Loading...
HomeMy WebLinkAbout154 FAIRVIEW DR ,�o13 -00aH Home Occupation Information and Application Form ASSESSOR'S USE ONLY 014inor Approved by Date "P-010/3 Home Occupation Type o Major Code Name a rt G `1 SG `l DBA �� 4vt &Z& Y F AWI.ac,eM e- Address of Proposed Occupation: Telephone PaQ -a -'3 g`Y!o Zone (Note:in DRZ,MF zones only minor home occupations are allowed;approval letter from homeowners assn required) Descriptio of Home Occupation: 1 -' ���— u,eJc.•�-mac - �h�u c,�.�-�, c, Please use the boxes below or an attached sheet to provide the following: A. Proposed Sign 1. Attach copy of plot plan if available. (max.2 sq.ft.) 2. Use Box A(or attach sketch)to draw proposed signage. 3. Use Box B(or attach sketch)to draw the floor plan of the Home Occupation area. 4. Architectural elevations for any proposed additions or modifications must be provided. FLOOR PLAN (_Basement _ 1st floor _2nd floor) Floor area of dwellin /10 o Floor area of home occupation f0 S % of floor area devoted to home occupation ;25%total floor area) I have read the regulations regarding home occupations and will comply with said regulations. I understand that I must notify the Planning Department in writing upon termination of this occupation at this address. This permit is not transferable or assignable to another person. In the event of relocation,the permit holder must notify the Planning Department in writin to transfer ef it to the new location. Signature of Applicant 1 157 Date Signature of Property Owner Date ll--! } NESTOR I . MARTIN INSTALLATION AND OPERATING INSTRUCTIONS S33 H33 R33 X33 EPA-CERTIFIED NONCATALYTIC WOODSTOVES WITH WOODBOX©TECHNOLOGY Manufactured by: Fonderies du Lion Development 11 Rue du Lion 5660 Couvin, Belgium i SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE v - Safety Notice Please read this entire manual before you install and use your new room heater. Failure to follow instructions may result in property damage, bodily injury or even death. If your stove is not properly installed, a house fire may result. For your safety,follow the installation directions. Contact local building or fire officials about restrictions and installation requirements in your area. The authority having jurisdiction(such as municipal building department,fire department,fire prevention bureau,etc.) should be consulted before installation to determine the need to obtain a permit. ENSURE THAT THIS MANUAL REMAINS WITH THE APPLIANCE AND IS PASSED ON TO THE USER AFTER INSTALLATION. DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS APPLIANCE. WARNING: Improper installation,adjustment,alteration,service or maintenance can cause injury or property damage. Refer to this manual for assistance or consult a qualified(experienced)installer. Product Specifications Flue collar size: 6' Flue position: top Max bum rate: 59,000 BTU/hr EPA output range: 8,600—37,300 BTU/hr Emissions rate: 3.43 g/hr Heating capacity: 1,100—1,500 sq ft Max.bum time: up to 10 hours Max log length: 17' Weight: H33: 346 Ibs S33: 358 Ibs R33: 316 Ibs X33: 316 Ibs Safety Listing Your appliance has been tested following standards US Standard:ANSI/UL 1482 Canadian Standard CAN/ULC-S627 Tests performed by OMNI-Test Laboratories, Inc., Beaverton, Oregon This stove meet the US Environmental Protection Agency's emissions limits for wood heaters. i I Installation Guide S33 and H33 cast iron models F Dimensions g C S33 H33 A 30"(751 mm) 28"(716mm) B 25'(631 mm) 26'(649mm) C 16"(395mm) 15'(370mm) D 6" 050mm) 6"(150mm) A c E 32"(816mm) 31'(781mm) G F 5" (113mm) 5"(113mm) Clearances to Combustible Materials i + The following clearances may only be reduced by means approved by the regulatory authority. Back and side wall clearances IA B Connector pipe A B C D Single wall 14' 13" 18' 9" C Double wall 13' 12" 18" 9" D Minimum ceiling height: 30'(unit to ceiling) i I + Comer clearances E VE li Connector pipe E F Single wall 10%" 19' Double wall 7" 15%" Minimum ceiling height:30'(unit to ceiling) Alcove clearances G IConnector pipe G H 7-60* Double wall 48' 28" III bl e �c,�,t c �,�► t( i 1 '� v c�cA�///t �� Y t�� cr� '�' �J !'t z' � ,S l� �G �i c�Ol Fk«a�•4 v" r r VC IA 3 M�rr. /'A3o[44l'¢t-- jo (G t U a pr NESTOR ii i s MARTIN INSTALLATION AND OPERATING INSTRUCTIONS T $i µ� S33 H33 R33 X33 EPA-CERTIFIED NONCATALYTIC WOODSTOVES WITH WOODBOX°TECHNOLOGY Manufactured by: Fonderies du Lion Development 11 Rue du Lion 5660 Couvin, Belgium r SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE Installation Guide S33 and H33 cast iron models F B Dimensions C S33 H33 A 30"(751 mm) 28'(716mm) B 25'(631 mm) 26"(649mm) C 16"(395mm) 15"(370mm)D 6" (150mm) 6"(150mm) A c E 32'(816mm) 31"(781mm) G F 5' (113mm) 5'(113mm) Clearances to Combustible Materials The following clearances may only be reduced by means approved by the regulatory authority. Back and side wall clearances A B Connector pipe A B C D Single wall 14' 13" 18" 9" C Double wall 13' 12" 18' 9" D Minimum ceiling height: 30"(unit to ceiling) fI I i i Comer clearances E F Connector pipe E F Single wall 10%. 19' Double wall 7" 151W E Minimum ceiling height: 30"(unit to ceiling) F Alcove clearances G H Connector pipe G H I Double wall 48" 28" 60" X33 and R33 steel body moms F B Dimensions C X33t34 33 A 31'/.'(807 m807 mm) E B 16%" (390 m390 mm) C 16" (404 m00 mm)D 6"(150 mm50mm) E 37" (942 m42 mm) F 5% (132 m13mm)G 21'(542 m42 mm) ' 1� Clearances to Combustible Materials The following clearances may only be reduced by means approved by the regulatory authority. �kI Back and side wall clearances AK Connector pipe A B C D Single wall 11' 10" 24' 18Y2" C Double wall 8" 7" 23" 17%' Minimum ceiling height:30'(unit to ceiling) i I Comer clearances I E F Connector pipe E F Single wall 10" 15% Double wall 9% 15' E Minimum ceiling height: 30"(unit to ceiling) 4 F Alcove clearances G Connector pipe G H I H Double wallLI j U IDo iD� 5 Floor Protection Requirements A non-combustible floor protector(hearth extension) must be installed under the unit. Check with local building authorities as to what other materials are acceptable. The floor protector must extend: 1. Beyond the front door, a minimum of 16 inches(400 mm)in USA and 18 inches(450 mm)in Canada. See measurement"B"on the floor protection drawing below. 2. On both sides of the unit,a minimum of 5 inches (125 mm) in USA and 8 inches(200 mm)in Canada. See measurement"C"below. 3. On the back of the unit, a minimum of 0"(0 mm)in USA and 8 inches(200 mm)in Canada. See measurement"A"below. Notice: In case of installation with horizontal pipe,the floor protection must be extended beyond the back of the appliance under the chimney connector and 2"(50 mm) beyond each side of the chimney connector. A 0 Ic Minimum requirements for floor protection on combustible floors Types of Chimneys The Chimney is a vital part of your stove installation. Your stove must be connected to either a code-approved masonry chimney(a flue liner may be required),or a 6-inch diameter factory built chimney complying with the UL requirements for Type HT chimneys(regulation UL 103 and ULC S629). All chimneys must be installed either according to the local building codes in the case of a masonry chimney or according to the chimney manufacturer's instructions in the case of a factory-built metal chimney. See the chimney manufacturers instructions for exact specifications. An oversized chimney may result in less than optimum performance. Installations into a large,masonry chimney may require a liner to improve performance. Chimney Inspection Existing chimneys must be inspected before installing your stove.Consult your local building department for chimney code requirements.A masonry chimney should have a code-approved liner.This liner must not have broken or missing pieces.Some non-code masonry chimneys may be brought up to code by being relined. (Consult your dealer or qualified chimney sweep.)Factory built metal chimneys should also be inspected,first for creosote deposits(which would be removed), and then for integrity of the stainless steel liner. Look for obvious bulges in the lining,which may indicate the need to replace that section (use a bright flashlight).Also inspect the attic to see that the chimney has proper clearance to combustible framing members. Above a Fireplace _ In this type of installation,the chimney connector rises , from the stove,turns 90%and then goes into the fireplace minimum 18" chimney (Fig. B)The liner of the fireplace chimney should ; extend at least to the point at which the chimney connector enters the chimney. Follow all the guidelines for installing a chimney connector into a freestanding masonry chimney, and pay special attention to these additional points: ell • Double check the connector clearance from the ceiling: 18'minimum. • The fi damper must be closed and sealed seal the 41replace to prevent room air from being drawn up the flue, thereby reducing the draft. However,it must be possible to re-open the damper in order to inspect the chimney. == i Fig.B: Chimney connector enters the chimney above a fireplace Wall Pass-Through Whenever possible,design your installation so that the wall connector does not pass through a combustible wall. If you are considering a wall pass-through in your installation,check with your building inspector before you begin. Also check with the chimney connector manufacturer for any specific requirements. Accessories are available for use as wall pass-throughs. If using one of these, make sure it has been tested and listed for use as a wall pass-through. The National Fire Protection Association (NFPA)has established guidelines for passing chimney connectors Wall stud through combustible walls. Many building code inspectors follow these guidelines when approving installations. Chimney ConnectoL'.' The methods approved by the NFPA are: • Cutting away all combustible material in the wall a sufficient distance from the single wall connector, ❑ to provide the required 12'(300 mm)clearance for the connector. Any material used to close the opening must be non-combustible(as in Fig C). • Using a section of double-wall chimney with a 9'(230 mm)clearance to combustibles. • Placing a chimney connector pipe inside Floor Protectio a ventilated thimble,which is then separated from combustibles by 6'(150 mm)of fibreglass insulating material. Fig.C: An example of an approved wall pass-through • Placing a chimney connector pipe inside a section of 9'(230 mm)diameter,solid-insulated factory built chimney,with two inches of air space between the chimney section and the combustibles. I` I 9 CAP—_^ <SDP-C) Z J FLASHING ®®® VENTILATED/ STORM COLLAR ��-/i�T NON-VENTILATED (SDP-SC) �/ (SDP-F) CHIMNEY SECTIONS (SDP-P) I ROUND CEILING SUPPORT BOX I SUPPORT WITH ATTIC IN CATHEDRAL I TRIM PLATES ENCLOSURE INSULATION CEILING WITH SHOWN I IN PLACE DOTTED LINES (SDP-IS) TRIM FRAME S) IN PLACE RADIATION Fig 6 RADIATIOO N SHIE—WOOD SCREW WOOD SCREW (SDP`DRS) (6 REQ) (8 REQ) ATTIC TABLE 2-FRAMING FOR SQUARE SUPPORT BOXES,ROUND SUPPORT Wood screws. A completed f BOXES AND WALL THLIIBLES SQUARESLPPORTBOxEs Square Support Box installed -2 INCH MINIMUM CLEARANCE TO CHIMNEY INSIDE OF SECTIONS CHRYZEYINSM 6INCHES 71NMES 81NCkffS in a cathedral ceiling with the ENCLOSURE (SDP-P) FRAMED �� "U-shaped"trim is also shown ENCLOSURE ' FRAMED 14-1/2 X 14-1n 14-1n x 14-1n 14-In x 14-In in Figure 6.Trim kits are avail- SECOND STORY OPENINGINSIDE i DLNIE SIONS able inbrass,antique brass,and I chrome,to enhance the appear- ROUNDSUPPORTBOXES ___L_A MINIMUM OF I ance of the various Support 2 INCHES BELOW CHNINE'MWE 6INCHES 7INCHES 8INCHES FINISHED CEILING DIEM Boxes and Trim Frames I j Where the chimne asses MINIMUM18 HES FOR y P FRAMED 14-1n X 14-1n 14-1n X 14-1n 14-1n X 14-1/2 SINGLE-VALE OPENNIGINSIDE through additional floors and STOVEPIPE DIIvII]NSIONS ceilings,install Firestop Ra- WAI.LTHI'IBIES diation Shields. Where the CM&E'Yume 6INCHES 7INCM 8INCHES FRAMED DIANIEIM chimney passes through an at- Fig OPENING t' L� 7 SQUARE tic, Firestop Radiation CEILING SUPPORT FRAMED 14-1n X 14-1n 14-1n X 14-1n 14-1n X 14-1n BOX OPFNWGINSIDE Shields and Insulation (SD-SB) DIIv)LTiSIONS -OR- Shields must be installed. ROUND CEILING SUPPORT (SDP-RS) FIRESTOP RADIATION SHDIDS 4. Frame Openings:Frame CMINEYINSIDE 6INCHES 7INCHES 8g or INCHES openings in each ceiling opening by dropping a plumb bob to the four corners of the opening below. , . .0 floor above the Support Box. Maintain the minimum clearances and dimensions as specified in FRAM7ED 14 In X i41n 141n X 14 In 14 1/2x 14 1n (Figure 7). These openings Table 2.If Elbows must be used to avoid an obstruction,refer to the offset elbow OPENINGINSroE installation section. Dnv>FNs10Ns are to hold the Firestop Ra- diation Shields and Attic In- 5. Cut Roof Opening:Cut an opening in the roof directly above the opening sulationShields.Locateeach below, and at least 4 inches larger than the chimney's outside diameter to I ; 9 8 Other products made by DURA-PLUS (SDP) INSTALLATION UL ` Simpson Dura-Vent: AND OPERATION INSTRUCTIONS DuraTech Chimney A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO Direct Vent GS Direct Vent System COMBUSTIBLE MATERIALS. IT IS OF THE UTMOST IMPOR- TANCE THAT THIS CHIMNEY BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS. 4 Dnra-Vent Gas Vent (B-Vent) Read through all these instructions before beginning your installation.Failure to k _ F install the chimney as described in these instructions will void the manufacturer's Dura-Black Single Wall Stovepipe warranty and may have an effect on yourhome-owner's insurance and UL listing status. Keep these instructions for future reference. DVL Close Clearance Connector Pipe Contents Dura-Liner Masonry Chimney Reliner CLEARANCE.....................................................................................................................2 PERNM............................................................................................................................2 DURA-PLUS APPLICATIONS.........................................................................................2 Dura-Flex Masonry Reliner for Gas Appliances TOOLS...............................................................................................................................2 MATERIAIS......................................................................................................................3 SAFETYEQUIPMENT.......................................................................................................3 Dura-Connect & Dura-Connect II Single and Double INSTALLATION NOTES .................................................................................................3 wall Flexible Connectors for B-Vent Appliances CMINEYDIANIEIER......................................................................................................4 CIMINE'YHEIGHT ...........................................................................................................4 CMINEYPLACENIENT'..................................................................................................4 CMINEY ENCLOSURE REQUI U3EEN I'S....................................................................5 STOVE RECONEVIENIDATIONS.......................................................................................5 STEP-BY-STEP DIRECIIONS.........................................................................................6 CEMINGSUPPORTED.....................................................................................................6 OFFSET ELBOW INSTALLATION..............................................................................14 SIMPSON EXTENDED ROOF BRACKET INSTALLATION........................................................15 DURA-VENT,INC ROOF SUPPORTED INSTALLATIONS...................... ..........16 ................................... . PO Box 1510 TEE SUPPORTED INSTALLATIONS Vacaville,CA 800-835-4429 ...........................................................................19 Vaca8 e, 807-846-4 29(FAX) MASONRY FIREPLACE INSTALLATIONS................................................................23 ZERO-CLEARANCE FIREPLACE INSTALLATIONS .................................................24 PO Box 1253 CONNECTION FROM APPLIANCE TO CIIININEY SYSTEM..................................24 Vicksburg,MS C11DI EYMAINTENANCE............................................................................................25 39180 March 2001 L119 28 r STEP-BY-STEP DIRECTIONS There are five general types of Dura-Plus installations: 14 1/2 CEILING JOISTS 1.Ceiling-supported 2.Roof-supported 3.Tee-supported(through the wall) 4.Masonry Fireplace SUPPORT B❑x 5.Zero-Clearance Fireplace JOISTS Review the step-by-step directions before beginning yourinstallation. CEILING SUPPORTED --1 1. Place Appliance:Position the appliance according to the manufacturer's 14 1/2—� instructions. The flue outlet collar should be placed between the rafters or L 2 INCHES MINIMUM Fig 4 FRAMING BELOW FINISHED joists above, if possible. CEILING 2. Frame Support Opening: Drop a plumb bob to the center of the appliance's flue outlet and mark this centerpoint on the ceiling. Refer to Table 2 for specific framing and clearance dimensions.Mark appropriate cutting lines CAP around the centerpoint.Cut a square hole in the ceiling fora Square SupportBox, <SDP-C) FLASHING oraround hole for a Round Support Box.Frame a level,square opening centered STORM COLLAR VENTILATED/ over the hole which you have cut. (Figures 3 and4). (SDP-SC) NON-VENTILATED CSDP-F) 3.Install Support:Slip the Support Box,(Figure 5),into the framed opening.It CHIMNEY mustextendat least 2 inches below the finished ceiling.Level the Square Support SECTION S Box and nail it to the framing using atleasttwo 8-pennynails per side.Thetwo Trim Frames are positioned as shown,and screwed through the ceiling and into the framing members with(6) 1-1/4 inch long round-head wood screws. (Figure 6). ATTIC Tbebottomof the Round Support must also beat least2 inches below the finished ATTIC ceiling. Trim forthe SupportBoxes is"U-shaped" The trimpieces are adjusted INSULATION to accommodate the Square Support Box,and screwed into the framing,using SHIELD A MINIMUM OF (SDP-IS) 2 INCHES BELOW FINISHED CEILING 18 INCHES MINIMUM FOR SINGLE-WALL STOVEPIPE FRAMED OPENING SQUARE CEILING ROUND Fig 3 SUUPPORT SUPPORT BOX FLAT SUPPORT BOX (SDP-SB) SDP-RS Fig 5 SDP-s -OR- ROUND CEILING SUPPORT <SDP-RS) 6 7 provide at least a 2-inch clearance all on the bead. (Figure 9). Refer to around the chimney. Iftheinstallationis Table 2 for the framing require- t--I a--C_f x located betweenrafters that are 16 inches ments. on center,Close Clearance Shields(a 7.Assemble Chimney Sections: t fA,f—f sheet metal product fabricated by Simp- Lower and seat the female end of —� son Dura-Vent),may be used to avoid the first Chimney Section in the x _T structural refraining.(Figure 8).The 2- Support Box. (Figure I I). It inch minimumclearance to combustibles will twist-lock onto the male end is notrequired when the chimney passes NON-VENTILATED FLASHING VENTILATED FLASHING of a Low Profile Starter Sec- CUT PANELS through Close Clearance Shields. tion,which is a component of the PITC�cC When using Close Clearance Fig 10 pp pa Sec- ITCH Box. Turn Pi Fig 8 LINE Shields, Ventilated Flashing must DURA-PLUS tions clockwise, firmly to lock be installed. Refer to Figure 10,which them together. Sheet metal pictures both Ventilated and Non-ventilated Flashing. CHIMNEY SECTION screws may be used to reinforce 6. Install Firestop Radiation Shield:One of two possible situations exist for SDP-P the connection,however they are installing the Firestop Radiation Shield. One is a two-story dwelling where not normally required. Screws the chimney passes through a Firestop Radiation Shield, a ceiling,and into are only acceptable in the outer an attic. The other is a multi-story building where the chimney passes through liner. a Firestop Radiation Shield,through a ceiling, into another story,and then 8. Install Attic Insulation into an attic. Each of these require a different configuration of the Firestop Shield: Install the Attic Insula- Radiation Shield. Figure 7 illustrates the two-story building. In the case of SUPPORT BOX tion Shield where the chimney the two-story installation,the base of the Firestop Radiation Shield is nailed ® SDP-S passes into an attic. It's purpose FIRESTOP to the top of the fram- SDP-RS is to prevent debris and insula- RNDIATELD D" ing, with the pan (the SDP-SB tion from getting too close to the ,SDP-FRS) Fig 11 depressed portion of chimney. (Figure 12). An in- the base),facing down- stalled Attic Insulation Shield FRAMING Wards. For the multi- is 14 inches high. In attic areas NAILS 4EWN IF CHIMNEY IS (AT LEAST IN ATTIC AREA, where this shield won't fit, a 2 PER SIDE) story installation, the USE VENTILATED base is nailed to the Square Support Box, (which is T bottom of the framing available in heights up to 36 FRAMING with the pan facing up- inches),can be used instead of an wards. The cylindrical Attic Insulation Shield, pro- NAILS /// (AT LEAST vided it reaches through the roof, 2 PER SIDE) component of the Fir- g estop Radiations as in a Roof Supported Installa- I Shield is then slipped tion. Refer to page 18 for details TWO-STORY MULTI-STORY 12 of fitting the Support Box to the GOING INTO ATIC GOING INTO NEXT down through the base Fig g ply Fig 9 FLOOR p from the to until it rest roof. If the chimney is fully en- 10 11 _ closed through the attic, an Insulation CAP is maintained all around.Install the Shield is not required,however, again, SDP-C upper edge of the Flashing under Ventilated Flashing must be used. the roofing. Nail to the roof along Where the chimney passes into the attic, APPLY SMALL BEAD OF the upper edge and to 4 inches NN-HRDENNG MASTIC / install the Attic Insulation Shield as ALLONGASEAMI❑F C HI below the upper edge on each side PIPE SECTION follows: with 1-inch roofing nails. Do not a. If the Firestop Radiation Shield nail the loweredge ofthe Flashing, extends above the attic floor,no modifi- or the lowerhalf of the sides.(Fig- cations are necessary. The Firestop ure 14). Seal all nail heads with a Radiation Shield will fit inside the At- Fig 15 non-hardening waterproof mastic a tic Insulation Shield. sealant. On flat or tarred and grav- b. Assemble Chimney Sections until at eled roofs, nail and seal the Flat Fig 13 least 18 inches of chimney extends above Roof Flashing to the roof on all the Firestop Radiation Shield. SPLITTER sides with roofing compound.Ifthe c. Slip the Insulation Shield over the chimney in the attic areaisenclosed, Chimney and Firestop Radiation Shield until the base sits squarely on the Ventilated Flashing must be used. framed opening. (Figure 7). Ventilated Flashing maybe iden- d. Nail the Insulation Shield to the top of the framed opening with at least tified by the indented ribs around two 8-penny nails per side. (Figure 12). the circumference of the top open- e. Wrap the Collar around the chimney and fasten it loosely. Slide the Collar ing.Do not put screws through the down to meet the Insulation Shield. Slip the tab through the adjacent slot and SPLITTER Flashing into the Chimney Pipe. fold it back to tighten the Collar. (Figure 13). 10. Finish Top: Apply a non- 9. Attach Flashing: In new construction, assemble the Chimney Sections hardening waterproofmastic(seal- to a point above the roof, r r ant)around the chimney at the point then slip the Flashing over r where the Storm Collar will meet PUSH COLLAR DOWN TO the chimney above the Flashing, the chimney. On an exist- I-INCH FLASHING AND SEAL 'J 'J ing roof,center and install ROOFING WITH NON-HARDENING r _ r and also along the vertical seam NAILS the Flashing before ex- ALONG MASTIC. (SEALANT of the chimneypipe, which is TOP SHOWN IN HEAVY P P tending the chimney above OF I LINE) Fig16 exposed to the weather. (Figures the roof. Allow space to FLASHING i To SDPSTORSCC❑LEAK rTOP VIEW-- 14 and 15). Slide the Storm Col- permit sliding the next lar down over the chimney to the Chimney Section up top ofthe Flashing.Tighten and seal the Storm Collar against the mastic(sealant). through the Flashing. Al- After installing sufficient Chimney Sections to meet the height requirement, ways insure the chimney Figure 1),snap the Chimney Cap onto the top of the chimney.The Chimney Cap remains vertical, and that FLASHING can be removed for chimney cleaning as described in the Chimney Maintenance SDP-F at least a 2-inch clearance SDP-TF section ofthe instructions.Use an Extended RoofBracketifthe chimney extends to combustible materials Fig 14 more than 4 feet above the roof. (Figures 17,and 18 in the Extended Roof 12 13 x i Bracket section.If you are located in heavy snow country,a"splitter"should be Section below,and align it SDP-M E 15°/30. fabricated from heavy gauge sheetmetal,and installed.(Figure 16).This will route for the offset.Refer to Table the snow around the chimney,andprotect it.This item is not furnished by Simpson 3 to determine the required Dura-Vent. offset length and attach an 11.Enclosures:Enclose chimneys where they pass through occupied spaces, appropriatelength(orlengths) including closets. Always maintain at least a 2 inch clearance between the NOT MORE SDP-P of Chimney Section(s) chimney and any combustible surface. Interior enclosures may be con- THAN 48 IN. above the Elbow. Do not structed with standard framing and sheathed with sheetrock orplywood.Use Wall exceed themaximumlengths Straps if necessary,to maintain aminimum of 2 inches of air space between the E between the Elbows speci- chimney and combustible materials. fied in Table 3. Attach the SDP-P second Elbow above the OFFSETELBOW INSTALLATION Chimney Section to com- Elbows are manufactured in 15°and30°angles measured from the vertical.A30° plete the offset. (Figure 17). Elbow is the largest that can be used in an offset.A 30"Elbow may notbe combined Fig17 --� OFFSET 2. Secure Offset:Place the with al5°Elbowto make a45°offsetforexample. Avoid Elbows ifpossible,since Elbow Strap's band around a totally vertical chimney is more efficient.When Elbows are necessary to avoid the angled portion of the obstructions such as rafters,ridgepoles,or joists,use no more than 2 pairs of top Elbow,then tighten the Elbows in any one chimney system. CHIMNEY SECTA3/4' THIN-WALL ON nut and bolt until the clamp SDP-P 1. Attach Elbows:Attach Elbows to Chimney Sections or other Elbows by is firm. Wrap the Elbow twisting clockwise until they lock firmly. Attach one Elbow to the Chimney OF EXTENDED Strap end over an adjacent ACKET joist or rafter and secure it TABLE 3-ELBOW OFFSET TABLE SDP-RSA with at least two 8-penny nails. Do not add more SIZE 6-INCH DIAMETER 7-INCH DIAMETER 8-INCH DIAMETER Chimney Sections until the ELBOWS CHIMNEY OFFSET RISE OFFSET RISE OFFSET RISE(DEGREES LENGTH INCHES INCHES INCHES INCHES INCHES INCHES Elbows are supported. Be A sure that the chimney re- 15 0 1-1/2 12 1-1/2 13-1/2 1-3/4 13-1/2 GALVANIZED ELECTRICAL 30 0 3-3/4 14-1/4 3-3/4 14-1/4 3-3/4 14-3/4 Fig is length of the Chimney CONDUIT (NOT FURNISHED) mains vertical. If the total 15 12 4-1/4 23-1/2 4-1/4 23-1/2 4-1/4 23-1/4 Sec- tions between the two El- 30 12 s 24 s 24 s 24 bows exceeds 3 feet, install a second Elbow Strap around the center of the 15 24 7-1/2 34 7-3/4 35-1/2 6-3/4 35-1/2 ChimneySection(s). 30 24 15 33-3/4 15 33-1/4 14-3/4 34-1/4 15 36 10-1/2 45-1/2 10-3/4• 46-3/4 9-1/2 47 EXTENDED ROOF BRACKET INSTALLATION 30 36 21 44 21 43-1/2 20-1/2 44-3/4 If the chimney extends more than 4 feet above the roofline,an Extended Roof { 15 24+24 13 1/4 55-1/2 13-1/2 57 12 57-1/4 Bracket must be installed at every 4-foot increment of height above the yLL 30 24+24 26-1/4 53 26 52-1/2 25-1/2 53-3/4 roofline, leaving no more than 4 feet extending above the last pipe band. 1. Mount Pipe Band: Slip the Pipe Band around the chimney and secure i r 1 r' 14 15 CHIMNEY CAP by tightening the nut r SDP-C andbolt. CAP (SDP-L) � VENTILATED 2. Install Roof FLASHING EXTENDED ROOF BRACKET SDP-RSA STORM COLLAR (SDP-F) Brackets: Measure (SDP-SC) —"® CONSIST OF: CIMNEY A (I) PIPE BAND from the Pipe Band so CO ROOF BRACKET to the points where CONNECTED WITH 3/4' THIN WALL GALVANIZED the conduit will meet STORM COLLAR ELECTRICAL CONDUIT. the roof,and form ap- SDP-SC (NOT FURNISHED BY FLASHING DURA-VENT). FLATTEN proximately a 60' ENDS AND BOLT TO 4rCOFSDP-F PIPE BAND AND BRACKET. angleWlththechlm- SDP-TF ney, and with each _1A MINIMUM OF NOTE IF DIMENSION 'A' IS GREATERTHAN 4 FEET, EXTENDED ROOF BRACKET other.(Figures 18and INISHE S BELOWFINISHED CEILINGMUST BE USED. 19). Cut 2 pieces of Fl 19 18 INCHES g 3/4 inch thin wall gal- SINNIMUMWFOR ALL OPENING vanized Steel electrl- STOVEPIPE cal conduit,(orrigidgalvanized tubing)to these lengths.The conduit is not furnished 4 by Simpson Dura-Vent,and must be locally procured. Mount the two Roof LOW ATTIC SQUARE PUSH SUPPORT BOX Brackets where the conduit meets the roof,using 6 roofing nails per bracket.Seal Fig 20 SCEILING UPPORT UP THRU ROOF, TRIM AND FOLD BACK the nail heads carefully with a non-hardening,waterproof mastic sealant. BOX EXCESS AS SHOWN 3.Attach Conduit: Flatten 1 inch and drill a 1/4-inch hole at each end of both (SDP-SB) IN FIGURE 22 pieces of conduit. Bolt each conduit to the Pipe Band and Roof Brackets with CAP the nuts and bolts provided. `SDP-C) FLASHING VENTILATED STORM COLLAR (SDP-F) (SDP-SC) ROOF SUPPORTED INSTALLATIONS `SEcriarYis (SDP-P> Use only where a leveled Square Support Box will extend at least 2 inches below the ceiling(on the low side),while the top edge at least covers the edge of the roof's 2 INCHES decking material.Square Support Boxes are available in 11 inch,24 inch,and MINIMUM 36 inch heights.Mobile home chimney installations are roof supported,and use Ventilated Fleshings. Do not seal openings. ROOF 1. Place Appliance: Place the appliance in it's proper location,referring to ItIWINCHES � the manufacturer's instructions as to allowable distances from combustibles, MINIMUM FOR etc. SINGLE-WALL w ESTOVEPIPE 2. Cut Openings: Cut a roof opening directly above the appliances' flue '1� outlet collar,just as in a Ceiling-Supported Installation(Steps 1 thru 5). If a Fig 21 separate ceiling and roof exists,as shown in Figure 20,(Low Attic),first cut CATHEDRAL CEILING SQUARE PUSH SUPPORT BOX and frame a ceiling opening as described in Ceiling-Supported Installations CEILING UP THOU ROOF, TRIM b p Pp SUPPORT AND FOLD BACK BOX(Step 2). Refer to Table 2 for clearance and framing specifications. If it is S IN FIGURE (SDP EXCESS SHOWN 22 16 17 desired to install through a cathedral ceiling(Figure 21),then the hole is cut in the roof. PIPE 3. Install Support Box: Slip the SDP-P Y Square Support Box into the framed t opening so it projects at least 2inches PIPE SECTION INH i T ' below the fnushedceiling and rafters, 6 INCH OR SDPCP TEE and extends above the ceiling tofr SDP-Tam- 5/16 X 3• in ordeckiri materials that it can be WALL THIMBLE LAG SCREWS g g SDP-WT (6 RED) nailed to. Level the Support Box, NOT FURNISHED SUPPORT BOX and slit the corners to the roofline REMOVABLE SDP-SB Fig 22 where they extend beyond it. Bend TRAY (COMPONENT-� OF SDP-TS) the flaps(created by the slitting)flush with the roof,and nail the Support Box to the roof or framing with at least two 8- penny nails per side.(Figure 22). Screw the trim sections into the ceiling.(Figure 6) TEE SUPPORT -" --SHEET 1 METAL SDP-TSSCREW ALLOW 1/2 INCH Fi 2.1 AIR SPACE g BETWEEN BASE TEE CAP (COMPONENT WARNING OF SDP-T> ❑F FLASHING ❑R i VENTILATED COVER AND ENCLOSURE FLASHING FRAMING MUST BE USED 4.Complete Installation:Refer to Steps WITH ENCLOSURES FRAMED 8,and 9,in the Ceiling Supported Instal- EXTERIOR 1 lation section,to complete the Roof-Sup- ENCLOSURE 4' ported installation. TYPICAL TEE-SUPPORTED WaE THE- EE- INSTALLATIONS SUPPORTED Tee-Supported installations are used INSTALLTION pp when passing through a wall to an out- ACCESS DOOR FOR CLEANING side chimney. The required parts and general configuration are as shown in Figures 23, and 24. 1. Place Appliance:Position the appli- ance according to the manufacturer's instructions. Fig 23 Fig 25 2. Cut and Frame Opening: Cut 14-1/4 inch diameter holes in the inner ` 18 19 •L.�ais_ a and outer walls. The center of PENNY NAILS theseholesshouldbealignedwith and fasten it to the wall (4) REO INTERIOR PORTION OF with screws. From the WALL THIMBLE the center of the stove's flue outside, slip the Chim- outletcollar. Fornewconstruc- WALL IF SYSTEM EXITS THRU WALL INTO GARAGE, AN ney Section, which is MSHIMS TO AINTAIN , tlon,prior to sheetrock or other ENCLOSURE IS REQUIRED. attached t0 the Tee,into CIRCULARITY coveringof the wall studs is a - OF THIMBLE to-v2 P the Thimble. NEVER 1 2) REQ lied, frame a square opening(NOT P q P g 2 INCHES VENTILATED INSTALL SINGLE FURNISHED- MINIMUM MAY BE MADE between the studs,asspecifiedin FLASHING MUST BE USED. WALL STOVEPIPE OF WOOD) Table2. I THROUGH THE I4-1/2 (Figure25). Should it be neces- -VIEW FROM OUTSIDE- sary to go through concrete,ma- 2 INCHES MINIMUM WALL THIMBLE! 6-INCH OR sonny,or cinder-block,a 14-1/4 ENCLOSURE 5. Install Tee Support: 2 INCHIM CHIMNHY ' Remove the two screws MINIMU "�- inch diameter hole must be cut GARAGE SECTION from the Tee Cleanout LIVING SPACEIDE SDP-P throw hthewall. g Fig 27 Cap,and detach it from 3.Install Wall Thimble:Insert the Tee. Attach the Tee the black section of the Wall Support Straps to the INTERIORNCHES Thimble into the opening in the PORTION OF WALL THIMBLE CLEARANCE SDP-T wall from inside the room,and SDP-WT WALL (BLACK' align the nail with the studs. STRAP Fig 26 (Figure 26).Do not nail the black thimble sectionatthis time.Attach theTeetoa9-inchor 12-inch Chimney Section by twisting until itis firmly locked. If the wall is less than 6 inches thick,use a 9-inch Chimney Section;if the wall is between 6 and 9 inches thick,use a 12-inch Chimney Section.From outside the building,insert the Chimney Section into the hole until the vertical part of the Tee 2 INCHES is 2 inches away from the outside of the wall,and the black portion of the Wall AALLOW A MINIMUM OF MINIMUM 2 INCHES AIR 2 INCHES Thimble and the Chimney Section protrude into the room at least 2 inches. SPACE ON ALL MINIMUM Remove theTee and ChimneySection from the wall,and nail the Wall Thimble's SIDES. Fig 28 F. black section to the studs with four 1-inch roofing nails. If the Wall Thimble is 14 going through a concrete wall,and no framing members are available to nail the base with the nuts and bolts provided.Use(2)5/16 inch,3-inch long lag screws ,:. black portion of the Wall Thimble to,use masonry anchors to attach it.If a Tee- to attach the straps to the wall. Replace the Tee Cleanout Cap and screws,once Supported installationisbeing installed in a garage,it must be enclosed.(Figure27). the Tee is installed. 4:,Seal Outside:From the outside,insert the galvanized section of the Wall 6. Complete Chimney: Attach the Chimney Sections as in Step 7 in the Thimble through the wall and into the black section. If it does not reach the Ceiling Supported Installation section. Secure the chimney to the wall with .Y black section, an extension tube can be locally made from 018 thick Wall Straps at 4-foot intervals to maintain at least 2 inches of clearance to galvanized steel. Seal the flange of the galvanized portion of the Wall combustible materials. Slip the Wall Straps around the chimney,tighten the Thimble to the outside wall,using non-hardening waterproof mastic sealant, bolts,and fasten the Wall Straps to the wall with(2)5/16-inch, 3-inch long t 20 21 i� Safety Label - Models X33 and R33 u ro f r Teswea ,,,� DO NOT REMOVE THIS LABEL/NE PAS ENLEVER CETTE ETIQUETTE NESTOR I.w W w crepes USA CONTACTLOCAL NAIDSIG IytAEIIFFIWIS ASGR NSTALLATDM AIOIESiRCIIfNSNTdIRARFAlREi40GIEZ•YgIS AIRRES OESAIIrpRIES IDGIB OYIFTest Laeereeerle,YeG US; ,Y °E►PR�ESWA UtI���II LN " �mmA � MARTIN Repel MalYueke dr lUMM i32i-0id IDIIOLIMRE rouR 16fALLATDN5IIE9DUIIIf1lF5, MODEL I MOOtLE. TESTED TO TESTE AUX NORMES:UL 1484 ULCSW Serial Number O X33 O R33 Roan Hamer.SON Fuel Type f AppM.E do Chaullage It Combustibles Solldaa Numbro de Sdrle Z' PREVENT MOUSE FIRES-Instal and Law only In accordance wIN the nuwwlsolurves Installation PREVENTION DES INCENDIES:Instaltez N Wlllsaz coMrmdrnea Buz Instructions du hbNcanL and operating bestrueUons.Confect your local building or We oBMJNs about restrbtlon,and RensNpnez-vous aueprM des autorlW locales dB Is constfUd on at do l prMMlon des Inosndles (nsfellatlon Inspection In your area.Refer to local building codes and mane edurer's so suit des nstrfcbom at Inspections d'kwtapatlen dam votre W9km Des wAdvades spiciMa awd Instructions for precautions required for passing a chle my through a combustible Wall of Ion do per"d-un■Ns as pllond.Verifier is btructfons du febrlrard at In coda du calling.Do not run a ehNwy connecter enough a combustible well or exping.Do not conned fMoment.y No s0dmGw cyst Bwpps�ieN i 4 oMmN4 d'un coin BppreL Ldap�dep�geesurface �f a mMMMbi stides this cads to•chimney flue serving another aspic■nes.Clearances may be reduced by '"Chico"ca,,,b,M,�Pwmt km,6d�Belong let"MhOdes apdcMles dada NFPA 211,svee des methods specified In NFPA tm 1,land wall Bh1eWa,pips NNWe,r other mans approved by PraeUl0m murals Nomologuies,des Protections do ehaminie hOmoWpuies,so d'eums wiww local building or fire officials. appewvis Pr r.sulorft"da l eartruetlm at d.IN priverdlsn des Ince dla For use with solid wood fuel only(cord wood). Pour usage unkNunaM arse du bol. Opera,with feed dor closed•open to feed firs onty. FaRes fonglnner rappersB awc be pores de eharpeneerd lean es-owak ordW ernerd poor,shouger. Do not use a grate to slevets We-build if.directly on hearth. No Des UMlar law Odle suppldmenUlm pow dfaer Is Iwo-taha l fee direel.ment sw Is foyer. tie pee ailm lonctlonrwr rapprall awe 6 ports eendrlw ourvra. Do not Operate with the ash door open. NE PAS SURCHAUFFER-IN err pall do rappralt ou du rarcardem ad ds elm ji,is cem we ca i DO NOT OVERFIRE-N mater or chimney eaUwNr Slows,you are owdkMp. roerpaoyr,vous ties an shundon do surehauns. Impacoccur t elan ehlnwy frequently-under certain conditions of use,creosote buildup m y i"Pedas. r O���I nO�wnme ende re fbuti<tlons 0 In voco u)ulna to f ondlnnda mi(pare garcon Paul as produlre repidemrd. FREESTANDING INSTALLATION STANDARD RESIDENTIAL FREESTANDING OWALLATYONIS REOUM.r dWMr,eeebeieene 2s YSO bles or 26 MSO bawd aWl ateaeector,eMe Mbd Mpe IR10f fin tallorybuY e1YmnN.aullbl leer w aMh adN IuN.r pyos 1te11A�ti M tar S42a1 etrnLfeW no.—de.an eaexrcfars do b 1"ds dleBihe,es scW nok da slInsnwn M YSO es es sder blu de rsdnres 36 YSO vsn err uwMrW PrNeprlpwe honnbguy CLEARANCE REOUIREMEMfi: SNOLEWALL CONNECTOR DMLEWALL CONNECTOR SOfGLFNALL CONNECTOR DEOAGEAEtRt YNYAUX DES YA75RMIIIC tXYYlUt7lLES: WH MEATTUYAU DE RACCOADEMENTIRA►OMPLE►ARDI TUYAU of RACCOROEIEM IDOIMIE►ARd 7UTw DE RACCOR IELD MPLE►AR01 1 AVEC PROTECTEUR DE CHALLIr AVEC PROTECTEUR DE CNALEUR SALK PROTECYEUR DE CHALEUR A. SACKINLLTOUNRIDUINm movERE OW AU►OEtL 1aAYade.el 17F(AaSnes) Iln"seBN e. CORNERLLTOTOUT/TI LIUMaRDoC wUPO C. SIDEWA LLTO CONNECTOR I UNIT/W YUR W CON AU POLE Is ) 93 Al7" E. SAL"LLTO CONNECTORIDYURDECOTE All RACCORDDE CHEM1EE ""Is" nrla/mm) nr(sa.ee) E. SACXWALLTD CONNECTORIW YllMMBECOw U RCCRDDEE CNEA N 11rit7wen) Lron.r) 11xvro Bee) F. COW ERWALLTO fONNECTOR/WIUR DE CONwRACtORD DE CXE1f1EE 1wilm—) 1SA'pMms) "LO(3Mrn) IL FLOUNIOR R OCELCBUNN/I Do POtIA UPLAFDND K FLOOR 70 CELNO/W eawPIAFOND wr(ISM—) dDA'(1EN—) IILnI5124fl,e.) MINIMUM CLEARANCES TO COMBUSTIBLES: NIONCOMBOSDBLE FLOOR PROTECTOR FLOOR PROTECTOR MUST BE A NON-COMBUSTIBLE DEGAGEMENTS MININAUX AUX MATERIAUX COMBUSTIBLES: PROTECIEUR DEP ANDO NCOYB05 W MATERIAL,AND IT MUST EXTEND BENEATH HEATER, BACIGTALLIMURARRIERE AWACENINALLIMIRADIACElft AND TO THE FRONTAWDESIREAR AS INDICATED. C B E F s A O LE►ROTECTEUR DE►LANCHER DOIT ETRE UN MATERIAL INCOMBUSTIBLE ET IL DOFF S'ETENDRE EN p C E S. S' DE US DE VAPPAREX ET AU DEVAM,AUX C6TES 41 MCI w 16NI'MAIN. Mp ET A L'ARRIERE DE L'APPAREIL COMNE INpOUE. HOT LE IN CAUTION.TOUCH• KEEPPCHILDRENOAND ATTENTION. NEMENT NOT CHAUD LNE PAS TOUCHER LE CLOTHING AWAY.CONTACT MAY CAUSE SKIN BURNS.SEE CONTACT PEUT CAUSER DES BRULURES A LA PEAU.GARDEZ NAMEPLATE AND INSTRUCTIONS,KEEP FURNISHINGS AND LES ENFANTS,LES VETEMENTS,LES MEUBLES,ET TOUS LES OTHER COMBUSTIBLE MATERIALS A CONSIDERABLE MATERIAUX COMBUSTIBLES LOIN DE VESPACE DESIGNE DE DISTANCE AWAY FROM THE APPLIANCE ( IVAPPAREIL LIRE ATT'ENTIVEMENT LES ETIQUETTES ET LES DO NOT OVERRRE-IF HEATER OR CHIMNEY GLOWS,YOU INSTRUCTIONS.NE PAS SURCHAUFFER.S1 L'APPAREIL OU LE ARE OVERFIRING. TUYAU DE CHEMINEE ROUGISSENT,VOUS SURCHAUFFEZ Manufachwed Dr./FabrkpA per.Fonderive du Lion Devakwmwd Couvin(Belgkpn) US.ENVIRONMENTAL PROTECTION AGENCY CartlMd so comply with Judy 1990 par- ,Big,aneldon starldarda: W04 Beat Mas A., F.e. Nor Ar. IBM ace.. Act Boa. are. Oa. N.v. ter. CNdfli cordomse an forme,EPA do Jolliet 1990 pow let drnlsions de po rtieudes sonde l ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 11 0 ❑ ❑ KIN Safety Label - Models S33 and H33 t I� I� w.� DO NOT REMOVE THIS LABEL/NE PAS ENLEVER CETTE ETIQUETTE NESTOR Or►ArLrYr.MiY..r.. ,�; °, °` ,r "° °`°,'° , 'r° r, MARTIN rr.te.,redw«Awl.emsata, � . MODEL/MODELS: TEMOTOITEMAUX NORNF9:UL 1482,ULC•wv OS13 QH33 P-DMH W.Solid►a01TOW/ApperedaC+wlre0v0Cwd,,wDlafoddu SWIMNumDer PREYE►R HOUSE FIRES•erY1 eml w only b..ord Nunwo do Shh Z- r�0.eq ti ewd�d YMMYOr, erA1 ependMq In.e.. kwftwboee.Crd"rev heel PREVENTION OET dNZrOd:/:MrYN.atetr er esnfardmwa.a /I.Ir d.tiMrra. •««np vI do elOrOb evaul r.trrTle„s end wwPv+aiw awrM d..vuYdY.Y.AI.A N Y wweewlen r r Y pkwnM.dr.r.ndi.. ��W."luc ow erp.etYw r rw ere.Rat a l.eel e�dYYy voar ell vAnaavoQ..re a rAK dr raWr.w M rwo.ceo.r nn.reww,d.r..0w Do m Pleara+eir�rr«.A for pa.Mq.tliYnnN r.py..�lusLOY-0 ar r I rn w1 Mq- d w wr.0 M.Y+r.Wnwr M.rpm d�i1>owd"N Mn..e.,am d. «ie dnR a.enrrq wyln a ve.MIa1YM aa0 aro.ee r.Deer comet < ~w°ioy"rosiwo0r e.l e...r Y~"r rneied.dr.er.wr A...r.en.r.f..e oa.r,wdA& 1M010r.oanbd b WPA 211,d.v 0 wall ep 00-1 CYrrleee ery a ndue.d er .rerlwrt er.Y.ry.e drwrd due .0aw r4r td.dLPan+MM.au...eM ra bat l.IldMr w1Y.ellkrY. ft Wa• '~dln.r drrr.dTret'.d�, pp.a vy� dw Mel.ceo�a.ewr.srri-dru WPA 211,ma dr voprn+.rr Ye vuYdw r r aweave.r r r pr..wn d.e er radwe ery.a F.Aw..Am vodd weal T.r emy prrd woodF hrww.nlp�w0r e.a du e.r.Opwer.en Ard roar 01.0d•dP.n r 1-d An wowed ewe r.prY.roreywwd ddera. «dr. ►.aw a.emrr r ODMI ereperlI el-W,d—build MddeetlyalrerK wet OW.w rw plreeppllewnY.e p Ant YYd•YA..k A�.pwrdwrYv .Ddrotopar.rergdr @"door,'' wTw.Y4.H..tlorMrrAppd.d everPrr e.ebYreew... 00 NOT OVEN•r A.rr d aYwy eene.rer Pall red er rAf illanbmii-•Y er yrlY r r.0or.d ed d..rm.rw.r do AArw.d. ��er.n arr,.r ew-rdh•M�dlr wQ+Y1 ow,dnlW{of v0,amour �4 Mw �rwrrrof mwy...U w k.669. m ae dum e.rwr. ...,dnwa. r+er4 M nAvolwr r elr.iiy. rr.r rY.nr err 0nrm.r wONr r~"ru0 M"""d M Oemw►.vrRodiM.npkw,rd, amouvoair a.. 1 w for.ra.e r t"am fTANDAADItMVEUrALiFW.AN"W4TAUAT*W u.FREESTANWNGjGTALLATION ►MArwy!hrw YwAadr.wrMrOW NIX4.w.a.:w�d.0-A dial rde rek.xNsowww.d.erwe..Anlbdlno.wroMT11�1r.�. dir+r4wawrw.ri..0 w. i'�I Ote.IL16T XT w1Al bxl.e.q www.e.eewa Wra..neel♦r rr r AAAd�w N db6ww erlr Wu1O.wiir.0101iG..e w dwr.pwliYp.l.Yr..� rT4rMD edrOQmAL aRAILAT..1 Ob A0BenimrNAyi00 rATOL4U[ yypu TrollDOUe.lrALL ODIeRCrCR eQgllAip��eED�gEM}�(� TrrADTd:aADcaAerrd,tAeWri µdpL reMW1Irw fawwaAAGI Ilrt AEIII "Amf QAAm01mrJIfAW1lIF A. dan'ALLTDrerrouaAraeentAdrotLL aACWAU.TO udt10U rir AArUE w MN! tl.T+r+rtl CMMNaALLMUWIOUuXDUCQdw.Chl 1 irlwouwq uerim" nA"tw.w Q t«EMALLTOCDOMCGd IDUVONCOMAUUACCCIraCI.BMIEr K. SAcdEALLTOCrrECTMfCUNWAwswdAccaoogcwwd!E 140v m" rovah.) WA >h II'I F. cde.urAIL l000rlCTOa/Y/dwK00r WdAccpoda Cvadx to+�Pr�1 ty/py..l d10� 0. MR10CEL00ro0rOrLIAll ar larpsrr1 ri*V" urp3m d w naoato aedarou NlaOROD.o wn 00rTM" x�Z A ma"Wry a AT1111 y I jl oeoAQr�""Mrs~rw�.waAw�mooweurnrrs Oe.OD00us�tenoar�mxiDe wa. "a ALCOVE dA�leA,;rOudwed �wurirneLdh reOicaAOFrud�araraard�t .+Ir.aememw OCerttlraOTALLATION/OMSTALLAT10NALCOVE I, r1ACrIrTALLrV A'AYC9d McAllanQl¢rer.fMreetYtr. �� ,� d e dl�a e • -!k e r d• POiF r u.0r.rewNAwaa rrtrr Mimi. fS• 0 0 M (U A �y. rM. �f aw woroarAraOen.neaererrwE �Si A .Ge'.F T C HOT 'ICI i �r � �� L}II YQLa.v A�Oa�rQYQ4'MYIr S 4 A� Irlr �OEIF 7rirreYr.Uq evM r twat N•«vow} taFerrerrer�«hodw r Pdd«I.rx'(MrN NOT CAUTION.T000H.K EPPCHILO ENOAND ATTENTION.CLOTHING AWAY-CONTACT MAY CAUSE SKIN BURNS.SEE CHAUDNEMEN LORE DU FONCETIION- NAMEPLATE AND INSTRUCTIONS.KEEP FURNISHINGS AND CONTACT PEUT CAUSER DES BRULURES A LA PEAU.GARDEZ OTHER COMBUSTIBLE MATERIALS A CONSIDERABLE LES EWANTS,LES VETEMENTS,LES MEUIBLES,ETTOUS LES DISTANCE AWAY FROM THE APPLIANCE. MATERWUX COMBU8TTBLES LOIN DE L'ESPACE DESIGNE DE DO NOT OVMRE•IF HEATER OR CHIMNEY GLOWS,YOU VAPPAREIL LIRE ATTENTNEMENT LES ETOUETtES ET LES ARE OVERFIRING. INSTRUCTONS.NE PAS SURCHAIFFER.SI VAPPAREIL OU LE TUYAU DE CHEMINEE ROUGISSEHT,VOUS SURCHAUpFEE Nrrtaoeer sy:/P.eripud rdl:Pe.awia a Lienm.r Ce1Ay, LLLEIVAPAX MWALPROTECTIONADENC'r Celled 1.comply wid,JWr IM pwa=Areeml..irr or Will de: erA >r< rr Aa ..a ne ow rw 4.w A+. rs 4 Oa ... ❑ea GhtlYoerdrrrrudrrmrdEPAaIuNeT1MOp«rMfrWirraprvll,adderda ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 El ❑ ❑ ❑ aw 7 Standard Installation Procedure 1. Position the unit no closer than the minimum clearances to combustible materials. Check that no overhead cross members in the ceiling or roof will be cut. Reposition unit if necessary, being careful not to move closer than the minimum clearances. 2. Mark the position of the required floor protector on the floor. Remove the unit and install the floor protector. 3. Position the unit on the floor protector at the proper clearances. 4. Install'a 6-inch diameter, minimum 24 MSG black or 26 MSG blued steel connector pipe on the flue collar of the unit. 5. The stove is NOT to be connected to any air distribution duct or system. A chimney connector shall not pass through an attic or roof space,closet or similar concealed space,or a floor, or ceiling. Where passage through a wall or partition of combustible construction is desired,the installation shall conform to CAN/CSA- B365, Installation Code for Solid-Fuel-Buming Appliances and Equipment. (Canadian installations only). 6. Use a 6"chimney connector adapter to connect the chimney connector up to the chimney. The small ends of the chimney connector should all point down to ensure a drip-free installation. , 7. Check that all clearances are still within the allowable tolerances. 8. Secure adjoining sections of chimney connector to each other using three equally spaced sheet metal screws. Secure the connector pipe to flue collar using three equally spaced sheet metal screws. DO NOT secure chimney connector to chimney with screws. 9. The unit must be connected to either. • a code-approved masonry chimney with a flue liner,or • a 6 inch diameter factory built chimney complying with the requirements for Type HT chimneys in the standard UL 103 and ULC S629. WARNING: DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE. UNIT MUST BE INSTALLED ACCORDING TO ALL LOCAL CODES. A BUILDING PERMIT MUST BE OBTAINED BEFORE INSTALLING. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. DO NOT INSTALL IN A MOBILE HOME. READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION. UNIT MUST BE PROPERLY INSTALLED OR LISTING WILL BE VOID. INSTALLATIONS OTHER THAN THOSE SPECIFICALLY COVERED HEREIN HAVE NOT BEEN CONFIRMED BY TESTAND ARE NOT COVERED BY THE LISTING. Freestanding Installations If the chimney connector must pass through a combustible wall to reach the chimney, follow the recommendations in the Wall Pass-Through section that follows. The opening through the chimney wall to the flue(the"breach")must be lined with either a ceramic or metal cylinder, called a"thimble",which is securely cemented in place. Most chimney breeches incorporate thimbles, but the fit must be snug and the joint between the thimble and the wall must be cemented firmly(Fig.A) Chimney Flue Liner A special piece called the"thimble sleeve", slightly smaller in Elbow Flue Liner diameter than standard connectors and most thimbles,will € l facilitate the removal of the chimney connector system for Slip Pipe inspection and cleaning. Thimble sleeves are available from Thimble your local dealer. Standard Connector To install a thimble sleeve, slide it into the breech until it is flush Flue Collar with the inner flue wall. Do not extend it into the actual flue passage,as it could interfere with the draft. The thimble sleeve should protrude 1-2'(25-50 mm)into the room. User fire cement and thin gasketing to seal the sleeve in place in the thimble. Secure the chimney connector to the outer end of the sleeve with sheet metal screws. Fig.A: Chimney connection in a freestanding installation 0 t ' 4 17 } it � Cf�ladw� ?i 6 co I Y i i! °fib �•��� ao� .ob C�o•s�,1..... • t 4AY 2 2 1989 South Windsor BUILDING DEPARTMENT (tl W 3�-4004 DFpr, ?OWN of sOUTN ivimsm 'This ce►titled that this plan and ap"'fic-tions are trur doplea of the proposed building or alterations o u �Md et together With n � Stree with planfil nts stated In Butldi:, and 1 agree to tion ..n: and state laws and such ordwun all zonin. issued by the Building Oeparttnent Of ,.,' en as shall O.. t.1s aPPlicatlo durin permit. nand /lnal Issuance of a buf dln► Stan This do a.In Is epprnved ArnP$eend nw1% pet finances ►egulatlnp Duildingdlahalitpti C"d'"O"dlt, Apmv*a These filed with B 1f Clem (;Lk1-1FiCATiON OF ZONiNG COMPUAIvCE Proposed building;s), use(s) and(or structUN(S) as shown on this plan appears) to ba In conformance with current_ South regulations. Variances and sp cciai exrePtivnS may apply.. Gate — Z�� ng Enforcement Officer