HomeMy WebLinkAbout2016-3-28 - 1969 Ellington Road - Lead Test ResultsP,
STATE OF CONNECTICUT
OFFICE OF EARLY CHILDHOOD
March 18, 2016
SUSAN KUPCHUNOS
;1969 ELLINGTON RD
SOUTH WINDSOR, CT 06074-2801
Dear Susan:
Is
Connecticut Office of
Early Childhood
Enclosed is a copy of the test results from paint sample(s) that were collected during my visit to your family`• -_
day care home on 2/17/16. These samples were collected from painted surfaces that were observed to 'bero; _"
deteriorated.
Test results from the paint samples indicate that:
1: ❑ Lead -based paint was not identified in any of the paint samples that were collected. There is
no action required from you.
2: ® Some of the paint sample(s) that were collected contain levels of lead below the level (0.5%
by dry weight) deemed to be lead -based paint. Although these surfaces do not contain a
regulatory level of lead -based paint, lead dust or lead -contaminated soil hazards could be
created if the paint is turned into dust by abrasion, scraping, or sanding. Caution should be
taken when disturbing these surfaces. There is no action required from you regarding these
surfaces.
3: ❑ Lead -based paint was identified in paint samples that were collected. Whenever testing
identifies deteriorated lead -based paint in an existing or proposed family day care home that has
not been previously inspected, the Connecticut Office of Early Childhood will require that a
comprehensive lead inspection shall be conducted by a trained code enforcement official or a
DPH-certified lead inspector or lead inspector risk assessor. Children under the age of six do not
reside in your home and the residence is owner -occupied. Therefore, the lead -based paint
hazards must be corrected and made inaccessible in accordance with the Regulations for
Family Child Care Homes (Section 19a-87b-9): "Poisonous substances shall not be
accessible to children enrolled in the facility." You are required to take immediate steps
to correct this problem because you (intend to) operate a Family Day Care Home.
Performing this work improperly may create a greater lead hazard. It is recommended that
you contact your local health department or the Lead Environmental Management Unit of this
department [(860) 509-7299] who can help you decide what work methods are most
appropriate for your property and situation. Before work is initiated a copy of the lead hazard
remediation plan' must be submitted to the Child Day Care Licensing Specialist for OEC
review and approval. The plan must -be in accordance with the Lead Poisoning Prevention
and Control regulations Sections 19a-lllc-1. through 19a-lllc-11). You are also
responsible for notifying the parents of enrolled children that lead -based paint hazards have
been identified at the facility and the conditions are being corrected. (See attached sample
letter.)
Phone: (860) 509-8045 • Fax: (860) 509-7541
RECEIVED
P.O. Box 340308, MS #12CBR
410 Capitol Avenue
MAR 2 82016
Hartford, Connecticut 06134
www.ct.gov/o.ec
SOUTH WINDSOR
AfirinativeAction/EqualOpportuniol Einployer
HEALTH DEPT.
4 SCANNED
Please call me at the number listed if you have any questions concerning this matter.
Sincerely,
51,1�1-lo
Karin Kido
Child Care Licensing Specialist
Copies: Local Health Department
DPH Lead Poisoning Prevention and Control Program MS# 51 LED
Attachments: Test Results
t Such plans (a) describe measures that will be taken to ensure that children will not be exposed to any
hazards (including lead paint chips and dust) before, during and after the remediation, (b) describe work that is
to he perfonmed and provide an explanation of how that work will be performed in a lead -safe manner. (c)
identify who. will perform the work, (d) provide time frames for completion of repairs, and (e) document that
all parents of enrolled children have been given notice that lead -based paint hazards have been identified at the
facility, and that the conditions are being corrected. Other information may also be required.
STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH i
`'. Dr. Katherine A. Kelley State Public Health LaboratoryKePpIng
395 West Street, Rocky Hill, CT 06067 DPH"
,Connecticut
Phone: (860) 920-6500 1: Healthy
Fax: (860) 920-6718 _
n
SAMPLE SUMMARY
Workorder: 576472 1969 ELLINGTON RD 021716 1 Location
Property S. RUPCHUNOS
Street 1969 ELLINGTON ROAD
Town SOUTH WINDSOR
State CT
Lab ID Sample ID Matrix Date Collected Date Received
576472001 BASEMENT FURNACE ROOM Paint Chip 2/17/2016 3/1/2016
REPORT OF ANALYSIS
Connecticut Registration No : PH-0905
EPA Certificate No. 201 OCT01
Page 2 of 4 Report ID: 576472 - 8525864
STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH
lot Dr. Katherine A. Kelley State Public Health Laboratory C Ki2szpIng
k.
395 West Street, Rocky Hill, CT 06067�� t0Phone: (860) 920-6500 Healthy
Fax: (860) 920-6718
r
PROJECT SUMMARY
...ram
Workorder: 576472 1969 ELLINGTON RD 021716 1 Location
Sample results are not blank corrected.
The results on this report relate only to the items tested
REPORT OF ANALYSIS
Connecticut Registration No : PH-0905
EPA Certificate No. 201 OCT01
Page 3 of 4 Report ID: 576472 - 8525864
STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH =
r Dr. Katherine A. Kelley State Public Health Laboratory 1>. Keupjng
a 395 West Street, Rocky Hill, CT 06067 CtJrtl��Ct�C�lt
Phone: (860) 920-6500 DPH' Healthy
Fax: (860) 920-6718
racNsr� - -
r
ANALYTICAL RESULTS
Workorder: 576472 1969 ELLINGTON RD 021716 1 Location
Lab ID: 576472001
Sample BASEMENT FURNACE ROOM
Parameters Results
--- METALS ---
Preparation Method: EPA 3050E (Paint Chips)
Analytical Method: EPA 239.1
Lead <0.0343
Date Received: 3/1/2016 1:57:00 PM Matrix: Paint Chip
Date Collected: 2/17/2016 Description:
Units Report Limit DF Prepared By Analyzed By
% 0.0343
REPORT OF ANALYSIS
Connecticut Registration No : PH-0905
EPA Certificate No. 2010CT01
1 3/8/2016 GG 3/10/2016 GG
Page 4 of 4
Report ID: 576472 - 8525864