HomeMy WebLinkAbout1810 MAIN ST Electric # APPLICATION FOR BUILDING PERMIT
Plumbing#
HVAC# 1810 Main Street Date: s'b _Zoe°
Sprinkler#
FINAL APPROVALS Estimated Cost $ro.�*. `y
Permit Fee $
Building COMPLETE RED BOXED AREAS Occupancy Fee $
Engineering TYPE OF PRINT ONLY Ene. Insp. Fee $
Affidavit No- SIGN ON REVERSE SIDE A �
Appr.for CO. + Total Fee��j $
TO THE BUILDING D MENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost1 $
The undersigned hereby applies to do work according to the following:
Applicant Od / CUi✓ LocationofWork )810 r►wx;-% Sfir A*- LotNo.
Applicant's Address :211 F,44jidfe i evrer4rw e-f- Tel # 8,60 6/'/-32416
Town Ca de Lrt4-k--q� Zip Orel 3$ Lic.#/V/G D60S6 7.�__
Owner }74-tifr, C t �t�/wt dgOrlr►al+. Architect _
Owner's Address AA Ana, S-' Architect's Address
`� W,4se✓ Zip - Zip
Sq. Ft. New Area: 1 st FI. 2nd Fl. 3rd FI. Total New Area
Purpose of this permit Ae-00` Zoe -2 -10,but
&A A!&
City Water'J Well J Septic System J Sewer J
Ins: HO SP e Area Basement Garage
Approved by e Use Group Construction Type
-J�`t11V1c� Revised 1708
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required
distances from all other zones and is located in which this building and its use is allowed.
Signed
I hereby apply for a Certificate of Occupancy for the work described in this application for the permit.
Signed -_— -
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
INSPECTION FIELD SHEET 09/01/11 -
Printed by Peart, Dayshell it 30:25
INSPECTION: 31472 FINAL PERMIT:
STATUS:
APPLICATION: 201000520
LOCATION: 1810 MAIN STREET
SOUTH WINDSOR
PROPERTY ID: 54901810
OWNER: OGORMAN PATRICK L & FELINE
CONTRACTOR:
REQUEST BY:
DESCRIPTION: REMOVE AND REPLACE ROOF
WORK ORDER:
INSPECTOR: ROSE RESULT: PASS
REQUESTED: 08/29/11 PRIORITY:
SCHEDULED: 08/29/11 PM COMPLETED: 08/29/11
UNPAID FEES 00 Date Time
TIME: TRAVEL ONSITE
COMMENTS
c .m
V
S
4 l�
SOA-CO��
CERTIFICATE OF APPROPRIATENESS
Certificate Number 04.14 Date Issued July 2,2014
To: Feline and Patrick O'Gorman
Applicant
Name(s) of Owner Feline O'Gorman and Patrick O'Gorman
Address 1810 Main Street,South Windsor, CT 06074
Address of proposed work same
Contractor self
On July 1, 2014, the Historic District Commission voted to grant this
date
Certificate of Appropriateness for work described in Application for a
Certificate of Appropriateness Number 02.14, dated June 6, 2014.
COMMENTS/STIPULATIONS:
Approval is given for installation of a split rail fence, except on the west side which should be a
more formal wood fence appropriate to a Greek Revival home.
-IN
Chair, istoric District Commission
-------------------------------------------------------------------------------------------------------------------------------
For Building Inspector Use (when inspection is necessary)
This certifies that the work herein described has been completed in
compliance with the terms specified.
Date of Inspection Attest
Building Inspector
Dated:
LAectnc#
APPLICATION FOR BUILDING PERMIT
Plumbing
A # 1810 Main Street Date: 51S
r
Sprinkler# 900193
FINAL APPROVALS — - --"- — — Estimated Cost $ 200.
Building -- ----- —---11,
Permit Fee $
Engneering COMPLETE RED BOXED AREAS Occupancy Fee $
TYPE OR PRINT ONLY Eng. Insp. Fee $
Affidavit
for CO. SIGN ON REVERSE SIDE I Total Fee $ 010
TO THE BUILDING E ARTMENT,TOWN OF SOUTH WINDSOR, CT (Additional Cost) $
The undersigned hereby applies to do work according to the following:
Applicant ' v rltcv S 1 L L Location of Work /��U /^�.��� S�- Lot No.
Applicant's Address .- r �t Tel.# YEO 6 /Y 32--1 .
Town 6,a Zip 6 61(' Lic.# j�'�-19d
Owner f in e v Peetl-r-lc. Architect
Owner's Address 610 w,a,.. S t Architect's Address
Zip Zip-
-Sq. Ft. New Area: 1st Fl. 2nd Fl. 3rd Fl. Total New Area
Purpose of this permit lw r4/ .e Atw
City Watero Wello Septic System❑ Sewero
Ins: HO SP Cert. Area Basement Garage
Approved by Date _2 Use Group Construction Type
Revised 6/02
0�45
r
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance froro all street lines,side yard lines,and required
distances from all other zones and is located in which this building andits use is allowed.
Signed���—`;/
I hereby apply for a Certificate of Occupancy for the work described in this application for the permit.
Signed
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
TOWN OF SOUTH WINDSOR
AFFIDAVIT OF ACTUAL COSTS
PERMIT NO: 151000 9 3 DATE 1 g (� l
The undersigned,being a duty authorized representative of,�dvaf•�,_., / .,� �5 CL C
do by this statement, certify that the actual,costs shown below, of the project referenced by the Permit
Number shown above,are true and accurate.
This statement is being made pursuant to the Town of South Windsor Ordinance,Ar II, Section 14-31,
(a)thru(e),( Wo see attached).
I understand that verification for accuracy of actual costs may be made at any time by the Building Official
through an appraisal of the work at the expense'of the property owner.
1 hereby certify that tho'actual cost of the work performed under this permit is:
Signature of Permit Holder.
Name(Please Print)
Date:
arrarMrrrrraaaaraarararrarrrararararararaaraarararrrraaararraaarraaaaa�rarr�aaarr
State,of Connecticut]
] ss South Windsor Date: U
County of Hartford]
Personally appeared as aforesaid,
Signer and sealer of the foregoing Instrument and acknowledged'the same to be
his/her free act and deed, before me.
Notary Public
Commissioner of the Superior Court
My commission expires on
INSPECTION FIELD SHEET 12/02/09
Printed by Peart, Dayshell 13 50 48
;NSPECTION: 23071 FOOTING PERMIT:
STATUS:
APPLICATION: 200900445
LOCATION: 1810 MAIN STREET
SOUTH WINDSOR
PROPERTY ID: 54901810
OWNER: OGORMAN PATRICK L & FELINE
CONTRACTOR:
DESCRIPTION: INSTALL AND REPLACE FIVE NEW WINDOWS
WORK ORDER:
INSPECTOR: ROSE RESULT: N/A
REQUESTED:
SCHEDULED: COMPLETED: 12/02/09
UNPAID FEES 00 Date Time
TIME: TRAVEL ONSITE
COMMENTS
ALL INSPECTIONS:
INSPECTED INSPECTOR RESULT INSP DESCRIPTION
12/02/09 ROSE N/A B002 FOUNDATION
12/02/09 ROSE N/A B003 FRAMING (ROUGH)
12/02/09 ROSE N/A B004 INSULATION
12/02/09 ROSE N/A B005 FIREPLACE / CHIMNEY
12/02/09 ROSE N/A B006 WOOD / GAS STOVE
12/02/09 ROSE N/A B009 OTHER
11/18/09 ROSE PASS BO10 FINAL
s I
tOr1N SF�
h r Town 074CS
o
�i
9 a
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
~°SOR•C TELEPHONE(860)644-2511
March 9, 2009
Mr. and Mrs. Patrick O'Gorman
1810 Main Street
South Windsor, CT 06074
Dear Feline and Patrick,
Thank you for appearing at our March 3rd meeting. Enclosed please find the Certificate
of Appropriateness for the installation of windows and door as outlined in your
application. Please contact the Building Department at 644-2511 ext. 230 to see if any
permits are required for this project.
Good luck on your project!
Sincerely,
rAvA
Virginia Macro, Chair
Historic District Commission
cc: Building Dept.
�W N SF II
S �(
o
710-u� O-P S-au� V&U/&A
C U
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE(860)644-2511
CERTIFICATE OF APPROPRIATENESS
Certificate Number 01.09 Date Issued March 5,2009
To: Feline and Patrick O'Gorman
Applicant
Name(s) of Owner Feline O'Gorman and Patrick O'Gorman
Address 1810 Main Street,South Windsor, CT 06074
Address of proposed work same
Contractor Boudreau Builders,East Hartford,CT
On March 3,2009,the Historic District Commission voted to grant this
date
Certificate of Appropriateness for work described in Application for a
Certificate of Appropriateness Number 01.09, dated February 20, 2009.
COMMENTS/STIPULATIONS:
Approval is given for installation of windows and door on the south side porch.
�I I�tQ I JL M C �
Chair,Historic District Commission
-------------------------------------------------------------------------------------------------------------------------------
For Building Inspector Use (when inspection is necessary)
This certifies that the work herein described has been completed in
compliance with the terms specified.
Date of Inspection Attest
Building Inspector
Dated:
vim d!oJ
t%Z �
SOUTH WINDSOR,
Town Hal!- 1540 Sullivan Ave., South windsor CT 06074 (860)644-2511
R.cu Office hours:Monday-Friday 8:00 am to 4:30 pm unless otherwise stated.
HDC - Certificate of Appropriateness
To: Historic District Commission Date:
APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
Application is hereby made for issuance of a Certificate of Appropriateness under an"Ordinance
Establishing an Historic District Within the Town of South Windsor",Ordinance 100,for proposed work as
described below and as shown on photographs and plans or drawings(where applicable),accompanying
this application.
Name of Applicant
Address (R 10 1 I IAA V) '
Phone# 'iS(Q 'I S-1 �— l
Name(s)of Owner(s) `ii `
Address of Owner(s) 0
hh If 1
Address of Proposed work ��V I'YIC�t,C1 c
Agent or Contractor
Address
Nature and description of proposed work:(include plan,photo(s)if possible,and elevation drawing where
necessary.) Enclosed is a copy of Ordinance and applicable statutes which you should review in filling out
this Application. Use reverse side hereof and/or additional pages if needed. You will be notified of a
hearing date. ��
Proposed date of commencement of work 4 2L67
Estimated completion (�^6
Signature of Owner
Signature of Owner
Signature of Applican
FOR COMMISSION USE oft ________�_____
Application No. 0/, 0 G( Approved
Date Received 0 Denied
Date4 �
http://www.southwindsor.org/Pages/SWindsorCT BC0MM/certofapprop?textPage=1 2/19/2009
zq
'mom
f M T F11��� t� .�~�!<I v rt t�r��C• !� i
sa
FK
431
Al
i•• l♦ l ( � l4 7 a r ``a � 9C
' �/iC �' �M_, �'sr �r .irk' •N{r�'�ri�� l�, `�. ��� �,f 6 , f {' � �:J
r, ;fit&S f `V ��,t T,_,r_� � ��r •!. ,�t �q.( h� 7t `y�•.,• �� * �A
{./� O' 'I >♦ t`� � �.��,{ R.N���• 1. Nvv ,•1, l :
�� c S '�� � ; 2 �; rj'et, 1 � r' c.,r d'�r � r •t k r� (' '
t t•.� P
r r 7 1 di S,,y ail ' O y
,` r? wi«� 'c,''� 1 ,� {;•.�� �i' N ^s ti tl � ZS:' 'r '-.y' .� r w, `�'� �'
.+.t '+•r �.7. ��. +{�y,�tG3 �•��p I �i:l�. .. t � "i!{t:� ��Xt.� ,��� 1!,� ;�,..
+i. .. •a y�.; 1 e'v_`.`' F `•fir' , �a►"� r;..'►{j S+y .�: j V' _' N �... _ b/G (+ -1.
J,�• .�a�b�„ .��'}�� � ('tf�r'�a r t'♦�■�'I,._ .r ft ``\ ' 'J
a 1 aAp.
r a^r'ra 1 ! S •�r :�5.i �� `�I � 3" 1.1p' x. �+r_ -� • y a f+ a., ! r
.i y1 ' _ f:W�WI ' .1 .t.� l• ,r �� �
aS..7MIN Wit' �i 7'� �•i�+ S. ,� 4 '�
Y
aj,-
1f5;. [ 1��f ,{r � � 1 �.,31"' ;111�� G [n• r k S.�r J�� � 4 �i+'� r6"+t
r >.F r' r, t r >"i`t,• •t tr 1"'J'a• 1 t �j�
+ ' r l�/•` < yl� + � :r • � A� , rirtJ 1+ �T , 1' I�i,�r• I' r
1+ 1- t, • f C-tJ.; � � ii .1 I.J 1J)�I } 1<�1 �J f+�I�t _ .,�Jw Yi
r•,, + lr �1; r 1 f Rt 11 t�i 1J. �,r •, t 1
( ,Kf �I J! ,r. I, � YI tJSr :}]K Y 1•'S �r� � a1•{,� .k, '
�. � }� r i �`!, t,pS , �It .•� t� };1
i•. J i{
� :�71 �5 jg`y! f t�>, y� � '�r,�"� ':� �3 � ,,>}� y�•ta' .i{r 1 S I': 4 ,)>`
:�'r� r 3 �f�`:i-. ,ri..�. �t.,�i 4+`Il ,. l'.�: ,t r �+ 'f f it,; `>, .., " •S,
RIP
r� no�`M ;• -� � �. +grJ�,' ll J � = p�F�Sj�`r' � ; ''}` ��'Y �er
a�jk
q t� ;.r,,, er � O .�t i, 11 �? a� � Fd34t �? �( �• r[�
jo
i.
,�� f� � a rf� � ! � �i{; ;���i �,� ter,. , Ys• i� t`� �'e?�.
3, t
P �jbWW-i�„
t
20
I.00 Ac.
�l co
�9 r ,r• ` k t� s �•`, i J
`rY+.' t .p.•�K,�'Fbj r t *+ `P'ilfk s�+: t,r� ,� y � Y"�•
UA
AA
Kt
•yvt C Y '. � {� fit.; 1
f+ FF 1
•1 .f{4� .I ,F�. ' + Pam„! ,t R J� .iF rJ� �: .,�+�. r' h�'. }+I+y y'�: •lrJ. 1: .£ t c f3 �Y
4� J�{ ,. .d tA! f��. � �'iH r�•. �1 1 •}C r'C� .� C •J��• y�r
ti
J.j
l +
I
f ^
i -
i W w +�7txr► �l
1 ,
,I S
ttvuse- 0
i
�n
I
i
;
AdaO5 0vt G� 5i
O ���aCe I/Y�E'�'�`� �h- D LtJL r C�:r✓�Cct�S C-A N Side
(Porch
f
E
1. Replacement of 2 Lower Windows on EAST facing side
EXISTING:
AX
y
P
r -
' f �.., •,nw. ...,_ .. .. ;:;..,,and "'�
.,_
• 1: Replacement of 2 Lower
Window
s on EAST facing side
PROPOSED:
Sams
CoC�{ iDr1
J = 44`r
t II
Ik nXe*W S
J
(�x�krcrr <<AA in CtIuMintU:tA, - (UkA(f rr�t3�c�1 r✓� ���QnQf f�AO
otter t� S
i
_ i e
r
�.
MEN
men son
man ONE 1 som
11 11
� o
■■■■ iii iii '■■
11 :: son MEN iii
son Non on
C�
'2. Replacement of 2 Lower Windows on NORTH facing side
PROPOSED:
® LiPlace w► s t ,
►,cAnddkaS
n✓ �-
eon h = w x 3 he-htx-e.K ea i
1
V
4
t
r
. T
C
'u
w
x
L
µ4
A•
r
J
I Replacement of 2 Doors on SOUTH facing side
PROPOSEM.
-
M�
me-e 41
TiarKGritec-,
"Pa.rk &ree-r-I Va r,k 61 mcun
l
4iS&TOVF'S
JUIS ORRUCO ) q7.,_',rE
2198 Berlin Turnpike
Newington, CT 06111
1 800-869-2579
(860) 436.6387 ORDER TAK Y CUSTOMERS ORDER NUMBER
TO P Z ' `L� (1 C�1 �i�/�/ ❑ DAY WORK ❑ CONTRACT ❑ EXTRA
/ O // 5�y / JOB NAMEINUMBER
Sa)22 / j
JOB LOCATION
JOB PHONE STAR N D jFr�
TERMS:
l (/
OTY. MATERIAL PRICE AMOUNT DESCRIPTION OF WORK
L✓ /'fit-� G '�'r ..�" �!c.� �"1�
s
1
t i �
OTHER CHARGES
TOTAL OTHER
LABOR HRS. RATE AMOUNT.
>
l� ) OL `
TOTAL LABOR
DATE COMPLETED
/r TOTAL MATERIALS TOTAL MATERIALS
, TOTAL OTHER
S—v o PZ5/b
Work ordered by
; TAX y
Signature �l �—� ! 7
1 hereby acknowledge the satisfactory completion of the above described work. TOTAL
Cam/ ., ��
Dutchwest Non-Catalytic Convection Heater
Securing the Connector Thimble
toMasonryChimneySleeve
Flue
The Dutchwest Convection heater may be connected Elbow Thimble
to either a freestanding masonry chimney or a masonry L ____
fireplace chimney. Keep
Sleeve
Freestanding Installations El I End Flush
with Flue
If the chimney connector must pass through a combus- Tile
tible wall to reach the chimney, follow the recommenda- Chimney
tions in the wall pass-through section that follows. Connector
The opening through the chimney wall to the flue
(the"breech") must be lined with either a ceramic or Flue Liner ST243
metal cylinder, called the "thimble", which is securely Fig.7 The thimble, made of either ceramic or metal, must be
cemented in place. (Fig. 7) Most chimney breeches cemented in place securely.
incorporate thimbles, but check to be sure the fit is snug
and the joint between thimble and chimney wall firmly Masonry Wall
cemented.
A special piece called the"thimble sleeve," slightly Ceramic Flue Liner
smaller in diameter than the standard connector and
most thimbles, will ease the removal of the chimney Chimney Connec-
connector system for inspection and cleaning. Thimble for Shield
sleeves should be available from your local dealer. dock-off Plate ,
To install a thimble sleeve, slide it into the breech until
it is flush with the inner flue wall. Don't extend it into Chimney Connector
the actual flue passage, as that could interfere with the y
draft.
The thimble sleeve should protrude 1-2" (25-50 mm)
into the room. Use furnace cement and thin gasketing 0
to seal the sleeve in place in the thimble. Secure the
chimney connector to the outer end of the sleeve with
sheet metal screws.
ST796as
FireplaceInstallationsFig.S The connector enters flue above the fireplace. If the
Above the Fireplaceclearance between the chimney connector and either the
In this installation, the chimney connector rises from mantel and/or the ceiling is inadequate,special protective
shields will be required.
the stove, turns ninety degrees, and goes back into the
fireplace chimney. The liner of the fireplace chimney
should extend at least to the point at which the chimney Flue Liner
connector enters the chimney. Follow all the guidelines Extend Chimney
for installingchimney connector into a freestanding Connector to the Damper
a y g First Tile of the Flue
masonry chimney, and pay special attention to these Liner Plate is
Removed
additional points: or Locked
in Open
• Check the stove and chimney connector clearances Observe Position
to combustible mantel or trim materials. Use the Miniumum Clearances
j
necessary combination of mantel, trim, and connec-
tor heat shields to provide the required clearances. Close Off
(Fig. 8) O the Damper
Opening with•
Double-check connector clearance from the ceiling. Sheet Metal
• The fireplace damper must be closed and sealed ST797 and Sealant
to prevent room air from being drawn up the flue, Fig.9 The connector passes through the fireplace to enter
reducing the draft. However, it must be possible to flue. Special Fireplace Adapter Kits to simplify fireplace instal-
re-open the damper to inspect or clean the chimney. lations are available from your local dealer.
30002291 7
Dutchwest Non-Catalytic Convection Heater
ThroughFireplace Installations -
- .
12"
The Convection heater may be installed either without Chimney Con- (305mm)
legs` as a fireplace insert, or with standard legs at- nector
tached -depending on the safety regulations that apply 0
to your situation, the height of the fireplace opening and
your own preference. For either situation, the chimney
connector/positive connection kit extends back from the
stove, enters the fireplace cavity, and turns upward. It
then passes through the fireplace damper opening and 12"
smoke chamber and connects to the chimney flue. (305mm)
In such installations, a "positive connection"must be
made to the chimney flue with a special kit available
from your local dealer. Also, special clearance and floor
protection provisions must be observed. These provi- ST420
sions are discussed in the Clearance and Floor Protec- Fig. 10 Wall pass-through enclosed with noncombustible
tion sections respectively. materials.
Wall Pass-Throughs
Whenever possible, design your installation so the con- 18"(450mm)
nector does not pass through a combustible wall. If you Empty Space
All Around the
must use a wall pass-through in your installation, check Chimney Con-
with your building inspector before you begin and con- nector cover
struct it in accordance with local building codes. Also (One side
check with the chimney connector manufacturer for any O only)
specific requirements.
Accessories are available for use as wall pass-
throughs. If using one of these, make sure it has been
tested and listed for use as a wall pass-through.
All combustible material in the wall is cut away a suffi-
cient distance from the single-wall connector to provide
the required 12"(305 mm)clearance for the connector.
Any material used to close up the opening must be non- ST421
combustible. Fig. 11 Hollow wall pass-through.
The following wall pass-through methods may be ap-
proved in your area: DO NOT CONNECT THE HEATER TO ANY AIR
• Use a section of listed factory-built chimney with a DISTRIBUTION DUCT OR SYSTEM
nine-inch clearance to combustibles.
• Place a chimney connector pipe inside a ventilated In Canada: The Canadian Standards Association has
thimble, which is then separated from combustibles established different guidelines. Figure 11 shows one
by 6" (152 mm)of fiberglass insulating material. method, in which all combustible material in the wall is
• If the stove is installed without legs,we recommend cut away to provide the required 18" (450 mm)clear-
the use of noncombustible tiles or pavers as shims to ance for the connector. The resulting space must
allow air flow into the convection air inlets under the remain empty.
stove. Make sure not to block air slots instove bottom
with shims or remove fan cover.
- Place a chimney connector pipe inside a section of
listed solid-insulated, factory-built chimney,with an
inside diameter 2" (51 mm)larger than the chimney
connector and having 1" (25 mm)or more of insula-
tion and maintaining a minimum 2 inch air space
between the outer wall of the chimney and combus-
tibles.
8 30002291
l
' Dutchwest Non-Catalytic Convection Heater
A flush-mounted sheet metal cover may be used on one c
side only If covers must be used on both sides, each
cover must be mounted on non-combustible spacersL7
at least 1"(25 mm)clear of the wall. Your Dutchwest A B
dealer or your local building inspector can provide de-
tails of other approved methods of passing a chimney
connector through a combustible wall. In Canada,this
type of installation must conform to CAN/CSA-B365, A B B
Installation Code for Solid Fuel Burning Appliances and A
Equipment.
NOTE: Do not vent your Dutchwest stove into a factory- A A
built(zero-clearance)fireplace.These appliances and
their chimneys are specifically designed as a unit for U.S. Canada
use as fireplaces. It may void the listing or be hazard- A. 16" 18"(457 mm)
ous to adapt them for any other use. B. 6" 8"(203 mm)
C. 10" 10"(254 mm) ST798
Floor Protection
Minimum Dimensions for Noncombustible Floor
A tremendous amount of heat radiates from the bottom Protectors (Width x Depth):
plate of your Dutchwest stove.The floor area directly (1"/25mm thick minimum with an R-value of at least 1.19)
under and around the stove will require protection from Model I U.S. Canada
radiant heat as well as from stray sparks or embers that 2479 1 513/4"x 461/2" 553/4"x 50'/z"(1416 mm x 1238 mm)
may escape the firebox. Fig.12 Be sure to follow exactly the minimum floor protection
Heat protection is provided by the CFM Corporation requirements on all four sides of the stove.
Bottom Heat Shield. Spark, ember and thermal protec-
tion must be provided by a floor protector constructed
with noncombustible material as specified.
In the US and Canada most installations will require
that the bottom heat shield must be attached. Only
when the stove is placed on a completely noncombusti-
ble surface such as unpainted concrete over earth may
it be used without the heat shield.
Even when the bottom heat shield is installed,you
must provide special protection to the floor beneath.
For installation with the heat shield attached, use an
approved 1" (25mm)noncombustible hearth pad with K A
=0.84 BTUrn ft2 hr°F or an equivalent material with an �C snss
R-value of at least 1.19. (Refer to"How to Determine Fig.13 Combustible supporting timbers(A)may lie beneath
if Alternate Floor Protection Materials are Acceptable" fireplace hearths;such situations require additional floor
section)The floor protector may be covered with a protection.
decorative noncombustible material if desired. Do not Due to the side loading door,floor protector require-
obstruct the space under the heater. ments call for more protection on the left side than on
Protection requirements vary somewhat between the the right. If you wish a more balanced look, increase
United States and Canada as follows: the other side of the hearth as well. Do not reduce side
U.S. Installations:The floor protector is required under protection under any circumstances.
the stove and must extend at least 16"from the front How to Determine if Alternate Floor Protection Ma
and left(loading door)side of the stove, and at least 6" terials are Acceptable
from the right side and rear. (Fig. 12) All floor protection must be noncombustible(i.e.metals,
In Canada: a noncombustible floor protector is required brick,stone, mineral fiber boards,etc.).Any organic
under the heater also.The floor protector must extend materials(i.e.plastics,wood paper products,etc.)are
18"(457mm)from the front and left(loading door)side combustible and must not be used.The floor protection
of the stove, and at least 8"(203mm)from the right side specified includes some form of thermal designation
and rear. (Fig. 12) such as R-value (thermal resistance)or k-factor(ther-
mal conductivity).
30002291 9
Dutchwest Non-Catalytic Convection Heater
Procedure: Many fireplaces do not satisfy the"completely non-
1. Convert specifications to R-value: combustible" requirement because the brick or con-
i. R-value given-no conversion needed. crete hearth in front of the fireplace opening usually is
ii. k-factor is given with a required thickness (T)in supported by heavy wooden framing as in Figure 13.
inches: R= 1 x T Because heat passes readily through brick or concrete,
it can easily pass through to the wood.As a result, such
iii. K-factor is given with a required thickness(T)in fireplace hearths are considered a combustible floor.
inches: R = 1 2 x T You may not install a heater on a combustible hearth
iv. r-factor is given with a required thickness(T)in without legs. Standard leg installations must include the
inches: R = r x T bottom heat shield. The floor protector must also meet
2. Determine the R-value of the proposed alternate standard requirements for freestanding installations.
floor protector: FloorFireplace
i. Use the formula in Step 1 to convert values not Installations with Standard Legs
expressed as R.
ii. For multiple layers, add R-values of each la er to Fireplace installations with the standard legs and the
y bottom heat shield must have a floor protector of the
determine overall R-value. same construction as that specified for freestanding in-
3. If the overall R-value of the system is greater than stallations: use an approved 1"(25mm)noncombustible
the R-value of the specified floor protector,the alter- hearth pad with K= 0.84 BTUrn ftz hr°F or an equiva-
nate is acceptable. lent material with an R-value of at least 1.19(that may
EXAMPLE: The specified floor protector should be 3/4- be covered with a decorative noncombustible material
inch thick material with k-factor of 0.84. The proposed if you desire). (Refer to"How to Determine if Alternate
alternate is 4"brick with an r-factor of 0.2 over 1/8" Floor Protection Materials are Acceptable: section)The
mineral board with a k-factor of 0.29 floor protector must extend at least 16"(406 mm) [18"/
Step a: Use formula above to convert specification to 457 mm in Canada]from the front of the stove and from
R-value: R = x T =L x 1.00 = 1.19 the left(loading door)side, and at least 6"(152 mm)
k 0.84 [8" (203 mm)in Canada]from the right side and rear.
Step b: Calculate R of proposed system. It must also provide protection beneath any horizontal
4" brick of r= 0.2, therefore: runs of the chimney connector, including 2"to either
R� =0.2x4 = 0.8 side.
1/8"mineral board of k =0.29, therefore Many raised hearths will extend less than the required
Rmineratboard = 1 x 0.125= 0.431 distance from the front of the heater when it is installed.
0 29
In such cases, sufficient floor protection, as described
Rtotal = R,Kk+ Rff"neralboard =0•8 +0.431 = 1.231 above, must be added to extend the hearth 16"(406
Step c: Compare proposed system Rtotal of 1.231 to mm)[18"(457 mm)in Canada].
specified R of 1.19. Since proposed system Rtotal is Hearth rugs do not satisfy the requirements for floor
greater than required, the system is acceptable. protection.
Definitions Fireplace insert installations also have specific clear-
R =(ft2)(hr)(°F) k = (Btu)(in) = K x 12 ance requirements to the side walls, side decorative
Btu— hr ) trim, and fireplace mantel. This information is found in
(Btu) in "Fireplace Installation Clearances"in this section.
(ft2)(hr)(°F) (Btu
)(in)
= (Btu)(ft) r= ( )(°F)_ 1 REMINDER-FIREPLACE INSERT INSTALLATIONS
k
WITHOUT LEGS ARE PERMISSIBLE ONLY IF THE
FireplaceHEARTH IS COMPLETELY NONCOMBUSTIBLE,
The Dutchwest Model 2479 has a reversible flue collar SUCH AS UNPAINTED CONCRETE OVER EARTH.
to allow for either top exit or rear exit installations.
You may install your Dutchwest Model 2479 in an exist-
ing fireplace as a fireplace insert with no legs,or with
the standard legs attached.
To install the heater without legs as a fireplace insert,
the floor must be completely noncombustible, such as
an unpainted concrete floor over earth.
10 30002291
Dutchwest Non-Catalytic Convection Heater
Clearances
Keep the Stove a Safe Distance
From Surrounding Materials
Both a stove and its chimney connector radiate heat in
all directions when operating.A safe installation re-
quires that adequate clearance be maintained between
the stove and nearby combustible materials to ensure
that such materials do not overheat.
Clearance is the distance between either your stove or
chimney connector, and nearby walls, floors, the ceiling,
and any other fixed combustible surface. Keep furnish-
ings and other combustible materials away from the
stove as well. In general, a distance of 48" (1220 mm)
must be maintained between the stove and moveable sTF
combustible items such as drying clothes, furniture, Fig. 14 Extra floor protection may be required for the fire-
newspapers, firewood, etc. Keeping those clearance place hearth, even if your stove is installed with the legs and
areas empty assures that nearby surfaces and objects the bottom heat shield.
will not overheat.
Fireplace
Safe Ways to Reduce Clearances
A fireplace installation requires special clearance be-
Your stove has specific clearance requirements that tween the:
have been established through careful research and • Side of the stove and the right and left walls
testing to UL and ULC standards. 0 Side of the stove and the decorative side trim on
Clearance requirements have been established to meet the fireplace face
every installation possibility, and they involve the combi- • Top of the stove and the mantel
nation of basic variables:
In addition, both Fireplace Adaptor and Fireplace Insert
• When the stove has no listed heat shield installations have special floor protection requirements
• When the stove has a listed heat shield that are addressed in the section on Floor Protection.
• When the wall has no heat shield
• When the wall has a heat shield
• When the stove has a double-wall chimney con-
nector
� M
• When the stove has a single-wall connector
with heat shields, or without heat shields
In general, the greatest clearance is required when you
locate a stove with no heat shield near a wall with no T heat shield. The least clearance is required when both s
the stove and the wall have heat shields. Reducing a
stove clearance may require a listed heat shield on the
chimney connector as well, or a double-wall connector. LJUULUIULJU L
Clearances may be reduced only by means approved
J I OU'1
by the regulatory authority and in accordance with the
clearances listed in this manual. The charts and sample Side walls(S)................8"(2" 3 m )
installations that follow list all the clearances required Trim rim(TT).................1 "(33 mm)
for the various installation configurations of Dutchwest Top Trim )... .................27"(686 mm)
Convection Heaters. Mantel(M).....................27"(686 mm)
Fig. 15 Minimum clearances for fireplace installation. Recom-
mended clearances must be maintained between stove and
the surrounding combustible components.
30002291 11
Dutchwest Non-Catalytic Convection Heater ,
Designing a Safe InstallationReference Diagrams
The section that follows contains charts with the infor- Refer to the diagrams below when using the Stove and
mation that you'll need to make your installation safe. Chimney Connector Clearance Chart that follows. For
Included are a chart to tell you exactly where to cut the example,the letter"A"gives the minimum side clear-
hole in the ceiling so that the stove will meet clearance ance for installations in which the stove is not equipped
requirements, a chart that gives stove clearances for with any heat shield and the wall beside the stove is not
all installations, and a chart to illustrate the required protected. T"gives the minimum side clearance when
sizes of wall shields for various installations. the stove does not have any heat shield, but the wall is
Refer to these charts as you plan the installation and do protected.
not compromise on any of the dimensions listed. Measure clearance distances from the top plate of the
stove or chimney connector to the wall, not the wall
protector.
Unprotected Surfaces Protected Surfaces
Parallel Installations Corner Installations Parallel Installations Corner Installations
f A Tm� A
B _C E F
A > t)
C F
--------------------------
Installations with no stove heat shields
t
H J
N/A
G > I NIA
E:1
Rear exit,flue collar heat shield installations
L M O P
K> N
M P
ST255a
Top exit,flue collar heat shield, right side heat shield and chimney connector heat shields or double wall
connector
12 30002291
Dutchwest Non-Catalytic Convection Heater
Stove and Chimney Connector Clearance Charts
Model 2479 Large Convection Heater
UNPROTECTED SURFACES PROTECTED SURFACES
Corner Corner
Parallel Installations Installations Parallel Installations Installations
Stove Clearance Side Rear' Corner Side Rear' Corner
No heat shields (A)21" (B)26" (C)21'/2" (D)8" (E)20" (F) 16'/2"
533 mm 660 mm 546 mm 203 mm 508 mm 419 mm
Rear exit, (G)23" (H) 13" N/A N/A N/A N/A
flue collar heat shields 584 mm 330 mm
Top exit'.2,flue collar (K) 15" (L) 15" (M) 12'h" (N)8" (0) 12" (P) 10"
Single-wall connector (381 mm) (381 mm) (318 mm) (203 mm) (305 mm) (254 mm)
w/connector heat shield Right Side Right Side
and right side heat shield Only Only
Top exit',flue collar (K)20" (L) 16" (M) 12'/i" (N)8" (0) 14'h" (P) 12"
heat shield, (508 mm) (406 mm) (318 mm) (203 mm) (368 mm) (305 mm)
Double wall connector
Chimney Connector Clearance:To Rear Wall Combustible Surface
Single-wall connector 20" 14"
No connector heat shield 508 mm 356 mm
Single-wall2 connector
w/connector heat shield 9" 6"
&flue collar heat shield 229 mm 152 mm
Double-wall connector 10" 8'h"
&flue collar heat shield 254 mm 216 mm
Front Clearance to Combustibles: (All Installations) 48"(1219 mm)
1. Shielding for a top exit stove must include a flue collar shield to protect the area behind the flue collar.
2. Chimney connector heat shields must extend exactly 24"(610 mm)above the flue collar of the stove.
3. Dimension is to the top plate of the stove,not the back wall of the stove.
Important:
When choosing an installation utilizing the side loading door located on the left side of the stove,follow the
minimum dimensions given in the Stove and Chimney Connector Chart on Page 4 and the Minimum Dimen-
sions for Noncombustible Floor Protectors given on Page 9, Figure 12.
For operation of the side loading door,the minimum clearances on the left side of the stove for usable opera-
tion is 141/2"(368 mm) in a corner installation and 20"(508 mm)in a parallel installation.
30002291 13
Dutchwest Non-Catalytic Convection Heater
Dutchwest Convection Heater Model 2479
NOTE:These are not clearance distances. These measurements indicate where the centerline of the flue col-
lar will be for various installations. Measurements are from the centerline of the flue collar to the wall, not the
wall protector.
.-A
1 :C 1 ;F
� C F
ST427
UNPROTECTED SURFACES PROTECTED SURFACES
Corner Corner
Parallel Installations Installations Parallel Installations Installations
Chimney Connector Side Rear Corner Side Rear Corner
Listed,Approved (A)341/2" (B) 12'/2" (C)21" (D)221/2" (E) 12" (F)20'2"
Double-wall,with (846 mm) (318 mm) (533 mm) (572 mm) (305 mm) (521 mm)
flue collar shield
Single wall,with (A)29'/2" (B) 12'/2" (C)21" (D)22'h" (E)91h" (F) 18'h"
Connector heat shields (749 mm) (318 mm) (533 mm) (572 mm) (241 mm) (570 mm)
and flue collar shield
Single wall with no (A)351/2" (B)231/2" (C)30" (D)22'/2" (E) 171/2" (F)25"
heat shields (902 mm) (967 mm) (762 mm) (572 mm) 1 (445 mm) (635 mm)
14 30002291
• Dutchwest Non-Catalytic Convection Heater
Wall Heat Shield Dimensions
DutchWest Non-Catalytic Convection Heater Model#2479
48
48' (1219 mm)
(1219 mm)
Rear Exit
A.,
t 48*(1219 mm)
48"(1219 mm) f Spaced 1' Spaced V
Centered Behind Stove (25 mm) (25 mm)
ST801 from Floor from Floor ST802
L
Fig. 16 Rear wall protection. Fig.17 Sidewall protection.
Wall Shields
Meet at
Corner
48"
1219 mm)
ii k- "I"
x0, !t
48"
(1219 mm)
Spaced 1"t
(25 mm)
L ST803 from Floor
Fig.18 Corner wall protection.
30002291 15
PIP-
f
Dutchwest Non-Catalytic Convection Heater
Securing Connector Thimble
to a Masonry Chimney Sleeve --
--Flue
The Dutchwest Convection heater may be connected Elbow i--- Thimble
to either a freestanding masonry chimney or a masonry
fireplace chimney. Keep
'�-- Sleeve
Freestanding • End Flush
with Flue
If the chimney connector must pass through a combus- Tile
tible wall to reach the chimney, follow the recommenda- Chimney
tions in the wall pass-through section that follows. Connector
The opening through the chimney wall to the flue
(the"breech") must be lined with either a ceramic or Flue Liner ST243
metal cylinder, called the"thimble", which is securely Fig.7 The thimble, made of either ceramic or metal,must be
cemented in place. (Fig. 7) Most chimney breeches cemented in place securely.
incorporate thimbles, but check to be sure the fit is snug
and the joint between thimble and chimney wall firmly Masonry Wall
cemented. Al
A special piece called the "thimble sleeve," slightly Ceramic Flue Liner
smaller in diameter than the standard connector and
most thimbles, will ease the removal of the chimney Chimney Connec-
connector system for inspection and cleaning. Thimble for Shield
sleeves should be available from your local dealer. Block-Off Plate
To install a thimble sleeve, slide it into the breech until
it is flush with the inner flue wall. Don't extend it into Chimney Connector -
the actual flue passage, as that could interfere with the
draft.
The thimble sleeve should protrude 1-2" (25-50 mm)
into the room. Use furnace cement and thin gasketing
to seal the sleeve in place in the thimble. Secure the
chimney connector to the outer end of the sleeve with
sheet metal screws.
ST796as
FireplaceInstallationsFig.8 The connector enters flue above the fireplace. If the
Above the Fi ' • clearance between the chimney connector and either the
mantel and/or the ceiling is inadequate,special protective
In this installation, the chimney connector rises from shields will be required.
the stove, turns ninety degrees, and goes back into the
fireplace chimney. The liner of the fireplace chimney
should extend at least to the point at which the chimney Flue Liner --
connector enters the chimney. Follow all the guidelines Extend Chimney 4}����g r-A k---V-A
for installing a chimney connector into a freestanding Connector to the �✓, Damper
First Tile of the Flue � Plate is
masonry chimney, and pay special attention to these Liner -- Removed
additional points: s ==__ or Locked
Oen
• Check the stove and chimney connector clearances Observe Po Poo
Miniumum Clearances
to combustible mantel or trim materials. Use the j =_
necessary combination of mantel, trim, and connec-
tor heat shields to provide the required clearances. O Close off
(Fig. 8) the Damper
Opening with
• Double-check connector clearance from the ceiling. Sheet Metal
• The fireplace damper must be closed and sealed I ST797 and Sealant
to prevent room air from being drawn up the flue, Fig. 9 The connector passes through the fireplace to enter
reducing the draft. However, it must be possible to flue. Special Fireplace Adapter Kits to simplify fireplace instal-
re-open the damper to inspect or clean the chimney. lations are available from your local dealer.
30002291 7
gooaa`I
Electric#
Plumbing#HVAC # APPLICATION FOR BUILDING Sprinkler# ( '. PERMI
FINAL App V Date: Cj
Building C_
Engineering COMPLETE Estimated Cost
Affidavit RED BOXED AREAS Permit Fee
Appr. for C TYPE OR PRINT ONLY Occu arty Fee a
SIGN ON REVERSE SIDE pp
Eng.Insp. Fee $--�--TO THE BUILDING DE P
The undersigned ARTMENT,TOWN OF SOUTH WINDSOR Total Fee $ -D
fined hereby applies to do CT
work according to the following. (Additional Cost $
Applicant E i
ToP nt's Addre s ^ Location of Wok $
V►'lai�� T•P_
Owner C Lot No.
Tel.#_g4r
Owner's Address Architect Lic.#
S � n
,,��--1�Arcchitect's Address
Sq.Ft.New Area; 1st Fl. ZpacL—
Purpose of this Permit C 2nd FI. _3rd I.
.- p
Total New Area
City Wate
WeIIO Septic 8ystemO
Ins: HO---__S Sewer[
Approved by Ce .
� Date �ea-----.Basement -----._Gar e
Use Gmup Constructi n Type
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspecto f any aeration in he plans or specifications of the Building for which this
permit Is asked,and agree that this building Is ted the er istance from all street Ones,side yard fines,and required
distances from all other zones and is located whic t it and use Is allowed.
Signed
I hereby apply for a Certificate ofTTRrrE
desc In this appfication for the permit.
Signed
DELOW THIS LINE
INSPECTION COMMENTS
1owN Se 13 1c) M Q1 r\ -S+ Ono 1q3)
G
-1 U
2 h
1540 SULLIVAN AVENUE• SOUTH WINDSOR. CT 06074
asOR_�oe TELEPHONE(860) 644-2511
March 9, 2009
Mr. and Mrs. Patrick O'Gorman
1810 Main Street
South Windsor, CT 06074
Dear Feline and Patrick,
Thank you for appearing at our March 3rd meeting. Enclosed please find the Certificate
of Appropriateness for the installation of windows and door as outlined in your
application. Please contact the Building Department at 644-2511 ext. 230 to see if any
permits are required for this project.
Good luck on your project!
Sincerely,
r
Virginia.Macro, Chair
Historic District Commission
cc: Building Dept.
r„I i
r, 1
/ t0w N s,4
7-own aic S-ot,,A ?d,
a u
s �
1540 SULLIVAN AVENUE• SOUTH WINDSOR. CT 06074
4'~OSOR•CON� TELEPHONE(860) 644-2511
CERTIFICATE OF APPROPRIATENESS
Certificate Number 01.09 Date Issued March 5, 2009
To: Feline and Patrick O'Gorman
Applicant
Name(s) of Owner Feline O'Gorman and Patrick O Gorman
Address 1810 Main Street,South Windsor CT 06074
Address of proposed work same
Contractor Boudreau Builders,East Hartford, CT
On March 3, 2009, the Historic_District Commission voted to grant this
date'
Certificate of Appropriateness for work described in Application for a
.Certificate of Appropriateness Number 01.09, dated February 20, 2009.
COMMENTS/STIPULATIONS:
Approval is given for installation of windows and door on the south side porch.
�\Iutn Moom cy,
Chair, Historic District Commission
-------------------------------------------------------------------------------------------------------------------------------
For Building Inspector Use (when inspection is necessary)
This certifies that the work herein described has•been completed in
compliance with the terms specified.
Date of Inspection Attest
Building Inspector
Dated:
• �Q'Mw 2
$OUT,,
I
_� town yo11 - rr
��` 1540 SU�lIYdR SOR Office h Ave., South W' T
vats:Monddy-Priddy8;00dmb4s 3 p (860)644-2.51 l
H'�C - Certificate of Pm unless otherwise sfdle�d
Appropriateness
To: Historic DisUict Commission
Date: Z b
APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
Application's hereb,made for
Establishing an H' issuance of a Certificate of M
described `�0"` for
Within the Town of south yy;,Y• da ess under an below and as shown on Photographs ry "Ordinance
this application. ographs and Plans .Ordinance it>0,for
p or drawings(why applicable�Om work as
1,_ ,accompanying
Name of Applicant 1 ��1 f�(L
l�h{nCK Q
Address
Phone# --
Name(s)of Owner(s)
Address of Owner(s)
Address of Proposed work
Agent or Contractor �Z(L
Address
Nature and description of proposed K,
nis�rY•) Enclosed is a copy of Ordinance and Irldlude Plan,photos)if Possible,and elevation drawl
Application. Use reverse side hereof and applicable statutes which you n9 where
hearing date. /w additional pages If named. Y�will b review fled of a out
Proposed date of commencement of work �/�( - n c�j
Estimated ��h �—LC� !
completipdagZ
Signature Of owner GG
Signature of Owner
Signature of Applica
FOR COMMISSION USEO
Application No.
Date Received Approved
Denied
Date
http://µ,wv_Southwindsor.org/p$gcs/SWindsorG"1' BCOMIVI/c
-- ertofappcop?tuxtPage=1 2/19/2009