Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
270 PEPIN PL BLDG 10
202000430 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER CERTIFICATE OF OCCUPANCY DATE: 04/13/2020 GIS ID:70700270 FEE: 30.00 MUNIS APPLICATION# 201801993, -BUILDING DESCRIPTION: APPLICANTSLOCATION NAME: T&M BUILDING W01c', ADDRESS 270 PEPIN PLACE ADDRESS: 110 BROOK STRE15FC -OWNER: __'7 BUILDING CO INC BROOK STREET j TORRINGTON,CT 06790 DESCRIPTION OF WORK: CONSTRUCT:1,076 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS 2.5 BATH,2,CAR GARAGE&DECK BLD.1 0 UNIT 270 SPECIAL CONDITIONS: ALL WORK TO BE DONE IN ACCORDANCE WITH,THE APPLICATION-AND PLANS APPROVED BY THE BUILDING DEPARTMENT. CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING OFFICIAL 4113/2020 12:54 PM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE INSPECTION FIELD SHEET 02/10/21 Printed by Middleton, Morgan 14 54 39 INSPECTION: 110292 FRAMING (ROUGH) PERMIT: STATUS: APPLICATION: 201801993 LOC: 270 PEPIN PLACE SOUTH WINDSOR PROPERTY ID: 70700270 OWNER: T & M BUILDING CO INC CONTRACTOR: REQUEST BY: PROJ DESC: CONSTRUCT 2,076 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS WORK ORDER: INSPECTOR: ROSE RESULT: PASS REQUESTED: PRIORITY: SCHEDULED: 01/29/20 PM COMPLETED: 04/13/20 UNPAID FEES: 00 Date Time MILEAGE: 00 TIME: TRAVEL ONSITE COMMENTS: ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION 04/13/20 DOUG PASS B001 FOOTING 04/13/20 DOUG PASS B002 FOUNDATION 04/13/20 ROSE PASS B004 INSULATION 04/13/20 WEAR PASS BO10 FINAL 12/12/19 ROSE PASS E001 ELECTRIC SERVICE RELEASE TO WVERSOURCE CRS 43363306 12/17/19 08/15/19 ROSE PASS E002 ELECTRIC UNDERGROUND 04/13/20 ROSE PASS E003 ELECTRIC ROUGH 04/13/20 DOUG PASS H003 HVAC ROUGH 08/15/19 ROSE PASS P002 PLUMBING UNDERGROUND WATER TEST ON UNDERGD PLBG & TEST HOT & COLD LINES. 04/13/20 DOUG PASS P003 PLUMBING ROUGH O1/06/20 ROSE PASS P004 PLUMBING GAS TEST GAS PIPING FOR METER SERVICE APPROVED 03/1B/20 FOLG APPWBOND Z003 CO PLANNING INSPECTION l f S y 4 C APPLICATION FOR PLUMBING PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074(PHONE) 860-644-2511 EXT. 230 DEPARTMENT DECISION PERMIT NUMBER: APPLICATION IS HEREBY: 1 ct UO APPROVED: BLDG.PERMIT NUMBER: DATE INSPECTOR LOCATION OF WORK: �d PF'(,� 1 N �I C APPLICANT: OWNER: TYPE OF STRUCTURE: _ XNEW BUELDING NAME: -,�� C) Q1(1,f+ (ecVj6Z NAME: j V Im &j jA y Ca • ❑ADDITION PHONE NUMBER:�'� �T ^]3 PHONE NUMBER: 5116 q F4 ?,>a 9 Cl EXISTING BUILDING ADDRESS: S3 ALL r )�►$ars D� ADDRESS: //a TYPE OF USE: *ESIDENTIAL o COMMERCIAL PLUMBING INFORMATION:( FURTHER DESCRIPTION OF WORK: TYPE OF INSTALLATION: tJQty '1{b L0f tie ULd ��L t� �- a No.OF TOILETS:�_STYLE:kuAwto.OF BATHTUBS: w k D V LB NO.OF SHOWERS: I NO.OF LAVATORIES:_ !y _ NO.OF CATCH BASINS: No.OF FLOOR DRAINS: ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY WINDOW? c%ES °NO ESTIMATED COST: IF SIZE OF WINDOW: SIZE OF DUCTS: r- k- SEWER OR SEPTIC TANK: FEE ENCLOSED:S 3/� �- SIZE OF WATER PIPING AND RISER: Ili WATER HEATER: TYPE thcrl L MANUFACTURER FEE SCHEDULE:$18 PER S1,000 OF THE ESTIMATED COST. ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS SLOO OVER (.26 CENT EDUCATIONAL FEE 17VC7. AS PART OF THE PERMIT FEE) THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: TYPE: ^I STATE: T SIGNATURE OF APPLICANT: DATE: hzh9 r. APPLICATION FOR HVAC PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230 DEPARTMENT DECISION PERMIT NUMBER. APPLICATION IS HEREBY: I q oo-7 Q 3 APPROVED: BLDG.PERMIT NUMBER- DATE INSPE OR LOCATION OF WORK 70 Pe pi n P/c;_c e APPLICANT: OWNER: TYPE OF STRUCTURE: /1 '' (( V<W BUILDING NAME: Nki Affo r I�,.A Hc,LL?-A;(b� NAME: � i~t o ADDITION PHONE NUMBER PHONE NUMBER C%``L 1 3�) o EXISTING BUILDING ��c�r+dl ADDRESS:? l✓vC' Rp P� ADDRESS: I)o g wx>k S`}- x ' TYPE OF USE: C.'r Ylolc C'r -Y�7iG Tod V l��on C T O Goo �// iSRESIDENTIAL ❑COMMERCIAL // HVAC INFORMATION: FURTHER DESCRIPTION OF WORK: TYPE OF SYSTEM: AZATING � Tn,4-sk(( WG C M P�.�r C�CI 11rC .SCrS� HEATING: TOTAL HEAT LOSS(BTUH) °F (HEAT LOSS SHEET REQUIRED) DESCRIBE ALL HEATING EQUIPMENT(INCLUDE MAKE AND MODEL NO.): Goac(.Yx�, �GM N S�i60�/o 3A1�17 �j ESTIMATED COST:S coo AIR CONDMONING: DESIGN TEMP:OUTSIDE °F INSIDE T DIFFERENCE F° FEE ENCLOSED:S I 7`7'•U�� TOTAL HEAT GAIN(BTUH) (HEAT GAIN SHEET REQUIRED) DESCRIBE ALL COOLING EQUPMENT(INCLUDE MAKE AND MODEL NO.): FEE SCHEDULE:$18 PER$1,000 OF THE ESTIMATED COST. Y� ( ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS S1.00 OVER (.26 CENT EDUCATIONAL FEE INCLUDED AS PART OF THE PERMIT FEE) THE UNDERSIGNED NEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK CONTRACTORS LICENSE NO.: 0-. q 1,79 a-S) TYPE: S_ l STATE: C T SIGNATURE OF APPLICANT: DATE: ( ► bah 4 a0�9oa��s r 5 APPLICATION FOR ELECTRICAL PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230 DEPARTMENT DECISION PERMIT NUMBER: APPLICATION IS HEREBY: HV� 7 APPROVED: BLDG.PERMIT NUMBER: DATE INSP CTOR LOCATION OF WORK: Z 70 � '���1 —� G�—f ' 1c?z 15-1.� (o APPLICANT: OWNER: TYPE OF STRUCTURE: fNEW BUILDING NAME: NAME:NAME: ]`�✓r� �l//L�//!/dL ❑ADDITION PHONE NUMBER PHONE NUMBER: Z5�6D ZSV ❑EMSTI IG BUILDING ADDRESS: ADDRESS: Ile TYPE OF USE: 1491DENTIAL ❑COMNIERCML IL ELECTRICAL INFORMATION: FURTHER DESCRIPTION OF WORK: TYPE OF INSTALLATION: /7�t 4 SIZE OF SERVICE: �� /=,Ole SIZE OF MAIN SERVICE: /fO NUMBER OF METERS: NUMBER OF PANELS: NUMBER OF LIGHT CIRCUITS: ESTIMATED COST:S — NUMBER OF SWITCHES: I aV NUMBER OF LIGHT FIXTURES: FEE ENCLOSED:S I NUMBER OF A/C CIRCUITS: NUMBER OF POWER CIRCUITS: /Q FEE SCHEDULE:$18 PER$1,000 OF THE ESTIMATED COST. ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT NUMBER OF OUTLETS: IS$1.00 OVER (Z6 CENT EDUCATIONAL FEE INCLUDED AS PART OF THE PERMIT FEE) THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: /O��:S�z _ TYPE: E/ STATE: SIGNATURE OF APPLICANT:��e C�'��L�� i.' DATE: 42 -9--Z0/ I SITE COMPLIANCM CHECKLLST RECEIVED TOWN OF SOUTH WiINDSOR,CONNECncur *****FOR C OF 0***** MAR 18 2020 ADDRESS o I►y� > � y /� WINDWR PLAMINQ DEPT. �/�0 9 , Reviewed by B CONTACr/DEv +'m I" utxf Lf )X7 1 )7 Y Date Reviewed --L, la• ied PH#r 7 E 2 1 aq u Reviewed by P7 VWV*V) Pe pv n Date Submitted / Z• Date Reviewed 3 a2 �jD��ied Date Reviewed Approved/Denied(Health) As required in the Zoning and/or Subdivision Regulations,no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied N/A �L 1. Approved building permit plan 2. Finish grading per approved building permit plan 3. Site work, i.e.trees,shrubs, dumpsters,required parldng 4. Utility location; a. sanitary sewer/septic systems b. foundation drain --� C. electrical&telephone d. water e. other 4.+r 5. Sewer connection charge paid 6. Appropriate certification 7. Bonding 8. Planning&Zoning/ Inland Wetlands Considerations a. Lighting b. Signage Freestanding Wall C. Fee in lieu of Open Space COMMENTS: A, Je S 'fD 3i/ 7/r ��Cl1 P ►=.ti..� Cow..ce. �--s- \�.rel�e.�C �k.c.•�. �<<•.►+�Y olae.✓1 evi ���'ewcc�,r s/engineering/molloy/site compliance cheddist 43 a. , / } B / + (, r ..-_� EASEMENT pV FA wR cF ? A ` 73.5 / + i_�l _ MA EWN LWEW NER CANPANY Y /1 \ / ` ,\ i't ,1 ' (K. 2498 PG 78) E ! x71.3 \ \ \ _I 1 t r•.r• .--�� WATER EASfLENT NV rAKff of ME7ROPOMAN O/S7R/CT �+ (KL 2J90 PG 6) C 1 + x71.4 !! 1 +�x 72.4 % \ 2" ,,,,SLE +/ — — — -�1 / 1` �r I k'k w� YANKE£CAS EASEMENT c M �'� I , i � (YM 2500 PG J2) M FVA LAA19sCAP1Nc 70.8 �+ x71.5 1 r CAR ' P `\ r / r r r 1.0' SH 14i PA no 41!111 !�isij! 1 7 1.9' 2" � \ \ \ CLEANO'UT � F \ oQz /NY768.67 r 'c+ \ , 69.50 r- i \..lr DECK \ x 69.5/V�66.75(12'CPP) y g ■ 1 y. Orr ■s x cy Silk, cy -- Q 4YNV:6144 DECK I I x�ZJ NOMM y o u 0.9' L AU AAWAEWrA 7M MAID ar SEr 6 VVICA9 AVVM p t7 2 M ALvDVTAL 0AR.■r M NAD el WRACM DARM 6 NATO A■E n 1\ / \ L RPCI�E7P/1 IS IV PC 101/57MAL 2p1E MO+i-M 1G11E 3 a cy x .9 4. RE PRAM AREA-21542M SOVARr FEET 0R ARS47 AOWS a PAa9ERrY a MOr N A ROAD MZAAID AREA AS VD rEV aV RE 7M RODO MRRAACE RA)£ YAP NARA�OAO COEMTY,COY1ECAp/T(AfL.R.1¢ISLNC1KY45f PAAEL J7R Or 47S YAP MA@]i N mm 090aXW74r VMJ7W DA 1£SZPMW E1P 24 20M' 1.0' p PA710 \ \ 4 MWON OLAV D1urY,S1M.CR.4E AAO FAOUIY LOG"M5 VD-ACED AAO AVER 19WF MA W O � _ — x ,r , /, F \ \ I x71.4 BEEN rnRxtu M PARr•MOM Armor MAM%W AiHED Or RE MSVECRW VMJ7Y QawAAWS � 4A DQ \ \_ l \ + ooa v \ \\ \ 1il nWS Am6 ON&-CaV aEr�S APJ aWA 7OW E0.M EAPC AD6 WMU Y OR*W S L40Y FE1 RAPES YAY i=r a ,\� ♦ ti,--- \ $• \ 5 LW RE 91E RE EYSIEICE tT IMAIOV ARE rA;raPNOirN m acs,ov PAa�ES9QYALC INC 1NF.s7C VV \ 1^ \ +t�+ P O 9' coa nnv AAo ExsAEwr ar Art sum rEA nAas wsT ae Aran armaMen AAn Ecoestn Br nir y •J ` _ / - _ iiiMMaNN P� ' ; 1� AFrROWAIE AVVAW ES V~m CaWIRM"M CALL MUM M LND 1-e 0 9a-M6Si +� r r5o , /�+ , \ r s. CLEANOUT 71.3 r x71.2 r\ \ r SAP R£fFR£N= g � t_,�r ', t MaxroE.r-MENT LOCH naV wRWr-R£cam savrN wNosae 1.9 6 \ r 1 Mt0Gi0S PLEASANT VALLEY ROAD SAf17N MINOSOR, CONNECnwr DA7E 12122115 RENSM 05IJ1/16 SCALE 1-40'S7EET Vl OF 5 DES&V PROFESSOVALS; ANC .y 1.0' CB , 5 I t p G \ F 71.59 X + I /Nµ66.26(f? CPP) a 3' + \ G� \ p /NV.`6S 9 15'CPP � ' 9 1 CLEANOUT \io. \ `�� \ OV 1 9HKEd0Z�S 11 ` 70 6' I '� /'�— ` '+ L NO SGR+Y AW YAP MS SUN PAVW ED PEWMAWr m RE fiFaRAMM Or a?V%WjrarT STAW 1 + i AW CE5 YCDrWS JV-X%-f RM ZP-JMV-1D MD AV SrAMWM RO 9GPK/5 MD YYS M N/ �VV 2.0' �'p \\ s+ EL H.L'\ ` .+s — 1 V+ RE SMA PE Or mV,MUr AS ADWMV NY RE cumerP1a/r ASSgaA)It N OF JAAO SERWMn ` .J /J .r '-\ al O 1 rxr ar SiRKY a AR YIFWbCldE IS AIZA IV P-ALL17�-MO a NEIILND m N \ / t \% � \ '; / '„ , ` t � '4 DFFlCT RE LaGINOV Or YN01k7EN75 AFLIRIE m RP[iE1P7Y(KS y ,(� _\\N ` 't RRT a A ACROPWY NA.YD aN YM AT7D�ID/[MOTE BEECH + +',,\ `'I `+ a ,3/APLE / `1 V-` / �. 1, 7A��7KA SueAcr Lms a.L4 A-t sTMwRvs Mo IEielrAL AmRAcr LErrS aAss \ �J 70 MY A7YtlMLME MO 6[LEF, IM MAP IS SEWrAN7MUY CaMCT AS AOM SCALE: 0 10, 20' 49 '7"7 1' - 20' Aa V-1 �I MAR 7-SO �HGIN ER�NGp �� T 1540 SULLIVAN AVENUE®SOUTN WINDSQfi CT 06074 'N�BQR•Co�� TELEPHONE(660)644-2511 AN A ` CONCERNING CONCRETE FOUNDATIONS: Section 1(Public ActNo.16-45)M-W)(Effective October 1,2016)Prior to the Wuanoo of a CaMeate of Occupancy for a now residential,or cou=oreial building for which a concrete foundation was installed:ou or after October 1,2016,tho applicant shall provide the Building Official with written doownentation of the name of the individual or entity that supplied the concrete aid the nazae of the individual or entity that installed the concrete. Copies o>aulx docrmentation shall.bo=mhmod in the records of the office of the Building Official for not less than fifty(50)years. Please fill the information in and submit to the Budlding Department: Date of ftttformattont received/E{led-._c y/ / ,?O�2L'� /� Project xoatiou: S©" h 6.A v�Q' yAe,(�`y[Ge.� n Job description:_ ,;� _p�YJ►rt �1 ct[e. l��l I� �� f�lr�%( 10 C®I CXZETE sUPFL R -CQNg M RMALLER (Please Print) (Please Tint) Address.-__, -• fg!Q "o—ore' J Address: A10Aviv Li Phone/contact:�d-IiE�- y�/Z phone contact: "O d • O AMMMANEX0� Oz 1-a-fam RECEIVED rl :ue:_ r�_f•�i�lra�6, C� - �o�i�`��i��� APR 13 2020 South Windsor Buikft Dept Address: /�D �/'p�G Phone/Ccnatact: �• � � � ors' ><� -� ®6 E-�aii:���,. 5•�a�rt,tia�� � �t���� �o� Signature: �� .--�— Date: i DUCT LEAKAGE TEST RESULTS RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 03-13-2020 Test File: New-Exeter-Unit#84-282 Pepin Place,South Windsor, Duct Test Performed For: T&M Building Co. 110 Brook Street Torrington, CT. 06790 Phone 860-250-6144 V. Castellon III / R. Matto Test Results 1. Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 25.0 Pa 3. Measured Duct Leakage: 63.0 CFM (11.9 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 252.0% 5. Duct Leakage as a Percent of Building FloorArea: 3.0% X Pass Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house, forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. BUILDING LEAKAGE TEST RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 3/13/2020 Test File: Exeter-Unit#84-282 Pepin Place, T&M, South Windsor Customer: T&M BUILDING CO. Technician: V.Castello n/R.Matto 110 BROOK STREET Project Number: 03-13-2020-E TORRINGTON, CT. 06470 Phone: 860-250-6144 Building Address: EXETER STLYE Email: bob.stanhope@tandm.com SOUTH WINDSOR WOODS Website: tandm.com #84-282 PEPIN PLACE SOUTH WINDSOR, CT 06074 Test Results V. Castellon III / R. Matto 1. Airflow at 50 Pascals: 1083 CFM50 (50 Pa= 0.2 w.c.) 3.71 ACH50 X Pass 2. Leakage Area: 59.6 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient(C) = 85.2 Exponent(n) = 0.650 (Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 48.3 CFM 0.17ACH 9.7 CFM per person 2. Estimated Design Infiltration Rate: Winter. 69.6 CFM Summer: 54.7 CFM 0.24 ACH 0.19 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: InsulSafie \L Fiber Glass Blowing Insulation I A, Certificate of Insulation MINIMUM INITIAL INSTALLED THICKNESS WhiMW , THICKNESS MAXIMUM OVERACI AR-YALUE BAG t.: . '. TO OOT�OI A TW'OYH OEtM;TOMCF.OT: Mit!�1ON,Q.FT.pM W OF ItET AII[A l%MWON Of W INV"NOT COIIUI am TWY[ SHOW NOT K LW TINR � LORDMO1 K IN TOR R 60 31.4 31.9 22.00 22.00 R-44 22.4 1 44.6 16.75 16.75 3 11.75 67.1 R-30 14.9 11.75 R-13 6.2 161.7 1 5.25 5.25 •' c lnsttl5afe"5P Fiber Glass insulation has been installed to the manufacturci recommendations and will This is to certify that CertainTee l achieve an R Value" of using 5 K.lgs of insulation to cover (io silu re are feet of area at a minimum installed thickness of L.S inches. 3::. . 01V Statc Zip $two A re," Siglud t nst� rr5 Vale eW-Elctglat"uildingProducts-- - ,i.uc Vicetue tium r il'rryuirc omptt t 45 Golden Street .Meriden CT O6450 — City,st.t 1490-445-9717 ln.alSa1.1.11 i,nononnbn.tibir,nom onoch•e mul inuTReni: A prnrhtci dcsiFncd Tor ualay's saicly stambrds and bnnorrowti mer}y rrryuirenls nts.Keep duff crrubrra wish}vnu othrr c:duehlr pal r. if t•uu eeet sell this ptolwnyt tbi;cettilicAte slumlel he p.mcd,rn to th,•pun Imsn •'I he higher the R-Vaiur•ills'gn•an•r ilie lu+ul,lunR pacer —. yottr viler for the lact%hci•t ou R-Wtlries ti11T@� tr••NrT■aJr:nl_.r 5.r,ya.f:.,a•u.,l..I' C.dainTiad lwprrr t wr 1!O.tka OW • 79u t..iwetimWd 114wt • Valk Fmgr.PA 19481 wY■at V..Omd.ermr r; TOVIAn ��,(t2 o �slcw ?V%� 6t- w� 1.540 SULLIVAN AVENUE e SOUTH WINASQfi, CT 06074 f��so$•co TELEPHONE(860) 644-2511 ACT CONCERNING CONCRETE FOUNDATIONS: 5eotion 1(F611cAdNo.1"5)(NM(Effective October 1,2016)Prioxto the issuance ofa Certificate of Occupanoy for a now resideatial or coi=ercial Ddding for which a concrete fonadatioa was installed on or after October 1,2016,tho applicant shaft provide the Building Official with written documentation of the name of the individual or entity that supplied the concreto and the name of the individual or entity that installed the conoreto. Copies of'such documotation Shan ba wandaixted is the records of tho office of thei Buildizt$Official for not less thm fifty(50)years. Please 0 the inforbaatiou ins and submit to the Buffdiztg Department: Date of formation received/ftled: Project?loeation: 2Qg % Sob desulptiorn: 06 PPAT )h Plan'- 12N�� , ✓� . j ,zr ON tJPP —qp9a=='PAx,]GlM Name:_ AtgdgAr,s Lou te' ri=e: 9 Oy cSoviI (Please Print) (Please runt) Address-. . 4dowf g J Address: �r /V1 0i y q l 0W17Y Phone/contact: a' ✓��' y� Z phone Contact: 6L4L�• ✓��i��' .A.11'PLYC.A��I7ClC4/N'PR-At�C'X"4R�n�oxxaa#fo�/; (� (Please Print) Addresg: /iD ,Gro�� : x�har�®!�a>ut �t: �6�AP- W 2 orb' �at•> —,VI,ZPEE->oaafl: D��i. �J�Ar•t�rtYeG c7 JIoA/ �.fgvattraee: ' ! Date: RECEIVED APR 19 2020 South Windsor Building NO r BUILDING LEAKAGE TEST RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 3/13/2020 Test File: Ives-Unit#85-290 Pepin Place,T&M, South Windsor Customer: T&M BUILDING CO. Technician: V.Castel lon/R.Matto 110 BROOK STREET Project Number: 03-13-2020-F TORRINGTON, CT. 06470 Phone: 860-250-6144 Building Address: IVES STLYE Email: bob.stanhope@tandm.com SOUTH WINDSOR WOODS Website: tandm.com #85-290 PEPIN PLACE SOUTH WINDSOR, CT. 06074 Test Results V. Castellon III / R. Matto 1. Airflow at 50 Pascals: 1196 CFM50 (50 Pa= 0.2 w.c.) 3.96ACH50 X Pass 2. Leakage Area: 65.8 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient(C) = 94.1 Exponent(n) = 0.650(Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 53.4 CFM 0.18ACH 10.7 CFM per person 2. Estimated Design Infiltration Rate: Winter: 76.9 CFM Summer: 60.5 CFM 0.25 ACH 0.20 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: DUCT LEAKAGE TEST RESULTS RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 03-13-2020 Test File: Ives-Unit#85-290 Pepin Place,South Windsor, Duct Test Performed For: T&M Building Co. 110 Brook Street Torrington, CT. 06790 Phone 860-250-6144 V. Castellon III / R. Matto Test Results 1 Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 25.0 Pa 3. Measured Duct Leakage: 58.0 CFM (10.9 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 232.0% 5. Duct Leakage as a Percent of Building Floor Area: 2.8% X Pass Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house, forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. i . InsuiSafe Fiber Glass Blowing Insulation i 4 Certificate of Insulation :SS. R-VALUE BAG RE.UUMHAE NIS MAXIMUM COVERAGE MINIMUM INITiAL INSIALLED THICKNE, MiNIMUM SET11--0 THICKNESS TA OWW A r11t11trN pt3R7MICE OP: L4kU PER"M 99"MW w Or 00 MN 11"sma NOT COVIR■W Tom; Now NOT K LLZS 111Ar • owe ROt R U t flow. `Y R-60 31.4 31.9 22.00 ` 22.00 R-44 22.4 44.6 16.75 16.75 1 :,>y:; . =R-13 14.9 67.1 11.75 11.75 6.2 1 161.7 1 5.25 5.25 This is to certify that CertainTeetl insul5afe'°5P Fiber Glass Insulation has been installed to the manufacturer's recommendations and willwry R—�-- — 1 Dui R-Value" of using ( bags of insulation to c mer D se[tare feet of area at a minimum installed thickness of i` . inches. achieve is") 1 U -Q - Street A ress City State Zip • l E ?J�L� �( Il U��JvcJ -- •��h�7 no Date t .t er N t-} C. l v c i o- Z Nump.+—Building-Prodtleft ` --- - tote _icemw!awn r(if rcyuired) — S Golden Street .Meriden, CT 06450 - (-ity'Sul i,.g00-44S-9717 In.ulti If."I"is it,-lit. mnn orrmit•e atul inorganic.A rr.r h ci designrd Inc itwlays satrlc stindarJ+:urd tomornlw•s energy nYrutrement�.Keep lion crrutttatt with Sow other valuable[xtpt rs. 3 N: If Saco aver u II this property,thi;cenilicatr Would hr lxrsed r•n to the Ixm Iwxer. •The higher the R•Velur,dlr gnvtrr ate lnsulming Lawn A4 your seller for the laa J-:1�xY K-laltus w CerUinTeWM (ti.hro waJ.;uu_•\•circa/w..�rr.•b./' i Cert'aleat Cu►pu Wn 80[tiM� IW L tirairs&W Road . W11ry f*o.W.PA l4W waut redmm RECEIVED 1540 SULLIVAN AVENUE•SOUTH WINDSQIi.CT 06Q74 JUN 2 3 2020 TELEPHONE(00)644-2511 ,ouch Windsor Building DeM A►t�i A&CONCERNING CONCRETE FOUNDA,`t` ONS: Bad=1(Publtc ActN0.1645)W)Moadve October 1.2016)1Srlor to the lseuamm of a culf3aate of Occgmy Su a new reuide did or commaaW bwldlog for which a oonwvto toon e; W"ineW04 On or saw October 1,2016,d a applioemt slut!PwvM8 the BuUftg Official with vvrlthm doouaaemtatioen of IM reaae of the individual or entity drat scgeplW the cram eto arvd the nam of the h dividaal or ekW them faetalled the co>aeacata CqpW �"bo maintained in llta ramouU of the ofka of t1#BuUft Of idal far not lea Please MI this infonution in and mbn g to the Baldfug Depwtment: Dab os�xece�ve/dlBMd: �/ .,�Q�D /L Project tkvc+tet[wa:_ sob No me:- a 1 �r4� 6)/4Wet - Nxms: rSlm►1 Prk* Q►las pduo e «•:� -- � 5 .lalr...= � /Von' ate r�rcotatact: ed- �G• Y// lam.c,�t�_�D-6y�1. 5�,��, aae�ar�.: /�D �e�iS�. rlt�arc�b+�: �y•y�9• �`�9 6 01 E.> 6.9�aK�tri� � , fob VOL. �i���a InsuiSafe Fiber Glass Blowing Insulation 'a *� Certificate of Insulation H BAG REQUIREMENTS MAXIMUM OVERACt MINIMUM INITIAL INSTALLED THICKNESS MINIMUM SETTLED T14ICKNESS •''.Y' W INIM A TWORk Itt'l1 aKt Or. OA6t PO MR AQ FI AN M'Or KTNtG cour m R W NMI)UOt COM mtlt Irm. rMOUM NOT K Ills TNAIt: SIIWLO NOT R tTlt THAW R-60 314 31.9 22.01 2200 R-44 22-4 44.6 16 75 16.75 R-30 14.9 67.1 11.75 11.75 l R-13 6.2 161.7 525 5.25 •tee::�. This is to certify that CertainTeed lns�jlSafe"SP Fiber Glass Insulation has been installed to the manufacturer's recommendations and will achieve an R-Valuc* of 32 using hags of insulation to cover hO.square feet of aura at a minimum installed thickness of N. inches. G V C 1. �' �� tJ, `�l/�•i� 1_'{ r��_!` J 11' C _ (OV "�`: . reef A reK City Stitt- zip � �``*'� Si Insttt cr Date :': om t l t3k11BgPr+ -. Stair uccrnc NamTicr Til'r.ctnnrcl�i 5 Golden street Meriden, CT 06450 _ ; z vut1- 445-9717 t'"' lr+,+dtalr W w mmc.rndnwihk,n.mronr+si+t auJ irr.rt�anlc.A�r.>,bu.t desl�ned tar tr+day's s1f+It tita+ul,trrlr l+ikl romr�mrv.x trKrgy rrquorrnents.Keep this crrtth.-at'.with yvm other rahrahk parr r> e It you reel vll Ihfc p►i7my,th6 certificate should he powd.,a k•th.•purriutser. 'The higher rin•R VANC,Ihr;',reur•r the imidiftnit V mrr.A.k+•our m-fles Ga rbt lacy�he.•l++n R Moue. CertainTeedffl- C"tas+Tred Carew rrrref r o Los W - I ttr E !SYm&%hnd ttud • Wifer frnw,rA 194w - wwrdrrurnreed awn DUCT LEAKAGE TEST RESULTS RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 04-09-2020-D Test File: Dover-Unit#83-278 Pepin Place,South Windsor, Duct Test Performed For: T&M Building Co. 110 Brook Street Torrington, CT. 06790 Phone 860-250-6144 V. Castellon III / R. Matto Test Results 1. Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 25.0 Pa 3. Measured Duct Leakage: 62.0 CFM (11.7 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 248.0% 5. Duct Leakage as a Percent of Building FloorArea: 3.4% X Pass Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house, forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. BUILDING LEAKAGE TEST RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 4/9/2020 Test File: Dover-Unit#83-278 Pepin Place,T&M, South Windsor-Air Customer: T& M BUILDING CO. Technician: VCastellon/R.Matto 110 BROOK STREET Project Number: 04-09-2020-B TORRINGTON, CT. 06470 Phone: 860-250-6144 Building Address: DOVER STLYE Email: bob.stanhope@tandm.com SOUTH WINDSOR WOODS Website:tandm.com #83-278 PEPIN PLACE SOUTH WINDSOR, CT. 06074 Test Results V. Castellon III / R. Matto 1 Airflow at 50 Pascals: 712 CFM50 (50 Pa= 0.2 w.c.) 2.76 ACH50 X Pass 2. Leakage Area: 39.2 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient(C) = 56.0 Exponent (n) =0.650(Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1 Estimated Average Annual Infiltration Rate: 31.8 CFM 0.12 ACH 7.9 CFM per person 2. Estimated Design Infiltration Rate: Winter: 45.7 CFM Summer: 36.0 CFM 0.18 ACH 0.14 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: �; r . • oil - s� •.. ••. M. n �WORKSITESHEET DATE: W-Building Company Delivery Address 110 Brook Street ,400 Pleasant Valley Rd 'Building , Unit# i i Decks no roof or hot tub ■ M•• � • � ■■■■■■■ � � �■■■0►J ONE■■■■■■■■■ OMEN■ONO ■■■�11■■r7YY }IY■■■■■■■■■■■ -jjrQN7jrf.,4 Per ■7■�■�Y�■■IiY■■1IY�il11YYr�t•■■■■■ti■■■■ Rotary H"cl: ■�i■�■■ice■■■■�YY■■■■■■�It■■■■�■�■■■■ .. . o�t�■��oil , : . � : ' , ■�ir■■■■I■-i■■■-�I I■�il■- 00001110 Signature of Installer: r . • i pow se�� Town opsaua v&&4,'t RECEIVED 1540 SULLIVAN AVENUE*SOUTH WIN4SQ14,CT 06074 MAY 14 2020 TELEPHONE(MOj-644.2511 South Windsor Building Dqn Ate` CONCERNING CONCRATIE FOUNDATIONS: . Swd=1(1' UC Ac�No-16.45)XW)rya O*bar 1,2016)Prior to tbb luua=of a CaW ats of 0=f mW for a ww V*idaa W or cmm&vWWft for WU,*a colao*fot»:datLoa was luet�led ore or ell6er Dcbober 1,2016,On appUoant shalt provide the Bulldiag Official with wdittaa docuaetaz►tation of to nAm of the hxdivtduat or- ... t haat m"Ifed the cmmrete and the new of the individual or a dty that iastailed flee cowxoto. Ctrpies of=*du meatti►ft 64be Xabida wdist o records oftha oTm of the Buff tg OfMal for not Im then$fly(50)ymm Please fM the fnfOnnstion in and rgubmft to the Baffling Department: Date ofboif Mnad"xecekv.avid 4d: Proj.cc>loaatto�a: k� , C I, Job Emil Nsunaet_ Rik! !n0'4 �D ftCyG...1z Name: gee r (PIN"Prbtt) (P1me Ads: Addrew: , wr Phoae/Contut: d- .J!�` , B /! Phone cautt�__ �D�Ly�• ���g , , Nit.—G"�• {Pleaso Pt� Adder: ' ,-6f vE-mait:�BtO.�Lir• �Yi,,�a� �c�IKI, !� 5lgaatvse: � �9' did , • - 12-13-2019 Building • •. Address 110 Brook Street 400 Pleasant Valley Rd Building 1 Unit# :• Type of project: Decks no roof or hot tub ■■■■■■■■■■■■�■�■►■�■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■/'.7■r.7I1■r•7■■/.fit■■■■■■■■■■■■ ■r•:�r►:4rair►:•�r- ffin■llr.�iw �l■■■■■■■■■■■■ ■E1■�■1k1■J■■�I■■■lIY�V�IY■■II■■■■■■■■■■■■ Signature . Paz&OSPa4V insuiSamw Fiber Glass Blowing!Mlation Certificate of Insulation TO asctra a t7MMM title ISM OFF SAM Pt t0M 19 R nM r Of WT wts of on"we 01 eavN1 iMMRM1IR _ nauts rer Y«ss rttre R 60 3IA 22.00 R-44 U4 16.75 1 1 16.75 R- IF1 , This is to certify that GcrtainTeetl InsuiSafe'SP Fiber Gins Insulation has been inmalled to the nmAufacturer's and will achieve an R-Value* of using bap of insulation to covera7 square feet of area at a minimum installed d4cktess of 1Y, S itches. Q G � � �Z w c 7 y Street Address I city p �ZJ �i 7tnratt�l e 0 WL., v Oj��y Z ui wip1naglaad IIaildlrig Products e u ttrqu • c ttmpa t S Golden Street 1Vleriden&JkWO �- { .N�sUi490-45-9717 inmasak SP m lumen"bu%tim e.n„nconnOw mod fvuw mtk A prodam desipwd kw tedpyS satetp sturvionrt call psttonowt energy m"movi*m Keep this cmitksu with yener other vain"papers. if yat rvrr't11 thk prrgteny.this reridicate 4%xeki he petwed tat u,the puw wtter •l'hr htRhn the R-Wkw,the gw mrr t1w insu sting f"vet A,:k ytmtr tiller km tht ist't 4wrt(in R-Wlum CertainTeed■ Gttaiarred Lutinx jum • r!o tlt*w ry t, `pvjrtl.ad Muaut • V.eliry Fong,rA 10461 wA w."hmneri oo* a BUILDING LEAKAGE TEST RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test:4/9/2020 Test File:Ashford-Unit#82-274 Pepin Place,T&M, South Windsor-Air Customer: T& M BUILDING CO. Technician: V.Castel lon/R.Matto 110 BROOK STREET Project Number: 04-09-2020-A TORRINGTON, CT. 06470 Phone: 860-250-6144 Building Address: ASHFORD STLYE Email: bob.stanhope@tandm.com SOUTH WINDSOR WOODS Website:tandm.com #82-274 PEPIN PLACE SOUTH WINDSOR, CT. 06074 Test Results V. Castellon III / R. Matto 1. Airflow at 50 Pascals: 438 CFM50 (50 Pa= 0.2 w.c.) 2.53 ACH50 X Pass 2. Leakage Area: 24.1 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient(C) = 34.4 Exponent(n) =0.650(Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1 Estimated Average Annual Infiltration Rate: 19.5 CFM 0.11 ACH 4.9 CFM per person 2. Estimated Design Infiltration Rate: Winter: 28.1 CFM Summer: 22.1 CFM 0.16 ACH 0.13 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: v DUCT LEAKAGE TEST RESULTS RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 04-09-2020-D Test File: Dover-Unit#82-278 Pepin Place,South Windsor, Duct Test Performed For: T&M Building Co. 110 Brook Street Torrington, CT. 06790 Phone 860-250-6144 V. Castellon III / R. Matto Test Results 1. Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 25.0 Pa 3. Measured Duct Leakage: 62.0 CFM (11.7 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 248.0% 5. Duct Leakage as a Percent of Building Floor Area: 3.4% X Pass Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house,forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. 1 �40,0 ,,�/ v Tvwn t�s'UatA ?&Ua tL a� 1640 SULLIVAN AVENUE•SOUTH W(NOSQit,CT 06074 TELEPHONE(866 644-2611 Ali[ ACT CONCERNING CONCRETE FOUNDATIONS: Seudon 1(Public Act 14o.1$45)Q;M(Bi Wdve October 1s 2016)Prior to the issuance of a cutmeate of Ocoupaaay for a now re:tldantiel or commmld bulldicg for which a oonome foumbtion was installed,on or after October 1,2016,the applioatat shell provide the Building Offiotal with written documemtetion of the name of the individual or entity that eupgl#ed the concrete and the name of the individual or entity that installed tho concrete. Copies of such docameatatioa shA be zaitdainod in the records of the office of the Building Official for not Un than Say(50)years. Please Sil the information in and submit to the Buff teg Department'. Date of Wormadoat rocdvedlftW-. Project location: 22 01% ���r►!l'snnoKi �it,0 ASS Job desarilition: 2 7Q fle D 1 it cw_, �� 9/ Old l 0 Q903M ME= COMM 2MIAL= Name. t �a 4 .yeb!mcyd ' Name: 9tl CY1011 (pica"Pzhd) (Please ) AddresB.-_ -- 64 gfi t g 9t Addresr: 3 4 JV0.400L S ery. Phone/Contact: d'�✓' ` Y�ll phone Cotatttct: �� '��• ✓�'�,� {Please Fdut) Address:_ PhorielContzatce Ny-f 2 Signature: ye Dom; RECEIVED APR 13 2020 South Windsor Building DOM BUILDING LEAKAGE TEST RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test:4/9/2020 Test File: Exeter-Unit#81-270 Pepin Place,T&M, South Windsor-Air Customer: T& M BUILDING CO. Technician: V.Castellon/R.Matto 110 BROOK STREET Project Number: 04-09-2020-C TORRINGTON, CT. 06470 Phone: 860-250-6144 Building Address: EXETER STLYE Email: bob.stanhope@tandm.com SOUTH WINDSOR WOODS Website:tandm.com #81-270 PEPIN PLACE SOUTH WINDSOR, CT. 06074 Test Results V. Castellon III / R. Matto 1. Airflow at 50 Pascals: 736 CFM50 (50 Pa=0.2 w.c.) 2.52 ACH50 X Pass 2. Leakage Area: 40.5 in2 LBL ELA @ 4 Pa 3. Building Leakage Curare: Flow Coefficient(C) = 57.9 Exponent(n) =0.650(Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 32.8 CFM 0.11 ACH 6.6 CFM per person 2. Estimated Design Infiltration Rate: Winter: 47.3 CFM Summer: 37.2 CFM 0.16 ACH 0.13 ACH Cost Estimates 1 Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: DUCT LEAKAGE TEST RESULTS RPM Energy Solutions LLC. 69 Perry Road Hamden, CT. 06514 BPI# 5005996 Date of Test: 04-09-2020-D Test File: New-Exeter-Unit#81-270 Pepin Place,South Windsor, Duct Test Performed For: T&M Building Co. 110 Brook Street Torrington, CT. 06790 Phone 860-250-6144 V. Castellon III / R. Matto Test Results 1 Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 25.0 Pa 3. Measured Duct Leakage: 66.0 CFM (12.5 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 264.0% 5. Duct Leakage as a Percent of Building FloorArea: 3.2% X Pass Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house, forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. r Electric # APPLICATION FOR BUILDING PERMIT Plumbing# HVAC# l Date: 9 ..44��Ol if Sprinkler# Estimated Cost $ 11400 top FINAL APPROVALS Building COMPLETE RED BOXED AREAS Permit Fee $ -0 Engineering Occupancy Fee $ Affidavit TYPE OR PRINT ONLY Eng. Insp. Fee $ Appr.forCO. Oil- SIGN ON REVERSE SIDE t Total Fee $ � TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ The undersigned hereby applies to do work according to the following:1:;i-4 C,IC C Applicant Location of Work 41W11A Lot No. 1 Applicant's Address O Tel # a0d �'` Town Zip Lic.# [jo l`t 9Q Owner � 1� Architect Owner's Address Architect's A dress Zip Zip r�r Sq. Ft.New Area: 1 st Fl. 2nd Fl. 11A 3rd Fl. '07h Total New Area to Purpose of this permit - City Water Well J Septic System J Sewer Ins: HO SP Area Basement Garage Approved by Date Use Group Constructi T pee 74 0/o� l I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the pr e distance from all street lines,side yard lines,and required distances from all other zones and is located in whi this buildill its use is allowed. Signed I hereby apply for a Certificate of Occupa or t e wo d cribed in this application for the permit. Signed DO NOT WR BELOW THIS LINE INSPECTION COMMENTS INSPECTION FIELD SHEET 04/19/22 Printed by Middleton, Morgan 15 23:15 INSPECTION: 110295 FINAL PERMIT: STATUS: APPLICATION: 201801993 LOC: 270 PEPIN PLACE SOUTH WINDSOR PROPERTY ID: 70700270 OWNER: T & M BUILDING CO INC CONTRACTOR: REQUEST BY: PROD DESC: CONSTRUCT 2,076 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS WORK ORDER: INSPECTOR: WEAR RESULT: PASS REQUESTED: PRIORITY: SCHEDULED: 04/09/20 PM COMPLETED: 04/13/20 UNPAID FEES: 00 Date Time MILEAGE: 00 TIME: TRAVEL ONSITE COMMENTS: ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION 04/13/20 DOUG PASS B001 FOOTING 04/13/20 DOUG PASS B002 FOUNDATION 04/13/20 ROSE PASS B003 FRAMING (ROUGH) 04/13/20 ROSE PASS B004 INSULATION 12/12/19 ROSE PASS E001 ELECTRIC SERVICE RELEASE TO WVERSOURCE CRS #3363306 12/17/19 08/15/19 ROSE PASS E002 ELECTRIC UNDERGROUND 04/13/20 ROSE PASS E003 ELECTRIC ROUGH 04/13/20 DOUG PASS H003 HVAC ROUGH 08/15/19 ROSE PASS P002 PLUMBING UNDERGROUND WATER TEST ON UNDERGD PLBG & TEST HOT & COLD LINES. 04/13/20 DOUG PASS P003 PLUMBING ROUGH O1/06/20 ROSE PASS P004 PLUMBING GAS TEST GAS PIPING FOR METER SERVICE APPROVED 03/18/20 FOLG APPWBOND Z003 CO PLANNING INSPECTION i c REScheck Software Version 4.6.5 Compliance Certificate Project Building 10 Unit 81 - Exeter Energy Code: 2012 IECC Location: South Windsor, Connecticut SCANNED Construction Type: Multi-family Project Type: New Construction Orientation: Bldg. faces 225 deg. from North Conditioned Floor Area: 2,076 ft2 Glazing Area 5% Climate Zone: 5 (6155 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 270 Pepin Place T&M Building Co., Inc. T&M Building Co., Inc. South Windsor Woods 110 Brook Street 110 Brook Street South Windsor, CT 06074 Torrington, CT 06790 Torrington,CT 06790 860-489-9229 860-489-9229 info@TandM.com info@TandM.com Compliance: Passes using UA trade-off Compliance: 1.5%Better Than Code Maximum UA: 336 Your UA: 331 The%Better or Worse Than Code Index reflects how dose to compliance the house Is based on code trade-of rules. It DOES NOT provide an estimate of energy use or cost relative to a rrdnimum-code home. Envelope Assemblies Gross Area Cavity Cont. Perimeter Wall 1:Wood Frame, 16"o.c. 180 19.0 0.0 0.060 10 Orientation: Back Comment: Ground Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E it 0.300 3 Orientation: Back Wall 2: Wood Frame, 16"o.c. 135 22.0 0.0 0.056 8 Orientation:Left side Comment: Ground Floor-left party wall Wall 3: Wood Frame, 16" o.c. 168 19.0 0.0 0.060 9 Orientation: Left side Comment:Ground Floor-left wall Door 1: Solid 20 0.130 3 Orientation: Left side Wall 4: Wood Frame, 16" o.c. 160 19.0 0.0 0.060 8 Orientation: Front Comment: Ground Floor-front wall Door 2:Solid 20 0.130 3 Orientation: Front Wal 5:Wood Frame, 16" o.c. 333 22.0 0.0 0.056 19 Orientation: Right side Comment: Ground Floor-right side party wall 205 19.0 0.0 0.060 9 Project Title: Building 10 Unit 81 - Exeter Report date: 09/27/18 Data filename: C:\Users\Bob\Documents\bce\Building 10-Unit 81 Exeter.rck Page 1 of 3 lot Gross Area Assembly or Cavity Cont. U-Factor LIA Windows:Vinyl Frame:Double Pane with Low-E 7 0.300 2 Orientation: Back Door 3: Glass 40 0.280 11 Orientation: Back Wall 7:Wood Frame, 16"o.c. 82 22.0 0.0 0.056 5 Orientation: Back Comment: 2nd Floor-back party wall Wall 8: Wood Frame, 16"o.c. 113 19.0 0.0 0.060 7 Orientation: Left side Comment: 2nd Floor-left side walls Wall 9: Wood Frame, 16" o.c. 205 22.0 0.0 0.056 11 Orientation: Left side Comment:2nd Floor-left side party wall Wall 10:Wood Frame, 16"o.c. 187 19.0 0.0 0.060 10 Orientation: Front Comment: 2nd Floor-front 2x6 walls Windows:Vinyl Frame:Double Pane with Low-E 22 0.300 7 Orientation: Front Wall 11:Wood Frame, 24"o.c. 99 30.0 0.0 0.047 3 Orientation: Front Comment: 2nd Floor-front 2x10 walls Windows:Vinyl Frame:Double Pane with Low-E 25 0.300 8 Orientation: Front Wall 12:Wood Frame, 16" o.c. 333 22.0 0.0 0.056 19 Orientation: Right side Comment: 2nd Floor-right side party wall Wall 13: Wood Frame, 16" o.c. 9 19.0 0.0 0.060 1 Orientation: Right side Comment: 2nd Floor-right side wing wall Wall 14:Wood Frame, 16" o.c. 224 19.0 0.0 0.060 12 Orientation: Back Comment: 3rd Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E 27 0.300 8 Orientation: Back Wall 15: Wood Frame, 16" o.c. 208 13.0 0.0 0.082 17 Orientation: Left side Comment: 3rd Floor-left walls R13 Wall 16:Wood Frame, 16" o.c. 88 22.0 0.0 0.056 5 Orientation: Left side Comment: 3rd Floor-left walls R22 Wall 17:Wood Frame, 16"o.c. 147 19.0 0.0 0.060 8 Orientation: Front Comment: 3rd Floor-front 2 x 6 walls Windows:Vinyl Frame:Double Pane with Low-E 19 0.300 6 Orientation: Front Wall 18:Wood Frame, 24" o.c. 77 30.0 0.0 0.047 2 Orientation: Front Comment: 3rd Floor-front 2 x 10 wall Windows:Vinyl Frame:Double Pane with Low-E 25 0.300 8 Orientation: Front Wall 19:Wood Frame, 16" o.c. 288 22.0 0.0 0.056 16 Orientation: Right side Comment: 3rd Floor-right side party wall Wall 20:Wood Frame, 16" o.c. 8 19.0 0.0 0.060 0 Orientation: Right side Comment: 3rd Floor-right side wing wall Floor 1:All-Wood Joistlrruss:Over Unconditioned Space 440 30.0 0.0 0.033 15 Comment: Floor over garage Floor 2:All-Wood joist/Truss:Over Unconditioned Space 300 30.0 0.0 0.033 10 Comment: Floor over mch room Project Title: Building 10 Unit 81 - Exeter Report date: 09/27/18 Data filename: C:\Users\Bob\Documents\bce\Building 10-Unit 81 Exeter.rck Page 2 of 3