Loading...
HomeMy WebLinkAbout14 KENNISON CT BLDG 3/21/22,11:24 AM Town of South Windsor Building Department 41 r` Electrical Permit ELEC-22-23 APPLICANT NAME: Robert Damaschi EMAIL ADDRESS: amozzicato@comcast.net ADDRESS:22 Englewood Dr Manchester, CT 06040 LOCATION ADDRESS: 14 KENNISON CT South Windsor CT 6074 OWNER:T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: 200 amp underground servic.Complete wiring of new home to code W r January 19, 2022 BUILDING OFFICIAL DATE SIGNED BALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT— PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL— 1/1 + r� REScheck Software Version 4.6.5 Compliance Certificate Project Building 6- Unit 61 - Dover SC4A Energy Code: 2012 IECC Location: South Windsor, Connecticut NED Construction Type: Multi-family Project Type: New Construction Orientation: Bldg. faces 315 deg. from North Conditioned Floor Area: 2,137 ft2 Glazing Area 4% Climate Zone: 5 (6155 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 14 Kennison Ct. T&M Building Co., Inc. T&M Building Co., Inc. South Windsor,CT 06074 110 Brook Street T&M Building Co., Inc. Torrington,CT 06790 110 Brook Street, CT 06790 (860)489-9229 (860)489-9229 info@TandM.com info@TandM.com Compliance: Passes usi • UA trade-off Compliance: 2.3%Better Than Code Maximum UA: 385 Your UA: 376 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Perimeter Wall 1:Wood Frame, 16"o.c. 37 19.0 0.0 0.060 1 Orientation:Front Comment: Ground Floor-front wall Door 1: Solid 20 0.130 3 Orientation: Front Comment:Ground Floor-front door Wall 2:Wood Frame, 16" o.c. 222 19.0 0.0 0.060 12 Orientation: Right side Comment: Ground Floor-garage to house wall Door 2: Solid 20 0.130 3 Orientation: Right side Wall 3:Wood Frame, 16" o.c. 185 19.0 0.0 0.060 11 Orientation: Back Comment: Ground Floor-garage to mech room wall Wall 4:Wood Frame, 16" o.c. 120 22.0 0.0 0.056 7 Orientation: Right side Comment: Ground Floor-party wall Wall 5:Wood Frame, 16"o.c. 222 19.0 0.0 0.060 13 Orientation: Back Comment:Ground Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E 13 0.290 4 Orientation: Back Project Title: Building 6- Unit 61 - Dover Report date: 09/28/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-6- Unit 60- Dover.rck Pagel of 3 Gross Area Cavity Cont. Perimeter Wall 6:Wood Frame, 16" O.C. 56 13.0 0.0 0.082 5 Orientation: Left side Comment: Ground Floor-wing wall Wall 7: Wood Frame, 16"o.c. 278 22.0 0.0 0.056 16 Orientation: Left side Comment: Ground Floor-party wall Wall 8:Wood Frame, 24" o.c. 123 19.0 0.0 0.059 6 Orientation: Front Comment: 2nd Floor-2x6 front Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4 Orientation: Front Wall 9:Wood Frame, 24"o.c. 123 30.0 0.0 0.047 5 Orientation: Front Comment: 2nd Floor-2x10 front Windows:Vinyl Frame:Double Pane with Low-E 25 0.290 7 Orientation: Front Wall 10:Wood Frame, 16"o.c. 379 22.0 0.0 0.056 21 Orientation: Right side Comment: 2nd Floor-party wall Wall 11:Wood Frame, 24" o.c. 246 19.0 0.0 0.059 12 Orientation: Back Comment: 2nd Floor-back wall Windows:Vinyl Frame:Double Pane with Low-E 7 0.290 2 Orientation: Back Door 3: Glass 33 0.200 7 Orientation: Back Wall 12:Wood Frame, 24" o.c. 72 13.0 0.0 0.080 6 Orientation: Left side Comment: 2nd Floor-left wing wall Wall 13:Wood Frame, 16" o.c. 297 22.0 0.0 0.056 17 Orientation: Left side Comment: 2nd Floor-party wall Wail 14:Wood Frame, 24" o.c. 97 19.0 0.0 0.059 5 Orientation: Front Comment: 3rd Floor-2x6 front Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4 Orientation: Front Wall 15:Wood Frame,24" o.c. 97 30.0 0.0 0.047 4 Orientation: Front Comment: 3rd Floor-2x10 front Windows:Vinyl Frame:Double Pane with Low-E 20 0.290 6 Orientation: Front Wall 16:Wood Frame, 16" o.c. 296 22.0 0.0 0.056 17 Orientation: Right side Comment: 3rd Floor-right party wall Wall 17:Wood Frame, 24" o.c. 191 19.0 0.0 0.059 9 Orientation: Back Comment: 3rd Floor-back wall Window 7:Vinyl Frame:Double Pane with Low-E 40 0.300 12 Orientation: Back Wall 18:Wood Frame, 16" o.c. 285 22.0 0.0 0.056 16 Orientation: Left side Comment: 3rd Floor-left party wall Wall 19:Wood Frame, 24" o.c. 156 22.0 0.0 0.054 8 Orientation: Left side Comment: Loft-left side Wall 20:Wood Frame, 24" o.c. 156 22.0 0.0 0.054 8 Orientation: Right side Comment: Loft-right side Project Title: Building 6- Unit 61 - Dover Report date: 09/28/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-6-Unit 60-Dover.rck Page 2 of 3 Gross Area Cavity Cont. Perimeter Wall 21:Wood Frame,24" o.c. 126 19.0 0.0 0.059 7 Orientation: Back Comment: Loft-back wall Ceiling 1: Flat Ceiling or Scissor Truss 127 30.0 0.0 0.035 4 Comment: Loft-sloped ceiling-rear Ceiling 2: Flat Ceiling or Scissor Truss 207 38.0 0.0 0.030 6 Comment: Loft-flat ceiling Ceiling 3: Cathedral Ceiling 256 30.0 0.0 0.034 9 Comment: Loft-sloped ceiling front Floor 1:All-Wood Joistlfruss:Over Unconditioned Space 576 30.0 0.0 0.033 19 Comment: Floor over garage Floor 2:All-Wood J oist/Truss:Over Unconditioned Space 328 30.0 0.0 0.033 11 Comment: Floor over mech room Floor 3: Slab-On-Grade:Unheated 48 10.0 0.684 33 Insulation depth: 4.0' Comment: Perimeter slab insulation Floor 4: Slab-On-Grade:Unheated 44 10.0 0.807 36 Insulation depth: 1.6' Comment: Interior slabinsulation Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Building 6-Unit 61 - Dover Report date: 09/28/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-6-Unit 60- Dover.rck Page 3 of 3 3/21/22, 11:23 AM SOw� f1 Town of South Windsor Building Department I T t�50R CV: Building Permit: BLDP-22-83 APPLICANT NAME: Bob Stanhope EMAIL ADDRESS: bob.stanhope@tandm.com ADDRESS: 110 BROOK ST TORRINGTON , CT 06790 LOCATION ADDRESS: 14 KENNISON CT South Windsor CT6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: CONSTRUCT SINGLE FAM TOWNHOUSE W/2 BEDROOMS 2.5 BATH 2 CAR GARAGE&DECK BLD 6 UNIT 14(MUNIS PERMIT APPROVED 2018) W February 8, 2022 BUILDING OFFICIAL DATE SIGNED -ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT- PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL- 1l1 3/21/22, 1123 AM S�wN sF1 Town of South Windsor Building Department `Y Imo' a? �LSOR Cp. Plumbing Permit: PLMB-21-153 APPLICANT NAME: Jan Gryckiewicz EMAIL ADDRESS: farmingtonplumbing@comcast.net ADDRESS: 53 tall timbers drive farmington, ct 06032 LOCATION ADDRESS: 14 KENNISON CT South Windsor CT 6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: plumbing for new 2.5 bath townhouse.gas piping W July 26, 2021 BUILDING OFFICIAL DATE SIGNED ""ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT- -PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL— 1%' 3/21/22, 11:24 AM .`0 sf� C Town of South Windsor Building Department HVAC PERMIT. HVAC-21-528 APPLICANT NAME:jay valimont EMAIL ADDRESS: missductwork@aol.com ADDRESS: 6397 RO Box Wolcott, CT 06716 LOCATION ADDRESS: 14 KENNISON CT South Windsor CT 6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: Install warm air and AC system. W November 23, 2021 BUILDING OFFICIAL DATE SIGNED —ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT— "*PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL— 1/1