Loading...
HomeMy WebLinkAbout11 STONEFIELD TRL Electric # APPLICATION FOR BUILDING PERMIT Pluinbing HVAC# # , -Ft��'�2�i-e rr-`l Date: 41 2 Sprinkler# Q p 03 Estimated Cost $ FINAL APPROVALS Permit Fee $ Im Building COMPLETE RED BOXED AREAS Occupancy Fee $ 10 Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $ Affidavit A r.forc0. ► SIGN ON REVERSE SIDE pp Total Fee $ ,CjS 00` 11 )� TO THE BUILDING TMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ The undersigned hereby applies to do work according to the following: Applicant _ 111t e 00 ^f o P2 "S Location of Work�fP.ti It Lot No. Applicant's Address � 14s��1=L�CD �� — _ Tel # 940 , 3Qy • zo;i Town S- K�1.. fJ,)/Z Zip —Lic.# Owner Sj,rr z _ Architect Owner's Address Architect's Address Zip Zip ---- Sq. Ft. New Area: 1 st FI. 2nd FI 3rd FI. Total New Area Purpose of this permit City Water J Well J Septic System J Sewer J 361 Ins: HO SP Cert. / Area Bas�nt Garage Approved by Date Use Groups Construction Type Revised 1108 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its use is allowed. Signed W-9111, I hereby apply for a Certificate of Occupancy for the work described in t pkcation for the permit. Signed w DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS Fireside Supply, Inc. 33 East St Hebron CT 06248 Phone "&228.1383 Fax 860-228-3044 W wiv.liresi�sv�ly,net Date: Customer's Name Address Taw np is Code f Howe Phone I has been authorized to apply for a permit(s) for Fireside Supply, Inc.,to perform work at the above address and use our Home Improvement registration and Heating, Piping& Cooling registration numbers as required by law to obtain said permit. Scheduling of Final Inspection A ith the Building Department is the RESPONSIBILTV of the HOMEOWNER. jSin i- J rquiniu _ I e Supply. Inc. STATE OF 1 OF 1 I IOME* I:11I'R(IV L.AIENT CONf RACfOK tili.A.`I ING,t.ir•UNL,&c c OLIN(-U.N11 I LU(0 i►t%(► roR nll FIRESIDE SUPPLY INC 33 B FAST ST JOHN TARQU)NIO HEBRON,CT "M FIRESiDir SUPPLY INC i 33b EAST ST FIRESIDE SUPPLY INC HEBRON,CT Q62411-1308 HIC.e �4R /2015 lll3o/2Btb ITG.03"I1 14VGI 09/01/20111- 08/31/2016 siGry S A L E S O R D E R PAGE:11 FIRESIDE SUPPLY, INC PHONE#: (860)306-1252 DATE: 6/20/2016 33-B East St Hebron CT 06248 CELL k: ORDER#: 52170 489 Old Hartford Rd Colchester 06415 ALT.U: CUSTOMER N: 24322 Hebron 860-228-1383, P.O* CP: Chris K Phone#. (860)603-2041 TERMS: Cash LOCATION: 1 SALES TYPE: $Wn Order STATUS: Back Ordered BILI,TO 24322 SHIP TO Don Maurus Don Maurus 11 Stonefield Trail 11 Stonefield Trail S Windsor, CT 06074 S. Windsor, CT 06074 MFR PRODUCT NUMBER DESCRIPTION ORD ".D B/O PRICE NET TOTAL REGEGF55 GF55 Greenfire Pellet Stove 1 0 $2,591.00 $2,591.00 $2,591.00 S/N 334004180HSR "' DISCOUNT Summer Discount 1 0 $0.00 ($696.00) ($696.00) Cust. interested in removing existing wood stove and installing a pellet stove. Cust came in and gave deposit on GF55 free standing pellet stove. CK to perform site visit on Wed.6/22/16 8am-9am Copy of sales receipt scanned and saved to documnets. CK performed site visit 6122/16. Will need to remove existing wood stove and do level 1 inspection of chimney flue to determne if liner is needed OLYM VP-MA038-4 8"Masonry Adapter 1 1 $90.00 $90.00 $90.00 Connects 3"Pellet to 4"Flex Liner OLYMVP-T03 3"ID Pellet Vent Tees 1 0 $101.25 $101.25 $101.25 OLYM VP-SA03 3"Stove Adapters 1 0 $26.00 $26.00 $26.00 OLYMVP-EL0390 3"ID Pellet Vent 90'Elbow 1 0 $62.00 $62.00 $62.00 OLYM VP-0348 3"IDx 48 inch length Pellet 1 0 $72.00 $72.00 $72.00 Vent OLYM VP-0324 3"ID x 24 inch lenght pellet 1 0 $45.20 $45.20 $45.20 vent OLYMVP-0312 3"ID x 12 inch length 1 0 $34.21 $34.21 $34.21 OLYMVP-0309SL 3"IDx9 inch slip 1 0 $44.00 S44 00 $44.00 "Note. The venting listed above is an estimate and may change. Any pieces not used will be taken off of the bill." .... INSTALLPS Install Pellet Stove and 1 0 $650.00 $650 00 $650.00 Removal/Disposal of Wood Stove "'Add an additional$100 for labor and$300 for materials if we need to install a liner kit after inspecting chimney flue.*' """HOME OWNER IS RESPONSIBLE FOR PULLING THE PERMIT PRIOR SCHEDULED INSTALLATION DATE."" CUSTOMERS ARE RESPONSIBLE FOR ALL PERMITS & INSPECTIONS CT License#HIC0550849 & HTG0398151-HPG1 Deposits and or Down Payments are NON-REFUNDABLE. Fuel is Non-Returnable or Refundable Prices are subject to change without notice. ALL Pricing is Contingent on Verification via a Site Inspection All Discounted Sales are Final- No Refunds or Returns Please Allow four to six weeks for all Special Orders Payment is due in full when services are rendered • INSPECTION FIELD SHEET 07/21/16 vrinted by Peart, Dayshell 10 57 51 INSPECTION: 86554 WOOD / GAS STOVE PERMIT: - STATUS APPLICATION: 201600857 LOC 11 STONEFIELD TRAIL SOUTH WINDSOR PROPERTY ID: 86100011 OWN�,R: MAURUS DONALD P CONTRACTOR: REQUEST BY: PROJ DESC: INSTALLATION OF PELLET STOVE WORK ORDER: INSPECTOR: ROSE RESULT: N/A REQUESTED: PRIORITY: SCHEDULED: COMPLETED: 07/11/16 UNPAID FEES 00 Date Time MILEAGE 00 TIME: TRAVEL ONSITE COMMENTS ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION _7PASS.. A--B010' .,FINAL "• GREENPZRE-PELLET-STQVE MODEL GFSS., 1-----1 \ EXIST. \l.P. N/F / Town of South Windsor / o �J 4p� \ EXIS �5 MON. r -------- -- ---- EXIS T DRIVE I,{ DECK L i Are = 32,615 s.f. .75 A c. Mud UGINdW r1f :•aR1A11U3:: flNflpMp� V �1 .sr10ftM ..GARAGE r Vkns VW i EXIST. NOU .................. EXIS MOA ' Io � , DECK ' to N L - - ----- I 0. ' 0� I \` I I IEXIS A—90'00'00" ( MOA R=25.00' L-39.27' I EXIST. _ f 33.69' MON. N67.54'00"W EXIST. EDGE PVMT. (TW) Miller Road l _CZ31 This survey and map has been prepared in accordance with Sections 20-30 Regulations of Connecticut State Agencies — "Minimum Standards for Survey o E cv � v ED Souln vVinusor BUILDING DEPARTMENT v ,1 .A!+ ;,, (a.N OF SOUTH WINDSUI i his crvun a tn:•t tni, ;>I-n and sPeciflcatlons are tru• copies of the proposed Ouitlling or alterations to bs erected at _ Street mrnts st:�t:.d in application and together with ar d_ with all zoning. filed with plan a d I agr.�e 1'�comply hall be Building and state laws end au:.n orders a+ sndcncy Issued by the Building Departm^r;t during of this application and final Issusnoa of s building permit. V-Signed This plan Is apPrnved s eat�Wtl- �.ndj,.J.nithat orders and ordinances regulating building be compiled with. The" }pad with Conditionally ►tpproyetill Clerb Building Inspector Na. gooa`�3 Cleto`--- "CERTIFICATION OF ZONING COMPLIANCE Proposed building(s), use(s) and/or structure(s) as shown on this plan appear(s) to be in conformance with current South Windsor regulations. Variances and special exceptions may apply. Date i Enf ment Officer one-A'e t►-� i ( _ � (P Lfo 3 MM TECHNICAL MANUAL Freestanding • Fireplace TM InsertPellet Stove ilk i fir.. yGa� WARNING: FOR YOUR SAFETY: Improper installation, adjustment, alteration, Do not store or use gasoline or other flammable service or maintenance can cause vapoursand liquids inthevicinityofthisorany other injury, property damage, or loss of life. appliance. Refer to this manual. For assistance or additional information consult an authorized installation and service must be performed by an authorized installer or service agency. installer or service agency.IMPORTANT: SAVE THESE INSTRUCTIONS T@s(CO by vnrT4 GF55-080 FPI FIREPLACE PRODUCTS INTERNATIONAL,LTD. 69"vendee St,Delta,BC, Canada V4G 1144 10126/09 Safety Note: If this stove is not properly installed, a house fire may result. For your safety, follow the installation instructions,contact local building,fire officials,or authority having jurisdiction about restrictions and installation inspection requirements in your area. The authority having jurisdiction should be consulted before installation to determine the need to obtain a permit. ONE REGENCY rHATxm^LL We recommend that our products be msmuTe installed and serviced by professionals who am certified in the U.S.by the National Fireplace Institute'(NFI) G3 or in Canada by wood Energy Technical ..Training(SETT). ' "°• ONE TREE TM 2 Greenfire Pellet Stove and Insert Technical Manual TABLE OF CONTENTS This manual is designed for the technician in conjunction with the owner's manual. SAFETY LABEL GF155 Pellet Insert.......................................................15 Clearances to Combustibles...................................15 Copy of Serial No. Decal...............................................4 Fireplace Specifications..........................................15 Pedestal&Leveling Legs.......................................15 UNIT DIMENSIONS Hopper Cover&Adjusting Hopper Height..............15 Exhaust& Fresh Air Intake Location......................16 Outside Fresh Air Connection.................................16 GF55 Freestanding Pellet Stove...................................6 Masonry Fireplace Insert Install..............................16 GF155 Fireplace Pellet Insert.........................................6 Positive Flue Connection without a Full Reline(USA only).........................................17 INSTALLATION Control Panel in Surround Panel............................18 Surround Panel Installation....................................18 Important Safety Information.........................................7 plated Door Installation 19 Safety Warnings& Recommendations..........................7 Thermostat Installation................................................19 Removing Pellet Stove From Pallet...............................8 Slider!Damper Set-Up................................ 20 Opening the Door Locating the Pellet Appliance........................................8 TROUBLESHOOTING GF55 Freestanding Pellet Stove...................................9 Clearances to Combustibles.....................................9 Troubleshooting FAQ's................................................21 Alcove Clearances.................................................... Wiring Diagram ...................................... 23 Mobile Home Installation..........................................9 Vent Termination Requirements.............................10 PARTS LIST Exhaust& Fresh Air Intake Location......................11 Outside Fresh Air Connection.................................11 Corner Through Wall Install....................................11 Parts List&Components.............................................24 Horizontal Exhaust Through Wall Install.................12 Pellet Stove Components............................................25 Vertical Rise with Horizontal Termination...............13 GF55 Freestanding Pellet Stove.................................26 Through Concrete Wall with Vertical Rise..............13 GF155 Pellet Insert-......................................................27 Inside Vertical Installations.....................................13 Outside Vertical Installations..................................14 WARRANTY Hearth Mount Installations......................................14 Warranty......................................................................28 Exclusions and Limitations..........................................29 Greenfire Pellet Stove and Insert Technical Manual 3 i i SAFETY LABEL This is a copy of the label that accom -- .. ponies each GF55&GF155. We have i} D printed a copy of the contents here for your reference. s 16. 4 b �l On the GF55 the safety label is located _ on the underside of the hopper fid. z g 9 On the GFI55 the safety label is located i 1 to on the hopper cover behind the top faceplate. • s a a w IN a g� o � w gg sa $ us W m ` a - OIS�Ai� ilit _ _ OR nuor jis a ZLLJ 111a � �=� s � lit Ilia a i z s a �a foil if i s G 4 Greenfire Pellet Stove and Insert Technical Manual UNIT DIMENSIONS GF55 FREESTANDING PELLET STOVE 23t/16" \ 7 • (40mm)A 0 z 19'/1e" (494mm) 34'/e, _�♦�_ (866mm) m 13t/,e" (332mm) 0 247he" (620mm) 24" _ (610mm) +631e (148awn) x 00IM1111919IMI 00010000 0��a��111lift 11810101 . o 01 205 14 Srd (356mm) 12� (319mm) 6"r,e --— (291mm) (25mm) (170mm) - Greenfire Pellet Stove and Insert Technical Manual S UNIT DIMENSIONS GFI55 FIREPLACE PELLET INSERT • (253mm) ir,3• (32 We 24'1,:(610mm) — (1 ) 30'h: (76611a11) ZZ15I16• 2rh (582mm) (587mm) o ,�n• 3lkran s FACEPLATE DIMENSIONS Rayular Facaplata 30•(761mm) i %B, Widin 39-15,,16"i101 A � i Oversize Faceplate 21Vi (A) Heght (B) Width 45-1506'(1167mm) t 21W om-- MDg"r^► 6 Greenfire Pellet Stove and Insert Technical Manual INSTALLATION ELECTRICAL: The use ut a surge Protected power bar is IMPORTANT SAFETY INFORMATION recommended. The unit must be grounded. The grounded electrical cord should be connected to a standard 115 volts(4.6 Amps).60 hertz electrical outlet. Be careful that the electrical cord is not trapped under Failure to follow these instructions may result the appliance and that it is dear of any hot surfaces or sharp edges and in property damage, bodily injury or even death. also must be accessible. If this power cord should become damaged. a replacement power cord must be purchased from a Greenfire dealer. Contact your local building or fire official to obtain a permit and any This unit's maximum power requirement is 520 watts. information on installation restrictions and inspection requirements for your area. GLASS: Do not abuse the glass by striking or slamming the door. Do not attempt to operate the stove with broken glass.The stove uses ceramic To prevent the possibility of a fire,ensure that the appliance is properly glass. Replacement glass must be purchased from a Greenfire dealer. installed by adhering to the installation instructions.A Greenfire dealer will Do not attempt to open the door and dean the glass while the unit is in be happy to assist you in obtaining information with regards to your local operation or if glass is hot.To dean the glass,use a soft cotton cloth and budding codes and installation restrictions. mild window cleaner,gas or wood stove glass cleaner,or take a damp paper towel and dip into the fly ash.This is a very mild abrasive and will Be sure to maintain the structural integrity of the home when passing a not damage the glass. vent through walls,ceilings.or roofs. FLAMMABLE LIQUIDS: Never use gasoline, gasoline-type lantern The, stove's exhaust system works with negative combustion chamber fuel.kerosene,charcoal lighter fluid,or similar liquids to start or"freshen pressure and a slightly positive chimney pressure.It is very important to up'a fire in the heater. Keep all such liquids well away from the heater ensure that the exhaust system be sealed and airtight.The ash pan and white it is in use. viewing door must be locked securely for proper and safe operation of the pellet stove. SMOKE DETECTOR: Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning Do not burn with insufficient combustion air.A periodic check is recom- appliance mended to ensure proper combustion air is admitted to the combustion chamber. Setting the proper combustion air is achieved by adjusting the OPERATION: The ash pan and door must be closed securely for proper slider damper located on the left side of the stove.Refer to"Slider/Damper and safe operation of the pellet stove.Also ensure all gaskets on the door Set-up"section. are checked and replaced when necessary. Wien installing the stove in a mobte home,it must be electrically grounded INSTALLATION: Be sure to maintain the structural integrity of your to the steel chassis of the home and bolted to the floor. Make sure that the home when passing a vent through walls. ceilings, or roofs 11 is structural integrity of the home is maintained and all construction meets recommended that the unit be secured into its position in order to avoid local budding codes. any displacement. Minor soot or creosote may accumulate when the stove is operated under DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING incorrect conditions such as an extremely rich burn (black tipped. lazy SYSTEM OF THIS UNIT. orange flames). DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING If you have any questions with regard to your stove or the above-men- ANOTHER APPLIANCE. troned information,please feel free to contact your local dealer for further clarification and comments FRESH AIR: Outside Fresh Air connection is optional. Must be connected to all units installed in Mobile and"Air Tight Homes-(R2000) or where required by local codes.Consider all large air moving devices SAFETY WARNINGS & when installing your unit and provide room air accordingly. Limited air for combustion may result in poor performance,smoking and other side RECOMMENDATIONS effects of poor combustion. CAUTION: If you have any questions with regards to your stove or the above- Do not connect to any air distribution duct or system. mentioned information,please feel free to contact your Greenfire dealer Do not burn garbage or flammable fluids such as gaso- for further clarification and comments. line,naptha or engine oil. Unit hot while in operation.Keep children,clothing and furniture away.Contact may cause skin bums. SINCE FPI HAS NO CONTROL OVER THE INSTALLATION OF YOUR STOVE.FPI GRANTS NO WARRANTY IMPLIED OR STATED FOR THE INSTALLATION OR MAINTENANCE OF YOUR STOVE.THEREFORE. SOOT: Operation of the stove with insufficient combustion air will result in FPI ASSUMES NO RESPONSIBILITY FOR ANY CONSEQUENTIAL the formation of soot which will collect on the glass.the heat exchanger DAMAGE(S). the exhaust vent system.and may stain the outside of the house.This is a dangerous situation and is inefficient.Frequently check your stove and adjust the slider.rdamper as needed to ensure proper combustion. See "Slider'Damper Setting". CLEANING: There will be some build up of fly ash and small amounts of creosote in the exhaust.This will vary due to the ash content of the fuel used and the operation of the stove.It is advisable to inspect and clean the exhaust vent semi-annually or every two tons of pellets. Greenfire Pellet Stove and Insert Technical Manual 7 INSTALLATION REMOVING PELLET STOVE FROM PALLET To remove your new stove from its pallet, remove the two (2) screws securing the bottom to the pallet. Freestanding: Fireplace Insert: One screw can be easily seen from behind but to access the second screw There is one screw on either side of the bottom.See figure 2. the ashnan must be removed.See figure 1. IWO • I Figure 2.Removing GF155 From Pallet Figure r Removing GF55 From Palet OPENING THE DOOR The door lever can be found inbehind the right side of the door frame To open the door.poet the lever outwards and upwards unfit it unlocks. LOCATING THE PELLET APPLIANCE 1. Check clearances to combustibles.See"Clearance to Combustibles" 5. Locate the stove in a large and open room that is centrally located it section. the house. This will optimize heat circulation. 2. Do not obtain combustion air from an attic,garage or any unventilated g. The power cord is 8 feet(2.43 m)long and may require a grounded space if enough an is available. Combustion air may be obtained from extension cord to reach the nearest electrical outlet. a ventilated crawlspace. 3. Do not install the stove in a bedroom. 4. You can vent the stove through an exterior wall behind the unit or connect it to an existing masonry or metal chimney(must be lined if the chimney is over 6*'(15 cm)diameter.or over 28 inches'(180 cm`) cross sectional area).An interior vent can be used with approved pipe passing through the ceiling and roof. • Greenfire Pellet Stove and Insert Technical Manual INSTALLATION GF55 FREESTANDING PELLET STOVE CLEARANCES TO COMBUSTIBLES ALCOVE CLEARANCES These dimensions are minimum clearances to combustibles,however it is highly recommended that you leave sufficient room on each side(20" / where possible) for servicing,routine cleaning and maintenance. mini"'vm wiam 38"(914mm) This pellet stove requires floor protection.The floor protection must be non-combustible,extending 6"(150mm)beyond the full width and depth of the unit including 6"(150 mm)in front for ember protection Floor Protactkm: Width 36-7116'(934mm) Depth 36"(914mm) 4r(1219mm) 11 i � • 6• ! b Maxomin Depth min. ® nun. 30'1792mm) Figure 5 Alcove Clearances MOBILE HOME INSTALLATION \ • Secure the heater to the floor using the holes in the pedestal of the appliance. • Ensure the unit is electrically grounded to the chassis of your home (permanently). W(ISomm) WARNING:Do not install in a room people sleep in. Figum 3:Fbor ProMdbn, CAUTION:The structural integrity of the manufactured home floor, wall and ceiling/roof must be maintained •Outside fresh air is mandatory.Secure outside a,r connections directly to Back wall fresh air intake pipe and secure with three(3)screws evenly spaced. r(7Ernm) Well Adjacent r51 ) f � II (152mm) 8 � iD *NOTE: If the unit is installed as a comer installation, -4.b1h Pad clearances change from 2"to Y. see"Corner thru Wall FIOO M9 Installation"section. 54W F a-, y Figure 4 Ommum Clearances to Combustibles a c r;�, ui •.,,,. Figure 6 Mobile Home Install Mounting Greerfire Pellet Stove and Insert Technical Manual 9 INSTALLATION VENT TERMINATION REQUIREMENTS Letter Minimum Clearance Description A 24 in(61 call Above grass.top of plants,wood,or any other cornbustrole mater.a:s 48 in (122 cxn) From besidelbelow any door or window that may be opened. (18'(460m)if outside fresh air installed). C 12 in(30 cm) From above"door or witdow Yrat mey be opened. (9'(23cm)if outside hes• air installed). 24 n,5'cn,, To any adjacent building,fences and protruding parts of the structure. E 24 in(61 cm) Below any save or roof overhang 12 in(30 cm) To outside corner. „ 12 in(30 oin) To inside corner,combustible wa1(verbcal and hon aorilal temt,nations). 3 ft(91 ,i a height of 15 h(4.5 m) To each side of center line extetided above natural gas or propar .. above the meter/regulator assembly regulator assembly or mechanical vent. l 311(91 cm) From any forced air irtl"of odrer appliance 12 on(30 am) Clearance to ran-mechanical an supply inlet to budding,or the combustion au irtet io any appliance K 24 in(61 cm) Clearance above rod Wo for verWW terminations. Clearance above paved sidewalk or paved driveway located on public property K E qA1 C D F Doss otrss L 2 Termination Cap H ® Air Supply Inlet Gas Meter ®Restriction Zone y TimrtiRnii not abreE) Figure 7 Albwable exterior vent temrnarion bcaWns. 1. Do not terminate the vent in any enclosed or semi-enclosed areas such as a carport,garage,attic,crawlspace,narrow walkway,closely fenced area,under a sundeck or porch.or any location that can build up a concentration of fumes such as stairwells.covered breezeway.etc. 2. Vent surfaces can become hot enough to cause bums if touched by children.Non-combustible shielding or guards may be required. 3. Termination must exhaust above the inlet elevation.It is recommended that at least five feet of vertical pipe be installed outside when the appli- ance is vented directly through a wall,to create some natural draft to prevent the possibility of smoke or odor during appliance shut down or power failure.This will keep exhaust from causing a nuisance or hazard from exposing people or shrubs to high temperatures.In any case,the safest and preferred venting method is to extend the vent through the roof vertically. 4. Distance from the bottom of the termination and grade is 12'(30 cm)minimum.Thus is conditional upon the plants and nature of grade surface. The exhaust gases are hot enough to ignite grass,plants and shrubs located in the vicinity of termination.The grade surface must not be lawn. 5. If the unit is incorrectly vented or the air to fuel mixture is out of balance.a slight discoloration of the exterior of the house might occur.Since these factors are beyond the control of FPI,we grant no guarantee against such incidents. NOTE:Venting terminals shall not be recessed into walls or siding. 10 Greenfire Pellet Stove and Insert Technical Manual INSTALLATION EXHAUST AND FRESH AIR INTAKE LOCATION OUTSIDE FRESH AIR CONNECTION Outside fresh air is mandatory when installing this unit in airtight EXHAUST: homes and mobile homes. same of unit to cNaarof Au 20-5/16'( t) A Fresh-air intake is strongly recommended for all installations Side o1 omit to center of flue 6-n 16' (t 70mm) Failure to install intake air may result m improper combustion as well as the unit smoking during power failures. Center of uMt b am der of flat 5-314•(14fimm) When connecting to an outside fresh air source. do not use plastic or • FRESH AIR INTAKE: combustible pipe. A 2' minimum (51 mm) ID (inside diameteri steel. aluminum or copper pipe should be used.It is recommended.when you ewe of wtt to artier cf irtlaka 14-5lit'(35 rim) are installing a fresh air system.to keep the number of bends in the pipe to a minimum. Side of unit to center of intake 11-7l16'(291mm) Center of unit to aerltar of Wake 1•(25mm) de INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENTING ouur wall MANUFACTURER. 2't0 Optional (St min) Elbow �5114 (146mm) • Figure 9:Outside An Connection DD8199DG91E19DD91pill0 DDDo88D00�'��'�II�G81D ID� o CORNER THROUGH WALL INSTALLATION 16 20 Slus' Fresh Air Intake (508—) 14 sle (356nwn) 3'(7.5 cm) Wall thimble manufactured by pellet vent manufacturer. 11'ne' ft- 6 nr ti� (291mm) (25nxn) (170mm) Figure 8-Freestanding Inlet and Outlet Locatuvi \\ O 3- (7.5 cm) Figure 10 Comer Installation Greenfire Pellet Stove and Insert Technical Manual 11 INSTALLATION HORIZONTAL EXHAUST THROUGH WALL INSTALLATION Vent installation: install vent at clearances specified by the vent 0 manufacturer. i i A chimney connector shall not pass through an attic or roof space,closet or similar concealed spaces,or a floor,or ceiling.Where passage through EAh"Tube a wall or partition of combustible construction is desired.the installation r p5iivi l or 4'(tom) shall conform to CANJCSA-B365Installation Code for Solid-Fuel-Burning °c Olt '"t Appliances and Equipment.Only use venting of L or PL type with an inside car diameter of 3 or 4 inches(7.6 or 10.1 cm). 1. Choose a location for your stove that meets the requirements stated C in this manual and allows installation with the least amount of interfer- ��� 45•Elbw vM screen ence to house framing,plumbing,wiring.etc. cir Twirroriabwc p 2. Install anon-combustible hearth pad(where necessary) f/ 3. Place the appliance 15"(37.5 cm)away from the wall.If the stove is Pesh Ax Intake MghTenewwiw(m to be set on a hearth pad.set the unit on it. I s+Ka,enquwe 4. Locate the center of the exhaust pipe on the stove.Extend that line to Figure tf:Straight through well installation. the wait.Once you have located the center point on the wall,refer to pellet vent manufacturer installation instructions for correct hole size NOTE: and clearance to combustibles. •Some horizontal through wall installations may require a"T'and 3 to 5 feet(91 to 152 cm)of vertical pipe outside the building to help naturally 5. Install the wall thimble as per the instructions written on the thimble. draft in the unit Maintain an effective vapour barrier in accordance with local building codes. •This may be required if a proper bum cannot be maintained,after the stove has been tested and the airflow set. 6. Install a length of 3"(76 mm)or 4'(101 mm)vent pipe into the wall thimble.The pipe should install easily into the thimble. •This is due to the back pressure in the exhaust caused by airflow,around the structure. 7. Install the fresh air intake See"Outside Fresh Air Connection'sec- tion. •All sections of pipe must have three 13)screws evenly spaced and all horizontal and vertical vent sections located within the house must have 8. Connect the exhaust vent pipe to the exhaust pipe on the stove.Seal a bead of high temperature silicone installed on the male end of the pipe the connection with high temperature silicone. before installation to create a gas tight seal. 9. Push the stove straight back,leaving a minimum of 3-(8 cm)dear- •The termination must be 12 inches(30 cm)from the outside wall and 12 ance from the back of the stove to the wall. Seal the vent pipe to the inches(30 cm)above the ground. thimble with high temperature silicone •A 45"elbow may be used in place of the termination cap(or stainless 10.The pipe must extend at least 12"(30 cm)away from the building.If steel termination hood). necessary,bring another length of pipe(PL type)to the outside of the home to connect to the first section.Do not forget to place high tem- perature silicone around the pipe that passes through the thimble. Wall framing 11.Install a vertical pipe,or if all requirements for direct venting are met. install vent termination.The stainless steel cap termination manufac- Horizontal frame lured by the vent manufacturer is recommended.However,when the for thimble vent terminates several feet above ground level and there are no trees, plants.etc.within several feet,a 45`elbow can be used as termination. The elbow must he turned down to prevent rain from entering. Vent pipe Termination i �P Wall thimble Figure 12 Straight through Wa1IrWaflatoon-Side View 12 Greenfire Pellet Stove and Insert Technical Marual INSTALLATION VERTICAL RISE WITH HORIZONTAL INSIDE VERTICAL INSTALLATIONS TERMINATION INSTALLATION 1. Choose a stove location that is meal. Refer to"Locating Your Pellet A 45 elbow may be used in place of the termination cap(or stainless Appliance'section. steel termination hood). 2. Place the unit on the hearth pad(if installed on a carpeted surface) and space the unit in a manner so when the pellet vent is installed vertically,it will be 3"(76 mm)away from a combustible wall. Termination cap 3. Locate the center of the fresh air intake pipe on the unit.Match that � 90'elbow ` center with the same point on the wall and cut a hole about 2'(51 mm) in diameter. Wall trami 4. Install the fresh air intake pipe. Vertical section of vent pipe 5. Install the tee with clean out Horizontal frame WIM swp for thimble 6. Install the pellet vent upward from there. When you reach the ceiling. make sure that the vent goes through the ceiling fire slop. Maintain a 3'(76 mm)distance to combustibles and keep attic insulation away from the vent pipe.Maintain an effective vapor barrier. fl Il'J' 7. Finally,extend the pellet vent to go through the roof flashing. Clean LJ out tee B. Ensure that the rain cap is at least 24'(610 min)above the roof at the shortest side of the vent. Wiii thimble J Figure r3 Thro h,Wall with Horizontal Termination Ram Cap-ensure Cap i5 9' u9 least 2 feet(610nvn)above the roof at the lowest point THROUGH CONCRETE WALL Storrs collar WITH VERTICAL RISE INSTALLATION Roof flashing A 45'elbow may be used in place of the termination cap (or stainless steel termination hood)- Roof rafter This is the recommended installation to use if there is a concrete or retain- Fire stop with ing wall in line with exhaust vent on pellet stove. Support Collar Ceding gist The termination must be 12 inches(30 cm)from the outside wall and 12 incbes(30 cm)above the ground. H " ri l kame Ax tirrrre w111111 Vertical vent pipe 90'rdDow Y1411 fr�nrp Clean out tee with - Pipe adapter 11 i i 1 i Conrsew b1 / 1 NOTE / All vent sections must maintian T (76 mmi clearances to combustibles Figure 14 Vertical rise with Honzontal Termination Figure 15:Inside Vertical Installation. Greerhre Pellet Stove and Insert Technical Manual 13 INSTALLATION OUTSIDE VERTICAL INSTALLATIONS HEARTH MOUNT INSTALLATION To accomplish a outside vertical pipe installation,follow steps 1 through 5 1. Lock fireplace damper in the open position. in the'Inside Vertical Installation"section and then finish it by performing 2. Install a positive flue connector at the fireplace dampers. the following(refer to Figure 16). 1. Install a tee with clean out on the outside of the house 3. Connect a dean-out tee or a 90`elbow to the exhaust pipe. 2. Install PL vent upward from the tee.Make sure that you install support 4. Install flexible stainless steel liner or listed pellet vent to the top of the brackets to keep the vent straight and secure. chimney 3. Install ceding thimble and secure the flashing as you go through the roof. 4. Ensure that the rain cap is approximately 24" (610 mm)above the roof. Damper Removed or Fastened Open Mantel Rain cap _ Mmnnum K(20 an) from top of stove Zc '61Cmi F Iashmg I Clean-out Frest�ar retake -. - LIM V 5nould com from ?i. (150 Ichrnney.It holes/ 3"(7 5 tire) keady exist fresh-aw Floor Clearance intake can be taken _---- Protedion Mrougn back of 00 3^ fireplace or w— �y Fireplace `--Cumtwsbole Fk-r t7 5cm) --—" bra ort ineFpura 17.Hearth Mount-Side Yrew bra . cket j ► Tee wAn J \ Geanout Type'L `PL"o+ am"vent F•esr ar intake Figure 16 Outside Vertical Instaliatron 14 Greenfire Pellet Stove and Insert Technical Manual INSTALLATION GFI55 PELLET INSERT CLEARANCES TO COMBUSTIBLES INSTALLING HOPPER COVER AND ADJUSTING HOPPER HEIGHT The fireplace insert is certified to be installed into a masonry fireplace only and/or zero clearance wood burning factory built fireplace where allowed The hopper cover initially comes upside-down on top of the hopper.To by local codes.This model includes a surround faceplate and a pedestal. install the hopper When installing this unit, ensure that the,pedestal is removed from the cover flip the cover over and fasten in place with four inside of the hopper and installed on the bottom of the unit. T-20 screws(see Figure 24). • From the body of the heater to the The back height of this unit can be set to one(1)of three(3)heights'.195; Side Wall 8"(203mm)minimum (495 mm).21%:(537 mm),22/."(565 mm).The hopper should beset to Facing on Masonry Fireplace 8"(203mm)minimum the maximum height that can be used in the installation. 8"(203mm)mantle: 8'(203mm)minimum To change the height of the hopper back up or down,remove the seven FIREPLACE SPECIFICATIONS (7)T-20 screws, three(3)on each side and one(1)on the back.The screw placement is shown Figure 25.Move the hopper assembly to the required setting and replace the screws. When the hopper back is in Your fireplace opening requires the following minimum sizes: place it is recommended that silicone is used to seal the bottom lip of the He9W 551bs hopper(standard) 72?S-(578y„) hopper back and sides. 42 IDs hopper(adjusted) 19.5-(49&nrn) Aidth 26" (660mm,� Depth 1e��3l1mm) INSTALLATION OF PEDESTAL AND LEVELING LEGS There are two parts to the GF155 insert pedestal and they can be found O inside the hopper.Place unit on its back.Two(2)hex head screws are used on each side of the pedestal(refer to Figure 22).Using a 5/16"wrench or socket.secure the pedestal to the bottom of the unit. OPTIONAL There are two(2)leveling legs and they can be found inside the manual bag.Each leveling leg consists of a long bolt,a hex nut,a washer,and a square boltwith clip(see Figure 23).For installation of the leveling legs the unit should be on its back and a`- "wrench is required for adjustments Install the square bolts into the square holes in the back corners of the bottom. The square bolt should be inserted from inside the unit so that the clip will be facing up. FV"24:Hopper Cover Screw FUcement. Thread hex nut onto the bolt till it is approximately 1"(25 mm)from the bolt head,slide washer onto boll. Thread the bolt into the square nut so length of the bolt shown is the approximately height needed for leveling When the unit is up right and the bolts can be adjusted to the exact height required.To lock the bolts at a height tighten the hex nut and washer against the square bolt LOP Figure 22 fnslBMhpFie0dfal. Fpuro 25:Hopper Extension Screw Plecienient. Rpm 21 Spuw 80R Greenfire Pellet Stove and Insert Technical Manual INSTALLATION EXHAUST AND FRESH AIR INTAKE LOCATION MASONRY FIREPLACE INSERT INSTALLATION EXHAUST: The GFI55 requires a surround faceplate and a pedestal.When Installing this unit,ensure that the pedestal is removed from the inside of the hopper one of unit to COON of flue 9.1116-(229n") and installed on the bottom of the unit. Refer to"Installation of Pedestal and Leveling Legs'. Side or unit to center of flue 6-t i8' (156mm) Center d Will lo ON-No dlllue 5-3r4-(146nert) Adjust hopper height-refer to"Installing Hopper Cover and Adjusting Hop- per Height"and assemble surround panel.See"Installation and Removal FRESH AIR INTAKE: on Control Panel in the Surround Panel-and"Assembly and Installation of Insert Surround Panels"before starting installation. tape d we to t w ilm d Intake 3-7/18'(87mm) Anon-combustible hearth pad must cover combustible flooring underneath. Side of unit to center of intake 10-7'8'(277mm) as well as 6'(150 mm)in front of the heater and 6'(150 mm)to the side of the healer Career ofunit to tender of intake 1•(25mm) INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENTING t• Install the hearth pad,if required. MANUFACTURER 2. Lock the fireplace damper in the open positron. 3. Install a positive f ue connector at the fireplace damper. _ 4. Connect a tee or 90'degree elbow to the exhaust pipe. fs�lr 146rniri 5. This fireplace insert must be installed with a continuous chimney liner of 3 or 4'diameter extending from the fireplace insert to the top of the chimney. The liner must conform to type 3 requirements of CAN/ULC S635. For lengths below 25'use 3"and increase to 4'if longer. •e• 6. (Recommended)Install fresh air intake either through the back of the e 7 fireplace or through the positive flue connector. e TI ' (229rtvn) Rain Cap j Fraah-air intake 3 The (87e+Tm)TL Steal Plateor Flashing T 4�—'e try f 1• 8 4°• (277mm) (25mm) (t56nvn) Figure 26 Insert Inlet and Outlet Location OUTSIDE FRESH AIR CONNECTION Outside fresh air is mandatory when installing this unit in airtight homes and mobile homes. A Fresh-air intake is strongly recommended for all installations Failure to install intake air may result in mproper combustion as well as Damper Removed the unit smoking during power failures or Fastwied open When connecting to an outside fresh air source, do not use plastic or Mantel(8-deep) combustible pipe. A 2` minimum (51 mm) ID (inside diameter) steel. aluminum or copper pipe should be used.It is recommended when you are installing a fresh air system.to keep the number of bends in the pipe Min.8-from to a minimum. lop of stove ouui* Ckar*uul tee well MM.8� it+,Dies already e.,a imam-ar irwks can r' � be taken d iroupti an Protectior 1D 0, L-L hack d sn tkepacw - (St mwl cbow or ` 1lirouplf the aMi Masonry Fireplace Comtwsnde FF ioa dump. Fom 28 installation of Fireplace Insert, Figure 27:OuW*Air Cdnnsctlon. 16 Greenfire Pellet Stove and Insert Technical Manual INSTALLATION When installing the insert into a masonry fireplace DO NOT remove any When installing the fireplace insert into a zero clearance fireplace.where bricks or masonry,with the following exception.masonry or steel,including allowed by local codes DO NOT cut or modify any factory firebox parts. the damper plate, may be removed from the smoke shelf and adjacent If the fireplace insert does not fit into a zero clearance fireplace we recom- damper frame if necessary to accommodate a chimney Inver. Provided that mend you use an Greenfire freestanding model and install as a hearth their removal will not weaken the structure of the fireplace and chimney. mounted unit. Install a 3"(76 mm)flex pipe from the stove to the top of and will not reduce protection for combustible materials to less than that the chimney.Refer to"Hearth Mount Installation". required by the national building code. POSITIVE FLUE CONNECTION WITHOUT A FULL RELINE • (USA ONLY) This unit does not require a full reline(in USA only)when installing into a masonry fireplace, however, it is recommended to ensure proper drafting of the appliance. This type of application is not recommended. IMPORTANT:Ensure the chimney and firebox are cleaned and free of all debits.including soot and ashes,before proceeding with this installation. If it is not clean soot maybe blown into the room through the units blower The exaWq chomy ciao Ensure the fireplace and chimney have not deteriorated in any way. It ,,,r;y. there is any sign of corrosion or damage in the chimney the unit can not be installed.This unit can be installing in a masonry fireplace built to(UBC be 37 or ULC S628 standards)or a factory built fireplace(built to UL 127 or �+*hh+^o—� M"Wl W4 maps r.mo"d ULC S610 standards) TopaV ww%m►'fXCbs~"o mire a+!� (IS?Cm)n*WrWn 1. Install the hearth pad. The floor 6"(150 mm)in front of the unit and 0ors Mantel(e.deep) 6"(150 mm)to each side of the unit must be protected with a non- combustible hearth pad 2. The vent connector from the insert must extend a minimum of 18' !r from by of slow above the chimney seat plate.The chimney seal plate area must be sealed to prevent the exhaust from the chimney from coming back into the fireplace and prevent air from the fireplace from entering the chimney which will affect proper drafting of appliance. A qualified installer should evaluate the existing fireplace to determine the best method for achieving a positive flee connection between the vent pipe or liner and the chimney.Whatever method used must effectively seal the area to prevent room au passage to the chimney Min.6"-- cavity of the fireplace. A couple examples of Approved Methods of Achieving a Positive Flue Connection are FArY V,:lc�:� a)Secure a seat-oft plate(i,e. 22-gage sheet steel)in the masonry ra„ -yF Co Lin tin o1 fireplace throat using masonry screws. Figure 29 Masonry fireplace posMve flue installation. b)Pack non-combustible material(re.roc;kwool)around the vent pipe or using a flue adapter. 3. Set leveling leg to approximate height. IMPORTANT:The chimney seal plate must be removed for the annually chimney cleaning as ash will build up on top of the plate. Be aware that this type of application may have a negative effect on per- formance not covered under warranty. Greenfire Pellet Stove and Insert Technical Manual 17 INSTALLATION INSTALLATION AND REMOVAL OF CONTROL PANEL IN THE SURROUND PANEL When installing the circuit board control panel into the surround panel, the surround does not need to be assembled. The circuit board will be found in the firebox. i Place the circuit board control panel on the backside of the right surround panel so the hinge is or the outside and the top and bottom holes on the control panel line up with those on the surround.Attach using two(2)T- 20 screws through the front of the surround into the circuit board control panel(see Figure 30). 4 After the surround has been assembled and is ready to be installed on the !f unit plug the wiring harness into the control panel(see Figure 311. Plug I I REMOVAL: When maintenance is required on the unit the surround must be removed. Pull the surround straight up till it stops then pull R out about 4'(10 cm) and rest the surround on top of the unit while the control panel is removed or disconnected. If electrcal connection is required for the maintenance remove the circuit board control panel from the surround. \ If electrical connection is not required for the maintenance remove the wiring harness from the bottom of the circuit board control. Folite 30:Pa9 t Path F*"31:RW i9& -Fina Back. ASSEMBLY AND INSTALLATION OF INSERT SURROUND PANELS The trim set for your surround panel must be installed before installing the 2. Place the assembled surround panel around the stove.align the slots surround panel onto the unit,if not already done with the screw heads.Push surround in then down to engage the sur- round slots on the mounting screws(see Figure 33).Make sure the 1. To assemble the surround panels lay the panels face down on a soft top surround panel sits flat behind the stove top. flat surface and align the outer edges of the sides with the top panel. Using four(4)T-20 screws up through the side panels into the top(see Figure 32). I k • i ,I • \ il, Figure 33.installed Surround Panel. Figure 32 Assembled Surround Panel 18 Greenfire Pellet Stove and Insert Technical Manual INSTALLATION PLATED DOOR INSTALLATION THERMOSTAT INSTALLATION TO AVOID PERSONAL INJURY DO NOT REMOVE OR REPLACE COVER WHEN PELLET STOVE IS HOT! 1. Install the thermostat by connecting a low voltage millivolt thermostat to the circuit board jumper location shown below.Connect 2 x 18 gauge wires from the connection points on the back of the control board to TOOLS REQUIRED: the thermostat(see figure 38). a) 11132"socket 2. Choose a location for the thermostat,which will effectively heat the REMOVAL OF DOOR COVER: desired area.Do not install close to the unit,typical installation is When stove is off and cool.open the door. Remove the four(4)#8 hex 1Oft-20ft away in an open area(not hidden). nuts around the inside of the glass retainer showr in Figure 37. 3. Review each of the three control switch positions with the Remove door cover from door by gently sliding the studs out of the holes. consumer. If it is difficult to remove the cover, the glass retainer may be pinching the threads on the studs.Slightly loosen the four(4)screws(by each of the studs). REPLACEMENT OF DOOR COVER: Stine new door cover into place and hand tighten the four 14)#8 hex nuts around the inside of the glass retainer.Ensure the four screws are also hand \ tight and close docr Do not overtighten or you may break screws. Clean all plated surfaces before starting the stove. Refer to"Clean- wn and nWer ing Plated Surfaces in Routine Cleaning and Maintenance in the Owner's tesemostat ohs here. Manual. Fi gure 38 Thermostat wire placement 1 _ I Figure 37:dryer side of door. Greenfire Pellet Stove and Insert Technical Manual 19 INSTALLATION SLIDER / DAMPER SET-UP THE SLIDER I DAMPER MUST BE SET AT TIME OF INSTALLATION, The easiest way to make sure that an efficient flame is achieved is to IT IS USED TO REGULATE THE AIRFLOW THROUGH THE PELLET understand the characteristics of the fire. STOVE. •A tall.lazy flame with dark orange tips requires more air-Open slider A Qualified Service Technician or Installer must set the Slider (Pull out)slightly. Damper •A short,brisk flame,like a blowtorch.has too much air-Close slider The slider damper is used to regulate the airflow through the pellet stove (push in)slightly. and is located behind the left cab side(refer to Figure 39).The door must .If the flame is in the middle of these two characteristics with a bright yel- be open for the cab side to be removed on all models. On freestanding lowiorange.active flame with no black tips then the air is set for proper model loosen the two T-20 torx screws,one above and one below hinge, swing open left panel to access.On insert model remove the two(2)T-20 operation. torx screws on the front,one above and one below hinge,and the one T-20 at the top of the cab side under the top front. The combustion exhaust blower is a variable speed blower controlled by the heat output button. This blower will decrease the vacuum pressure inside the stove and as the heat output button is turned down.The vacuum pressure inside the firebox will increase as the combustion exhaust blower increases in speed(higher heat output setting). If the fire should happen to go out and the heat output indicator has been set on the lowest setting.the Slider Damper should be pushed in slightly decreasing the air in the firebox. If,after long periods of burning,the fire builds up and overflows the burn pot or there is a build up of clinkers,this would be a sign that the pellet quality is poor,this requires more primary air,the slider damper must be pulled out to compensate. Pulling the slider damper out gives the fire more air. Figure 40 Eftient Flame. Exhaust Blower L/ o ® Exhaust e Channel • • • -Slider • e Damper O e Note:Some parts Figure 41 Hole for Pressure test with Magnehelic Gauge have been removed in order to see components more dearly. SPECIAL NOTES: Pellet qual ly is a major factor in how the Pellet stove will operate.If the Fom 39 Slider,Damper pellets have a high moisture content or ash content the fire will be less efficient and has a higher possibility of the fire building up and treat ng clinkers(hard ash build-up). Taking a reading of vam m pressure inside the Firebox with a magnehelic gauge can be used to set the slider for best combustion.The slider damper should be set only on a hot stove(operating for thirty(30)minutes or more) by placing a Magnahehc Pressure Gauge in the firebox.The reading can be taken from the':e`(3 mm)hole located in the front of the firebox under the door(see Figure 41).The best settings are a reading of approxi- mately 0.1"to 0.12"of water column on the high fire setting. Some fuels may require higher or lower settings. 20 Greenfire Pellet Stove and Insert Technical Manual A J v • William R. fanning Fire Chief Z � V � Fire Marshal so "0 Fire Department September 30, 1999 on August 9 , 1999 I witnesed the removal of a 1000 gallom tank at 11 Stanfield Trail So. Windsor, Ct. It was Clean and dry. William R. Lanning Fire Marshal 1175 Ellington Rood •South Windsor, Connecticut 06074•(203)644-8547 i ' 223.4 j0 ,- r N C T . o p 9• a05.96't r 31. �if��.j��r� s.. 6 7� v - � m (�s> slIz0 28 (s to E- 30 -� . 2 -1`• Co 400, \_` N o 01) ae3 ' r ' ' 3 Ro c � 9 . 0 9 a 3 D 199S South Windsor BUILDING DEPARTMENT TO THE D91LDING DEFT. TOWN OF SUCTH 7-ADSC. This certified that this plan and specifications are true copies of the proposed building or alterations to be erected at [ �+ r S_6A> �(e� Street t gether with amendments stated in application and filed with plan and I afire^to comply with all zoning, nuilding and state laws and such orders as shall be issued by the Building Department during pendency of this application d final Issuance of a building permit. Signed Thie plan is approved subfect to the condition that orders and ordinances regulating building shall be complied with. Gon tienalty Approved These filed with Gsuildlnit Mspcctor Clark u;ste ���'.1 U lN0• ���� C;iL'xJ4-Ji�',Af1K)N OF ZONING ' Proposed building(s), use(s) and/or g x o as shown on this plan appears) to Le A conformance with current So:-,dh regulations. Var iancius and special except;..:-, may apply. Date ; ng Enfcrcemsnt O',Icer • � o PARCEL "A" s 4 AREA = 34,700 S.F. 0.80 ACRES N pg'02 46'v1 s 127.40 V � � N �• N AREA = 0.75 17 pETENt�ON _-- 8 I►b t tr 1 3�.4 ti T. AREA 32 615 S.F. = cm*oON V. 0 . � ;�; �- -� � M � tom• �,,,•zo� �gA1t 0. cw 1�11wr I PARCEL "Boo Z2e,4� �vtl �??•Os ��O AREA = 13,650 S.F. 0.31 ACRES ti R' 150.00 l= 103.26 E C E � Y E ,IUl 1 6 2009 P b wtn Vviiwsm BUILDING DEPARTMENT IU jn: tl....Jtr;: .ter. , _I v !a ..,.._. Phis c;"trti d to—, ,; elan nre sp='iiic.11r.as'.-re Z". copies of the proposed Duitdaig or alterdtions to to. erected at ^ _ J stree tog^then with a !Invents et.1t��U in application arc 11l.�d v:ath plan erd I igr.-r io comply Nlth Al Z�nir,g euiluing and stcte lows � .,,ui crders es "t"1I o� issued by the euUding bepartmrnt during pendr-o" of this application and tinal issuance of a building permit. Signed This plan Is approved subject to the condition that orders and ordinances regulating building shall be complied .,ith. Conditionally Approved These flied with Building Inspector C't" I'%.te No. CERTIFICATION OF ZONING COMPLIANCE Proposed building(s), use(s) and/or structure(s) as shown on this plan appear(s) to be in conformance with current South Windsor regulations. Variances and special exceptions may apply. Date ; -'k9 fl fin OAkM APPLICATION FOR HVAC PERMIT DEPARTMENT DECISION TOWN OF SOUTH WINDSOR PERMIT# Application is hereby: BUILDING DEPARTMENT 1306LJ 17 APP OV 1540 SULLIVAN AVENUE Bldg.Permit# y 1 644-2511 ext. 230 Date — Building Inspector Application must be printed or typed FEE SCHEDULE / ocation of Job: $0-$1,000=$15.00 SrGiZ L �y 7— —a`j Over$1,000= Street No. Street Lot No. $15.00 per$1,000 or any fraction thereof Tenant Designation Apt.No. APPLICANT 147J'e-`Jf 0` ` (;;45 S«lGc� APP ICANT ADDRESS 136 j Itfe-l-A G f. e)6 0 y APPLICANT'S PHONE/# c�GG S 8—G7 OWNER .`OW,N Sfq OWNER AD RESS �5,e OWNER PHONE ESTIMATED COST$ 7G O C�CJ C (� IS THIS A CONTRACT COST? Yes LNo FEE ENCLOSED$ TYPE OF JOB: Z�� �SOR•COS ` New Installation Alteration/Addition/Repair Revised 03/05/10 APPLICATION FOR HVAC PERMIT(Continued from reverse side) TYPE OF SYSTEM: TYPE OF BUILDING: O'FIEATING f-RESIDENTIAL ❑ A/C ❑ COMMERCIAL ❑ VENTILATION ❑ INDUSTRIAL HEATING ❑ STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. ❑ HYDRONIC ❑ WARM AIR ❑ UNIT RADIANT HEATER EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION DESIGN TEMP.OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT LOSS(BTUH) OF(HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL HEATING EQUIPMENT(INCLUDING MAKE&MODEL NO.) GROSS HEATING CAPACITY(INPUT-BTUH) /T0'r-) NET RATING(OUTPUT-BTUH) //;7 OG d TYPE OF FUEL tpIL-GPM OIL TANK LOCATION: ❑ INSIDE ❑ OUTSIDE CAPACITY 'GAS-INPUT LPG TANK CAPACITY ELECTRIC-KW AIR CONDITIONING DESIGN TEMP: OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT GAIN(BTUH) (HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING EQUIPMENT(INCLUDING MAKE&MODEL NO.) TONNAGE COOLING CAPACITY(BTUH) VENTILATION DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT) TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM) (PLANS MUST ACCOMPANY APPLICATION) / FURTHER DESCRIPTIONPF WORK �C/y�i��.00 l� /jl,�� /L '�•�/ �a� �-t THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. CONTRACTORS LICENSE NO. TYPE STATE SIGNATURE OF APPLICAN DATE S f�. o PARCEL "A" AREA = 34,700 S.F. 0.80 ACRES ^ r' .ti N 08.02�46'W � Z C �Z7.40 V � � �• o AREA = 3' 0.75 A r ' �) r 1 3�►Q,.Te i. AREA 320615 S.F. y bUT�-1NE�`� `zcr`w�o .75 A S .o ha 2 55 .Og9 0 cD O_t� R= 100.00 L- 68.84 �y 1z6 4� PARCEL "H" �V�2 N??•ps,� qo� •• , es�1 AREA = 13.650 S.F. is?t �E 0.31 ACRES �^ R° 1$0.00 L= 103.26 South Windsor BUILDING DEPARTMENT mow •,sf hia1J j1 l� "y Joydadsul Rujolloil { 411m Pall; 02941 peil Allmolupso 411m Po"d"ima eq Ila4s Sulpllnq Sullelnsai saoueulpia pue ssapatl ie4; uolllPuo of ;oalgns pe.oidds 61 ueld slily �psoats ,Sjwjgd 4ulpllnq a to so s1 Isul1 pue uoflealidde slat to wapuad Pui.lnp luawUedaq 8uTIM8 a4; Aq panssi I!F-12 se sjapjo 4ons pue smel a1,';s pile SutpPnB '1',os' lie ill!.Aidwoo o;aalHe I pue veld 111.w pagl u4314rWidds u a e s s uow uea1B ! D i t 3 p 4;,.+ iayldlEol if P-13a,a "1 n1^ m 9slpei.xl Pasod.lM ov) 10 s Aden t l ►Uiv Li�lvll la — L�.c.u'r`1l11 v`...."'opcsed buildings), use ay X3d' =s scowl and/or structures; �nforrna,7ce n '•tip to be in c-gulations b`. ,. , a -lay apply ti sp. _. :; - �:.eptian to 0; cer a 223 4 53o.e2� N � ti N � T N *554.2G' • 2 in 4 0 0 557.49' 5.90' �O'S.90' a05• 3 6 7 OD V � � m n r%196 N 400, ab o c. 2q a83 ' Ro �� so +so. N 3g N ) a�a Sic• 3�9> s 110 . ;S Sao ago. � 34 • >s�c rJs3) -zoo 3C a • >s 33 rA, tv > ro 32 iVQ r _ f � ` r — O� °!Z DY ZI — i J1 11 , I 1 1 1 I ow ` A AL I %� -�,•fit / I t I I v � fl I � I / I — I I , I , I , I I I � I I I I \ I I I I Iml \ Iml I \ I I =�Ie— II \ 1 I • I II ' � Lc�lllllAw- .s� s 0 PARCEL "A" o AREA = 34,700 S.F. __ so �► _ 1 __ 0.80 ACRES ti s a N 08.02'46" W 127.40 a °' v V �= o AREA = 32,560 S.F. 0.75 ACRES 17 ' AREA 32,615 S.F. 2 ouT�1�v� R�ho,,�o cE E .75 A S "TOWN CT-M z rn 9• 49 isezi ago �''��� 15p•� 2��12 488a s \ / N +s.2t 1ai22:tti 4 Boa. S`�0 ?. c4 Os.oa.f zpag a � N 172p'11"W Slp� R' 100 60 .00 L= 68.64 a, PARCEL "B" 001, ,y oo gs.z `v�2 ?6?iLb•F AREA = 13,650 S.F. � 0.31 ACRES R= 150.00 L= 103.26 n Electric# sk APPLICATION FOR BUILDING PERMIT Plumbing# 11 STONEFIELD TRAIL Date: 5 HVAC # No 26619 Sprinkler# j FINAL PRO Estimated Cost $ 6) Building/ G .+ COMPLETE RED BOXED AREAS Permit Fee 3 If,Z Engineer TYPE OR PRINT ONLY Occupancy Fee $ Affidavi SIGN ON REVERSE SIDE Appr.for N f < Total Fee $ TO BUILD D P MEPf�,TO OF SOUTH WINDSOR,CT (Additional Cost) $ The undersigned hereby applies to do work according to the following specificatiorw. ab Location `C plc /✓�� Lot No. Side of Street Zone Applicant/ i(�- �L Tel # G 4f4/ C(r ( 3Address / .6-5 D{ 0,A1/it c 671 Zip L►�, Lic. # 06 5"3 q q7 Owner d-�� ��.` , Addres cat Architect Address LA Sq. Ft.New Area: 1st FI. 7)-L) 2nd FI. 3rd Fl. Total New Area #Rooms #Lavatories #Bathrooms #Garages Purpose of this permit: 3 L,, zt, -t,l tt 4- -f LvtJ (k,✓ City Water ❑ Well ❑ Septic System ❑ Sewer ❑ Ins. H.O. Cert. Area Basement Garage Approved by •a Date (I 15111 Use Group a4 Construction Type R.vs.d 1/97 I hereby agree to conform to all the requirements of the laws of the State of Connecticut and the Ordinances of the Town of t, South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which buildir aA its use is alkrived. Signed I hereby apply for a Certificate of j the work described in this application for the permit. Stgf111ld - DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS , Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- 99-26619-B 14,000 BO1 FOOTING 11/22/99 DCJ A E03 ROUGH 02/25/00 DCJ A B03 FRAMING (ROUGH) 12/26/06 JFF A WITH OWNER B10 FINAL 12/26/06 JFF A WITH OWNER BUILDING INSPECTION DEPARTMENT TOWN of SOUTH WI OR, ONNEC. ICUT C E R T I I C A 'I' L O P ; C P A. N C Y R< ZONE: A30 �; x r ?( °� E, ember 26 2006 This is to certify th 9011 STor1EfiIELD TRAY $CTEDnr hermit No. 26619 conform gubgantiallx t.Q t:he recuirement� �jP',the Cpnnecticut Basic Building co enc ©, n s of thecfwf� f South Windsor and ,3i ft a'yap rove �f pupancy as indir,,4t l below I ' s ,�t+463X+, Approved for Occt Bn�y T HED 2- ' F A4 2.1 X 30.1 � �4 Use Group: R4 :. Constr. Type: 5B w ng' Off cial-- 4N, > 'fie` - •' .'',r. ,.:a""'r' Notice: If this certiika a e le; to "i�Y estTiV .a duplicate should be obtained imme Department. Any change or extension of the use herein approved requires a new certificate of occupancy. gown O f c�OuEiz ' VVindiOZ 016H26504963 1540 Sullivan Avenue $00.390 *., �.�` South Windsor, CT 06074 c e• = 01/23/2007 �u.. o jk Mailed From 06074 \ - US POSTAGE Carolyn Frattaroli .� 11 Stonefield Trail South Windsor, CT 06074 NIXIE 061 1 39 01/26/07 RETURN TO SENDER ATTEMPTED -- NOT KNOWN UNADLE TO FORWARD CC: 0607427eSOl *0144-OS729--23-45 ,:r Electric # APPLICATION FOR BUILDING PERMIT Plumbing# 11 Stonefield Drive HVAC# Date: Sprinkler# 900283 Estimated Cost $ /. f o FINAL APPROVALS Building COMPLETE RED BOXED AREAS Permit Fee $ Occupancy Fee $ Engineering TYPE OF PRINT ONLY Eng. Insp. Fee $ Affidavit Appr.forCO. ► SIGN ON REVERSE SIDE / .�✓,•;,a Total Fee $ TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ The undersigned hereby applies to do work according to the following: Applicant f764&4-�:Q I•' LocationofWork s LotNo. Applicant's Address 2&,N1 Tel # c� Town s � �� Zip 7� Lic.# Owner Architect �— Owner's Address Architect's Address �! Zip Zip Sq. Ft. New Area: 1 st FI. 2nd A. 3rd FI. Total New Area Purpose of this permit ��flOf i� ;5 /f+ �fl • /V ' City Water Well 0 Septic Systems Sewer❑ Ins: HO S Ce Area Basement Garage Approved by Date Use Group Construction Type a()" Revised,108 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its use is allowed. SignecfG�/ I hereby apply for a Certificate of Occupancy for the work d scribed in this application for the permit. Signed / DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS I Electric # A PP �CatyN FOR BUILDING PERMIT Plumbing# 11 Sto9� � ra H VAC# Date: Sprinkler# Estimated Cost � I FINAL APPROVALS Permit Fee $ Building COMPLETE RED BOXED AREAS Occupancy Fee $ Engineering TYPE OF PRINT ONLY Eng. Insp. Fee $ _ Affidavit ► SIGN ON REVERSE SIDE A Appr.for CO. Total Fee $ TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) ,7 z� r The undersigned hereby applies to do work according to the following: Applicant ;ON P 4,4 0 tZ L�� Location of Work Lot No. Applicant's Address // :jT-j2iut F1r44) Z-1Z'I-i L Tel # G YY P z� 7 Town S '+ w, .v 12 Sa/Z Zip V Gd 7 Lic.# Owner S'1 ^ t Architect Owner's Address y1 Architect's Address Zip Zip Sq. Ft.New Area: 1 st Fl. 2nd Fl. 3rd Fl. — Total New Area Purpose of this permit �,v7- ,-V/-")0 �f City Water❑ Well ❑ Septic System ❑ Sewer 0 Ins: HO SP Cert. Area Basement Garage Approved by Date Use Group Construction Type Revised 1108 r I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which �this building and its use is allowed. Signed /�✓/�� {,� I hereby apply for a Certificate of Occupancy for the work described in this application for the permit. Signed - - - --- — DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS INSPECTION FIELD SHEET 03/17/10 Printed by Peart, Dayshell 11 36 55 a INSPECTION: 26415 FOOTING PERMIT: STATUS: APPLICATION: 200901153 LOCATION: 11 STONEFIELD TRAIL SOUTH WINDSOR PROPERTY ID: 86100011 OWNER: MAURUS DONALD D EST CONTRACTOR: DESCRIPTION: WINDOW REPLACEMENT WORK ORDER: INSPECTOR: ROSE RESULT: N/A REQUESTED: SCHEDULED: COMPLETED: 03/17/10 UNPAID FEES 00 Date Time TIME: TRAVEL ONSITE COMMENTS: ALL INSPECTIONS: INSPECTED INSPECTOR RESULT INSP DESCRIPTION 03/17/10 ROSE N/A B002 FOUNDATION 03/17/10 ROSE N/A B003 FRAMING (ROUGH) 03/17/10 ROSE N/A B004 INSULATION 03/17/10 ROSE N/A B005 FIREPLACE / CHIMNEY 03/17/10 ROSE N/A B006 WOOD / GAS STOVE 03/17/10 ROSE N/A B009 OTHER 03/17/10 ROSE N/A BO10 FINAL 02/10/10 ROSE PASS BO10 FINAL Electric # APPLICATION FOR BUILDING PERMIT 1iSJlumbing# VAC# 1i S{arse 74 eac,( -Ti2��I Date: s -- Sprinkler# Estimated Cost $ 11�9v6 FINAL APPROVALS Building U 'r1�J COMPLETE RED BOXED AREAS Permit Fee $ I g� Occupancy Fee $ Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $ Affidavit A r.forCO. ► SIGN ON REVERSE SIDE PP Total Fee $ TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $ 74-�P The undersigned hereby applies to do work according to the following: Applicant___ ign LocationofWork 11 519,44th Tor-0 ___LotNo. Applicant's Address�S_Ec�w i Tel # Z�y -W Town l� _S�✓ Zip N o l Y Lic.# V /wS Owner on /"►4Arus Architect Owner's Address rrt.-1 Architect's Address v Zip 06 o7 y Zip Sq. Ft. New Area: 1 st FI. 2nd FI. 3rd FI. Total New Area Purpose of this permits T"r ,fj 34,-,41e5 f JrizC1cw-y , ,f-c- City Water > Well J Septic System J Sewer J 'S Q Ins: HO S ert. Area Basement Garage Approved by Date S �o ( _ Use Group Construction Type Revised 1108 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its use is allowed. Signed - ---- - I hereby apply for a Certificate of Occupancy for the work described in this application for the permit. Signed DO NOT WRITE BELOW THIS LINE INSPECTION COMMENTS INSPECTION FIELD SHEET 03/17/23 Printed by Middleton, Morgan 10 19 34 INSPECTION: 76234 FINAL PERMIT: STATUS APPLICATION: 201500545 LOC: 11 STONEFIELD TRAIL SOUTH WINDSOR PROPERTY ID: 86100011 OWNER: MAURUS DONALD P CONTRACTOR: REQUEST BY: PROJ DESC: TEAR OFF SHINGLES ON HOUSE AND BREEZEWAY. INSTALL ICE AND WORK ORDER: INSPECTOR: WS-B RESULT: PASS REQUESTED: PRIORITY: SCHEDULED: COMPLETED: 03/17/23 UNPAID FEES: 00 Date Time MILEAGE: .00 TIME: TRAVEL ONSITE COMMENTS: INSPECTED BY VALERIE MUSZYNSKI 201600167 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER CERTIFICATE OF USE DATE: 07/21/2016 GIS ID: 86100011 FEE: 10.00 MUNIS APPLICATION# 201600857 BUILDING DESCRIPTION: APPLICANT LOCATION NAME: MAURUS DONALD P ADDRESS: I 1 STONEFIELD TRAIL ADDRESS: 11 STONEFIELD TRAIL OWNER: MAURUS DONALD P SOUTH WINDSOR,CT 06074 11 STONEFIELD TRAIL SOUTH WINDSOR,CT 06074 DESCRIPTION OF WORK: INSTALLATION OF PELLET STOVE. SPECIAL CONDITIONS: ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT. CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING OFFICIAL 7/21/2016 10:58 AM TIIE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE 1600403 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER BUILDING PERMIT DATE: 06/29/2016 GIS ID: 86100011 FEE: 45.00 MUNIS APPLICATION# 201600857 BUILDING DESCRIPTION: APPLICANT LOCATION NAME: MAURUS DONALD P ADDRESS: I 1 STONEFIELD TRAIL ADDRESS: l l STONEFIELD TRAIL OWNER: MAURUS DONALD P SOUTH WINDSOR,CT 06074 11 STONEFIELD TRAIL SOUTH WINDSOR,CT 06074 DESCRIPTION OF WORK: INSTALLATION OF PELLET STOVE. SPECIAL CONDITIONS: ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT. CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING OFFICIAL 6/29/2016 10:08 AM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE 1500204 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER BUILDING PERMIT DATE: 05/29/2015 GIS ID: 86100011 FEE: 180.00 MUNIS APPLICATION# 201500545 BUILDING DESCRIPTION: APPLICANT LOCATION NAME: DZEN RESIDENTIAL ROOFING ADDRESS: I I STONEFIELD TRAIL ADDRESS: 105 EDWIN ROAD OWNER: MAURUS DONALD P SOUTH WINDSOR,CT 06074 11 STONEFIELD TRAIL SOUTH WINDSOR,CT 06074 DESCRIPTION OF WORK: TEAR OFF SHINGLES ON HOUSE AND BREEZEWAY. INSTALL ICE AND WATER SHIELD,FELT PAPER,RIDGE VENT,AND RESHINGLE. SPECIAL CONDITIONS: ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT. CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING OFFICIAL 5/29/2015 11:09 AM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE 1300417 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER HVAC PERMIT DATE: 09/27/2013 , GIS ID: 86100011 a '" ` ` FEE: 120.00 MUNIS APPLICATION# 201301390 "_,-� . BUILDING DESCRIPTION: Zi APPLICANT, r ,°M1„ ,rck, ,. :< ° ,,.�� ^V„ F��1� LOCATION NAME: ANDREWS OIL CO. ',; �, ';ADDRESS:, I I STONEFIELD TRAIL ADDRESS: 136 RYE STREET °' I a; y ,.OWNER: r�-MAURUS DONALD P SOUTH WINDSOR,CT Ob074 k` = = �'ti �r ��.Jl STONEFIELD TRAIL SOUTH WINDSOR,CT 06074 DESCRIPTION OF WORK: RUNNING HOUSE GAS MAIN;REPLACING BOIL}jEP,AND WATER HEATER. .ecrb'!, � '� ,k' 6.n,,i..-r <iwM>'' ...,✓'`� L R� .a H �'driN f� SPECIAL CONDITIONS: �:° .� ALL WORK TO BE DONE IN ACCORDANCE' WI'il..TH APPLICATION AND`PI ANS'APPROVED BY THE BUILDING DEPARTMENT. CONSTRUCTION TYPE:'° ` �'~� Ar OCCUPANCY GROUP: ,.,°'" �.. �.-,. .. — " BUILDING OFFICIAL 9/27/2013 12:54 PM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE