HomeMy WebLinkAbout0 STONE XING GENERAL A Division of
Eastern
- Materials
Testing
Laboratorya
o
. .
FIELD REPORT JAWORSKI
GEOTECH,INC.
Project: Stone Crossing Client: Mannarino Brothers, Inc.
South Windsor, CT Contractor:
Project No.. 02396C Weather: Sunny, 85 degrees
J y, gre s �
Date: June 19, 2002
Purpose: To perform field density testing.
Contractor Activities:
Upon this writer's arrival, Simscroft Echo-Farms had prepared Phase I to 15-inches below
finished grade and Phase II to subgrade. Compactive efforts were applied using a vibrating
roller.
JGI Activities:
Twenty one field density tests were performed on previously placed earthwork using a
nuclear density gauge in general accordance with ASTM D 2922. The test results indicated
that the specified 95% minimum compaction requirement had been achieved as compared to
ASTM D 1557 test methods. Please refer to the attached Field Density Test Summary for
individual test data.
The General Contractor was notified of these results prior to JGI's departure from the site.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: N. Teodoro
Reviewed by:Xt
R Date: 6/28/02
TEST RESULTS X DO - DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution maybe made.
Eastern
A Divislt;n of
- Materials a-z-
JAWORSE
Testing
LaboratoryFIELD DENSITY TEST SUMMARY •
GEOTECH, IN(
Project: Stone Crossing Client: Mannarino Builders
South Windsor, CT Contractor: Simscroft Echo-Farms
Project No.. 02396C Weather: Sunny, 85 degrees
Date: 6/19/2002
Max Optimum Field Field
Dry Moisture Dry Moisture Spec
Test Lift or Density Content Density Content Percent Minimum
No. Location Elevation JGI Lab No. (pcf) (%) (pcl) (%) Compaction Compaction
1 Phase II Station 13.00 SBA C1103-02 133.5 6.3 128.8 6.6 95
2 Phase II Station 12.00 SBA C1103-02 133.5 6.3 131.3 7.3 ::::::9$; 95
3 Phase II Station 11.00 SBA C1103-02 133.5 6.3 131.6 6.9 95
4 Phase II Station 10.00 SBA C1103-02 133.5 6.3 129.8 7.9 :::::97:Z:::::::: 95
5 Phase II Station 9.00 SBA C1103-02 133.5 6.3 126.9 6.4 ::::::95:1:: :::: 95
6 Phase II Station 8.00 SBA C1103-02 133.5 6.3 129.5 5.5 :: ::9T:0::::::::: 95
7 Phase II Station 7.00 SBA C1103-02 133.5 6.3 132.4 6.4 ::::::9g:2:':::::: 95
8 Phase II Station 6.00 SBA C1103-02 133.5 6.3 130.2 6.5 ::::::: 95
Eastern A Division of
- Materials
Testing
Laboratory FIELD DENSITY TEST SUMMARY •"• ' •• •=
JAWORSK
cozECH.INC
Project: Stone Crossing Client: Mannarino Builders
South Windsor, CT Contractor: Simscroft Echo-Farms
Project No.. 02396C Weather: Sunny, 85 degrees
Date: 6/19/2002
Max Optimum Field Field
Dry Moisture Dry Moisture Spec
Test Lift or Density Content Density Content Percent Minimum
No. Location Elevation JGI Lab No. (pcf) (%) pcf) (%) Compaction Compaction
9 Phase II Station 5.00 SBA C1103-02 133.5 6.3 126.5 6.9 ::::::94;$:::::::::: 95
10 Phase II Station 4.00 SBA C1103-02 133.5 6.3 133.5 5.7 ..... 00:0::::: 95
11 Phase II Station 3.00 SBA C1103-02 133.5 6.3 132.2 6.5 ;:::::99;Q:::'::::: 95
12 Phase II Station 2.00 SBA C1103-02 133.5 6.3 128.3 7.3 95
13 Phase II Station 1.00 SBA C1103-02 133.5 6.3 130.0 6.0 :::97;A '::: 95
14 Phase II Station 0.00 SBA C1103-02 133.5 6.3 131.9 4.8 9$.$ :: 95
15 Phase I Station 1.00 15" C1105-02 135.1 6.3 127.7 6.0 94:5::::: 95
BG
16 Phase I Station 2.00 15" C1105-02 135.1 6.3 129.2 5.0 95:6:: :: 95
BG
Eastern A Division of
- Materials W�, :
Testing
LaboratoryFIELD DENSITY TEST SUMMARY
JAWORSK
GEOTFXH, INC
Project: Stone Crossing Client: Mannarino Builders
South Windsor, CT Contractor: Simscroft Echo-Farms
Project No.. 02396C Weather: Sunny, 85 degrees
Date: 6/19/2002
Max Optimum Field Field
Dry Moisture Dry Moisture Spec
Test Lift or Density Content Density Content Percent Minimum
No. Location Elevation JGI Lab No. (pcf) (%) (pct) (%) Compaction Compaction
17 Phase I Station 3.00 15" C1105-02 135.1 6.3 128.5 4.5 :::95:1::::: 95
BG
18 Phase I Station 4.00 15" C1105-02 135.1 6.3 135.1 5.0 1 U .O::':': 95
BG
19 Phase I Station 5.00 15" C1105-02 135.1 6.3 131.4 4.5 95
BG
20 Phase I Station 6.00 15" C1105-02 135.1 6.3 130.4 7.2 :: 9$:S:':': 95
BG
21 Phase I Station 7.00 15" C1105-02 135.1 6.3 131.4 4.5 �7;3:::: : 95
BG
MATERIAL DESCRIPTION:
C1103-02: brown C-F Sand,some C-F Gravel,trace Silt
C1105-02: brown C-F Sand,some C-F Gravel,some Silt
NOTES:
SBA=subgrade below asphalt
BG=below grade
Phase II,Sweet Meadow Road
FIELD SKETCH
Project: Stone Crossing South Windsor, CT
Eastern
Materials
Project No.. 0 2 3 9 6 C Date: Testing
Laboratory
a Division OfJaworski Geotech• !n,
-.
.L___--J
44
ail,
t
i .ate•/\ :�.'�
�,va
stone . .
'Project No.. • •C D.
�R K r '
ce-- �\
--:i :ice
yFR
41� �
fill OF
Mill '
ME< - f
Ilk
hNY I-
�'�., �►�� ..�' :, Imo. � .
�i
FIELD SKETCH
Project: Stone Crossing South Windsor, CT Eastern
_ Materials
Project No.: 02396C Date: /p'a Z Testing
- Laboratory
a Division ofJaworski Geolech• Inc.
Q9A I FUR
a It
I ! _ P - J L
Oil I I all
1.
if
if
� ' � i ► ;
•p,If J
! +
A Division of
Eastern
- Laboratory Materials
Testing
FIELD REPORT
JAWORSKI
Project: Stone Crossing Client: Mannarino Brothers, Inc. GEOTECH,INC.
South Windsor, CT Contractor: Simscroft Echo Farms, Inc.
Project No.. 02396C Weather: Sunny&clear, 86 degrees
Date: June 21, 2002
Purpose: To perform field density testing.
Contractor Activities:
Upon this writer's arrival, Simscroft Echo Farms was observed applying compactive efforts
to the material placed 9-inches below finish grade. Compactive efforts were applied using a
vibratory roller. Two field density tests showed that the 95% specified minimum compaction
was not achieved. Additional compactive efforts with a 10-ton vibratory roller showed no
improvement. This writer performed a surface test, which showed that the moisture of the
material was low within the first two inches of the surface. This writer was therefore asked
to return on Monday June 24, 2002 when water would be available on site.
JGI Activities:
Four field density tests were performed on today's earthwork using a nuclear density gauge in
general accordance with ASTM D 2922. Four of the test results indicated that the specified
95% minimum compaction requirement had not been achieved as compared to ASTM D 698
test methods. Additional compactive efforts were applied to these areas and compactive
efforts indicated adequate compaction. Please refer to the attached Field Density Test
Summary for individual test data.
The General Contractor was notified of these results prior to JGI's departure from the site.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: N. Teodoro
Reviewed by:MR Date: 6/27/02
TEST RESULTS DO X DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION DOES X DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division.of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution maybe made.
Eastern A Divisio&of
- Materials -
Testing
Laboratory FIELD DENSITY TEST SUMMARY
JAWORSKI
GEOnai. INC
Project: Stone Crossing Client: Niannarino Builders
South Windsor,CT Contractor. Simscroft Echo-Fauns
Project No.. 02396C Weather: Sunny&clear,86 degrees
Date: 6/21/2002
Max Opdmum Field Field
Dry Moisture Dry Moisture Spec
Test Lift or Density Content Density Content Percent Minimum
No Location Elevation JGI Lab No. (Pcf) (°/u) (Pcf) 0/.) Conpactioo Compaction
..............
1 Phase I 9" C1086-02 141.2 4.5 130.0 4.3 :;::92 I:::::::::: 95
Station 0+00 BFG
2 Phase I 9" C1086-02 141.2 4.5 131.9 4.0 :::::93.4:::;:;:;: 95
Station 1+00 BFG
3 Phase I 9" C1086-02 141.2 4.5 130.8 4.2 :::::::9 .b::::... 95
Station 0+00 BFG
4 Phase I 9" C1086-02 141.2 4.5 130.0 2.4 :: 92;I::: 95
Station 1+00 BFG
MATERIAL DESCRIPTION:
C1086-02:red-brown GF Gravel and Sand,trace Silt,bank rim.
NOTES:
BFG:below finish Bade
FIELD SKETCH
Project: Stone Crossing South Windsor, CT Eastern
—%fi Materials
Project No.. 0 2 3 9 6 C Date: f2 A 7 Testing
Laboratory
a Division ofJaworski Georech. Inc.
—
7
;pall q 0
VO
-X� I
G
I F-1 H
_J
.-J
all
4.
.11, 1 rill
J L J
XJ
M
; M
it q
41pl
list"
A VVFY
A Division of
�.
Eastern
- Materials
Testing
Laboratory FIELD REPORT • ••
JAWORSKI
Project: Stone Crossing Client: Mannarino Brothers, Inc. GE0IECH.INC.
South Windsor, CT Contractor: Simscroft Echo Farms, Inc.
Project No.. 02396C Weather: Clearing, 80 degrees
Date: June 24, 2002
Purpose: To perform field density testing.
Contractor Activities:
Upon this writer's arrival, it was determined that this morning's early rain would provide
adequate moisture for optimum compaction. Compactive efforts were applied using a
vibratory roller. Field density tests show that even after the maximum compactive effort,
95% of the 141.2 maximum dry density from lab # C1086-02 could not be achieved.
Therefore, it was concluded that there had been a sampling error. Observing last week's
compactive effort as well as today's, this writer used the highest field dry density as the
maximum density for a field proctor. This writer was notified that past station 5+00,
different material from Charbonneau and Sons was placed client provided proctor
information for this material. The tests show that 95%maximum compaction was achieved.
JGI Activities:
Eight field density tests were performed on previously placed earthwork using a nuclear
density gauge in general accordance with ASTM D 2922. The test results indicated that the
specified 95% minimum compaction requirement had been achieved as compared to ASTM
D 698 test methods. Please refer to the attached Field Density Test Summary for individual
test data.
The General Contractor was notified of these results prior to JGI's departure from the site.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: N. Teodoro
Reviewed by: lf Date: 6/27/02
TEST RESULTS X DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express xritten consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution maybe made.
Eastern A Division-of
- Materials FIELD DENSITY TEST SUMMARY
Testing
Laboratory ..• •
JAWORSKI
Project: Stone Crossing Client: Mannarino Builders GEOTECH• INC
South Windsor, CT Contractor: Simscroft Echo-Farms
Project No.. 02396C Weather: Clearing, 80 degrees
Date: 6/24/2002
Max Optimum Field Field
Dry Moisture Dry Moisture Spec
Test Litt or Density Content Density Content Percent Minimum
No. Location Elevation JGI Lab No. (pct) (•/.) (pct) (%) Compaction Compaction
1 Phase I 9" Field Proctor 132.4 4.0 131.9 4.5 :::99:6:::::: 95
Station 0+10 BFG
2 Phase I 9" Field Proctor 132.4 4.0 128.4 5.9 95
Station 1+00 BFG
3 Phase I 9" Field Proctor 132.4 4.0 132.1 4.4 : :::::::::: 95
Station 2+00 BFG
4 Phase I 9 Field Proctor 132.4 4.0 132.4 4.0 ::100.0:::::" 95
Station 3+00 BFG
5 Phase I 9" Field Proctor 132.4 4.0 132.4 3.9 :::14 .:D:: 95
Station 4+00 BFG
6 Phase I 9" Provided 138.0 7.0 131.5 4.8 :::95.3.:::: 95
Station 5+00 BFG by Client
7 Phase I 9" Provided 138.0 7.0 131.4 5.5 :;::;95:2:;: ::::: 95
In front of Lot 5 BFG by Client
8 Phase 1 9" Provided 138.0 7.0 132.1 4.6 ::9s:Z::::: 95
Between Lots 3&4 BFG by Client
MATERIAL DESCRIPTION:
red-brown C-F Gravel and Sand,trace Silt
NOTES:
BFG:below finish grade
FIELD SKETCH
Project: Stone Crossing South Windsor, CT
Eastern
Materials
Project No.. 0 2 3 9 6 C Date: 6//Z4/0-Z Testing
Laboratory
a Division of-iarworskj Georech.1,7c
<
>
a\
V".
V
Jq
-J
5;
Oil,
7).
4;
if
Jig
lid?
tj U
J;
'44
GRAIN SIZE DISTRIBUTION TEST REPORT
— -- ASTM C136.C117
100VK 1 [11 -11 -
r T soIF-TT-T-F-1
rta sue,
6o I ) _� a podikaeor iinm r i
70
Z 60 Al ... I
IN
U.
� I a
W2 Sp
i
ce
a 40 - - '-
1
30 {
20
10 I -
I
8 Sao S c
GRAIN SIZE—mmo
%Cobbles %Gravel Crs Med Fine %Fines
17.6 34.1 48.2 sin I Clay
0.0 31.2 %Sand 50.0 18.8
Classification: BROWN C-F SAND,some C-F Gravel.some Silt.
Sieve Size Sieve Size Cumulative %Passing %Passing Specification
(mm.) (inJno.) Wt.Retnd (Tot Sample)(Sand Port)Minimum Maximum
203.200 8"
125.000 5"
90.000 3.5" 0.00 100.0
57.000 2.25
50.800 2"
38.100 1.5" 2.81 89.1
25.400 1"
19.050 3/4" 4.62 82.1
12.700 1/2"
9.525 3/8"
6.300 114" 8.04 68.8 100.0
4.750 #4
2.000 #10 015 60.0 87.2
1.000 #18
0A25 #40 0A4 43.0 62A
0.250 #60
0.150 0100 0.72 26.5 38.5
0.075 #200 0.85 18S 27A
Total Dry Wt. 25.81
Split Wt 1.17
Project STONE CROSSING PHASE I &II Project No 02M Date: 6/19/02
Specification: Not Provided Lab No' C1105-02
Source Nature Base Matenal Sampled from:Sampled By Client At Phase I
Eastern Materials Testing Laboratory, a d/'w5/0n of Rema*S:
JAWORSKI GEOTECH.INC. NVLAP# 10316-0
PROCTOR TEST REPORT
140 --
138
136
134 -
132
t30
128 - -
126 --
124 ---t— t-
122
120
118 -_�- L I _
116 --
114
if
112 -
110 - '-- -- - -'i--
108 r
106
104
-50 00 50 100 150 200
WATER CONTENT(%)
%.Gravel 31.2 ]%Sand 50-0 %Oversized Stone +314' 17.9 %Sift 18.8
Classification BROWN C-F SAND,some C-F Gravel,some Sift.
Modified Proctor,ASTM D 1667 Method C
Point No 1 2 3 4 5 6 7 8 9
Com acted Wt 1522 1602E04
16.33
Wt of Mold 5.9 5.95.9
Wt.Wet+Tare 1 64 155 1.53
Wt D +Tare 1.61 1.49 1.42
Wt Tare 043 033 042
Wet Density 124.3 134.9 1384 139.1
%Moisture 25 5.2 6.9 11.0
Dry Density 1212 1283 1295 1253
MA74MUM DRY DENSITY fir") 129.9 PCF OPTIMUM MOISTURE frw* j Z%
Specific Gravity 2.65
D 4718 CORRECTION FOR OVERSIZE PARTICLES
MAXIMUM DRY DENSITY 135.1 PCF OPTIMUM MOISTURE La %
Project STONE CROSSING PHASE I &II Project No.: 0zMC Date 6/19/02
Specification: Not Provided jLabNo C1105-02
Source: Nature Base Matenal Sampled from. Sampled By Client At Phase I
Eastern Materials Testing Laboratory, a division of IRema*3:
JAWORSKI GEOTECH.INC. NVLAP#10315-0
r
GRAIN SIZE DISTRIBUTION TEST REPORT
ASTM C136.C117
100r-
f
90 I
NIII. 1 I
i %PA
80
70
{ 1 1 J
W 60
i
Z 50
W
IL 40
3020
10 I l
i
n 8 05i _ m 8 8m R 2 0
GRAIN SIZE-mm
%Gobbles %Gravel LME
Med Fine %Fines 29.8 54.4 1 Sift I Clay
0.0 29.4 1 %Sand 50.3 20.3
Classification: BROWN C-F SAND.some C-F Gravel.some SitL
Sieve Size Sieve Sine Cumulative %Passing %Passing Specification
(mm.) (inlno.) WL ReMd (fat Sample)(Sand Port)Minimum Matamum
203.200 8'
125.000 5'
90.000 3.5" 0.00 100.0
57.000 2.25,
50.800 2•
38.100 1.5' 2.43 89.4
25.400 1
19.050 314• 4.14 82.0
12.700 1/2"
9.525 318:
6.300 1/4 6.76 70.6 100.0
4.750 f4
2.000 #10 0.18 62.6 88.8
1.000 f18
0.425 #40 0.52 47.6 67.5
0.250 #60
0.150 #100 0.85 33.1 46.9
0.075 #200 1.14 20.3 28.8
Total Dry WL 22.97
Split WL 1.60
Project: STONE CROSSING PHASE I&II Project No.: 0239fiC Date: 6118/02
Specification: Not Provided Lab No: C1103-02
Source: Native Base Material Sampled from:Sampled By Client At Phase I I
Eastern Materials Testing Laboratory, ad not aA11'wks:
JAWORSKI GEOTECH,INC- I NVLAP#10316-0
• PROCTOR TEST REPORT
140 - -- -- .._ - -_---i--�---- -- - -- --
138 ,
-t_
136
134
132 }
130
Nix
128
126
124 1 N k I
122 1 AF
t -
120
114
112
110 - -- '
I
104 -- -- - ��- - - - - a
102
-50 00 5.0 100 15.0 200
WATER CONTENT II%)
Gravel 29.4 [%Sand 50.3 %Oversized Stone +3/4" 18.0 %Silt 20.3
Classification BROWN C-F SAND,some C-F Gravel,some Silt.
Modified Proctor,ASTM D 1667 Method C
Point No 1 2 3 1 4 5 6 7 8 9
Compacted Wt 15.33 15.92 16.18 16.31 15.93
M.of Mold 5.9 5.9 5.9 5.9 5.9
WL Wet+Tare 1 56 1.59 1.65 1.63 1.57
Wt D +Tare 153 1.53 1.57 152 1.41
Wt Tare 0.43 043 0.43 0.43 0.20
Wet Density 1257 133.6 137.1 1388 133 7
%Moisture 2 7 5.5 TO 10.1 13.2
D Densrly 122.4 126.7 1 128.1 126.1 1 118.1
MAMMUM DRY DENSITY Fri* 128.1 PCF OPTIMUM MOISTURE[nMA Z2%
Specific Gravity 2.65
D 4718 CORRECTION FOR OVERSIZIF PARTICLES
MAXIMUM DRY DENSITY 133.5 PCF OPTIMUM MOISTURE %
Project STONE CROSSING PHASE I &II Project No.. 0239K Date. 6118/02
Specification Not Provided Lab No: C1103-02
Source: Native Base Material Sampled from. Sampled By Client At Phase II
Eastern Materials Testing Laboratory, adnisionof Remarks:
JAWORSKI GEOTECH,INC. NVLAPtt 10316-0
SA
Fx--1 MEETING MINUTES
❑ FIELD OBSERVATION REPORT
Prepared by: John Samford
Project Information
Project: Filene's D/C 2002 Addition jJSA Project No: 01-30 May D&C Pro'.#: 2196
Date/Time of Meeting: 4-Jun-02 Weather: Clear/Sunny
Date of Issuance: 10-Jun-02 Location of Mt : Site
Project Location: South Windsor CT Purpose of Mt : Job Meeting
Project Team Contact Company Phone Fax E-Mail
Planner: Steve Sobo May D&C 314.342.6770 314.342,6127 steve sobo@may-co.com
Project Manager: Steve Sobo May D&C 314.342.6770 314.342.6127 Steve sobo@may-co.com
Field Project Engineer: Bruce Shoemaker May D&C 860.289.7952 860.289.7951 cell: 314.614.0945
May D&C Merchandiser:
Production Architect PM: Andrew Rauch JSA 412.788.1500 x214 412.787.5960 arauch@jsa-architects.com
Production Pro'.Architect: Andrew Rauch JSA 412.788.1500 x214 412.787.5960 arauch@jsa-architects.com
Concept Architect:
Interior Designer:
Lighting Designer.
Contractor Project Mgr.: Frank Poerio Poerio, Inc. 412.366.6700 412.366.1404 fpoerio@choiceonemail.com
Contractor Superintendent: Ray Ferguson Poerio, Inc. 860.289.7952 860.289.7951
Environmental:
Testing and Inspection: Robert Munck PSI 781.281.2355 860.827.6276 r.munck@psiusa.com
Persons Participating: Contact Company Phone Fax E-Mail
1. Steve Sobo May D&C 314.342.6770 314.342.6127 steve sobo@may-ro.com
2. Frank Poerio Poerio, Inc. 412.366.6700 412.366.1404 fpoedo@choiceonemail.com
3. John Samford JSA 412.788.1500 x245 412.787.5960 jsamford@jsa-architects.com
4. Steve Brogan May D&C
5. Alan Beaulieu Filene's 860.282.3006 860.282.4399
6. Ray Ferguson Poerio, Inc. 860.289.7952 860.289.7951
7. Dave Hroncheck DCB 770.992.2277 770.992.0554 davehroncheck dcbandcom an .
8. Paul Diehm May D&C 860.289.7952 860.289.7951
9. Steve Wronski W&H 2O1.933.7840 201.933.2144
12. Jim McGinn Filene's D/C 860.282.3017 860.282.3020 James McGinn@Filenes.com
13. Mike Rickwalder Filene's D/C 860.282.4385 860.282.3020 Mike_Rickwalder@Filene's.com
Additional Distribution: Contact Company Phone Fax E-Mail
1. Tim Lawler JSA 412.788.1500 x241 412.787.5960 tlawler@jsa-archftects.com
2. Andrew Rauch JSA 412.788.1500 x214 412.787.5960
3. Tom Mrozenski JSA 412.788.1500 x222 412.787.5960 tmrozenski@jsa-architects.com
4. David Nelson May D&C 314.342.6644 314.342.6127
6. Dana Steel JR Russo 860.623.0569 860.623.2485 j.r.russo@snet.net
7. Matt Austin CCI 314.991.2633 314.991.4614
8. Jeff Evans Benchmark 319.393.9100 319.373.3994
9. John Collins S.Windsor
Time,Date, Location of Next Project Meeting Tuesday,July 10,2002 @ 8:00 a.m.
'NOTE-PERSONS IN ATTENDANCE AND ADDITIONAL DISTRIBUTION MUST RECEIVE FAX OR EMAIL COPIES WITHIN 24
HOURS OF MEETING. MAILED COPIES ARE NOT REQUIRED UNLESS SPECIFICALLY REQUESTED.
Page 1 of 3
SA
New Business: 06/04/02
Date&Item# Description Deadline for
Resolution Action Taken B
6-4.1 Material handling CCTV coordination meeting needs to be arranged.
6-4.2 Need Brace letter addressing W&H's hanging of M.H. Equipment.
6-4.3 Al-issue with 6"bumper&trailer impacting of siding. Need to be resolved.
6-4.4 Mike Rickwater better coordination of shutdown for electrical tie-in.
6-4.5 Alan-Need 6"valve on riser 6 outside#43.
Open Report Items Carried Forward From Prior Meetings: 06/04/02
Date&Item# Description Deadline for
Resolution Action Taken B
2-13.7 Poerio prepared and issued construction schedule. Copy attached.
Revised today.
Steve Sobo issues:
2-13.25 Poerio to provide minutes from their subcontractor meetings to all parties.
Also to give to JSA to attach to their meeting minutes-action reports, RFI
Log, FWO Request Log and planning actions. Cary. 5-7: Carry. 6-4:
Carry.
John Samford (JSA) issues:
2-13.31 Distributed O&M and Warranty Checklist to Poerio to use as a guide in
creation of their submittal log and to assist in the project's close-out.
(Attached) Will revise. 5-7: Carry. 6-4: Carry.
Steve Sobo issues:
4-9.2 Bill Hoffman said to leave parapet wall. Ok with maintenance for accessing
roof. 5-7: Need ladder access. 6-4: Frank installed ramp to get ladder.
4-9.3 Hoffman questioned binder installation date-about a month.
5-7: Pave 5-28-02. 6-4: Paving complete.
5-7.1 Do not accelerate wall demo due to roof work and odors.
6-4: Remove wall now. Security by Filenes.
Paul Diehm issues:
5-7.3 Smoke vents-One damaged,will need to be replaced. 6-4: On order.
Steve Sobo Issues:
5-7.4 Field Work Order to be issued to replace valve in curb box. 6-4:
Complete.
5-7.5 Needs JSA letter concerning POS rooms to be affected. 6-4: Complete.
5-7.6 Dennis Krocker to call Joe Pallardy about heads above new trash chute. 6-
4: Ok as is.
Page 2 of 3
'5-7.7 Sprinkler submittals missing from section under Mezzanine. 6-4: SA
Complete.
5-7.8 One section of racking to be completed after Baler Installation. 6-4: Racks
75% -6/13.
Resolved Items: 06/04/02
Date&Item# IDescription
Progress: 06/04/02
Date&Item# Description
Steel Erection - 100%
Sitework-95%
Steel Detailing 99%
Electrical (Main Building)-80%
Electrical (Expansion)-80%
Sprinklers(Main Building)-30%
Sprinklers(Expansion)-90%
Masonry-95%
Plumbing Underground-100%
HVAC-75%
Roofing 95% Less coating
Toilet Rooms-60%
Plumbing Finish -0
Siding- 100%
Dock Equipment-50%
Dock Door-0%
Fencing&Gate-0%
Exterior Painting-0%
Attachment U dates: 06/04/02
Date&Item# Description Revision Dates
3112/02 Emergency Telephone Nos. N/A
3/12/02 RFI Log 6/4/02
3112/02 FWO Log 6/4/02
3/12/02 Submittal Log 6/4/02
5/7/02 1 Schedule 1 5/7/02
Page 3 of 3
• 467 LOWRIES RUN RD.
237
+OERIO
INC. 412-366-H, 7 - FAX: -
2 366 6767 • FAX: 412-366 1404
24 Hour Ti Mpr`pPC4' phone Numbers
Frank Poerio 724-449-3318
Poerio Incorporated
Topper& Griggs Dave Ward
Structural Steel 860-747-5737
Butler Company Robert Jacobsen
Sitework 860-688-8024
Limited Partnership Mike Moyher
Concrete 203-795-5987
Allstate Fire Sprinkler, Inc. Dave Thompson
Fire Protection 860-246-7711
McLain Electric Co. Jeff McLain
Electrical 860-667-9280
MRS Enterprises Inc. Mike Boucher
Metal Siding Cell Phone: 860-250-4519
or
Dave Lemoine
S60-747-4994
CGNT:zAC 7 OR5 ENGINEERS
AN E OUAL OPPORTI1AJ17Y FkfP1 nvcR
Filene's Windsor Ct
Task Name Duration Start End 2002
Jan27 Febro3 Feb/10 Feb/17 Feb/24 Mar/03 Mar/lo Mar/17 Mar/24 Mar/31 A /07 A r/14 A /21 AprJ28 Ma/OS Ma/12 Ma/19 Ma J26 Jun/02 Jun/09 Jun/16 JurLI23IJun/301 JuV07 JuW
Mobilize 3 00 d Jan/26/02 Jan/30/02
Temp Road 600 d JarV31102 FebJ07ro2
Earth WorklUti6hes 10 00 d Feb/04102 Feb/15/02
OJo F s Piers 14 00 d Feb/19/02 Mar/06102
SO JoisWeck/EreU. 15 00 d Mar/04IO2 Mar22/02
Conc.Found Wan 29 00 d Feb/19/02 Mar29ro2
Slab on Grade 22.00 di Mar25/02 A rp 23/02
Maso 15 00 dI A r/15ro2 Ma/03/02
Parapet Work 25 00 dI A r/15ro2 Ma/17/02
Roofing 10OOdI Ma 20A2 Junro3102
Melal Sidina 25 00 d A r29102 Jun/03/02
Overhead Doors 11.00 d JuN10ro2 Jun24/02�oadtn t
HVAC Dock Equip 11.00 d Apr/15/02 Ju UOI/02
HVAC 55 00 d A r/15ro2 JuU01ro2
Plumbing 55 00 d A r/15/02 JuV01102
Fke Protection 55.00 d A /15/02 JuVOtro2
Elec" 55 00 d A13015ro2 JuV01lD2
Slab on Grade Seal 14 00 d Jun24/02 Jul/12102
Demo Exist. rel 4.00 tl pr/01/02 av/13/0.^,.
EzlenorConcrele 3100d Arrotro2Ma/13ro2
Fencing 1100d Jun/17ro2 Ju1101/02
Toilet Room 46 OO d A r24102 Julro1/027=7
Printed:May/06102
Page 1
PARRAN.TLP
POERIO INC. SUBMITTAL LOG
JOB NAME AND LOCATION F,
ouTH to r2 C-T Division No.
POERIO JOB NO. 02,��op y SUBCONTRACTOR
T of Work
I CGS,p�TEM Shop TOARCH/ FROM ARCH/
NO: ITEMS Galc awes Samples SUBMISSION READ P.I. OWNER OWNER STATUS SUBOWNER OWNER TOARCFWV OM CH/
/'7;t' / i o a MISSION RECD P.I. STATUS
33 Cw s,74t- P Jrt, A &f.st
36 sl.• T.,,- /0;L
,
7 S `c orl LA Ct
3 �I.Ivss,..�y �,rFrulrrrr. I / si o;L ' o� y
r /b;-
S i9se�+rv, G.nr� (e�f I yC
y0 2 F/�r✓I5 �Kf+/C�aa L7L�/Xi'2 7.,oS fj{r',QTS@ I'P4/I.��.S,Pb�F.FCi4r�r�r�.tRt,�r-SS 3� 7/d G2o Z
Y3 Eu.ASTRIL APer nr%oIre,
U r tN{At'r/-S O.�I �-C rS f�3'j-GZ
POERIO INC. SUBMITTAL LOG
JOB NAME AND LOCATION
SoLA7'r+ wr�::nrc -�— Division No.
POERIO JOB NO. SUBCONTRACTOR
T of Work
ITEM shop
NO: TOARCH! FROM ARCH/ TOARCH/ F ROM ARCH/
ITEMS Calc Dwgs samples SUBMISSION REC-D P.I. OWNER OWNER STATUS SUBMISSION RECD P.I. OWNER OWNER STATUS
//�E' ^.?. / �9 0�-
/�2 Dwc,S �-- q,G�vEp
C ,a... c i SA..n Ef -ell 3/ a 2 �, 2. a ovc
/!7i y+ dt S N / 3/ d a.
/
li Fi�mE x �o� 7 a2 y Dom /fQ�, �5.. �►zN 1Z/A2_.
:2 ,S D� � '7 Q.L �L
�, f GPSSv�rtS / 702- 3 SraZ
/sc /17.c�n s
7 0 7 o Z j;; Fi¢L
c S/a o� 9/ oL �7 0 t9m� Rici.r SfQKf^+tE
•CZ&"S
010.
ocEsS ACsGrEGA = SE / oL
.vr {'/�/I SEw£2 P PlNC� yr� o� .'2I 0 .� 9/ G.�. / 6oZ /g1)4� n
E2/9,4 oNi„G r lo/ 4 ?/ Off- 01 3i p
�D t1rvN o L F_ l N h S�-N c�•. 0 �
. e- /a-r A /
�3 A,,..-f— o z Alto.
a ;�-- 03-
'S 5 PrrNk�f �� 2 02
(Zt a r S 14
o� oZ V10;�gr
/9PP.5 Pr, G�— tF,K Ft+(-
t,• ,I' �'�1.i4
�i4xr>n RECEIVED
Su C3S ELT Vf woe,:G /551�E RFSoI.v,�D ?
ROOF t 2eA w oLA T G r T- Pi P m 4-o C 4 A r, a2
/�//ate
o[ raE Pbu2r�0 +o Cr...rE2
a//9/� y e S
�-ron� o� S6R✓rcE .-� /
ar-r'v,L F CoV(C 2
�►IIG r�Ce�< A lr�'t.R� /Lc�u�/)T e �r1 f ��» D�— I� d�-
17 Ce/v—& .P 11- s147
3/jazz _
ee
/� Co,�..« • F S Ir'n r,cG pia F l Na r-Y ----
w r•.•�er Ca C....-cl.,.��l ,U^"�Fic .. . ...._�...._ �-�Lt^.�.N.
17
I
I _
t
f
i
I
1 I I
I 1
1 �
�i
• I
�'�--�d tf I I G s�`' Gv►�- FT
LO o rz
k
rni r
I, o Aevowe I�""r 1 P
202 Z ( D D V Z O D O
{ /�I De l,tlyd R Tv A A-j0 3✓- q
1.
I 1 Z 1 g 2P 1..
! I
RPM KC 3.
t 1 ..v `-A L93 �,I �{ 1 Rr2 lz"GPrm wrra W'GPrp L, S` `-I C►S- u
z
- J 0 cp
�t.ns3 "1 3 z I 3 L t
it L
lip
I
i
I,
I�
i►l
�
a�
i
i
I
r
I
POERIO INC. SUBMITTAL LOG
JOB NAME AND LOCATION gr S
o�.eTN tot L-r Division No.
POER10 JOB NO. a�aoc,y SUBCONTRACTOR
T 'Work
ITEM -
Shop TOARCW FROM ARCH! TOARCHr FROM ARCHr
NO: ITEMS Calc Dwgs samples SUBMISSION RECD P.1. OWNER
i-OA OWNER STATUS SUBMISSION REC P.I. OWNER OWNER STATUS
plYIE D
a 33 0.� S, ��r�►,w� A lei r c� s o3. a oa r
PP
%L i o� of 9 0 fi PP f
�b E� S/r+ So,.. o,« gµc,.�c_ •1 3 oZ s / /0;L APp.
\ ?7 $''C vr�vt 4 ,� ��oZ Ape-
r icN i� e
oA
/ oa oa y s az
yo i o� oa :fzLiz s o1 rlr'P N� �ia// f' �/�/✓/N�ss � 37�l.Z �' Q Z-
I f-/a '/ZS Z/0� FAL
cZ FitN$ KJALLN �4r7S PL,„b. a res 61 !�/ OZ :t- d;L O,v/
y yy a Z
A£
S02 o g 6�L APP-
Ew T/�i L e� I�PE•f/}T�e�o�$�,�{-
i
POERIO INC. SUBMITTAL LOG
JOB NAME ANp LOCATION ,LF,✓�c .s (,��}
So �' Division No.
aTN w,r.,�soz LT
POERIO JOB NO. S Joo SUBCONTRACTOR:
T of Work
IT
ITEM
NO: shop TOARCW FROM ARCH/
EMS Cale Dwgs Samples FROM
/T1 t T2�� /JACE,i�nt<L,v Tu GoD,Gev[CsH S,�S >G SUBM/ISS N � CHON RECDP.I. OWNER OWNER STATUS SUBMISSION RECD P.I. WER OWNER
STATUS
a 9 0 5- . ,r,a c rt /!7j ya S, ./�I / 3♦Ec�TP-E6s!oEDo_.Sr,ft-Ss
/ Gs 000 GZz� / r3S♦ 2�2 o pQ�a�-
AA�yO C.
o.2 � 19 0 L C
..
2
�oz 3 �eZ-
3�►°� �1�C�fr♦u/.sr $EQK • 7off- co LZ �7o 0.17- fF/4 f�c-
sa...S.��EKeuwC osS�E 6G•�erf,�•E..�GPrEA��JPcEo-..C�E/�/a•ScsEEsE1�sn=wS �x
ao
K X 3. Oa.
o�2 O
No":
a
♦!P�
APP
ie E L s E ex17
s/ oa 6; A
/9- i/7,- IG
�E2✓1L � 3/ d7� � p� ♦ Oa- J�
2 5�» /�[ E CoP•rC� O� 7 oZ
7-
� X
GEi9,� 2 a1 Qtu rnnrr S
s
� ♦ 02,25 X
.-,ei.-if
5 . ,t °'s- 3 -1 r ol-. /9 o�-- �i°y.
�g •�/ H T G k u2 ES .3 0� of / oa ♦9,aPP.
Tct4td
Alll/ o� 3/ c2 a o� F�9-G
...-___ ....._._.._.. .. � III
)L2 s"`'v� ,J� �. - Loh I.I
Lh
•-7'2- I L(
C
-
nc7ol cool
r c-,c7 c7 c,
`-Z 66A.
+ITG�by Qc
-zo/*o/'�
'••i� r�r �iMi'
r... ....•..N1N4.i�
Faeovc.S RFz 4 oG
FA'AM1> '2ECEIv6�
SU 19 5- GT A�ff �i�G� /5SUe RFSoLVCD ?
R Uo� t P-A i;., ou r L:r T- Pt P a +o c 8 A G
Fco�ri-cd s �!-e OF- Poa2r�D •�-o eg"T'C2
r • .
3 prr-,4cNOflRlv7— A-ac r9 -r o•F SFjer1CC
a o
?C.: S is LE
,,. ._ +� waf '� s�r✓icF Coves 2
ANcHa�-Goif$ 'Y` G./u»+s -�1R- S 9'1 s*-T99
----------
Aft111,
3XI, �a 2--
l� �t' Co,�,.r+-�_�'+-••v- • F SI'y�ir/cC.,�!'iq'�`C� � v..-._._. _..FI o ...... ...._.._...
...__.__—
.
1