Loading...
HomeMy WebLinkAbout1810 MAIN ST Electric # APPLICATION FOR BUILDING PERMIT Plumbing# HVAC# 1810 Main Street Date: s'b _Zoe° Sprinkler# FINAL APPROVALS Estimated Cost $ro.�*. `y Permit Fee $ Building COMPLETE RED BOXED AREAS Occupancy Fee $ Engineering TYPE OF PRINT ONLY Ene. Insp. Fee $ Affidavit No- SIGN ON REVERSE SIDE A � Appr.for CO. + Total Fee��j $ TO THE BUILDING D MENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost1 $ The undersigned hereby applies to do work according to the following: Applicant Od / CUi✓ LocationofWork )810 r►wx;-% Sfir A*- LotNo. Applicant's Address :211 F,44jidfe i evrer4rw e-f- Tel # 8,60 6/'/-32416 Town Ca de Lrt4-k--q� Zip Orel 3$ Lic.#/V/G D60S6 7.�__ Owner }74-tifr, C t �t�/wt dgOrlr►al+. Architect _ Owner's Address AA Ana, S-' Architect's Address `� W,4se✓ Zip - Zip Sq. Ft. New Area: 1 st FI. 2nd Fl. 3rd FI. Total New Area Purpose of this permit Ae-00` Zoe -2 -10,but &A A!& City Water'J Well J Septic System J Sewer J Ins: HO SP e Area Basement Garage Approved by e Use Group Construction Type -J�`t11V1c� Revised 1708 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its use is allowed. Signed I hereby apply for a Certificate of Occupancy for the work described in this application for the permit. Signed -_— - DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS INSPECTION FIELD SHEET 09/01/11 - Printed by Peart, Dayshell it 30:25 INSPECTION: 31472 FINAL PERMIT: STATUS: APPLICATION: 201000520 LOCATION: 1810 MAIN STREET SOUTH WINDSOR PROPERTY ID: 54901810 OWNER: OGORMAN PATRICK L & FELINE CONTRACTOR: REQUEST BY: DESCRIPTION: REMOVE AND REPLACE ROOF WORK ORDER: INSPECTOR: ROSE RESULT: PASS REQUESTED: 08/29/11 PRIORITY: SCHEDULED: 08/29/11 PM COMPLETED: 08/29/11 UNPAID FEES 00 Date Time TIME: TRAVEL ONSITE COMMENTS c .m V S 4 l� SOA-CO�� CERTIFICATE OF APPROPRIATENESS Certificate Number 04.14 Date Issued July 2,2014 To: Feline and Patrick O'Gorman Applicant Name(s) of Owner Feline O'Gorman and Patrick O'Gorman Address 1810 Main Street,South Windsor, CT 06074 Address of proposed work same Contractor self On July 1, 2014, the Historic District Commission voted to grant this date Certificate of Appropriateness for work described in Application for a Certificate of Appropriateness Number 02.14, dated June 6, 2014. COMMENTS/STIPULATIONS: Approval is given for installation of a split rail fence, except on the west side which should be a more formal wood fence appropriate to a Greek Revival home. -IN Chair, istoric District Commission ------------------------------------------------------------------------------------------------------------------------------- For Building Inspector Use (when inspection is necessary) This certifies that the work herein described has been completed in compliance with the terms specified. Date of Inspection Attest Building Inspector Dated: LAectnc# APPLICATION FOR BUILDING PERMIT Plumbing A # 1810 Main Street Date: 51S r Sprinkler# 900193 FINAL APPROVALS — - --"- — — Estimated Cost $ 200. Building -- ----- —---11, Permit Fee $ Engneering COMPLETE RED BOXED AREAS Occupancy Fee $ TYPE OR PRINT ONLY Eng. Insp. Fee $ Affidavit for CO. SIGN ON REVERSE SIDE I Total Fee $ 010 TO THE BUILDING E ARTMENT,TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ The undersigned hereby applies to do work according to the following: Applicant ' v rltcv S 1 L L Location of Work /��U /^�.��� S�- Lot No. Applicant's Address .- r �t Tel.# YEO 6 /Y 32--1 . Town 6,a Zip 6 61(' Lic.# j�'�-19d Owner f in e v Peetl-r-lc. Architect Owner's Address 610 w,a,.. S t Architect's Address Zip Zip- -Sq. Ft. New Area: 1st Fl. 2nd Fl. 3rd Fl. Total New Area Purpose of this permit lw r4/ .e Atw City Watero Wello Septic System❑ Sewero Ins: HO SP Cert. Area Basement Garage Approved by Date _2 Use Group Construction Type Revised 6/02 0�45 r I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance froro all street lines,side yard lines,and required distances from all other zones and is located in which this building andits use is allowed. Signed���—`;/ I hereby apply for a Certificate of Occupancy for the work described in this application for the permit. Signed DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS TOWN OF SOUTH WINDSOR AFFIDAVIT OF ACTUAL COSTS PERMIT NO: 151000 9 3 DATE 1 g (� l The undersigned,being a duty authorized representative of,�dvaf•�,_., / .,� �5 CL C do by this statement, certify that the actual,costs shown below, of the project referenced by the Permit Number shown above,are true and accurate. This statement is being made pursuant to the Town of South Windsor Ordinance,Ar II, Section 14-31, (a)thru(e),( Wo see attached). I understand that verification for accuracy of actual costs may be made at any time by the Building Official through an appraisal of the work at the expense'of the property owner. 1 hereby certify that tho'actual cost of the work performed under this permit is: Signature of Permit Holder. Name(Please Print) Date: arrarMrrrrraaaaraarararrarrrararararararaaraarararrrraaararraaarraaaaa�rarr�aaarr State,of Connecticut] ] ss South Windsor Date: U County of Hartford] Personally appeared as aforesaid, Signer and sealer of the foregoing Instrument and acknowledged'the same to be his/her free act and deed, before me. Notary Public Commissioner of the Superior Court My commission expires on INSPECTION FIELD SHEET 12/02/09 Printed by Peart, Dayshell 13 50 48 ;NSPECTION: 23071 FOOTING PERMIT: STATUS: APPLICATION: 200900445 LOCATION: 1810 MAIN STREET SOUTH WINDSOR PROPERTY ID: 54901810 OWNER: OGORMAN PATRICK L & FELINE CONTRACTOR: DESCRIPTION: INSTALL AND REPLACE FIVE NEW WINDOWS WORK ORDER: INSPECTOR: ROSE RESULT: N/A REQUESTED: SCHEDULED: COMPLETED: 12/02/09 UNPAID FEES 00 Date Time TIME: TRAVEL ONSITE COMMENTS ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION 12/02/09 ROSE N/A B002 FOUNDATION 12/02/09 ROSE N/A B003 FRAMING (ROUGH) 12/02/09 ROSE N/A B004 INSULATION 12/02/09 ROSE N/A B005 FIREPLACE / CHIMNEY 12/02/09 ROSE N/A B006 WOOD / GAS STOVE 12/02/09 ROSE N/A B009 OTHER 11/18/09 ROSE PASS BO10 FINAL s I tOr1N SF� h r Town 074CS o �i 9 a 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 ~°SOR•C TELEPHONE(860)644-2511 March 9, 2009 Mr. and Mrs. Patrick O'Gorman 1810 Main Street South Windsor, CT 06074 Dear Feline and Patrick, Thank you for appearing at our March 3rd meeting. Enclosed please find the Certificate of Appropriateness for the installation of windows and door as outlined in your application. Please contact the Building Department at 644-2511 ext. 230 to see if any permits are required for this project. Good luck on your project! Sincerely, rAvA Virginia Macro, Chair Historic District Commission cc: Building Dept. �W N SF II S �( o 710-u� O-P S-au� V&U/&A C U 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE(860)644-2511 CERTIFICATE OF APPROPRIATENESS Certificate Number 01.09 Date Issued March 5,2009 To: Feline and Patrick O'Gorman Applicant Name(s) of Owner Feline O'Gorman and Patrick O'Gorman Address 1810 Main Street,South Windsor, CT 06074 Address of proposed work same Contractor Boudreau Builders,East Hartford,CT On March 3,2009,the Historic District Commission voted to grant this date Certificate of Appropriateness for work described in Application for a Certificate of Appropriateness Number 01.09, dated February 20, 2009. COMMENTS/STIPULATIONS: Approval is given for installation of windows and door on the south side porch. �I I�tQ I JL M C � Chair,Historic District Commission ------------------------------------------------------------------------------------------------------------------------------- For Building Inspector Use (when inspection is necessary) This certifies that the work herein described has been completed in compliance with the terms specified. Date of Inspection Attest Building Inspector Dated: vim d!oJ t%Z � SOUTH WINDSOR, Town Hal!- 1540 Sullivan Ave., South windsor CT 06074 (860)644-2511 R.cu Office hours:Monday-Friday 8:00 am to 4:30 pm unless otherwise stated. HDC - Certificate of Appropriateness To: Historic District Commission Date: APPLICATION FOR CERTIFICATE OF APPROPRIATENESS Application is hereby made for issuance of a Certificate of Appropriateness under an"Ordinance Establishing an Historic District Within the Town of South Windsor",Ordinance 100,for proposed work as described below and as shown on photographs and plans or drawings(where applicable),accompanying this application. Name of Applicant Address (R 10 1 I IAA V) ' Phone# 'iS(Q 'I S-1 �— l Name(s)of Owner(s) `ii ` Address of Owner(s) 0 hh If 1 Address of Proposed work ��V I'YIC�t,C1 c Agent or Contractor Address Nature and description of proposed work:(include plan,photo(s)if possible,and elevation drawing where necessary.) Enclosed is a copy of Ordinance and applicable statutes which you should review in filling out this Application. Use reverse side hereof and/or additional pages if needed. You will be notified of a hearing date. �� Proposed date of commencement of work 4 2L67 Estimated completion (�^6 Signature of Owner Signature of Owner Signature of Applican FOR COMMISSION USE oft ________�_____ Application No. 0/, 0 G( Approved Date Received 0 Denied Date4 � http://www.southwindsor.org/Pages/SWindsorCT BC0MM/certofapprop?textPage=1 2/19/2009 zq 'mom f M T F11��� t� .�~�!<I v rt t�r��C• !� i sa FK 431 Al i•• l♦ l ( � l4 7 a r ``a � 9C ' �/iC �' �M_, �'sr �r .irk' •N{r�'�ri�� l�, `�. ��� �,f 6 , f {' � �:J r, ;fit&S f `V ��,t T,_,r_� � ��r •!. ,�t �q.( h� 7t `y�•.,• �� * �A {./� O' 'I >♦ t`� � �.��,{ R.N���• 1. Nvv ,•1, l : �� c S '�� � ; 2 �; rj'et, 1 � r' c.,r d'�r � r •t k r� (' ' t t•.� P r r 7 1 di S,,y ail ' O y ,` r? wi«� 'c,''� 1 ,� {;•.�� �i' N ^s ti tl � ZS:' 'r '-.y' .� r w, `�'� �' .+.t '+•r �.7. ��. +{�y,�tG3 �•��p I �i:l�. .. t � "i!{t:� ��Xt.� ,��� 1!,� ;�,.. +i. .. •a y�.; 1 e'v_`.`' F `•fir' , �a►"� r;..'►{j S+y .�: j V' _' N �... _ b/G (+ -1. J,�• .�a�b�„ .��'}�� � ('tf�r'�a r t'♦�■�'I,._ .r ft ``\ ' 'J a 1 aAp. r a^r'ra 1 ! S •�r :�5.i �� `�I � 3" 1.1p' x. �+r_ -� • y a f+ a., ! r .i y1 ' _ f:W�WI ' .1 .t.� l• ,r �� � aS..7MIN Wit' �i 7'� �•i�+ S. ,� 4 '� Y aj,- 1f5;. [ 1��f ,{r � � 1 �.,31"' ;111�� G [n• r k S.�r J�� � 4 �i+'� r6"+t r >.F r' r, t r >"i`t,• •t tr 1"'J'a• 1 t �j� + ' r l�/•` < yl� + � :r • � A� , rirtJ 1+ �T , 1' I�i,�r• I' r 1+ 1- t, • f C-tJ.; � � ii .1 I.J 1J)�I } 1<�1 �J f+�I�t _ .,�Jw Yi r•,, + lr �1; r 1 f Rt 11 t�i 1J. �,r •, t 1 ( ,Kf �I J! ,r. I, � YI tJSr :}]K Y 1•'S �r� � a1•{,� .k, ' �. � }� r i �`!, t,pS , �It .•� t� };1 i•. J i{ � :�71 �5 jg`y! f t�>, y� � '�r,�"� ':� �3 � ,,>}� y�•ta' .i{r 1 S I': 4 ,)>` :�'r� r 3 �f�`:i-. ,ri..�. �t.,�i 4+`Il ,. l'.�: ,t r �+ 'f f it,; `>, .., " •S, RIP r� no�`M ;• -� � �. +grJ�,' ll J � = p�F�Sj�`r' � ; ''}` ��'Y �er a�jk q t� ;.r,,, er � O .�t i, 11 �? a� � Fd34t �? �( �• r[� jo i. ,�� f� � a rf� � ! � �i{; ;���i �,� ter,. , Ys• i� t`� �'e?�. 3, t P �jbWW-i�„ t 20 I.00 Ac. �l co �9 r ,r• ` k t� s �•`, i J `rY+.' t .p.•�K,�'Fbj r t *+ `P'ilfk s�+: t,r� ,� y � Y"�• UA AA Kt •yvt C Y '. � {� fit.; 1 f+ FF 1 •1 .f{4� .I ,F�. ' + Pam„! ,t R J� .iF rJ� �: .,�+�. r' h�'. }+I+y y'�: •lrJ. 1: .£ t c f3 �Y 4� J�{ ,. .d tA! f��. � �'iH r�•. �1 1 •}C r'C� .� C •J��• y�r ti J.j l + I f ^ i - i W w +�7txr► �l 1 , ,I S ttvuse- 0 i �n I i ; AdaO5 0vt G� 5i O ���aCe I/Y�E'�'�`� �h- D LtJL r C�:r✓�Cct�S C-A N Side (Porch f E 1. Replacement of 2 Lower Windows on EAST facing side EXISTING: AX y P r - ' f �.., •,nw. ...,_ .. .. ;:;..,,and "'� .,_ • 1: Replacement of 2 Lower Window s on EAST facing side PROPOSED: Sams CoC�{ iDr1 J = 44`r t II Ik nXe*W S J (�x�krcrr <<AA in CtIuMintU:tA, - (UkA(f rr�t3�c�1 r✓� ���QnQf f�AO otter t� S i _ i e r �. MEN men son man ONE 1 som 11 11 � o ■■■■ iii iii '■■ 11 :: son MEN iii son Non on C� '2. Replacement of 2 Lower Windows on NORTH facing side PROPOSED: ® LiPlace w► s t , ►,cAnddkaS n✓ �- eon h = w x 3 he-htx-e.K ea i 1 V 4 t r . T C 'u w x L µ4 A• r J I Replacement of 2 Doors on SOUTH facing side PROPOSEM. - M� me-e 41 TiarKGritec-, "Pa.rk &ree-r-I Va r,k 61 mcun l 4iS&TOVF'S JUIS ORRUCO ) q7.,_',rE 2198 Berlin Turnpike Newington, CT 06111 1 800-869-2579 (860) 436.6387 ORDER TAK Y CUSTOMERS ORDER NUMBER TO P Z ' `L� (1 C�1 �i�/�/ ❑ DAY WORK ❑ CONTRACT ❑ EXTRA / O // 5�y / JOB NAMEINUMBER Sa)22 / j JOB LOCATION JOB PHONE STAR N D jFr� TERMS: l (/ OTY. MATERIAL PRICE AMOUNT DESCRIPTION OF WORK L✓ /'fit-� G '�'r ..�" �!c.� �"1� s 1 t i � OTHER CHARGES TOTAL OTHER LABOR HRS. RATE AMOUNT. > l� ) OL ` TOTAL LABOR DATE COMPLETED /r TOTAL MATERIALS TOTAL MATERIALS , TOTAL OTHER S—v o PZ5/b Work ordered by ; TAX y Signature �l �—� ! 7 1 hereby acknowledge the satisfactory completion of the above described work. TOTAL Cam/ ., �� Dutchwest Non-Catalytic Convection Heater Securing the Connector Thimble toMasonryChimneySleeve Flue The Dutchwest Convection heater may be connected Elbow Thimble to either a freestanding masonry chimney or a masonry L ____ fireplace chimney. Keep Sleeve Freestanding Installations El I End Flush with Flue If the chimney connector must pass through a combus- Tile tible wall to reach the chimney, follow the recommenda- Chimney tions in the wall pass-through section that follows. Connector The opening through the chimney wall to the flue (the"breech") must be lined with either a ceramic or Flue Liner ST243 metal cylinder, called the "thimble", which is securely Fig.7 The thimble, made of either ceramic or metal, must be cemented in place. (Fig. 7) Most chimney breeches cemented in place securely. incorporate thimbles, but check to be sure the fit is snug and the joint between thimble and chimney wall firmly Masonry Wall cemented. A special piece called the"thimble sleeve," slightly Ceramic Flue Liner smaller in diameter than the standard connector and most thimbles, will ease the removal of the chimney Chimney Connec- connector system for inspection and cleaning. Thimble for Shield sleeves should be available from your local dealer. dock-off Plate , To install a thimble sleeve, slide it into the breech until it is flush with the inner flue wall. Don't extend it into Chimney Connector the actual flue passage, as that could interfere with the y draft. The thimble sleeve should protrude 1-2" (25-50 mm) into the room. Use furnace cement and thin gasketing 0 to seal the sleeve in place in the thimble. Secure the chimney connector to the outer end of the sleeve with sheet metal screws. ST796as FireplaceInstallationsFig.S The connector enters flue above the fireplace. If the Above the Fireplaceclearance between the chimney connector and either the In this installation, the chimney connector rises from mantel and/or the ceiling is inadequate,special protective shields will be required. the stove, turns ninety degrees, and goes back into the fireplace chimney. The liner of the fireplace chimney should extend at least to the point at which the chimney Flue Liner connector enters the chimney. Follow all the guidelines Extend Chimney for installingchimney connector into a freestanding Connector to the Damper a y g First Tile of the Flue masonry chimney, and pay special attention to these Liner Plate is Removed additional points: or Locked in Open • Check the stove and chimney connector clearances Observe Position to combustible mantel or trim materials. Use the Miniumum Clearances j necessary combination of mantel, trim, and connec- tor heat shields to provide the required clearances. Close Off (Fig. 8) O the Damper Opening with• Double-check connector clearance from the ceiling. Sheet Metal • The fireplace damper must be closed and sealed ST797 and Sealant to prevent room air from being drawn up the flue, Fig.9 The connector passes through the fireplace to enter reducing the draft. However, it must be possible to flue. Special Fireplace Adapter Kits to simplify fireplace instal- re-open the damper to inspect or clean the chimney. lations are available from your local dealer. 30002291 7 Dutchwest Non-Catalytic Convection Heater ThroughFireplace Installations - - . 12" The Convection heater may be installed either without Chimney Con- (305mm) legs` as a fireplace insert, or with standard legs at- nector tached -depending on the safety regulations that apply 0 to your situation, the height of the fireplace opening and your own preference. For either situation, the chimney connector/positive connection kit extends back from the stove, enters the fireplace cavity, and turns upward. It then passes through the fireplace damper opening and 12" smoke chamber and connects to the chimney flue. (305mm) In such installations, a "positive connection"must be made to the chimney flue with a special kit available from your local dealer. Also, special clearance and floor protection provisions must be observed. These provi- ST420 sions are discussed in the Clearance and Floor Protec- Fig. 10 Wall pass-through enclosed with noncombustible tion sections respectively. materials. Wall Pass-Throughs Whenever possible, design your installation so the con- 18"(450mm) nector does not pass through a combustible wall. If you Empty Space All Around the must use a wall pass-through in your installation, check Chimney Con- with your building inspector before you begin and con- nector cover struct it in accordance with local building codes. Also (One side check with the chimney connector manufacturer for any O only) specific requirements. Accessories are available for use as wall pass- throughs. If using one of these, make sure it has been tested and listed for use as a wall pass-through. All combustible material in the wall is cut away a suffi- cient distance from the single-wall connector to provide the required 12"(305 mm)clearance for the connector. Any material used to close up the opening must be non- ST421 combustible. Fig. 11 Hollow wall pass-through. The following wall pass-through methods may be ap- proved in your area: DO NOT CONNECT THE HEATER TO ANY AIR • Use a section of listed factory-built chimney with a DISTRIBUTION DUCT OR SYSTEM nine-inch clearance to combustibles. • Place a chimney connector pipe inside a ventilated In Canada: The Canadian Standards Association has thimble, which is then separated from combustibles established different guidelines. Figure 11 shows one by 6" (152 mm)of fiberglass insulating material. method, in which all combustible material in the wall is • If the stove is installed without legs,we recommend cut away to provide the required 18" (450 mm)clear- the use of noncombustible tiles or pavers as shims to ance for the connector. The resulting space must allow air flow into the convection air inlets under the remain empty. stove. Make sure not to block air slots instove bottom with shims or remove fan cover. - Place a chimney connector pipe inside a section of listed solid-insulated, factory-built chimney,with an inside diameter 2" (51 mm)larger than the chimney connector and having 1" (25 mm)or more of insula- tion and maintaining a minimum 2 inch air space between the outer wall of the chimney and combus- tibles. 8 30002291 l ' Dutchwest Non-Catalytic Convection Heater A flush-mounted sheet metal cover may be used on one c side only If covers must be used on both sides, each cover must be mounted on non-combustible spacersL7 at least 1"(25 mm)clear of the wall. Your Dutchwest A B dealer or your local building inspector can provide de- tails of other approved methods of passing a chimney connector through a combustible wall. In Canada,this type of installation must conform to CAN/CSA-B365, A B B Installation Code for Solid Fuel Burning Appliances and A Equipment. NOTE: Do not vent your Dutchwest stove into a factory- A A built(zero-clearance)fireplace.These appliances and their chimneys are specifically designed as a unit for U.S. Canada use as fireplaces. It may void the listing or be hazard- A. 16" 18"(457 mm) ous to adapt them for any other use. B. 6" 8"(203 mm) C. 10" 10"(254 mm) ST798 Floor Protection Minimum Dimensions for Noncombustible Floor A tremendous amount of heat radiates from the bottom Protectors (Width x Depth): plate of your Dutchwest stove.The floor area directly (1"/25mm thick minimum with an R-value of at least 1.19) under and around the stove will require protection from Model I U.S. Canada radiant heat as well as from stray sparks or embers that 2479 1 513/4"x 461/2" 553/4"x 50'/z"(1416 mm x 1238 mm) may escape the firebox. Fig.12 Be sure to follow exactly the minimum floor protection Heat protection is provided by the CFM Corporation requirements on all four sides of the stove. Bottom Heat Shield. Spark, ember and thermal protec- tion must be provided by a floor protector constructed with noncombustible material as specified. In the US and Canada most installations will require that the bottom heat shield must be attached. Only when the stove is placed on a completely noncombusti- ble surface such as unpainted concrete over earth may it be used without the heat shield. Even when the bottom heat shield is installed,you must provide special protection to the floor beneath. For installation with the heat shield attached, use an approved 1" (25mm)noncombustible hearth pad with K A =0.84 BTUrn ft2 hr°F or an equivalent material with an �C snss R-value of at least 1.19. (Refer to"How to Determine Fig.13 Combustible supporting timbers(A)may lie beneath if Alternate Floor Protection Materials are Acceptable" fireplace hearths;such situations require additional floor section)The floor protector may be covered with a protection. decorative noncombustible material if desired. Do not Due to the side loading door,floor protector require- obstruct the space under the heater. ments call for more protection on the left side than on Protection requirements vary somewhat between the the right. If you wish a more balanced look, increase United States and Canada as follows: the other side of the hearth as well. Do not reduce side U.S. Installations:The floor protector is required under protection under any circumstances. the stove and must extend at least 16"from the front How to Determine if Alternate Floor Protection Ma and left(loading door)side of the stove, and at least 6" terials are Acceptable from the right side and rear. (Fig. 12) All floor protection must be noncombustible(i.e.metals, In Canada: a noncombustible floor protector is required brick,stone, mineral fiber boards,etc.).Any organic under the heater also.The floor protector must extend materials(i.e.plastics,wood paper products,etc.)are 18"(457mm)from the front and left(loading door)side combustible and must not be used.The floor protection of the stove, and at least 8"(203mm)from the right side specified includes some form of thermal designation and rear. (Fig. 12) such as R-value (thermal resistance)or k-factor(ther- mal conductivity). 30002291 9 Dutchwest Non-Catalytic Convection Heater Procedure: Many fireplaces do not satisfy the"completely non- 1. Convert specifications to R-value: combustible" requirement because the brick or con- i. R-value given-no conversion needed. crete hearth in front of the fireplace opening usually is ii. k-factor is given with a required thickness (T)in supported by heavy wooden framing as in Figure 13. inches: R= 1 x T Because heat passes readily through brick or concrete, it can easily pass through to the wood.As a result, such iii. K-factor is given with a required thickness(T)in fireplace hearths are considered a combustible floor. inches: R = 1 2 x T You may not install a heater on a combustible hearth iv. r-factor is given with a required thickness(T)in without legs. Standard leg installations must include the inches: R = r x T bottom heat shield. The floor protector must also meet 2. Determine the R-value of the proposed alternate standard requirements for freestanding installations. floor protector: FloorFireplace i. Use the formula in Step 1 to convert values not Installations with Standard Legs expressed as R. ii. For multiple layers, add R-values of each la er to Fireplace installations with the standard legs and the y bottom heat shield must have a floor protector of the determine overall R-value. same construction as that specified for freestanding in- 3. If the overall R-value of the system is greater than stallations: use an approved 1"(25mm)noncombustible the R-value of the specified floor protector,the alter- hearth pad with K= 0.84 BTUrn ftz hr°F or an equiva- nate is acceptable. lent material with an R-value of at least 1.19(that may EXAMPLE: The specified floor protector should be 3/4- be covered with a decorative noncombustible material inch thick material with k-factor of 0.84. The proposed if you desire). (Refer to"How to Determine if Alternate alternate is 4"brick with an r-factor of 0.2 over 1/8" Floor Protection Materials are Acceptable: section)The mineral board with a k-factor of 0.29 floor protector must extend at least 16"(406 mm) [18"/ Step a: Use formula above to convert specification to 457 mm in Canada]from the front of the stove and from R-value: R = x T =L x 1.00 = 1.19 the left(loading door)side, and at least 6"(152 mm) k 0.84 [8" (203 mm)in Canada]from the right side and rear. Step b: Calculate R of proposed system. It must also provide protection beneath any horizontal 4" brick of r= 0.2, therefore: runs of the chimney connector, including 2"to either R� =0.2x4 = 0.8 side. 1/8"mineral board of k =0.29, therefore Many raised hearths will extend less than the required Rmineratboard = 1 x 0.125= 0.431 distance from the front of the heater when it is installed. 0 29 In such cases, sufficient floor protection, as described Rtotal = R,Kk+ Rff"neralboard =0•8 +0.431 = 1.231 above, must be added to extend the hearth 16"(406 Step c: Compare proposed system Rtotal of 1.231 to mm)[18"(457 mm)in Canada]. specified R of 1.19. Since proposed system Rtotal is Hearth rugs do not satisfy the requirements for floor greater than required, the system is acceptable. protection. Definitions Fireplace insert installations also have specific clear- R =(ft2)(hr)(°F) k = (Btu)(in) = K x 12 ance requirements to the side walls, side decorative Btu— hr ) trim, and fireplace mantel. This information is found in (Btu) in "Fireplace Installation Clearances"in this section. (ft2)(hr)(°F) (Btu )(in) = (Btu)(ft) r= ( )(°F)_ 1 REMINDER-FIREPLACE INSERT INSTALLATIONS k WITHOUT LEGS ARE PERMISSIBLE ONLY IF THE FireplaceHEARTH IS COMPLETELY NONCOMBUSTIBLE, The Dutchwest Model 2479 has a reversible flue collar SUCH AS UNPAINTED CONCRETE OVER EARTH. to allow for either top exit or rear exit installations. You may install your Dutchwest Model 2479 in an exist- ing fireplace as a fireplace insert with no legs,or with the standard legs attached. To install the heater without legs as a fireplace insert, the floor must be completely noncombustible, such as an unpainted concrete floor over earth. 10 30002291 Dutchwest Non-Catalytic Convection Heater Clearances Keep the Stove a Safe Distance From Surrounding Materials Both a stove and its chimney connector radiate heat in all directions when operating.A safe installation re- quires that adequate clearance be maintained between the stove and nearby combustible materials to ensure that such materials do not overheat. Clearance is the distance between either your stove or chimney connector, and nearby walls, floors, the ceiling, and any other fixed combustible surface. Keep furnish- ings and other combustible materials away from the stove as well. In general, a distance of 48" (1220 mm) must be maintained between the stove and moveable sTF combustible items such as drying clothes, furniture, Fig. 14 Extra floor protection may be required for the fire- newspapers, firewood, etc. Keeping those clearance place hearth, even if your stove is installed with the legs and areas empty assures that nearby surfaces and objects the bottom heat shield. will not overheat. Fireplace Safe Ways to Reduce Clearances A fireplace installation requires special clearance be- Your stove has specific clearance requirements that tween the: have been established through careful research and • Side of the stove and the right and left walls testing to UL and ULC standards. 0 Side of the stove and the decorative side trim on Clearance requirements have been established to meet the fireplace face every installation possibility, and they involve the combi- • Top of the stove and the mantel nation of basic variables: In addition, both Fireplace Adaptor and Fireplace Insert • When the stove has no listed heat shield installations have special floor protection requirements • When the stove has a listed heat shield that are addressed in the section on Floor Protection. • When the wall has no heat shield • When the wall has a heat shield • When the stove has a double-wall chimney con- nector � M • When the stove has a single-wall connector with heat shields, or without heat shields In general, the greatest clearance is required when you locate a stove with no heat shield near a wall with no T heat shield. The least clearance is required when both s the stove and the wall have heat shields. Reducing a stove clearance may require a listed heat shield on the chimney connector as well, or a double-wall connector. LJUULUIULJU L Clearances may be reduced only by means approved J I OU'1 by the regulatory authority and in accordance with the clearances listed in this manual. The charts and sample Side walls(S)................8"(2" 3 m ) installations that follow list all the clearances required Trim rim(TT).................1 "(33 mm) for the various installation configurations of Dutchwest Top Trim )... .................27"(686 mm) Convection Heaters. Mantel(M).....................27"(686 mm) Fig. 15 Minimum clearances for fireplace installation. Recom- mended clearances must be maintained between stove and the surrounding combustible components. 30002291 11 Dutchwest Non-Catalytic Convection Heater , Designing a Safe InstallationReference Diagrams The section that follows contains charts with the infor- Refer to the diagrams below when using the Stove and mation that you'll need to make your installation safe. Chimney Connector Clearance Chart that follows. For Included are a chart to tell you exactly where to cut the example,the letter"A"gives the minimum side clear- hole in the ceiling so that the stove will meet clearance ance for installations in which the stove is not equipped requirements, a chart that gives stove clearances for with any heat shield and the wall beside the stove is not all installations, and a chart to illustrate the required protected. T"gives the minimum side clearance when sizes of wall shields for various installations. the stove does not have any heat shield, but the wall is Refer to these charts as you plan the installation and do protected. not compromise on any of the dimensions listed. Measure clearance distances from the top plate of the stove or chimney connector to the wall, not the wall protector. Unprotected Surfaces Protected Surfaces Parallel Installations Corner Installations Parallel Installations Corner Installations f A Tm� A B _C E F A > t) C F -------------------------- Installations with no stove heat shields t H J N/A G > I NIA E:1 Rear exit,flue collar heat shield installations L M O P K> N M P ST255a Top exit,flue collar heat shield, right side heat shield and chimney connector heat shields or double wall connector 12 30002291 Dutchwest Non-Catalytic Convection Heater Stove and Chimney Connector Clearance Charts Model 2479 Large Convection Heater UNPROTECTED SURFACES PROTECTED SURFACES Corner Corner Parallel Installations Installations Parallel Installations Installations Stove Clearance Side Rear' Corner Side Rear' Corner No heat shields (A)21" (B)26" (C)21'/2" (D)8" (E)20" (F) 16'/2" 533 mm 660 mm 546 mm 203 mm 508 mm 419 mm Rear exit, (G)23" (H) 13" N/A N/A N/A N/A flue collar heat shields 584 mm 330 mm Top exit'.2,flue collar (K) 15" (L) 15" (M) 12'h" (N)8" (0) 12" (P) 10" Single-wall connector (381 mm) (381 mm) (318 mm) (203 mm) (305 mm) (254 mm) w/connector heat shield Right Side Right Side and right side heat shield Only Only Top exit',flue collar (K)20" (L) 16" (M) 12'/i" (N)8" (0) 14'h" (P) 12" heat shield, (508 mm) (406 mm) (318 mm) (203 mm) (368 mm) (305 mm) Double wall connector Chimney Connector Clearance:To Rear Wall Combustible Surface Single-wall connector 20" 14" No connector heat shield 508 mm 356 mm Single-wall2 connector w/connector heat shield 9" 6" &flue collar heat shield 229 mm 152 mm Double-wall connector 10" 8'h" &flue collar heat shield 254 mm 216 mm Front Clearance to Combustibles: (All Installations) 48"(1219 mm) 1. Shielding for a top exit stove must include a flue collar shield to protect the area behind the flue collar. 2. Chimney connector heat shields must extend exactly 24"(610 mm)above the flue collar of the stove. 3. Dimension is to the top plate of the stove,not the back wall of the stove. Important: When choosing an installation utilizing the side loading door located on the left side of the stove,follow the minimum dimensions given in the Stove and Chimney Connector Chart on Page 4 and the Minimum Dimen- sions for Noncombustible Floor Protectors given on Page 9, Figure 12. For operation of the side loading door,the minimum clearances on the left side of the stove for usable opera- tion is 141/2"(368 mm) in a corner installation and 20"(508 mm)in a parallel installation. 30002291 13 Dutchwest Non-Catalytic Convection Heater Dutchwest Convection Heater Model 2479 NOTE:These are not clearance distances. These measurements indicate where the centerline of the flue col- lar will be for various installations. Measurements are from the centerline of the flue collar to the wall, not the wall protector. .-A 1 :C 1 ;F � C F ST427 UNPROTECTED SURFACES PROTECTED SURFACES Corner Corner Parallel Installations Installations Parallel Installations Installations Chimney Connector Side Rear Corner Side Rear Corner Listed,Approved (A)341/2" (B) 12'/2" (C)21" (D)221/2" (E) 12" (F)20'2" Double-wall,with (846 mm) (318 mm) (533 mm) (572 mm) (305 mm) (521 mm) flue collar shield Single wall,with (A)29'/2" (B) 12'/2" (C)21" (D)22'h" (E)91h" (F) 18'h" Connector heat shields (749 mm) (318 mm) (533 mm) (572 mm) (241 mm) (570 mm) and flue collar shield Single wall with no (A)351/2" (B)231/2" (C)30" (D)22'/2" (E) 171/2" (F)25" heat shields (902 mm) (967 mm) (762 mm) (572 mm) 1 (445 mm) (635 mm) 14 30002291 • Dutchwest Non-Catalytic Convection Heater Wall Heat Shield Dimensions DutchWest Non-Catalytic Convection Heater Model#2479 48 48' (1219 mm) (1219 mm) Rear Exit A., t 48*(1219 mm) 48"(1219 mm) f Spaced 1' Spaced V Centered Behind Stove (25 mm) (25 mm) ST801 from Floor from Floor ST802 L Fig. 16 Rear wall protection. Fig.17 Sidewall protection. Wall Shields Meet at Corner 48" 1219 mm) ii k- "I" x0, !t 48" (1219 mm) Spaced 1"t (25 mm) L ST803 from Floor Fig.18 Corner wall protection. 30002291 15 PIP- f Dutchwest Non-Catalytic Convection Heater Securing Connector Thimble to a Masonry Chimney Sleeve -- --Flue The Dutchwest Convection heater may be connected Elbow i--- Thimble to either a freestanding masonry chimney or a masonry fireplace chimney. Keep '�-- Sleeve Freestanding • End Flush with Flue If the chimney connector must pass through a combus- Tile tible wall to reach the chimney, follow the recommenda- Chimney tions in the wall pass-through section that follows. Connector The opening through the chimney wall to the flue (the"breech") must be lined with either a ceramic or Flue Liner ST243 metal cylinder, called the"thimble", which is securely Fig.7 The thimble, made of either ceramic or metal,must be cemented in place. (Fig. 7) Most chimney breeches cemented in place securely. incorporate thimbles, but check to be sure the fit is snug and the joint between thimble and chimney wall firmly Masonry Wall cemented. Al A special piece called the "thimble sleeve," slightly Ceramic Flue Liner smaller in diameter than the standard connector and most thimbles, will ease the removal of the chimney Chimney Connec- connector system for inspection and cleaning. Thimble for Shield sleeves should be available from your local dealer. Block-Off Plate To install a thimble sleeve, slide it into the breech until it is flush with the inner flue wall. Don't extend it into Chimney Connector - the actual flue passage, as that could interfere with the draft. The thimble sleeve should protrude 1-2" (25-50 mm) into the room. Use furnace cement and thin gasketing to seal the sleeve in place in the thimble. Secure the chimney connector to the outer end of the sleeve with sheet metal screws. ST796as FireplaceInstallationsFig.8 The connector enters flue above the fireplace. If the Above the Fi ' • clearance between the chimney connector and either the mantel and/or the ceiling is inadequate,special protective In this installation, the chimney connector rises from shields will be required. the stove, turns ninety degrees, and goes back into the fireplace chimney. The liner of the fireplace chimney should extend at least to the point at which the chimney Flue Liner -- connector enters the chimney. Follow all the guidelines Extend Chimney 4}����g r-A k---V-A for installing a chimney connector into a freestanding Connector to the �✓, Damper First Tile of the Flue � Plate is masonry chimney, and pay special attention to these Liner -- Removed additional points: s ==__ or Locked Oen • Check the stove and chimney connector clearances Observe Po Poo Miniumum Clearances to combustible mantel or trim materials. Use the j =_ necessary combination of mantel, trim, and connec- tor heat shields to provide the required clearances. O Close off (Fig. 8) the Damper Opening with • Double-check connector clearance from the ceiling. Sheet Metal • The fireplace damper must be closed and sealed I ST797 and Sealant to prevent room air from being drawn up the flue, Fig. 9 The connector passes through the fireplace to enter reducing the draft. However, it must be possible to flue. Special Fireplace Adapter Kits to simplify fireplace instal- re-open the damper to inspect or clean the chimney. lations are available from your local dealer. 30002291 7 gooaa`I Electric# Plumbing#HVAC # APPLICATION FOR BUILDING Sprinkler# ( '. PERMI FINAL App V Date: Cj Building C_ Engineering COMPLETE Estimated Cost Affidavit RED BOXED AREAS Permit Fee Appr. for C TYPE OR PRINT ONLY Occu arty Fee a SIGN ON REVERSE SIDE pp Eng.Insp. Fee $--�--TO THE BUILDING DE P The undersigned ARTMENT,TOWN OF SOUTH WINDSOR Total Fee $ -D fined hereby applies to do CT work according to the following. (Additional Cost $ Applicant E i ToP nt's Addre s ^ Location of Wok $ V►'lai�� T•P_ Owner C Lot No. Tel.#_g4r Owner's Address Architect Lic.# S � n ,,��--1�Arcchitect's Address Sq.Ft.New Area; 1st Fl. ZpacL— Purpose of this Permit C 2nd FI. _3rd I. .- p Total New Area City Wate WeIIO Septic 8ystemO Ins: HO---__S Sewer[ Approved by Ce . � Date �ea-----.Basement -----._Gar e Use Gmup Constructi n Type I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspecto f any aeration in he plans or specifications of the Building for which this permit Is asked,and agree that this building Is ted the er istance from all street Ones,side yard fines,and required distances from all other zones and is located whic t it and use Is allowed. Signed I hereby apply for a Certificate ofTTRrrE desc In this appfication for the permit. Signed DELOW THIS LINE INSPECTION COMMENTS 1owN Se 13 1c) M Q1 r\ -S+ Ono 1q3) G -1 U 2 h 1540 SULLIVAN AVENUE• SOUTH WINDSOR. CT 06074 asOR_�oe TELEPHONE(860) 644-2511 March 9, 2009 Mr. and Mrs. Patrick O'Gorman 1810 Main Street South Windsor, CT 06074 Dear Feline and Patrick, Thank you for appearing at our March 3rd meeting. Enclosed please find the Certificate of Appropriateness for the installation of windows and door as outlined in your application. Please contact the Building Department at 644-2511 ext. 230 to see if any permits are required for this project. Good luck on your project! Sincerely, r Virginia.Macro, Chair Historic District Commission cc: Building Dept. r„I i r, 1 / t0w N s,4 7-own aic S-ot,,A ?d, a u s � 1540 SULLIVAN AVENUE• SOUTH WINDSOR. CT 06074 4'~OSOR•CON� TELEPHONE(860) 644-2511 CERTIFICATE OF APPROPRIATENESS Certificate Number 01.09 Date Issued March 5, 2009 To: Feline and Patrick O'Gorman Applicant Name(s) of Owner Feline O'Gorman and Patrick O Gorman Address 1810 Main Street,South Windsor CT 06074 Address of proposed work same Contractor Boudreau Builders,East Hartford, CT On March 3, 2009, the Historic_District Commission voted to grant this date' Certificate of Appropriateness for work described in Application for a .Certificate of Appropriateness Number 01.09, dated February 20, 2009. COMMENTS/STIPULATIONS: Approval is given for installation of windows and door on the south side porch. �\Iutn Moom cy, Chair, Historic District Commission ------------------------------------------------------------------------------------------------------------------------------- For Building Inspector Use (when inspection is necessary) This certifies that the work herein described has•been completed in compliance with the terms specified. Date of Inspection Attest Building Inspector Dated: • �Q'Mw 2 $OUT,, I _� town yo11 - rr ��` 1540 SU�lIYdR SOR Office h Ave., South W' T vats:Monddy-Priddy8;00dmb4s 3 p (860)644-2.51 l H'�C - Certificate of Pm unless otherwise sfdle�d Appropriateness To: Historic DisUict Commission Date: Z b APPLICATION FOR CERTIFICATE OF APPROPRIATENESS Application's hereb,made for Establishing an H' issuance of a Certificate of M described `�0"` for Within the Town of south yy;,Y• da ess under an below and as shown on Photographs ry "Ordinance this application. ographs and Plans .Ordinance it>0,for p or drawings(why applicable�Om work as 1,_ ,accompanying Name of Applicant 1 ��1 f�(L l�h{nCK Q Address Phone# -- Name(s)of Owner(s) Address of Owner(s) Address of Proposed work Agent or Contractor �Z(L Address Nature and description of proposed K, nis�rY•) Enclosed is a copy of Ordinance and Irldlude Plan,photos)if Possible,and elevation drawl Application. Use reverse side hereof and applicable statutes which you n9 where hearing date. /w additional pages If named. Y�will b review fled of a out Proposed date of commencement of work �/�( - n c�j Estimated ��h �—LC� ! completipdagZ Signature Of owner GG Signature of Owner Signature of Applica FOR COMMISSION USEO Application No. Date Received Approved Denied Date http://µ,wv_Southwindsor.org/p$gcs/SWindsorG"1' BCOMIVI/c -- ertofappcop?tuxtPage=1 2/19/2009