Loading...
HomeMy WebLinkAbout20-49P ValvolineAHqH QWBk/m yjg $u[[lu4~#Vf TYPEOFPROJECT:WIVQ/H'YC @‘A3 NAME: LOCATION: ARCHITECFURAL AND DESIGN REVIEW COMMI'I—I'EE CHECKLIST The following items must be submitted,in accordance with Section 9.1 of the Zoning Regulations at the time of a site plan application for an industrial or commercial building,or high density housing. 1.Site plan of the property (per Section 8 of the Zoning Regulations) 2.Architectural elevations of the proposed buildings 3.Types,styles and colors of building materials,exterior facades and facing,and fenestrations (samples suggested) Special architectural features (if applicable) Colors,materials,and location of lighting Design of signs Mechanical hardware proposed on or around the building and roof,including trash compactor,and auxiliary storage areas 8.Landscape plan indicating location,types,sizes,and quantities of proposed plantmaterials 9.Lighting Plans (per Section 17.22.1.A.1-4 Submission requirements) All of the above reqwred information/materials have been prOVIded _/I 7 /K /la Signature Date' Please be aware that missing information or incomplete information may result in a delay in action by the Committee on this application. Revised December 20,2000 PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE:9-9-20 TO:Michael Maniscalco,Walter Summers,Jeff Doolittle,Ray Favreau Chris Dougan,Heather Oatis,Kevin Cooney,Tony Manfre, John Caldwell,Andrea Confrancesco,Chris Duchesne,Vincent Stetson FROM:Michele Lipe,AICP,Director of Flaming The Planning &Engineering Departments have received plans for the following projects: Appl 20-49P,Valvoline Site Plan Modification Location:818 Sullivan Ave %Site Plan D Subdivision No.Acres 4.4 Zone GC D Industrial @ Commercial D Residential No.Lots/Units E new street(s)E new detention area D new open space/recreation area D active Dpassive Planning Department notes: The existing house 0n the easterly end 0f the property will be removed Please comment by 9/25/20 and return to the Flaming Department. Water:g Public D Private Well Sewerage:%Public E Septic System Project Description:3,837 sf new oil change facility Future Town—owned property involved?D Yes &No k\ September 18,2020 Michele M.Lipe,AICP Town of South Windsor 1540 Sullivan Avenue South Windsor,Connecticut 06074 Dear Michele, Enclosed please find six drawings of the revised site plan,including the small additiononthecarwash;could you please give three copies to the wetlands commission fortheirfiles. If you have any questions please feel free to contact me. Respectfully submitted, e si Building &Engineering Company,Inc. Chairman ENGINEERS'DESIGNERS'CONTRACTORS 21 55 East Main Street Torrington,CT 06790 860-482-7513 FAX 860-482-5082 y & mEn-ineerin -Co. 1540 SULLIVAN AVENUE O SOUTH WINDSOR,CT 06074 TELEPHONE (860)644—2511 October 15,2020 Borghesi Building 815 Engin€ering Company,Inc. Allan Borghesi 2155 East Main Street Torrington,CT 06790 Dear Mr.Borghesi: RE:Appl.20—49P,Valvoline Instant Oil Change ~request for site plan modification to construct a 3,837 sf oil change facility,on property located at 818 Sullivan Avenue,GC zone Please be advised the above referenced matter has been scheduled on the Planning 8r,Zoning Commission Regular Meeting agenda for Tuesday,October 27,2020.The Regular Meeting Will follow a Public Hearing that begins at 7:00 p.In. This meeting will be held online via a WebeX Conference call.Someone must call in to represent the application.Call in information will be available when the agenda for this meeting is posted and will be sent to you. One sign advertising the meeting must be posted on the property for ten (10)consecutive days prior to the hearing and must be clearly visible from a town street. The sign must be posted on Sullivan Street by Friday,October l6,2020. Signs can be picked up at the main entrance of the Town Hall,1540 Sullivan Avenue,in the large grey plastic drop off bin next to the main entrance doors.Please call (860)644—2511 Ext 329 if you have any questions,Monday -Friday,8:00 a.m.- 4:30 p.m. Sincerely,(SQPavgt Lauren Zarambo Planning Department Secretary MEMORANDUM To:Michele Lipe,Director of Plannning From:Jeff Doolittle,P‘E.,Town Engineer LA?) V Date:October 20,2020 Re:App 20—49P —Valvoline SP,818 Sullivan Ave i have reviewed the above Site Plan Modification and have the following comments 1.There needs to be a demolition/construction plan to show which existing features are proposed to be removed including the house,pavement,and any trees,and how the construction area will be separated and secured from the existing car wash on the west part of the site that i presume will remain in operation during construction.Any trees to remain on site must be protected from damage during construction. 2.The existing driveway to the house from Sullivan Avenue needs to be labeled to be closed)curbed and pavement removed and the area restored with topsoil and grass seed/landscaping. 3.Show the existing sanitary sewer lateral and water service for the car wash building to insure there are not conflicts with these utilities. 4.The new sanitary sewer lateral and water service are shown close to existing and proposed trees and landscaping.These should be separated from any landscaping that is to remain or be planted.5.The southern corner of the proposed parking area (el 87.0)should be lowered a little to insure water drains away from the building. 6.Label the size of the pipe from CB1 to the detention basin.This pipe should have a flared end in the detention basin to spread out the flow. 7.The outlet pipe is shown as 4"diameter which is too small to be maintained.lt will clog and be difficult to keep clear.This pipe needs to be at least 12" diameter with a 4"orifice inlet.The outlet pipe needs to be in a structure or surrounded by stone or a grate to keep it clear of vegetation,soil,weeds and debris. 8.All parking spaces around the car wash need to be striped 9 Show an outlet for any foundation drain needed around the new burldlng 1O Are any floor drains connected to the sanitary sewer lateral?lf so an Oil/water separatorWIll be required 11 .WPCA review and approval is needed for this application Please let me know if there are any questions. and flowing to MDC—East Hartford.The plans shouid show the MDC approval to connect.We will also need written clarification on who is cotlecting the connection fees. Rega rds, Tony From:Lipe,Michele <Michele.Lipe@southwindsor—ct.gov> Sent:Thursday,December 17,2020 2:56 PM To:Manfre,Anthony <Anthony.Manfre@southwindsor—ct.gov> Subject:360 Burnham St Can you please review the email below and advise? Thanks Michele From:Dave Simler <dave@messiersurvey.com> Sent:Thursday,December 17,2020 2:55 PM To:Lipe,Michele <Michele.Lipe@southwindsor—ct.gov> Subject:Re:My project I talked to Tony after talking t0 the guy that runs our WPCA at Glastonbury and he said I should not need town approval and to talk to the south Windsor WPCA Tony and explain that the system is not in south Windsor ,so I called Tony and explained that to him.Should I call him again and get some kind of letter? On Thu,Dec l7,2020 at 2:50 PM Lipe,Michele <Michele.Lipe@southwindsor—ct.gov>wrote: Dave, Attached is my planning report (read at the PZC meeting and in the minutes)which reflected the comments that l had received from Tony Manfre prior to the meeting. Also,approval condition #8 indicated it was required.lam not sure who told you it was not needed. Lipe,Michele From:Manfre,Anthony Sent:Thursday,December 17,2020 3:27 PM To:Lipe,Michele;'Dave Simler' Subject:RE:360 Burnham St Michele and Dave, l need to apoiogize for the confusion.After reviewing the property,the laterat will be discharging to a MDC sewer pipe Micheie From:Dave Simler <dave@messiersurve_1.com> Sent:Thursday,December 17,2020 2:45 PM To:Lipe,Michele <Michele.Lipe@southwindsor-ct.gov> Subject:Re:My project Michele,Iasked that months ago about the WPCA and the system is not in South Windsor,it is in East Hartford and that I don’t need. On Thu,Dec 17,2020 at 2:40 PM Lipe,Michele <Micheie.Lipe@soutlrwi11dsor-ct.gov>wrote: Hi Dave, Looking through the plans,i do not see a page with the approvai ietters have been reproduced.They have to be on one of the mylars that gets created (or a separate myiar).Aiso,jeff Dooiittle was asking if any additionai drainage information had been provided reiated to the subsurface infiEtration systems and verification of the capacity of the stormwater basins. Also,South Windsor WPCA approva!is needed.Typicaiiy,the final plans incorporate any of their requirements as well as their approval letter:On the mylar.in speaking with Tony Manfre,Supt in Pollution Control,he indicated that MDC approval wouid be needed first,then SW WPCA.Please feel free to contact him at (860)644—2511,ext 247 with any questions about the process. Please let me know if you have any questions. Thanks, Michele Michele M.Lipe,AICP Director ofPlanning U%wv:/_r-L‘iM r‘l TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE &SUBDIVISION x/pa—gzg~%%o CHANGE ORDER coNTAc-r PERsoN 4 W‘3 »—a }”1 Phone No.56.”[/5 Z 7%UGENERAL: Address 'L I C5“!F /%4//u NWM¥>N (if 557% Site Namej’U’L Aé/rw '“Wv w‘l -$’\I x/Ij P&z No.2L ’LH I")/:7{4‘7?F.‘jQj Owner E2y1".(IIII~Phone Nona;ELI/V40; Contractor lg w }\kk M (A }”I\«<LA 17w Signature of Owner // 3 Date:"'//K /‘2./ Signature of Des;gn Engr.:da/zir/z’t/I)‘y1-4-.‘//2,)/Date:‘//§/17/ CHANGE:(Describe location and nature of change.Include Four(4)copies of plan/proflle of Change )/A1L A /)u[\L‘W:ill)LIA“f7 +¢w /\!173+ 31,-‘1 €”4"+f/7L /3UI[l/N\JTH: 2"'S11F+‘7 I K57 yyg Swwww #vww¢ Reason \l4‘k# fer Change .(Why Ls change T requlred?fh k f3)Lg,i;/)/./< Dlr of Publlc Won/J:Date: Other:Date: STAFF COMMENTS' (A éh y s /«In Arc~oL kwe lap xhuwM}/,\Jg/‘L’d w (v NA ,LvL'Lm;M gin/(PA;mé’;MCLL'tLKr/ White —Town Engineer Yellow -ApplicantPink-Director of Planning Goldeno :~,Engineering Departmentrda> \ 7:?in;‘wn W:44m.I [Elk 1 it RewirwlEr APPROVALS'(As Required) Dlr Of Planning mix/n1 ’ Town Engineer M4 LJK1 w Date:Why/9" q/t STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION DISTRICT I 1107 Cromwell Avenue Rocky Hi1},Connecticut 06067 Phone: April 8,2021 Mr.Michael Sowell Jr. Project Manager 2155 East Main Street Torrington,CT 06790 Dear Mr.Sowell: Subject:Valvoline Instant Oil Change 822 Sullivan Avenue (Route 194)Town 0f South Windsor The Department of Transportation (Department)has reviewed your latest plans for the abovenotedsubjectreceived03/19/2021,entitled "VALVOLINE INSTANT OIL CHANGE 822 SULLIVANAVENUESOUTHWINDSORCT"Your submittal/application to work within the State Right of Way orperformworkthatmayaffectStatepropeityisdeniedbasedonthefollowingcomments. 1i Per the Department‘s encroaclunent permit requirements and due to the request for private stormwaterconnectiontotheState's drainage system,please provide a capacity analysis includingcomputationsforstormsewer,hydraulic grade line (water surface profile)and outiet protectionasappropriatefortheStatefacilities,to its terminus or to a distinct hydraulic conh‘ol to verify ifsadequacy.This analysis must consider the relative times—to-peak of the site and State maintaineddrainagesystemsandisrequiredevenifareductioninpeakflowsfromthesiteitselfisanticipated. 2,The site is currently connected to the State's system (a DCC is on frle with the Department in ourpermanentrecords)via a 12"I-LDPE pipe connected to a flat top catch basin in the driveway apronarea.This structure has three pipes currently connected to it with a pipe entering the back wallConnectionproposedonthesamebackwallisnotpermitted.Please revise plans and calculationstomovethenewconnectiontothecatchbasinjusteastoftheexistingdrivewaylocatedonthenorthgutterofRte,194 west of SNET Pole #5218. 3i The current design standards require pipes that enter into the State‘s right ofway to be made ofconcrete.Please revise plans to show drainage pipe material entering the State's right of way to bereinforcedconcrete.Should the connection be approved,the property owner will be required to ' enter into a Drainage Connection Concurrence (DCC)and a Hold Harmless (HH)AgreementwiththeState 4. peak The submittal hour oil change did not traffic include volumes, any supporting combined traffic traffic data volumes Please generated provide the by following the current estimated and proposed land uses,oil change site traffic distributions and combined site traffic distributions. Au Equal Oppm'nuiiry Employerpumaanrecycledmrgcmrzvedpaper Show the vehicle trips expected to be generated on a flow diagram during a typical weekdaymorningandeveningpeakhourandSaturdaymid-day peak hour, Based on the submitted volumes,a Route 194 eastbound bypass area warrant needs to beinvestigatedbasedonthefullbuildtrafficvolumes.If warranted,a bypass area needs to bedesignedinaccordancewiththeDepartment’s Highway Design Manual (2003 edition),SectionI1-5r04. Regarding the proposed driveway to the instant oil change,it appears that the operation of thedrivewayfortheoilchangebuildinghascarsenteringandexitingfromtheleftsidesofthedrivewayopening.This type of operation is opposite of driver expectations for right sideddriving.It is also unclear how traffic will flow in and out of the driveway since there are no proposed signing or pavement markings for the driveway. The lack of proper directional flow or traffic control for the proposed driveway in proximity to the site driveway at Route 194 and the ingress to the car wash area is of concern.lfan incidentweretooccurattheproposeddrivewaytotheinstantoilchange,traffic backups could affect theStatehighway. Consider separating the driveways by having an ln—only drive to the north of the proposeddrivewayleadingtothebackoftheinstantoilchangebuildingandanExit»only drive at thecurrentlyproposeddrivewayrShowappropriateOne~way,Do Not Enter and Stop signs alongwithpavementmarkingarrowsforthedriveways. The site drive radii need to be labeled and be able to accommodate the largest size vehicleanticipated.A turning template diagram is also required to show that an appropriate size truck canenterandexitthesitedrivewaywithoutcenterlineorcurblineencroachment.In order for theDepartmenttoevaluatethedrivewayradii,the Route 194 pavement markings must be shown ontheplans. 10.The proposed concrete sidewalk needs to be shown in a straight path and placed a sufficient distance back from the edge of road to provide a buffer area between the outside edge of sidewalkandedgeofroad(8 ft.to 10ft).The buffer area provides separation between vehicles and pedestrians,an area for snow storage,signs and future underground conduits or utilities. ll.The sidewalk teiminus at the west edge of the property line ends near the drop offto the PodunkRiver.Show a chain link fence or barrier placed at the sidewalk terminus to prevent pedestriansfrominadvertentlyaccessingthearea. 12.The proposed sidewalk ramp types need to be called out using the Department’s nomenclaturenotedonourguidesheets.The tactile warning strips on the ramps also need to be shown in linewiththecrosswalktodirectpedestriansstraightacrossthedrivewayandnotintotheRoute194 shoulder.Include all applicable sidewalk ramp guide sheets in the plan set. Install a 12"stop bar a minimum distance of4'north ofthe crosswalk and 25 feet of double yellow centerline in the driveway.Also,install a stop Sign identified with the DOT's catalognumber(3 1—0552 —30")to ensure the correct size and retro reflectivity is used.Please add a notetotheplanindicatingthatallsignspostedintheStateROWmustcomplywithDOTstandardsforheight,breakaway components,retro reflectivity,etc. l3. 14.Remove the existing non»c0mpliant Stop Sign in the State highway right of way. 15.In the general notes include All construction materials and methods shall confum t0 theDepartment’s Specification Form 818 When you resubmit,please provide two sets of P.E.stamped plans,40 scale or larger,and a writtenresponsereflectingtheabovecomments. Please note that any resubmission may generate additional comments and concerns and in no way guarantees the issuance of an encroachment permit.An encroachment permit must be obtained prior to performing any work Within or affecting the highway right of way. If you have any questions concerning this matter,please contact Rick Pelletier at 860—258—4521. ,Very tr y yours Daniel A.Di einzo Special Services Section Manager Bureau of Highway Operation Richard Pelletier/rs cc:South Windsor Planning and Zoning Four (4)copies of plan/profile of Change.) Remove the additi n at the rear inside corner from sco e o work.A addifinn at thp far rear nf the car wa§h Reason for Change:(Why is change required) The addition at the inside corner is no Ion er needed as the e ui merit wi 'x' ".‘l 01 I l".‘.,lO OI I"i‘0 I.Du...‘I‘l‘t .O ArPRovALs:(As Required) Dir.0f Plannin Date:‘9/<93 a)Town Engineer ,[/m/m Date:é 7 WDir.of Public Wogwpv /Date: Other:Date: STAFF COMENTS 3 White -Town Engineer Yellow —ApplicantPink—Director of Flaming Goldenrod -Engineering Department . g ’ $ TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE 5 SUBDIVISION GENERAL:Change Order NO‘L‘ FHANGE ORDER comnAC'r PERSON Michael Sowell Phone HmwAddress818,$ullivan Ava site NnmPJamoHne CarWa=h Pu No.Owner EXRCT LLC Phone No. Contractor ''‘ Date:5 2/a: Date;é/zx/z/CHANGE:(Describe location %d nature of C(ange.Include Ea:3§2€55§Esam:22525.535.S.y:Er—v:«my,,35‘3.:ow£5,gmug;Eu.a.53... EVE:36>uimu:EaoEViiEsom{zanEm>{z«:ua53o)3:533:33;{zmu«mumwm:‘m‘mm)¥man-wvcm)Am(m-'’2wwkwam,nExm3:53m3anER6)momazs,zSomEzit{zz<>_._.5mu:zw>(zoEnn<5E\,aENoa$940>o:duo:n3£3{z_—?aE()2363Asm5km2f38x .‘lsxi§§§§IE~12dSAEKQExmiEzomN.3um....pmmV'asmy<Lmmmo<mm—.mNww<mm<dom<mSe;Emnzs,x33nozgo.<2Euisuin:5\21:;322::K2a»,wna;.5)i$53:amaxmkE§E,fxma)cf5nm3>jduo9:£2\\V<((V3).A«Nn“629I.....Z<4a_DO%<:_wwOZ__Iojma<omQZ<4aw)wyny¢§uOwwmonzLgiW/xn\.v\\y\uNa..5;.a SOUTH WINOSOR MANNING DEFT, Dear Mr.Sowell: Subject:Valvoline Instant Oil Change 822 Sullivan Ave.(Route 194) Town of South Windsor We have accepted your plans for the above—noted subject received on 03/19/21 entitled “VALVOLINE INSTANT OIL CHANGE 822 SULLIVAN AVENUE SOUTH WINDSOR CT“with a revision date of 6/1 1/21 An encroachment permit will be issued upon receipt of the following: A completed encroachment permit application (State form PMT~l Rev.lO/l 8)A bond (State form CLA 5 Rev 8/00)in the amount $20 000 00 in the contiactor s nameACertificateofInsuiancerequiringBodilyInjuryLiabilityof$1 000 000 and Aggregate of $2 000 000 4.A check 01 money order in the amount $100.00 made payable to “Treasure —State ofConnection" This approval is good for only two years from the above date. “NO WORK ON OR AFFECTING STATE PROPERTY IS TO BEGIN UNTIL ANENCROACHTVIENTPERL/[IT IS ISSUED” Ifyou have any questions Concerning this matter,please contact Rick Pelletier at 860-258-4521. Spec1al Serv1ces Section Manager Bureau ofl-lighway Operation cc:South Windsor Planning and Zoning An Equal Oppominny Empinm Famed on ism/den m iecovcicu mum E DEPARTMENT OF TRANSPORTATION DISTRICT I 1107 Cromwell Avenue Rocky Hill,Connecticut 06067 Phone: June 28,2021 Mr.Michael Sowell Jr.RECEIVED Project Manager 2155 East Main Street JUL 0 2 2021Torrington,CT 06790 BORS GENERNIV:\ cum ORDER (mum kiison Address_§22 SuuivanAve a ‘E site Rama volin gilCh Change Ordar Noii *>_PhoneNo.-’ P’aa so.lO‘IMP Four (4 )copies!‘'ea‘ndrdriveu ' Reason fa:Changa:(Why 1‘ ‘ s cha n’ APPROVELs : 7//é//y/ ?/Fi/h Date : Date: Date: Dir.6f Planmmg (ifs Raqu/i :djr/Town Engineer 7 [bps grIDir.of Public Wééks’ profile of Change.) é Siam nf CT / m V r [ Owner EXPCT LLC Phone No. Cmtracto‘rmhesi Buildi 'Co .lnc Signature of Owner a ’J:g awiZf (or:Date:?z/ signature of Des 'Er .Date:V;a CHANGE:(Describe locatic»”ture of change.Include Other:L,Date: STAFF CWS:Hi, l, I ? White -Town Engineer ,eI‘Yellow —ApplicantPink-Director of ‘Goldenrod -Engineering Department TOWN OF SQUTH WINDSOR STAFF SITE CHANGE FOR SITE &SUBDIVISION GENERAL:Change Order Nag— CHANGE ORDER CONTACT PERSONMiChaeI L Sowell Jr.Phone No.-_ Addreaa §g2 §ullivan Ave- Site Name Valvoline InstantOil Chan e P&Z No. Owner EXPCT LLC Phone No. Contractor BorqheSI Bulldlnq &Enqlneennq Co i Signature of Owner A e Date:10/13/21 Signature of Design Engr.WL 50M Date:10/13/21 CHANGE:(Describe location and nature of change.Include Four (4)copies of plan/profile of Change.) Added Bollards at the gas goint of entm ger Eversource gas Relocated the transformer ro t e re r o Show condenser at rear of oil change in Iieg 9f transformer Added bollards in front of transformer er Everso rce Pow Relocated draina e manhole at rearof r0 ert outofthe drivewa Added pumgchamber in front island of oil Change for footinq drain pump.Kept out of landscapinq. Reason for Change:(Why is change required) Transformer and associated work required to brinq new power to the car wash as welL as Qil change and ultimately remove overhead wires at the left side of car wash that were beinq hit by tall vehicles. Draina e manhole relocated to lessen im act to existin drivewa were required.Pump chamber added as there is siqnifqant qround water’pushing on foundation AypgovALs,(As Required Adding the pump Will lessen pressure and chances for leaking Dir 0f Planning 74/)Date:/0//z7/a/ Town Engineer oMn Owe/U/V Date:M119/z! Dir.of Public Works Date: other:Date: STAFF COMMENTS: White -Town Engineer Yellow -Applicant Pink -Director of Planning Goldenrod -Engineering Department ‘3;0.5Electrical Contractors CT LIC.#125120 Thursday,July 21,2022 To whom it may concern, To our knowledge,the building mounted lighting and site pole lighting for the Valvoline Instant Oil change facility located at 822 Sullivan Avenue in South Windsor,Connecticut have been installed per the submitted and approved site plan and electrical drawings. Civil drawing:SP3 dated 09~08~2020,last revision date 10—21—2021 Electrical drawings:Permit set dated 8/23/2021,last revision 08/26/2021 Regards, Lee Carter Estimator/project manager Eastside Electric.Inc. 178 Birge Park Road Harwinton,Ct. 06791 Ct.E1 —125120 (860)485-0700 O 178 Birge Park Road,Harwinton,Ct.06791 (860)485-0700 'Fax (860)485-9669 1 Page PIANNINE DEPARTMENT May 7,2024 EXCPT,LLC 8 Two Mile Road Fannington)CT 06032 To Whom It May Concern: Re:App].20-49P Valvoline Site Plan I am pleased to advise you that the South Windsor Planning and Zoning Commission.at its Regular Meeting on February 13,2024.,voted to release the following bonds: Anpl.20-49P Valvoline Stormwater Bond in the amount of$10.000 reduced by $10.000 to leave a balance of -0-. Appl.20-49P Valvoline E &S Bond in the amount of$5.000 reduced by $5.000 to leave a balance of -0-. A check will be mailed to you from the Town ofSouth Windsor.If you have any further questions.please contact the Planning Department at 860—644—251 l.ext.2329. Thank you. Very truly yours. Stephen Wagner,Chairman PLANNING &ZONING COMMISSION SW/js 151m Sullivan Avenue,Snuth Windsar,CI 05074 l Tel (BED)E44‘2511 Ext 2329 1 Flanning@suuthWindsur-CTguv PLAI‘INING M?M¥¥MEKT my 28.2025 Allan Borghesi 21 55 E Mam Street Torrington.CT 06790 Dear Mr.Borghesi: Re:Appl.20—491’,Valvoiine lam pleased to advise you that the South WindSOr Planning and Zoning Commission at its Regular Meeting on July 22.2025‘voted to release the following bonds: Appl.20—49?‘v’alvoline Landscaoe Bond in the amount of $3,000 reduced by $3.000 to leave a balance of -0-. A check will be mailed to EXC PT.LLC from the Town ofSouth Windsor.lfyou have any further questions.contact the Planning Department at 860—644-251 1-ext.225.).Thank you. Very truly yours. Kevin Foley.Vice Chairman PLANNING &ZONING COMMISSION KFIjs ec:Town Engineer 1540 Sullivan Avenue,Smith Windsor.ET UBB‘M Tel (360)644-250 Ext 2329 g Planning@SoulhWindsar-Cl.gav