLE 10' UPSLOPE FILTER FOR STABILITY AND FABRIC SELF CLEANING. FLOW COMPACTED 100' BACKFILL - BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. BOTTOM OF DRAINAGEWAY I I LLL LLL 0p LLLLLMLLLEB BA LLLLLLLLLLL LLLLLLL A Li. 1 LLLLLLLLLLLLLLLLLLLLLL LL I I LLLLLLL POINTS "A" SHOULD BE HIGHER THAN POINT "B" I I I L ELEVATION PLAN VIEW SOURCE: U.S. DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE, STORRS, CONNECTICUT SEDIMENTATION BARRIER (SIL T FENCE) DETAIL INLET, See notes 8, 9 A 11" NOT TO SCALE 10'-0" Sealant Aluminum angle flange with neoprene gasket Wei_ r t / Sealant Baffle Wall' �A PLAN VIEW B - B 6" Concrete Typ OUTLET, See note 9 f: 4' 0" -Flow Control Wall Rim elevations to match finished grade Cuncicte ic reiniuiccu for HS20-44 loading ADJUST TO GRADE W/ COURSES OF CONC. BRICK OR ' GRADE RINGS FB Top and sides B sealed to vault Butyl rubber Weir Weir sealant and Orifice Plates 7' IO" O OrrficeINLET Invea OUTLET Invert 4' 44' 4 o0p0 � oq o0 O ogo0 O oCi'o0 O ogc0 O opu0 O o000 O SECTION A - A Minimum 6" compacted gravel -T NOTES: 1. Stormwater Treatment System (SWTS) shall have: 5. SWTS inverts in and out shall be at the some elevation Peak treatment capacity: 2.8 cfs 6. SWTS shall not be compromised by effects of downstream tailwater Sediment storage: 1.25 cu yd 7. SWTS shall have no internal components that obstruct maintenance access Sediment chamber dia: 4' min 8. Inlet pipe must be perpendicular to the structure 2. SWTS shall be contained in one rectangular structure 9. Pipe orientation may vary; see site plan for size and location 3. SWTS shall remove 80% of annual TSS loading 10. Purchaser shall not be responsible for assembly of unit 4. SWTS shall retain flootables and trapped sediment up to and 11. Manhole frames and perforated covers supplied with system, not installed including peak treatment capacity 12. Purchaser to prepare excavation and provide lifting equipment 13. Contact Vortechnics 0 (207) 878-3662 Ext. 123 for ordering information IMPTFr�I Mnl)Fl lonnn V V1 ( L v1 1 1 1VLLL. f..VVV NOT TO SCALE DEPTH TO INVERT I.D.+2' 12" 12"MIN. RAI 12" I I 7�o D,. ri ) 1§ �" PROPOSED GRADE n AITt•['A!T CC/N77,nA/ /10 c" rrt vcmcry a, rwiv L ri LANDSCAPING (SEE PLANS) APPROVED BACKFILL PLACED AND COMPACTED IN 12" LAYERS (OR AS 07HERKISE APPROVED) NO STONE LARGER 7HAN 3" WARNING TAPE - MIN. 12" MAX. 24" ABOVE PIPE SAND BEDDING PLACED AND COMPACTED IN 6" LAYERS MATERIAL SHALL MEET CT -DOT M2.06-GRADING C BACKFILL TO SPRINGLINE OF PIPE W/7H 3/4" CRUSHED STONE (CT -DOT M.02.01) S T ORM DRA IN TRENCH DE TA IL NOT TO SCALE PRE CAST CONCRETE UNIT ADJUST FRAME ELEVATION KITH CONC. BLOCKS OR BRICKS, 6" TO 12" ALL JOINTS TO BE W POINTED FLUSH & FULL PRE CAST CONCRETE OR CONCRETE MASONRY UNITS PRE CAST SUMP OR SLAB (OR EQUAL) 3500 PSI 6" OF 3/4" CRUSHED STONE FRONT ELEVATION SIDE ELEVATION NOTES: 1. MINIMUM COVER OVER TOP OF PIPE SHALL BE V-6". 2. WALL THICKNESS SHALL BE SUFFICIENT TO MEET HS 20 LOADING. 3. WALL THICKNESS FOR STRUCTURES OVER 10' HIGH IS 12" FOR CONCRETE BLOCK UNITS. INSIDE DIMENSIONS REMAIN THE SAME. 4. ALL PIPES SHALL BE CUT FLUSH WITH INSIDE WALLS. 5. ALL BRICKS SHALL BE CONCRETE T YPE "CL " CA TCH BASIN NOT TO SCALE w • w w w a • w �� .� �.� Imo. • • •ter A • 1 !� A • • f /� B/ T UMI NUU,5 (; UNC HL I t L It C,-UH&l NV NOT TO SCALE ADJUST TO GRADE WITH COURSES-� OF BRICKS OR Cv^NC. GRADING RINGS (MAX. 4 BRICK COURSES) 8" ALUMINUM STEP SEE JOINT DETAILS BELOW BITUMASTIC DAMP PROOFING FOR SANITARY _._I6 23' 3/4" STANDARD FRAME & COVER CONFORMING TO TOWN SPECIFICATIONS MANHOLES OUTSIDE OF PAVEMENT TO HAVE LOCKING COVERS VARIES 6" TO 12" 2'-2" 8" 4„ 12" T)P. 3' OR 4' CONE SECTION 48" DIA. BRICK SHELF SLOPED 1"/FT. 6" _ Min. CONCRETE OR BRICK MASONRY SELF- CLEANING INVERT SECTION ROUND RUBBER GASKET JOINT COLD APPLIED BITUMINOUS SEALER SPIGOT & BELL REINFORCEMENT GASKET JOINT ALTERNATE JOINT N. T. S. N.T.S. 5" 4" VARIES RISER SEC710N(S) AS REQUIRED 3' OR 4' BASE SECTION 3/4" CRUSHED STONE 6" ]HICK NOTES: 1. TOP STEP TO BE A MAXIMUM OF 24" BELOW TOP OF MANHOLE FRAME & COVER ELEVATION. 2. IF TOTAL DEPTH IS TEN FEET OR GREATER, CERTIFICATION OF H-20 LOAD BEARING CAPACITY SHALL BE SUBMITTED TO THE TOWN ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. PRECAST REINFORCED CONCRETE MA NH OL E NOT TO SCALE 1 1/2" BIT. CONCRETE CLASS II (CT -DOT M.04) 1 1/2" BIT. CONCRETE CLASS I (CT -DOT M.04) �- 4" PROCESSED AGGREGATE BASE (CT -DOT M.05.01) 12" GRANULAR BASE (CT -DOT M.02.03) COMPACTED SUBGRADE RETE PAVEMENT SEC Tl ON BITUMINOUS CONC NOT TO SCALE ^ AC•T IRON DUTY ROVIDE 8" ADAPTER ROM PVC TO CPEP UTLET PIPE NSTALL PER 4ANUFACTURER'S ZECOMMENDATIONS END CAP 3/4" CRUSHED STONE PVC YARD DRAIN DETAIL N.T.S. "NEENAH" R-7506 SERIES — FLOOR BOX FRAME AND LID, OR EQUAL W/S.S. CAP SCREW LID CLOSURE CLASS "B" CONCRETE BIT. CONCRETE PAVEMENT CONC 24" SQUARE 13" .40 11.5" 01 CLEAN—OUTW/ SCREW —IN PLUG DIRECTION OF FLOW 'T WYE' IN —LINE OR 45' ELBOW AT END OF LINE 6" N CD DEGREE BEND 3/4" BROKEN 77?APROCK UNDER BEND SANITARY CLEAN -OUT DETAIL NOT TO SCALE Reflective Paint Irking Space T YPI CAL HANDI CAP SYMBOL NOT TO SCALE FINISHED GRADE BRICK LEVELING COURSE (TYP.) 6" DIA. INLET SCH. Varies 80 PVC 1 1� 2" VENT PIPE 8' HIGH MIN. 6" A41n eYi STATIC WATER LEVEL INTERIOR 42" MIN. SS PIPE PROTECTIVE SUPPORT COATING I STRAP I- 6" —� 12" 6" DIA. OUTLET SCH. 80 PVC EXTERIOR PROTECTIVE COATING 6" Min. 6" Min. 1 /2" or 3/4" Crushed Stone NOTES: All joints & pipe penetrations to be made watertight with non —shrink waterproof grout. No structural joints shall be allowed below inlet & outlet elevations. Provide 24 hour detention time. Minimum 1000 gallon capacity tank OIL/WA TER SEPARA TOR DETAIL NOT TO SCALE PLAN 3" BIT. CONC. CLASS "A" CONC. 4" PROCESSED STONE BASE 6"x6" #6 WIRE MESH (CT -DOT M.05.01) IF i 18" "' 8" COMPACTED 12" GRAVEL BASE frT_nnT ne n,) nzl • w,- vv, ,n.v�.va� SEC TION A A CONC. DUMPSTER PAD DETAIL NOT TO SCALE 12' � I � 18' HANDICAP PARKING SPACE NOT TO SCALE Ct PLANT SHRUBS 6' O.C. 1' OFF BACK SIDE OF KOIRLOG (SEE LANDSCAPE PLAN FOR SPECIES) 2"X2"X36" OAK STAKE 2' O.C. PLACE EXCAVATED MATERIAL -/ A 12" KOIRLOG BEHIND KOIRLOG AND TAMP t 4� - �- �___�_ BY NEDIA ENTERPRISES OR EQUAL 1, SECURED TO STAKES W/ TWINE HAND EXCAVATED TRENCH EXIST. STREAM 1' BACK FROM EXIST. BANK AND BOTTOM 4" BELOW STREAM BOTTOM N SLEEVES ENCE 'RIVACY SLATS PAVEMENT STREAM BANK STABILIZATION NOT TO SCALE A O.D. 1' PIPE 1' TYPICAL SECTION APPROVED GRANULAR NON — ORGANIC BACKFILL MATERIAL PLACED AND COMPACTED IN ONE FOOT (1') (MAX.) LIFTS. WARNING TAPE PER CONN. GENERAL STATUTE SECTION 16-345, AS AMENDED, PLACED 12" (MIN.) TO 24" (MAX.) ABOVE TOP OF PIPE. CULVERT END 1I MIN PIPE, AS SPECIFIED �— ~} ^ 4� s SAND BLANKET 3/4" BROKEN TRAPROCK A° < G / 6" MIN. `< A1 J PLAN VIEW END WALL EXTEND RIPRAP ADDITIONAL 3' UP THE SLOPE OPPOSITE OF OUTLET PIPE 3 3 1 a nc1 �il' 1.5' INTERMEDIATE RIPRAP NONWOVEN FILTER FABRIC 6" GRANULAR FILL MIRAFI 140N OR EQUAL SECTION A- A PREFORMED SCOUR HOLE SAND BLANKET -FILTER FABRIC (SEE NOTE) PIPE, AS SPECIFIED •3/4" BROKEN TRAPROCK O.D. 1' PIPE 1' PIPE - IN GROUND WATER NOTE: 1. INSTALL CLAY STOPS WHERE NECESSARY. 2. FILTER FABRIC SHALL BE NONWOVEN CLASS 2, WITH PERMITTIVITY OF 0.5 TO 0.1 SEC-1 AND ADS OF 0.43 mm TO 0.22 mm AND SHALL MEET AASHTO M288-96. T YP/ CAL SAN/ TAR Y SEWER TRENCH SECTION NOT TO SCALE ---12'----I o � ,1 Q 4Ei HANDICAPPED 21" r > PARKING CO (L STATE PERMIT REQUIRED VIOLATORS SUBJECT TO PENALTY White 4"x4" Steel Tube with Welded Top Cap Anchored 24" in Solid Concrete TYPICAL HANDICAP SIGN NOT TO SCALE NOT TO SCALE GENERAL NOTE REGARDING DETAILS I► ALL IVIJ"%I IALS SHALL COIF-vR,Yi T v II CT DOT FORM 814, LATEST EDITION, UNLESS OTHERWISE NOTED. Il II