Loading...
HomeMy WebLinkAbout10 KENNISON CT BLDG 3/21/22, 11:26 AM Town of South Windsor Building Department L�SOR-CO Building Permit: BLDP-22-82 APPLICANT NAME: Bob Stanhope EMAIL ADDRESS: bob.stanhope@tandm.com ADDRESS: 110 BROOK ST TORRINGTON , CT 06790 LOCATION ADDRESS: 10 KENNISON CT South Windsor CT6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: CONSTRUCT 1,225 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS 2.5 BATH, 2 CAR GARAGE&DECK BLD 6 UNIT 10(APPROVED MUNIS PERMIT FROM 2018) W March 21, 2022 BUILDING OFFICIAL DATE SIGNED -ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT- -PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL- 1!1 3/21/22, 11:26 AM Town of South Windsor Building Department SoR c� Plumbing Permit: PLMB-21-152 APPLICANT NAME: Jan Gryckiewicz EMAIL ADDRESS: farmingtonplumbing@comcast.net ADDRESS: 53 tall timbers drive farmington, ct 06032 LOCATION ADDRESS: 10 KENNISON CT South Windsor CT 6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: plumbing for new 2.5 bath townhouse,gas piping W i July 26, 2021 BUILDING OFFICIAL DATE SIGNED —ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT" PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL— 1/1 3/21/22, 11:27 AM towN sf� Y r Z; Town of South Windsor Building Department �ly11 OR-Co- HVAC PERMIT. HVAC-21-526 APPLICANT NAME:jay valimont EMAIL ADDRESS: missductwork@aol.com ADDRESS: 6397 P.O Box Wolcott, CT 06716 LOCATION ADDRESS: 10 KENNISON CT South Windsor CT 6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: Install warm air and AC system. W November 23, 2021 BUILDING OFFICIAL DATE SIGNED "'ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT— PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL— lit 3/21/22,11:27 AM 1 r = Town of South Windsor Building Department E- 4�tiosoa-c Electrical Permit ELEC-21-564 APPLICANT NAME: Robert Damaschi EMAIL ADDRESS: amozzicato@comcast.net ADDRESS: 22 Englewood Manchester, CT 06042 LOCATION ADDRESS: 10 KENNISON CT South Windsor CT 6074 OWNER: T& M BUILDING CO INC 110 BROOK STREET TORRINGTON CT 6790 DESCRIPTION OF WORK: 200 amp underground service and complete wiring of new home to code December 20, 2021 BUILDING OFFICIAL DATE SIGNED ""ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT— PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL"" 1/1 REScheck Software Version 4.6.5 Compliance Certificate Project Building 6 - Unit 60- Ashford Energy Code: 2012 IECC Location: South Windsor, Connecticut Construction Type: Multi-family SCANNED Project Type: New Construction Orientation: Bldg. faces 315 deg. from North Conditioned Floor Area: 1,225 ft2 Glazing Area 5% Climate Zone: 5 (6155 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 10 Kennison Ct. T&M Building Co., Inc. Andrew Ugalde South Windsor, CT 06074 CT CT 8604899229 • • • ILIA trade-off Compliance: 2.1%Better Than Code Maximum UA: 288 Your UA: 282 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Perimeter Wall 1: Wood Frame, 24" D.C. 37 19.0 0.0 0.059 1 Orientation: Front Door: HalfMoon: Solid 20 0.130 3 Orientation: Front Comment: Front Door Wall 2: Wood Frame, 16" o.c. 55 19.0 0.0 0.060 3 Orientation: Right side Wall 3: Wood Frame, 16" o.c. 275 22.0 0.0 0.056 15 Orientation: Right side Wall 4: Wood Frame, 16" o.c. 330 19.0 0.0 0.060 20 Orientation: Left side Wall 5: Wood Frame, 24" D.C. 37 19.0 0.0 0.059 1 Orientation: Back Door: HalfGlass: Solid 20 0.130 3 Orientation: Back Comment: Front Door Wall 6: Wood Frame, 24" o.c. 163 19.0 0.0 0.059 6 Orientation: Front Window: 5-Ox5-0 SLIDER: Vinyl/Fiberglass Frame, Double Pane with Low-E 50 0.300 15 Orientation: Front Window: 2-4x3-0: Vinyl/Fiberglass Frame, Double Pane with Low-E 14 0.300 4 Orientation: Front Wall 7: Wood Frame, 24" o .c. 10 19.0 0.0 0.059 1 Orientation: Right side Project Title: Building 6 - Unit 60-Ashford Report date: 09/28/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-6 Unit 60 - Ashford.rck Page 1 of 2 Gross Area Cavity Cont. Perimeter Wall 8:Wood Frame, 16"o.c. 366 22.0 0.0 0.056 20 Orientation: Right side Wall 9: Wood Frame,24"o.c. 163 19.0 0.0 0.059 5 Orientation: Back Window: 6-Ox3-6:Vinyl/Fiberglass Frame,Double Pane with Low-E 21 0.300 6 Orientation: Back Window: 2-4x3-0:Vinyl/Fiberglass Frame,Double Pane with Low-E 14 0.300 4 Orientation: Back 6' Patio Door: Glass 40 0.290 12 Orientation:Back Comment: Patio Door Wall 10:Wood Frame, 24" o.c. 61 19.0 0.0 0.059 4 Orientation: Left side Wall 11:Wood Frame, 16" o.c. 305 22.0 0.0 0.056 17 Orientation: Left side Wall 12:Wood Frame,24" o.c. 10 19.0 0.0 0.059 1 Orientation: Left side Wall 14:Wood Frame,24" o.c. 163 19.0 0.0 0.059 10 Orientation: Back Wall 15:Wood Frame, 24" o.c. 10 19.0 0.0 0.059 1 Orientation: Right side Wall 15:Wood Frame, 16" o.c. 366 22.0 0.0 0.056 20 Orientation: Right side Wall 16:Wood Frame, 24" o.c. 163 19.0 0.0 0.059 10 Orientation: Back Wall 17:Wood Frame, 24" o.c. 61 19.0 0.0 0.059 4 Orientation: Left side Wall 18: Wood Frame, 16" o.c. 305 22.0 0.0 0.056 17 Orientation: Left side Wall 19: Wood Frame, 24" o.c. 10 19.0 0.0 0.059 1 Orientation: Left side Ceiling 1: Flat Ceiling or Scissor Truss 588 38.0 0.0 0.030 18 Floor 1:All-Wood joist/Truss:Over Unconditioned Space 511 30.0 0.0 0.033 17 Floor 2:Slab-On-Grade:Unheated 22 10.0 0.684 15 Insulation depth: 4.0' Floor 3:Slab-On-Grade:Unheated 36 10.0 0.767 28 Insulation depth: 2.0' Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Building 6 - Unit 60-Ashford Report date: 09/28/18 Data filename: C:\Users\Bob\Documents\bce\Bldg-6 Unit 60-Ashford.rck Page 2 of 2