HomeMy WebLinkAbout261 PEPIN PL BLDG 15 ' C
Electric # _ APPLICATION FOR BUILDING PERMIT
Plumbing# 91�HVAC# (f�/ f l�_�C7 [ Date: •.�d:.ZB�
Sprinkler# Estimated Cost $ 13 Z jup
FINAL APPROVALS
Permit Fee $
Buildingc{
COMPLETE RED BOXED AREAS Occupancy Fee $ 30
Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $
Affidavit ► SIGN ON REVERSE SIDE A
Appr.for Total Fee $
TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ 24 21-
The undersigned hereby applies to do work according to the following:
Applicant cationoMor 7ZOW Lot No..
Applicant's Address Tel # W 6 lrr 7 9d d--t
Town d 74 Zip t Lic.# 06 l T�
Owner Architect �N
Owner's gddl;ess Architect's Address" Is
Zip_ _6bts1-o 110o#, f ZiD&P037)
Sq. Ft.New Area: 1 st FI. 7 S 2nd FI. 7 dw
y� 3rd FI. �y0 1 Total New /9 Are
Purpose of this permit 1 Yl b
S
City Water Well J Septic System :3 Sewe4a-'�-
Ins: HO S Area Basement Garage
Approved by Date I i- s- - 14a> Use Group Construct'on Type
� A / � aeo„oe
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required
distances from all other zones and is located in whi
pp this building and it wed.
Signed
I hereby apply for a Certificate of Occupa y for the work,4Lqs bed in this application for the permit.
Signed
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
201900392 TOWN OF SOUTH WINDSOR CT
PERMIT NUMBER
CERTIFICATE OF OCCUPANCY
DATE: 08/22/2019 =
GIs ID:70700261 - FEE:
MUNIS APPLICATION# 201801869 }r y" t-`` s-� x ZONE:
THIS IS TO CERTIFY THAT xrt itEPIN a ,
CONFORMS SUBSTANTIALLY TO;THE-kEQIREMENTS OF THE CO-,,UNDER APPLICATION NUMBER 201801869
ZONING REGULATIONS OF THE TWN,OF SOUTH WINDSOR AND IS HEREB A PROVED OUT BASIC F OCCUPANCYING CODE AS
INDICATED BELOW:
+ _ice ,,E _.-
APPROVED FOR OCCUPANCY
ONSTRUCT A'1960 SQFT SINGLE FAM TONWHOUSE W/2 BEDROOMS
2 1/23BATHS 2 CAR GARAGE&DK`BLD�15
SPECIAL COND ' IRS`, ` = EC,
NOTICE: IF THIS CERTIFICATE IS L'OST OR DESTROYED,'A
THE BUILDING DEPARTMENT. DUpI;ICgTE SHOULD BE OBTAINED IMMEDIATELY FROM
�=" y •,, :i
CONSTRUCTION TYPE:
OCCUPANCY GROUP:
= BUILDING OFFICIAL
8/22/2019 2:04 PM ANY CHANGE OR EXTENSION OF THE USE HEREIN APPROVED REQUIRES A NEW CERTIFICATE OF OCCUPANCY
INSPECTION FIELD SHEET 02/10/21
Printed by Middleton, Morgan 14 39 44
INSPECTION: 109694 PLUMBING UNDERGROUND PERMIT:
STATUS
APPLICATION: 201801869
LOC: 261 PEPIN PLACE
SOUTH WINDSOR
PROPERTY ID: 70700261
OWNER: T & M BUILDING CO INC
CONTRACTOR:
REQUEST BY:
PROJ DESC: CONSTRUCT A 1960 SQFT SINGLE FAM TONWHOUSE W/2 BEDROOMS
WORK ORDER:
INSPECTOR: ROSE RESULT: PASS
REQUESTED: 12/13/18 PRIORITY:
SCHEDULED: 12/13/18 PM COMPLETED: 12/13/18
UNPAID FEES: 00 Date Time
MILEAGE: 00 TIME: TRAVEL ONSITE
COMMENTS:
WATER TEST UNDERGD. PLBG.
ALL INSPECTIONS:
INSPECTED INSPECTOR RESULT INSP DESCRIPTION
11/02/18 ROSE PASS B001 FOOTING
08/22/19 DOUG PASS B002 FOUNDATION
04/11/19 ROSE PASS B003 FRAMING (ROUGH)
05/08/19 DOUG PASS B004 INSULATION
08/21/19 ROSE PASS BO10 FINAL
04/16/19 ROSE PASS E001 ELECTRIC SERVICE
RELEASED TO EVERSOURCE CRS #3261441
08/22/19 DOUG PASS E002 ELECTRIC UNDERGROUND
04/11/19 ROSE PASS E003 ELECTRIC ROUGH
04/12/19 ROSE PASS H003 HVAC ROUGH
04/11/19 ROSE PASS P003 PLUMBING ROUGH
WATER TEST WV & TEST ON WATER PIPES
04/11/19 ROSE PASS P004 PLUMBING GAS TEST
06/20/19 FOLG PASS Z003 CO PLANNING INSPECTION
a
l.'
APPLICATION FOR ELECTRICAL PERMIT
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074(PHONE) 860-644-2511 EXT. 230
DEPARTMENT DECISION PE T NUMBER:
APPLICATION IS HEREBY: ft
APPROVED: BLDG.PERMIT ER:
�c
DATE INSPECYOR
LOCATION OF WORK: 16/ PEA/r[l
APPLICANT: OWNER: TYPE OF STRUCTURE:
Q� �J
Q4w—BUILDING
NAME: /�-G'B rd/�i'��SCIf�L_ NAME: / -,-y aBG�/L.�J//L!�C� ❑ADDITION
PHONE NUMBER: PHONE NUMBER 6n ❑EXISTINGBUILDING
ADDRESS: E/L�i��LGbQD�° ADDRESS:ffD —
TYPE OF USE:
o4ESIDENTIAL o COMMERCIAL
ELECTRICAL INFORMATION: FURTHER DESCRIPTION OF WORK:
TYPE OF INSTALLATION:
SIZE OF SERVICE:
SIZE OF MAIN SERVICE: Z4I.A
NUMBER OF METERS:
NUMBER OF PANELS:
NUMBER OF LIGHT CIRCUITS: ESTIMATED COST:S
NUMBER OF SWITCHES:
NUMBER OF LIGHT FIXTURES: FEE ENCLOSED:S d8 /
NUMBER OF A/C CIRCUITS: /
FEE SCHEDULE:$18 PER$1,000 OF THE ESTIMAYED eOST.
NUMBER OF POWER CIRCUITS: ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT
IS S1.00 OVER (.26 CENT EDUCATIONAL FEE INCLUDED AS
NUMBER OF OUTLETS: PART OF THE PERMIT FEE)
THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL
ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO.: /D��22 TYPE: STATE: 451:�;r-
SIGNATURE OF APPLICANT: DATE:
a?7
S M
APPLICATION FOR PLUMBING PERMIT
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074(PHONE) 860-644-2511 EXT.230
DEPARTMENT DECISION PERMIT NUMBkIL,
APPLICATION IS HEREBY: `J1
APPROVED: BLDG.PERMIT
DATE INSPECTOR
r
LOCATION OF WORK: pr p f� Pia Chi 19 1
APPLICANT: OWNER: TYPE OF STRUCTURE:
�• Oew BUILDING
NAME: /y j?�/G tC�/PPr4J/DLL NAME: / (- Q Q ❑ADDITION
PHONE NUMBER: r�(IJL 7/ d- 7j� PHONE NUMBER: 7l /�/ ❑EXISTING BUILDING
ADDRESS:-�74ADDRESS:
TYPE OF USE:
C oIDENTIAL o COMMERCIAL
PLUMBING INFORMATION: FURTHER D CRIPTION OF WORK: y�
TYPE OF INSTALLATION: -Av r✓t1 I
NO.OF TOILETS: STYLE: NO.OF BATHTUBS:
NO.OF SHOWERS: _ NO.OF LAVATORIES:T
NO.OF CATCH BASINS: NO.OF FLOOR DRAINS:
ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY WINDOW?
'ES oNO ESTIMATED COST: S
SIZE OF WINDOW: 3x3 �SIM OF DUCTS:
SEWER OR SEPTIC TANK: ��t r� L FEE ENCLOSED:S 6 U
r 2 V
SIZE OF WATER PIPING AND RISER: I A-
WATER
J�
WATER HEATER: TYPE pn2 I L MANUFACTURER /
FEE CHED E:$18 PER$1,000 OF THE ESTIMATED COST.
ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS
$1.00 OVER. (.26 CENT EDUCATIONAL FEE INCLUDED AS PART
OF THE PERMIT FEE)
THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL
ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. �+
CONTRACTORS LICENSE NO.: PE: / STATE: e r
SIGNATURE OF APPLICANT: DATE: /
.,O%v M 8
T�� 0-P s-0� ?40
1540 SULLIVAN AVENUE• SOUTH WINDSPf. CT 06074
TELEPHONE(860)644-2511
AN ACT CONCERNING CONCRETE FOUNDATIONS:
Section 1(Public Act No.16-45)OMV)(Effective October 1,2016)Prior to&bwa=of a Certificate of
Occupancy for a now rmclential or com=dal buMng for which a ca=eta foundation was installed on or after
October 1,2016,the applicant shall provide the Building Official with written documentation of tha name of the
individual or entity that supplied the concrete and the name of the individual or antity that installed flee concretes
Copies of such docamea#ation shall be mamtamed in the records of the office of the Building Official for not less
than fdy(50)years.
Please fill the information in and submit to the Bufiding Department:
Date of information received/filed: j 7 0.�019
Project locatiow Syk}fit. V iodS ,v t4.90DAX5
Job description:._-thi l p 104 all Cain Pl k ce
CONCRETE SUPPLLIER CONCR INSTALLER
Name: Dail c L�/Ls�T�Qa1�✓/7!X Name: h 04 1 JnOkS
(Picase Print) (Please Print)
Address: (Q M eAdD iv LR H d Address: Xe N0,e1ns9
or 4Vo r!, M t n D D7d %c ul& r D607y
Phone/Contact: Phone Contact: 0 60 6 yy--OWV P
APPLICANT/CONTRACTOR Information:
Name: in �r�G �OLS�4w41 ye-
(Please Print)
Address: I 10 Dropk S'f• Phone/Contact: �(,D• 'y�'9 9���
bvr tor 4 o,,w. 6790 E-malt: 1395b,, 54,00 pe 4 74ud�M•co`r1
Signature. ��Date:.,.
RPM ENERGY SOLUTIONS
BUILDING LEAKAGE TEST 69 PERRY RD HAMDEN CT
06514 203-903-7387
BPI#5005996
Date of Test: 7/8/2019 Test File:261 PEPIN PLACE
Customer. BOB Technician: V CASTELLON
Project Number.
Building Address: 261 PEPIN PLACE
SOUTH WINDSOR, CT
Test Results
1. Airflow at 50 Pascals: 699 CFM50
(50 Pa=0.2 w c.) 2.91 ACH50 X PASS
2. Leakage Area: 38.4 in2 LBL ELA @ 4 Pa
3. Building Leakage Curve: Flow Coefficient(C)= 55.0
Exponent(n)=0.650(Assumed)
4. Test Settings: Test Standard: RESNET One-Point Test
Test Mode: Depressurization
5. Accuracy Level Standard Level of Accuracy Test
V CASTELLON 203-903-7387
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate: 31.7 CFM
0.13ACH
7.9 CFM per person
2. Estimated Design Infiltration Rate: Winter: 44.9 CFM Summer. 35.3 CFM
0.19 ACH 0.15 ACH
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
Mechanical Ventilation Guideline(based on ASHRAE 62.2-2010)
Recommended Whole Bldg Rate: 46.0 CFM
Base Rate: 46.0 CFM
RPM ENERGY SOLUTIONS
DUCT LEAKAGE TEST RESULTS 69 PERRY RD HAMDEN CT
06514 203-903-7387
BPI#5005996
Date of Test: 7/08/17 Test File:261 PEPIN PLACE
Test Performed For: BOB
Phone V CASTELLON 203-903-7387
Test Results
1. Test Type: Total Leakage
(Duct Blaster Only)
2. Test Pressure: 25.0 Pa
3. Measured Duct Leakage: 52.0 CFM (9.8 sq.In.)
4. Duct Leakage as a Percent of System Airflow:
5. Duct Leakage as a Percent of Building FloorArea: 3.3% X PASS
Additional Information
Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes
expensive conditioned air to be lost before it can be delivered to the house,forcing your system to run longer to
keep you comfortable.
Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house.
Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air
conditioning is running.
I
techno ffUMM ff@W of Connecticut
766 Marion Road P:203-723-9904
Cheshire,Cr. 06410 syMeOtechnomp.com
WORK SITE SHEET DATE:03/26/2019
TM Building Company Delivery Address
110 Brook Street 400 Pleasant Valley Road
Torrington, Ct 06790 South Windsor, CT
Bldg# 15
Type of ro'ect: Installed piers to support decks with no roofs-
oty Cateqory Galy. Black Fixed H. Ad' H Ext.
12 P1-8G X 6x6
installer.0 Dave 0 Sylvain ❑Cod Keven 0 Paul ❑ Richard
SKETCH OF WORKSITE
1 d 11
—9 10 11
7 O /
D
N
I
I i
I '
i
Signature of Installer:Xiac* !tea
techno of Connecticut
766 Marion Road
_717] CheshlM CT. 06410
]ob site: 400 Pleasant Valley Road
South Windsor, CT
Bldg # 15
This process for the above listed project involved the screwing of specifically
designed and engineered posts applicable for this project. PSI readings were
taken on each individual post during the installation and with the use of a
correlation table these measurements are listed and described below.
PSI/Torque: Pounds per square inch I The rotational pressure taken to drive the post
Depth: The distance downward from its top surface.
IyM. Piers are categorized for each individual specific project
Bearing: Downward pressure post can withstand
Finned: Bored into solid immoveable rock reaching maximum compression and tension.Once
the post was driven one additional test was performed,the percussion test.This test involves
striking the post with a sledge hammer,5 times per set,while being measured for resistance.
Once there is zero downward moment the post and pressures are verified.
Unlift: The force required to pull the post out of the ground,the uplift value is half of the bearing.
The speck results gathered and certified for your project are as follows:
# PSI/ Depth #Type Bearing # PSI/ I Depth #Type Bearing
Torque Torque
1 11100 5'-8" ' P1-8G 6361lbs
2 11100 5'-6" P1-8G 6361lbs --�
3 11100 5'-6" P1-8G 6361lbs
4 11100 4'-0" P1-8G 6361lbs
5 1100 5'-8" PI-8G 6361lbs
6 1100 5'-9" P1-8G 6361lbs
7 1100 5'-2" P1-8G 6361lbs
8 1100 47-8" P1-8G '6361lbs
9 1100 4'-9" P1-8G 6361lbs
10 1100 5'-8" _ P1-8G 1636110s.
11 1000 6'-0" 1 P1-8G 15654lbs
12 1000 113'-0" I P1-8G 15654lbs
REScheck Software Version 4.6.5
Compliance Certificate
Project Building 15-unit 106 Cobalt (96)A
Energy Code: 2012 IECC
Location: South Windsor, Connecticut *e4o
Construction Type: Single-family
Project Type: New Construction
Orientation: Bldg. faces 45 deg. from North
Conditioned Floor Area: 2,000 ft2
Glazing Area 9%
Climate Zone: 5 (6155 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
261 Pepin Place T&M Building Co., Inc. T&M Building Co.,Inc.
South Windsor, CT 06074 110 Brook Street 110 Brook Street
Torrington, CT 06790 Torrington,CT 06790
(860)489-9229 (860)489-9229
info@TandM.com info@TandM.com
Compliance: Passes using UA trade-off
Compliance: 1.1%Better Than Code Maximum UA: 362 Your UA: 357
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Perimeter
Wall 1: Wood Frame, 24" o.c. 112 19.0 0.0 0.059 5
Orientation: Left side
Comment: GROUND FLOOR-Front door wall
Door: Solid 20 0.130 3
Orientation: Left side
Comment: GROUND FLOOR-Front door
Wall 2:Wood Frame,24"o.c. 159 19.0 0.0 0.059 8
Orientation: Front
Comment: GROUND FLOOR-Garage to House wall
Door: Solid 18 0.130 2
Orientation: Front
Comment: GROUND FLOOR-Garage to House wall door
Wall 3:Wood Frame, 16" o.c. 112 22.0 0.0 0.056 6
Orientation: Right side
Comment: GROUND FLOOR-Party wall
Wall 4:Wood Frame, 24" o.c. 159 19.0 0.0 0.059 9
Orientation: Back
Comment: GROUND FLOOR-Back wall
Windows: Wood Frame:Double Pane with Low-E it 0.290 3
Orientation: Back
Comment: GROUND FLOOR-Back wall window
Wall 5:Wood Frame, 24"o.c. 374 19.0 0.0 0.059 18
Orientation: Left side
Comment: 2nd FLOOR-Front door wall
Project Title: Building 15-unit 106 Cobalt Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-15 unit 106-Cobalt.rck Pagel of 3
Gross Area Cavity Cont.
Perimeter
Windows:Vinyl Frame:Double Pane with Low-E 62 0.290 18
Orientation: Left side
Comment: 2nd FLOOR-Front door wall windows
Wall 6:Wood Frame, 24" o.c. 199 19.0 0.0 0.059 10
Orientation: Front
Comment: 2nd FLOOR-Front wall
Windows:Vinyl Frame:Double Pane with Low-E 32 0.290 9
Orientation: Front
Comment: 2nd FLOOR-Front wall windows
Wall 7: Wood Frame, 16" o.c. 10 15.0 0.0 0.077 1
Orientation: Right side
Comment: 2nd FLOOR-wing wall
Wall 8: Wood Frame, 16" o.c. 360 22.0 0.0 0.056 20
Orientation: Right side
Comment: 2nd FLOOR-party wall
Wall 9:Wood Frame, 24" o.c. 199 19.0 0.0 0.059 9
Orientation: Back
Comment: 2nd FLOOR-Back wall
Windows:Vinyl Frame:Double Pane with Low-E 7 0.290 2
Orientation: Back
Comment:2nd FLOOR-Back wall windows
Door: Glass 33 0.330 11
Orientation: Back
Comment: 2nd FLOOR-Back wall deck slider
Wall 10:Steel Frame, 16" o.c. 336 22.0 0.0 0.098 27
Orientation: Left side
Comment: 3rd FLOOR-front door wall
Windows: Vinyl Frame:Double Pane with Low-E 57 0.290 17
Orientation: Left side
Comment: 3rd FLOOR-front door wall windows
Wall 11: Wood Frame, 24" o.c. 178 19.0 0.0 0.059 9
Orientation: Front
Comment: 3rd FLOOR-Front wall
Windows:Vinyl Frame:Double Pane with Low-E 32 0.290 9
Orientation: Front
Comment: 3rd FLOOR-Front wall windows
Wall 12:Wood Frame, 24" o.c. 9 15.0 0.0 0.074 1
Orientation: Right side
Comment: 3rd FLOOR-wing wall
Wall 13:Wood Frame, 16" o.c. 327 22.0 0.0 0.056 18
Orientation: Right side
Comment: 3rd FLOOR-party wall
Wall 14:Wood Frame, 24"o.c. 178 19.0 0.0 0.059 9
Orientation: Back
Comment: 3rd FLOOR-Back wall
Windows:Vinyl Frame:Double Pane with Low-E 22 0.290 6
Orientation: Back
Comment: 3rd FLOOR-Back wall windows
Ceiling 1: Flat Ceiling or Scissor Truss 431 38.0 0.0 0.030 13
Comment: 3rd FLOOR-ceiling
Wall 15:Wood Frame, 24"o.c. 90 19.0 0.0 0.059 5
Orientation: Front
Comment: 1/2 story-Front wall
Wall 16:Wood Frame, 24" o.c. 90 19.0 0.0 0.059 5
Orientation: Back
Comment: 112 story-Back wall
Wall 17: Wood Frame, 24"o.c. 150 19.0 0.0 0.059 7
Orientation: Left side
Comment: 1/2 story-Side wall
Windows:Vinyl Frame:Double Pane with Low-E 25 0.290 7
Orientation: Left side
Comment: 1/2 story-Side wall windows
Project Title: Building 15-unit 106 Cobalt Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-15 unit 106- Cobalt.rck Page 2 of 3
Gross Area Cavity Cont.
Perimeter
Wall 18:Wood Frame, 24" o.c. 150 19.0 0.0 0.059 9
Orientation: Right side
Comment: 1/2 story-Side wall
Ceiling 2: Cathedral Ceiling 300 30.0 0.0 0.034 10
Comment: 1/2 story-Sloped ceiling
Ceiling 3: Flat Ceiling or Scissor Truss 150 48.0 0.0 0.026 4
Comment: 112 story-Flat ceiling
Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 456 30.0 0.0 0.033 15
Comment: Floor Over Garage
Floor 2: All-Wood Joist/Truss:Over Unconditioned Space 80 30.0 0.0 0.033 3
Comment: Floor Over Mech Room
Floor 3: Slab-On-Grade:Unheated 55 10.0 0.684 38
Insulation depth: 4.0'
Comment: perimeter slab insulation
Floor 4: Slab-On-Grade:Unheated 14 10.0 0.767 11
Insulation depth: 2.0'
Comment: interior slab insulation
Compliance Statement. The proposed building design described here is consistent with the building plans, specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Building 15-unit 106 Cobalt Report date: 09/25/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-15 unit 106-Cobalt.rck Page 3 of 3