HomeMy WebLinkAbout20-17P TRAFFIC IMPACT STATEMENT_1-30-20 360 BurnhamTRAFFIC IMPACT STATEMENT FOR THE PROPOSED DEVELOPMENT OF
360 BURNHAM STREET
SOUTH WINDSOR, CT
The proposed development of the subject property will be the construc on of 13 small business rental
units in 3 separate buildings, with a total gross floor area of 13,400 square feet; construc on of paved
driveways and parking areas; construc on of on-site storm water management facili es, including
storm water reten on/infiltra on basins with a discharge either to wetlands on the project site or to a
catch basin located on the north side of Burnham Street; installa on of on-site sanitary sewer, potable
water supply, natural gas, electric and telecommunica ons facili es, which will be constructed from
connec ons to the respec ve exis ng main line u lity infrastructure in Burnham Street or its right of
way; other miscellaneous associated incidental construc on; and land regrading and restora on,
including earth cuts and fills and finished landscaping. A new curb cut from Burnham Street will be
created for the construc on of a proposed 24 foot wide two-way driveway entrance/exit for the subject
property. The curb-to-curb pavement width of Burnham Street is 29 feet where the new curb cut is
proposed. Sight lines from the proposed driveway loca on are sa sfactory. The proposed driveway cut
for the subject project site will be located about 0.5 miles east of the western terminus of Burnham
Street, from its intersec on with U.S./CT Route 5.
Burnham Street and its right of way in the vicinity of the proposed project site is located en rely within
the Town of East Har ord. The East Har ord – South Windsor town line is coincident with the
northerly street line of Burnham Street. Burnham Street in this area is mostly developed with a
mixture of commercial, industrial and medium-density residen al use.
It is an cipated that the primary market for the proposed rental units will be for the small business
building and maintenance trades and skilled cra spersons, such as electricians, plumbers, carpenters,
home improvement contractors, roofers, painters, woodworkers, handymen/women, graphic ar sts,
event stagers, and the like, who may use the units as a base of opera ons for an office, storage of
materials and supplies used in their trade or business, assembly and fabrica on of parts, materials and
products used or produced in their business, and parking of motor vehicles and u lity trailers used in
the trade or business in which they are engaged. Eleven of the proposed units will be located within
one building and will each have a gross floor area of 1000 square feet. Each unit will have a personnel
door, an overhead door, and two external and one internal parking spaces. The construc on of this
proposed building containing the eleven rental units will be modular, so that each unit could be rented
individually for the smallest business opera on, or two or more con guous units could be rented by
one en ty for a larger business opera on. Whatever, the arrangement, the unit(s) rented by any
par cular tenant would be separated from adjacent tenants by walls constructed within the interior of
the buildings. In addi on, there will be two separate free standing buildings of 1200 square feet gross
floor area each on the site, with each comprising one rental unit, and having the same door and
parking space arrangement as the proposed 1000 square foot units.
The subject project site will have easy access and egress to/from major roads and highways located
within a short distance of the site, including I-291 east and west; U.S. /CT Route 5 north and south, and
CT Route 30 east. It is logical to presume that most traffic will u lize one or more of these major
routes for access and egress to/from Burnham Street and the subject project site. In addi on, the
noted routes in turn directly connect to other major expressways and/or arterial routes in South
Windsor, East Har ord, and vicinity, providing ul mate direct travel in all direc ons to and from the
subject project site.
The traffic impact of the proposed development will depend on how the proposed rental units will be
used and occupied once the site is fully developed. For instance, if each constructed unit is ul mately
rented separately, which may not be the case, one could presume that the traffic generated from the
site might be more than if the par cular tenants were to rent two or more adjacent mul ple units.
Even though the proposed use of the subject property does not fit the exact descrip on of any one
par cular category of published ITE traffic genera on rates, employing the “Light Industrial” (Use 110)
and “Industrial Park” (Use 130) classifica ons as the most similar, and using an average daily traffic
genera on rate of 7 trips per 1000 square feet of gross floor area, or 3.6 trips per employee, together
with the proposed total gross floor area proposed for the project and a presump on of all units being
rented separately, with an average of 3.5 employees per unit, 91-146 daily vehicle trips may be
expected. While the average daily traffic genera on was derived from the foregoing, the peak AM and
PM hours are more specula ve. Based on the selected use categories, the peak AM hour would be
about 10-16 trips, while the peak PM hour would be about 11-18 trips. However, in a typical industrial
use and employment scenario, employees would generally come to work during the usual peak
morning hours and leave work for the day during the PM peak hours, with occasional come-and-go
trips and deliveries to or shipping from the par cular business during other hours. However, with the
poten al use and occupancy of the proposed rental units, it is probably unlikely that each one would
be con nuously occupied and used during the en rety of a usual working day, like an industrial or
manufacturing facility or office, or even maintain regular on-site hours, therefore reducing the daily
traffic genera on to and from the subject site. With the nature of the proposed businesses likely to
rent the proposed units, it is presumed that the primary mes when the units might be used is early
mornings and late a ernoons, which might not coincide with peak traffic hours for more conven onal
employment centers, and with less come-and-go traffic during the day me. Also, there would likely be
certain par cular units which might be used irregularly, and/or not on a daily basis, so that the total
amount of traffic genera on from the developed site could be at a lower rate.
Another factor to be recognized in considering the traffic impact of the proposed use of the subject
property is that this property will be but one of many already commercial and/or industrial developed
proper es within this general vicinity of South Windsor and East Har ord, which historically may have
ranged in use, occupancy and traffic genera on rates from me to me, as ownership and/or leasing of
the proper es and employee counts changed, and that total traffic counts along Burnham Street may
have varied as a result.
Therefore, based on the foregoing discussion, it is my professional opinion that the development of the
subject property as now proposed, the an cipated use and occupancy of this property, and the
addi onal traffic movements which will be generated as a result of the proposed development, are
an cipated to have minor impact on traffic use, volume and pa erns on the local and State roads in the
vicinity which will be used as access to and egress from the subject project site.
___________________________________
Raymond F. Nelson, Jr., P.E.
Civil Engineer