HomeMy WebLinkAbout10 KENNISON CT BLDG 3/21/22, 11:26 AM
Town of South Windsor Building Department
L�SOR-CO
Building Permit: BLDP-22-82
APPLICANT
NAME: Bob Stanhope
EMAIL ADDRESS: bob.stanhope@tandm.com
ADDRESS: 110 BROOK ST
TORRINGTON , CT 06790
LOCATION
ADDRESS: 10 KENNISON CT
South Windsor CT6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
CONSTRUCT 1,225 SQFT SINGLE FAM TOWNHOUSE W/2 BEDROOMS 2.5 BATH, 2 CAR GARAGE&DECK BLD 6 UNIT 10(APPROVED
MUNIS PERMIT FROM 2018)
W
March 21, 2022
BUILDING OFFICIAL DATE SIGNED
-ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT-
-PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL-
1!1
3/21/22, 11:26 AM
Town of South Windsor Building Department
SoR c�
Plumbing Permit: PLMB-21-152
APPLICANT
NAME: Jan Gryckiewicz
EMAIL ADDRESS: farmingtonplumbing@comcast.net
ADDRESS: 53 tall timbers drive
farmington, ct 06032
LOCATION
ADDRESS: 10 KENNISON CT
South Windsor CT 6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
plumbing for new 2.5 bath townhouse,gas piping
W i
July 26, 2021
BUILDING OFFICIAL DATE SIGNED
—ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT"
PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL—
1/1
3/21/22, 11:27 AM
towN sf�
Y
r Z; Town of South Windsor Building Department
�ly11 OR-Co-
HVAC PERMIT. HVAC-21-526
APPLICANT
NAME:jay valimont
EMAIL ADDRESS: missductwork@aol.com
ADDRESS: 6397 P.O Box
Wolcott, CT 06716
LOCATION
ADDRESS: 10 KENNISON CT
South Windsor CT 6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
Install warm air and AC system.
W
November 23, 2021
BUILDING OFFICIAL DATE SIGNED
"'ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT—
PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL—
lit
3/21/22,11:27 AM
1
r = Town of South Windsor Building Department
E-
4�tiosoa-c
Electrical Permit ELEC-21-564
APPLICANT
NAME: Robert Damaschi
EMAIL ADDRESS: amozzicato@comcast.net
ADDRESS: 22 Englewood
Manchester, CT 06042
LOCATION
ADDRESS: 10 KENNISON CT
South Windsor CT 6074
OWNER: T& M BUILDING CO INC
110 BROOK STREET
TORRINGTON CT 6790
DESCRIPTION OF WORK:
200 amp underground service and complete wiring of new home to code
December 20, 2021
BUILDING OFFICIAL DATE SIGNED
""ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT—
PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL""
1/1
REScheck Software Version 4.6.5
Compliance Certificate
Project Building 6 - Unit 60- Ashford
Energy Code: 2012 IECC
Location: South Windsor, Connecticut
Construction Type: Multi-family SCANNED
Project Type: New Construction
Orientation: Bldg. faces 315 deg. from North
Conditioned Floor Area: 1,225 ft2
Glazing Area 5%
Climate Zone: 5 (6155 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
10 Kennison Ct. T&M Building Co., Inc. Andrew Ugalde
South Windsor, CT 06074 CT CT
8604899229
• • • ILIA trade-off
Compliance: 2.1%Better Than Code Maximum UA: 288 Your UA: 282
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area
Cavity Cont.
Perimeter
Wall 1: Wood Frame, 24" D.C. 37 19.0 0.0 0.059 1
Orientation: Front
Door: HalfMoon: Solid 20 0.130 3
Orientation: Front
Comment: Front Door
Wall 2: Wood Frame, 16" o.c. 55 19.0 0.0 0.060 3
Orientation: Right side
Wall 3: Wood Frame, 16" o.c. 275 22.0 0.0 0.056 15
Orientation: Right side
Wall 4: Wood Frame, 16" o.c. 330 19.0 0.0 0.060 20
Orientation: Left side
Wall 5: Wood Frame, 24" D.C. 37 19.0 0.0 0.059 1
Orientation: Back
Door: HalfGlass: Solid 20 0.130 3
Orientation: Back
Comment: Front Door
Wall 6: Wood Frame, 24" o.c. 163 19.0 0.0 0.059 6
Orientation: Front
Window: 5-Ox5-0 SLIDER: Vinyl/Fiberglass Frame, Double Pane with Low-E 50 0.300 15
Orientation: Front
Window: 2-4x3-0: Vinyl/Fiberglass Frame, Double Pane with Low-E 14 0.300 4
Orientation: Front
Wall 7: Wood Frame, 24" o .c. 10 19.0 0.0 0.059 1
Orientation: Right side
Project Title: Building 6 - Unit 60-Ashford Report date: 09/28/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-6 Unit 60 - Ashford.rck Page 1 of 2
Gross Area Cavity Cont.
Perimeter
Wall 8:Wood Frame, 16"o.c. 366 22.0 0.0 0.056 20
Orientation: Right side
Wall 9: Wood Frame,24"o.c. 163 19.0 0.0 0.059 5
Orientation: Back
Window: 6-Ox3-6:Vinyl/Fiberglass Frame,Double Pane with Low-E 21 0.300 6
Orientation: Back
Window: 2-4x3-0:Vinyl/Fiberglass Frame,Double Pane with Low-E 14 0.300 4
Orientation: Back
6' Patio Door: Glass 40 0.290 12
Orientation:Back
Comment: Patio Door
Wall 10:Wood Frame, 24" o.c. 61 19.0 0.0 0.059 4
Orientation: Left side
Wall 11:Wood Frame, 16" o.c. 305 22.0 0.0 0.056 17
Orientation: Left side
Wall 12:Wood Frame,24" o.c. 10 19.0 0.0 0.059 1
Orientation: Left side
Wall 14:Wood Frame,24" o.c. 163 19.0 0.0 0.059 10
Orientation: Back
Wall 15:Wood Frame, 24" o.c. 10 19.0 0.0 0.059 1
Orientation: Right side
Wall 15:Wood Frame, 16" o.c. 366 22.0 0.0 0.056 20
Orientation: Right side
Wall 16:Wood Frame, 24" o.c. 163 19.0 0.0 0.059 10
Orientation: Back
Wall 17:Wood Frame, 24" o.c. 61 19.0 0.0 0.059 4
Orientation: Left side
Wall 18: Wood Frame, 16" o.c. 305 22.0 0.0 0.056 17
Orientation: Left side
Wall 19: Wood Frame, 24" o.c. 10 19.0 0.0 0.059 1
Orientation: Left side
Ceiling 1: Flat Ceiling or Scissor Truss 588 38.0 0.0 0.030 18
Floor 1:All-Wood joist/Truss:Over Unconditioned Space 511 30.0 0.0 0.033 17
Floor 2:Slab-On-Grade:Unheated 22 10.0 0.684 15
Insulation depth: 4.0'
Floor 3:Slab-On-Grade:Unheated 36 10.0 0.767 28
Insulation depth: 2.0'
Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Building 6 - Unit 60-Ashford Report date: 09/28/18
Data filename: C:\Users\Bob\Documents\bce\Bldg-6 Unit 60-Ashford.rck Page 2 of 2