Loading...
HomeMy WebLinkAbout253 PEPIN PL BLDG 15 ' D Electric # APPLICATION FOR BUILDING PERMIT Plumbing# HVAC# Date: 9l1 �01 Sprinkler# Estimated Cost $ 07 Q 0 FINAL APPROVALS Permit Fee $ Buildin COMPLETE RED BOXED AREAS Occupancy Fee $ 30 Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $ Affidavit Affidav - ► SIGN ON REVERSE SIDE t Total Fee $ TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ 2 31 The undersigned hereby applies to do work according to the following: Applicant Location of Work_ 2 tJ GIC�- C,�' 4LotrNo. Applicant's Addresskt�l Tel # 1)0 `t q'Q��� Town Yf tl� T Zip Q� Lic.# 00 4 ql3 d Owner Architect_.4 0-NW Sao 9qs' 7071 Owner's Adriress Architect's Address 15,o rr ZAP1OhbJ /u— iP Sq. Ft. New Area: 1 st FI. 2nd FI. 3rd FI. Tot I Ne Area 11 1 . Purpose If this permit ( Yl 1 kW _ c� -�_ City Water Well`J Septic System J Sewer Ins: HO SI�� rt. Area Basement Garage Approved by ��( t Date f I 1 1 Use Group Construction Tye j" �P�'ric�'108 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked, and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in whic this building nd is use is allowed. Signed OF I hereby apply for a Certificate of Occupan for the worZesbed in this application for the permit. Signed DO NOT WRITE BEL W THIS LINE INSPECTION COMMENTS 201900304 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER CERTIFICATE OF OCCUPANCY DATE: 07/17/2019 "'s FEE: ., .. GIS ID:70700253 ZONE: z: .. MUNIS APPLICATION# 201801867 THIS IS TO CERTIFY THAT /<�253 PEPIN PLACE'.,-, "UN 3ER'APPLICATION NUMBER 201801867 CONFORMS SUBSTANTIALLY TO TH13.REQUIREMENTS OF.THE,CONNECTICTDASIC BUILDING CODE AND THE ZONING REGULATIONS OF THE TQ OF SOUTH.WINDSOR AND IS HEREBY'"APPROVED OF OCCUPANCY AS INDICATED BELOW: APPROVED FOR OCCUPANCY XONSTRUCT 1825 SQFT-SINGLE FAM,TOTHOUSE W/2 BEDROOMS '2'°1/2 BATH_ 2 CAR.GARAGE�&DECK-BLDg1((5 t ,i SPECIAL CONDITIONS ;x` ra lw•y6 � '# �J! X L7 NOTICE: IF THIS CERTIFICATE IS LOST-OR DESTROYED;A DUPLICATE SHOULD BE OBTAINED IMMEDIATELY FROM THE BUILDING DEPARTMENT. - ; :•wX= °"' �`" CONSTRUCTION TYPE: - '- OCCUPANCY GROUP: BUILDING OFFICIAL 7/17/2019 9:21 AM ANY CHANGE OR EXTENSION OF THE USE HEREIN APPROVED REQUIRES A NEW CERTIFICATE OF OCCUPANCY INSPECTION FIELD SHEET 02/10/21 ' Printed by Middleton, Morgan 14 34 11 INSPECTION: 109666 PLUMBING UNDERGROUND PERMIT: STATUS: APPLICATION: 201801867 LOC: 253 PEPIN PLACE SOUTH WINDSOR PROPERTY ID: 70700253 OWNER: T & M BUILDING CO INC CONTRACTOR: REQUEST BY: PROJ DESC: CONSTRUCT 1825 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS WORK ORDER: INSPECTOR: ROSE RESULT: PASS REQUESTED: 12/13/18 PRIORITY: SCHEDULED: 12/13/18 PM COMPLETED: 03/18/19 UNPAID FEES 00 Date Time MILEAGE: 00 TIME: TRAVEL ONSITE COMMENTS: WATER TEST UNDERGD.PLBG ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION 11/02/18 ROSE PASS B001 FOOTING 07/17/19 DOUG PASS B003 FRAMING (ROUGH) 10/17/19 DOUG PASS B004 INSULATION 07/11/19 ROSE PASS BO10 FINAL 04/16/19 ROSE PASS E001 ELECTRIC SERVICE RELEASED TO EVERSOURCE CRS#3261441 07/17/19 DOUG PASS E003 ELECTRIC ROUGH 07/17/19 DOUG PASS H003 HVAC ROUGH 05/02/19 ROSE PASS P003 PLUMBING ROUGH WATER TEST ON DWV /TEST ON WATER PIPING APPROVED 05/02/19 ROSE PASS P004 PLUMBING GAS TEST PRES TEST ON GAS PIPNG APPROVED FOR METER SERVICE. NEED TO BOND GAS PIPING. 06/20/19 FOLG PASS Z003 CO PLANNING INSPECTION ALL AMERICAN HEATING • AIR CONDITIONING, INC. `—' P.O. Box 6397 Wolcott, Connecticut 06716 Phone: (203) 879-4928 Fax: (203) 879-4920 CT License#303291 CT License#391792 CT License#203918 Date C73 �, I, Jay Valimont Sr, hereby grant permission to ����►�• _to apply for a HVAC permit in the town/city of Soo �1 �"� + r� using my S1-0391792 license for the address I }- IUt3 Sincerely, l Jay Val o t Sr President HEATING,PIPING&COOLING UNLIMITED CON'iRACTOR JAY C VALIMONT SR PO BOX 6397 WOLCOTT,CT 06716-0397 EFFECTIVE EXPIRE PEG iz Og/31/2019 HTG.0391792-S1 09/01/2018 nI s APPLICATION FOR HVAC PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230 DEPARTMENT DECISION ERMIT NUM APPLICATION IS HEREBY: APPROVED: BL MI PERT NUMBE DATE INSPECTOR LOCATION OF WORK: oZ 3 G o APPLICANT: OWNER: // TYPE OF STRUCTURE: t�NEW BUILDING A�� m c tl� Nei ��CC4�/�r NAME: I�( ,rnPs 0ADDITION PHONE NUMBER: PHONE NUMBER: WO��!S 6G 3 ❑EXISTING BUILDING ADDRESS:7� &,oryi line {?pQp ADDRESS: _I10 6 39-Z Wei r'44 c-r 06,1'6 T � ,C r o 6>90 TYPE OF USE: o«�r>G n // s'RFSIDENTIAL o COMMERCIAL HVAC INFORMATION: FURTHER DESCRIPTION OF WORK: TYPE OF SYSTEM: KIIEATING 0 A/ + m C �l -� =hS Q l vJQ.c G.1 c C� /'fi_ HEATING: TOTAL HEAT LOSS(BTUH) (HEAT LOSS SHEET REQUIRED) DESCRIBE ALL HEATING EQUIPMENT(INCLUDE MAKE AND MODEL NO.): drnan �/o 1� lC-M5�i6oyaa ESTIMATED COST:S anoo AIR CONDITIONING: � DESIGN TEMP:OUTSIDE °F INSIDE 'F DIFFERENCE F' FEE ENCLOSED:S I LI L1•c;b TOTAL HEAT GAIN(BTUH) (HEAT GAIN SHEET REQUIRED) / DESCRIBE ALL COOLING EQUPME (INCLUDE MAKE AND MODEL NO.): ,� FEE SCHEDULE:$18 PER SI000, OF THE ESTIMATED COST. Go ocfroc„o aTor, 6A 1362 j j) ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS $1.00 OVER. (.26 CENT EDUCATIONAL FEE flVCLUDED AS PART OF THE PERMIT FEE) THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: 03 ql TYPE: 5- STATE: C- 'T- SIGNATURE OF APPLICANT: DATE: 0 vZE 19 O � APPLICATION FOR ELECTRICAL PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE)860-644-2511 EXT.230 PE NUMBER: DEPARTMENT DECISION APPLICATION IS HEREBY: V� APPROVED: BLDQ.PERW NUMB �7 ]� ) v7N DATE INSPECTO LOCATION OF WORK: Z 53 &EP/ilJ APPLICANT: OWNER: TYPE OF STRUCTURE: Wl�/BUMDING NAME: /CDRt�T��i4�YlAdG/tJ� NAME:�7�`Y!7 FU/ln.Utd��. oADDITION PHONE NUMBER:_A40-17b//1� PHONE NUMBER :�'Sa /f/'I/ ❑EXISTING BUILDING ADDRESS: ADDRESS: //O TYPE OF USE: ifJA� /t Gl AA0YZ // loE MENTIAL o COMMERCIAL ELECTRICAL INFORMATION: FURTHER DESCRIPTION OF WORK: TYPE OF INSTALLATION:_ GO SIZE OF SERVICE: '2A1 9A 4ezl9l1f/G- �le/��k.-I SIZE OF MAIN SERVICE: -72Q'.4 NUMBER OF METERS: / NUMBER OF PANELS: NUMBER OF LIGHT CIRCUITS: ESTIMATED COST:S NUMBER OF SWITCHES: NUMBER OF LIGHT FIXTURES: FEE ENCLOSED:S NUMBER OF A/C CIRCUITS: FEE SCHEDULE:$18 PER$1,000 OF TIEtt STIMA C NUMBER OF POWER CIRCUITS: 1/J ROUND UP TO THE NEXT THOUSAND ONCE THE PItqdECT IS$1.00 OVER (.26 CENT EDUCATIONAL FEE INCLUDED AS NUMBER OF OUTLETS: PART OF THE PERMIT FEE) THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: TYPE: STATE: G SIGNATURE OF APPLICANT: DATE: ao�o oe� a r APPLICATION FOR PLUMBING PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074(PHONE) 860-644-2511 EXT.230 DEPARTMENT DECISION PERMIT NUMBS APPLICATION IS HEREBY: APPROVED: BLDG.PERMIT NUMBER: Q DATE INSPECTOR LOCATION OF WORK: C7�)VS3 Pe-'Q' I f\j (Ole f- , �I J�j Is' APPLICANT: OWNER: TYPE OF STRUCTURE: VW BUILDING NAME: / M V / 'y ��' ❑ADDITION PHONE NUMBER: D© 7 �/7�r]' PHONE NUMBER:�/ Q ! 7/ n20 ❑E)USTING BUILDING ADDRESS. �C;s T fil 11�✓`f ADDRESS: Z) IRdd J , i C 711// TYPE OF USE: � p�ESIDENTIAL ❑COMMERCIAL PLUMBING INFORMATION: FURTHER ESCRIPTION,O"F�WORK: TYPE OF INSTALLATION: JN► iJ oY I GS NO.OF TOILETS: STYLE: NO. BATHTUBS: v �� N NO.OF SHOWERS:�_NO.OF LAVATORIES:_ C NO.OF CATCH BASINS: NO.OF FLOOR DRAINS: ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY WINDOW? -NO ESTIMATED COST: $ �v " SIZE OF WINDOW: SIZE OF DUCTS: /1 SEWER OR SEPTIC TANK: ` It FEE ENCLOSED.S SIZE OF WATER PIPING AND/RISER: 30 3 ,( WATER HEATER: TYPE P/J e IV j(, MANUFACTURER 4/4) iY 1-1-q FEE SCHEDULE:$18 PER$1,000 OF THE ESTIMATED COST. ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS $1.00 OVER. (.26 CENT EDUCATIONAL FEE INCLUDED AS PART [OF THE PERMIT FEE) THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: 1' TYPE: STATE: G f SIGNATURE OF APPLICANT: DATE: � // / ' S "~ APPLICATION FOR HVAC.PERMIT TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (PHONE) 860-644-2511 EXT. 230 DEPARTMENT DECISION PERMIT NUMBER: APPLICATION IS HEREBY: APPROVED: BLDG.PERMIT NUMBER: DATE ' INSPECTSR LOCATION OF WORK: @ 53 121 n Plc-cC L c' APPLICANT: OWNER: / TYPE OF STRUCTURE: /� /� 1 (( �1 PJ NEW BUILDING NAME:Ak d rykac-itCr..it 14 P�7 i freA NAME: TF M E-EcYr,P s O ADDITION PHONE NUMBER:ROq- 7 9 -Li9a e PHONE NUMBER: gGO 3�9' t�O3I ❑ExisrnaG BUILDING ADDRESS:770 �UnGli n e_ ADDRESS: 'c' TYPE OF USE: Poevl G397 ►.-rn(co+1- cT- To^ CT 06790 // �dRFSIDENTIAL ❑COMMERCIAL HVAC INFORMATION: FURTHER DESCRIPTION OF WORK: / TYPE OF SYSTEM: iEATING e�A/C Tr) C^ HEATING: J 5� TOTAL HEAT LOSS(BTUH) °F O EAT LOSS SHEET REQUIRED) DESCRIBE ALL HEATING EQUIPMENT(INCLUDE MAKE AND MODEL NO.): ESTIMATED COST:S AIR CONDITIONING: / }I DESIGN TEMP:OUTSIDE °F INSIDE °F DIFFERENCE F° FEE ENCLOSED:S TOTAL HEAT GAIN(BTUH) (HEAT GAIN SHEET REQUIRED) DESCRIBE ALL COOLING EQUPMENT(INCLUDE MAKE AND MODEL NO.): FEE SCHEDULE:$18 PER$1,000 OF TICE ESTIMATED COST. &Ooc(MCM _�j-� / �U�L(� ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT IS SI.00 OVER. (.26 CENT EDUCATIONAL FEE INCLUDED AS PART OF TIIE PERMIT FEE) THE UNDERSIGNED NEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFOMANCE OF SUCH WORK. CONTRACTORS LICENSE NO.: 03 TYPE: S STATE: C SIGNATURE OF APPLICANT: DATE: Q aOjRoi 'i3g o 1540 SUWVAN AVENUE• SOUTH WINDSOR,CT 06074 °soQ.co�' TELEPHONE(860}6442511 AN ACT CONCERNING CONCRETE FOUNDATIONS: Seotisan 1(Pablic Act No.16-45)(NEW)(Effective October 1,2016)Prior to the issuance of a Certificate of Occupancy for a new remdeatml or commercial budding for which a concrete foundation was installed on or after October 1,2016,the applicant shall provide the Building Official with written station of the name of the sodtvidual or entity that supplied the concrete and the name of the indr dual or entity that installed the concrete. Copies of such dxumeatafi=shall be mimed in the records of the office of the Building Official for not less than fly(50)years. Please Sill the information in and submit to the Building Department: Date of h formation received/Bled: 17- M.-4,01 9 Project location: Sou.}� M oA or (it a5 A/lff Job description.-_ GIno ✓r Y"w // z�e, CONCRETE SUPPLIER CO ENCRET INSTALLER Name: Onilcc�/Ls�T�C�tl•�,// l�k' Name: h D✓ e 5"Oks (Please Print) (Please Print) Address: 16 Meahw Lail e Address: Xe itNo,e1,rW ,&It 54 Ar o rintS © D761 J�ou� . GyloApr AWJI Phone/Contact: 9Z A - S� -9�l,�� Phone Contact: W'0 APPLICANT/CONTRACTOR Information: Name: 7 9 Rdir1 ! 6 line- ,4oLS14rokye- {Please Print} Address: 6�1l d 19?-oflk S f Phone/Contact. err ✓� o,v 67M E-mail: Piob , S-fa►ikop _ 0 -r.11dM•com Sigaatare: l`Date: 7✓1:1D/9 f techno of Connecticut 766 Marion Road P:203-723-M Cheshire,Cr. 06410 syMeetechnomp.com WORK SITE SHEET DATE:03/26/2019 TM Building Company Delivery Address 110 Brook Street 400 Pleasant Valley Road Torrington, Ct 06790 South Windsor, CT Bldg# 15 Type ofproject: Installed plerms to Support decks with no roofs- at roofs- aty Category Galy. Black Fixed H. Ad' H Ext. 12 P1-8G X 6x6 Installer.❑ Dave ❑Sylvain ❑Cody ml Keven ❑ Paul ❑ Richard SKETCH OF WORKSITE I d1 I , 10 11 1 O / d ` „41 I'D Signature of installer:xtac* (? vv.;v% technoPOW of Connecticut 766 Marion Road Cheshire,Cr. 06410 b Job site: 400 Pleasant Valley Road South Windsor, CT Bldg # 15 This process for the above listed project involved the screwing of specifically designed and engineered posts applicable for this project. PSI readings were taken on each individual post during the installation and with the use of a correlation table these measurements are listed and described below. PSI/Torque: Pounds per square inch/The rotational pressure taken to drive the post Depth: The distance downward from its top surface. Type: Piers are categorized for each individual specific project Bearing: Downward pressure post can withstand Pinned: Bored into solid immoveable rock reaching maximum compression and tension.Once the post was driven one additional test was performed,the percussion test.This test involves striking the post with a sledge hammer,5 times per set,while being measured for resistance. Once there is zero downward moment the post and pressures are verified. UDlift: The force required to pull the post out of the ground,the uplift value is half of the bearing. The specific results gathered and certified for your project are as follows: # PSI/ Depth I #Type Bearing # ( PSI/ ( Depth #Type Bearing Torque Torque 1 11100 5'-8" P1-8G 6361lbs 2 11100 5'-6" P1-8G 6361lbs 3 1100 5'-6" PI-8G 6361lbs 4 1100 4'-0" P1-8G 6361lbs 5 1100 5'-8" 1 P1-8G 6361lbs _ 6 1100 5'-9" P1-8G 6361lbs 7 1100 5'-2" P1-8G 6361lbs 8 1100 4'-8" P1-8G '6361lbs 9 11100 4'-9" P1-8G 6361lbs 10 1100 5'-8" _ P1-8G 63611bs 11 1000 1 6'-0" P1-8G 156541bs 12 1000 6'-0" P1-8G I 5654lbs c y.Y 6 d�4 Y, Fiber Glass Blowing Insulation Ve ertificate of Insulation R-VALUE BAG REHIREMENTS MAXIMUM COVERAGEt THICKNESS TO OHM A TWRWL RESISTANCE OF: em Ft"1000 SO.F1.lf00 W Or NET AOEA CONTENTS OF BAG SHOUlO N01 COVEN MORE THAN: SHOULD NOT BE LESS THAN: SHOULD NOT EE IESS TWIN: R-60 31.4 31.9 22.00 22.00 R-44 22.4 qq g 16.75 16.75 R 30 14.9 67.1 11.75 11.75 R-13 6.2 161.7 5.25 5.25 ` .:{. This is to certify that•CertainTeed lnsulSafee'SP Fiber Glass Insulation has been installed to the manufacturer's recommendations and will achieve an R-Value* o(�usingq2,3 _bags of insulation to cover square feet of area at a minimum installed thickness of �- inrhes. W, dst/r LJ1 .: Strcct At t EmsCity stale Zip sigt Insl1 rr Date stale 1_iccnsc Num xr(i rrquinEU oEnran},5 Goldcn Street Meriden, CT 06450 Cily staEl-$DO-445-9717 lu,ulStk�l'is nancotnhtl+tilde,nancarnhivc 91x!inurJ;nnc.A paxlucl Jr.igncJ h1r ualal vlrlc aalxlarJs mil Como r m%eurrp rclµtirrmcnu.Keep this ccnllirale with your olhcr ralua111r Ixyw r.. It yuu rccr xll thl,lxnlx•rly,thi:,ixtilhcatl•41mild be lu.o-cd I'll1u Ill..pun'ha.cr. 'Thr higltct the RA'Atlr,1hr gl(-AICF 11K i1tNUL111119 IX"A' . ,>Ii your:cllcr hn the lace sheet on R•4'alur.- _ _- -- - CertainTeedEt —- - - - - 7501:.Slacd,sla;d R.ad Valley Tut}c,P.1 19.182 www r1a11eedxom - RPM ENERGY SOLUTIONS 69 PERRY RD HAMDEN CT BUILDING LEAKAGE TEST 06514 203-903-7387 BPI#5005996 Date of Test: 7/8/2019 Test File:253 PEPIN PLACE Customer: BOB Technician: V CASTELLON Project Number: Building Address: 253 PEPIN PLACE SOUTH WINDSOR, CT Test Results 1 Airflow at 50 Pascals: 676 CFM50 (50 Pa=0.2 w.c.) 2.82 ACH50 X PASS 2. Leakage Area: 37.2 in2 LBL ELA c@ 4 Pa 3. Building Leakage Curve: Flow Coefficient(C) = 53.1 Exponent(n)= 0.650 (Assumed) 4. Test Settings: Test Standard: RESNET One-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test V CASTELLON 203-903-7387 Infiltration Estimates 1 Estimated Average Annual Infiltration Rate: 30.7 CFM 0.13 ACH 7.7 CFM per person 2. Estimated Design Infiltration Rate: Winter: 43.4 CFM Summer: 34.2 CFM 0.18 ACH 0.14 ACH Cost Estimates 1 Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: Mechanical Ventilation Guideline(based on ASHRAE 62.2-2010) Recommended Whole Bldg Rate: 46.0 CFM Base Rate: 46.0 CFM S C A RPM ENERGY SOLUTIONS DUCT LEAKAGE TEST RESULTS 69 PERRY RD HAMDEN CT 06514 203-903-7387 BPI#5005996 Date of Test:7/08/17 Test File: 253 PEPIN PLACE Test Performed For: BOB Phone V CASTELLON 203-903-7387 Test Results 1 Test Type: Total Leakage (Duct Blaster Only) 2. Test Pressure: 26.0 Pa 3. Measured Duct Leakage: 60.0 CFM (11.3 sq. in.) 4. Duct Leakage as a Percent of System Airflow: 5. Duct Leakage as a Percent of Building FloorArea: 3.8 % X PASS Additional Information Duct leakage is often one of the largest sources of energy loss in a house. Leaky supply ductwork causes expensive conditioned air to be lost before it can be delivered to the house,forcing your system to run longer to keep you comfortable. Leaky ductwork can seriously degrade indoor air quality by pulling pollutants and irritants directly into your house. Leaky return ductwork can also pull moisture into your home, making it feel uncomfortable even when the air conditioning is running. k j ' (...'vAN NED REScheck Software Version 4.6.5 Compliance Certificate Project Building 15-unit 108- Dover Energy Code: 2012 IECC Location: South Windsor, Connecticut C44 Construction Type: Single-family Project Type: New Construction Orientation: Bldg. faces 45 deg. from North Conditioned Floor Area: 2,137 ft2 Glazing Area 4% Climate Zone: 5 (6155 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 253 Pepin PI. T&M Building Co., Inc. T&M Building Co.,Inc. South Windsor, CT 06074 110 Brook Street T&M Building Co.,Inc. Torrington,CT 06790 110 Brook Street,CT 06790 (860)489-9229 (860)489-9229 info@TandM.com info@TandM.com Compliance: Passes using UA trade-off Compliance: 2.3%Better Than Code Maximum UA: 385 Your UA: 376 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules. it DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Perimeter Wall 1: Wood Frame, 16" o.c. 37 19.0 0.0 0.060 1 Orientation: Front Comment: Ground Floor-front wall Door 1: Solid 20 0.130 3 Orientation: Front Comment: Ground Floor-front door Wall 2:Wood Frame, 16" o.c. 222 19.0 0.0 0.060 12 Orientation: Right side Comment: Ground Floor-garage to house wall Door 2: Solid 20 0.130 3 Orientation: Right side Wall 3: Wood Frame, 16" o.c. 185 19.0 0.0 0.060 11 Orientation: Back Comment: Ground Floor-garage to mech room wall Wall 4: Wood Frame, 16"o.c. 120 22.0 0.0 0.056 7 Orientation: Right side Comment: Ground Floor-party wall Wall 5:Wood Frame, 16" o.c. 222 19.0 0.0 0.060 13 Orientation: Back Comment: Ground Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E 13 0.290 4 Orientation: Back Project Title: Building 15-unit 108- Dover Report date: 09/25/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-15-unit 108 -Dover.rck Page 1 of 3 t . Gross Area Cavity Cont. Assembly or U-Factor UA Perimeter Wall 6:Wood Frame, 16"o.c. 56 13.0 0.0 0.082 5 Orientation: Left side Comment: Ground Floor-wing wall Wall 7:Wood Frame, 16" o.c. 278 22.0 0.0 0.056 16 Orientation: Left side Comment: Ground Floor-party wall Wall 8: Wood Frame, 24" o.c. 123 19.0 0.0 0.059 6 Orientation: Front Comment: 2nd Floor-2x6 front Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4 Orientation: Front Wall 9:Wood Frame, 24" o.c. 123 30.0 0.0 0.047 5 Orientation: Front Comment: 2nd Floor-2x10 front Windows:Vinyl Frame:Double Pane with Low-E 25 0.290 7 Orientation: Front Wall 10:Wood Frame, 16" o.c. 379 22.0 0.0 0.056 21 Orientation: Right side Comment:2nd Floor-party wall Wall 11:Wood Frame,24" o.c. 246 19.0 0.0 0.059 12 Orientation: Back Comment:2nd Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E 7 0.290 2 Orientation: Back Door 3: Glass 33 0.200 7 Orientation: Back Wall 12: Wood Frame,24" o.c. 72 13.0 0.0 0.080 6 Orientation: Left side Comment: 2nd Floor-left wing wall Wall 13: Wood Frame, 16" o.c. 297 22.0 0.0 0.056 17 Orientation: Left side Comment: 2nd Floor-party wall Wall 14:Wood Frame, 24" o.c. 97 19.0 0.0 0.059 5 Orientation: Front Comment: 3rd Floor-2x6 front Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4 Orientation: Front Wall 15:Wood Frame,24" o.c. 97 30.0 0.0 0.047 4 Orientation:Front Comment: 3rd Floor-2x10 front Windows:Vinyl Frame:Double Pane with Low-E 20 0.290 6 Orientation: Front Wall 16:Wood Frame, 16"o.c. 296 22.0 0.0 0.056 17 Orientation: Right side Comment: 3rd Floor-right party wall Wall 17:Wood Frame,24"o.c. 191 19.0 0.0 0.059 9 Orientation: Back Comment: 3rd Floor-back wall Window 7:Vinyl Frame:Double Pane with Low-E 40 0.300 12 Orientation: Back Wall 18:Wood Frame, 16"o.c. 285 22.0 0.0 0.056 16 Orientation: Left side Comment: 3rd Floor-left party wall Wall 19:Wood Frame, 24"o.c. 156 22.0 0.0 0.054 8 Orientation: Left side Comment: Loft-left side Wall 20:Wood Frame, 24"o.c. 156 22.0 0.0 0.054 8 Orientation: Right side Comment: Loft-right side Project Title: Building 15-unit 108- Dover Report date: 09/25/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-15-unit 108 - Dover.rck Page 2 of 3 1 Gross Area Cavity Cont. Perimeter Wall 21:Wood Frame,24" o.c. 126 19.0 0.0 0.059 7 Orientation: Back Comment: Loft-back wall Ceiling 1: Flat Ceiling or Scissor Truss 127 30.0 0.0 0.035 4 Comment: Loft-sloped ceiling-rear Ceiling 2: Flat Ceiling or Scissor Truss 207 38.0 0.0 0.030 6 Comment: Loft-flat ceiling Ceiling 3: Cathedral Ceiling 256 30.0 0.0 0.034 9 Comment: Loft-sloped ceiling front Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 576 30.0 0.0 0.033 19 Comment: Floor over garage Floor 2:All-Wood Joistfrruss:Over Unconditioned Space 328 30.0 0.0 0.033 11 Comment: Floor over mech room Floor 3: Slab-On-Grade:Unheated 48 10.0 0.684 33 Insulation depth:4.0' Comment: Perimeter slab insulation Floor 4: Slab-On-Grade:Unheated 44 10.0 0.807 36 Insulation depth: 1.6' Comment: Interior slabinsulation Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Building 15-unit 108- Dover Report date: 09/25/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-15-unit 108- Dover.rck Page 3 of 3