HomeMy WebLinkAbout2002-5-20 - 1009 Foster Street Extension - Well Completion Report'-‘§
CPR-9 Rev.7/95
STATE OF CONNECTICUT ._-
DEPARTMENT OF'CONSUMER PROTECTION'REAL ESTATE &PROFESSIONAL TRADES DWISION ’
WELL'DRILLING COMPLETION REPORT '
165 Capitol Avenue,Harthrd.Connecticut.08]06 '
Do NOT ml In
STATE WELL N0,
OTHER NOT
OWNER NAME PAGANELLI CONST .
ADDREssP20.Box 652,smsea Supmng
LOCATION iOFWELL‘
.(No.a swat)(Town).(Lot Number;
1009'FOSTER $T.EXT.w 3 u:1 [J 09m.\
DOMES‘nc «BUSINESS FARM TEST
ESTABLISHMENT -weu.
PUBLIC
SUPPLY E INDUSTRIAL AIR
CONDITIONING $92?ABAMNDONMENT
ROTARY COMPRESSED CABLE -OTHER‘AIR PERCUSSION PERCUSSION (Specify)
'PROPOSED '
USE OF WELL
EQUIPMENT
DRILLING 'D
——"——CASING
DETAILS
LENGTH («eon DIAMETER (mans)wEIGHT FER FOOT
‘.B THREADED D WELDED DRIVE SHOEAD
YES V D No
was CASING GROUTED?
D YEs‘D No
‘YIELD TEST —'a DAILED D PunPED D conPREss AIR HOURS YIELD (m)
—-‘——"WATER‘LEVEL MEASURE FROM LAND sURFACE -STATIc (specily m1)l 4 ~_DURING vxELD Test «eon Damn a:‘ompletea Weu In feet
§§x 2 5
SCREEN
LENGTH OPEN to AQUIFER (Dex)
DIAMETER (inns)IF GRAVELPACKED:Dmaler of we"ind‘uding graval padc
(M38)
’GRAVEL SIZE (mam)FROM (Ieel)..‘ro (lest)
DEPTH FROM LAND TO SURFACE
FEET To FEET.
FORMATION DESCRIP‘IION Sketch exact baton of well wllh distances to at least two
permanent landmarks
0 7 5 XX CEMENTED
g
If yield was Iesled at difierent depths duting drilling.Iist beIDw
FEET -GALLONS PER MINUTE
-DATE WELL co PLETED
.EXX 2/10/0
PER—M?NoT
211140
-REGIsTRATION No.
.4 2 _
DATE OF REPORT
5 /2 0 /0 2 .
AGENCY