HomeMy WebLinkAbout10 ANDMAR LN CP
rye
4
APPLICATION FOR ELECTRICAL PERMIT
TOWN OF SOUTH WINDSOR BUILDING DEPARTMENT
1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074(PHONE) 860-644-2511 EXT. 230
DEPARTMENT DECISION PERMIT NUMBER:
APPLICATION IS HEREBY:
VE BLDG.PERMIT NUMBER:
DATE PECTOR
LOCATION OF WORK: 14 ((�( 4g l f�
APPLICANT: OWNER: TYPE OF STRUCTURE:
7100AAJ 41)1a --e_ / ❑NEW BUILDING
NAME:U Gt�/lo;:�Q ,�(acy l aH Sf NAME: L>t 1 Y lC`� O ADDITION
PHONE NUMBER: 1/3a' A 34'[S PHONE NUMBER: P�=TING BUILDING
ADDRESS: l(! s14/j•f ADDRESS: /d A(3 4-' L[�
l TYPE OF USE:
IDENTIAL o CONOAERCIAL
ELECTRICAL I/NFORMATION: FURTHER DESCRIPTION OF WORK:
TYPE OF INSTALLATION: f zk�l
SIZE OF SERVICE: 70-p A ` e "A"
SIZE OF MAIN SERVICE: ✓�/li �
NUMBER OF METERS:
NUMBER OF PANELS: /�
NUMBER OF LIGHT CIRCUITS: ESTIMATED COST:S -3 /J o V
NUMBER OF SWITCHES:
NUMBER OF LIGHT FIXTURES: FEE ENCLOSED:S 6
NUMBER OF A/C CIRCUITS:
FEE SCHEDULE:SIS PER SI,060 OF THE EST OST.
NUMBER OF POWER CIRCUITS: ROUND UP TO THE NEXT THOUSAND ONCE THE PROJECT
IS S1.00 OVER (.26 CENT EDUCATIONAL FEE INCLUDED AS
NUMBER OF OUTLETS: PART OF THE PERMIT FEE)
THE UNDERSIGNED HEARBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL
ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERRFOMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO.: � E: l' C STATE: /C! /
SIGNATURE OF APPLICANT: DATE: 'f'�O ' 7
PrGY w r� % ac)k l oo`"( /
NIF FicAARI) 4 -:rdL,.E. tA. MULLER
J f
6 I-ORA 6
a
9!
5-Iz.>� �
oil
I III
�j
0 EI.X
U
Z, N0%10 CC"
:2 5.cc'
s 2"ZI-5
ANI
F0 R
F. C-,\:n'-7=. -T. 57AIr.-S
to ANDNt4p, L-ANE ANI tJ DSOR cr
PAY 15. 19t3Co
715 L&�Oz3 -7 HERIE53--( CE:rZn n-iD cc*j. —uzu7-rcc,
F.'TITLED."RE56501\41 SION OF FCF;7!C?,! 9N 4- C6NN. AIDCTZ'KaY5 TlTll-- 1N6. CO. Ti-r\-- 7p..5
CF PARCEL -A-- PGH6ATE ESTATES 5ECTION11.H PLAN 4 15 SLJRJSFh,,\,,M,\'L-LY CCRREr-7 AND -DA-AU-
SOU'r Y-ONIM& A TZE. NCT VIDLA-TED
H 'VA t4 DBOR-,C,09'4. OWNER�5U5DIVI DER
U.ArR. V.QLnIW-, CORP 24=-RE:TC-GA-RDN. F-R WMA �?F—SPEC -Flp C-LaA-na,1,5---0"BULr.XM6<
V�j
dTk 8-A 550C- 5CALE I"-4d D8,TE OR 1975
j
5E EET !'-0 Z OF 7-
KASPER 4550CIATES, IW� VEPNON,C+-. M-AV¢F-5 C.3CMMERS L.549C.78
ldAY 2 91992
South Windsor
3UILDING DEPARTMENT
?�
1 .. ti• •1
i
i
NSF- RICHARb S-JLlE ?�!. MCJLLER h,
N 19°-5a-24 E-!,
ta �,
� I
l�32 ! i 33
t• p I
9 Z
0
0 O
v
Z
__� ,--�--� >
.. �•� Tom•-o.ra,_
i
I
'
i
4ND R
F. STAIRS
10 ANDt`W R LANE 50UM.V\,'1N DSOR,cr
SCAt✓EI„��. P�.Y 15, 1`�BCn
fiFFERENCE -T HERE5( CEi 'fnF'`t" -To ccgzw. ►igu-5TCG.
W ENTITLED- "RE56501\6510N C_F_Ftg7!.CN _ KA A- CGNN. Xi(ORKEY5 TITLE INS. CO. Tl -
CF FARCEL n" WGRG TE ESTA'TES 5ECTION 111. PLAN 15 SUeJSFt„`f ALLY CORREcl—AND -M-AU-
SOU'rH W NDSOR,CON.v. OWNER,4r 5UBDIVIIDER ZONING REL•,UL-,-\TIONS ARE NOT VIOLA-IED
U.�R. H.WSING CORP EVGRE•T C.GARMNER WrM 74ESPEC.T BUimme,5
A550C. SOLE f'�40 CATS 1975 SNCNJN H .'X�^�•t
5�ET- �.O 2 OF Z"
KA5PER AS50CIATE 5, INC VERNON,Ct. ;rA1 JES C.S�MMERg �..a4c,-ra
YO•.973 E
FEB 03 1992
South Windsor
13UILDING DEPARTMENT
t
197�J
EV'ERETT O. GARDNER & ASSOCIATES 576OLD POST ROAD TOLLAND, CONNECTICUT 06084
111E RICNARC ��• NtL1Ll.._��
<<1
�z
�_ Hwy SSA
A O o 3Ci:R�52 7-.g �''. _IR G;.WSJ v'`•J iJ r_a� r. �
Tw ,
` N V71kj Cyotl L)
51
O
MORTGAGE SURVEY ♦ "'
LOT #33 HIGHGATE ESTATES - SECTION III
TOWN OF SOUTH WINDSOR CONNECTICUT `
SCALE: 1 " = 40' ? No. 10339
I hereby certify to Savings Bank of Manchester that the
ati•°
location of the building as shown is substantially
correct and that there are no zoning violations of the
same.
L. S. 10839
September 22, 1978 For vere Gardner & Associates
PROFESSIONAL ENGINEERS ��
LAND SURVEYOR$
A_ P p--I-R 0 [D
SOR
ENGINEERI vG DE-PART
DATE-
StGv
N;i;" R1c�tL�RD -UUL,E MI. MULLER
N(9° 56� 2X E-�
N IS° 3l 12G 48-95'
/ lO1.41'
. d
I �t1ii D.N:: I..UCATEO
I D.5 SHoWhJ 5.12•bto
�Twoo--sue
32 p 33
o 03
1
I a
I
O �C
;1; N _ In W
o sp - c j (>
n; DE4x f cr
•r i
1 Z 70'T'orq_ 51'Y
25 oa
' 125-CC -
ir(�rt>.): ^•--5 22'-S7'•21".`,�' '" MoN.z`ff?
PLAN PREPARED I=0R'
nl �1 M F" rr CAPDL-E. T STA1fZ5
10 ANDMA LANE 5boDTH•WIWD50R,CT
SCat_E•t'4 40' „ MAY 15, l98Co
REFERENCE KNOWN Z>� CL7f 3'S - T NEREFS( CETZn"' TD COW4. [ANK 'CRUST"CO.
ON MAP E14TITLED "RE565DIVIS►ON OF PosTION KA 4, CDNN. A 0TZNEY5 TITLE. IN5. CO. THAT TN15
OF PARCEL A-' HIGHGATE E'.STATES SECTION 11 PLAN 5 SUFt6T"MAL.LY COIZRE/-T AND I[ AAT
SOUTH WIND30R,CONN. ONNER 4, SUBDIVIDER Z.ONINU RFC-,ULATION
O.CARP E WCTR RESPECT -TZD Tt-1
U.�R. HOt35lNC� VERE--IT- C-�ARDNER • �,mG�F�- [ �.NGS
4-M�...,OC. SCALE l':40 D\TE SA, l 1976 5H01JN �IETZEbN. -
5I.1EET �;v 2 OF Z" �
I
1
KASPER ASSOCIATES, INC. VERNON, Ct.
.7'At-}ES C. E30M1rtERS L.3.9[078
YO.973•E
TO, THE BUILDING DEPT. TOWN OF SOUTH WINDSM
is
oDk• of the propoose li unified that se plan and specifications are trtl.
d erectedbuilding or alterations t6 be
�/ef t -l M
��/ �nl/l i"lu✓� Lu� street
LO together with amendments stated in application and
filed with plan and I agree to comDlY with all toning,
Building and state laws and such orders as D.
�� feauetl Dy the Buildi shall
ng Department durin
Of this application and final i:suanq g pendenry
Permit. of a building
Signed
This plan la approved subiect to
arde- and t rdin,ncz be
the condition that
aomplicd ,th s regulating building •ball D
Condition�lty Approved
Thye }Ikd with
Building Inspector
----------
cleft
EVERETT O. GARDNER E ASSOCIATES iX OLD POST ROAD TOLLAND, CONNECTICUT 06084 f
MUL`CF2 n
1 ov 40
i
to
co
\ I- I N ° I
�' rJ r
_
ram_ � �} t "gI
� � 1
Pn 356,v N 1 i
C c7�
i33
344 w
I =Z$•C.
�� � �, �t z s•vQ _ � c
100,
q
.. s z z•'-s-r- z�w ''
:- No. 4395 �, 3 44L 34$ 3!50 Jul
gF��STERE� / ♦ PERMIT PLAN > �7
<L! „/
401" R
SURVEl �nnnnnnnai�9arr
A♦d♦° CDN 7!, ��i
y LAND OF U. & R. HOUSING CORP,
LOT # 33 HIGHGATE ESTATES SECTION III a°�Q o"P i`����rsc '^rQGi 3Sz
e
TOir1PJ OF SOUTH WINDSOR, CONNECTICUT
> "'A rr;
SCALE: 1" = 40' - •w A,
No. 4395 i Q
Certified substantially correct.
IM
395
June 6, 1978
REFERENCE: '
NOTE: MDC DATUM
Resubdivision of a portion of parcel A
Highgate Estates - Section IIII
PROFESSIONAL ENGINEERS 1 " — 40' LAND SURVEYORS Jan. 1978 �J
i
i
t
R Go�v
A P ._
TD�N �� DIpA�
p ATE=
51GZ
r�
EVERETT O. GARDNER & ASSOCIATES—576 OLD POST ROAD— To LAND, CONNECTICUT 06084
L
U V—
7-
TA
M
FZ
4-
I\J
O "1116 '1%
,
Z'51 14 sz
kk
a�crAyzr >:
1b, 2:-'3'
-P q9
Tw Z
r-ml CAT? 3S3.9,1
to
ANZ)tiA AP,
4 41
MORTGAGE SURVEY 0 0
c a
%0.-, R. Pz-T�
LOT433 HIGHGATE ESTATES - SECTION III
TOWN OF SOUTH WINDSOR, CONNECTICUT
No. 10339
SCALE: 1 40'
<-- t&ISTEOO
0
`a OI hereby certify to Savings Bank of Manchester that the U
location of the building as shown is substantially
correct and that there are no zoning violations of the ,
same...
September 22, 1978 For vere Gardner & As o'di ates *
77
PROFESSIONAL ENGINEERS
LAND SURVEYORS
7-701-11E 1-01. MULLER
N'19*-5a-214V F-
N 48-95-
------------
1C1.SpRAC,; -49"Y9,610
q/2X
A/
17 6-s
52 33
0
ul
0
0 0,
WOOL,
21 DE4X
w
>
u
Z)
oc",
Z,
AND M-4,R
PLAN c�Ep-\RED F-OR
A*" F. � CARC)LE. T EMAR-S
ID AtvDNt4R L.A1,IE 50UM WllJD50R,Cr.-
MAY 15. 19eCo
T HEREF3Y CET<-n n, -Tn cn1zw. 7-9u4,-rco.
W P.47ITLED."RE-5650NI SION OF FoFriioN NA 4, c&NN. 4,7orzmaY5 TITL-- lW5. CO. WART -T"Hn
CF FARCEL 'X VAIGRC-ATE ESTATES SECTIONY FtAq r5 5UF-'95FZ,\MALLY CjC)RREC-, AND TA-AU-
SOUTP 'v,4t,ID50R,C4)gq. OWNER� 5U5DIvloER ZOMIM6, REGULATIONS ARE. NVT VIOLZ\-TF-[D
U.�R. HOUSING CORP E\4EFKE:T C.GARMER Wrl"A RESPECT -ro THE, LCZA-ncw,5 oF- 'BUlLVl.N&5
A,45SOC. ALE I"-4d D6,TE Z�,lkl 197E, EIEREOI-A � ,
5�EET !'.0 2OF 7- s co; i
( �',s�
7- A7
KA5PER AssociAxEs. INC. VEPNON)C+—.
.U-Av4E5 C. 3ommER5 L ABA 9 Col 5
DEC sU1991
South Windsor
BUILDING DEPARTMENT
r �
o xm M f
CbrK
fVa
:s shown on this plan appear(.,) 'Le
5 � .mformance with current South
�!gulations. Variances and special exc.
+iay apply.
DC� 30 (`i`ll
Date
C C
Enforcement Off;c;;
• <oW N sr4
- Y
ZONING COMPLIANCE FOR SMALL STRUCTURE y •'
(Sheds and detached decks 200 sq. ft. and smaller) R.00,
Address of Proposed Structure: /4 4A-0 ne.-L c-s4,v,c Zone: 4A 3--L)
Name of Owner: .425tQ Z itaa P s21t GIS PIN:
Phone Number: g&0' soF-3�ZS'33 Application #: _ V'P lac)
1. Name of Applicant: -Doo<� >ru r
Address: - Lw
Phone Number: 31�4- L5?-ZS--F
2. Structure cannot exceed 200 square feet.
TYPE OF STRUCTURE: SHED DECK (not to exceed 30"from grade)
DIMENSIONS OF PROPOSED STRUCTURE: // �y "fi zLlo
3. A Class D survey must be submitted with the application showing the property lines, all other
buildings and the location of the proposed structure.
4. Is the property served by a septic system? Yes 4 C No If yes, the applicant must
complete and submit a B100a Application to the Health Department for review and approval.
The undersigned hereby permits Town staff to enter onto and inspect this property during
reasonable hours for the purpose of reviewing this application and to determine final compliance
once construction is completed.
I, the undersigned, acknowledge that the above information is true to the best of my knowledge
and that the above requirements ar erstood.
Applicant Signature: Date:
Owner Signature: Date: Cv Z
Reviewed and approved by: Date:
Zoning Enforcement Officer
Reviewed and approved by: Date:
Environmental Health Officer
cc: Assessor
Building File
04/15/14
t
NIF R1cNARD 4 -J LaE MIJLLER a,
yN 19--5&'-24'E.-"
9 �-'-- NV3 .�
Je
Ld
t � I
a I
- N .�
p
DELX r cr
• Y to
�' 'jq•Cora�. _I•L
• •'• r=a7.z--T
;25-aV .,
ANDt•'�
FOR.
? ST"AIRS
10 ANIDN14R LAME SOOP4•WIIJDSOR,C17
SCALE#*f'%,Ac MAY 15. 19e�o
'REFERENCE K�O N .,SIfyr:#33 S 1tEM- CETz'f1n*7Z7 CO';N. Fwr: �' RUST-CG
a1 ;.',1.P F..,'TITLED•`%RE-565DIVISION Cf F097'.ON __ Na 4- C&N. '47,0RKL-f5 -nTL INS. CO.
CF FARCEL %a" 14!(,14G4TE ESf'AMS 5ECTI0KI.Y PLAN 15 SUP-jSrls„\Ir,-�LL\( coRRE- -, AND VI i
SOJTr4 b�NDWR.1 Cp(,l,1t, ONNQZ�5UBDIVICER ZON1N(o F:EL�L1t1�T►ONS Ate l�Cn Vtx�1`[7~D
U. R. 14QMIW.:, CDR? EVL--RE T C.GARDNER Went RESPEL Eav�t L>�TrcraS°c3'� SUILD!NG�
A - ••..S�ALE 1'1-4O MTE SA,R' 1978 SKCW14 Fl �' �w ` � �� •y .
KASPER ASSOCIATES, INC. V=_-RNOty,Ct. =WIE5 C. E01MMER5 L.'3�9Co78
VO.973•E
SHEET INDEX
PV-1 SITE PLAN x VICINITY MAP ROOF DESCRIPTION PROJECT DESCRIPTION: PROJE
PV-2 ROOF PLAN 6 MODULES 33x250W ROOF MOUNTED SOLAR LAN,
PV-3 MOUNTING DETAIL&P.O.0 DETAIL ROOF AZIMUTH PHOTOVOLTAIC MODULES
PV4 ELECTRIC LINE DIAGRAM 6 •t _ 23• MY SYSTEM SIZE:7.85 kW AC
WIRING CALCULATIONS .--.
Pvs PLACARDS c
E(XXPMENT SUMMARY
PV-6 LAYOUT MAP 33 SR SPR-X20-250-BLK.B-AC ARRAY LOCATION RE
PV-7 MODULE DATA SHEET 8 33 SUN4POWEPOWER SPR-X20-250$LK-&AC MICRO INVERTERS
INVERTER DATA SHEET - —
PV-0 RAIL DATA SHEET
PV-9 RAIL DATA SHEET
PV-10 MONITORING DATA SHEET .��
CTOR
PV-11 ATTACHMENT DATA SHEET
EREVO
,
wq,Struauni E,Pwemo n.,r„ro,ae a,.aynp wugxe
.aIM b.6q aa.Ihr wlw.n.r m0 Y ann aron,ro m.
CLOVER DR. ddr G«
TRACT
.``��OF ICOlyryF, raEvar,SUN.,
(E)CHIMNEV ROOF#1
(33(SUNPOWER
SPR-X20-250-BLK-B-AC •: _: ""
-148'-1"SIDE PROPERTY LINE
.� �7Q) - DATE
aRo's� s ..$Eo��e`�``
V ,unuu.a ' DOIA
•.,
10 At
. O.1072019 SOUTH I
z I HOUSE PHOTO JDH7#:rr►
} I Z SCALL:NIS APN
4"'. J z
a --- 2-STORYI F- Ckl —
7(7
HOUSE I d Q 7E
o I I O -
- d Q PROJECT SITE --N,, I
LU z Z
I
EXISTING I f
N I DRIVEWAY LL
t
N 1
-168'-1"SIDE PROPERTY LINE
(E)MAIN SERVICE PANEL I
r �I
j I SITE
VICIl�
A'
SITE SPECIFICATIONS GOVERNING CODES 11
OCCUPANCY CATEGORY 11 2014 NATIONAL ELECTRICAL CODE
1 SITE PLAN WITH ROOF PLAN DESIGN WIND SPEED:124 MPH 780CMR,81h EDITION VICINITY MAP
EXPOSURE CATEGORY:C UNDERWRITERS LABORATORIES(UL)STANDARDS F
PV 1 SCALL v3z-=V-0" GROUND SNOW LOAD:30 PSF OSHA 29 CFR 1910.269 SCAL F NTS
MODULE TYPE,DIMENSIONS&WEIGHT
MODULE TYPE-SUNPOWER SPR•X20.250-BLK-B-AC w+'
MODULE WEIGHT-38.7 LBS
MODULE DIMENSIONS-61.34 k 31.42'-13.38 SF
ROOF DESCRIPTION RE
ROOF TYPE•COMP SHINGLE ROOF oesravno
(E) BACK YARD TOTAL ROOF AREA.1911
44154/1911•23.10%OF ROOF
FACE AREA COVERED BY ARRAY
LOAD CALCULATION REvO
TOTAL N OF PANELS 133
AREA COVERED(SO FT) 4415
WIRING IN ATTIC AVG LOAD PER CONNECTION POINT(LBS) 260 �I+TTT
-
WIRING INSIDE WALL FROM \ I! N SOLAR DECK COMBINER BOX WEIGHT PER SO FT OF SOLAR ARRAY(PSF) 301 R S(M1
ATTIC TO GARAGE
TOTAL WEIGHT OF MODULES 12771 ao�
TOTAL WEIGHT OF RACKING COMPONENTS 5058 W
\ / TOTAL SYSTEM WEIGHT(LBS) 1327 7 �
TOTAL RAIL LENGTH(FT) 1756 DATE
/ N OF 10 9'EQUINOX RAILS(129-)
\ TOTAL RAIL LENGTH fIELIl(FT) 19J 5 DOUI
N OF RAIL SPLICES 12 10 AI
SOUTH
\ '.p} 1 1'_ 1• TOTAL NOF END-CLAMPS 12 1
"I 29'-3' IA
TOTAL N OF MID-CLAMPS 30 APN
/ r r, n TOTAL N OF L-FOOT ASSEMBLIES 51
�WECTOR P
1 ■ n • 1 R • a III
(N)SUNPOWER
(NJ ACD MONITORINGNNECT i1 —'�! � `"�"'�ai"�o�. a '°"m"°i°"�°°' ET�GINEEI
(N)SMART METER
WIRING IN
GARAGE CEILING aara.aae,�aana,wwa.a.wwan.aa�a.
(E`Eu1WA METER
; _+._ti.............................4 h ,o•Neaa"' 31.42'
SERVICE PANEL (N)100A LOAD CENTER �
(N)AC DISCONNECT
L (33)MICRO-INVERTER(ROOF 01)
(33)SOLAR PANELS(ROOF N1) ROOF*I
m
I (51)PVATTACHMENT TILT - ••§•"'\t�'+ I
(N)SUNPOWER EQUINOX RAIL TYP. A21M-105 41y f11G�o`
uauaw`^
05.1072019 SUNPOWER
_
SPR-X20-250-BLK$AC
2Xs RAFTER @ 1s•D.C. LEGEND limo
• -SOLAR DECK COMBINER BOX RAFTERS/TRUSSES
❑�N -UTILITY METER '-"'� -r EMT CONDUIT
E-1 -MAIN SERVICE PANEL -EXTERIOR CONDUIT (+,
(E) FRONT YARD ["fl -AC DISCONNECT o ROOF OBSTRUCTION �I
1 ROOF PLAN&MODULES LOAD CENTER(4 SPACE)
CHIMNEY El
PV-2 SCALE 116•=V-T SUNPOWER MONITORING
CONSTRUCTION NOTES "` '
/ 1.) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
INITIATING CONSTRUCTION.
�- 2.) CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION
—
PV MODULE TYP, DOCUMENTS PRIOR TO INITIATING CONSTRUCTION.
3.) ALL EQUIPMENT SHALL BE LISTED BY U.L.(OR EQUAL)AND LISTED FOR
ITS SPECIFIC APPLICATION.
4.) ALL EQUIPMENT SHALL BE RATED FOR THE ENVIRONMENT IN WHICH IT
IS INSTALLED.
5.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE tELO
18"MAX MANUFACTURER'S INSTALLATION INSTRUCTIONS.6.) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND
SHALL BE RESTRICTED TO QUALIFIED PERSONNEL.
f 4'A'MAX 7.) ALL CONDUCTORS SHALL BE COPPER,RATED FOR 6W VOLTS AND
1 4" ___{ 90"C WET ENVIRONMENT,UNLESS OTHERWISE NOTED.
n 8.) WHERE SIZES OF JUNCTION BOXES,RACEWAYS,AND CONDUITS ARE
NOT SPECIFIED,CONTRACTOR SHALL SIZE THEM ACCORDING TO �GONT
APPLICABLE CODES.
9.) PV MODULE FRAMES SHALL BE BONDED TO RACKING RAIL OR BARE u�
COPPER G.E.C.PER THE MODULE MANUFACTURER'S LISTED INSTRUCTION �.
SHEET. wwn
10.)PV MODULE RACKING RAIL SHALL BE BONDED TO BARE COPPER
— -� '--- _� � -- —---------- G.E.C.VIA WEEB LUG,ILSCO GBL4DBT LAY-IN LUG,OR EQUIVLENT LISTED
LUG. DATE
/ 11.)GROUNDING ELECTRODE CONDUCTOR(G.E.C.)SHALL BE CONTINUOUS (R
AND/OR IRREVERSIBLY SPLICEDWELDED. I
12.)ALL JUNCTION BOXES,COMBINER BOXES,AND DISCONNECTS SHALL DOUI
BE INSTALLED IN AN ACCESSIBLE LOCATION. SOUTH II
. 3,�. t // 13.)ROOF ACCESS POINTS SHALL BE AT A STRONG POINT ON THE 1
/ BUILDING AND NOT REQUIRE THE PLACEMENT OF LADDERS OVER EXTERIOR JOBp;µ
RACKING RAIL J WALL OPENINGS. APN
FLASHING J / 14.)WOORKIN0 28SPACE AROUND ELECTRIAL EQUPMENT SHALL COMPLY WITH
NE
L-FOOT 1 MOUNTING PLAN VIEW ---
PV-3 SCALE:NTS 3 MOUNTING METHOD 7'
PV-3 SCALE NTS
EWRICEI
GROUNDING END/MID CLAMP
PV MODULE j`�— �
SUNPOWER EQUINOX
a= ��/ RAIL SYSTEMS
ALUMN."L"BRACKET � / COMPOSITE i
W/3/8"SS BOLT&NUT ��
� � SHINGLE ROOF
E OO-
G 6pow4 ��(a�1g SU
FLASHING LASHING
12"xl2"x0.050',,
% 3/8"x3.5"SS LAG BOLT 5050,MILL ` \� ��-�"� WITH MIN 212 Mou
"THREAD
EMBEDMENT,SEALED P01
PENETRATION
2 MOUNTING METHOD
PV-3 SCALE'314'=V-0' '�.-. �.�� F
mTEM ourm RAT
___(A)BUNPOYIER 9Ri Xx6x5aDK YAC IEGOIAEa 151RE NOCOIDUl BCIEOIIIE V0.TAOE DROP CALCIMigN N1G ARRAY CONFIGURATION PROJE,
DL NGMNIK POWER 250W VARE eUE CGNGIAT 9UE GQOIICIdi OEMIE MAR MICANVARTMO"In IANI
W COIDIKTOR wwa DC OIITN7T {x01.1Y
AC C9TMT CGNlwuoT VOLTAGE DROP
OVIR RA —_—
7ONTANNOMMAIO xl1/!10'1{FV wMTEDAT SfA02w•C __T_ BIlE CNWCUT LENGTH CINNEN _ I wi,VxMOUTPUI T{SKW BItANCII �-1
fEEPERATIAE OEMTNcp51'taN AIIMYT O 1 BRNCNn1ENOTN Ix I
�, N)PMWO TNWNx6(lY{wW0 CONDUCTOR IEgNI COMMNER Box wAWO tl wwA ZA{ L II MAXwCOPERARID ow BRANLNwlENO7N 11 1
OUT ®2WV("M"0A)) 1DO060x9V 71NM2OAOUNDN7PVC SSAM)6YBPANN• BIA OKTO COMBINER 00X TO
- pNIENI__ r-
M MM NRtALLw1-2 IOW CENtER MAV10 w A19A 0057% ' NOMINAL OPEMDNO x10V MAIKM 10lENG7N II RE
OKMTNG FREOUENCYIMWNOVAIVA y93l00S0lIN LGADGENTER TO AC -.------' VOLTAGE
TOIII MOGRE OIY,A I DE�
w MTEDATSSAOW, DISOMECi wArD q DNA *I^ f
AC MAX OONRNUOVS GUTPUT CUNENT®24w 09M TEMPE MTUIE DE MIND(E5X•pON - En
TINMxGRA
R)FMT2GRONi{U7MAVD TOTN VOLlAOE OgOP 11RRAYJ BOX lOP01 9AxIL I
1�2 MpN7PVC yA-361AMTO
ACLWICOiTINUIXBOUtTVI CUIRRCM Q209V 11w NSTAuwrlNm2 AC SYSTEM SUMMARYJiR
`NOMNN 8Y9tEY WlTAOE 1S0 VOlT9 AC E�AC MM CONt11M0US OVTM Pa+LA zAW wMTEO ATOM yW%CIINIIEMI-3fR640-MNIt EO AI INP9 ., 7MOQRIE]„2� � MGDOID„ E[EVO
p90' I YAX CUMEN7 PER w0aAK31 wAMPB
-' AC' rnwAWGTA'M-]6(17w ANV TEMPERA7URE OEBATNOgYaa w.
DC CEC EFFICIENCY wm---'� TI-20RONDN7PVC CQW(XJI��„OMEMT�w
ANI(UMi9 PEA ORANCHCNCUT g72N Ia991NE1N/vY) .�_ I INSTNL41-2 RRATICM AMPx1n•136A SRA2ICN w,3nRna1x6u BRANGM NrXtnsll{M
WXUNTSPER SRNICR CRCUl e2WV N(iWOPIXF) wWED ATATn Qw•F
Ac6 PT-2 lIOUN{I,KAWa TEMPFAATUIE OEBA7-IONGfOw
TMYAF2GRGIMDN I"PVC )SAX99&72A+•AO{MOK TO NA9lNL
w nrvnfz To urlLm cgro
6NMTEDAT�Mg9W I1�I`I1 REVOIUSUN
D191lWNG DNM2{UXILLWO TH,m TUIEGE MTNOgIx'OO wy �.4i• (E)Ill-DIRECTIONAL
AGS XM X6 w•x{BN•ISA pt TO,NSTALL 1
1NVMxORpRDN9Y PVC NI9 TAWE2 1 UTILITY METER
UGLILY OF NTERCONNECTNJII 1 I I /-PNASE.740 V
IMI INN;
�—IN —+• EXT BURDI G PER IEC H971IRX11{7951Ww1 w
�—ON ROOFTOP I I a LENOtH os Tw CG_CTGRS
t I AC CrfNSCONIIE S LNOT EXCEED WT
I I 240V.60NAP
NOWUSED u- _DATE
NE i MA 3R UL LISTED '
IN SlSEMENT PRO
i_..-
IN W LOAD CENTER i NCH
PV LOAD CENTER IS DEDICATED TO PV BREAKERS ONLY THERE ARE 240 VAC 175 A MAX I - `k2
NO UNUSED BREAKER POSITIONS N THE PV LOAD CENTER NEMA 1.UL USTEO I I AC DISCONNECT _ 10 A7
tt NOV 60AMP FUSED AG .SOUTH
ACS' rAC3f ,TO
O MAINE2NVR
(N)9NART METER J1 �WR AI�O TOMWSE 2lOV 1
wMOWLE
N -- PV -- - - ii1 11 L s M% lo9A2P J08N17—
Mt
MICR0VERTER--( BRANCHI (1) MODULE PER MICRO-INVERTER i L7 L2 L2 •-Ins--- I SUNPDWER AC250Nf BLV(11)MICROERTERS CONNECTED IN SERIES �6 UL LISTED a 275 KWSTC TOTAL H N (E)MAIN SERVIC
+1 7 0 G� PANEL.IA 1,
`-'1 G� G 3-W MURRAY, PROD
1DOA RATED,
MI SOLAR DECK � i � 24OV,2P
COMNNER BOX YI
*-A16i U
L
I/1
; *-MA{%lLISTED � 70A7ri
11 10 9 2 1 tt 11� - —:AW
, ENGINEEi
\ V I G�I
`-NUINCH LENGTH i 'INDICATOR I ZON2P I -
(� ' I EXISTING G0.0UNDNG
Ij � ELECTRODE SYSTEM
BPANCH2(1)P7MODULE PER MICRO-INVERTER
(II)WRO-INVERTER8 CONNECTEOINSERIES I G I
2 75KW STC TOTAL
i 26A� I
BRANCH 3(1)W NODULE PER MICRO-INVERTEq
(11)MEROINVEMER$CONNECTEONSERIES V IG G
2 75M STC TOTAL J 1
I
RIPV6u MNrtGRNG �.. ELECT
G N G I SH
I AC5 E�F
WARNING
PHOTOVOLTAICWARNING
ELECTRICAL SHOCK HAZARD POWER SOURCE____,
REQ'BY:NEC 690.31(G)(3) 40
TERMINALS ON BOTH LINE AND APPLY TO: DISCONNECT
LOAD SIDES MAY BE ENERGIZED DC WIRING CONDUCTORS OR ANY
IN THE OPEN POSITION ENLOSURE CONTAINING DC WIRING.
SPACING SHALL BE NO MORE THAN 10 FEET RATED AC OUTPUT CURRENT: 40.84 AMPS
EVO
REO'BY.NEC 990.53 _ 1 NOMINAL OPERATING AC VOLTAGE: -240 VAC
APPLY TO: - --- ----
AC DISCONNECTS INTERIOR AND EXTERIOR REQ'BY NEC 690.54 cmrRAcT
APPLY TO. REVOLUMM
AC DISCONNECT AND LABEL VOLTAGE AND
SOLAR PV SYSTEM EQUIPPED CURRENT WITH PERMANENT MARKER
WITH RAPID SHUTDOWN •• •.
• DATE
REQ'BY:NEC 690.56(CC) ow
TURN RAPID SHUTDOWN110 Al
5i
SWITCH TO THE"OFF" - --- APPLY TO: SOUTH
POSITION TO SHUT DOWN INVERTER NEXT TO DC SHUTOFF IF
INVERTER IS INSTALLED OUTSIDE, JOBM9A
CONDUCTORS OUTSIDE THE APN
ARRAY.CONDUCTORS OTHERWISE APPLY TO MAIN AC DISCONNECT
WITHIN ARRAY REMAIN
ENERGIZED IN SUNLIGHT.
T.E
REO'BY:NEC 690.56(C)(1)(A)
APPLY TO: -
INVERTER ONLY OR NO MORE
THAN 3 FEET FROM INVERTER SOLAR ELECTRIC CIRCUIT
BREAKER IS 13ACKFED�
REC!'BY:NEC?06.12 LB)-(34)--! 8
1 N' DUAL POWER SUPPLY SOURCES:UTILITY GRID APPLY TO: _
AND PV SOLAR ELECTRIC TO BREAKER OR AREA LABELING
TRUN OFF PHOTOVOLTAIC AC SYSTEM BREAKER SUPPLYING POWER TO
INVERTER AND OR 2 CIRCUIT LOAD
DISCONNECT PRIOR TO — CENTER
WORKING INSIDE PANEL REC1'BY:NEC 705.12(B)(3d) 16
APPLY TO: 1 7pu
CIRCUIT LOAD CENTER,MAIN
REC7 BY:NEC 690.54 SERVICE PANEL AND METER 9M
3 SOCKET a
APPLY TO:
MAIN SERVICE PANEL AND METER SOCKET
CF
ROOF DESCRIPTION 1 �O1E'
IAN�
ROOF Off AZIMUTH
#1 23- IW
RE
otxnvno
REVO
CONTRACT
Oevo sm
DATE
PF1G
Doul
10 AI
SOUTH
JOB#M.
APN
PRa
C
ENGINE@
E�l
A'
11
CF
LAN•
r PIP
r
dolt?, I tEEVO
Residential AC •• • Module
DesWi-Drawn M1"arI caNmrar
unmgr[rw9—I-1.11vony
SERIES - •.. .. - w.m�
•]Sy.a,MM,•+rvl Wnr a,Ir _ _ . - _. _. .IMMW
FA.OkrrMlrrE Yi1J!tD!Root _� ..• r .. �+
OPW- Perp.m—of ewer`ff-k* DATE
Re•ch New Customers
10 At
•c�lmge.•mrz _ DOIM
SOUTH I
XWAL
1
simple L Fast lingallatlon """
.f.r<' ltnJ'rY-mkYF9W :, •,: .• ..:-.,• .
•Pomus_ck,nwe Ixr1a K r�vr•�rors Optimize System and Installation Efficiency •• -
Eavp+;nm.l•�x�,m^(>r+�.ts�vr"*- .e.•. Iv ,. . .naxr 1 , .ol,.N 1. ,• .. If
or nttu•MI PE ,. - 1
--------------
.ympr.•cnv�sv�:n•q '• .• - - - ENDNIEH
C•re Of supenar Sy54em
•P.cM l�r,n.+•m.Ynf+JVM inaSlM�li'•"• ". - 1 .. �y
•B1`Px,CId4;4K.Mi Til.>fWty-d dP4^flrc .li."-. - +•t:.. '.,.[- yy S.,)1
I '
•A(s�sre.-.�;e re+er Pans z;^vh ar{tn a. ,�-/-,., e er �� ,c.., � ._ .
.P�wn^w*ynwa,*+v+wn,q aPP ra .. _.. - P � -���� .��---;—'--�-_• •�
c em tiara _
Sunpow:•r.Com I +•'I
71
1
SPIy
Ai
11'
F
F
PROJE
E
_----------------�----------�-------_--m--- •-•--------- - Importantf If an L-foot in its final installed position
extends above the top surface of the rail,you must Side view
ensure that the L-foot does not contact any part of EVO
the module or module/rome(Fig.20).
Warning!Do not step on,stand on,or walk on the "
modules or the module frames,and do not place
anything whatsoever on them—even for a moment.
1. Slide an end clamp over the same end of each of I ��' CONTRACT
the rows two rails,such that the clamp opens
away from the roof peak(Fig.21).Position the
clamp near the end of the rail. 110' Ar
Fig.20 .wwW
2. Position the first module atop the rats. Peak
DALE
!-a Alwaysp have workers and position each ♦01A
InvisiMount° Residential ® -xrdule. '10N
MI MI
i
Mounting System '°° "`
Importand If you afe Installing modules in APM
landscape povhon,ensure that you review the d
rail positioning table at the beginning of this
.r
section. —
INSTALLATION GUIDE
C
3. Move the first module into position rear the end FIB.21
of the raJz,and[hen reach Under the module
and slide the end clamps toward the rail ends,
ensuring that each clamp fits over the module
SUNPUWER
® frame edge as far as it will go(Fig.22). _
Note.Clearance is a between the roof surface and
the modules is a function of the roof attxhment
method chosen.
M.N.—Corp i"t_
N fasrris Fe+enea Fig.22
iAYrcn Im6
smC
•'f•.....µ 2 SuNawr P.'Y 0oonr••1oH11 w.f 1� w�'owr�-owrvY A'
HCUE
IAN
Residentialpipwiii
• �2EVO
Ample and Fad[ln9taLgo r
•Irxegrated R10d1,4:0 �O-rd liM n„
•Reassenqiecl and an0 entl c arrp; G0efTRWT
•INtatng mdca+rp for easy gacarKrrt IFp�voL
•MdcWrpwd]Ifx!rtates even nur,e�.ea
modu'e"5wrig rrw nr:�
•Smile.pre-di%ed ra�spice
wwwr
LA 2703 L Sled zregard grid n8 r
Flexible Design - pOUE
•Addresses 0ewr y SI S oMd resl0enUa ro&s
• Des'gn n andscape antl Portrait a,w x DW
:rq„ore u..64"C� •K'-ya asls,L+, •.riC C.i
•W s enshe easy obstsc a rnsvgernert: IOAI
' SOUTH II
B Customer PreferredAesthetics - JOW.11A
AM
•.1 mpdU4 and.1 maxron desy+E'UCS
Best-ri-c:ass sy-,.cmae:'trtcs Elegant Simplicity
•Rarni--W of a deign
Backanoesdccvvco's SunPowersinAstMount' isaSun?ower-designed
PROJ
•M men and c amps and end c amps raJ-based mounting system.The lrmsMounL system
hardware and rapped Bush raiK IIL-r
addresses residential sloped roofs anti comfrnes faster �
Pan of Superior System installation time,design flexibility,and superbr aesthetics
.,,x.s •.•....
••u'1fV usew:h Sur�VdJer DCaMKmodu es li ,.' u.... . ,w„., .rt,+
The InwsiMounr product was specA,cally ermz+oned and " '- -..•
•Best•nc:m sys�en reuati'ay and aestnehcs r, �=,r.:,,
Ctlmbnew7+swpowermodues and enginwed to pair with SunPower modules The resulting
mon Lang aPD dydtem level approach will amplify the aesthetic and r_s.,, +.=a+, .:,.-+�"•.::a..::.,: ..,
installation benefits for Koch homeowners and installers
A �i/�l�/ .. ,...• ...- .r. .., ra •,n,, ax ., •. ,tn. rwr.u.n.s .ti�
lYI sunpower.com
..,..a.. .,..,,., ....a ,,..�..... ... .,..rr,f.,.,, SPEC
SUNPOWER' • • a
11
CF
ova u!
LAN
.r. Q9(YUVDD
• • • .- •• • EVO
Improve upport, SunPower Monitoring Soiution. �i _ toles
Reduce Maintenance Costs Plug and Play Installation —
MiM.It1�ACrrey+NOrn,�AYCSKr•gr.phle.,jVu lit 1 .-.. t..�...I F IIIIIII - CONTRACT
IIEVIIIIM
SPP n V�4,.i ff1AP M hf)I^,R1Ni,rf SKCS L PC(,t.. u'..<lt.�... :•!i i
s ind Jde Emert�er. K rfgpdes.DC Hral�•
. U Arl rlY 91 h,mblKts,lt�,llt .-� r•� .., .-.n. .. ,^r C'W4,dM leb.Lr +NNINi.dnd hy"MC 1r,J1•M
AM L•*AkPSflw•`.re{x[5 .•r !•..• ••rl'ri,�.. antl Klsystems .w w
• tnt�te vryn�•ssxs a�arPrnxeHudpvR r;r..,: ,r rf ,un-='r;.•�:-.,.,.,. r. ,. •„
• D�.dq+ase s,/e,erva•e ./ .. �. a_, .. •. �•�.;,.�.ia,'. _ _, .„-�+1
DATE
DM
�• IOAI
Add value for Homeowners Robust Cloud Connectivity -.......
Nfi�the'HV•Puwer4MMo�';yANn - ,� f .._ _-_— I - rv.v
• SP2 aril tl10r Sp:dL 545Iern PG41GlK 0J(11 �--._- � GriiFq
CKeKrt.re 1t+ML X•Hr K.de$Itnml am SJR or ••r —�-- — — N 1
P•er�erDtT'6. l
• Seetl+co enagy:n¢e mxl c^shfnaeV d,sa•mFs .�. ' -.. e __..- y __—_ __ �._---_.—_...
See Ihe+r sour sysrtns a..!,xm:�n?:.srR the _ -�
Sun{brie m1r.YJfa,g We[fi9F•Jt LM,Die,y,p �.. -..- I _ .. - y+..1
Supports Multiple Inverter Types —- -- -- ----
ii
..� Ic
ac DrAWS13M rrE:14M22 SPEC
SUNPOWEW
A
_11
CsYtEE
PROIE
Vsl'
EverFlash gComp + Slide Kit
With Quick Mount PVS Elevated Water Seal Technology
V` ► Fast,simple installation that fits _
;N 1r with most composition roof types ---. -
► Minimal component count resulting in a LEVO
�•' � �. ''� lower overall installation cost
�.
'it ,, ► Compatible with CrossF?aif Shared Rail System —
caFFtFinaT
► Fused flute raised 0.3"above the metal flashing REVOLUSLN
to stop water encroachment ;
DA7E
Components ooM
70 AI
SOUTH
JO"
APN
ENGWOPRGJ
i 7
S /J
7F
00 Tools Required
► 112"socket (for lag bolt)
EverFlash gComp EverFlash L-Foot 5l16"Lag Bolt Slide Kit ► 7132"aircraft extention
Flashing 9x12" and Hardware
Material:stainless Material:aluminum ► Measuring tape
Material:aluminum Material:aluminum steel
Finish:mill,dark and stainless steel ► Cordless drill
Finish:mill,dark
► Torque wrench (0-50 ft/lb)
► Roofing bar ATTi
► SealantVI
s
sH
R E VO LU . S U N• ► String line
cleaner. smarter. solar. I �Fy
(781,3486496 , I Noah Avenue Sune A,aun�nQton MA 01803
VECTOR
E n a i n E E R s
VSE Project Number:U1883-0842-191
May 7,2019
Revolusun
ATTENTION:Ian Clifford
I North Avenue
Burlington,MA 01803
REFERENCE: Doug Pierce Residence:10 Andmar Lane,South Windsor,CT 06074
Solar Array Installation
To Ulom It May Concern:
Per your request,we have reviewed the existing structure at the above referenced site. The purpose of our review was to
determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on
the panel layout plan.Based upon our review,we conclude that the existing structure is adequate to support the proposed
solar panel installation.
Design Parameters
Code:Connecticut State Building Code,2018 Edition(2015 IBC)
Risk Category:II
Design wind speed:125 mph (3-sec gust)per ASCE 7-10
Wind exposure category:C
Ground snow load: 30 psf
Existing Roof Structure
Roof structure:2x6 rafters @ 16"O.C.
Roofmg material:1-layer composite shingles
Conclusions
Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation.
In the area of the solar array,other live loads will not be present or will be greatly reduced(2018 CSBC.Section 1607.12.5).
The glass surface of the solar panels allows for a lower slope factor per ASCE 7,resulting in reduced design snow load on
the panels. The member forces in the area of the solar panels are not increased by more than 5%;thus,the stresses of the
structural elements are not increased by more than 5%.Therefore,the requirements of Section 807.4 of the 2015 IEBC are
met and the structure is permitted to remain unaltered.
The solar array will be flush-mounted(no more than 6"above the roof surface)and parallel to the roof surface.Thus,we
conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible.
The connections to the existing roof shall be spaced at 48" maxinuun. It is our conclusion that any additional seismic
loadings related to the addition of these solar panels is negligible.
651 W.Galena Park Blvd.,Ste.101/Draper,UT 84020/T(801)990-1775/F(801)990-1776/www.vectorse.com
VSE Project Number:U1883-0842-191
E C T O R Doug Pierce Residence
5/7/2019
E n G i n E E R S
Limitations
Installation of the solar panels must be performed in accordance with manufacturer recommendations.All work performed
must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor shall notify
Vector Structural Engineering,LLC should any damage,deterioration or discrepancies between the as-built condition of the
structure and the condition described in this letter be found.Connections to existing roof framing must be staggered,except
at array ends,so as not to overload any existing structural member. The use of solar panel support span tables provided by
others is allowed only where the building type,site conditions,site-specific design parameters,and solar panel configuration
match the description of the span tables.The design of the solar panel racking(mounts,rails, etc.),the connection of the
racking to the roof and electrical engineering is the responsibility of others.Waterproofing around the roof penetrations is the
responsibility of others.Vector Structural Engineering assumes no responsibility for improper installation of the solar array.
VECTOR STRUCTURAL ENGINEERING.LLC
CT Firm License:PEC 0001229 pf COlyti''''
Roger Alworth.P.E. 05/07/2019
CT License:PEN.0026467-Expires:01/31/2020
Principal
Enclosures
RTA/bal
651 W.Galena Park Blvd.,Ste.101/Draper,UT 84020/T(801)990-1775/F(801)990-1776/www.vectorse.com
U1883
2-191
yTCTOR JOB NO.: GRAM 08 LOADSUBJECT: GRAVITY LOADS
n G i n E E R S
PROJECT: Doug Pierce Residence
CALCULATE ESTIMATED GRAVITY LOADS
Increase due to Original
ROOF DEAD LOAD D pitch loading
Roof Pitch/12 5.0
Composite Shingles 2.2 1.08 2.0 psf
1/2" Plywood 1.1 1.08 1.0 psf
Framing 3.0 psf
Insulation 0.0 psf
1/2" Gypsum Clg. 0.0 psf
M, E&Misc 0.0 psf
DL 6 psf
PV Array DL 3 psf
ROOF LIVE LOAD(Lr)
Existing Design Roof Live Load[psf] 19 ASCE 7-10,Table 4-1
Roof Live Load With PV Array[psf] 0 2018 CSBC,Section 1607.12.5
w/Solar Panel
SNOW LOAD(S): Existing Array
Roof Slope[x:12]: 5.0 5.0
Roof Slope[°]: 23 23
Snow Ground Load, p9[psf): 30 30 ASCE 7-10,Section 7.2
Terrain Category: C C ASCE 7-10,Table 7-2
Exposure of Roof: Fully Exposed Fully Exposed ASCE 7-10,Table 7-2
Exposure Factor, Ce: 0.9 0.9 ASCE 7-10,Table 7-2
Thermal Factor, C,: 1.1 1.1 ASCE 7-10,Table 7-3
Risk Category: II 11 ASCE 7-10,Table 1.5-1
Importance Factor, I5: 1.0 1.0 ASCE 7-10,Table 1.5-2
Flat Roof Snow Load, p,[psf]: 30 30 ASCE 7-10,Equation 7.3-1
Minimum Roof Snow Load, pm[psf]: 0 0 ASCE 7-10,Section 7.3.4
Unobstructed Slippery Surface? No Yes ASCE 7-10,Section 7.4
Slope Factor Figure: Figure 7-2b Figure 7-2b ASCE 7-10,Section 7.4
Roof Slope Factor, C5: 1.00 0.79 ASCE 7-10,Figure 7-2
Sloped Roof Snow Load, ps[psf]: 30 24 ASCE 7-10,Equation 7.4-1
Design Snow Load, S[psf]: 30 24
U188
-191
ECTOR JOB NO.. LOAD COMPARISON
SUBJECT: LOAD COMPARISON
E n O I n E E R S
PROJECT: Doug Pierce Residence
Summary of Loads
Existing With PV Array
D[psf] 6 9
Lr[pstJ 19 0
S[psf) 30 24
Maximum Gravity Loads:
Existing With PV Array
(D+Lr)/Cd[psfJ 20 10 ASCE 7-10,Section 2.4.1
(D+S)/Cd(psf] 32 29 dASCE 7-10,Section 2.4.1
(Cd=Load Duration Factor=0.9 for D,1.15 for 5,and 1.25 for Lr)
Maximum Gravity Load(psf]: 32 1 29
Ratio Proposed Loading to Current Loading: 91% OK
The gravity loads in the area of the solar array are decreased;thus,the stresses of the
structural elements are decreased.Therefore,the requirements of Section 807.4 of the
2015 IEBC are met and the structure is permitted to remain unaltered.
Shippee Solar and Construction LLC Doug Pierce
111 Sabin St Putnam CT 06260 10 Admar In
HIC #.0627891 South Windsor CT 06074
Phone# 860-450-2345
System Sizing: 8.25 kW STC
Total System install Cost: S 17,375
Major components & Engineering of site plan of the area the solar PV system is to be
installed, a 1 line electrical diagram,the furnishing of roof mounted arrays total of 33
SunPower 250 watt AC panels. SunPower AC inverters are pre mounted to panel.
Shippee Solar will supply, installation of solar array and wiring and grounding of all
components, AC disconnects mounted next to the Eversource meter(utility requirement)
and the connection into electrical panel. Electrical done by a licensed and insured
electrician. Cost of system also includes monitoring equipment for the solar PV system
(required by CT Green Bank, and labeling of components to meet local and state codes.
(Customer needs to supply the computer for viewing the monitoring).
Solar PV Rebate: S 3,499 estimated
CT Green Bank gives residential home owners a EPPB of MAX $0.46 for the
first 10 kWh and a rebate of MAX $0.39 for 10.01 —20 kWh.
The max rebate amount is based on due south with 0 shading on a 30 degree tilt angle.
I take a shade analysis of the area the solar array would be installed on, I give the
analysis readings to CT Green Bank and they give a calculation based rebate number.
This CT Green Bank rebate will be passes on to you upfront directly.
$200 Eversource interconnection fee for Net metering. Added into system cost
$120 energy audit which is mandated by CT Green Bank to receive rebates.
We set up the initial contact with the HES (Home Energy Solutions) vendor.
Building Permit Fee(set by your local town) Added into system cost
Warrantee:
• Customer initials:
All products used are new with complete manufacturer warranty We
warrantee all installation for 10 year. Does not include Act of God.
We will not be held liable for issues that don not directly pertain to the install of
the solar PV system. All of our work is completed to meet all local, state, and
federal NEC building codes.
Inverters warrantee is a minimum of 5 years.
Solar panel warrantee is a minimum of 20 years.
Shippee Solar and Construction LLC Doug Pierce
1 I 1 Sabin St Putnam CT 06260 10 Admar In
HIC #.0627891 South Windsor CT 06074
Phone# 860-450-2345
Shippee Solar& Construction LLC.
By signing our contract agreement,you are fully aware of and agree to abide to the following terms and
conditions:
As per the State of Connecticut statues,necessary facilities will be provided throughout the
duration of the project.This is to include but is not limited to power(ie. 1 WORKING outlet),bathroom
facilities,access to potable water,and any other necessary means to conduct regular business. If these
conditions cannot be met the provisions will be brought in(ie.Generator,porta potty,etc.)and will result in
an increase in contract cost as necessary.
The homeowner is responsible for the execution of a home energy audit.This includes the
scheduling of the appointment and providing Shippee Solar&Construction LLC with the proper
documentation showing completion. This does not require the solar to be installed and can be completed
anytime once the contract is signed. It is mandated by the state in order to receive your state incentive.
Solar systems will not be commissioned until it is complete.
Once the contract is agreed upon and signed,the signee has 3(three)business days to cancel
(excludes Sundays)without penalty. If the signee requests to opt out'of the contract beyond the third
business day they ultimately and knowingly will forfeit the initial 1/3(one-third)deposit made upon the
contract signing.
The signee agrees to make payments at the following intervals:
Initial 1/3(one-third)total contract cost due upon signing*
Second 1/3(one-third)total contract cost due upon material delivery**
FINAL PAYMENT DUE UPON SOLAR ARRAY COMMISIONING***
*Smart E-Loan will require additional signatures for deposit to be valid
**Smart E-Loan not subject to second payment
***Smart E-Loan release of final 2/3(two-thirds)payment paperwork MUST BE SIGNED
We take pride in assuring safety while providing quality installs in a reasonable time frame. It is
currently a state average of around 270 business days from contract agreement being reached and the
actual commissioning of the array. Proper processes(permits,inspections,Eversource approvals,etc.)do
take time and we want our customers to fully understand that from the start. Thank you for choosing to
"go greed"with us.We look forward to working on your project
Shippee Solar and Construction LLC Doug Pierce
111 Sabin St Putnam CT 06260 10 Admar In
HIC #.0627891 South Windsor CT 06074
Phone# 860-450-2345
NOTE:
Includes removal of roof shingles and installation of GAF shingles, grace ice and water
18in up rakes and 36in across bottom of roof on house.
Total system cost with install & electrician $17,375
Site plans $ 0
1 line Electrical diagram $ 0
Energy audit $ 120 (customer cost)
CL&P $ 0
Building permit $ 0
-CT Green Bank incentive -$3,499 estimated
$13,876
Estimated to produce 9,813 kWh per year
Install start date:
Install complete dated: on or around 2 weeks after install is started
May be longer for pole/ground installs
Customer gnature
Date: ,
ppee So Construction Signature:
Date:
845 Brook Street,Rocky Hill,CT 06067 CO N N ECT I CU T
T 860.563.0015GREEN BANK
ctgreenbankank.com
The following Connecticut Green Bank Residential Solar Investment Program (RSIP)terms and
conditions are expressly incorporated into the Contract. In the event of any conflict between these terms
and conditions and other sections of the Contract, the RSIP terms and conditions shall control.
Residential Solar Investment Program (RSIP)
Terms and Conditions
Version 11/1/2016
The Eligible Contractor(Contractor) or Third-Party PV System Owner(System Owner) agrees to and will
incorporate the following terms into each agreement/lease/power purchase agreement(PPA) between
the Contractor and Homeowner and/or System Owner if a Residential Solar Investment Program (RSIP)
incentive is requested, and will ensure that Homeowner provides signature as proof of agreement to
these terms:
1. Neither the Connecticut Green Bank(Green Bank)nor the State of Connecticut: (1) endorses the
workmanship of any Contractor; nor(2)guarantees,warranties, or in any way represents or assumes
liability for any work proposed or carried out by a Contractor. Additionally, the Green Bank is not
responsible for assuring the design, engineering, and construction of any PV system is proper or
complies with any particular laws, regulations, codes, licensing, certification and permit requirements,
or industry standards. The Green Bank does not make any representations of any kind regarding the
results to be achieved by the system or the adequacy or safety of such measures.
2. Where applicable, Contractor shall pass on to the Homeowner 100% of the Green Bank Expected
Performance Based Buydown (EPBB)as an up-front reduction in the total price of the solar
photovoltaic(PV)system.
3. Contractor and/or System Owner and Homeowner shall ensure and submit confirmation that a Home
Energy Solutions or equivalent energy efficiency auditor has audited the location of the PV installation
prior to EPBB or PBI disbursement.
4. No PV system receiving an EPBB or PBI shall be removed from the State of Connecticut for the
useful life of the PV system.
5. The Green Bank shall be entitled to all Renewable Energy Certificates(RECs)and any other tradable
energy or environmental-related commodity produced by or associated with the PV system during its
useful life, including but not limited to greenhouse gas credits, emissions credits, tradable carbon
credits, and all other types of tradable project-related commodities however named that are presently
known or designated or created in the future. This includes RECs generated from systems sized
greater than 20 kWPTC, unless such RECs are measured separately from the portion of the system
receiving a Green Bank incentive.
6. Homeowner acknowledges that a copy of the Guidelines for Renewable Energy Claims(Center for
Resource Solutions)found here: ctgreenbank.com/rec.pdf was provided to them.
Last updated 11/1/2016
7. Contractor and/or System Owner and Homeowner agree to install a revenue-grade meter and an
approved web-based monitoring system on PV system and maintain working connection with the
Green Bank's monitoring platform for the useful life of the PV system.
8. Contractor and/or System Owner and Homeowner agree that the Green Bank shall have access to all
data generated from the revenue-grade meter and monitoring system, either directly from the
monitoring system or an Application-Programming Interface (API), for the useful life of the PV system.
Contractor and/or System Owner and Homeowner hereby authorize the Green Bank to access such
data without their or any monitoring system vendor's prior authorization or approval.
9. Contractor and/or System Owner and Homeowner acknowledge that the Green Bank maintains the
right to inspect all residential PV systems prior to disbursement of EPBB or PBI payment.
Homeowner should make reasonable effort to coordinate with the Green Bank's Solar PV Inspector to
allow inspection to take place.
10. Contractor and/or System Owner and Homeowner acknowledge that the Green Bank is a public
agency for purposes of the Connecticut Freedom of Information Act(FOIA).Any material submitted to
the Green Bank will be considered a public record and will be subject to disclosure under FOIA.
Under Connecticut General Statute§1-210(b) and§ 16-245n(d), FOIA includes exemptions for trade
secret and commercial or financial information given in confidence. Only the particular information
falling within a statutory exemption can be withheld by the Green Bank. In no event shall the Green
Bank or any of its officers, directors or employees have any liability for the disclosure of documents or
information in the Green Bank's possession where the Green Bank, or such officer, director or
employee in good faith believes the disclosure to be required under FOIA or other law.
11. In consideration for your participation in the Residential Solar Photovoltaic Investment Program
("Program"), Homeowner does hereby disclaim, release and forever discharge the Green Bank, and
its officers, board, and employees jointly and severally from any and all actions, causes of actions,
claims and demands for, upon, or by reason of any damage, loss, or injury, which hereafter may be
sustained by Homeowner for participating in the Program.
Please direct all correspondence regarding these terms to the Connecticut Green Bank at
(860) 563.0015 or smallsolar a-ctgreenbank.com.
"I have read and agree t6 he above to
/17
I I
Customer Signatu1
Customer Name
Last updated 11/1/2016
�I
State of Connecticut
N
' Workers' Compensation Commission
7B
Wi �St\Mtt
Please TYPE or PRINT IN INK
rRAMSf(R�S
l
Proof of Workers' Compensation Coverage when Applying
fora Building Permit for the Sole Proprietor or Property Owner
who WILL act as General Contractor or Principal Employer
APPLICANT FOR BUILDING PERMIT
Name of Applicant for Building Permit / s[KWS >0!?11�
Property located at /O AL
in Out t!/�
in the City/Town of S7 ci-�(y:, GCS K� C /
ATTEST
If you are the owner of the above-named property or the sole proprietor of a business doing work on the site of the construction project at the above-named
property and you WILL act as the general contractor or principal employer,you must provide proof of workers compensation insurance coverage for all
employees.
Complete this form and,if applicable,sign the Affidavit below in the presence of a Notary Public or a Commissioner of the Superior Court.
CHECK ONE(1) BOX ONLY, provide the appropriate information,and sign:
❑ 1 am the OWNER of the above-named property.I WILL act as the general contractor or principal employer and,as such,will submit proof of workers'
compensation insurance coverage for all employees who are doing work on the site of the construction project at the above-named property.
Signature of OWNER Applicant
2"m the SOLE PROPRIETOR of a business doing work at the above-named property.I WILL act as the general contractor or principal employer and,as
such,will submit proof of workers'compensation insurance coverage for all employees who are doing work on the site of the construction project at the above-
named property.
Signature of SOLE PROPRIETOR Applicant
❑ I am the OWNER of the above-named property or the SOLE PROPRIETOR of a business doing work at the above-named property.I will not personally
submit proof of workers'compensation insurance coverage,but I will attest to the following
AFFIDAVIT
I hereby swear and attest that I will require proof of workers'compensation insurance for every contractor,
subcontractor,or other worker before he or she does work on the site of the construction project at the
above-named property in accordance with Section 31-2 rs om tion Act
Signature of OWNER or SOLE PROPRIETOR Applicant
Name of Business—,/applicable
Federal Employer ID#(FEIN)—rrapplicable
Subscribed and sworn to before me this day of 200
Signature of Notary Public/Commissioner of the Superior Court
T&S Homes and Electric LLC.
60 Bailey Hill Rd._
Danielson Ct 06239
Phone 860-234-8340
Uc # 0197207 E-1
T&S Homes and electric LLC. Gives Thomas Shippee of Shippee Solar and
Construction permission to represent T&S Homes and electric LLC As an agent to apply
for electrical permits.
Job location:
10 Andmar Ln
South Windsor CT
06074
Jeremy Sadowski
STATE OF C1NNECTICUT
ELECTRICAL UNLIMITED CONTRACTOR
JEREMY J SADOWSKI
310 HODGE POND RD
VOLUNTOWN,CT W84
C i ErPME
1-:1-C.0197207-E1 10/01/2018 09/30/2019
SIGNID
STATE OF CONNECTICUT ♦ DEPARTMENT OF CONSUMER PROTECTION
Be it known that
SHIPPEE SOLAR AND CONS,Z,RU
CTION LLC
111 SABIN St
PUTNAK CT 06260-1844
I
i
has satisfied the uaU
q cations required by law and is hereb re
HOME IMPROVE y gistered as a
MEND' CONTRACTOR
Registration # HIC-0627891
Effective: 12/01/2018
Expiration: 11/36/2019
Mtchede Seagull,CO°'��*toaer
:.� fret b.n. iUL11Y L:f )UF'rt< :,ira ..ys
(his Certified that this plan and st jrtc.tm 5 :re tru•
-opips of the proposed building or Alt—Minns to of
erected at
Str of
together with amendr•ents stated in application anq
flled with plan an] 1 e_r to cc•mpg -ith .-II zoning,
Building anti I—S r.A s:u.n Lrd.C, as shall be
Issued by t),e iir.. p�rtlncnt dorm g pendrnp/
of this appitc,t,on .111 issuance of a bulldiflig
permit.
6IShed _
?Ms plan is approved sublact to the onnditlon that
orders and nrdinanees regulating building, shall be
Cbmphrd with.
ZCO"ditllla2l�voved Qh !Z w
Euilding Inspe
ctor
y He.
Electric # APPLICATION FOR BUILDING PERMIT
Plumbing#
HVAC# (kJI,�UV/ / D.tte:
Sprinkler#
FINAL APPROVALS Estimated Cost $_
Permit Fee $
Building _ COMPLETE RED BOXED AREAS Occupancy Fee $
Engineering TYPE OR PRINT ONLY Eng. Insp. Fee $
Affidavit
Appr.for CO. SIGN ON REVERSE SIDE t
Total FeeTO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $
The undersigned hereby applies to do work according to the following: (�
/o q/t/,D �}tZ ln1 S a,
Applicant ,e r 4 cax_y LocationofWork to /40 Pt_O w Lot No.
Applicant's dress I(( S-Rai p, 51 Tel # 86&-Ka
Town eT Zip 0&2&c) Lic.#
Owner Architect
Owner's Address 60 tk(, t"4f- 14 Architect's Address
Zip Zip
Sq. Ft. New Area: 1 st FI. 2nd FI. 3rdFl. Total New Area
Purpose of this permit 5iQ&A t__ �U ��UC k^-F ll (( G
33 - a s� war-r ��� (s = �, z r Icy.,.
cywatefi J t Well J Septic System J Sewer J
Ins: HO SP Cert. Area Basement Garage
Approved b Date -/ Use Group� Co:�()
ructt n Toel
/ V U Rey
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required
distances from all other zones and is located in which this building and its use is allowed.
Signed
I hereby apply for a Certificate of Occupancy for the work described in this application for the permit.
Signed
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
INSPECTION FIELD SHEET 03/31/22
Printed by Middleton, Morgan 11 49 56
INSPECTION: 117324 FINAL PERMIT:
STATUS:
APPLICATION: 201900992
LOC: 10 ANDMAR LANE
SOUTH WINDSOR
PROPERTY ID: 03000010
OWNER: PIERCE DOUG & DANIELLE L
CONTRACTOR:
REQUEST BY:
PROJ DESC: INSTALL 33 ROOF MOUNTED SOLAR PANELS 8 25 KW ON RESIDENTIAL
WORK ORDER:
INSPECTOR: DOUG RESULT: PASS
REQUESTED: PRIORITY:
SCHEDULED: COMPLETED: 05/21/19
UNPAID FEES: 00 Date Time
MILEAGE: 00 TIME: TRAVEL ONSITE
COMMENTS:
Electric # APP ICATION FOR BUILDING PERMIT
Plumbing# V
HVAC#
Sprinkler#
FINAL APPROVALS Estimated Cost
Permit Fee $ _
Building COMPLETE RED BOXED AREAS Occupancy Fee $
Engineering Affidavit TYPE OR PRINT ONLY Eng. Insp. Fee $
-
Appr.forCO. SIGN ON REVERSE SIDE 4 Total Fee $
6P
TO THE BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT (Additional Cost) $
The undersigned hereby applies to do work according to the following: C)c
zx
Applicant O V,03 �e _ LoccationofWork / MO alit-.- C-N L�ottNCCo...
AppliA/ddress Tel # (rid' `lam 13Y��
Town`T cif vrc/l� Zip O 6 Z� Lic.# if/� OGZ7SQ/ _
Owner Architect
Owner's Address /O "(ttaztx�G L,-) Architect's Address
Zip Zip
Sq.Ft.New Area: 1 st Ft. /J 2nd FI. 3rd Fl. Total New/Area_-
Purpose of this permit /o0AW 6"C o/f �� a--.,
,&ee-)
City Water J Well 'J Septic System J Sewer J
Ins: HO SP V Cert. Area Baseme t Garage
Approved by Date Use Group, � Constructio T pe �—
W� is
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for Hhich this
permit is asked,and agree that this building is to be locate he proper rom all street lines,side yard lines,and required
distances from all other zones and is located in which s wilding and use is (lowed
Signed
I hereby apply for a Certificate of Occupancy for the work described in this application for the permit.
Signed
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
INSPECTION FIELD SHEET 02/15/23
Printed by Middleton, Morgan 15 46 14
INSPECTION: 117638 FINAL PERMIT:
STATUS
APPLICATION: 201901057
LOC: 10 ANDMAR LANE
SOUTH WINDSOR
PROPERTY ID: 03000010
OWNER: PIERCE DOUG & DANIELLE L
CONTRACTOR:
REQUEST BY:
PROJ DESC: REMOVE AND REPLACE ROOF SHINGLES 21 SQ
WORK ORDER:
INSPECTOR: WS-B RESULT: PASS
REQUESTED: PRIORITY:
SCHEDULED: COMPLETED: 02/15/23
UNPAID FEES: 00 Date Time
MILEAGE: 00 TIME: TRAVEL ONSITE
COMMENTS:
FINAL -INSPECTION INSPECTED BY ADAM CHROSTOWSKI - REF. ONLINE PERMIT VPC
BLDP-19-385
ALL INSPECTIONS:
INSPECTED INSPECTOR RESULT INSP DESCRIPTION
B001 FOOTING
B002 FOUNDATION
B003 FRAMING (ROUGH)
B004 INSULATION
B005 FIREPLACE / CHIMNEY
B006 WOOD / GAS STOVE
B009 OTHER
2/15/23,2:47 PM OpenGov
Town of South Windsor, CT
Inspection Report
Inspection: FINAL ROOF INSPECTION
Inspector: Adam Chrostowski
Inspection Date: Feb 15,2023
Record: Building Permit#BLDP-19-385
Location: 10 ANDMAR LN, South Windsor, CT 06074
Applicant:
Final Roof Inspection
Overall Result: Pass
https://southwindsorct.viewpointcloud.io/#/inspect/inspection-reporU9475 1/1
1900332 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER BUILDING PERMIT
DATE: 05/28/2019
GIS ID:03000010 FEE: 180.00
MUNIS APPLICATION# 201901057 BUILDING DESCRIPTION:
APPLICANT LOCATION
NAME: SHIPPEE SOLAR AND CONSTRUCTION LLC ADDRESS: 10 ANDMAR LANE
ADDRESS: I I I SABIN STREET. OWNER: PIERCE DOUG&DANIELLE L
10 ANDMAR LANE
PUTNAM,CT 06260
DESCRIPTION OF WORK: REMOVE AND REPLACE ROOF SHINGLES 21 SQ
SPECIAL CONDITIONS:
ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT.
a-4
CONSTRUCTION TYPE: 4�
OCCUPANCY GROUP: BUILDING O I IAL
5/28/201912:38 PM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE
1900187 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER ELECTRICAL PERMIT
DATE: 05/28/2019
GIS ID:03000010 FEE: 432.00
MUNIS APPLICATION# 201900992 BUILDING DESCRIPTION:
APPLICANT LOCATION
NAME: SHIPPEE SOLAR AND CONSTRUCTION LLC ADDRESS: 10 ANDMAR LANE
ADDRESS: 11 I SABIN STREET, OWNER: PIERCE DOUG&DANIELLE L
10 ANDMAR LANE
PUTNAM,CT 06260
DESCRIPTION OF WORK: INSTALL 33 ROOF MOUNTED SOLAR PANELS 8.25 KW ON RESIDENTIAL
SPECIAL CONDITIONS: INTERCONNECT O MAIN SERVICE
ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED TH ILDING DEPARTMENT.
a
CONSTRUCTION TYPE:
OCCUPANCY GROUP: BUIL15fNG OFFICIAL
5/28/2019 12:41 PM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE
1900331 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER BUILDING PERMIT
DATE: 05/28/2019
GIS ID:03000010 FEE: 180.00
MUNIS APPLICATION# 201900992 BUILDING DESCRIPTION:
APPLICANT LOCATION
NAME: SHIPPEE SOLAR AND CONSTRUCTION LLC ADDRESS: 10 ANDMAR LANE
ADDRESS: I I I SABIN STREET OWNER: PIERCE DOUG&DANIELLE L
10 ANDMAR LANE
PUTNAM,CT 06260
DESCRIPTION OF WORK: INSTALL 33 ROOF MOUNTED SOLAR PANELS 8.25 KW ON RESIDENTIAL
SPECIAL CONDITIONS:
ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT.
CONSTRUCTION TYPE: (AJL�
OCCUPANCY GROUP: BUILD FICIAL
5/28/2019 12:40 PM THE FEE ABOVE INCLUDES A$0.26 PER THOUSAND CT STATE EDUCATION SURCHARGE