HomeMy WebLinkAbout2016-10-13 - 2075 John Fitch Boulevard - Septic Approved Design§Town of South Windsor —Health Department
1540 Sullivan Avenue,South Windsor,CT 06074-2786
Phone:860-644-2511 ext.250 Fax:860-644-7280
APPROVAL OF DESIGN FOR SEWAGE DISPOSAL SYSTEM
STREET ADDRESS:2075 John Fitch Bouievard TOWN:South Windsor
INSTALLER:TBD CT.LIC #EXPIRES:TBD
INSTRUCTIONS FOR INSTALLER
1.This office must be contacted for approval if any change is going to be made in the system location,size or
design,or any changes in buildings or property line locations.
2.Any NEW sewage disposal system must conform to ALL requirements of Section 19-13-BIO3 of the CT
Public Health Code.
4.ALL new construction to be under DIRECT supervision of a CT licensed installer under Section 20-341 of the
CT General Statutes.
5.The installer is RESPONSIBLE for VERIFYING LOCATIONS of PROPERTY LINES,WELLS,and BURIED
UTILITY LINES prior to construction.
Installer to notify South Windsor Health Dept.24 hours prior to the start of construction.
7.Installer to have septic tank covers removed at the time of inspection.
SPECIFIC INSTRUCTIONS:
Install per approved plan,(Design Professionals,dated 10/3/16).
2.Licensed Engineer to field stake buildings,well (it applicable),permanent benchmark,and septic system.Offset
stakes to include bottom of trench or flow line elevations.
3.A bottom of excavation inspection is required.Original topsoil must be removed and replaced with suitable select
till material.Select fill to be perced once in place.
Current Sieve analysis (within 30 days)tor select fill must be submitted to the South Windsor Health Department.
Permanent benchmark to be set within 50 feet horizontally and 12 feet vertically of septic system.
Installer to schedule,and be present for final inspection with Health Dept.staff.Level to be set up for verification of
elevations OR an engineer's/surveyor's as built will be required.
7.Installer to complete and submit septic system as built plan and drawing with ties to the house.
SIGNATURE:M 'DATE ISSUED:10/1 3/16
APPROVED BY:Heather Oatis,REHS EXPIRES:10/13/1 7
Q
l._
(sentrltn
Town of South Windsor —Health Department
1540 Sullivan Avenue,South Windsor,CT 06074
Phone:860-644-2511 ext.250 Fax:860-644-7280
May 2011
B100a APPLICATION
(for building conversion,change 0f use,building addition,accessory structure and lot line change)
Standard application review time is 5-10 days,if soil testing is needed,additional time will be required to complete the review process.
2063 John Fitch Blvd.
Street Address of Proposed Activity/Structure
Paul R.&Judith M.Tellier /2063 John Fitch Blvd /860-528—2450
Owner Name Mailing Address Telephone
Tellier Properties,LLC /2063 John Fitch Blvd /860-289-3942
Applicant Name (if different than owner)Mailing Address Telephone
Describe the proposed structure or activity with dimensions:
Lot size modification:Present lot area:2.07 Acres Proposed lot area:0.53 Acres
Residential yes Number of existing bedrooms 3
Non-residential NO Please describe
Property served by on-site well?Y ®If N0,List name of water company CT water
Property served by septic system?®N Age of system 48 YEARS Date last pumped 1 0/201 2
Plot plan ~attach a scaled drawing showing property lines and dimensions,location and size of existing and proposed
structures,and site features such as driveways,wells and septic systems,drains and water courses.
Building plan —attach a sketch/floor plan of the proposed structure,addition or renovation showing existing and
proposed rooms with door and window locations.
Soil test data (deep test pits and percolation test)are required for the review of this application.
If the data is NOT available,you will need to schedule an appointment with the health department for soil testing.
As property owner 0r duly authorized representative of the property owner of the above referenced property,I agree to allow the
health department staff to enter the above referenced property as part of this B100a application review process.I further agree that
this authorization to enter the subject property may extend through a period of time ending with the final B100a application
approval and affirm such with my}signature below.
Applicant Signature:Date:[ll 3/1 0/7/
FOR OFFICE USE ONLY‘
Approved:N By:M ‘\IUA 36 G“
Date:)6 \t’g liloV(Av
&<Glam “l“M St AlamitkatComments/Conditions:5 M ‘h C W (m i 3v
/\\\\\r \A‘a/+—
Town of South Windsor —Health Department
1540 Sullivan Avenue,South Windsor,CT 06074
Phone:860-644-2511 ext.250 Fax:860-644-7280
May 2011
B100a APPLICATION
(for building conversion,change of use,building addition,accessory structure and lot line change)
Standard application review time is 5-10 days,if soil testing is needed,additional time will be required to complete the review process.
2045 John Fitch Blvd.
Street Address of Proposed Activity/Structure
Paul R.&Judith M.Tellier /2063 John Fitch Blvd /860-528-2450
Owner Name Mailing Address Telephone
Tellier Properties,LLC /2063 John Fitch Blvd /860-289—3942
Applicant Name (if different than owner)Mailing Address Telephone
Describe the proposed structure or activity with dimensions:
Lot size modification:Present lot area:2.79 Acres Proposed lot area:0.61 Acres
Residential yes Number of existing bedrooms 3
Non-residential No Please describe
Property served by on-site well?Y ®If No,List name 0f water company CT water
Property served by septic system?®N Age of system 26 YEARS Date last pumped 1 0/201 1
Plot plan —attach a scaled drawing showing property lines and dimensions,location and size of existing and proposed
structures,and site features such as driveways,wells and septic systems,drains and water courses.
Building plan —attach a sketch/floor plan of the proposed structure,addition or renovation showing existing and
proposed rooms with door and window locations.
Soil test data (deep test pits and percolation test)are required for the review of this application.
If the data is NOT available,you will need to schedule an appointment with the health department for soil testing.
As property owner or duly authorized representative of the property owner of the above referenced property,I agree to allow the
health department staff to enter the above referenced property as part of this B 100a application review process.I further agree that
this authorization to enter the subject property may extend through a period of time ending with the final B100a application
approval and affirm such w1th my Signature below
Applicant Signature %/A&EMT Date:/O/3//6//
FOR OFFICE USE ONLY:
Approved:Y N By:VXA/l 0m i Date:iO \IDM‘Gu
Comments/Conditions:
P.O.BOX 1 167
21 JEFFREY DRIVE
SOUTH WINDSOR,CT 06074
PHONE:860.291 .8755
FAX:860.291 .8757
www.designprofessionalsinc.com
CIVIL &TRAFFIC ENGINEERS /PLANNERS /SURVEYORS /GIS ANALYSTS /LANDSCAPE ARCHITECTS
Eervmg Connect/cut,Ma55achusett5,$Khode /5/and
LETTER OF TRANSMITTAL
To:Heather Oatis Date:10/3/2016 DPI Project No.3300
Town of South Windsor Re:South Windsor Star Center
2075 John Fitch Boulevard
WE ARE SENDING YOU:Attached D Underseparate covervia the following items:
D Shop Drawings E Prints D Renderings D Specifications
D Copy of Letter D Change Order U
These are transmitted as checked below:
E ForApprovaI D No exceptionstaken U Resubmit copies for approval
U Foryouruse D Make corrections U Submit copies for distribution
D As requested D Revise and Submit D Return corrected prints
E For review and comment D Forbids due D Prints returned after loan to us
REMARKS:
SIGNED:CC:
Daniel H.Jameson,€fT.
COPIES DATE No.DescRIPTION ,
1 10/3/16 1 B1003 Apps for 2045 &2063 John Fitch Blvd (Lot Line Mod)
1 10/3/16 2 Site Plan Sheets:CS-1,CU-1,LS-1,C-D4,&V-1&2
P.O.BOX 1 167
21 JEFFREY DRIVE
I SOUTH WINDSOR,CT 06074eslgnPHONE:860.291 .8755rofessionalswww.designprofessiona|sinc.com
FAX:860.291 .8757
CIVIL &TRAFFIC ENGINEERS /PLANNERS /SURVEYORS /GIS ANALYSTS /LANDSCAPE ARCHITECTS
5erwng Connect/cut,Masaachu5ett5,t Rhoda /5/and
k
October 3,2016
Heather Oatis
Environmental Health Officer
Town of South Windsor
1540 Sullivan Ave
South Windsor,Connecticut 06074
Re:B100a Applications South Windsor Star Center
DPI Poject No.3300
Design Professional Inc.(DPI)are in receipt of your emailed comments dated 9/12/2016 &
9/19/2016.DPI offers the following,as well as the attached revised site plans (revised to October
3th,2016),in response to those comments.For ease of your continued review,we have reiterated
comments in italics followed by responses noted in bold:
Star Center:
1.What is the center-to-center spacingfar the primary and reserve systems?
i.The center to center spacing between the primary and reserve systems is 12’.
2.Last I knew there was a proposedfood service area in the establishment.Please conhrm
this has been eliminated.
i.The food service area (smoothie bar)is no longer proposed.The septic design
is limited to the following uses:
a)Sports Theater Complex for 214 peopleb)1980.3 SQFT of Retail Space
c)3894 SQFT of Office Space (19.47 Employees)
See sheet CD-4 for the septic system design criteria.
Parcel 2:
1.The current septic system does not meet the separation distancefor the new lot line.It
must be at least I Ofeet awayfrom the property line.
i.A note was added to the utility plan instructing the contractor to abandon the
existing system and build the code complying area.See sheet CU—l.
Parcel 3:
1.The reserve area is indicated within the area ofthe current system.Pleasefind a stand
alone area on the property that can accommodate the reserve area.
i.The proposed code complying area was moved out from the existing system
location.See sheet CU-l.
G:\jobs\3300\Docs\Correspondence\Sent\3300 —Response to Health Depart.comments 201 6—10—3.d0cx
OOOOOOOOCCO0OOO0OOOOOU...OOOOCCO0000.0..0OOOOOCOOOOOOOOOCIICO.DIO.IDCOOOO.ICC.II.D.CQCIOOOOOO.OO.OOOOOOOOOOO
Encroachment Permit Application
Arcadia Crossing
August 8,2016
[just talked with Sean at DPH abOut this praject.In orderfor the new [at (parcel 2)t0 be created,
there are n0 exceptionsfar separation distances.The current system can be abandoned and the
repair can be installed t0 accammodate the new lot line.
i.The proposed code complying area was moved away from the existing system
location.See sheet CU-l.
Also for Parcel 2,please be sure that the existing yard drain in the south west corner 0fthe
properly is at least 25feetfrom any parts 0fthe septic system.
i.The required 25’separation distance from the proposed septic system to the
existing yard drain at the south west corner of parcel 2 has been depicted 0n
the plan.See sheet CU-l.
Please add a note that the sanitary manhole line will be plugged at Parcel 1.
i.The callout to the proposed sanitary manhole up gradient from the proposed
septic tank instructs the contractor to plug the east 6”service for future sewer
connection.See sheet CU-l.
If you have any further comments or questions feel free to contact us.
Regards,/
\gmW
%Z%’%(//[é}/1Z¢/'DESIGN PROFESSIONALS,INC.
:/James Bernardino,PE
Director of Engineering
C:\jobs\3300\Docs\Correspondence\$ent\3300 —Response to Health Depart.comments 2016—10—3.d0cx
330 O
September 14,2015
To Whom It May Concern:
l hereby authorize Peter R.DeMaHie of Design Professionals,Inc.to sign any Iand use commission
applications with respect to my properties at 2045 &2063 John Fitch Boulevard in South Windsor,
Connecticut.
Sincerely,
Paui R.Teliier
Tellier Properties,LLC
@%g