HomeMy WebLinkAbout14 KENNISON CT BLDG 3/21/22,11:24 AM
Town of South Windsor Building Department
41 r`
Electrical Permit ELEC-22-23
APPLICANT
NAME: Robert Damaschi
EMAIL ADDRESS: amozzicato@comcast.net
ADDRESS:22 Englewood Dr
Manchester, CT 06040
LOCATION
ADDRESS: 14 KENNISON CT
South Windsor CT 6074
OWNER:T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
200 amp underground servic.Complete wiring of new home to code
W r
January 19, 2022
BUILDING OFFICIAL DATE SIGNED
BALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT—
PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL—
1/1
+ r�
REScheck Software Version 4.6.5
Compliance Certificate
Project Building 6- Unit 61 - Dover SC4A
Energy Code: 2012 IECC
Location: South Windsor, Connecticut NED
Construction Type: Multi-family
Project Type: New Construction
Orientation: Bldg. faces 315 deg. from North
Conditioned Floor Area: 2,137 ft2
Glazing Area 4%
Climate Zone: 5 (6155 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
14 Kennison Ct. T&M Building Co., Inc. T&M Building Co., Inc.
South Windsor,CT 06074 110 Brook Street T&M Building Co., Inc.
Torrington,CT 06790 110 Brook Street, CT 06790
(860)489-9229 (860)489-9229
info@TandM.com info@TandM.com
Compliance: Passes usi • UA trade-off
Compliance: 2.3%Better Than Code Maximum UA: 385 Your UA: 376
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Perimeter
Wall 1:Wood Frame, 16"o.c. 37 19.0 0.0 0.060 1
Orientation:Front
Comment: Ground Floor-front wall
Door 1: Solid 20 0.130 3
Orientation: Front
Comment:Ground Floor-front door
Wall 2:Wood Frame, 16" o.c. 222 19.0 0.0 0.060 12
Orientation: Right side
Comment: Ground Floor-garage to house wall
Door 2: Solid 20 0.130 3
Orientation: Right side
Wall 3:Wood Frame, 16" o.c. 185 19.0 0.0 0.060 11
Orientation: Back
Comment: Ground Floor-garage to mech room wall
Wall 4:Wood Frame, 16" o.c. 120 22.0 0.0 0.056 7
Orientation: Right side
Comment: Ground Floor-party wall
Wall 5:Wood Frame, 16"o.c. 222 19.0 0.0 0.060 13
Orientation: Back
Comment:Ground Floor-back wall
Windows:Vinyl Frame:Double Pane with Low-E 13 0.290 4
Orientation: Back
Project Title: Building 6- Unit 61 - Dover Report date: 09/28/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-6- Unit 60- Dover.rck Pagel of 3
Gross Area Cavity Cont.
Perimeter
Wall 6:Wood Frame, 16" O.C. 56 13.0 0.0 0.082 5
Orientation: Left side
Comment: Ground Floor-wing wall
Wall 7: Wood Frame, 16"o.c. 278 22.0 0.0 0.056 16
Orientation: Left side
Comment: Ground Floor-party wall
Wall 8:Wood Frame, 24" o.c. 123 19.0 0.0 0.059 6
Orientation: Front
Comment: 2nd Floor-2x6 front
Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4
Orientation: Front
Wall 9:Wood Frame, 24"o.c. 123 30.0 0.0 0.047 5
Orientation: Front
Comment: 2nd Floor-2x10 front
Windows:Vinyl Frame:Double Pane with Low-E 25 0.290 7
Orientation: Front
Wall 10:Wood Frame, 16"o.c. 379 22.0 0.0 0.056 21
Orientation: Right side
Comment: 2nd Floor-party wall
Wall 11:Wood Frame, 24" o.c. 246 19.0 0.0 0.059 12
Orientation: Back
Comment: 2nd Floor-back wall
Windows:Vinyl Frame:Double Pane with Low-E 7 0.290 2
Orientation: Back
Door 3: Glass 33 0.200 7
Orientation: Back
Wall 12:Wood Frame, 24" o.c. 72 13.0 0.0 0.080 6
Orientation: Left side
Comment: 2nd Floor-left wing wall
Wall 13:Wood Frame, 16" o.c. 297 22.0 0.0 0.056 17
Orientation: Left side
Comment: 2nd Floor-party wall
Wail 14:Wood Frame, 24" o.c. 97 19.0 0.0 0.059 5
Orientation: Front
Comment: 3rd Floor-2x6 front
Windows:Vinyl Frame:Double Pane with Low-E 14 0.290 4
Orientation: Front
Wall 15:Wood Frame,24" o.c. 97 30.0 0.0 0.047 4
Orientation: Front
Comment: 3rd Floor-2x10 front
Windows:Vinyl Frame:Double Pane with Low-E 20 0.290 6
Orientation: Front
Wall 16:Wood Frame, 16" o.c. 296 22.0 0.0 0.056 17
Orientation: Right side
Comment: 3rd Floor-right party wall
Wall 17:Wood Frame, 24" o.c. 191 19.0 0.0 0.059 9
Orientation: Back
Comment: 3rd Floor-back wall
Window 7:Vinyl Frame:Double Pane with Low-E 40 0.300 12
Orientation: Back
Wall 18:Wood Frame, 16" o.c. 285 22.0 0.0 0.056 16
Orientation: Left side
Comment: 3rd Floor-left party wall
Wall 19:Wood Frame, 24" o.c. 156 22.0 0.0 0.054 8
Orientation: Left side
Comment: Loft-left side
Wall 20:Wood Frame, 24" o.c. 156 22.0 0.0 0.054 8
Orientation: Right side
Comment: Loft-right side
Project Title: Building 6- Unit 61 - Dover Report date: 09/28/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-6-Unit 60-Dover.rck Page 2 of 3
Gross Area Cavity Cont.
Perimeter
Wall 21:Wood Frame,24" o.c. 126 19.0 0.0 0.059 7
Orientation: Back
Comment: Loft-back wall
Ceiling 1: Flat Ceiling or Scissor Truss 127 30.0 0.0 0.035 4
Comment: Loft-sloped ceiling-rear
Ceiling 2: Flat Ceiling or Scissor Truss 207 38.0 0.0 0.030 6
Comment: Loft-flat ceiling
Ceiling 3: Cathedral Ceiling 256 30.0 0.0 0.034 9
Comment: Loft-sloped ceiling front
Floor 1:All-Wood Joistlfruss:Over Unconditioned Space 576 30.0 0.0 0.033 19
Comment: Floor over garage
Floor 2:All-Wood J oist/Truss:Over Unconditioned Space 328 30.0 0.0 0.033 11
Comment: Floor over mech room
Floor 3: Slab-On-Grade:Unheated 48 10.0 0.684 33
Insulation depth: 4.0'
Comment: Perimeter slab insulation
Floor 4: Slab-On-Grade:Unheated 44 10.0 0.807 36
Insulation depth: 1.6'
Comment: Interior slabinsulation
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Building 6-Unit 61 - Dover Report date: 09/28/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-6-Unit 60- Dover.rck Page 3 of 3
3/21/22, 11:23 AM
SOw� f1
Town of South Windsor Building Department
I T
t�50R CV:
Building Permit: BLDP-22-83
APPLICANT
NAME: Bob Stanhope
EMAIL ADDRESS: bob.stanhope@tandm.com
ADDRESS: 110 BROOK ST
TORRINGTON , CT 06790
LOCATION
ADDRESS: 14 KENNISON CT
South Windsor CT6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
CONSTRUCT SINGLE FAM TOWNHOUSE W/2 BEDROOMS 2.5 BATH 2 CAR GARAGE&DECK BLD 6 UNIT 14(MUNIS PERMIT
APPROVED 2018)
W
February 8, 2022
BUILDING OFFICIAL DATE SIGNED
-ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT-
PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL-
1l1
3/21/22, 1123 AM
S�wN sF1
Town of South Windsor Building Department
`Y Imo' a?
�LSOR Cp.
Plumbing Permit: PLMB-21-153
APPLICANT
NAME: Jan Gryckiewicz
EMAIL ADDRESS: farmingtonplumbing@comcast.net
ADDRESS: 53 tall timbers drive
farmington, ct 06032
LOCATION
ADDRESS: 14 KENNISON CT
South Windsor CT 6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
plumbing for new 2.5 bath townhouse.gas piping
W
July 26, 2021
BUILDING OFFICIAL DATE SIGNED
""ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT-
-PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL—
1%'
3/21/22, 11:24 AM
.`0 sf�
C
Town of South Windsor Building Department
HVAC PERMIT. HVAC-21-528
APPLICANT
NAME:jay valimont
EMAIL ADDRESS: missductwork@aol.com
ADDRESS: 6397 RO Box
Wolcott, CT 06716
LOCATION
ADDRESS: 14 KENNISON CT
South Windsor CT 6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
Install warm air and AC system.
W
November 23, 2021
BUILDING OFFICIAL DATE SIGNED
—ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT—
"*PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL—