Loading...
HomeMy WebLinkAbout24-40P Home Market FoodsWes Atamian 4,722 1 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION FOR SITE PLANS APPLICANT_____________________________________________________________ PROJECT NAME_________________________________________________________ This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. _____ 1. On each sheet for plans or maps, title block with the following information: _____ a. Name, address, email address, and telephone of applicant _____ b. Name, address, email address, and telephone of Land Surveyor or Professional Engineer _____ c. Name of Development _____ d. Date when drawings were made _____ 2. Key Map: An overall map drawn to a scale of 1 inch equaling either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. _____ a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. _____ b. Outline of buildings _____ c. Layout of streets _____ d. Surrounding property boundaries within 500 feet _____ e. Names of abutting property owners _____ f. Proposed open spaces and recreation areas _____ g. Driveway cuts on abutting properties and any properties across from proposed site _____ h. Distance to and name of nearest intersection street _____ 3. Architectural Elevations: See checklist for Architecture and Design Review. Home Market Foods, Inc. 50 Talbot Lane Site Improvements See Property Survey 2 _____ 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equaling 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: _____ a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. _____ b. Proposed streets and street lines with center line station, curve data, and parking spaces _____ c. Building lines in accordance with zoning regulations _____ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened) _____ e. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g. below Grantor Grantee Type of Easement Date Filed Vol/Pg _____ f. Names of abutting property owners _____ g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. _____ h. All open space or other common or public land uses shall be indicated. _____ i. A-2 certification; P.E./L.S. Seal _____ 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: _____ a. All existing and proposed buildings _____ b. Curb Lines and pavement width, sidewalks _____ c. Existing and proposed sanitary sewers _____ d. Existing and proposed water and all existing utilities See Property Survey See Property Survey 3 _____ e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. _____ f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. _____ g. Regulated wetlands and 100-year floodplain or note that none are present _____ h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches, within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. _____ i. Connections of all springs into proposed storm drainage system as needed _____ j. Location and indications of existing brook channels, and 100-year flood limits _____ k. A-2 & T-2 Certification; P.E & L.S. Seals _____ 6. Landscaping plan _____ 7. Drainage calculations: Zero Runoff Increase per SW Public Improvement Standards. _____ 8. Traffic Report _____ 9. Site Lighting Plan _____ 10. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: _____ a. Layout of streets in sections coordinated by stations with the profile _____ b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes . _____ c. Sight line at driveway & street intersections 4 _____ d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. _____ e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths, and slopes of pipes. _____ f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. _____ g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. _____ h. Profiles shall show all sanitary sewer lines and manholes, including elevations (inverts, top of frame), sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. _____ 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. _____ 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. ____________________________________ _________________________ PLAN PREPARER (P.E./L.S.) DATE ______________________________________ Print Name W:\Planning Admin\Forms\Check Lists\Site Plan Checklist.doc February 2002; Rev. 4-04, 04-23 Kevin Solli, P.E. 10/16/24 Monroe, CT | West Hartford, CT | Norwood, MA www.SolliEngineering.com PROJECT NARRATIVE MEMORANDUM To: Town of South Windsor Planning & Zoning Commission From: Kevin Solli, PE, PTOE / Solli Engineering Paul Rodrigues, P.E. / Solli Engineering Subject: Proposed Site Improvements 50 Talbot Lane South Windsor, Connecticut Project No.: 24106501 Date: 10/16/2024 INTRODUCTION Solli Engineering (Solli) has prepared this Project Narrative Memorandum (Memo) to provide a summary of the proposed project improvements, including four (4) Fulton boilers, four (4) 10,000 gallon oil tanks, a wastewater treatment plant (WWTP) and EQ storage tanks (to be permitted through WPCA by others), and associated utilities, for the existing industrial development located at 50 Talbot Lane in South Windsor, Connecticut. The proposed site improvements have been designed in compliance with the Town of South Windsor Zoning Regulations and other applicable state and federal requirements and regulations. EXISTING CONDITIONS PROJECT SITE The Site, 50 Talbot Lane, consists of a 19.85± acre parcel situated along the south side of Talbot Lane, east of Nutmeg Road. The Site is located within the Industrial Zoning District in the Town of South Windsor. The Site is bound by industrial uses to the south, west, and north, and vacant land and residential uses to the east. The Site is currently developed with an existing industrial building and associated utilities, parking, drive aisles, landscaping and lighting improvements. PROPOSED CONDITIONS PROJECT DESCRIPTION The Applicant is proposing to install four (4) Fulton boilers, four (4) 10,000 gallon oil tanks, a wastewater treatment plant (WWTP) and EQ storage tanks (to be permitted through WPCA by others), and associated utilities, located to the north of the building. The proposed WWTP will be served by new water, gas, and electrical service that will connect to the existing building’s utility rooms. Existing sanitary discharges from the building to existing grease interceptors will be connected to the WWTP via sanitary force mains within the building’s existing drive aisles. Wastewater will exit the WWTP through a proposed flume and eventually discharge to an existing sanitary manhole on-site which connects to the Town sanitary sewer system. STORMWATER MANAGEMENT The proposed site improvements result in a net increase in impervious area of approximately 1,360 square-feet. In May 2015, a site plan modification was approved by the Town of South Windsor Planning & Zoning Commission for a proposed building expansion of 177,000± square-feet and associated parking, stormwater, utility, landscaping, and lighting improvements. To date, a small portion of the building expansion (roughly 61,000 square-feet) has been constructed, along with a portion of the proposed parking. The stormwater management system, which was designed and approved to handle the increase in impervious area of this building expansion, has been constructed. Therefore, the de minimis increase in impervious area from the proposed site improvements will be adequately treated by the existing stormwater management system on-site. SOIL EROSION AND SEDIMENT CONTROL The proposed plans for soil erosion and sediment control prepared for this project have been developed in accordance with the Town of South Windsor Zoning Regulations as well as the 2024 Connecticut Guidelines for Soil Erosion and Sediment Control, prepared by the Connecticut Council on Soil and Water Conservation in cooperation with the Connecticut Department of Environmental Protection. The soil erosion and sediment control measures that will be proposed as part of this project include temporary construction fence, geotextile silt fence, and inlet protection for existing and proposed drainage features. APPENDIX: FIGURES Site Location Map (Figure 1) FEMA Flood Map (Figure 2) Natural Diversity Data Base Map (Figure 3) Soil Survey Map (Figure 4) ENGINEERING 24106501 10/03/24 Project #: Plan Date: Scale:50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT Figure: 501 Main Street, Monroe, CT 06468 T: (203) 880-5455 F: (203) 880-9695 0500 250 500NOTE: BASE MAP INFORMATION TAKEN FROM TOWN OF SOUTH WINDSOR GIS 1" = 500' 1 SITE LOCATION MAP PROJECT SITE ENGINEERING 24106501 10/03/24 Project #: Plan Date: Scale:50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT Figure: 501 Main Street, Monroe, CT 06468 T: (203) 880-5455 F: (203) 880-9695 01,000 500 1,000 NOTE: BASE MAP INFORMATION TAKEN FROM FEMA FLOOD INSURANCE RATE MAP, MAP NUMBERS 09003C0378F, EFFECTIVE 09/26/2008. 1" = 1,000' 2 FEMA FLOOD MAP PROJECT SITE ENGINEERING 24106501 10/03/24 Project #: Plan Date: Scale:50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT Figure: 501 Main Street, Monroe, CT 06468 T: (203) 880-5455 F: (203) 880-9695 01,500 750 1,500 NOTE: BASE MAP INFORMATION TAKEN FROM NATURAL DIVERSITY DATA BASE AREAS MAPPING FOR THE TOWN OF SOUTH WINDSOR, CT, DATED DEC 2023 PRODUCED BY CONNECTICUT DEPARTMENT OF ENERGY & ENVIRONMENTAL PROTECTION. 1" = 1,500' 3 NATIONAL DIVERSITY DATA MAP PROJECT SITE ENGINEERING 24106501 10/03/24 Project #: Plan Date: Scale:50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT Figure: 501 Main Street, Monroe, CT 06468 T: (203) 880-5455 F: (203) 880-9695 0250 125 250NOTE: BASE MAP INFORMATION TAKEN FROM WEBSOILSURVEY.NRCS.USDA.GOV 1" = 250' 4 SOIL SURVEY MAP Sheet Title:Sheet #: Project: COVER SHEET 0.00 PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Rev. #:Date Description PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT PREPARED FOR: HOME MARKET FOODS, INC. 140 MORGAN DRIVE NORWOOD, MA 02062 USGS MAP LOCATION MAP ENGINEERING MONROE, CT | WEST HARTFORD, CT | NORWOOD, MA PREPARED BY: SCALE: 1" = 1,000'PERMITTING PLAN SET SCALE: 1" = 1,000' PROJECT SITEPROJECT SITE DRAWING LIST SHEET NAME COVER SHEET PROPERTY SURVEY SITE LAYOUT PLAN SOIL EROSION AND SEDIMENT CONTROL PLAN SOIL EROSION AND SEDIMENT CONTROL NOTES & DETAILS CONSTRUCTION DETAILS SHEET # 0.00 1 OF 1 2.11 2.31 2.41 3.01 PLAN DATE 10/16/24 09/10/24 10/16/24 10/16/24 10/16/24 10/16/24 LATEST REVISION N/A 09/30/24 N/A N/A N/A N/A HOME MARKET FOODS, INC. 140 MORGAN DRIVE NORWOOD, MA 02062 (781) 733-1941 WETLANDS SPECIALIST SURVEYOR OF RECORD SITE / CIVIL ENGINEER KEVIN SOLLI, P.E., PTOE, CPESC, LEED AP BD+C (ENGINEER OF RECORD) LICENSE NO. 25759 SOLLI ENGINEERING, LLC 11 VANDERBILT AVENUE, SUITE 240 NORWOOD, MASSACHUSETTS 02062 (781) 352-8491 OWNER PROPERTY INFORMATION ADDRESS: 50 TALBOT LANE TOWN OF SOUTH WINDSOR CONNECTICUT 06074 ACCOUNT: 88900050 PARCEL ID: 60-29-3 AREA: 1.894± ACRES DOWE REALTY III, LLC 400 1ST AVENUE NEEDHAM, MA 02494 ARCHITECT APPLICANT BRYAN P. NESTERIAK, PE, LS LICENSE NO. 23556 ACCURATE LAND SURVEYING, LLC 15 RESEARCH DRIVE WOODBRIDGE, CONNECTICUT 06525 (203) 881-8145 WILLIAM KENNY, CPWS, PLA, ASLA WILLIAM KENNY ASSOCIATES 195 TUNXIS HILL CUTOFF SOUTH FAIRFIELD, CT 06825 (203)366-0588 CMC DESIGN BUILD, INC 859 WILLARD STREET QUINCY, MASSACHUSETTS 02169 (888) 328-2962 GENERAL SURVEY NOTES MAP REFERENCES 30 180120600 SCALE: 1"=60' 1 of 1 LOCATION MAP SCALE: 1"=800' PROPERTY SURVEY OF 50 TALBOT LANE & 90 NUTMEG ROAD SOUTH WINDSOR, CONNECTICUT PS, 50 TALBOT LANE & 290 NUTMEG ROAD, SOUTH WINDSOR, CT.LEGEND ACCURATELand Surveying, LLC 15 Research Drive Woodbridge, CT 06525 Tel: 203.881.8145 501 Main Street Monroe, CT 06468 Tel: 203.880.5455 TALBOT LANEPROPOSED WWTP (BY OTHERS) (28' HEIGHT) (4) PROPOSED 10,000 GALLON OIL TANKS (30' HEIGHT) ON CONCRETE PAD PROPOSED EQ STORAGE TANKS (BY OTHERS) (25' HEIGHT) (4)PROPOSED FULTON BOILERS (14' HEIGHT) PROPOSED METAL SIDING WALL & ROOF PROPOSED CONCRETE BOLLARD (12' O.C.) (TYP.) PROPOSED CONCRETE BOLLARD (6' O.C.) (TYP.) PR 750± LF OF 4" SDR-21 SANITARY FORCE MAIN PROPOSED NATURAL GAS CONNECTION TO EXISTING UTILITY ROOM PROPOSED 4" WATER SERVICE CONNECTION TO EXISTING UTILITY ROOM PROPOSED ELECTRICAL SERVICE CONNECTION TO EXISTING UTILITY ROOM EXISTING GREASE INTERCEPTOR TO BE UTILIZED AS PUMP CHAMBER (BY OTHERS) EXISTING GREASE INTERCEPTOR TO BE UTILIZED AS PUMP CHAMBER (BY OTHERS) STUB PROPOSED UTILITIES 5' FROM WWTP (TYP.) PR 154± LF OF 4" SDR-21 SANITARY FORCE MAIN PROPOSED WASTEWATER DISCHARGE TO FLUME (BY OTHERS) PROPERTY LINE (TYP.) BUILDING SETBACK LINE (TYP.) PROPOSED 12' HEIGHT PAINTED CMU BLOCK WALL PR 167± LF OF 6" SDR-35 PVC PIPE @ S = 2.0% MIN PR SANITARY CLEANOUT10'35' WATER MAIN / LATERAL GAS LINE ELECTRIC CONDUIT SANITARY SEWER PIPE LEGEND PROPERTY LINE W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM SITE LAYOUT PLAN 2.11 40 0 40 80 1" = 40' EEL AWC 1.EXISTING PROPERTY BOUNDARY INFORMATION TAKEN FROM THE CARLA'S PASTA "SITE PLAN MODIFICATION" PLAN SET; PREPARED BY DESIGN PROFESSIONALS; DATED: 06/19/2018. 2.THE SUBJECT PARCEL CONSISTS OF ±19.85 ACRES LOCATED WITHIN THE INDUSTRIAL DISTRICT (I) IN THE TOWN OF SOUTH WINDSOR, CONNECTICUT. 3.THIS PLAN WAS CREATED WITH LIMITED REGARD TO SITE GRADING AS DETAILED TOPOGRAPHIC INFORMATION IS UNKNOWN AT THIS TIME. GENERAL NOTES ABBREVIATIONS @ EX LF PR S SF TYP WWTP AT EXISTING LINEAR FEET PROPOSED SLOPE SQUARE FOOT TYPICAL WASTEWATER TREATMENT PLANT UTILITY NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION PERMITS REQUIRED BY GOVERNMENT AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE TRAFFIC CONTROLS NECESSARY FOR THIS PROJECT. 2.UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 72 HOURS BEFORE COMMENCEMENT OR WORK AT "811" OR 1-800-922-4455 AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. 3.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING, OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 4.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC DEVICES FOR PROTECTION OF VEHICLES AND PEDESTRIANS CONSISTING OF DRUMS, BARRIERS, SIGNS, LIGHTS, FENCES, AND UNIFORMED TRAFFIC CONTROLLERS AS REQUIRED, ORDERED BY THE ENGINEER OF RECORD OR REQUIRED BY THE STATE AND LOCAL GOVERNING AUTHORITIES. 5.ALL UTILITY WORK PROPOSED WITHIN THE TOWN'S RIGHT-OF-WAY SHALL COMPLY WITH TOWN OF BOZRAH DPW, CTDOT, UTILITY PROVIDER, AND ENGINEERING STANDARDS AND SPECIFICATIONS. PROPOSED UTILITY WORK WILL REQUIRE LANE CLOSURES. COORDINATION WITH THE ENGINEER OF RECORD WILL BE NEEDED FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLANS. 6.ALL DISTURBANCE TO TOWN, COUNTY, OR STATE PROPERTY DUE TO CONSTRUCTION SHALL BE RESTORED TO ITS PREVIOUS CONDITION OR BETTER. 7.IF IMPACTED OR CONTAMINATED SOIL IS ENCOUNTERED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUSPEND EXCAVATION WORK OF IMPACTED SOIL AND NOTIFY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT PRIOR TO PROCEEDING WITH FURTHER WORK IN THE IMPACTED SOIL LOCATION UNTIL FURTHER INSTRUCTED BY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT. 8.ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 9.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE WATER SERVICE SHALL BE IN COMPLIANCE WITH THE NORWICH PUBLIC UTILITIES STANDARDS AND SPECIFICATIONS. 10.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE SEPTIC SYSTEM SHALL BE IN COMPLIANCE WITH THE UNCAS HEALTH DISTRICT STANDARDS AND SPECIFICATIONS. ADDITIONALLY, PRIOR TO INSTALLATION, THE SEPTIC LAYOUT SHALL BE REVIEWED AND APPROVED BY UNCAS HEALTH DISTRICT. 11.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE ELECTRIC SERVICE SHALL BE IN COMPLIANCE WITH UTILITY PROVIDER STANDARDS AND SPECIFICATIONS. 12.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE GAS SERVICE SHALL BE IN COMPLIANCE WITH UTILITY PROVIDER STANDARDS AND SPECIFICATIONS. 13.THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES 72 HOURS PRIOR TO BEGINNING OF EXCAVATION. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TAP AND TIE-IN FEES REQUIRED BY UTILITY PROVIDERS. MINIMUM LOT AREA 30,000 SF 864,508± SF ZONING COMPLIANCE TABLE ZONE:INDUSTRIAL (I) DISTRICT ZONING REQUIREMENT (I)REQUIREMENT MINIMUM LOT DEPTH MINIMUM SIDE YARD BUILDING SETBACK MINIMUM REAR YARD BUILDING SETBACK MINIMUM FRONTAGE 100 FT 150 FT 10 FT 25 FT PROPOSED CONDITIONS 322 FT >25 FT 10 FT 359 FT MAXIMUM IMPERVIOUS LOT COVERAGE 65%<65% MINIMUM FRONT YARD BUILDING SETBACK 35 FT 35 FT TALBOT LANEINSTALL SILT SACK PROTECTION (TYP.) PROPERTY LINE (TYP.) INSTALL TEMPORARY CONSTRUCTION FENCE (TYP.) REMOVE EXISTING SAINTARY SEWER PIPE REMOVE EXISTING SANITARY SEWER PIPE DEMOLISH & DISPOSE OF EXISTING FENCE (TYP.) DEMOLISH & DISPOSE OF EXISTING EQUIPMENT AREA (TYP.) INSTALL SILT FENCE PROTECTION (TYP.)TALBOT LANEMAINTAIN SILT SACK PROTECTION (TYP.) PROPERTY LINE (TYP.) MAINTAIN TEMPORARY CONSTRUCTION FENCE (TYP.) MAINTAIN SILT FENCE PROTECTION (TYP.) LEGEND PROPERTY LINE BUILDING / STRUCTURE DEMOLITION STORM / SANITARY SEWER PIPE REMOVAL TREE PROTECTION FENCE / ROCK WALL REMOVAL SILT SACK INLET PROTECTION CONSTRUCTION FENCE W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM SOIL EROSION & SEDIMENT CONTROL PLAN 2.31 50 0 50 100 1" = 50' EEL AWC PHASE I - DEMOLITION & SOIL EROSION & SEDIMENT CONTROL INSTALLATION SCALE: 1" = 50' PHASE II - SOIL EROSION & SEDIMENT CONTROL INSTALLATION SCALE: 1" = 50' SEDIMENT & EROSION CONTROL NOTES 1.THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. NO CONSTRUCTION OR DEMOLITION SHALL BEGIN UNTIL APPROVAL OF THE FINAL PLANS IS GRANTED BY ALL GOVERNING AND REGULATORY AGENCIES. 2.ALL SITE WORK TO BE COMPLETED IN ACCORDANCE WITH ALL PERMITS, APPROVALS AND CONDITIONS OF APPROVALS ISSUED BY THE TOWN OF SOUTH WINDSOR FOR THIS PROJECT. 3.EXISTING SITE CONDITIONS AND BOUNDARY INFORMATION TAKEN FROM A PLAN TITLED "PROPERTY SURVEY OF 50 TALBOT LANE & 290 NUTMEG ROAD, SOUTH WINDSOR, CONNECTICUT"; SCALE 1"=60'; DATED: 09/30/24; BY "ACCURATE LAND SURVEYING, LLC." 4.PRIOR TO STARTING ANY OTHER WORK ON SITE, THE CONTRACTOR SHALL NOTIFY APPROPRIATE AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED, STATE, AND LOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT. EROSION CONTROLS TO BE INSTALLED AT THE EDGE OF PROPOSED WORK. 5.EROSION CONTROLS TO ACT AS A LIMIT OF WORK LINE TO ENSURE THAT NO EQUIPMENT ENCROACHES ON THE ADJACENT PROPERTIES. 6.EROSION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED FOR THE DURATION OF THE PROJECT TO LIMIT THE MOVEMENT OF SILTATION AND SEDIMENTS FROM ENTERING EXISTING DRAINAGE SYSTEMS OR FROM LEAVING THE PARCEL. ANY ACCUMULATED SEDIMENTS ARE TO BE REMOVED FROM THE EROSION CONTROLS AND DISPOSED TO PROPERLY. ADDITIONALLY, ALL EROSION CONTROLS ARE TO BE INSPECTED AFTER A STORM EVENT AND THE CONTROLS REPLACED OR ARMORED AS NECESSARY AND ACCUMULATED SEDIMENTS REMOVED. 7.ADDITIONAL EROSION CONTROLS ARE TO BE UTILIZED AS NECESSARY AND AS DIRECTED BY THE ENGINEER TO LIMIT SEDIMENTS FROM DISCHARGING TO ADJACENT PROPERTIES OR INTO EXISTING STORM DRAIN SYSTEMS. 8.CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT EROSION SHALL NOT AFFECT AND OFF-SITE AREAS, WHETHER SUCH EROSION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT. 9.A RESERVE AMOUNT OF EROSION CONTROL MATERIALS ARE TO BE KEPT WITHIN EASY ACCESS ON SITE AT ALL TIMES. 10.CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR MINIMAL TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION. 11.TEMPORARY STOCKPILING OF MATERIALS RELATED TO THE CONSTRUCTION ACTIVITIES ARE TO BE PROPERLY STABILIZED, PROTECTED AND DEMARCATED TO LIMIT MOVEMENT OF MATERIAL INTO STORM DRAIN SYSTEM OR ONTO ADJACENT PARCELS 12.REFUELING AND ANY WORK ASSOCIATED WITH THE MAINTENANCE OF CONSTRUCTION EQUIPMENT TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE REGULATIONS. 13.THE AREAS OF CONSTRUCTION SHALL REMAIN IN A STABLE CONDITION AT THE CLOSE OF EACH CONSTRUCTION DAY. EROSION CONTROLS SHALL BE CHECKED AT THIS TIME AND MAINTAINED OR REINFORCED IF NECESSARY. 14.EROSION CONTROLS SHALL REMAIN IN PLACE UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED WITH PAVEMENT, PLANTINGS, OR WITH AN ESTABLISHED STAND OF GRASS. EROSION CONTROLS SHALL NOT BE REMOVED UNTIL SITE STABILIZATION IS COMPLETE. CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT AND DEBRIS FROM ENTIRE DRAINAGE AND SEWER SYSTEMS AS DIRECTED BY THE ENGINEER OF RECORD, TOWN ENGINEER, DPW AND/OR SOUTH WINDSOR LAND USE AGENT. 15.UTILIZE APPROPRIATE DEWATERING SYSTEMS AND TECHNIQUES TO MAINTAIN THE EXCAVATED AREA SUFFICIENTLY DRY FROM GROUNDWATER AND/OR SURFACE RUNOFF SO AS TO NOT ADVERSELY AFFECT CONSTRUCTION PROCEDURES OR CAUSE EXCESSIVE DISTURBANCE OF UNDERLYING NATURAL GROUND. 16.WATER FROM TRENCHES AND EXCAVATIONS SHALL NOT BE DISCHARGED DIRECTLY TO STORM DRAIN SYSTEMS. PROPER TREATMENT TO A SEDIMENTATION AREA IS TO TAKE PLACE PRIOR TO DISCHARGE TO ANY DRAINAGE SYSTEMS. 17.THE CONTRACTOR SHALL REPAIR ANY DAMAGE RESULTING FROM THE FAILURE OF THE DEWATERING OPERATIONS OR FROM FAILURE TO MAINTAIN ALL THE AREAS OF WORK IN SUITABLE DRY CONDITION. 18.PRECAUTIONS SHALL BE TAKEN TO PROTECT NEW WORK FROM FLOODING DURING STORMS OR FROM OTHER CAUSES. GRADING IN THE AREAS SURROUNDING ALL EXCAVATIONS SHALL BE PROPERLY SLOPED TO PREVENT WATER FROM RUNNING INTO THE EXCAVATED AREA OR TO ADJACENT PROPERTIES. WHERE REQUIRED, TEMPORARY DITCHES SHALL BE PROVIDED FOR DRAINAGE. UPON COMPLETION OF THE WORK AND WHEN DIRECTED, ALL AREAS SHALL BE RESTORED IN A SATISFACTORY MANNER AND AS DIRECTED. 19.ALL PIPELINES OR STRUCTURES NOT STABLE AGAINST UPLIFT DURING CONSTRUCTION OR PRIOR TO COMPLETION SHALL BE THOROUGHLY BRACED OR OTHERWISE PROTECTED. 20.REFER TO SHEET 2.41 FOR DETAILS OF THE PROPOSED SOIL EROSION AND SEDIMENT CONTROL (SEC) MEASURES AND ADDITIONAL INFORMATION REGARDING CONSTRUCTION SEQUENCE, SEC MEASURE INSTALLATION, AND MAINTENANCE. DEMOLITION NOTES 1.CONTRACTOR SHALL SECURE ANY PERMITS, PAY ALL FEES AND PERFORM CLEARING AND GRUBBING AND DEBRIS REMOVAL PRIOR TO COMMENCEMENT OF GRADING OPERATIONS. 2.ALL BUILDINGS, INCLUDING FOUNDATIONS WALLS, FOOTINGS AND BASEMENT SLABS INDICATED ON PLAN ARE TO BE REMOVED FROM THE SITE. 3.ALL SEDIMENT AND EROSION CONTROLS AS SHOWN ON THE PLAN HEREON SHALL BE INSTALLED BY THE DEMOLITION CONTRACTOR PRIOR TO START OF DEMOLITION OPERATIONS. 4.REMOVE AND DISPOSE OF ANY SIDEWALKS, FENCES, STAIRS, WALLS, DEBRIS AND RUBBISH REQUIRING REMOVAL FROM THE WORK AREA IN AN APPROVED OFF SITE LANDFILL, BY AN APPROVED HAULER. THE HAULER SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATORY REQUIREMENTS. 5.THE CONTRACTOR SHALL CUT AND PLUG, OR ARRANGE FOR THE APPROPRIATE UTILITY PROVIDER TO CUT AND PLUG ALL SERVICE PIPING AT THE STREET LINE OR AT THE MAIN, AS REQUIRED BY THE UTILITY PROVIDER, OR AS OTHERWISE NOTED OR SHOWN ON THE DRAWINGS. ALL SERVICES MAY NOT BE SHOWN ON THIS PLAN. THE CONTRACTOR SHALL INVESTIGATE THE SITE PRIOR TO BIDDING TO DETERMINE THE EXTENT OF SERVICE PIPING TO BE REMOVED, CUT OR PLUGGED. THE CONTRACTOR SHALL PAY ALL UTILITY PROVIDER FEES FOR ABANDONMENT AND REMOVALS. 6.THE CONTRACTOR SHALL PROTECT ALL IRON PINS, MONUMENTS AND PROPERTY CORNERS DURING DEMOLITION ACTIVITIES. ANY CONTRACTOR DISTURBED PINS, MONUMENTS, AND OR PROPERTY CORNERS, ETC. SHALL BE RESET BY A LICENSED LAND SURVEYOR AT THE EXPENSE OF THE CONTRACTOR. 7.THE DEMOLITION CONTRACTOR SHALL STABILIZE THE SITE AND KEEP EROSION CONTROL MEASURES IN PLACE UNTIL THE COMPLETION OF HIS WORK OR UNTIL THE COMMENCEMENT OF WORK BY THE SITE CONTRACTOR, WHICHEVER OCCURS FIRST, AS REQUIRED OR DEEMED NECESSARY BY THE ENGINEER OF RECORD. THE SITE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE MAINTENANCE OF EXISTING EROSION AND SEDIMENTATION CONTROLS AND FOR INSTALLATION OF ANY NEW EROSION AND SEDIMENT CONTROLS AS SHOWN HEREON. 8.THE CONTRACTOR SHALL ADHERE TO ALL OSHA, FEDERAL, STATE AND LOCAL REGULATIONS WHEN OPERATING CRANES, BOOMS, HOISTS, ETC. IN PROXIMITY OF OVERHEAD ELECTRIC LINES. IF CONTRACTOR MUST OPERATE EQUIPMENT CLOSE TO ELECTRIC LINES CONTACT THE POWER COMPANY TO MAKE ARRANGEMENTS FOR PROPER SAFEGUARDS. ANY UTILITY PROVIDER FEES SHALL BE PAID BY THE CONTRACTOR. 9.PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 72 HOURS BEFORE THE COMMENCEMENT OF WORK AT "811" AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. INFORMATION ON EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS HAS BEEN COMPILED FROM AVAILABLE INFORMATION INCLUDING UTILITY PROVIDER AND MUNICIPAL RECORD MAPS AND/OR FIELD SURVEY AND IS NOT GUARANTEED CORRECT OR COMPLETE. UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY AND SECURITY OF THE SITE DURING ALL PHASES OF CONSTRUCTION. THE ARCHITECT AND ENGINEER OF RECORD ARE NOT RESPONSIBLE FOR SITE SAFETY MEASURES TO BE EMPLOYED DURING CONSTRUCTION. THE ARCHITECT AND ENGINEER OF RECORD HAVE NO CONTRACTUAL DUTY TO CONTROL THE SAFEST METHODS OR MEANS OF THE WORK, JOB SITE RESPONSIBILITIES, SUPERVISION OR TO SUPERVISE SAFETY AND DOES NOT VOLUNTARILY ASSUME ANY SUCH DUTY OR RESPONSIBILITY. 11.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 12.NO WORK ON THIS SITE SHALL BE INITIATED BY THE CONTRACTOR UNTIL A PRE-CONSTRUCTION MEETING WITH OWNER AND THE ENGINEER OF RECORD IS PERFORMED. THE CONTRACTOR SHALL HAVE MARK OUTS OF EXISTING UTILITIES COMPLETED PRIOR TO MEETING. 13.CONTRACTOR SHALL BACKFILL ALL AREAS WHERE BUILDING SLABS AND FOUNDATIONS HAVE BEEN REMOVED. THE BACKFILL SHALL BE FILLED UP TO THE LIMITS OF THE PAVEMENT SUBGRADE. SEDIMENT & EROSION CONTROL NARRATIVE THE SEDIMENT AND EROSION CONTROL PLAN WAS DEVELOPED TO PROTECT THE EXISTING ROADWAY AND STORM DRAINAGE SYSTEMS, ADJACENT PROPERTIES, AND ANY ADJACENT WETLAND AREA AND WATER COURSE FROM SEDIMENT LADEN SURFACE RUNOFF AND EROSION. CONSTRUCTION SCHEDULE THE ANTICIPATED STARTING DATE FOR CONSTRUCTION IS FALL 2024 WITH COMPLETION ANTICIPATED BY SPRING 2025. APPROPRIATE EROSION CONTROL MEASURES AS DESCRIBED HEREIN, SHALL BE INSTALLED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF ALL SITE CLEARING OR CONSTRUCTION ACTIVITY. SCHEDULE WORK TO MINIMIZE THE LENGTH OF TIME THAT BARE SOIL WILL BE EXPOSED. CONTINGENCY EROSION PLAN THE CONTRACTOR SHALL INSTALL ALL SPECIFIED EROSION CONTROL MEASURES AND WILL BE REQUIRED TO MAINTAIN THEM IN THEIR INTENDED FUNCTIONING CONDITION. THE LAND USE AGENTS OF THE TOWN OF SOUTH WINDSOR AND PROJECT ENGINEER SHALL HAVE THE AUTHORITY TO REQUIRE SUPPLEMENTAL MAINTENANCE OR ADDITIONAL MEASURES IF FIELD CONDITIONS ARE ENCOUNTERED BEYOND WHAT WOULD NORMALLY BE ANTICIPATED. OPERATION REQUIREMENTS CLEARING, GRUBBING & DEMOLITION OPERATIONS: 1. ALL SEDIMENTATION AND EROSION CONTROL MEASURES WILL BE INSTALLED PRIOR TO THE START OF CLEARING, GRUBBING AND DEMOLITION OPERATIONS. 2. FOLLOWING INSTALLATION OF ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THE CONTRACTOR SHALL NOT PROCEED WITH GRADING, FILLING, OR OTHER CONSTRUCTION OPERATIONS UNTIL THE ENGINEER OF RECORD HAS INSPECTED AND APPROVED ALL INSTALLATIONS. 3. THE CONTRACTOR SHALL TAKE EXTREME CARE DURING CLEARING, GRUBBING, AND DEMOLITION OPERATIONS SO AS NOT TO DISTURB SEDIMENTATION AND EROSION CONTROL DEVICES AS WELL AS EXISTING LANDSCAPED AREAS. 4.FOLLOWING THE COMPLETION OF CLEARING, GRUBBING, AND DEMOLITION OPERATIONS, ALL AREAS SHALL BE STABILIZED WITH TOPSOIL AND SEEDING, PROCESSED AGGREGATE STONE, OR DISPERSED HAY AS SOON AS PRACTICAL. ROUGH GRADING OPERATIONS: 1. DURING THE REMOVAL AND/OR PLACEMENT OF EARTH AS INDICATED ON THE GRADING PLAN, TOPSOIL SHALL BE STRIPPED AND APPROPRIATELY STOCKPILED FOR REUSE. 2. ALL STOCKPILED TOPSOIL SHALL BE SEEDED, MULCHED WITH HAY, AND ENCLOSED BY A SILTATION FENCE OR STRAW WATTLE BARRIER. FILLING OPERATIONS: 1. PRIOR TO FILLING, ALL SEDIMENTATION AND EROSION CONTROL DEVICES SHALL BE PROPERLY IMPLEMENTED, MAINTAINED AND FULLY INSTALLED, AS DIRECTED BY THE ENGINEER OF RECORD, MUNICIPAL LAND USE AGENT AND AS SHOWN ON THIS PLAN. 2. ALL FILL MATERIAL ADJACENT TO ANY WETLAND AREAS, IF APPLICABLE TO THIS PROJECT, SHALL BE GOOD QUALITY, WITH LESS THAN 5% FINES PASSING THROUGH A #200 SIEVE (BANK RUN), AND SHALL BE PLACED IN LIFT THICKNESS NOT GREATER THAN THAT SPECIFIED IN PROJECT SPECIFICATIONS. LIFTS SHALL BE COMPACTED TO 95% MAX. DRY DENSITY MODIFIED PROCTOR OR AS SPECIFIED IN THE CONTRACT SPECIFICATIONS OR IN THE GEOTECHNICAL REPORT. 3. AS GENERAL GRADING OPERATIONS PROGRESS, ANY TEMPORARY DIVERSION DITCHES SHALL BE RAISED OR LOWERED, AS NECESSARY, TO DIVERT SURFACE RUNOFF TO THE SEDIMENT TRAPS AND BASIN (IF APPLICABLE). PLACEMENT OF DRAINAGE STRUCTURES, UTILITIES, AND ROADWAY CONSTRUCTION OPERATIONS: 1. SILT FENCES AND STRAW WATTLE SHALL BE INSTALLED AT THE DOWNHILL SIDES OF TEMPORARY TRAPS, MUD PUMP DISCHARGES, AND UTILITY TRENCH MATERIAL STOCKPILES. HAY BALES MAY BE USED IF SHOWN ON THE EROSION CONTROL PLANS OR IF DIRECTED BY THE ENGINEER OF RECORD. FINAL GRADING AND PAVING OPERATIONS: 1. ALL INLET AND OUTLET PROTECTION SHALL BE PLACED AND MAINTAINED AS SHOWN ON EROSION CONTROL PLANS AND DETAILS, AND AS DESCRIBED IN SPECIFICATIONS AND AS DESCRIBED HEREIN. 2. NO CUT OR FILL SLOPES SHALL EXCEED 2:1 EXCEPT WHERE STABILIZED BY ROCK FACED EMBANKMENTS OR EROSION CONTROL BLANKETS, JUTE MESH AND VEGETATION. ALL SLOPES SHALL BE SEEDED, AND ANY ROAD OR DRIVEWAY SHOULDER AND BANKS SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF FINAL GRADING UNTIL TURF IS ESTABLISHED. 3. PAVEMENT SUB-BASE AND BASE COURSES SHALL BE INSTALLED OVER AREAS TO BE PAVED AS SOON AS FINAL SUB-GRADES ARE ESTABLISHED AND UNDERGROUND UTILITIES AND STORM DRAINAGE SYSTEMS HAVE BEEN INSTALLED. 4. AFTER CONSTRUCTION OF PAVEMENT, TOPSOIL, FINAL SEEDING, MULCH AND LANDSCAPING, REMOVE ALL TEMPORARY EROSION CONTROL DEVICES ONLY AFTER ALL AREAS HAVE BEEN PAVED AND/OR GRASS HAS BEEN WELL ESTABLISHED AND THE SITE HAS BEEN INSPECTED AND APPROVED BY THE ENGINEER OF RECORD. INSTALLATION OF SEDIMENTATION AND EROSION CONTROL MEASURES I. SILT SACK INLET PROTECTION: A. REMOVE CATCH BASIN GRATE AND PROPERLY PLACE THE SILT SACK INTO THE FRAME OF THE CATCH BASIN. B. PLACE GRATE BACK ONTO FRAME AND ENSURE NO PORTIONS OF THE SILT SACK HAVE SAGGED INTO THE CATCH BASIN. C. ONCE GRATE IS PLACED BACK ONTO FRAME OBSERVE TO SEE IF SILT SACK IS INSTALLED IN A MANNER THAT WILL ALLOW FOR SEDIMENT TO BE FILTERED OUT DURING STORM EVENTS. II. STRAW WATTLE: A. STRAW WATTLE BARRIERS TO BE PLACED IN ACCORDANCE WITH SHEET 2.31. ALL DAMAGED BARRIERS AND POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED AS NECESSARY. B. STRAW WATTLE BARRIERS TO BE SECURED BY EITHER SAND BAG (IMPERVIOUS AREAS) OR BY WOOD STAKE HAMMERED INTO GROUND (PERVIOUS AREAS). C. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE BARRIER WHEN THEY EXCEED 3-4 INCHES IN HEIGHT. III. CONSTRUCTION ENTRANCE: A. REMOVE ALL VEGETATION AND OTHER MATERIALS FROM THE FOUNDATION AREA. GRADE AND CROWN FOUNDATION FOR POSITIVE DRAINAGE. B. PLACE 1-3" STONE A MINIMUM OF 100 FEET ALONG THE FULL WIDTH OF THE CONSTRUCTION ACCESS ROAD. AGGREGATE SHOULD BE PLACED AT LEAST 6" THICK. C. GEOTEXTILE FILTER FABRIC SHALL BE PLACED BETWEEN STONE FILL AND EARTH SURFACE TO REDUCE THE MIGRATION OF SOIL PARTICLES FROM THE UNDERLYING SOIL INTO THE STONE AND VICE VERSA. D. ALL SURFACE WATER THAT IS FLOWING TO OR DIVERTED TOWARD THE CONSTRUCTION ENTRANCE SHALL BE PIPED BENEATH THE ENTRANCE. E. FILTER FABRIC FENCE SHALL BE INSTALLED DOWN GRADIENT FROM THE CONSTRUCTION ENTRANCE IN ORDER TO CONTAIN ANY SEDIMENT-LADEN RUNOFF FROM THE ENTRANCE. IV. SILTATION FENCE: A.DIG A SIX INCH TRENCH ON THE UPHILL SIDE OF THE DESIGNATED FENCE LINE LOCATION. B.POSITION THE POST AT THE BACK OF THE TRENCH (DOWNHILL SIDE), AND HAMMER THE POST AT LEAST 1.5 FEET INTO THE GROUND. C.LAY THE BOTTOM SIX INCHES OF THE FABRIC INTO THE TRENCH TO PREVENT UNDERMINING BY STORM WATER RUN-OFF. D. BACKFILL THE TRENCH AND COMPACT. OPERATION AND MAINTENANCE OF SEDIMENTATION AND EROSION CONTROL MEASURES I. SILT SACK INLET PROTECTION: A. ALL SILT SACK INLET PROTECTION DEVICES SHALL BE INSPECTED AT A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATE SILT SACKS AND SACKS THAT APPEAR TO HAVE AN EXCESS OF SEDIMENT SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM THE SILT SACKS WHEN THEY EXCEED A COUPLE INCHES OF SEDIMENT WITHIN THE CATCH BASIN. II. STRAW WATTLE: A. ALL STRAW WATTLE BARRIERSS SHALL BE INSPECTED AS A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATED FABRIC AND DAMAGED POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE BARRIERS WHEN THEY EXCEED A HEIGHT OF 4 INCHES. III. CONSTRUCTION ENTRANCE: A. THE CONSTRUCTION ENTRANCE AND FENCE SHALL BE INSPECTED AT A MINIMUM WEEKLY AND AFTER HEAVY RAINS OR HEAVY USE. B. REMOVE MUD AND HEAVY SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROAD IMMEDIATELY. C. THE GRAVEL PAD SHALL BE TOPDRESSED WITH NEW STONE WHEN MUD AND SOIL PARTICLES CLOG THE VOIDS IN THE GRAVEL. D. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. E. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. IV. SILTATION FENCE: A.ALL SILTATION FENCES SHALL BE INSPECTED AT A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATED FABRIC AND DAMAGED POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE FENCE WHEN THEY EXCEED A HEIGHT OF ONE FOOT. EROSION AND SEDIMENT CONTROL PLAN 1. HAY BALE FILTERS OR SILTATION FENCE WILL BE INSTALLED AT ALL CULVERT OUTLETS IF CULVERT OUTLETS ARE APPLICABLE TO THIS PROJECT AND ALONG THE TOE OF ALL CRITICAL CUT AND FILL SLOPES. 2. CULVERT DISCHARGE AREAS WILL BE PROTECTED WITH RIP RAP CHANNELS; ENERGY DISSIPATERS WILL BE INSTALLED AS SHOWN ON THESE PLANS AND AS NECESSARY. 3. CATCH BASINS WILL BE PROTECTED WITH HAY BALE FILTERS, SILT SACKS, SILTATION FENCE, OR OTHER INLET PROTECTION DEVICES PER DETAILS, THROUGHOUT THE CONSTRUCTION PERIOD AND UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED. 4. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL MANUAL, LATEST EDITION. 5. EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED PRIOR TO CONSTRUCTION WHENEVER POSSIBLE. 6. ALL CONTROL MEASURES WILL BE MAINTAINED IN EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. 7. ADDITIONAL CONTROL MEASURES WILL BE INSTALLED DURING THE CONSTRUCTION PERIOD, IF NECESSARY OR REQUIRED OR AS DIRECTED BY THE ENGINEER OF RECORD OF RECORD OR BY LOCAL GOVERNING OFFICIALS. 8. SEDIMENT REMOVED FROM EROSION CONTROL STRUCTURES WILL BE DISPOSED IN A MANNER WHICH IS CONSISTENT WITH THE INTENT AND REQUIREMENTS OF THE EROSION CONTROL PLANS, NOTES, AND DETAILS. 9. THE OWNER IS ASSIGNED THE RESPONSIBILITY FOR IMPLEMENTING THIS EROSION AND SEDIMENT CONTROL PLAN. THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVES OF THE PLAN. SOIL EROSION & SEDIMENT CONTROL NOTES 1" REBAR FOR BAG REMOVAL FROM INLET EXPANSION RESTRAINT 1/4" NYLON ROPE 2"x2"x3/4" RUBBER BLOCK SILT SACK NOTE: REGULAR FLOW = 40 GAL./MIN./SF HIGH FLOW = 200 GAL./MIN./SF SILT SACK DETAIL SCALE: NTS 2' 3' 4' NOTES: 1. ALL EXISTING EXCAVATED MATERIAL THAT IS NOT TO BE REUSED IN THE WORK IS TO BE IMMEDIATELY REMOVED FROM THE SITE AND PROPERLY DISPOSED OF. 2. SOIL/AGGREGATE STOCKPILE SITES TO BE WHERE SHOWN ON THE DRAWINGS OR WHERE APPROVED BY ENGINEER OF RECORD OF RECORD. 3. RESTORE STOCKPILE SITES TO PRE-EXISTING PROJECT CONDITION AND RESEED AS REQUIRED. 4. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. SOIL/AGGREGATE STOCKPILE OF EXISTING SITE MATERIAL TO BE REUSED AND/OR NEW MATERIAL TO BE INSTALLED IN THE WORK DIRECTION OF RUN-OFF FLOW (TYP.) MATERIALS STOCKPILE DETAIL SCALE: NTS STRAW WATTLE BARRIER TEMPORARY CONSTRUCTION FENCE DETAIL SCALE: NTS NOTES: 1.FENCING PANELS COMPLY WITH ASTM - A392-06 STANDARDS. 2.GALVANIZED STEEL, CORROSION-RESISTANT ZINC COATING. 3.36" BASE STANDS FOR STABILITY, NO DIGGING OR POST SETTING REQUIRED. SAND BAGS TO BE USED FOR ADDED STABILITY. 4.TYPICAL FENCE WIDTH: 12', TYPICAL FENCE HEIGHT: 4', 6' & 8'. 5.SCREENING MADE OF RESILIENT HDPE POLYEHTYLENE, WITH 88% BLOCKAGE. 6.REINFORCED SCREENING WITH HEMMED EDGES AND STEEL GROMMETS. 7.SCREEN HEIGHT: 5'-8" FOR 6' FENCE OR 7'-8" FOR 8' FENCE. 8.SCREEN COLORS: GREEN, TAN, BLUE OR RED. 12' (TYP.)4', 6', OR 8' (TYP.)TEMPORARY CHAIN LINK FENCE PANEL 36" FENCE BASE STAND (TYP.) STEEL FASTENERS (TYP.) NTS AWC DP 2.41 SOIL EROSION AND SEDIMENT CONTROL NOTES & DETAILS W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM WHEREVER SILT FENCE RUNS ACROSS OR PERPENDICULAR TO SURFACE CONTOURS, 10-FOOT LONG WINGS OF SILT FENCE PLACED PERPENDICULAR TO THE MAIN RUN OF SILT FENCE SHOULD BE PROVIDED AT APPROXIMATE INTERVALS OF 50-FEET. SILT FENCE PROTECTION DETAIL SCALE: NTS 3. BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. 2. ATTACH FILTER FABRIC TO THE POSTS AND EXTEND IT TO THE TRENCH. SILT FENCE 1. SET POSTS AND EXCAVATE A 6"x6" TRENCH, SET POST DOWNSLOPE. WOOD POSTS ANGLE 10° UPSLOPE FOR STABILITY AND SELF CLEANING COMPACTED BACKFILL BOTTOM OF DRAINAGE WAY ELEVATION POINTS "A" SHOULD BE HIGHER THAN POINT "B" PLAN VIEW 100° 12" MIN. DEPTH A B AFLOW W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM DP AWC NTS 3.01CONSTRUCTION DETAILS PLASTIC SLEEVE OVER 6" SCHEDULE 40 POST - GROUT SOLID NOTE SECURE PLASTIC SLEEVE TO STEEL POST CONCRETE WASH PAVING, SEE PLAN AGGREGATE BASE4'-0"1"4'-0"3"1'-0" DIA. CONCRETE FOOTING CONCRETE BOLLARD DETAIL SCALE: NTS ELECTRICAL, TELEPHONE AND GAS TRENCH SCALE: NTS SPECIAL FOUNDATION, IF ORDERED BY ENGINEER 3/4" CRUSHED STONE TO BE INSTALLED TO DEPTH DETERMINED BY GEOTECHNICAL ENGINEER IN PEAT AND UNSUITABLE SOIL AREAS 7" SAND BED FROM MAIN TO METER PIT (GAS LINE ONLY) 1'-0" MIN IN ROCK. 12" SAND COVER OVER PIPE METAL STRIPS BURIED 12" ABOVE P.E. PIPE EVERY 5' & AT BENDS (GAS LINES ONLY) MARKING TAPE BURIED OVER ELECTRIC AND TELEPHONE CONDUITS TRENCH WIDTH: 1'-6" (GAS) 1'-0" ELECT., TELE. AND CATV. 3'-0" WHEN ELEC., CATV, & TEL. ARE GROUPED IN TRENCH BOTTOM OF CONDUIT TRENCH APPROVED COMPACTED % MAX DRY BACKFILL (95 DENSITY) COMPACTION PER ASTM D1557 IN 8" LIFTS 3'-6" (FOR GAS)3'-0" (FOR ELECT.)2'-0" (FOR TEL. & CATV)4" TOPSOIL IN EARTH IN PAVEMENT SEE DETAIL FOR PAVEMENT SECTION GRAVEL OR CRUSHED STONE BED RESTORE TO ORIGINAL CONDITION TOP SOIL (6"MIN) GENERAL BACKFILL THOROUGHLY COMPACTED TOP OF PIPE 4" 4" 4"-5" 12" 6" 4"4" IN ROCK IN EARTHHORIZONTAL LIMIT OF PAYMENT LINE IN ROCK 6" BELOW PIPE NO ROCK SHALL BE CLOSER THAN 4" FROM OUTSIDE OF PIPE SELECT MATERIAL THOROUGHLY COMPACTED VERTICAL LIMIT OF PAYMENT LINE IN ROCK SEE SECTION (T) ITEM 3.7 GRAVEL OR PROCESSES AGGREGATE PAVEMENT PER TOWN REQUIREMENTS IN PAVEMENT IN GRASS AREAS TYPICAL WATER TRENCH DETAIL SCALE: NTS DETAIL PROVIDED BY AQUARION WATER COMPANY PERMANENT PAVEMENT PATCHING DETAIL SCALE: NTS TYPICAL SANITARY SEWER TRENCH SECTION SCALE: NTS TYPICAL CLEANOUT SCALE: NTS Image 1 – Talbot Lane looking SW Image 2 – Talbot Lane looking SW Image 3 – Talbot Lane looking W Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 1 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. www.fulton.com Date: 9/26/2024 Attention: Tahmas Ghani Company: Home Market Foods Project: (3) FT-0600C Heater package for Connecticut Application: Food Processing Quote #: 2024FTC-10471 Quoted By: Bob Fennelly | bob.fennelly@fulton.com | 315-298-7170 Dear Tahmas, Thank you for your interest in Fulton Thermal Corporation. Please find our formal proposal for an engineered thermal fluid heating system following this letter. At Fulton we strive to provide industry leading factory and field support for all of our products. Our goal is to design and engineer a process heating system that meets and exceeds your specific needs. Please review this quotation at your earliest convenience. Should you have any questions regarding our offering, do not hesitate to contact me at any time either by phone or e-mail. We look forward to hearing from you, and for the opportunity to discuss the Fulton advantage. Best regards, Bob Fennelly Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 2 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. www.fulton.com ( 3) Fulton Model FT- 0600 C Fuel-Fired Coil Design Thermal Fluid Heater: • Natural gas, modulated burner • Fuel train built to CSD-1 standards • 6,000,000BTU/Hr. net output • Standard linkageless controls – Siemens LMV • 460/60/3 motor voltage - TEFC • 120/60 control voltage through an incorporated step down transformer • NEMA 1 UL listed and labeled control panel • Required safety devices for a maximum operating temperature of 650°F • Low NOx burner capable of 15PPM NOx, 50PPM CO corrected to 3% O2 • Heater is rated for an ambient temperature of 32°F- 100°F • The heater shall have a flow rate of 480 GPM using incorporated bypass ..... $ 199,431.00 EA…. Total for (3) $ 598,293.00 Key C-Model Features: Industry leading efficiencies! Utilizing the following: Vertical 4-pass design Preheated combustion air Linkageless controls All heaters are manufactured to the ASME Code, Section VIII Div.1, inspected and certified. Please verify that you comply with all local codes when selecting heaters. Full factory test fire, to eliminate our competitor’s lengthy start up time. Manufactured in Pulaski, NY - USA since 1974 Five (5) year warranty of the coil pressure vessel. Please refer to FT-C Standard Warranty statement for further information. Heaters are built with no refractory bricks & minimal refractory cement to prevent overheating of thermal fluid inside the heater should a pump or power failure. Coil designed for a high velocity turbulent flow to maximize the life of your thermal fluid by minimizing the film temperature. Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 3 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. • NFPA 85 Fuel Train …………………………………………………. $ 7,656.00 per heater … Total for (3) heaters $ 22,968.00 • NFPA 87 Heater ……………………………………..………………. $ 1,853.00 per heater … Total for (3) heaters $ 5,559.00 • Indicating Stack Temperature Limit ........................... $ 1,347.00 per heater … Total for (3) heaters $ 4,043.00 • NEMA 4 Panel Box, Controls, & Wiring ...................... $ 13,174.00 per heater … Total for (3) heaters $ 39,522.00 • Panel Box Air Conditioner ……………………..………… $7,805.00 per heater … Total for (3) heaters $ 23,415.00 • Panel Box Heater ………………………………………..…… $1,966.00 per heater … Total for (3) heaters $ 5,898.00 (3)Dean RA3000 or SPX Flow Combitherm plus Centrifugal Pumps, Pumps to be selected by Fulton engineering to best meet your system design and delivery requirements: • Air cooled seal, designed for 650°F maximum operating temperature • 480 GPM at 70 PSI • 50 HP RPMTEFC motor final motor hp to be determined at engineering phase Complete with motor starter • 460/60/3 voltage ............................................................... $ 18,967.00 EA. Total for (3) $56,901.00 (1) Fulton Model No. FT- 5000-L Combination Deaerator/Expansion/Cold-Seal Thermal Buffer Tank, (non- code) to include: • Low liquid level switch • 1310 gallon total tank capacity • 1168 gallons available for expansion • 4600 gallons maximum total system fluid content Please verify capacity based on expansion rate at operating temperature. ……………………………………….................................................................................. $ 48,429.00 EA. • DA Tank built to ASME Code ...................................................................................... $ 16,583.00 • Protects thermal fluid from oxidizing • Continuous deaeration of steam and other non- condensable • Simplify piping for the ease of installation! Key Tank Features: Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 4 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. Above Equipment Fully Skid Mounted, Piped, and Wired, • Pump skid mounted piping featuring : o Suction Isolation gate valve for easy maintenance o Braided flex hose for vibration isolation on suction and discharge o Y-Strainer with 60 mesh to protect pump o Pressure Gauge(-30 inHg to 60 psig) o Discharge isolation/throttling globe valve for servicing pump o Low point ¾” NPT drain/fill connection • ¾” NPT drains with shutoff valve(s) as required • Heater inlet and outlet isolation gate valves • Framework for mounting inlet to Combination Deaerator/Expansion/Cold- Seal Thermal Buffer tank at a maximum of 10 feet from the heater's floor level.* • Single point power with interconnecting wiring between pump and heater • Interconnecting hot oil piping • Structural steel skids for all components with ¼” deck plate to prevent trip hazard • Connections pump suction and supply for future pump to be blind flanged .............................................................................................................................. $ 122,376.00 *Note: Inlet connection may be lower for smaller heaters. Reference PDS for approximate dimension. Heater outlet connections will not be manifolded together. (1) Samson pneumatic system by-pass valves with I/P positioner (skid mounted) • Isolation valves • Inlet and outlet pressure gauges • Pressure transducer • Digital pressure controller mounted in a NEMA 1 panel .............................................................................................................................. $ 69,105.00 • 200 Gallon Catch Tank (shipped loose) .................................................................. $ 7,290.00 • Nitrogen Blanket Kit (for code tanks, outdoor installations, etc.)(shipped loose) Including a loose safety relief valve (50 psi), a loose spool piece with a 2” bubble tight ball valve, and a loose, assembled N2 kit: 2-way nitrogen regulator, 2-way nitrogen back pressure regulator, check valve, and pressure gauge ....................................................................................................... $ 9,346.00 • Dean RA3000 loose pump end only (impeller trimmed for 480gpm at 70psi) .………. $ 8,647.00 100% turnkey packages are now offered by Fulton! Turnkey systems include the following: •Fulton skid mounted thermal fluid heater. •Fulton coordinated installation of your new Fulton thermal fluid heater, and skid mounted system. . Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 5 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. • Heater to have an Allen-Bradley PLC; CompactLogix PLC (without HMI) : The Allen Bradley PLC for Status and Alarm output over ethernet. The Following is a list of the PLC monitored points: • DA Tank Liquid Level Switch Status/Alarm • Thermal Pump On Status • E-Stop Switch Status/Alarm • Switch SS1 Off/Pump/Heat " Pump Position" Status • High Stack Temperature Shutdown Status/Alarm • Inlet High Pressure Switch Status/Alarm • Outlet High Pressure Switch Status/Alarm • Pump Start Button Pressed Status • Switch SS1 Off/Pump/Heat "Heat Position" Status • Differential Pressure Switch Status/Alarm • Inlet Low Pressure Switch Status/Alarm • Stack Temperature Scaled 0-1400F Status • Outlet Temperature Scaled 0-650F Status • System Outlet Pressure Scaled 0-100psi Status • Local Alarm Horn (If ordered) • Local Alarm Silence Button (If ordered) • Loal PLC is in Alarm Light Status • Local PLC Reset Button • Heater Outlet Mix Point Temperature ModBus Points from the Siemens LMV to the PLC: • Low Gas Pressure Switch Status/Alarm • High Gas Pressure Switch Status/Alarm • Main Valve Proof of Closure Status/Alarm • High Thermal Fluid Outlet Temperature Status/Alarm • Combustion Air Switch Status/Alarm • Ignition On Status • Pilot Gas Valves On Status • Main Gas Valves On Status • Heater Firing Rate Scaled 0-100% Status • Siemens General Alarm State covers all Siemens Alarms including the ones listed above. Status/Alarm Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 6 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. www.fulton.com Remote Signals to Fulton PLC over ethernet • Thermal Fluid Pump Enable/Disable • Thermal Fluid Pump Start • Heater Enable/Disable • Remote Heater Setpoint • Remote Firing Rate …………………………………....................... $ 15,594.00 per heater … total for (3) heaters $ 46,782.00 TOTAL FOR EQUIPMENT ………….............................................................................. $ 1,085,157.00 NET All prices quoted are your NET price, F.O.B. Pulaski, NY. Shipping costs are not included in the above total. Please contact customer service for a freight quote. For customer arranged freight, please note all equipment must be removed from Fulton’s docks within 5 business days of the ship date. Equipment that has not been removed within this time frame is subject to additional storage fees. THIS QUOTE IS VALID FOR 30 DAYS Standard Payment Terms+ • 30% Upon Receipt of PO* • 30% Upon Submission of Drawings, Net 30 • 40% Upon Shipment, Net 30 Pricing is firm for an acceptable purchase order received within 30 days of quotation date and shipment within six (6) months of quotation date. For a purchase order received after 30 days of quotation date or shipment six (6) months after quotation date, we must requote with prices in effect at that time. *Please include a payment of 30% with the purchase order. Equipment will not be scheduled with a firm ship date until the down payment has been received. Specification Notes: No specification was provided, all materials and components to be per Fulton standards. Fulton reserves the right to review and issue a new proposal in the event a specification becomes available. THANK YOU! Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 7 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. www.fulton.com www.fulton.com Project Notes: Engineering services provided with this equipment, if ordered/applicable, include: • Piping diagram and top layout/mechanical arrangement drawing • Electrical schematic • Fuel train drawing • End assembly prints • Applicable sub-assembly/kit drawing • If additional End Assembly Prints for any equipment not skid mounted. Please reference Sales Policy Bulletin 2012- 002SP “Quotation & Sales Order Procedures” for more detailed submittal information. A secure link to access instruction manuals will be provided after shipment for standard equipment packages. If additional documents or customized products are required additional drafting and engineering charges will apply at $ 100.00 net/hr and $150.00 net/hr respectively. Please contact the Fulton Engineering group for additional information. Unless otherwise noted, piping components and fabrication will be to Fulton standards. If piping codes such as B31.1, B31.3, B31.9, or other custom specifications apply, please contact the factory for pricing and availability. Unless otherwise noted, equipment is suitable for installations with ambient temperatures ranging from 32°F-110°F. Please contact Fulton’s Customer Service Department to determine the current lead-time for the above equipment. The actual delivery date will be determined at the time of order based on the current production schedule. Changes made to an order after approval may be subject to additional engineer costs and/or effect the ship date of the equipment. If approval is required, delivery will be determined after written release to fabricate. Quoted delivery of the equipment is from date Fulton receives approved drawings signed by the customer. Approval drawings are typically available 2 to 4 weeks after receipt of an approved order. The sales order may contain a line item for accrued engineering costs that may be charged in the event the order is cancelled. This fee would be in addition to any charges related to equipment already released for purchase or fabrication. A sales order is considered approved once the customer has provided written approval of Fulton’s order acknowledgement, which includes scope of supply and pricing. Engineering services such as installation/start- up support, system integration, troubleshooting and field modifications, etc. are available. Additional charges may apply. Please contact the Fulton Engineering Department for information. Start-up and Installation: Start-up service by a factory technician is required. Start-up of the heater by anyone other than a Fulton Service Solutions Service Technician will void the warranty on the equipment supplied. Please contact Fulton Service Solutions for pricing. Prior notice is required for factory technician. Start-up is not included herein. When scheduling factory start- up, ask about our VIP maintenance club and find out the peace of mind our technicians can provide. The system or heater may be partially disassembled for shipping. Assembly required on site by others is at the customer's expense. Please reference Product Bulletin 2013-005PB for clarification of the responsibility of the installer for multiple-skid engineered systems Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 8 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. and all jobs with single-point electrical wiring. Structural support of system components may be required and is the responsibility of others. Fulton equipment is not designed to function as structural support for field piping, etc. Warranty: Fulton Thermal Corporation will repair or replace F.O.B. any part of this equipment, of our manufacture, which, within one year of the date of shipment from the factory, is found to be defective in workmanship or material; provided this equipment is operated and maintained by the buyer in accordance with approved practices, and on the provision that the buyer gives proper notification in writing as soon as defect becomes apparent. In addition, Fulton FT-C model heaters come with a five (5) year warranty on the heater coil (pressure vessel) as detailed in the FT-C warranty statement. The thermal fluid system piping and valves are painted at the factory to protect them from corrosion prior to installation and operation. These system components are subject to extreme temperatures and should be insulated for safety and to maximize system efficiency. These painted surfaces are not covered under warranty. Please contact Fulton for the complete warranty statement. Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 9 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. www.fulton.com Carbon Steel Thermal Fluid Pipe Specification -20F to +650F, 100 psig Pipe 1/2” and under Carbon steel pipe, sch. 80 SA106B. >1/2” Carbon steel pipe, sch. 40, SA106B. Fittings 2” and under 3000# socket weld forged steel SA105 or butt weld connections ≥2 1/2” Carbon steel butt weld SA234 WPB sch. 40. Flanges ≤ 3” 300# raised face slip on or weld neck including blind flange ASTM A105/ANSI B16.5. ≥ 4” 150# raised face slip on or weld neck including blind flange ASTM A105/ANSI B16.5. Gaskets ≤ 3” 300# Corrugated Metal Core, Graphite Covered, Elastagraph or equal. ≥ 4” 150#, Corrugated Metal Core, Graphite Covered, Elastagraph or equal. Gate Valves ≤ 2” Class 800 forged carbon steel ASTM A 105 socket weld; Newco, RP&C, Vogt or equal. 2 ½” - 3” Class 300 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. ≥ 4” Class 150 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. Globe Valves ≤ 2” Class 800 forged carbon steel ASTM A 105 socket weld; Newco, RP&C, Vogt or equal. 2 ½” - 3” Class 300 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. ≥ 4” Class 150 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. Check Valves ≤ 2” Class 800 forged carbon steel ASTM A 105 socket weld; Newco, RP&C, Vogt or equal. 2 ½” - 3” Class 300 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. ≥ 4” Class 150 RF flanged cast carbon steel ASTM A216 Gr. WCB ASME B16.34; Velan, Stockham or equal. Instrumentation Isolation Valves ≤ ½” Globe valve socket weld carbon steel barstock ASTM A108 Gr. 1018 with Grafoil packing; RP&C or equal or ¼” NPT block valves Strainers ≤ 2” Cast carbon steel butt weld; ARI or equal 2 ½” - 3” 300# RF Flanged Y-type cast carbon steel ASTM A 216-77 Gr. WCB; Titan or equal. ≥ 4” 150# RF Flanged Y-type cast carbon steel ASTM A 216-77 Gr. WCB; Titan or equal. Thread Sealant Connections ≤ ¾” Keytite Temperature Gauges 2 ½” dial bimetal dual scale with thermowell. Winters or equal Pressure Gauges 2 ½” dial, stainless steel externals & internals, dual scale Winters or equal Nuts All Carbon Steel ASTM A194 Gr 2H Bolts All Carbon Steel ASME SA 193 Gr B7 Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 10 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. Fulton Thermal Corporation Terms & Conditions 1. General. Terms and Conditions are referred to herein as “T&Cs”. Fulton Thermal Corporation is referred to herein as “Fulton” or “Seller”. Order Acknowledgement from Fulton is referred to herein as “Acknowledgement”. Buyer is referred to herein as “Buyer”. 2. Acceptance. Acceptance of Buyer’s order is expressly conditional on agreement to these T&Cs. These T&Cs supersede all prior agreements and will apply to all orders between Buyer and Seller. Any modifications of the T&Cs made by Fulton on the Acknowledgement or any other Fulton document supersede the T&Cs stated herein. A modification in this manner to portion(s) of these T&C does not change the validity of any other portion(s) of this agreement. Any modification of the T&Cs must be made in writing and agreed to by Fulton in writing. By placing an order with Fulton, Buyer is accepting these T&Cs together with any and all modifications agreed to in any subsequent Fulton documents. 3. Ordering Process. a. Quote – A Quote from Fulton is valid for 30 calendar days unless otherwise stated on the face of the Quote by Fulton. After expiration, Fulton reserves the right to change pricing, schedule times or require a new Quote entirely. b. Acknowledgements for non-engineered equipment orders that are standard in nature (“Release to Production Orders”) and Acknowledgements for parts orders are assumed by Fulton to be pre-approved by Buyer upon placement of a Purchase Order (“PO”). Release to Production Orders will be released to manufacturing for production immediately upon sending the Acknowledgement to Buyer. Any changes made after the order has been Released to Production may cause pricing and delivery dates to change. c. Acknowledgements for orders that are non-standard in nature (“Approval Hold Orders”) require Buyer’s written approval of the Acknowledgement and the Approval Drawings before Fulton will release the order to manufacturing for production. Buyer’s approval of the Approval Drawings is expected within fifteen (15) business days of receipt. Any delay by Buyer in approving the Acknowledgement and Approval Drawings for an Approval Hold Order will cause delays in the shipment date of the order. d. Upon receipt of the Acknowledgement, Buyer should immediately check the following: i. Model Number ii. Type of Fuel/Fuel Code iii. Required Gas Pressure iv. Electrical Specifications v. Auxiliary Equipment vi. Special Customer Requirements/ NEMA Rating/Code Requirements vii. Ship Date and Shipping Orientation viii. Completeness of the Order Buyer assumes any risk and resulting delay from any errors or omissions not brought to the attention of Fulton prior to shipment of the Order. 4. Changes and Cancellations. Changes in customer specifications during the approval process may result in changes to pricing and to the Ship Date. All changes in specifications must be in writing and approved by Fulton before becoming part of the revised Acknowledgement. a. Any cancellation fees for Buyer approved orders are at Fulton’s sole discretion and may be assessed between 20% and 100% the price of the Purchase Order. b. Any restocking fees for returned goods are at Fulton’s sole discretion and may be assessed between 20% and 100% the price of the Purchase Order. Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 11 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. 5. Credit Terms. a. Payment terms for Release to Production Orders are Cash on Delivery, Letter of Credit or Sight Draft Bill of Lading basis. Special terms may apply and, if so, will be notated on the Acknowledgement. Progress payments are due upon receipt of invoice. b. Payment terms for Approval Hold Orders or high value orders are 50% due before Release to Production and 50% due before Shipment. Negotiations of any other payment terms will be subject to approval from Fulton’s Accounting Department and will be stated on the Acknowledgment. c. Production and shipment of Buyer’s order may be delayed if Buyer’s account is not in good credit standing. If the equipment is in production when the hold is placed, rent will be charged after 30 days for space taken on the shop floor. d. A 9.0% per annum finance charge will be charged on any past due balance. e. Buyer grants a purchase money security interest in the goods and proceeds, if any, and expressly authorizes the filing of any financial statement signed by Fulton. f. Buyer agrees to notify Fulton in writing as to the location for installation of all goods subject to this agreement, and, if such goods are to be relocated, Buyer will provide the new location to Fulton in writing. Upon any breach of this agreement by Buyer and at Fulton’s option, all obligations secured hereunder shall become immediately due and payable in full without notice or demand, and Fulton shall have all rights and remedies as are accorded a secured party by the Uniform Commercial Code. 6. Shipping. Any date specified on the Acknowledgement for goods to be shipped is approximate only and is subject to change. The date the goods are, or are expected to be, ready to ship is referred to herein as the Ship Date (“Ship Date”). a. Goods are shipped F.C.A. Fulton’s Factory and title shall pass at time of pickup by carrier. The risk of in transit losses or damages for all goods shall be held by Buyer and Buyer hereby agrees to look solely to the carrier for any and all claims for loss or damage in transit. b. Fulton will, at Buyer’s request, delay the shipment of an order past the Ship Date for a maximum of one week without charge. Any request to delay shipment of equipment beyond the Ship Date in excess of one (1) week may result in the assessment of reasonable storage fees. Goods shipped later than the Ship Date at Buyer’s request may be released to another order by Fulton at Fulton’s sole discretion. This will delay the order. c. Any notice of shortages or problems with the goods Buyer receives must be made in writing to Fulton within ten (10) days of receipt of goods. 7. Indemnification. Buyer shall fully indemnify, hold harmless and defend Fulton and its directors, officers, employees, agents, stockholders and affiliates (collectively, Indemnified Parties) from and against any and all claims, actions, suits, demands, damages, liabilities, obligations, losses, settlements, judgments, costs and expenses (including without limitation reasonable attorney‘s fees and costs), whether or not involving a third party claim, which arise out of, relate to or result from (1) any breach of any representation or warranty of Fulton contained in this Agreement, (2) any breach of any covenant or other obligation or duty of Fulton under this Agreement or under applicable law, and (3) in each case whether or not caused by the negligence of Fulton or any other Indemnified Party. Fulton shall not be liable for any direct, incidental or consequential damages or losses incurred by delays in manufacturing or delivery or arising in any way out of this Agreement, including, but not limited to, any loss of profits or loss of business, even if Fulton is provided notice of such damages. 8. Warranties. Any written express warranties issued by Fulton in connection with the goods ordered by Buyer are exclusive and in lieu of all other warranties, express or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose. All warranties are voided in the event the unit is not commissioned by a Fulton authorized service technician. Fulton Thermal Corp. 972 Centerville Road Pulaski, NY 13142 Call: (315) 298-5121 Fax: (315) 298-5312 Page 12 of 11 Fulton is a global manufacturer of steam, hot water and thermal fluid heat transfer systems. 9. Proprietary and Confidential Information. Buyer shall consider all information furnished by Fulton to be confidential and shall not disclose any such information to any other person, or use such information itself for any purpose other than related to this Purchase Order. This paragraph shall apply to drawings, specifications, or other documents prepared by Fulton for Buyer in connection with this order. Buyer shall not advertise or publish the fact Buyer has contracted to purchase goods from Fulton, nor shall any information relating to the order be disclosed without Fulton's written permission. Unless otherwise agreed to in writing, no commercial, financial or technical information disclosed in any manner or at any time by Buyer to Fulton shall be deemed secret or confidential and Buyer shall have no rights against Fulton with respect thereto, except such rights as may exist under patent laws. 10. Force Majeure. Fulton shall not be liable for any failure of or delay in the performance of any order if such failure or delay is due to causes beyond its reasonable control, including but not limited to acts of God, war, strikes or labor disputes, embargoes, government orders or any other force majeure event. Fulton shall assist Buyer in all reasonable ways to minimize the impact of the force majeure event. 11. Assignment. No contract or rights under any contract entered into with Fulton may be assigned without the prior written consent of Fulton. 12. Governing law. This Agreement shall be governed by and construed in accordance with the laws of the State of New York. Both parties agree to waive a trial by jury and consent that any cause of action that may arise under this agreement shall be tried by the Court. Both parties agree that the sole and exclusive jurisdiction and venue of any such cause of action shall be in the United States District Court, Northern District of New York, or in the New York State Supreme Court, County of Onondaga, or County of Oswego. Buyer agrees to submit to personal jurisdiction in said jurisdiction. 13. Entire Agreement. This Agreement represents the entire agreement between the parties. If any one or more provisions of this acknowledgement are declared invalid by a court, such invalidity shall not affect the remainder of this acknowledgement. 14. Survivorship. This agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns. ACKNOWLEDGED AND ACCEPTED: Signature: Printed Name: Company Name: Date: PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE:10-21 24 TO:Michael Maniscalco,Walter Summers,Jeff Doolittle,Molly Keays, Melissa Pierce,Kevin Cooney,Tony Manfre,Autum Burke,Dave Turkington, Andrea Cofrancesco,Vincent Stetson.David Gesualdi,Marc Melanson.Scott Roberts, Justin Russo FROM:Michele Lipe,AICP,Director of Planning The Planning &Engineering Departments have received plans for the following projects: Appl 24-40P,Whole Market Foods Location:50 Talbot Lane Project Description:4,722 sf waste water building,4 —10,000 gallon storage tanks Future Town-owned property involved?@ Yes D NO D new street(s)B new detention area D new open space/recreation area D active Dpassive Planning Department notes: Visit https://www.southwindsor-ct.gov/planning-department/pages/planning—and-zoning— commission-applications to review pending applications Please comment by l 1/4/24 and retum to the Planning Department. g Site Plan E Subdivision No.Acres 19.8 Zone I @ Industrial D Commercial D Residential N0.Lots/Units Water:%Public B Private Well Sewerage:Public B Septic System mWN QF SQUTH WINDS®R BUILDENE DEPARTMENT 1540 Sullivan Ave. South Windsor,CT 06074 Tel.(860)644-2511 Ext 2230 October 24,2024 PZC Application 24-40P 50 Talbot Lane Whole Market Site Plan Modification The application has been reviewed under the 2022 CT State Building Codes. Ihave no issues with the application. Be advised that this is a review for the Planning and Zoning application only and not for any other permits. If you have any questions,please feel free to contact me. Marc Melanson Building Official PLANNING DEPARTMENT October 28.2024 Luke Hefferman.P.E. CMC Design Build7 Inc. 859 Willard Street Quincy,MA 02169 Dear Mr‘Hefferman. Re:Home Market Foods,Inc e request for site plan modification to construct a 4,722 sf waste water building,on propeity located at 50 Talbot Lane.I Zonei Please be advised that the Public Meeting ofthe Planning &Zoning Commission for the above referenced matter has been scheduled for Tuesdav.November 12.,2024. This meeting will be held in the Council Chambers ofthe South Windsor Town Hall.Someone must be present to represent the application. Two signs advertising the meeting must be posted on the property for ten (10)consecutive days prior to the hearing and must be clearly visible from a town street.The signs must be posted on Talbot Lane and Nutmeg Road S frontage by Saturday,November 2.2024. Signs can be picked up at the Planning office ofthe South Windsor Town Hall,1540 Sullivan Avenue.Please call (860)644-2511 ext.2329 ifyou have any questions.Monday 8:00 am.i 7:00 p.m..Tuesday i Thursday 8:00 am.—4:30 p.m.and Friday 8:00 a.m.—1:00 p.111. Sincerely. /%Q3 Joshua Stern Administrative Secretarv/Land Use Coordinator 1541]Sullivan Avenue,South Windsar,ET D6074 i Tel (861])Bill-2511 Ext 2329 i Planning@SuuthWindsar»ET.gnv Memo T0:Andrew Capuano,Solli Engineering From:Michele Lipe,Director of Planning Date:1 0/29/24 Re:App]24-401),Home Market Site Plan Modifications The following are the Planning Department comments.Engineering comments will be sent separately.Please make the necessary revisions and submit three COMPLETE sets of full-size revised plans and 10 sets of ll”x17”plans by 11/6/24 to be sent out with the agenda (tentatively scheduled for l l/12/24). Site Plan Review Comments General comments The equipment proposed is considered part of outdoor equipment on site and is required t0 be screened from public ways.Could you provide details for the concrete building proposed,any landscaping treatment,additional lighting and make clear what will be remaining in this area versus removed on site.It is hard to tell form the drawings. Cross sections or pictures of the view from Talbot Lane would be helpful.Cut sheets of the equipment including heights and colors would help as well. Zoning Data Table l.Actual impervious coverage must be included 2.Parking requirements must be shown (breakdown by uses,e.g.office,manufacturing).I am providing a copy 0f the 201 5 zoning data table that can be added to the plans Plot Plan/Topo Plan The approved site plan did not show any parking spaces in the front area.Do you intend on using this for parking?lf so,the spaces should be designed so that they are usable spaces. Architectural Details of the block building should be provided 1540 Sullivan Avenue,South Wndsor,CT 06074 PH 860-644-251 1,ext.2252 email miche|e.|ipe@southwindsor—ct.qov o Page 1 South Windsor Planning Department 501 Main Street, Suite 2A 11 Vanderbilt Avenue, Suite 240 Monroe, CT 06468 Norwood, MA 02062 Office: (203) 880-5455 Office: (781) 352-8491 www.SolliEngineering.com November 5, 2024 Michele Lipe Director of Planning South Windsor Planning Department 1540 Sullivan Avenue South Windsor, CT 06074 RE: Site Plan Review Comments Appl 24-40P, Home Market Site Plan Modifications 50 Talbot Lane South Windsor, CT 06074 Project Number: 24106501 Dear Ms. Lipe, On behalf of the Applicant, Home Market Foods, Inc., Solli Engineering is pleased to respond to the Planning Department Comments received via email on October 28, 2024. A response to each comment is provided in bold when applicable. General Comments 1. The equipment proposed is considered part of outdoor equipment on site and is required to be screened from public ways. Could you provide details for the concrete building proposed, any landscaping treatment, additional lighting and make clear what will be remaining in this area versus removed on site. It is hard to tell from the drawings. Solli Response 11/05/24: We have provided architectural elevations and images of the proposed equipment in our response submission to better illustrate what the proposed equipment will look like under finished condition. We have also included images taken from the public right-of-way on Talbot Lane to show that existing vegetation will provide screening of the proposed EQ tanks and the architectural elevations of the WWTP show that the equipment will be fully enclosed and not visible from the right-of-way. 2. Cross sections or pictures of the view from Talbot Lane would be helpful. Cut sheets of the equipment including heights and colors would help as well. Solli Response 11/05/24: Images from Talbot Lane and additional information for the proposed equipment has been provided. Zoning Data Table 3. Actual impervious coverage must be included. Solli Response 11/05/24: The “Zoning Compliance Table” on Sheet 2.11 has been revised to include impervious coverage. 4. Parking requirements must be shown (breakdown by uses, e.g. office, manufacturing). I am providing a copy of the 2015 zoning data table that can be added to the plans. Solli Response 11/05/24: A “Parking Summary” table has been added to Sheet 2.11. Plot Plan/Topo Plan 5. The approved site plan did not show any parking spaces in the front area. Do you intend on using this for parking? If so, the spaces should be designed so that they are usable spaces. Solli Response 11/05/24: The striped area in the front area was not part of the approved site plan is proposed to be removed. The on-site parking will still be compliant when this change is made. Architectural 6. Details of the block building should be provided. Solli Response 11/05/24: Architectural elevations of the WWTP have been provided. The color of the WWTP building will match those of the existing building on-site. Please review the above response to comments. If you have any further comments or questions, please provide them at your earliest convenience. We look forward to working with you and the Planning Department to satisfy any outstanding issues. Sincerely, Solli Engineering, LLC Anthony Capuano Asst. Project Manager Enclosures: • Civil Design Plans (Revision Date: 11/05/2024) • Architectural Plans • Images from Talbot Lane (Images Taken: 10/29/2024) • Fulton Boiler Cut Sheet • Oil Tank Cut Sheet Sheet Title:Sheet #: Project: COVER SHEET 0.00 PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Rev. #:Date Description PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT PREPARED FOR: HOME MARKET FOODS, INC. 140 MORGAN DRIVE NORWOOD, MA 02062 USGS MAP LOCATION MAP ENGINEERING MONROE, CT | WEST HARTFORD, CT | NORWOOD, MA PREPARED BY: SCALE: 1" = 1,000'PERMITTING PLAN SET SCALE: 1" = 1,000' PROJECT SITEPROJECT SITE DRAWING LIST SHEET NAME COVER SHEET PROPERTY SURVEY SITE LAYOUT PLAN SOIL EROSION AND SEDIMENT CONTROL PLAN SOIL EROSION AND SEDIMENT CONTROL NOTES & DETAILS CONSTRUCTION DETAILS SHEET # 0.00 1 OF 1 2.11 2.31 2.41 3.01 PLAN DATE 10/16/24 09/10/24 10/16/24 10/16/24 10/16/24 10/16/24 LATEST REVISION 11/05/24 09/30/24 11/05/24 11/05/24 11/05/24 11/05/24 HOME MARKET FOODS, INC. 140 MORGAN DRIVE NORWOOD, MA 02062 (781) 733-1941 WETLANDS SPECIALIST SURVEYOR OF RECORD SITE / CIVIL ENGINEER KEVIN SOLLI, P.E., PTOE, CPESC, LEED AP BD+C (ENGINEER OF RECORD) LICENSE NO. 25759 SOLLI ENGINEERING, LLC 11 VANDERBILT AVENUE, SUITE 240 NORWOOD, MASSACHUSETTS 02062 (781) 352-8491 OWNER PROPERTY INFORMATION ADDRESS: 50 TALBOT LANE TOWN OF SOUTH WINDSOR CONNECTICUT 06074 ACCOUNT: 88900050 PARCEL ID: 60-29-3 AREA: 1.894± ACRES DOWE REALTY III, LLC 400 1ST AVENUE NEEDHAM, MA 02494 ARCHITECT APPLICANT BRYAN P. NESTERIAK, PE, LS LICENSE NO. 23556 ACCURATE LAND SURVEYING, LLC 15 RESEARCH DRIVE WOODBRIDGE, CONNECTICUT 06525 (203) 881-8145 WILLIAM KENNY, CPWS, PLA, ASLA WILLIAM KENNY ASSOCIATES 195 TUNXIS HILL CUTOFF SOUTH FAIRFIELD, CT 06825 (203)366-0588 CMC DESIGN BUILD, INC 859 WILLARD STREET QUINCY, MASSACHUSETTS 02169 (888) 328-2962 REVISED PER PLANNER COMMENTS11/05/241 GENERAL SURVEY NOTES MAP REFERENCES 30 180120600 SCALE: 1"=60' 1 of 1 LOCATION MAP SCALE: 1"=800' PROPERTY SURVEY OF 50 TALBOT LANE & 90 NUTMEG ROAD SOUTH WINDSOR, CONNECTICUT PS, 50 TALBOT LANE & 290 NUTMEG ROAD, SOUTH WINDSOR, CT.LEGEND ACCURATELand Surveying, LLC 15 Research Drive Woodbridge, CT 06525 Tel: 203.881.8145 501 Main Street Monroe, CT 06468 Tel: 203.880.5455 TALBOT LANE(4) PROPOSED 10,000 GALLON OIL TANKS (30' HEIGHT) ON CONCRETE PAD PROPOSED EQ STORAGE TANKS (BY OTHERS) (25' HEIGHT) (4)PROPOSED FULTON BOILERS (14' HEIGHT) PROPOSED 8' CHAIN LINK FENCE WITH PRIVACY SLATS PROPOSED CONCRETE BOLLARD (12' O.C.) (TYP.) PROPOSED CONCRETE BOLLARD (6' O.C.) (TYP.) PR 750± LF OF 4" SDR-21 SANITARY FORCE MAIN PROPOSED NATURAL GAS CONNECTION TO EXISTING UTILITY ROOM PROPOSED 4" WATER SERVICE CONNECTION TO EXISTING UTILITY ROOM PROPOSED ELECTRICAL SERVICE CONNECTION TO EXISTING UTILITY ROOM EXISTING GREASE INTERCEPTOR TO BE UTILIZED AS PUMP CHAMBER (BY OTHERS) EXISTING GREASE INTERCEPTOR TO BE UTILIZED AS PUMP CHAMBER (BY OTHERS) STUB PROPOSED UTILITIES 5' FROM WWTP (TYP.) PR 154± LF OF 4" SDR-21 SANITARY FORCE MAIN PROPERTY LINE (TYP.) BUILDING SETBACK LINE (TYP.) PROPOSED WASTEWATER TREATMENT FACILITY, (SEE BUILDING PLANS) 35' EXISTING PARKING SPACE STRIPING TO BE REMOVED PR 243± LF OF 8" C900 PVC PIPE @ S = 0.5% CONNECT TO EXISTING DMH INV = 71.2 10'PR 167± LF OF 6" SDR-35 PVC PIPE @ S = 2.0% MIN PR SANITARY CLEANOUT PR 50± LF OF 6" SDR-35 PVC PIPE @ S = 2.0% MIN PROPOSED WASTEWATER DISCHARGE TO FLUME (BY OTHERS) PROPOSED WWTP (28' HEIGHT) 4,722± SF FFE: 74.00 PR STORM CLEANOUT WATER MAIN / LATERAL GAS LINE ELECTRIC CONDUIT SANITARY SEWER PIPE LEGEND PROPERTY LINE W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM SITE LAYOUT PLAN 2.11 40 0 40 80 1" = 40' EEL AWC 1.EXISTING PROPERTY BOUNDARY INFORMATION TAKEN FROM THE CARLA'S PASTA "SITE PLAN MODIFICATION" PLAN SET; PREPARED BY DESIGN PROFESSIONALS; DATED: 06/19/2018. 2.THE SUBJECT PARCEL CONSISTS OF ±19.85 ACRES LOCATED WITHIN THE INDUSTRIAL DISTRICT (I) IN THE TOWN OF SOUTH WINDSOR, CONNECTICUT. 3.THIS PLAN WAS CREATED WITH LIMITED REGARD TO SITE GRADING AS DETAILED TOPOGRAPHIC INFORMATION IS UNKNOWN AT THIS TIME. GENERAL NOTES ABBREVIATIONS @ EX LF PR S SF TYP WWTP AT EXISTING LINEAR FEET PROPOSED SLOPE SQUARE FOOT TYPICAL WASTEWATER TREATMENT PLANT UTILITY NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION PERMITS REQUIRED BY GOVERNMENT AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE TRAFFIC CONTROLS NECESSARY FOR THIS PROJECT. 2.UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 72 HOURS BEFORE COMMENCEMENT OR WORK AT "811" OR 1-800-922-4455 AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. 3.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING, OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 4.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC DEVICES FOR PROTECTION OF VEHICLES AND PEDESTRIANS CONSISTING OF DRUMS, BARRIERS, SIGNS, LIGHTS, FENCES, AND UNIFORMED TRAFFIC CONTROLLERS AS REQUIRED, ORDERED BY THE ENGINEER OF RECORD OR REQUIRED BY THE STATE AND LOCAL GOVERNING AUTHORITIES. 5.ALL UTILITY WORK PROPOSED WITHIN THE TOWN'S RIGHT-OF-WAY SHALL COMPLY WITH TOWN OF BOZRAH DPW, CTDOT, UTILITY PROVIDER, AND ENGINEERING STANDARDS AND SPECIFICATIONS. PROPOSED UTILITY WORK WILL REQUIRE LANE CLOSURES. COORDINATION WITH THE ENGINEER OF RECORD WILL BE NEEDED FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLANS. 6.ALL DISTURBANCE TO TOWN, COUNTY, OR STATE PROPERTY DUE TO CONSTRUCTION SHALL BE RESTORED TO ITS PREVIOUS CONDITION OR BETTER. 7.IF IMPACTED OR CONTAMINATED SOIL IS ENCOUNTERED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUSPEND EXCAVATION WORK OF IMPACTED SOIL AND NOTIFY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT PRIOR TO PROCEEDING WITH FURTHER WORK IN THE IMPACTED SOIL LOCATION UNTIL FURTHER INSTRUCTED BY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT. 8.ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 9.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE WATER SERVICE SHALL BE IN COMPLIANCE WITH THE NORWICH PUBLIC UTILITIES STANDARDS AND SPECIFICATIONS. 10.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE SEPTIC SYSTEM SHALL BE IN COMPLIANCE WITH THE UNCAS HEALTH DISTRICT STANDARDS AND SPECIFICATIONS. ADDITIONALLY, PRIOR TO INSTALLATION, THE SEPTIC LAYOUT SHALL BE REVIEWED AND APPROVED BY UNCAS HEALTH DISTRICT. 11.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE ELECTRIC SERVICE SHALL BE IN COMPLIANCE WITH UTILITY PROVIDER STANDARDS AND SPECIFICATIONS. 12.ALL WORK ASSOCIATED WITH THE INSTALLATION OF THE GAS SERVICE SHALL BE IN COMPLIANCE WITH UTILITY PROVIDER STANDARDS AND SPECIFICATIONS. 13.THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES 72 HOURS PRIOR TO BEGINNING OF EXCAVATION. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TAP AND TIE-IN FEES REQUIRED BY UTILITY PROVIDERS. MINIMUM LOT AREA 30,000 SF 864,508± SF ZONING COMPLIANCE TABLE ZONE:INDUSTRIAL (I) DISTRICT ZONING REQUIREMENT (I)REQUIREMENT MINIMUM LOT DEPTH MINIMUM SIDE YARD BUILDING SETBACK MINIMUM REAR YARD BUILDING SETBACK MINIMUM FRONTAGE 100 FT 150 FT 10 FT 25 FT PROPOSED CONDITIONS 322 FT >25 FT 10 FT 359 FT MAXIMUM IMPERVIOUS LOT COVERAGE 65%39% MINIMUM FRONT YARD BUILDING SETBACK 35 FT 35 FT PARKING SUMMARY PROPOSED DEVELOPMENT REQUIRED PROVIDED 194 199 MANUFACTURING (PHASE I ADDITION) WAREHOUSE (PHASE I ADDITION) 45 47 44 47 * TOTAL REQUIRED PARKING FOR EXISTING BUILDING IS 105 SPACES AS PER PREVIOUS APPROVAL FROM TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION EXISTING BUILDING 105* GFA 31,000 ± SF 30,000 ± SF REQUIREMENT 1 SPACE / 700 SF 1 SPACE / EMPLOYEE 1 SPACE / 1,250 SF 1 11/05/24 REVISED PER PLANNER COMMENTS 105 TALBOT LANEINSTALL SILT SACK PROTECTION (TYP.) PROPERTY LINE (TYP.) INSTALL TEMPORARY CONSTRUCTION FENCE (TYP.) REMOVE EXISTING SAINTARY SEWER PIPE REMOVE EXISTING SANITARY SEWER PIPE DEMOLISH & DISPOSE OF EXISTING FENCE (TYP.) DEMOLISH & DISPOSE OF EXISTING EQUIPMENT AREA (TYP.) INSTALL SILT FENCE PROTECTION (TYP.)TALBOT LANEMAINTAIN SILT SACK PROTECTION (TYP.) PROPERTY LINE (TYP.) MAINTAIN TEMPORARY CONSTRUCTION FENCE (TYP.) MAINTAIN SILT FENCE PROTECTION (TYP.) LEGEND PROPERTY LINE BUILDING / STRUCTURE DEMOLITION STORM / SANITARY SEWER PIPE REMOVAL TREE PROTECTION FENCE / ROCK WALL REMOVAL SILT SACK INLET PROTECTION CONSTRUCTION FENCE W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM SOIL EROSION & SEDIMENT CONTROL PLAN 2.31 50 0 50 100 1" = 50' EEL AWC PHASE I - DEMOLITION & SOIL EROSION & SEDIMENT CONTROL INSTALLATION SCALE: 1" = 50' PHASE II - SOIL EROSION & SEDIMENT CONTROL INSTALLATION SCALE: 1" = 50' SEDIMENT & EROSION CONTROL NOTES 1.THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. NO CONSTRUCTION OR DEMOLITION SHALL BEGIN UNTIL APPROVAL OF THE FINAL PLANS IS GRANTED BY ALL GOVERNING AND REGULATORY AGENCIES. 2.ALL SITE WORK TO BE COMPLETED IN ACCORDANCE WITH ALL PERMITS, APPROVALS AND CONDITIONS OF APPROVALS ISSUED BY THE TOWN OF SOUTH WINDSOR FOR THIS PROJECT. 3.EXISTING SITE CONDITIONS AND BOUNDARY INFORMATION TAKEN FROM A PLAN TITLED "PROPERTY SURVEY OF 50 TALBOT LANE & 290 NUTMEG ROAD, SOUTH WINDSOR, CONNECTICUT"; SCALE 1"=60'; DATED: 09/30/24; BY "ACCURATE LAND SURVEYING, LLC." 4.PRIOR TO STARTING ANY OTHER WORK ON SITE, THE CONTRACTOR SHALL NOTIFY APPROPRIATE AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED, STATE, AND LOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT. EROSION CONTROLS TO BE INSTALLED AT THE EDGE OF PROPOSED WORK. 5.EROSION CONTROLS TO ACT AS A LIMIT OF WORK LINE TO ENSURE THAT NO EQUIPMENT ENCROACHES ON THE ADJACENT PROPERTIES. 6.EROSION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED FOR THE DURATION OF THE PROJECT TO LIMIT THE MOVEMENT OF SILTATION AND SEDIMENTS FROM ENTERING EXISTING DRAINAGE SYSTEMS OR FROM LEAVING THE PARCEL. ANY ACCUMULATED SEDIMENTS ARE TO BE REMOVED FROM THE EROSION CONTROLS AND DISPOSED TO PROPERLY. ADDITIONALLY, ALL EROSION CONTROLS ARE TO BE INSPECTED AFTER A STORM EVENT AND THE CONTROLS REPLACED OR ARMORED AS NECESSARY AND ACCUMULATED SEDIMENTS REMOVED. 7.ADDITIONAL EROSION CONTROLS ARE TO BE UTILIZED AS NECESSARY AND AS DIRECTED BY THE ENGINEER TO LIMIT SEDIMENTS FROM DISCHARGING TO ADJACENT PROPERTIES OR INTO EXISTING STORM DRAIN SYSTEMS. 8.CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT EROSION SHALL NOT AFFECT AND OFF-SITE AREAS, WHETHER SUCH EROSION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT. 9.A RESERVE AMOUNT OF EROSION CONTROL MATERIALS ARE TO BE KEPT WITHIN EASY ACCESS ON SITE AT ALL TIMES. 10.CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR MINIMAL TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION. 11.TEMPORARY STOCKPILING OF MATERIALS RELATED TO THE CONSTRUCTION ACTIVITIES ARE TO BE PROPERLY STABILIZED, PROTECTED AND DEMARCATED TO LIMIT MOVEMENT OF MATERIAL INTO STORM DRAIN SYSTEM OR ONTO ADJACENT PARCELS 12.REFUELING AND ANY WORK ASSOCIATED WITH THE MAINTENANCE OF CONSTRUCTION EQUIPMENT TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE REGULATIONS. 13.THE AREAS OF CONSTRUCTION SHALL REMAIN IN A STABLE CONDITION AT THE CLOSE OF EACH CONSTRUCTION DAY. EROSION CONTROLS SHALL BE CHECKED AT THIS TIME AND MAINTAINED OR REINFORCED IF NECESSARY. 14.EROSION CONTROLS SHALL REMAIN IN PLACE UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED WITH PAVEMENT, PLANTINGS, OR WITH AN ESTABLISHED STAND OF GRASS. EROSION CONTROLS SHALL NOT BE REMOVED UNTIL SITE STABILIZATION IS COMPLETE. CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT AND DEBRIS FROM ENTIRE DRAINAGE AND SEWER SYSTEMS AS DIRECTED BY THE ENGINEER OF RECORD, TOWN ENGINEER, DPW AND/OR SOUTH WINDSOR LAND USE AGENT. 15.UTILIZE APPROPRIATE DEWATERING SYSTEMS AND TECHNIQUES TO MAINTAIN THE EXCAVATED AREA SUFFICIENTLY DRY FROM GROUNDWATER AND/OR SURFACE RUNOFF SO AS TO NOT ADVERSELY AFFECT CONSTRUCTION PROCEDURES OR CAUSE EXCESSIVE DISTURBANCE OF UNDERLYING NATURAL GROUND. 16.WATER FROM TRENCHES AND EXCAVATIONS SHALL NOT BE DISCHARGED DIRECTLY TO STORM DRAIN SYSTEMS. PROPER TREATMENT TO A SEDIMENTATION AREA IS TO TAKE PLACE PRIOR TO DISCHARGE TO ANY DRAINAGE SYSTEMS. 17.THE CONTRACTOR SHALL REPAIR ANY DAMAGE RESULTING FROM THE FAILURE OF THE DEWATERING OPERATIONS OR FROM FAILURE TO MAINTAIN ALL THE AREAS OF WORK IN SUITABLE DRY CONDITION. 18.PRECAUTIONS SHALL BE TAKEN TO PROTECT NEW WORK FROM FLOODING DURING STORMS OR FROM OTHER CAUSES. GRADING IN THE AREAS SURROUNDING ALL EXCAVATIONS SHALL BE PROPERLY SLOPED TO PREVENT WATER FROM RUNNING INTO THE EXCAVATED AREA OR TO ADJACENT PROPERTIES. WHERE REQUIRED, TEMPORARY DITCHES SHALL BE PROVIDED FOR DRAINAGE. UPON COMPLETION OF THE WORK AND WHEN DIRECTED, ALL AREAS SHALL BE RESTORED IN A SATISFACTORY MANNER AND AS DIRECTED. 19.ALL PIPELINES OR STRUCTURES NOT STABLE AGAINST UPLIFT DURING CONSTRUCTION OR PRIOR TO COMPLETION SHALL BE THOROUGHLY BRACED OR OTHERWISE PROTECTED. 20.REFER TO SHEET 2.41 FOR DETAILS OF THE PROPOSED SOIL EROSION AND SEDIMENT CONTROL (SEC) MEASURES AND ADDITIONAL INFORMATION REGARDING CONSTRUCTION SEQUENCE, SEC MEASURE INSTALLATION, AND MAINTENANCE. DEMOLITION NOTES 1.CONTRACTOR SHALL SECURE ANY PERMITS, PAY ALL FEES AND PERFORM CLEARING AND GRUBBING AND DEBRIS REMOVAL PRIOR TO COMMENCEMENT OF GRADING OPERATIONS. 2.ALL BUILDINGS, INCLUDING FOUNDATIONS WALLS, FOOTINGS AND BASEMENT SLABS INDICATED ON PLAN ARE TO BE REMOVED FROM THE SITE. 3.ALL SEDIMENT AND EROSION CONTROLS AS SHOWN ON THE PLAN HEREON SHALL BE INSTALLED BY THE DEMOLITION CONTRACTOR PRIOR TO START OF DEMOLITION OPERATIONS. 4.REMOVE AND DISPOSE OF ANY SIDEWALKS, FENCES, STAIRS, WALLS, DEBRIS AND RUBBISH REQUIRING REMOVAL FROM THE WORK AREA IN AN APPROVED OFF SITE LANDFILL, BY AN APPROVED HAULER. THE HAULER SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATORY REQUIREMENTS. 5.THE CONTRACTOR SHALL CUT AND PLUG, OR ARRANGE FOR THE APPROPRIATE UTILITY PROVIDER TO CUT AND PLUG ALL SERVICE PIPING AT THE STREET LINE OR AT THE MAIN, AS REQUIRED BY THE UTILITY PROVIDER, OR AS OTHERWISE NOTED OR SHOWN ON THE DRAWINGS. ALL SERVICES MAY NOT BE SHOWN ON THIS PLAN. THE CONTRACTOR SHALL INVESTIGATE THE SITE PRIOR TO BIDDING TO DETERMINE THE EXTENT OF SERVICE PIPING TO BE REMOVED, CUT OR PLUGGED. THE CONTRACTOR SHALL PAY ALL UTILITY PROVIDER FEES FOR ABANDONMENT AND REMOVALS. 6.THE CONTRACTOR SHALL PROTECT ALL IRON PINS, MONUMENTS AND PROPERTY CORNERS DURING DEMOLITION ACTIVITIES. ANY CONTRACTOR DISTURBED PINS, MONUMENTS, AND OR PROPERTY CORNERS, ETC. SHALL BE RESET BY A LICENSED LAND SURVEYOR AT THE EXPENSE OF THE CONTRACTOR. 7.THE DEMOLITION CONTRACTOR SHALL STABILIZE THE SITE AND KEEP EROSION CONTROL MEASURES IN PLACE UNTIL THE COMPLETION OF HIS WORK OR UNTIL THE COMMENCEMENT OF WORK BY THE SITE CONTRACTOR, WHICHEVER OCCURS FIRST, AS REQUIRED OR DEEMED NECESSARY BY THE ENGINEER OF RECORD. THE SITE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE MAINTENANCE OF EXISTING EROSION AND SEDIMENTATION CONTROLS AND FOR INSTALLATION OF ANY NEW EROSION AND SEDIMENT CONTROLS AS SHOWN HEREON. 8.THE CONTRACTOR SHALL ADHERE TO ALL OSHA, FEDERAL, STATE AND LOCAL REGULATIONS WHEN OPERATING CRANES, BOOMS, HOISTS, ETC. IN PROXIMITY OF OVERHEAD ELECTRIC LINES. IF CONTRACTOR MUST OPERATE EQUIPMENT CLOSE TO ELECTRIC LINES CONTACT THE POWER COMPANY TO MAKE ARRANGEMENTS FOR PROPER SAFEGUARDS. ANY UTILITY PROVIDER FEES SHALL BE PAID BY THE CONTRACTOR. 9.PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 72 HOURS BEFORE THE COMMENCEMENT OF WORK AT "811" AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. INFORMATION ON EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS HAS BEEN COMPILED FROM AVAILABLE INFORMATION INCLUDING UTILITY PROVIDER AND MUNICIPAL RECORD MAPS AND/OR FIELD SURVEY AND IS NOT GUARANTEED CORRECT OR COMPLETE. UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY AND SECURITY OF THE SITE DURING ALL PHASES OF CONSTRUCTION. THE ARCHITECT AND ENGINEER OF RECORD ARE NOT RESPONSIBLE FOR SITE SAFETY MEASURES TO BE EMPLOYED DURING CONSTRUCTION. THE ARCHITECT AND ENGINEER OF RECORD HAVE NO CONTRACTUAL DUTY TO CONTROL THE SAFEST METHODS OR MEANS OF THE WORK, JOB SITE RESPONSIBILITIES, SUPERVISION OR TO SUPERVISE SAFETY AND DOES NOT VOLUNTARILY ASSUME ANY SUCH DUTY OR RESPONSIBILITY. 11.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 12.NO WORK ON THIS SITE SHALL BE INITIATED BY THE CONTRACTOR UNTIL A PRE-CONSTRUCTION MEETING WITH OWNER AND THE ENGINEER OF RECORD IS PERFORMED. THE CONTRACTOR SHALL HAVE MARK OUTS OF EXISTING UTILITIES COMPLETED PRIOR TO MEETING. 13.CONTRACTOR SHALL BACKFILL ALL AREAS WHERE BUILDING SLABS AND FOUNDATIONS HAVE BEEN REMOVED. THE BACKFILL SHALL BE FILLED UP TO THE LIMITS OF THE PAVEMENT SUBGRADE. 1 11/05/24 REVISED PER PLANNER COMMENTS SEDIMENT & EROSION CONTROL NARRATIVE THE SEDIMENT AND EROSION CONTROL PLAN WAS DEVELOPED TO PROTECT THE EXISTING ROADWAY AND STORM DRAINAGE SYSTEMS, ADJACENT PROPERTIES, AND ANY ADJACENT WETLAND AREA AND WATER COURSE FROM SEDIMENT LADEN SURFACE RUNOFF AND EROSION. CONSTRUCTION SCHEDULE THE ANTICIPATED STARTING DATE FOR CONSTRUCTION IS FALL 2024 WITH COMPLETION ANTICIPATED BY SPRING 2025. APPROPRIATE EROSION CONTROL MEASURES AS DESCRIBED HEREIN, SHALL BE INSTALLED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF ALL SITE CLEARING OR CONSTRUCTION ACTIVITY. SCHEDULE WORK TO MINIMIZE THE LENGTH OF TIME THAT BARE SOIL WILL BE EXPOSED. CONTINGENCY EROSION PLAN THE CONTRACTOR SHALL INSTALL ALL SPECIFIED EROSION CONTROL MEASURES AND WILL BE REQUIRED TO MAINTAIN THEM IN THEIR INTENDED FUNCTIONING CONDITION. THE LAND USE AGENTS OF THE TOWN OF SOUTH WINDSOR AND PROJECT ENGINEER SHALL HAVE THE AUTHORITY TO REQUIRE SUPPLEMENTAL MAINTENANCE OR ADDITIONAL MEASURES IF FIELD CONDITIONS ARE ENCOUNTERED BEYOND WHAT WOULD NORMALLY BE ANTICIPATED. OPERATION REQUIREMENTS CLEARING, GRUBBING & DEMOLITION OPERATIONS: 1. ALL SEDIMENTATION AND EROSION CONTROL MEASURES WILL BE INSTALLED PRIOR TO THE START OF CLEARING, GRUBBING AND DEMOLITION OPERATIONS. 2. FOLLOWING INSTALLATION OF ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THE CONTRACTOR SHALL NOT PROCEED WITH GRADING, FILLING, OR OTHER CONSTRUCTION OPERATIONS UNTIL THE ENGINEER OF RECORD HAS INSPECTED AND APPROVED ALL INSTALLATIONS. 3. THE CONTRACTOR SHALL TAKE EXTREME CARE DURING CLEARING, GRUBBING, AND DEMOLITION OPERATIONS SO AS NOT TO DISTURB SEDIMENTATION AND EROSION CONTROL DEVICES AS WELL AS EXISTING LANDSCAPED AREAS. 4.FOLLOWING THE COMPLETION OF CLEARING, GRUBBING, AND DEMOLITION OPERATIONS, ALL AREAS SHALL BE STABILIZED WITH TOPSOIL AND SEEDING, PROCESSED AGGREGATE STONE, OR DISPERSED HAY AS SOON AS PRACTICAL. ROUGH GRADING OPERATIONS: 1. DURING THE REMOVAL AND/OR PLACEMENT OF EARTH AS INDICATED ON THE GRADING PLAN, TOPSOIL SHALL BE STRIPPED AND APPROPRIATELY STOCKPILED FOR REUSE. 2. ALL STOCKPILED TOPSOIL SHALL BE SEEDED, MULCHED WITH HAY, AND ENCLOSED BY A SILTATION FENCE OR STRAW WATTLE BARRIER. FILLING OPERATIONS: 1. PRIOR TO FILLING, ALL SEDIMENTATION AND EROSION CONTROL DEVICES SHALL BE PROPERLY IMPLEMENTED, MAINTAINED AND FULLY INSTALLED, AS DIRECTED BY THE ENGINEER OF RECORD, MUNICIPAL LAND USE AGENT AND AS SHOWN ON THIS PLAN. 2. ALL FILL MATERIAL ADJACENT TO ANY WETLAND AREAS, IF APPLICABLE TO THIS PROJECT, SHALL BE GOOD QUALITY, WITH LESS THAN 5% FINES PASSING THROUGH A #200 SIEVE (BANK RUN), AND SHALL BE PLACED IN LIFT THICKNESS NOT GREATER THAN THAT SPECIFIED IN PROJECT SPECIFICATIONS. LIFTS SHALL BE COMPACTED TO 95% MAX. DRY DENSITY MODIFIED PROCTOR OR AS SPECIFIED IN THE CONTRACT SPECIFICATIONS OR IN THE GEOTECHNICAL REPORT. 3. AS GENERAL GRADING OPERATIONS PROGRESS, ANY TEMPORARY DIVERSION DITCHES SHALL BE RAISED OR LOWERED, AS NECESSARY, TO DIVERT SURFACE RUNOFF TO THE SEDIMENT TRAPS AND BASIN (IF APPLICABLE). PLACEMENT OF DRAINAGE STRUCTURES, UTILITIES, AND ROADWAY CONSTRUCTION OPERATIONS: 1. SILT FENCES AND STRAW WATTLE SHALL BE INSTALLED AT THE DOWNHILL SIDES OF TEMPORARY TRAPS, MUD PUMP DISCHARGES, AND UTILITY TRENCH MATERIAL STOCKPILES. HAY BALES MAY BE USED IF SHOWN ON THE EROSION CONTROL PLANS OR IF DIRECTED BY THE ENGINEER OF RECORD. FINAL GRADING AND PAVING OPERATIONS: 1. ALL INLET AND OUTLET PROTECTION SHALL BE PLACED AND MAINTAINED AS SHOWN ON EROSION CONTROL PLANS AND DETAILS, AND AS DESCRIBED IN SPECIFICATIONS AND AS DESCRIBED HEREIN. 2. NO CUT OR FILL SLOPES SHALL EXCEED 2:1 EXCEPT WHERE STABILIZED BY ROCK FACED EMBANKMENTS OR EROSION CONTROL BLANKETS, JUTE MESH AND VEGETATION. ALL SLOPES SHALL BE SEEDED, AND ANY ROAD OR DRIVEWAY SHOULDER AND BANKS SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF FINAL GRADING UNTIL TURF IS ESTABLISHED. 3. PAVEMENT SUB-BASE AND BASE COURSES SHALL BE INSTALLED OVER AREAS TO BE PAVED AS SOON AS FINAL SUB-GRADES ARE ESTABLISHED AND UNDERGROUND UTILITIES AND STORM DRAINAGE SYSTEMS HAVE BEEN INSTALLED. 4. AFTER CONSTRUCTION OF PAVEMENT, TOPSOIL, FINAL SEEDING, MULCH AND LANDSCAPING, REMOVE ALL TEMPORARY EROSION CONTROL DEVICES ONLY AFTER ALL AREAS HAVE BEEN PAVED AND/OR GRASS HAS BEEN WELL ESTABLISHED AND THE SITE HAS BEEN INSPECTED AND APPROVED BY THE ENGINEER OF RECORD. INSTALLATION OF SEDIMENTATION AND EROSION CONTROL MEASURES I. SILT SACK INLET PROTECTION: A. REMOVE CATCH BASIN GRATE AND PROPERLY PLACE THE SILT SACK INTO THE FRAME OF THE CATCH BASIN. B. PLACE GRATE BACK ONTO FRAME AND ENSURE NO PORTIONS OF THE SILT SACK HAVE SAGGED INTO THE CATCH BASIN. C. ONCE GRATE IS PLACED BACK ONTO FRAME OBSERVE TO SEE IF SILT SACK IS INSTALLED IN A MANNER THAT WILL ALLOW FOR SEDIMENT TO BE FILTERED OUT DURING STORM EVENTS. II. STRAW WATTLE: A. STRAW WATTLE BARRIERS TO BE PLACED IN ACCORDANCE WITH SHEET 2.31. ALL DAMAGED BARRIERS AND POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED AS NECESSARY. B. STRAW WATTLE BARRIERS TO BE SECURED BY EITHER SAND BAG (IMPERVIOUS AREAS) OR BY WOOD STAKE HAMMERED INTO GROUND (PERVIOUS AREAS). C. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE BARRIER WHEN THEY EXCEED 3-4 INCHES IN HEIGHT. III. CONSTRUCTION ENTRANCE: A. REMOVE ALL VEGETATION AND OTHER MATERIALS FROM THE FOUNDATION AREA. GRADE AND CROWN FOUNDATION FOR POSITIVE DRAINAGE. B. PLACE 1-3" STONE A MINIMUM OF 100 FEET ALONG THE FULL WIDTH OF THE CONSTRUCTION ACCESS ROAD. AGGREGATE SHOULD BE PLACED AT LEAST 6" THICK. C. GEOTEXTILE FILTER FABRIC SHALL BE PLACED BETWEEN STONE FILL AND EARTH SURFACE TO REDUCE THE MIGRATION OF SOIL PARTICLES FROM THE UNDERLYING SOIL INTO THE STONE AND VICE VERSA. D. ALL SURFACE WATER THAT IS FLOWING TO OR DIVERTED TOWARD THE CONSTRUCTION ENTRANCE SHALL BE PIPED BENEATH THE ENTRANCE. E. FILTER FABRIC FENCE SHALL BE INSTALLED DOWN GRADIENT FROM THE CONSTRUCTION ENTRANCE IN ORDER TO CONTAIN ANY SEDIMENT-LADEN RUNOFF FROM THE ENTRANCE. IV. SILTATION FENCE: A.DIG A SIX INCH TRENCH ON THE UPHILL SIDE OF THE DESIGNATED FENCE LINE LOCATION. B.POSITION THE POST AT THE BACK OF THE TRENCH (DOWNHILL SIDE), AND HAMMER THE POST AT LEAST 1.5 FEET INTO THE GROUND. C.LAY THE BOTTOM SIX INCHES OF THE FABRIC INTO THE TRENCH TO PREVENT UNDERMINING BY STORM WATER RUN-OFF. D. BACKFILL THE TRENCH AND COMPACT. OPERATION AND MAINTENANCE OF SEDIMENTATION AND EROSION CONTROL MEASURES I. SILT SACK INLET PROTECTION: A. ALL SILT SACK INLET PROTECTION DEVICES SHALL BE INSPECTED AT A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATE SILT SACKS AND SACKS THAT APPEAR TO HAVE AN EXCESS OF SEDIMENT SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM THE SILT SACKS WHEN THEY EXCEED A COUPLE INCHES OF SEDIMENT WITHIN THE CATCH BASIN. II. STRAW WATTLE: A. ALL STRAW WATTLE BARRIERSS SHALL BE INSPECTED AS A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATED FABRIC AND DAMAGED POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE BARRIERS WHEN THEY EXCEED A HEIGHT OF 4 INCHES. III. CONSTRUCTION ENTRANCE: A. THE CONSTRUCTION ENTRANCE AND FENCE SHALL BE INSPECTED AT A MINIMUM WEEKLY AND AFTER HEAVY RAINS OR HEAVY USE. B. REMOVE MUD AND HEAVY SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROAD IMMEDIATELY. C. THE GRAVEL PAD SHALL BE TOPDRESSED WITH NEW STONE WHEN MUD AND SOIL PARTICLES CLOG THE VOIDS IN THE GRAVEL. D. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. E. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. IV. SILTATION FENCE: A.ALL SILTATION FENCES SHALL BE INSPECTED AT A MINIMUM WEEKLY OR AFTER EACH RAINFALL. ALL DETERIORATED FABRIC AND DAMAGED POSTS SHALL BE REPLACED AND PROPERLY REPOSITIONED IN ACCORDANCE WITH THIS PLAN. B. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE FENCE WHEN THEY EXCEED A HEIGHT OF ONE FOOT. EROSION AND SEDIMENT CONTROL PLAN 1. HAY BALE FILTERS OR SILTATION FENCE WILL BE INSTALLED AT ALL CULVERT OUTLETS IF CULVERT OUTLETS ARE APPLICABLE TO THIS PROJECT AND ALONG THE TOE OF ALL CRITICAL CUT AND FILL SLOPES. 2. CULVERT DISCHARGE AREAS WILL BE PROTECTED WITH RIP RAP CHANNELS; ENERGY DISSIPATERS WILL BE INSTALLED AS SHOWN ON THESE PLANS AND AS NECESSARY. 3. CATCH BASINS WILL BE PROTECTED WITH HAY BALE FILTERS, SILT SACKS, SILTATION FENCE, OR OTHER INLET PROTECTION DEVICES PER DETAILS, THROUGHOUT THE CONSTRUCTION PERIOD AND UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED. 4. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL MANUAL, LATEST EDITION. 5. EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED PRIOR TO CONSTRUCTION WHENEVER POSSIBLE. 6. ALL CONTROL MEASURES WILL BE MAINTAINED IN EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. 7. ADDITIONAL CONTROL MEASURES WILL BE INSTALLED DURING THE CONSTRUCTION PERIOD, IF NECESSARY OR REQUIRED OR AS DIRECTED BY THE ENGINEER OF RECORD OF RECORD OR BY LOCAL GOVERNING OFFICIALS. 8. SEDIMENT REMOVED FROM EROSION CONTROL STRUCTURES WILL BE DISPOSED IN A MANNER WHICH IS CONSISTENT WITH THE INTENT AND REQUIREMENTS OF THE EROSION CONTROL PLANS, NOTES, AND DETAILS. 9. THE OWNER IS ASSIGNED THE RESPONSIBILITY FOR IMPLEMENTING THIS EROSION AND SEDIMENT CONTROL PLAN. THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVES OF THE PLAN. SOIL EROSION & SEDIMENT CONTROL NOTES 1" REBAR FOR BAG REMOVAL FROM INLET EXPANSION RESTRAINT 1/4" NYLON ROPE 2"x2"x3/4" RUBBER BLOCK SILT SACK NOTE: REGULAR FLOW = 40 GAL./MIN./SF HIGH FLOW = 200 GAL./MIN./SF SILT SACK DETAIL SCALE: NTS 2' 3' 4' NOTES: 1. ALL EXISTING EXCAVATED MATERIAL THAT IS NOT TO BE REUSED IN THE WORK IS TO BE IMMEDIATELY REMOVED FROM THE SITE AND PROPERLY DISPOSED OF. 2. SOIL/AGGREGATE STOCKPILE SITES TO BE WHERE SHOWN ON THE DRAWINGS OR WHERE APPROVED BY ENGINEER OF RECORD OF RECORD. 3. RESTORE STOCKPILE SITES TO PRE-EXISTING PROJECT CONDITION AND RESEED AS REQUIRED. 4. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. SOIL/AGGREGATE STOCKPILE OF EXISTING SITE MATERIAL TO BE REUSED AND/OR NEW MATERIAL TO BE INSTALLED IN THE WORK DIRECTION OF RUN-OFF FLOW (TYP.) MATERIALS STOCKPILE DETAIL SCALE: NTS STRAW WATTLE BARRIER TEMPORARY CONSTRUCTION FENCE DETAIL SCALE: NTS NOTES: 1.FENCING PANELS COMPLY WITH ASTM - A392-06 STANDARDS. 2.GALVANIZED STEEL, CORROSION-RESISTANT ZINC COATING. 3.36" BASE STANDS FOR STABILITY, NO DIGGING OR POST SETTING REQUIRED. SAND BAGS TO BE USED FOR ADDED STABILITY. 4.TYPICAL FENCE WIDTH: 12', TYPICAL FENCE HEIGHT: 4', 6' & 8'. 5.SCREENING MADE OF RESILIENT HDPE POLYEHTYLENE, WITH 88% BLOCKAGE. 6.REINFORCED SCREENING WITH HEMMED EDGES AND STEEL GROMMETS. 7.SCREEN HEIGHT: 5'-8" FOR 6' FENCE OR 7'-8" FOR 8' FENCE. 8.SCREEN COLORS: GREEN, TAN, BLUE OR RED. 12' (TYP.)4', 6', OR 8' (TYP.)TEMPORARY CHAIN LINK FENCE PANEL 36" FENCE BASE STAND (TYP.) STEEL FASTENERS (TYP.) NTS AWC DP 2.41 SOIL EROSION AND SEDIMENT CONTROL NOTES & DETAILS W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM WHEREVER SILT FENCE RUNS ACROSS OR PERPENDICULAR TO SURFACE CONTOURS, 10-FOOT LONG WINGS OF SILT FENCE PLACED PERPENDICULAR TO THE MAIN RUN OF SILT FENCE SHOULD BE PROVIDED AT APPROXIMATE INTERVALS OF 50-FEET. SILT FENCE PROTECTION DETAIL SCALE: NTS 3. BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. 2. ATTACH FILTER FABRIC TO THE POSTS AND EXTEND IT TO THE TRENCH. SILT FENCE 1. SET POSTS AND EXCAVATE A 6"x6" TRENCH, SET POST DOWNSLOPE. WOOD POSTS ANGLE 10° UPSLOPE FOR STABILITY AND SELF CLEANING COMPACTED BACKFILL BOTTOM OF DRAINAGE WAY ELEVATION POINTS "A" SHOULD BE HIGHER THAN POINT "B" PLAN VIEW 100° 12" MIN. DEPTH A B AFLOW W. HARTFORD, CT Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED SITE IMPROVEMENTS 50 TALBOT LANE SOUTH WINDSOR, CONNECTICUT APPLICANT: HOME MARKET FOODS, INC. / 140 MORGAN DRIVE, NORWOOD, MA 02062 / LHEFFERNAN@CMCDESIGNBUILD.COM / (781) 733-1941 Graphic Scale: Rev. #:Date Description KMS 24106501 10/16/24 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 MONROE, CT NORWOOD, MA SOLLIENGINEERING.COM DP AWC NTS 3.01CONSTRUCTION DETAILS PLASTIC SLEEVE OVER 6" SCHEDULE 40 POST - GROUT SOLID NOTE SECURE PLASTIC SLEEVE TO STEEL POST CONCRETE WASH PAVING, SEE PLAN AGGREGATE BASE4'-0"1"4'-0"3"1'-0" DIA. CONCRETE FOOTING CONCRETE BOLLARD DETAIL SCALE: NTS ELECTRICAL, TELEPHONE AND GAS TRENCH SCALE: NTS SPECIAL FOUNDATION, IF ORDERED BY ENGINEER 3/4" CRUSHED STONE TO BE INSTALLED TO DEPTH DETERMINED BY GEOTECHNICAL ENGINEER IN PEAT AND UNSUITABLE SOIL AREAS 7" SAND BED FROM MAIN TO METER PIT (GAS LINE ONLY) 1'-0" MIN IN ROCK. 12" SAND COVER OVER PIPE METAL STRIPS BURIED 12" ABOVE P.E. PIPE EVERY 5' & AT BENDS (GAS LINES ONLY) MARKING TAPE BURIED OVER ELECTRIC AND TELEPHONE CONDUITS TRENCH WIDTH: 1'-6" (GAS) 1'-0" ELECT., TELE. AND CATV. 3'-0" WHEN ELEC., CATV, & TEL. ARE GROUPED IN TRENCH BOTTOM OF CONDUIT TRENCH APPROVED COMPACTED % MAX DRY BACKFILL (95 DENSITY) COMPACTION PER ASTM D1557 IN 8" LIFTS 3'-6" (FOR GAS)3'-0" (FOR ELECT.)2'-0" (FOR TEL. & CATV)4" TOPSOIL IN EARTH IN PAVEMENT SEE DETAIL FOR PAVEMENT SECTION GRAVEL OR CRUSHED STONE BED RESTORE TO ORIGINAL CONDITION TOP SOIL (6"MIN) GENERAL BACKFILL THOROUGHLY COMPACTED TOP OF PIPE 4" 4" 4"-5" 12" 6" 4"4" IN ROCK IN EARTHHORIZONTAL LIMIT OF PAYMENT LINE IN ROCK 6" BELOW PIPE NO ROCK SHALL BE CLOSER THAN 4" FROM OUTSIDE OF PIPE SELECT MATERIAL THOROUGHLY COMPACTED VERTICAL LIMIT OF PAYMENT LINE IN ROCK SEE SECTION (T) ITEM 3.7 GRAVEL OR PROCESSES AGGREGATE PAVEMENT PER TOWN REQUIREMENTS IN PAVEMENT IN GRASS AREAS TYPICAL WATER TRENCH DETAIL SCALE: NTS DETAIL PROVIDED BY AQUARION WATER COMPANY PERMANENT PAVEMENT PATCHING DETAIL SCALE: NTS TYPICAL SANITARY SEWER TRENCH SECTION SCALE: NTS TYPICAL CLEANOUT SCALE: NTS DOWNSPOUT CONNECTION DETAIL SCALE: NTS NOTE: 1.INJECTION MOLDED FITTINGS ARE AVAILABLE IN TEES, WYES, REDUCERS, 45° BENDS AND BELL/BELL COUPLERS. 2.WATERTIGHT (WT) JOINTS SHOWN. SOIL-TIGHT (ST) FITTINGS ARE ALSO AVAILABLE. FINISHED GRADE NYLOPLAST CLEANOUT END CAP ADJUST GRADE PER ENGINEERS PLAN BUILDING FACE INSERT INJECTION MOLDED, GASKETED SPIGOT BY BELL REDUCER INJECTION MOLDED WT 45° WYE INJECTION MOLDED WITH 45° BEND GASKETED CONNECTION INJECTION MOLDED WT TEE INJECTION MOLDED WT 90° BEND HDPE PIPE (TYP) STORM / SEWER TRENCH SECTION DETAIL SCALE: NTS UNDISTURBED OR SUITABLE COMPACTED MATERIAL 3/4" CRUSHED STONE TO TOP OF PIPE (SEE NOTE BELOW) FINE GRAVEL OR COARSE SAND PLACED AND COMPACTED IN 6" LAYERS PROCESSED STONE OR GRAVEL AS ORDERED BY ENGINEER EXISTING PAVEMENT PAVEMENT REPAIR AS REQUIRED BY LOCAL AUTHORITY 4" LOAM, FERTILIZE & SEED WITH GRASS AND MULCH UNDISTURBED MATERIAL SUITABLE BACKFILL PLACED AND COMPACTED IN 6-INCH LOOSE LIFTS EXISTING GRASS AREA UTILITY IDENTIFICATION TAPE (NON DETECTABLE) FILTER FABRIC WRAPPED AROUND CRUSHED STONE BEDDING. (12" MIN. OVERLAP)24"O.D6" MIN. IN EARTH 12" MIN. IN ROCK PROPOSED STORM/SEWER PIPE 12"O.D.12" TRENCH WIDTH = MIN.MIN. 24" + NOMINAL PIPE DIAMTER (36" MINIMUM) NOTES: ·SUITABLE BACKFILL TO BE COMPACTED TO 95% MAX. DRY DENSITY IN LIFTS (6" TYPICAL) PER ASTM Δ1557/AASHTO T-99. ·SPECIAL FOUNDATION MAY BE REQUIRED AS DIRECTED BY CIVIL ENGINEER IN AREAS OF PEAT OR UNSUITABLES. ·TRENCH SUPPORT SYSTEMS TO BE USED PER OSHA STANDARDS. 1 11/05/24 REVISED PER PLANNER COMMENTS 8' HIGH CHAIN LINK FENCE W/ PRIVACY SLATS DETAIL SCALE: NTS 10'-0" O.C. (MAX.) 2.875" O.D. GALV. CORNER POST 1.66" O.D. GALV. BRACE RAIL (AT END POSTS AND GATE POSTS ONLY) 3 8" DIA. GALV. TRUSS ROD (AT END POSTS AND GATE POSTS ONLY) CONCRETE BASE (TYP.) 7-GAUGE GALV. BOTTOM TENSION WIRE (TYP.) 2" 12"36"9-GAUGE FABRIC 2" MESH WITH BLACK VINYL PRIVACY SLATS 2"8'-0" FABRIC HEIGHT2.875" O.D. GALV. PULL POST 1.66" O.D. GALV. TOP RAIL2.375" O.D. GALV. LINE POST Appl #24-40P, Home Market Foods Site Plan Modification 11-12-24 Planning Department Report 1. Request for site plan modification to construct a 4,722-sf wastewater building, on property, and associated equipment, located at 50 Talbot Lane, I zone. 2. The applicant’s narrative describes the specific scope of the work proposed. 3. The proposed facility is a blocked building with no roof, 28 feet high, and will be painted to match the existing building. 4. Additionally, the proposal includes two 25-foot-high storage tanks at the western side of the entrance and four oil tanks, 30 feet in height, on the westerly end of the building (four tanks already exist along up against the building). Other equipment (four 14-foot-high boilers) are proposed within a fenced/ screened area. 5. This area of the site was not originally approved for any site parking and the applicant intends to eliminate any spaces in the front. 6. There is existing mature landscaping that currently provides screening of the outdoor equipment. The applicant has provided some pictures from Talbot Lane ROW showing the area. 7. There are regulated wetlands on the property, however he works proposed is not near wetlands, so no permit was required. 8. The site is served by public water and sewer. Water Pollution Control Authority approval is required for the facility. If this application is approved, there are no other approval modifications requested. 5 30 25 50 290 310310310 319 310 310 310 310 274 310 310 310 310 310 310 310 310310 310 310 310 310 310 280 310 310 310 310 330 310 310 310 310 310 310 µ1 inch = 100 feet The information on this map is from a computer database accessed using a Geographic Information System (GIS). This is not a surveyproduct. The data provided on this map are provided for informationaland planning purposes only. The Town makes no claims or guaranteesabout the accuracy or currency of the contents of this map and expresslydisclaims liability for errors and omissions in its contents. Unauthorizedattempts to modify any information shown on this map or utilize thismap for other than its intended purposes are prohibited. Each user of thismap is responsible for determining its suitability for his or her intendeduse or purpose. In no event will the Town of South Windsor be liable forany damages, including loss of data, lost profits, business interruption,loss of business information or other pecuniary loss that might arise fromthe use of this map or the information it contains. Appl 24-40P, Home Market Foods PLANNING BEFARTMENT CERTIFIED MAIL #7022 2410 0000 6508 81 19 November 13.2024 Luke Heffemam P.E. CMC Design Build,Inc. 859 Willard Street Quincy,MA 02169 Dear Mr.Heffeman: Re:Appl.24—40P Home Market Foods.Inc.Site Plan Modification We are pleased to advise you that the Planning &Zoning Commission voted on November l2,2024 to approve with modifications the above referenced application. This approval is for a site plan modification to construct a 4,722 sf waste water building, on property located at 50 Talbot Lane.I zone.as shown on plans prepared by Solli Engineering.Project No.24106501 dated September 30,2024 and as revised November 3,2024.This approval is subject to the following modifications: ll Prior to commencement of any site work.a meeting must be held with Town Staff 2.No building permit will be issued until the final mylars have been filed in the Town Clerk’s office. 3.An as—built plan is required prior to issuance of a Certificate of Occupancy perSection9.l .3 ofthe Zoning Regulations. 4.All plans used in the field by the developer must bear the stamp and authorized signature ofthe Town of South Windsor. 5.This approval does not constitute approval of the sanitary sewer.which can only be granted by the Water Pollution Control Authority. 6.NO building permits will be issued until the Office 0f State Traffic Administration certificate has been issued (per CGS §l4-3l l). 7.The building street number must be included on the final plan.8.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 9.All free-standing signs and/or building signs require the issuance of a sign permitbeforetheyareerected. 10.The PZC recommends the Water Pollution Control Authority ensure odor control for the facility is adequate. Black and white transparent mylars of Sheet #2.]l with the above modifications.together with three print copies of the entire set of plans with live signatures and raised seals (including architectural elevations and landscaping plans).must be submitted t0 this Commission to be stamped and signed.The letters ofapproval ofthis Commission must be reproduced on the mylars. 1540 Sullivan Avenue,Suuth Windsur,CT 06074 i Tel (860)544-2511 Ext 2329 i Planning@SnuthWindsnr-Ci.guv After the mylars have been signed by the Commission.they will be returned to you for filing in the Office ofthe Town Clerk.After filing these plans,a copy ofthe receipt must be submitted to the Planning Department. Sincerely, arm/(Mme Stephen Wagner.Chairman Planning and Zoning Commission SW/js cc:Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal /