HomeMy WebLinkAbout279 PEPIN PL BLDG 14 �9 7 RJ�t?
Electric # APPLICATION FOR BUILDING PERMIT
Plumbing#
HVAC# ( �Z? QV4 I t{ Date:
Sprinkler# Estimated Cost $ 3,S"0O0
FINAL APPROVALS Permit Fee $ 14 30
Building COMPLETE RED BOXED AREAS Occupancy Fee $ 30
Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $
Affidavit
Appr.forCO. POP- SIGN ON REVERSE SIDE A Total Fee $ 24166
TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $
The undersigned hereby applies to do work according to the following: �Iq(„
Applicant U -Location of Work !1_ig Lot No.
Applicant's Address Tel # b 6,! 4 h?-
Town 0 zip Cc-7 Lic.# 66 /T 93 0
Owner Architect_ �u g S2A1
Owner's Address Architect's Address
Zip 6RSTAbory zip lQ&Q3
Sq. Ft. New Area: 1 st FI. f 2nd FI. 7 -3 3rd FI. 3"°i� Total New Area
Purpose of this permit
r
City Water Well > Septic System J SeweLj/
Ins: HO SP Cert. Area Basement Garage
Approved by Date Use Group Construction Type
S-&
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper di ance from all street lines,side yard lines,and required
distances from all other zones and is located in whic this builddii'n nd i use is allowed.
Signed L�
I hereby apply for a Certificate of Occup y for the work scr ed in this application for the permit.
Signed
DO NOT WRITE BELO THIS LINE
INSPECTION COMMENTS
201900547 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER CERTIFICATE OF OCCUPANCY
DATE: 01/10/2020 y FEE:
GIS ID:70700279 � '�•; 3-
ZONE:
MUNIS APPLICATION# 201801860 :Cl _ +- -
THIS IS TO CERTIFY THAT x. , PEPIN PLACE'..-,-, -,UNDER APPLICATION NUMBER 201801860
CONFORMS SUBSTANTIALLY TO THE RBQUZ79. IREMENTS OF THE CONNECTICUT BASIC BUILDING CODE AND THE
ZONING REGULATIONS OF THE TOWN OF SOUTH WIND-SOR'AND IS HEREBY APPROVED OF OCCUPANCY AS
INDICATED BELOW: f
APPROVED FOR OCCUPANCY:OCCUPANCY:f 4fCONSTRUCT A•1938 SQFT SINGLE FAMILY-TOWN HOUSE W/2 BEDROOMS
_2 1f/2 BATH,2 CAR GARAGE&DECK_',,?` =�
SPECIAL CONDITIONS
NOTICE: IF THIS CERTIFICATE IS 5LOST OR DESTROYED,A DUPLICATE SHOULD BE OBTAINED IMMEDIATELY FROM
THE BUILDING DEPARTMENT.
�L ;''.1 'y,�i .- .,,-.a r.:E•' '.l:•.+, by
CONSTRUCTION TYPE:
OCCUPANCY GROUP: r� r BUILDING OFFICIAL
1/10/2020 1:59 PM ANY CHANGE OR EXTENSION OF THE USE HEREIN APPROVED REQUIRES A NEW CERTIFICATE OF OCCUPANCY
INSPECTION FIELD SHEET 02/10/21
Printed by Middleton, Morgan 15 14 08
INSPECTION: 109565 ELECTRIC UNDERGROUND PERMIT:
STATUS:
APPLICATION: 201801860
LOC: 279 PEPIN PLACE
SOUTH WINDSOR
PROPERTY ID: 70700279
OWNER: T & M BUILDING CO INC
CONTRACTOR:
REQUEST BY:
PROJ DESC: CONSTRUCT A 1938 SQFT SINGLE FAMILY TOWN HOUSE W/2 BEDROOMS
WORK ORDER:
INSPECTOR: DOUG RESULT: PASS
REQUESTED: 05/16/19 PRIORITY:
SCHEDULED: 05/16/19 AM COMPLETED: 05/16/19
UNPAID FEES: 00 Date Time
MILEAGE: 00 TIME: TRAVEL ONSITE
COMMENTS
ALL INSPECTIONS:
INSPECTED INSPECTOR RESULT INSP DESCRIPTION
O1/10/20 DOUG PASS B001 FOOTING
O1/10/20 DOUG PASS B002 FOUNDATION
09/30/19 ROSE PENDING B003 FRAMING (ROUGH)
CLOSE DUCT CHASE AT CEILING. (ATTIC)
PROVIDE ADDITIONAL STUD BELOW TRUSS ECCENTRIC LOADED DUE TO SEVERED
WALLPLATE (2 LOCATIONS)
10/02/19 ROSE PASS B003 FRAMING (ROUGH)
RECHECK/ COMPLETE SEAL CHASE
10/02/19 ROSE PASS B004 INSULATION
INCLUDING FIRESTOPPING SEP. WALL
O1/08/20 DOUG PASS BO10 FINAL
07/29/19 ROSE PASS E001 ELECTRIC SERVICE
RELEASED TO EVRESOURCE 7/30/19 CRS#3305544
09/30/19 ROSE PASS E003 ELECTRIC ROUGH
09/30/19 ROSE PASS H003 HVAC ROUGH
05/16/19 DOUG PASS P002 PLUMBING UNDERGROUND
09/11/19 ROSE PASS P003 PLUMBING ROUGH
WATER TEST ON RG.PLBG WASTE & VENTS/TEST ON WATER PIPES
09/04/19 ROSE PASS P004 PLUMBING GAS TEST
APPROVED FOR METER SERVICE
Z003 CO PLANNING INSPECTION
14W
APPLICATION FOR PLUMBING PERMIT
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074(PHONE) 860444-2511 EXT. 230
DEPARTMENT DECISION
1�1U�ER
APPLICATION IS HEREBY:
(�fJ
APPROVED: BLDG.PERMIT NUMBER
DATE INSPECTOIC
LOCATION OF WORK: 7 9 ' BPS ��G /-&3
APPLICANT: / OWNER: TYPE OF STRUCTURE:
It 1�4
iyvl 7 I�/.-Yl �iJ .�f nn >QlEWBUILDING
NAME: —MrJ 9Z ZA^IeW/GZ NAME: 7' 4'lM �u I�Ay ea • ❑ADDITION
PHONE NUMBER �� ?3 PHONE NUMBER:�I D y F4 T ?>a 9 0 EXISTING BUI[LDING
ADDRESS: 5 .5 'FALL %l e"+PQr4 y-m ADDRESS: As A6r&-lc -
.-� TYPE OF USE:
C T
IDENTTAI, o COMN(ERCIAL
PLUMBING INFU01HATION:: FURTHER DESCRIPTION OF WORK:
TYPE OF INSTALLATION:—,t3P_ L0 la LOW hA ant$ 1���M(�T� —'a
NO.OF TOILETS:_�STYLE:kb CO.OF BATHTUBS: `]�W AS N D ftl LG ��N SHIN W�rfi✓
NO.OF SHOWERS:_�_NO.OF LAVATORIES:
NO-OF CATCH BASINS: NO.OF FLOOR DRAINS:
ARE TOUXT COMPART[(EtM VENTILATED TO OUTER AIR BY WINDOW?
s cm ESnMATED COST: S
SIZE OF WINDOW: SUE OF DUCTS:
SEWER OR SEMC TANK: S ruv-6r FEE ENCLOSED S
SIZE OF WATER PIPING AND RISER: I& + !�-
WATER HEATER: TYPE fir I G MANUFACTURER A&S-tiA v
FEE SCHEDULE:$19 PER SI,000 O THE ESTIMATED COST.
ROUND UP TO THE NEXT THOUSAND ONCE THE PROTECT IS
$1.00 OVER (.26 CENT EDUCATIONAL FEE IIVaQM AS PART
OF THE PERMPT FEE)
THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL
ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO.: _ TYPE: STATE:
D ZZ�h?
SIGNATURE OF APPLICANT: DATE:
ao��•4
S
c �
APPLICATION FOR ELECTRICAL PERMIT
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230
DEPARTMENT DECISION PERMIT NUMBER:
APPLICATION IS HEREBY: 14'a 3/ .7
APPROVED: BLDG.PERMIT NUMBER.
DATE INSPECTOR
LOCATION OF WORK: -2 79
APPLICANT: OWNER: TYPE OF STRUCTURE:
A,&BUILDING
NAME: QCZ tL!y(�Id1✓JSCI��' NAME: j�l✓"✓!7 R/7//.D//�� ❑ADDITION
PHONE NUMBER: �bG� 73O' _ PHONE NUMBER,���ip,--�ZSZ'�-ro/yy ❑EXISTING BUILDING
ADDRESS: -.22 ADDRESS:
TYPE OF USE:
aESIDENTIAL ❑COMMERCIAL
ELECTRICAL INFORMATION: FURTHER DESCRIPTION OF WORK:
TYPE OF INSTALLATION: /yz-z/�
SIZE OF SERVICE: -W.4
SIZE OF MAIN SERVICE: -2/9o14
NUMBER OF METERS: /
NUMBER OF PANELS:
NUMBER OF LIGHT CIRCUITS: ESTIMATED COST:S .S 89r
NUMBER OF SWITCHES: S 0�
NUMBER OF LIGHT FIXTURES: FEE ENCLOSED:S D C�
NUMBER OF A/C CIRCUITS:
FEE SCHEDULE:S18 PER$1,000 OF THE ESTIMATED COST.
NUMBER OF POWER CIRCUITS: //> __ ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT
IS$1.00 OVER. (Z6 CENT EDUCATIONAL FEE INCLUDED AS
NUMBER OF OUTLETS: PART OF THE PERMIT FEE)
THE UNDERSIGNED HEAEBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL
ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO.: /D.3Slz TYPE: E--/ STATE: cT
SIGNATURE OF APPLICANT: * �L DATE: 71Z g
do, gc/syy
5
"~ APPLICATION FOR HVAC PERMIT"
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230
DEPARTMENT DECISION PERMIT NUMBER:I ���Q9
APPLICATION IS HEREBY: `1
APPROVED: BLDG.PERMIT NUMBER:
DATE INSPECTOR
LOCATION OF WORK: Q/ 9 *Fo p 1 n plc-c-L L-c,-�- (G'
APPLICANT: OWNER: / TYPE OF STRUCTURE:
1 1 P �t PI NEW BUILDING
NAME:A�t 4IY1�,,,cc.n H P��.Til1u�/� NAME: TF M �P s o ADDITION
PHONE NUMBER:'Do -S 7 9 -Li9a 8 PHONE NUMBER: gG0' 9-603( o EXISTING BUILDING
a
ADDRESS:770 �Und ri n e_go ADDRESS: �( d- m"k %,e-
r
TYPE OF USE:
P.oec"c 6397 tTn(c 4-1- cT- Tot, CT oG7(;o PRESIDENTIAL oCon�MERC1AL
HVAC INFORMATION: FURTHER DESCRIPTION OF WORK:
TYPE OF SYSTEM: �ATING efA/C TY) wC�r V�. C
HEATING: S
TOTAL HEAT LOSS(BTUH) °F (HEAT LOSS SHEET REQUIRED)
DESCRIBE ALL HEATING EQUIPMENT(INCLUDE MAKE AND MODEL NO):
Cioocc Mr..,-I GMrSS-1 60�'-/o N
ESTIMATED COST:f GCX�
AIR CONDITIONING: ! 1 Of,
DESIGN TEMP:OUTSIDE .F INSIDE °F DIFFERENCE P FEE ENCLOSED:S r s py ��— W
TOTAL HEAT GAIN(BTUH) (HEAT GAIN SHEET REQUIRED)
DESCRIBE ALL COOLING EQUPMENT(INCLUDE MAKE AND MODEL NO.): FEE SCHEDULE:S18 PER S1,000 OF TILE ESTIMATED COST.
&C-10G M5it'n � �Cj ALL J ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS
SI.00 OVER. (.26 CENT EDUCATIONAL FEE INCLUDED AS PART
OF TI1E PERMIT FEE)
THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND
STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO.: 03cr799 TYPE: S STATE: �+C//
SIGNATURE OF APPLICANT:
DATE: G 1�
aotgol-73q
�4owh ar��
riovu Ole slout�i ?l &41at
1540 SULLIVAN AVENUE • SOUTH WINASQR, CT 06Q74
TELEPHONE (660) 644-2611
'AN ,ACT CONCERNING •CONCRETE �`OUri1DA'T`IC�NS.
Section t 0'6UC Ad NO- 1"5) &Odve Ootabea 1 20l�)� Prior to the issuanco of t,,ettiScats of
O �caupanoy for a new residevedi or mmmaomtal building for wWoh a conor to foundation was installed,on or a te,r
0dober 1,2016,the spplioant shell provide the SnUdiu,g Ojackl with written doavuaoutetion of the aamo of the
fm&YOW or entity that m"ged the ommto and the name of the individual or entity that ittatallai the conoreto,
Copies of such documentation abaci be wabodainod is:the records of the office of the Balding Offloiai for not iris
theta ft(50)years,
Please AU the information in and submit to the Buffdbag De arbnent:
Date of Wormadout r*cetve'Wffld: i-- 9 .1'0,a^�J
�1COi�CL RPCBt�OJt1: SDk�.lL �!Y1K WO
Job descrlPdon: �Nd M ) 79 -e p;,, P1,0-ce—
,_,�/J
Name: �L11I 0'r CDKCI�E� - Nsune: Ace 6',DN.4 .
(Please Px�nt) t;Pleesa �
Address:,_,1 �� �LP�►l J� Address:_.,.. ,wr
OOZY
Phone/Contact: o~ ✓l' - 7//l phone Contact: hL6 y�• '�f p
A •YCAN'jYCON'i`�eCTOB nfnrn�wHn
(Pleue pdnt)
Aadtirase: �. Phon,e/contact:
I" >�4tV 6 E-mrett: OD , toil/
Signature: Date: /- 9 Go y
WORK SITE SHEET . • 08-23-2019
CompanyiTM Building . .
• Brook Street00 Pleasant Valley -.
••
•c of project: Decks no roof or •
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■7■■�■■�■■�■f'`°�■`a■■MINI■■`'�■Ir■\'�■`'•
■■KSM0\■MININU NIMN■■■■MINE■■MINI■■■■■■
MINI"■`■■`r■`■■■!��Z■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
MKIMEMM ' ■_- -
ME
0 EMKOM ■----
Kam
■--�-
ature of Installer:
) i
tachna Me* po:.s
Selection Table - Techno Metal Post
Maximum compressive bearing Lateral bearing ado
Techno M apidt),ttxe capacitys bendtag
Past Model Project Type US ULS SLS ULS
(bs) (b) (W) (lb) (klY) (b•ft) (kN-m)
PI
(O.D.1.9 in/ Light residential(deck,patio,etc.) 6 800 30.2 9 520 42,3 225 1.0 1010 1.4
483mm)
P2 NMum residential and Ngbt commercial
(OD.2.4 in/ catpott,sunrooms,single storey residential 9 600 42,7 13 440 59.8 450 2.0 1785 2.4
603mm) dditionEing,
pedestrian bridge,ctc.)
ddendal,Llgiat to MedinaP3 ciai and Industrial(Cottage,camp,
(O.D.3.5 in/ me,two storey residential addition, 33750 150,1 47250 210,2 2250 10.0 6454 8,8
88.9rnm) ed,supporting cokunn,
brill etc.)
P4 envy Residential,Light to Medium
(O.D.4.0 in/ mmercial and Industrial(cottage,camp, 45000 200.2 63 000 280,2 2 700 12,0 9 411 12,8
101.6nun) ile home,supporting column,
ing,pedestrian bridge etc.)
P3-HD vy Residential,Light to Heavy
(O.D.3.5 in/ CommercW and Industrial(supporting 50 625 225.2 70 873 315.3 2 250 10,0 9 057 12.3
88.9mm) kmm,underpinning,etc.)
P4-14D vy Residential,Light to Heavy
(OD.4.0 in/ maereld and Industrial(supporting S0 625 225.2 70 873 313.3 2 700 12.0 13 394 18.2
101.611111) ahumm,underpinning em)
PS cavy Residendal,Light to Heavy
(OD.5.6 in/ mmcrelal and Industrial(cottage,camp, 50 US 225.2 70 873 315.3 4 SW 20.0 21316 28.9
mm 141.3n) le home,supporting column,sign,lamp
w9aPinnig.pedestrian bridge,etc.)
P6 eavy Residesdal,Light to Heavy
in/ mercid and Industrial(cottage,camp'
(O.D.6.6
168.6.6 in ife home,supporting column,sign.lamp 50625 225,2 70 575 315,3 6 750 30,0 33 876 45,9
t,MIgnuing. brldm ctc.)
Oks:
t.The maximum tensile toad capacity an be obtained,conservatively,by halving the values of the bearing capacity is compression shown In the sckctiun
table.
.The naxinu m compressive bad(SLS)shown in the selection table limit the settlements to 12 rant(1/2 inch).
3.Too ntaximumt compressive hearing capacity(SLS)is determined by the nuxlatum torque allowable by the installation equipment used(see
specifications of Installation equipment)
.When the pile is laterally trsupponed(soil vary bore/soft,liquefiable soils,water and air),the structural strength tithe pile nun be approved
by des technical depertmart of Techno Metal Post.
Tie values of latent capacity are average values and an be modified,more or fats,depending on the characteristics of the existing soil.
oaneets:
For my questions.please comet the technical department of Techno Metal Poet,
Lager Techno Metal Post cm be used for applimdom requiring a lateral or pending tasistmce higher than shown in the selection table.
This process for the above listed project involved the screwing of specifically
designed and engineered posts applicable for this project. PSI readings were
taken on each individual post during the installation and with the use of a
correlation table these measurements are listed and described below.
• PSI/Torque: Pounds per square inch/The rotational pressure taken to
drive the post
• Depth:The distance downward from its top surface.
• TYM, Piers are categorized for each individual specific project
• Bearing:Downward pressure post can withstand
• Pinned:Bored into solid immoveable rock reaching maximum compression
and tension.Once the post was driven one additional test was performed,the
percussion test.This test involves stalking the post with a sledge hammer,5
times per set,while being measured for resistance.Once there Is zero
downward moment the post and pressures are verified.
• t1 lit:The force required to putt the post out of the ground.the uplift value Is
half of the bearing.
1
i
i
I
fh
RPM ENERGY SOLUTIONS
69 PERRY RD,HAMDEN CT
BUILDING LEAKAGE TEST 06514 203-903-7387
BPI#5005996
Date of Test: 11/22/2019 Test File:279 pepin place
Customer: BOB Technician: V CASTELLON
Project Number:
Building Address: 279 PEPIN PL
SOUTH WINDSOR,CT
Test Results
1. Airflow at 50 Pascals: 718 CFM50
(50 Pa=0.2 w.c.) 2.99 ACH50 X PASS
2. Leakage Area: 39.5 in2 LBL ELA @ 4 Pa
3. Building Leakage Curve: Flow Coefficient(C)= 56.5
Exponent(n)=0.650(Assumed)
4. Test Settings: Test Standard: RESNET One-Point Test
Test Mode: Depressurization
5. Accuracy Level Standard Level of Accuracy Test
V CASTELLON 203-903-7387
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate: 32.6 CFM
0.14 ACH
8.1 CFM per person
2. Estimated Design Infiltration Rate: Winter. 46.1 CFM Summer: 36.3 CFM
0.19 ACH 0.15 ACH
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
Mechanical Ventilation Guideline(based on ASHRAE 62.2-2010)
Recommended Whole Bldg Rate: 46.0 CFM
Base Rate: 46.0 CFM
�~ RPM ENERGY SOLUTIONS
DUCT LEAKAGE TEST RESULTS 69 PERRY RD,HAMDEN CT
06514 203-903-7387
BPI#5005996
Date of Test: 11/22/19 Test File: 279 PEPIN PLACE
Test Performed For: BOB
Phone V CASTELLON 203-903-7387
Test Results
1. Test Type: Total Leakage
(Duct Blaster Only)
2. Test Pressure: 25.0 Pa
3. Measured Duct Leakage: 66.0 CFM(10.6 sq. in.)
4. Duct Leakage as a Percent of System Airflow:
5. Duct Leakage as a Percent of Building Floor Area: 3.5% X PASS
Additional Information
Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes
expensive conditioned air to be lost before it can be delivered to the house,forcing your system to run longer to
keep you comfortable.
Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house.
Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air
conditioning is running.
RPM ENERGY SOLUTIONS
69 PERRY RD,HAMDEN CT
BUILDING LEAKAGE TEST 06514 203-903-7387
BPI#5005996
Date of Test: 11/22/2019 Test File:279 pepin place
Customer: BOB Technician: V CASTELLON
Project Number.
Building Address: 279 PEPIN PL
SOUTH WINDSOR,CT
Test Results
1. Airflow at 50 Pascals: 718 CFM50
(50 Pa=0.2 w.c.) 2.99 ACH50 X PASS
2. Leakage Area: 39.5 in2 LBL ELA c@ 4 Pa
3. Building Leakage Curve: Flow Coefficient(C)= 56.5
Exponent(n)= 0.650(Assumed)
4. Test Settings: Test Standard: RESNET One-Point Test
Test Mode. Depressurization
5. Accuracy Level Standard Level of Accuracy Test
V CASTELLON 203-903-7387
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate: 32.6 CFM
0.14 ACH
8.1 CFM per person
2. Estimated Design Infiltration Rate: Winter. 46.1 CFM Summer: 36.3 CFM
0.19 ACH 0.15 ACH
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
Mechanical Ventilation Guideline(based on ASHRAE 62.2-2010)
Recommended Whole Bldg Rate: 46.0 CFM
Base Rate: 46.0 CFM
RPM ENERGY SOLUTIONS
DUCT LEAKAGE TEST RESULTS 69 PERRY RD,HAMDEN CT
06514 203-903-7387
BPI#5005996
Date of Test: 11/22/19 Test File:279 PEPIN PLACE
Test Performed For: BOB
Phone V CASTELLON 203-903-7387
Test Results
1. Test Type: Total Leakage
(Duct Blaster Only)
2. Test Pressure: 25.0 Pa
3. Measured Duct Leakage: 66.0 CFM(10.6 sq. In.)
4. Duct Leakage as a Percent of System Airflow:
5. Duct Leakage as a Percent of Building Floor Area: 3.5% X PASS
Additional Information
Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes
expensive conditioned air to be lost before it can be delivered to the house,forcing your system to run longer to
keep you comfortable.
Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house.
Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air
conditioning is running.
r•
REScheck Software Version 4.6.5
Compliance Certificate
Project Building 14-unit 103- Baltic
Energy Code: 2012 IECC
Location: South Windsor, Connecticut CA
Construction Type: Single-family IVNED
Project Type: New Construction
Orientation: Bldg. faces 45 deg. from North
Conditioned Floor Area: 1,938 ft2
Glazing Area 2%
Climate Zone: 5 (6155 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
279 Pepin PI. T&M Building Co., Inc. Hans Hansen
South Windsor, CT 06074 110 Brook Street Hans Hansen Architectural Design
Torrington, CT 06790 150 Sycamore Street
860-489-9229 Glastonbury,CT 06033
info@TandM.com 860-995-9671
hanshansendesign@yahoo.com
• • • UA trade-off
Compliance: 0.3%Batter Than Code Maximum UA: 319 Your UA: 318
The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off riles.
it DOES NOT provide an estimate of energy use or cost relative to a minimum code home.
Envelope Assemblies
Gross Area
Cavity Cont.
Perimeter
Wall 1:Wood Frame, 16"o.c. 63 19.0 0.0 0.060 4
Orientation: Back
Comment:Southeast wall
Wall 2:Wood Frame, 16"o.c. 333 21.0 0.0 0.057 18
Orientation: Left side
Comment: Northeast wall
Door 4: Solid 20 0.260 5
Orientation: Left side
Wall 3:Wood Frame, 16"o.c. 63 19.0 0.0 0.060 3
Orientation: Front
Comment: Northwest walls
Door 3:Solid 20 0.260 5
Orientation: Front
Wall 16:Wood Frame, 16" o.c. 63 19.0 0.0 0.060 4
Orientation: Right side
Comment:Southwest wing wall
Wall 4:Wood Frame, 16" o.c. 261 22.0 0.0 0.056 15
Orientation: Right side
Comment: Southwest party wall
Wall 5:Wood Frame, 16" o.c. 180 19.0 0.0 0.060 9
Orientation: Back
Comment: Sotheast 1st floor walls
Project Title: Building 14-unit 103- Baltic Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-14-unit 103-Baltic.rck Pagel of 3
1
Gross Area Cavity Cont.
Perimeter
Window 5:Vinyl Frame:Double Pane with Low-E 7 0.290 2
Orientation: Back
Door 5:Solid 18 0.260 5
Orientation: Back
Wall 6:Wood Frame, 16" o.c. 9 19.0 0.0 0.060 1
Orientation: Left side
Comment: Northeast 1st floor walls
Wall 17:Wood Frame, 16" o.c. 324 22.0 0.0 0.056 18
Orientation: Left side
Comment: Northeast party wall 1st floor
Wall 9:Wood Frame, 16" o.c. 180 19.0 0.0 0.060 9
Orientation: Front
Comment: Northwest 1st floor walls
Window 7:Vinyl Frame:Double Pane with Low-E 16 0.290 5
Orientation: Front
Window 8:Vinyl Frame:Double Pane with Low-E 6 0.290 2
Orientation: Front
Wall 10:Wood Frame, 16" o.c. 261 22.0 0.0 0.056 15
Orientation: Right side
Comment: Southwest party wall 1st floor
Wall 10:Wood Frame, 16" o.c. 72 19.0 0.0 0.060 4
Orientation: Right side
Comment: Southwest walls 1st floor
Wall 11:Wood Frame, 16"o.c. 160 19.0 0.0 0.060 8
Orientation: Back
Comment: Southeast wall 2nd floor
Window 10:Vinyl Frame:Double Pane with Low-E 20 0.290 6
Orientation: Back
Wall 13: Wood Frame, 16" o.c. 8 19.0 0.0 0.060 0
Orientation: Left side
Comment: Northeast wall 2nd floor
Wall 18:Wood Frame, 16" o.c. 324 22.0 0.0 0.056 18
Orientation: Left side
Comment: Northeast party wall
Wall 12:Wood Frame, 16" o.c. 160 19.0 0.0 0.060 8
Orientation:Front
Comment: Northwest walls 2nd floor
Window 10:Vinyl Frame:Double Pane with Low-E 20 0.290 6
Orientation:Front
Window 10:Vinyl Frame:Double Pane with Low-E 6 0.290 2
Orientation: Front
Wall 14:Wood Frame, 16" o.c. 232 22.0 0.0 0.056 13
Orientation: Right side
Comment: Southwest party wall 2nd floor
Wall 15:Wood Frame, 16" o.c. 64 19.0 0.0 0.060 4
Orientation: Right side
Comment: Southwest wing wall 2nd floor
Wall 18:Wood Frame, 24" o.c. 100 19.0 0.0 0.059 6
Orientation: Front
Comment: Loft-Front Wall
Wall 19:Wood Frame, 24" o.c. 100 19.0 0.0 0.059 6
Orientation: Back
Comment: Loft-Back Wall
Wall 20:Wood Frame, 16" o.c. 175 22.0 0.0 0.056 10
Orientation: Right side
Comment: Loft-Right Side Party Wall
Wall 21:Wood Frame, 16" o.c. 175 22.0 0.0 0.056 10
Orientation: Left side
Comment: Loft-Left Side Party Wall
Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 481 30.0 0.0 0.033 16
Comment: Floor over garage
Project Title: Building 14-unit 103- Baltic Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-14-unit 103- Baltic.rck Page 2 of 3
Gross Area Cavity Cont.
Perimeter
Floor 2:Slab-On-Grade:Heated 36 10.0 0.796 29
Insulation depth: 1.7'
Comment: Insulation at garage slab haunchs
Floor 3: Slab-On-Grade:Heated 27 10.0 0.702 19
Insulation depth: 3.0'
Comment: Perimeter foundation frost wall
Ceiling 2: Flat Ceiling or Scissor Truss 300 38.0 0.0 0.030 9
Comment: Ceilings not in loft
Ceiling 3: Flat Ceiling or Scissor Truss 432 30.0 0.0 0.035 14
Comment: Loft Ceilings
Skylight: FSM08:Vinyl/Fiberglass Frame, Double Pane with Low-E 22 0.440 10
Compliance Statement. The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been design d to meet the 2012 IECC requirements in
RESch k Version .6.5 and to comply with the mandatory require4re
ed in thM
ck Inspection Checklist.
lzf
Name-Title S' Date
Project Title: Building 14-unit 103- Baltic Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-14-unit 103- Baltic.rck Page 3 of 3