Loading...
HomeMy WebLinkAbout166 KRAWSKI DR 6 Electric # APPLICATION FOR BUILDING PERMIT rl,1 Plumbing# 166 Krawski Drive Date: HVAC # Sprinkler# O o FINAL P OV Estimated Cost $ -- ----- -- Permit Fee $ _ Building�� o COMPLETE RED BOXED AREAS Occupancy Fee $ id- — Enginee ' g j TYPE OR PRINT ONLY I Eng. Insp. Fee $ Affidavit SIGN ON REVERSE Appr. for CO SIDE j Total Fee $ 4 y of Z i, --- — - - l TO THE B IL ING DEPARTMENT,TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ The undersigned hereby applies to do work according to the following: ce a —g6 ;?5 Applicant i C- u I r I Location of Work /6 6 /C rc w S •— Lot No. Applicant's Address—/--K- a , S ki L7 r: Tel.# 6 V y- 60 7 5" Town ,n s a Zip a 6 o l y Lic.# toy 7 7 3 qZ j Owner 4ji e- 1i o c-l Architect 9Q n+ { Owner's Address_- ga v,, Architect's Address SQ c Zip Zip Sq. Ft. New Area: 1 st FI. 2nd FI. 3rd Fl. Total New Area Purpose of this permit City Watero Well❑ Septic System❑ Sewerc Ins: HO Cert. Area Basement Garage Approved by 7tDate 06 Use Group Construction Type Revised 6/02 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its use is allowed. Signed I hereby apply for a Certificate of Occupancy for the work described in this application for the permit. Signed DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS RECE,VET �� - CD/ o MAR 0 % 201, Home Occupation Information and Application Form ASSESSOR'S USE ONLY 13 Ma'or INNING D4p ved by Date 3 1 Home Occupation Type ype Code Name GW PIJ�I �!/l1 �jt, DBA 1 �tiA�1 Address of Proposed Occupation L(f�1 ,��/aw,f/ . Telephone (�t/��j� Zone "3t7 (tom nRz,m,�only=wr home oocap3,00 an aU M4%V(QYat ksta Gan homwwn=assa mpmed Description of Home Occupation: - ho rqa,, 15r, k s —v r4 oA 5T� (A WUNe Please use the boxes below or an attached sheet to provide the following: A.Proposed Sign 1. Attach copy of plot plan if available. 2. Use Box A(or attach sketch)to draw proposed signage. .3. Use Box B(or attach sketch)to draw the floor plan of the Home Occupation area. �/I 4. Amhite0hual elevations for any proposed additions or modifications /V must be provided FLOOR PLAN (0 Basement floor 0 Vd floor) Floor area of dwelling_ a� 5 B D Floor area of home occupation 100 S %of floor area devoted to home occupation 7 d,15 RAt m;l .I have read the regulations regarding home occupations and will comply with said regulations.I understand that I must notify the Planning Department in writing upon termination of this occupation at this address.This permit is not transferable or assignable to another person.In the event of relocation,the permit holder must notify the Planning Department in writing to transfer the permit to the new location. Signature of Applicant 4it rt�i � '7 Date Signature of Owner �G{' WI e Date j• �8•�z•ti �yA4 ,�•,,+ "max l� � {�P+O�� �p<�pr.+M 1'tlflO�: ', �'. � ',�.`_ ca•.o,iv-�om `9 i�"r'o 2 a1v r AX x NOtStnIQB�S ^� d•-� C.fOZ -z2-L Waal 1. s+ C ',� �• .s j"� F �.� a �� `�5r '� r� f Z �� SAb� '�„ '�` ,t71r�w1 �'�17r-y ' r ° " " `"' �trf�vje yOCgrl� �1L10r� ellly� 1'w� 'rIL1 .e� ' rrc��t ►+•rr*•��M .!o c'�3,.r11C3 •F ;. 9h dT11a 1 T1b �IW %oo" %:W, • •� �, eta ., "@ �� i 3 q dr.,. �, ° r S o0h't 2 d38 d J '3r �',{. ,�` 'par Ul •�M ` _ a R d" ;iz.�,,� ri, i iAe co CU 0 ®R y� -1 i ?' ` .,[ I ma's 1l•.�.4 ,p.1-4i-.'Y -�" ti b2` � � � , tam a ,•, "'� ��-ey'� - ri 0 8�a to$2 ,00 Z ot_*rN _ K r fi air»ot 3/1i Q ps-m VY y � �. _ +•. *�� SIP„�" t �,. '�i+ +��y y.��n y_:�� r�,@ '°i �. iF� � 40 �JL c - 5 Fri+° ,, •s° 'P S 3a• e , �'�F ' �# I+�'9 � .� C��IfJ�►)nw+S drr� N SN3�9++3 1sl►�� � �: i � , f yfl� rSJ� � ® `!TP _ _ -- �-- DsDR OWN OF S1DUpS ARTNIEN'C ENGINE/r��49 yi 'Sic 1 RE1NO E HYYPPA • ASSOCiAIES CPON. Ek4*Atk$ d LA" SURV(MftS "AS T O/i11 O" CONtr `l 00 �' ,� y, `�" i ^.� it ( 9. ♦,�_..!� .. ^ _i B `.; ca; g" Spa SEWER 2Y"RCP KRAW,5KI ure J£ 30"RCp co — \ _ - 615' Gi 1N" E - - 107 OD 1 f0� RLDG C, � F . cu 3 N N N AREA= 21,kOR S F /0700 N 6S' 21' 3H" W - -+_� 014 "T v►K�, �RCR1 MAP�Sy Auer T rR�Cp +16 `54'ho.3 Ir�►��s►ow� tA1t� Pit" R�I►L r'ft.T ROAD 1TM V�1w1VlO�,GDINJ� S 1 W" I-zz-t'J w Qrur►a�b L.S. '" CAD.-A bi• "r•„ R I DG E- 5 U B 0 I V 1510 N REE,N V mpkv-q .D 1 4- Z 'TA- L.C.AM& cDQc.>7 1?UCT\Q" CO. 1.b 2o..i+..�i� Vaau►:lsr'i `�� vJ�►J�.�Oft, C.C�1.��J. VVI NDsOR ""rMENr RfINO E. HYYPPA a ASSOCIATES CIVIL EM4W EtRS 96 LA%4i SLWV( k1S d �r Gi.A$T ONbURI, cal< k i.� w' Y r 0.'`^r' +a ti`�_ J ) tq Y ,. e" 1 ,s. z�` -•P'i.MM, d 1 y a RA WSW; OR, ✓% 30 AN, i /Nf r X T� W 4I iv Ft iN 6, '� r let ' - \ N cz Vic' J Sir ,Dq s t w' Tom+ 3yg.pS 47, +., Yy 4q 7 rI # 5f v,.It } 7777 � r--' . �..;.,+i<i ,�,.�,.�� 'd�,.,,M� k� •exY';; ' -..� — --•_• �gC yF•-•� _ ♦ �. ,V�_j°' K�'77�1'ng Y - lot (��T/►ZE.S 'f oC V�ItL.uN►� K.P����� ,� �r �t� , >�� `Y-7 - R"TA�.. �rC�L; 1~••�' � yJ. 3, 191Sij C,1T7 Z ( j� +" F�rt.cs L.S. -vLAA.,,a, CO.,.., ��� - RIDGE' SUBD+v15rON y uR E , ' �. _ :,.,. .:,: . - Sash w�ao5os� , co►�..i. C.1tt►f EGG t11r►�iI C.�M�LLT SGOA- ,, 4,) D 2V JUN 2 51991 South Windsor BUILDING DEPARTMENT TO THE BUILDING DEPT. TOWi: "is certified that this plan and specifications are tru copies of the proposed building or alterations to ba faded at tree} r together with amendments stated in application one filed with plan and I agree to comply with all zoning. Building and state laws and such orders as shall b+ Issued by the Building Department during pendeneY of this application and final Issuance of a building permit, Signed A y' This plan Is approved subject to the condition the orders and ordinances regulating building shall be complied with. Tttese filed with Conditionally ApgeileJ Clerk Building Inspeft" Date CcKTIFICATION OF ZONING CUNlt LiAlv�-- T1- rou �proposed buiiding(s), use(s) andf or structure(s) 9 Rt,�l as shown or► this plan appear(s) to be in conformance with current South Windsor reguLlOWS, Vartamwa and special exceptions max apply 3 �✓,vim `Lek -�,� R EnforCpnwnt Offl-r / tCWN Sf� r T-0� O-P slou(,/L ?&U&ot c 2 � 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 soR•c°r TELEPHONE(860) 644-2511 November 17, 2008 Michael Mitchell 166 Krawski Drive South Windsor, CT 06074 Dear Mr. Mitchell: Re: Open Permit #30174 There .is an outstanding permit on the property referenced above. It has been outstanding since November 27ffi 2006. State Building Codes require the issuance of a Certificate of Use prior to using the proposed wood stove. Please contact our office for a final inspection. This is a second notice and if the Building Department does not receive a response from you by December 8"' of 2008, a caveat may be placed in the land records stating a Building Code Violation exists on your property. Please call Alice at 644-2511, ext. 230, should you have any questions regarding this letter or to schedule the necessary inspections. Our office hours are 8:00 a.m. to 4:30 p.m. Very truly yours, Christopher Dougan Chief Building Official CID/mak Enclosure t0* Sf1 1540 SULLIVAN AVE71NDSOR. 074 SOR.co p q6�* 25116ro G p8 �iV O �-Cy — /�Q�C < cpc- 14 2 -t.1 — , , Michael Mitchel 166 Krawski Drive South Windsor, CT 06074 Dear Mr. Mitchell: Re: Open Permit#30174 It has come to our attention that there is an outstanding building permit dated November 27, 2006. State Building Codes require the issuance of a Certificate of Use prior to using the proposed installation of a wood stove. Please contact our office for a final inspection. All permits should be closed by August 14, 2008. Should you have any problem meeting this date, please send our office a letter stating the reasons. If the proposal is being used without the benefit of a Certification of Use, a caveat may be placed in the land records stating a Building Code Violation exists on your property. Please call Alice at 644-2511 ext. 230, should you have any questions regarding this letter or to schedule the necessary inspections. Our office hours are 8:00 a.m. to 4:30 p.m. Very truly yours, Christopher ougan Chief Building Official CJD/pmm Enclosure �. ����� .�k `��"� Z FIRESIDE SUPPLY & OVERHEAD DR. 33B EAST ST Date. , , • , _ 11 _22_06 12 : 26: 55 HEBRON CT 06248 Invoice # . . , : D02608, Page 1 CT .LIC.#00550849, Customer # . . : 6446075 (860) 228-1383 Salesperson. : CB P.O. #. . . . . . BILL TO: 6446075 MICHAEL MITCHELL SHIP TO: 166 KRAWSKI DRIVE MICHAEI, MIT--HELL SOUTH WINDSOR, CT 06074 160' KRAWSKI DRIVE SOUTH WINDSOR, CT 06074 (860) 644-6075 Alt : (860) 268-2414 - HELD INVOICE - -- NOT A COMPLETE INVOICE -- MFR. PART/MODEL # (DESCRIPTION j QTY QTY I _-------- -- --- --- IT�S� - ----- -------- -- SLD B/G PRTCE NFT TOTALIXIcI COPP 17632 30 'X6" ULTRA PRO 0 1 690.03 690.03 690-03 T N COPP 34265 COLLARPL.ATE 13X13 1 0 41 .92 41 .92 41 .92 T COPP 21065 316SS HsPro 7" Tee W 0 1 132.06 132. 06 132.06 T N COPP 21075 7" TEE COVFK 0 1 45.09 45.09 45.09 T N *** MTSC:ELLANEOUS FLOCK OFF PLATE 1 0 65.00 65.00 65.00 T INSTALL / DEL LABOR 1 0 600.00 600 .00 6OC_00 N 1T-1PE BM0127 18 X 48 HEARTH BOARD 0 1 52_29 52-29 52.29 T N **** DISCOUNT 1 0 -87.97 -87.97 -87.97 N STORE FOURS: MON 9-5, TT-E 9-5, WED 9-5, TA,R 9-7, FRI 9-5, SAT 10-S, SUN CLOSED SUBTOTAT, 1538.42 TAX 61 • 58 INVOICE TOTAL 1600.00 D (CCard) DEPOSIT ====800.00 D NOV 2 9 NO BALANCE DUE 800.00 South Wl"deor BUILDING DEPARTMENT , TilE B�JLQWG UEVI. I(2h'N :Jf SpUIN s are t1u n::urtiticd that this plan and speclttc atlo n e trw of the proposed "tiding or alteratMns GO be erected at Street her with amendments stated in application and ,i,.l ..ith plan and 1 agree to comply with .It zonln g. _ ing and state laws and such orders as shallbe :ed by the Building Department during pendency ,nts application and final Issuance of a building errnrt. S,toed ion •his plan is approved subject to the building itshellthbe 1,rs and ordinances reguiating -I,.plied with. 'rnese t11ed wtih :ondrtionally Approvsd Clers Building Inspector ht� lei I STATE OF CONNECTICUT ♦ DEPARTMENT OF CONSUMER PROTECTION Be it known that FIRESIDE SUPPLY INC 33 B V-AST ST HEBRUN, .ed4.48 is certified by the Departmeht oflCopsi r.P*ction as a registered HOME IMPROVEX�� CONTRACTOR ili,� i ,• g(1 � FIRESIDE SUPPLY INC •:`u� srLr Effective: 12/01/2005 EViradon: 11/30/2006 F.dRin R Yodd�uta,Gommiisio�r or Q Woodburning Stove Model 1920 Homeowner's Installation and Operating Manual For use in the i�� United States and Canada SAFETY NOTICE: IF THIS APPLIANCE IS NOT PROPERLY INSTALLED, OPERATED AND MAIN- TAINED,A HOUSE FIRE MAY RESULT. TO REDUCE THE RISK OF FIRE, FOLLOW THE INSTALLATION INSTRUCTIONS. FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY OR EVEN DEATH. CONTACT LOCAL BUILDING OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA. NATIoNAL We recommend that our woodburning "RHPLACE hearth products be installed and serviced E'INSTITUT by professionals who are certified in the U.S. by the National Fireplace Institutep (NFI)as NFI Woodburtting Specialists or who are certified in Canada by P CERTIFIED Wood Energy Technical .w.urlc.us.a.•Training (WETT). ,,.. .. D• Not Discard for 3000C369 4/D6 Rev. 11 The Aspen s i 1 i Aspen Woodburning Stove Introduction Thank you for choosing a Vermont Castings Aspen to meet your heating needs. We're confident you will find the Aspen to be an effective wood-burning heater incorporating modern, non-catalytic combustion technology with the classic aesthetic appeal of its Vermont Castings lineage, The Aspen achieves high-efficiency through precisely calibrated delivery of primary and secondary air into a refrao- tory-insulated firebox. Properly operated and maintained according to the guidelines in this manual, your Aspen will provide safe, dependable, and economical heating for years to come. ~rock Hers The Aspen Model 1920 has been tested and is listed by Intertek Testing Services/Wamock Hersey �r of Middleton, wsconsin.The test standards are ANSI/UL-1482 for the United States and ULC S627 �.� and CAN/CSA 5366.2 for Canada. The Aspen Model 1920 is listed for burning wood fuel only. Do not bum other fuels. The Aspen Model 1920 is approved for installation in manufactured (mobile) homes in the United States only using the optional Mobile Home Kit#1898 in accordance with the instructions in that kit and any local codes. The Aspen Model 1920 complies with the standards set forth by the Federal Environmental Protection Agency,40 CFR Part 60.532(b)(2), as stated on the permanent label attached to each stove. We recommend that you hire a professional, solid-fuel stove technician to install your Aspen, or to advise you on the installation should you attempt to install it yourself. Consult the authority having local jurisdiction (such as a munici- pal building department,fire department,fire prevention bureau, etc.) before installation to determine the need for a building permit.Also,consult your insurance agent to be sure your installation complies with specific requirements that may vary locally. In addition to directions on installation and operation,this manual includes directions on maintenance and assembly. Please read this entire manual before you install or operate your new room heater. Save These Instructions For Future Reference. Tableof • Proposition 65 WARNING: Fuels used in gas, woodbuming or oil fired appliances, and the prod- Specifications ."...................................3 ucts of combustion of such fuels, contain chemicals Installation Requirements...................4 known to the State of California to cause cancer, Clearances......................................... birth defects and other reproductive harm. ��'"""�""""'..... California Health&Safety Code Sec. 25249.E Assembly ...........................................15 Operation..".........................................17 Maintenance.......................................21 Appendix- Draft Management ...........24 Parts List& Exploded View ................26 2 30000369 Aspen Woodburning Stove Specifications Aspen, Model 1920 EPA Emissions rating .4.3 /h, non-catalytic)*Ic" 'This value can vary depending on how the stove is op- Maximum (g )' erated,the type and moisture content of the fuel used, Maximum heat output..........................18,000 Btu's/t►r. .....Up to 600 sq.ft. (56 sq. M)2 as well as the design, construction and climatic location Area heated................. of your home. Figures shown are based on maximum Fuel sizeltype ......... . . -• --- 16" (41 cm)logs fuel consumption obtained under laboratory conditions Loading .Front and on average efficiencies. Chimney connector....................6"(152 mm)diameter Chimney flue size.......................6" (152 mm) minimum 2These values are based on operation in building code- Flue exit position ....................... Reversible,top or rear conforming homes under typical winter climate condi- Primary air...Manually set, thermostatically maintained tions in New England. If your home is of nonstandard construction(e.g.. unusually well insulated,not insu- Ash handling system.....................Removable ash pan laced,built under ground, etc-)or if you live in a more Glass panel ....................•...• High-temperature ceramic severe or more temperate climate,these figures may Weight............. . -------- . . 240lbs. (576kg) not apply. Since so many variables affect performance, Width (Left leg-Right leg).-..-.-..... 16" (406 mm) consult your Vermont Castings authorized dealer to Depth (Front leg-Rear leg) ....................23" (584 mm) determine realistic expectations for your home. Height to top of top exit flue collar 24"(610 mm) Height to top of rear exit flue collar..........21"(533 mm) (191 mm) (152 mm) (381 mm)A — (565 mm)-- -- - 'N - rt N 24 22'h" (510 mm) (570 mm f � Top Exit I Flue Gollar 1 Height - I (457 mm) 084 mm' 23„ (406 mm) �—(584 mm) 'I J069 Fig.I Aspen 1920 specifications. 30000369 3 Aspen Woodburning Stove installation SAFETY NOTICE. IF YOUR STOVE IS NOT PROP- ChirnneyS ERLY INSTALLED,OPERATED AND MAINTAINED,A Your stove must be connected either to a sound HOUSE FIRE MAY RESULT. FOR SAFETY, FOLLOW masonry chimney that meets local codes,to a relined ALL INSTALLATION,OPERATION AND MAINTE- masonry chimney that meets Iocal codes, or to an NANCE DIRECTIONS. CONTACT LOCAL BUILDING approved prefabricated metal chimney Whichever of OFFICIALS ABOUT RESTRICTIONS AND INSTAL- those types you use,the chimney and chimney connec- LATION INSPECTION REQUIREMENTS IN YOUR for must be in good condition and kept clean. AREA. If you use an existing masonry chimney,it must be Before you begin an installation, review your plans to inspected to ensure safe condition before the stove is be certain that: installed. Your local professional chimney sweep, build- • Your stove and chimney connector will be far enough ing inspector, or fire department official will be able to from combustible material to meet all clearance make the inspection or direct you to someone who can. requirements. The chimney should extend at least 3'(914 mm)above • The floor protector is large enough and is constructed the highest point where it passes through a roof, and at property to meet all requirements. least 2'(610 mm)higher than any portion of a building • You have all necessary permits from local authorities. within 10'(3 m). Your local building official is the final authority for ap- To assure proper draft and good performance, any proving your installation as safe and determining that it chimney used with this stove should extend at least 16' meets local and state codes, (4.9 m)above the flue collar of the stove. The metal label permanently attached to the back of �V the stove indicates that the Aspen has been tested to o To 10'-i current UL and ULC standards by Intertek Testing Ser- 2'M1n vices of Middleton,Wisconsin. Clearance and installs- t_ i , - _T = Min. � tion information is also printed on the label. Local au- 2'Min. g, thorities generally will accept the label as evidence that, ! Mon when the stove is installed according to the information on the label and in this manual,the installation meets codes and can be approved. Codes, however,vary in different areas. Before starting the installation, review Reference Point-- AC517 your plans with the local building authority. Your local dealer can provide any additional information needed. Fig.2 The 2'-3'-10'Chimney Rule. For any unresolved questions about installation, referMasonry Chimneys to the National Fire Protection Association's publication ANSI/NFPA 211-1988 Standard for Chimneys, Fire- An existing masonry chimney must be inspected to con- places, Vents and Solid Fuel Burning Appliances. In firm that it has a lining. Do not use an unlined chimney. Canada,the equivalent publication is CSA CAN-13365, The chimney also should be examined for cracks, Installation Code for Solid Fuel Burning Appliances and loose mortar, other signs of deterioration, and blockage. Equipment. These standards are the bases for many Repair any defects before the chimney is used with national codes. They are nationally recognized and are your stove, accepted by most local authorities. Your local dealer Aprefabricated double- or your local building official may have a copy of these wall insuisted chimney -----__ regulations. IMPORTANT: Failure to follow these installation Instructions may result in a dangerous situation,in- eluding a chimney or house fire. Follow all instruc- tions exactly and do not allow makeshift compro- A tite u"edmasom miser to endanger property and personal safety. &i I ST241 Fig.3 Standard Chimney Types 4 30000369 Aspen Woodburning Stove Masonry Chimneys,cont'd. Ask your dealer about components available for con- • Unused openings in an existing masonry chimney netting the stove to a steel chimney liner. must be sealed with masonry to the thickness of GuidelinesChimne the chimney wall, and the chimney liner should be Connector repaired. Openings sealed with pie plates or wallpa- A chimney connector is the double-wall or single-wall per are a hazard and should be sealed with mortar pipe that connects the stove to the chimney. The chim- or refractory cement. In the event of a chimney ney itself is a masonry or prefabricated structure that fire,flames and smoke may be forced out of these encloses the flue. Chimney connectors are used only unused thimbles. to make the connection from the stove to the chimney. • The chimney should be thoroughly cleaned before They are for interior use only. use_ Double-wall connectors must be tested and listed for • A newly-built masonry chimney must conform to the use with solid-fuel burning appliances. Single-wall con- standards of local building code, or, in the absence nectors should be made of 24 gauge or heavier steel, of a local code, to a recognized national code. Ma- and should be 6"(152mm)in diameter. Oo not use sonry chimneys must be lined, either with code-ap- galvanized chimney connector; it cannot withstand the proved masonry or precast refractory tiles, stainless high temperatures that can be reached by smoke and steel pipe, or a code-approved, "poured-in-place" exhaust gases, and may release toxic fumes under high liner.The chimney clean-out door must seal tightly to heat ensure a good draft. If possible, do not pass the chimney connector Toward Prefabricated Chimneys stove through a combus- A prefabricated metal chimney must be one that is test- tible wall or ceiling. If ed and listed for use with solid-fuel burning appliances passage through a to the High-Temperature (H.T.) Chimney Standard combustible wall is UL-103-1985 (2100°F,)for the United States, and High unavoidable, refer to Temperature (650°C)Standard ULC S-629 for Canada. the recommendations Fwe gas in the section follow- direckm Chininey Size ing on Wall Pass- This stove is approved for venting into a masonry chim- throughs. Do not pass ney with a nominal flue size of 8"x 8" (203 x 203 mm), the connector through Fig.4 Chimney connector. and into a round flue size of 8"(203 mm)or 6" (152 an attic, a closet or mm). any similar concealed It may be vented into larger chimneys as well. However, space. The whole chimney connector should be ex- chimneys with liners larger than 8" x 12" (203 x 305 mm) posed and accessible for inspection and cleaning. may experience rapid cooling of smoke and reduction Install the single wall chimney connector not less than in draft,especially if they are located outside the home. 18*(457mm)from the ceiling. Keep it as short and Such large chimneys may need to be insulated or have direct as possible, with no more than two 90 degree the flue relined for proper stove performance. turns. If possible, use 45•elbows. Slope horizontal runs of connectors upward 1/4"per foot(20mm per meter) going from the stove toward the chimney. The Do not connect this unit to a chimney flue serv- recommended maximum length of a horizontal run is ing another appliance. 3'(914mm), and the total length of chimney connector NOTE: Do not vent this stove into a factory-built should be no longer than 8'(2.5 meters). (zero-clearance)fireplace.This stove has not In cathedral ceiling installations, extend the prefabri- been tested and listed for that type of installa- cated chimney downward to within 8 feet(2.4m) of the tion. Factory-built fireplaces and their chimneys stove. are specifically designed as a unit for use as fireplaces. It may void the listing or be hazard- ous to adapt them for any other use. SAFETY NOTE:Always wear gloves and protective Do not connect the STOVE to any air distribu- eyewear when drilling, cutting or joining chimney tion duct or system. connector sections. 30000369 5 Aspen Woodburning Stove Double-wall Chimney C• • The Aspen is approved for installation in the U.S, and Thimble Sleeve — Canada with double-wall chimney connectors that have Chimne Flue been tested and listed for use with solid-fuel burning Connector •a appliances by a recognized testing laboratory. Follow the instructions for assemblingand installing , [_ "Keep sleeve g end flush with double-wall connectors provided by the manufacturer of flue the the double-wall chimney. To ease assembly and help I assure safety, use chimney components manufactured I I by a single source. 11J NOTE: For installations using double-wall connec- sr2.3 tors, minimum clearances must conform to those Fig.6 The thimble, made of either ceramic or metal, must be listed in the clearance chart on Page 13. cemented securely in place. ConnectorsSingle-wall Chimney The adapter forms a union between the chimney and chimney connector that ensures any soot or creosote • Beginning at the flue collar of the stove, assemble falling from the inner wells of the chimney will stay the chimney connector. Insert the first crimped end inside the chimney connector. into the stove's flue collar, and keep each crimped end pointing toward the stove. Using the holes in the Securing the Single-Wall Connector flue collar as guides, drill 1/8"(3 mm)holes in the to a Masonry bottom of the first section of chimney connector and The Aspen may be connected to either a freestanding secure it to the flue collar with three Ik10 x 1/2"sheet metal screws. masonry chimney or to a fireplace masonry chimney. • Secure each joint between sections of chimney Freestanding Installations connector, including telescoping joints,with at least If the chimney connector must pass through a combus- three sheet metal screws. The predrilled holes in tible wall to reach the chimney,follow the recommenda- the top of each section of chimney connector serve tions for Wall Pass-Through construction on pages 7-8. as guides when you drill 1/8' (3mm) holes in the bot- tom f The opening through the chimney wall to the flue-the o the next section. 9 y • Secure the chimney connector to the chimney. In- "breech"— must be lined with a ceramic or metal structions for various installations follow. thimble which is securely cemented in place. • Be sure the installed stove and chimney connector A metal pipe section called the"thimble sleeve,"slightly are correct distances from nearby combustible mate- smaller in diameter than standard connector and the rial. thimbles,will allow the removal of the chimney con- nector system for inspection and cleaning. Thimble NOTE- Special slip pipes and thimble sleeves that form sleeves are available from your local dealer. telescoping joints between sections of chimney con- To install a thimble sleeve, slide it into the breech until nector are available to simplify assembly. Slip pipes it is flush with the inner flue wall. Be sure that it does eliminate the need to cut individual connector sections. not extend into the flue passage where it could interfere Consult your local dealer about these special connector with the draft. sections. The thimble sleeve should protrude 1-2" (25-50 mm) Securing the Single-wall • • • - into the room. Use furnace cement and thin kt as a in 9 9 Prefabricated to seal the sleeve in place in the thimble. Secure the Follow the installation instructions of the chimney chimney connector to the outer end of the sleeve with manufacturer exactly, sheet metal screws. Special adapters are available from your local dealer to make the connection between the prefabricated chim- ney and the chimney connector. The top of such adapt- ers attach directly to the chimney or to the chimney's ceiling support package. The bottom of the adapter is secured to the chimney connector, 6 30000369 Aspen Woodbuming Stove Aspen Clearance Chart Use the chart below together with the diagrams on the next page to determine the required clearance for your particu. lar installation. Stave clearances are measured from the top plate to the combustible surface. Chimney connector clearances are measured from the connector surface and take into account flue Collar offset. Unprotected Surfaces Protected Surfaces Comer Comer Parallel Installation Installation Parallel Installation Installation Stove Clearance Sid® Rear Corner Side Rear Comer No Heat Shields (A)24" (B) 13' (C) 13" (0) 16' (E)9" (F) 8" 610 min 330 min 330 min 406 min 23D min 203 min Top Exit,Rear Heat (G)24" (H) 11" (1) 13" (J) 16" (K)9' (L) 8" Shield ONLY' 610 min 179 min 330 min 406 min 230 min 203 min Rear Exit, Rear Heat (M)24" (N) 11" N/A (0) 16" (P)9" N/A Shield ONLY 610 min 179 min 406 min 230 min Top Exit, Rear H.S., Single- (Q)24" (R) 9' (S) 13' (T) 16" (U)9" M8" wall, connector shields'z 610 min 229 min 330 min 406 min 230 min 203 min Top Exit, Rear H.S., Double- (Q)24" (R) 7" (S) 13" (T) 16" (U)7" M 8" wall connector shields'.3 610 min 178 min 330 min 406 min 178 min 203 min ChimneyConnector Unprotected Surface I Vertical Protected Surface/Vertical No Heat Shields 15' 381 min 11' 279 min Using Connector Heat Shields' 13" 330 min 6" 152 min Double Wall Connector3 6" 152 min 6" 152 min Unprotected Surface I Horizontal Protected Surface/Horizontal Single Wall Connector 18' 457 min I 279 min Double Wall Connector 6" 152 min 6" 152 min Front Clearance All Installations to Combustibles 48' 1219 min A distance of 48'must be maintained between the stove and moveable combustible items such as drying clothes.fumi- ture,firewood,etc. 'When a rear heat shield is installed on a top exit stove,the shield insert must be attached to the shield so the area behind the flue collar on the stove is protected. =Chimney connector heat shields must extend exactly 24'(610 mm)above the top of the stove. No shielding can be used on the connector above 24"(610 mm). The unshielded chimney connector above the 24'(610 mm)point must be 13'(330 mm) from an unprotected wall. 3In top exit installations,this clearance requires the use of the rear stove heat shield with the flue collar cover plate installed. 30000369 13 Aspen Woodburning Stove ConnectionAbove the Fireplace In this installation, the chimney connector enters the - L fireplace flue though a thimble located above the fire- place. The liner of the fireplace chimney should extend Chimney Connector at least to the point at which the chimney connector Heat Shield - enters the chimney. Follow all the guidelines for install- j ing a chimney connector into a freestanding masonry chimney, and pay special attention to these additional points' 1t Note clearance requirement on * - • Check the stove and chimney connector clearances pages 11-14 i to combustible mantel and trim materials. If neces- sary, use a combination of mantel,trim, and connec- I Mantel for heat shields to provide the required clearances. • • Double-check connector clearance to the ceiling. • The fireplace damper must be closed and sealed to prevent room air from being drawn up the flue which it could reduce performance. However, it must be possible to reopen the damper to inspect or clean the chimney. Connection ThroughFireplace If your fireplace opening height is at least 211/2"(546 sr2s4 mm),you may install a stove through the opening us- Flg.7 If the clearance between the chimney connector and ing a"positive connection"kit available from your local either the ceiling or the mantel is inadequate, a protective dealer. These kits provide a secure connection be- heat shield is required. tween the stove flue collar and the chimney flue. Confirm that the stove location is within the required clearance specifications for the mantel and surrounding fireplace trim. Refer to Page 12. i Floor protection requirements also apply to fireplace *Maintain required clearance. 1 installations. Refer to Page 9. See page 13.Wall ! j Pass-throughs Whenever possible, design the installation so that the Flex Connector ' 9 1 connector does not pass through a combustible wall. If you must include a wall pass-through in your instal- _ lation, check with your building inspector before you i begin. Also check with the chimney connector manu- facturer for any specific requirements. MGM") . Consult with your dealer regarding special connection } components available for use as wall pass-throughs. , I T Use only parts that have been tested and listed for use as a wall pass-through. Fireplace Adapter wt Clean-out Tee 1611US �- 18"(460 mm)Caneds ST245 Fig.ti Special adapter kits are available from your local dealer to simplify fireplace installations. 30000369 7 Aspen Woodbarning Stove When: A=9'(229 mm)Max, B=22'fi'(572 mm)Min. A a TA"(191 mm)Max. - -- B=21'(533 n Max.9' mm)Min. (229mm) I B A=6"(152 mm)Max. B C i B=1955'(495 mm)Min. - i A=41h"(114 mm)Max. I p B=18"(457 mm)Min. 221/1 '(572mm) I �� A=3"(76 mm)Max, Min. 15" (38mm) B=161,i'(419 mm)Min. (381mm) A=1'h"(38 mm)Max. i B=15'(381 mm)Min. B: Mantel 221h"(572 mm) C, Top Trim' 12"(305 mm) O: Side Trim 8"(203 mm) material Is less than 1'h"(38 mm)thick ST252a I ST253e Fig.20 Mantel and trim clearances. Fireplace A fireplace installation requires special clearance be- tween the side of the stove and the right and left walls, C the side of the stove and the decorative side trim on the i fireplace face,and the top of the stove and the mantel. --- } Maximum Mantel depth (A, Fig.20)of a combustible mantel is 9" (230 mm).At that depth,the clearance to the stove top(B)must be a minimum of 22V(572 mm). Top Trim(C) protruding less than 1112" (38mm)from the face of the fireplace must be a minimum of 12" �— A (305mm)from the stove top.This clearance may not be reduced by shielding_ ST254 For every 1 I ' (38 mm)increment that the trim or man- _ tel extends in depth,the clearance from the stove top Unprotectedprotected must also be increased by 1 Ile(38 mm). Surfaces Surfaces Side Trim must have a minimum clearance of 8" (NFPA 211) (203 mm), measured from the stove's top edge. (D. Fig. A 62" 46" 20) Min.Width 158 cm 117 cm Alcove Clearances —- - _ 48" 48" The Aspen is approved for installation into an alcove Max.Depth 122 cm 122 cm constructed to maintain the clearances diagramed in Figure 21. C 36" 18" Ceiling Above 92 cm 46 cm Stovetop Fig.21 Alcove Specifications. 12 30000369