Loading...
HomeMy WebLinkAbout2002-5-20 - 1009 Foster Street Extension - Well Completion Report'-‘§ CPR-9 Rev.7/95 STATE OF CONNECTICUT ._- DEPARTMENT OF'CONSUMER PROTECTION'REAL ESTATE &PROFESSIONAL TRADES DWISION ’ WELL'DRILLING COMPLETION REPORT ' 165 Capitol Avenue,Harthrd.Connecticut.08]06 ' Do NOT ml In STATE WELL N0, OTHER NOT OWNER NAME PAGANELLI CONST . ADDREssP20.Box 652,smsea Supmng LOCATION iOFWELL‘ .(No.a swat)(Town).(Lot Number; 1009'FOSTER $T.EXT.w 3 u:1 [J 09m.\ DOMES‘nc «BUSINESS FARM TEST ESTABLISHMENT -weu. PUBLIC SUPPLY E INDUSTRIAL AIR CONDITIONING $92?ABAMNDONMENT ROTARY COMPRESSED CABLE -OTHER‘AIR PERCUSSION PERCUSSION (Specify) 'PROPOSED ' USE OF WELL EQUIPMENT DRILLING 'D ——"——CASING DETAILS LENGTH («eon DIAMETER (mans)wEIGHT FER FOOT ‘.B THREADED D WELDED DRIVE SHOEAD YES V D No was CASING GROUTED? D YEs‘D No ‘YIELD TEST —'a DAILED D PunPED D conPREss AIR HOURS YIELD (m) —-‘——"WATER‘LEVEL MEASURE FROM LAND sURFACE -STATIc (specily m1)l 4 ~_DURING vxELD Test «eon Damn a:‘ompletea Weu In feet §§x 2 5 SCREEN LENGTH OPEN to AQUIFER (Dex) DIAMETER (inns)IF GRAVELPACKED:Dmaler of we"ind‘uding graval padc (M38) ’GRAVEL SIZE (mam)FROM (Ieel)..‘ro (lest) DEPTH FROM LAND TO SURFACE FEET To FEET. FORMATION DESCRIP‘IION Sketch exact baton of well wllh distances to at least two permanent landmarks 0 7 5 XX CEMENTED g If yield was Iesled at difierent depths duting drilling.Iist beIDw FEET -GALLONS PER MINUTE -DATE WELL co PLETED .EXX 2/10/0 PER—M?NoT 211140 -REGIsTRATION No. .4 2 _ DATE OF REPORT 5 /2 0 /0 2 . AGENCY