Loading...
HomeMy WebLinkAboutCambria Bound Construction SK DrawingsHJLH.8 H.2 9 8.8 8.9 218 KING 01 220 KING 01 222 KING 02 RD OD RD OD PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO. Fairlawn, OH 443333660 Embassy Parkway www.mpg-architects.com 330.666.5770 15815 SKETCH FOR RFI #3 SK-01 CAMBRIA SUITES HOTEL OCTOBER 15, 2018 1/8" = 1'-0"1 PARTIAL 2ND-FLOOR ROOF DRAINS 3" OVERFLOW CONDUCTOR DOWNSPOUT NOZZLE AT EXTERIOR FACE, COORDINATE FINISH WITH OWNER DOWNSPOUT NOZZLE AT EXTERIOR FACE, COORDINATE FINISH WITH OWNER 3" ROOF DRAIN CONDUCTOR TO UNDERGROUND STORM EXTENSION TO STORM, BY CIVIL 3" STORM CONDUCTOR ROUTED ABOVE DROP-CEILINGS 3" 3" Floor 01 0" 1 TOF -1'-4" 8'-6" (COORDINATE WITH VENDOR)8"8"1'-4"4'-0" PROVIDE A CORROSION-RESISTANT COVER SUFFICIENT TO SUPPORT LIGHT FOOT TRAFFIC #4 DOWELS @ 12" O.C. (3) SIDES #4 @ 12" O.C. EACH WAY, TOP & BOTTOM. REFER TO STRUCTURAL DRAWINGS REFER TO WALL SECTIONS & DETAILS DRAIN OUTLET, COORDINATE WITH PLUMBING DRAWINGS CONSTRUCTION JOINT 2 SK-02 1'-0"1'-0"6'-6" EQUIPMENT Floor 01 0" G F 1 SK-02 1'-0"8'-0"1'-0" 10'-0" 1/4" / 12"1'-0"REFER TO PLANS DRAIN OUTLET, COORDINATE WITH PLUMBING DRAWINGS LINT SCREEN #4 @ 12" O.C. EACH WAY, TOP & BOTTOM #4 DOWELS @ 12" O.C. (3 SIDES) PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO. Fairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com 330.666.5770 15815 WASHER PAD DETAILS SK-02 CAMBRIA SUITES HOTEL OCTOBER 18, 2018 3/4" = 1'-0"SK-02 1 WASHER PAD PERPENDICULAR TO TRENCH 3/4" = 1'-0"SK-02 2 WASHER PAD PARALLEL TO TRENCH (2) C15x33.9 x 5'-10 BEARING PLATE PL 1/2"x7 1/2" x 1'-9" (2) #4 HOOKS REBUILD MASONRY CORNER. GROUT SOLID 16" HIGH x 32" LONG EXISTING W24 (4) 3/4" DIA. A325 BOLTS IN DOUBLE SHEAR, EACH SIDE FACE OF EXISTING CMU V.I.F. GAP 8"2'-0" Fairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO.330.666.5770 15815 BEAM TO CMU REPAIR EXAMPLE SK-03 CAMBRIA SUITES HOTEL JUNE 14, 2019 1" = 1'-0"SK-03 1 BEAM TO CMU REPAIR EXAMPLE F O R R E F E R E N C E O N L Y ! D W DE 7 2 A300 2 A300 7.2 7.5 2 A651 D.5 6.3 2 1/4"5 1/2"8'-6 7/8"5 1/2"8'-6"5 1/2"8'-4 1/4" 5'-10 1/4"5 1/2"2'-2 1/4"5 1/2" 2D1 2 HR 2D1 2 HR 2E 2 HR 1L1 1 HR 2D1 2 HR 0L1 0 HR 036 GUEST LAUNDRY 035 ELEV. EQ. RM 0G1 0 HR 039 FITNESS CENTER 151 CORRIDOR 32" HIGH FOLDING COUNTER 1L1 1 HR 1L1 1 HR 036 A035 151 A 9'-8 3/4"5'-7 3/4"5'-2 1/2"Fairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO.330.666.5770 15815 ROOMS 035 & 036 REVISED II SK-04 CAMBRIA SUITES HOTEL 1/4" = 1'-0"SK-04 1 ROOMS 035 & 036 REVISED OCTOBER 8, 2019 0 4' 8' 10' 1/4" 1'-0" 6' R E C E I V E A P P R O V A L F R O M O W N E R P R I O R T O A N Y W O R K 9 CURTAIN WALL GLAZING SYSTEM, SEE PLANS/DETAILS FASTEN BENT METAL CHANNEL TO METAL STUDS, TAPE AND MUD OVER METAL CHANNEL UP TO CORNER. PREP FOR PAINT. REFER TO FINISH SCHEDULE 1 5/8" METAL STUD TO ATTACH TO EXTERIOR WALL. FILL CAVITY WITH SOUND ATTENUATING BATT INSULATION BENT METAL CHANNEL -FINISH TO MATCH GLAZING SYSTEM (TYP. BOTH SIDES) 2x4 OR 2x6 WALL CENTERED ON MULLION. REFER TO FLOOR PLAN FOR WALL TYPE AND INFORMATION 1/2" -3/4" SOFT FOAM MATERIAL (COLOR TO MATCH CURTAIN WALL SYSTEM) SILL BELOW, SEE DETAILS WALLCURTAINDETAILSSILLSEEFairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO.330.666.5770 15815 TYPICAL WALL END AT MULLION SK-05 CAMBRIA SUITES HOTEL 1 1/2" = 1'-0"SK-05 1 TYP. WALL END AT MULLION DECEMBER 12, 2019 0 1' 2' 1 1/2" = 1'-0" 8 L A706 16 17 18 19 N VTAC WHIRLPOOL -REFER TO PLUMBING PROVIDE CONTINUOUS 2x BLOCKING AROUND THE JACUZZI TO SUPPORT STONE TOP (ST-02) AS REQUIRED. BUILD UP SO THAT JACUZZI WILL 'SIT' INTO STONE. STONE SUB CONTRACTOR TO COORDINATE WITH JACUZZI MEASUREMENTS COUNTER5'-9"COUNTER 5'-8" 'GRAY' AREA IS OPTIONAL EXTENSION OF STONE TOP; COORDINATE WITH OWNER AND PROVIDE ADDITIONAL BLOCKING AS REQUIRED.3'-0"Fairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO.330.666.5770 15815 1/A706 WHIRLPOOL SK-06 CAMBRIA SUITES HOTEL DECEMBER 24, 2019 0 4' 8' 10' 1/4" 1'-0" 6' HJ G FPA PA PB PB PC PC PD PD P1 P2 9 L 4 SK-07 W16x40W16x40 W16x40 W16x40 W16x40W16x40 W16x40 W16x40 W16x40 W16x40 W16x40 W16x40 HI & LOW W24x94 -CHAMFEREDW10x49W10x49W10x4910'-0"16'-0"10'-0"5'-10"5'-11"TRANSLUCENT POLYCARBONATE GLAZING SYSTEM OVER STEEL BEAMS/FRAMING -PAINT ALL EXPOSED STEEL TO MATCH EC-6, TYP. 1'-3"6'-5 1/4"7'-8 1/2"7'-8 1/2"7'-8 1/2"6'-5 1/4"1'-3" 2'-11"7'-1"10"13'-2"2'-0"7'-1 1/2"2'-10 1/2"1'-2" (6) 25'-0" LONG x 1'-0" TALL x 0'-6" WIDE CUSTOM TUBE STEEL AT EACH NORTH/SOUTH MULLION (REFER TO TRANSLUCENT CANOPY SHOP DRAWINGS). PAINT STEEL TO MATCH EC-6. (REFER TO SHOP DRAWINGS) 38'-6" TRANSLUCENT CANOPY (UPPER)@ 1"/12" SLOPE (4.76 DEGREES)28'-0" TRANSLUCENT CANOPY (UPPER)(LOWER)10'-0" TRANSLUCENT CANOPYW24x94 -CHAMFEREDW24x94 -CHAMFEREDW24x94 -CHAMFEREDHSS7X0.500 HSS7X0.500 HSS7X0.500 (ABOVE) (ABOVE) (ABOVE) 37'-10" TRANSLUCENT CANOPY (LOWER)W10x49W10x49W10x49W10x49W10x49HJ FPA PAPB PC PC PD PD P1 P2 9 8.8 L 8.9 G9 4 SK-07 10'-0"16'-0"10'-0" EL.-4'-8" FOOTING 5 EL.-4'-8" FOOTING 5 EL.-4'-8" FOOTING 5 EL.-4'-8" FOOTING 5 W10x49W10x49W10x49W10x49W10x49W10x49W10x49W10x492'-0"12'-0"2'-0"2'-0"6'-0"4'-0"6'-0"10'-0"6'-0"4'-0"6'-0"2'-0"3'-1"3'-1"6"1'-11"5'-11"5'-10"PROVIDE NEW MINIMUM 8" THICK CONCRETE SLAB (DIAGONAL HATCH) WITH 6x6 W2.0xW2.0 WWF (LOCATED 2" FROM TOP OF SLAB) ON TOP OF COLUMN FOOTERS AND EXTENDING A MINIMUM OF 2FT BEYOND FOOTING PERIMETER.'NEW' 8" CONCRETE PAD SET ON TOP OF COLUMN FOOTINGS16'-0"(EXISTING) (EXISTING) 'NEW' 8" CONCRETE PAD SET ON TOP OF COLUMN FOOTINGS 46'-0" REFER TO BUILDING DRAWINGS FOR MORE INFORMATION Floor 02 15'-2" Floor 01 0" TOF -1'-4" P1P2 9 8.8 BOF -4'-0" 1 1/8" 10"x1"x18" PLATE w/ (6) 1" DIA HIGH STRENGTH BOLTS TO BEAM FLANGE CANOPY STEEL COLUMN, REFER TO PLANS 1'-6"TOP OF COLUMN2'-7 1/2" FROM2'-0"5'-10"5'-11"2'-5"3'-4"1'-4"10'-4"9'-11"11'-9" STAMPED CONCRETE, REFER TO ARCHITECTURAL 1'-4"2'-8"1'-11"7'-1"4'-8"5'-8"1'-0"8'-0" 7" DIA x 1/2" THICK HSS BEAM WELDED TO BEAM AND PAINTED TO MATCH EC-6, TYPICAL. STEEL BEAMS -PAINT ALL EXPOSED STEEL TO MATCH EC-6, TYP. 3" RADIUS 18'-0" RADIUS 1'-2" TRANSLUCENT POLYCARBONATE GLAZING SYSTEM (BY OTHERS) ALUM GUTTER AND DOWNSPOUT, PAINTED TO MATCH EC-6. REFER TO ARCHITECTURAL 13'-5 1/4"2'-0"15'-5 1/4"14'-11 1/2"1'-8" 25'-0" 1'-4" W16x40 W16x40 W16x40 W16x40W24x94 -Chamfered Beam 25'-0" LONG x 1'-0" TALL x 0'-6" WIDE CUSTOM TUBE STEEL AT EACH NORTH/SOUTH MULLION (REFER TO TRANSLUCENT CANOPY SHOP DRAWINGS). PAINT STEEL TO MATCH EC-6. 4.76° (1"/12") 5'-0"1'-0"5'-0"7"1'-4"8"W16x26 2'-0"8"'NEW' 8"CONCRETE SLAB OVER CONCRETE FOOTINGS, REFER TO FOUNDATION PLAN (THIS SHEET) FOR MORE INFORMATION X X XXX X X XXX X X XXXX 10'-0" REFER TO BUILDING DRAWINGS FOR MORE INFORMATION LIGHT FIXTURES ATTACHED TO STRUCTURAL STEEL FLANGE - REFER TO ELEC. DWGS NOTE: THE ORIGINAL CONTRACT DOCUMENTS DEPICTED THE STRUCTURE WITH A SLOPE AT 1/2" PER FOOT, WHILE THE THE TRANSLUCENT CANOPY DRAWINGS DESIGNED BY MAJOR INDUSTRIES (DATED 1/2/2020) HAVE A 1" PER FOOT SLOPE. THE COLUMNS AT P2 HEIGHT HAVE CHANGED AS A RESULT, ALONG WITH THE HEIGHTS/ANGLES OF ALL ASSOCIATED 'HORIZONTAL' STRUCTURAL COMPONENTS. -4'-8" BOF 16'-4 1/2" 17'-2 1/2" EXISTING COLUMN FOUNDATIONS (ALREADY POURED) OUTLINE OF COLUMN ENCLOSURE, REFER TO ARCHITECTURAL DETAILS HJ G FPA PA PB PB PC PC PD PD P1 P2 9 L 4 SK-07 W16x40W16x40 W16x40 W16x40 W16x40W16x40 W16x40 W16x40 W16x40 W16x40 W16x40 W16x40 HI & LOW W24x94 -CHAMFEREDW10x49W10x49W10x4910'-0"16'-0"10'-0"5'-10"5'-11"OUTLINE OF TRANSLUCENT POLYCARBONATE GLAZING SYSTEM OVER STEEL BEAMS/FRAMING -PAINT ALL EXPOSED STEEL TO MATCH EC-6, TYP. 2'-11"7'-1"10"13'-2"2'-0"7'-1 1/2"2'-10 1/2"1'-2" (6) 25'-0" LONG x 1'-0" TALL x 0'-6" WIDE CUSTOM TUBE STEEL AT EACH NORTH/SOUTH MULLION (REFER TO TRANSLUCENT CANOPY SHOP DRAWINGS). PAINT STEEL TO MATCH EC-6.W24x94 -CHAMFEREDW24x94 -CHAMFEREDW24x94 -CHAMFEREDHSS7X0.500 HSS7X0.500 HSS7X0.500 (ABOVE) (ABOVE) (ABOVE)W10x49W10x49W10x49W10x49W10x496'-5 1/4"7'-8 1/2"7'-8 1/2"7'-8 1/2"6'-5 1/4"25'-0"6" 0 4' 8' 10' 1/4" 1'-0" 6'0 4' 8' 10' 1/4" 1'-0" 6' REVISIONS N PROJECT #: DATE:phonefaxmpg-architects.com330.666.5770330.666.88123660 Embassy ParkwayFairlawn, OH 44333ENTRY CANOPYSK-07CAMBRIA SUITES HOTEL1000 LONGLEAF LANE,SOUTH WINDSOR, CT 060741 OF 115815JUNE 24, 20161/4" = 1'-0"SK-07 2 FRAMING PLAN - ENTRY CANOPY 1/4" = 1'-0"SK-07 1 FOUNDATION PLAN - ENTRY CANOPY 1/2" = 1'-0"SK-07 4 STRUCTURAL SECTION - ENTRY CANOPY EXPLANATION OF REVISIONS TO CANOPY: • ORIGINAL CONTRACT DOCUMENTS REQUIRED THAT THE GENERAL CONTRACTOR HIRE A STRUCTURAL ENGINEER AS PART OF THEIR SCOPE TO DESIGN THE ENTIRE CANOPY (FOUNDATIONS, FRAMING, TRANSLUCENT MATERIAL, ETC.) -THIS WAS NOT DONE. • THIS SHEET REFLECTS THE CHANGE FROM THE PROTOTYPICAL 1/2"/12" SLOPED ENTRY CANOPY AS ORIGINALLY SHOWN, TO THE PROPOSED 1"/12" SLOPE BY THE TRANSLUCENT CANOPY COMPANY (BY MAJOR INDUSTRIES). • GENERAL CONTRACTOR SHALL SUBMIT STEEL SHOP DRAWINGS FOR ALL STEEL COMPONENTS NOT BY MAJOR INDUSTRIES REGARDING THE CANOPY AND ASSOCIATED STRUCTURE.JANUARY 8, 2020REFER TO DESIGN DRAWINGS FOR ADDITIONAL INFORMATION REFER TO DESIGN DRAWINGS FOR ADDITIONAL INFORMATION REFER TO DESIGN DRAWINGS FOR ADDITIONAL INFORMATION 1/4" = 1'-0"SK-07 3 FRAMING PLAN - ENTRY CANOPY (FRAMING ONLY) REFER TO DESIGN DRAWINGS FOR ADDITIONAL INFORMATION VERIFY ALL EQUIPMENT PRIOR TO FABRICATION OF MILLWORK. TB-02 TB-02 WC-06WC-06 TILE BASE VINYL WALLCOVERING PT-11 PL-01T-16 ART DIN-701 50" T.V.50" T.V. T-16 PL-05 9"9"12'-0"9"9" LOCATION OF SD5, SEE PLAN DETAIL 4'-9"2'-6"4'-9"3'-0"0"3'-0"3'-0"9"9"9"9"9"LINE OF SOFFIT ABOVE, SEE ELEVATION BELOW T-16 PL-05 SD5 LIGHT WITH ALE CHANNEL Fairlawn, OH 44333 3660 Embassy Parkway www.mpg-architects.com PROJECT NO. PROJECT INFORMATION DATE: SHEET NAME SHEET NO.330.666.5770 15815 SD5 LIGHT @ 5/I1.11 AND 5/I2.04 SK-08 CAMBRIA SUITES HOTEL 1/4" = 1'-0"1 BAR ELEVATION B FEBRUARY 25, 2020 1" = 1'-0"2 SD5 LIGHT H.8AIRTYP. FLOOR LINE1B11HR1B11HR22S2 HRTYPICAL CORRIDOR FLOOR ASSEMBLY OR GUESTROOM FLOOR ASSEMBLY TYPICAL CORRIDOR 1-HOUR BEARING WALL ASSEMBLY (1B1 OR 1L1)TYPICAL 2-HOUR RATED SHAFT WALLAIR GAP BETWEEN RATINGS (WIDTH VARIES)PROVIDE FIREBLOCKING AT EACH FLOOR LINE. MATERIALS TO COMPLY WITH IBC 718.2.1 (SEE ABOVE)1ORPROJECT NO.PROJECT INFORMATIONDATE: SHEET NAMESHEET NO.Fairlawn, OH 443333660 Embassy Parkwaywww.mpg-architects.com330.666.577015815SHAFT & CORRIDORWALL CONDITIONSK-09CAMBRIA SUITES HOTEL1" = 1'-0"SK-091DETAIL @ SHAFT & CORRIDOR WALLDECEMBER 1, 2020 Floor 0215'-2"JH.81B2-HR FLOOR ASSEMBLY AT BASE OF SHAFT1TYPICAL 2-HOUR RATED SHAFT WALLEXTEND 2-HOUR RATED SHAFT DOWN TO BOTTOM OF FLOOR/CEILING ASSEMBLYLINE OF ASSEMBLY BEYOND1L11 HR1L11 HR2S2 HR2S2 HR88NOTE: DETAIL IS SIMILAR FOR ALL SHAFT CONDITIONS NOT EXTENDING TO SLABREFER TO MECHANICAL DRAWINGS FOR DUCTWORK WITHIN ASSEMBLY (SHOWN DASHED FOR REFERENCE). FIRE CAULK ALL PENETRATIONS WITH UL LISTED MATERIAL, TYP.PROJECT NO.PROJECT INFORMATIONDATE: SHEET NAMESHEET NO.Fairlawn, OH 443333660 Embassy Parkwaywww.mpg-architects.com330.666.577015815TYP. SHAFT @ BASESK-10CAMBRIA SUITES HOTEL1" = 1'-0"SK-101DETAIL @ SHAFT BASEJANUARY 21, 2021 116 RAMPREF.D W 042 POOL MECH. ROOM POOL EQPM RM 041 MEN'S 043 040 INDOOR SWIMMING POOL 037 CORRIDOR 039 FITNESS CENTER008 WOMEN TLT 009 MEN TLT ELEV. EQ. RM 035 ELEVATOR LOBBY 007 CORRIDOR 151 102 KING 03 104 KING 01 106 DQ 04 108 ADA KING 02 110 DQ 04 112 ADA KING 02 033 IT ROOM 032 OFFICE 031 OFFICE 002 CART 029 WORK AREA 003 WELCOME LOBBY 001 VESTIBULE 006 HANGOUT 005 MARKET COFFEE HOUSE PUB 010 011 PREFUNCTION 013 KITCHEN MEETING ROOM 012 FUNCTION STOR. 015 BOH CORRIDOR 016 BEV. STOR. 020 ENG. OFFICE 022 LAUNDRY OFFICE 024 LINEN STOR. 026 ELEC. 028 023 MECH. RM LAUNDRY 025 153 STAIR B 027 LINEN CHUTE 152 STAIR A 034 DOS OFFICE 036 GUEST LAUNDRY 038 STORAGE WELCOME DESK 004 WOMEN'S 044 47'-9"30'-0"7'-5"5'-7"LOCKERS 018 017 BREAK RM 18'-2"15'-4"33'-6"40'-9" 46'-1" 44'-11"48'-1"11'-11"19'-1"24'-0"27'-1"13'-5" 7'-0"48'-10"41'-10"41'-6"22'-3"30'-2"27'-4"54'-9"0 8' 16' 20' 1/8" = 1'-0" 12' REVISIONS N PROJECT #: DATE:phonefaxmpg-architects.com330.666.5770330.666.88123660 Embassy ParkwayFairlawn, OH 44333FIRST FLOOR FURNITURE PLANSK-11CAMBRIA SUITES HOTEL1000 LONGLEAF LANESOUTH WINDSOR, CT 0607415815JUNE 24, 20161/8" = 1'-0"1 FIRST FLOOR FURNITURE PLAN AREA SF BREAKDOWN LOBBY & HANGOUT: 2,215 SF BAR: 255 SF PREFUNCTION: 1,294 SF MEETING ROOM: 1,430 SF BEVERAGE STORAGE: 42 SF OUTDOOR PATIO: 3,992 SF TOTAL AREA: 9,228 SF DATE: FEBRUARY 16, 2021 Floor 0215'-2"Floor 0325'-11 3/8"Floor 0436'-8 3/4"JTruss Bearing45'-10 3/8"H.81B2-HR FLOOR ASSEMBLY AT BASE OF SHAFT1TYPICAL 2-HOUR RATED SHAFT WALLEXTEND 2-HOUR RATED SHAFT DOWN TO BOTTOM OF FLOOR/CEILING ASSEMBLYLINE OF FLOOR ASSEMBLY BEYOND1B11 HR88REFER TO MECHANICAL DRAWINGS FOR DUCTWORK WITHIN ASSEMBLY (SHOWN DASHED FOR REFERENCE). FIRE CAULK ALL PENETRATIONS WITH UL LISTED MATERIAL, TYP.2S2HR1B11 HRSK-091SK-091TYP.TYP.2S2HR1B11 HRDASHED LINE INDICATES MECHANICAL DUCTWORK (SHOWN FOR REFERENCE), REFER TO MECHANICAL DRAWINGS AND DETAILS.PROVIDE FIREBLOCKING AT EACH FLOOR LINE (IF AIR GAP IS PRESENT). MATERIALS TO COMPLY WITH IBC 718.2.1EXTEND 2-HOUR RATED SHAFT 'UP' TO BOTTOM OF ROOF SHEATHING.VOID,SEE PLANSPROVIDE FIREBLOCKING AT EACH FLOOR LINE (IF AIR GAP IS PRESENT). MATERIALS TO COMPLY WITH IBC 718.2.1VOID,SEE PLANS113A4222S2HR1B11 HR2S2HRREFER TO MECHANICAL DRAWINGS FOR CONTINUATION OF ROOF CURB AND DUCTWORKSK-101NOTE:PROVIDE, AT EACH FLOOR, A CLEANOUT WITH ACCESS PANEL (2-HOUR RATED) FOR THE KITCHEN EXHAUST PER REQUEST FROM FIRE MARSHALWALL TYPE 2S:SYSTEM B PER UL U415TYPICAL 2-HOUR RATED SHAFT WALL BETWEEN DUCTWORKPROJECT NO.PROJECT INFORMATIONDATE: SHEET NAMESHEET NO.Fairlawn, OH 443333660 Embassy Parkwaywww.mpg-architects.com330.666.577015815KMAU-1 & KEF-1 2-HRRATED SHAFT (REVISED)SK-12CAMBRIA SUITES HOTEL0 1'3/4" = 1'-0"2' 3'DECEMBER 14, 2021 Floor 0215'-2"Floor 0325'-11 3/8"Floor 010"JK.2Truss Bearing45'-10 3/8"H.88A651INSTALL 1-HR FLOOR ASSEMBLY AT BASE OF 1-HR MECHANICAL SHAFTEXTEND 2-HOUR RATED SHAFT DOWN TO 2-HOUR SHAFT BASE.REFER TO MECHANICAL DRAWINGS FOR DUCTWORK WITHIN ASSEMBLY (SHOWN DASHED FOR REFERENCE). FIRE CAULK ALL PENETRATIONS WITH UL LISTED MATERIAL, TYP.2S2HR2S2HR28EXTEND 1-HOUR RATED SHAFT DOWN TO SECOND FLOOR1S1HR1S1HR2E2 HR3AREFER TO MECHANICAL DRAWINGS FOR CONTINUATION OF ROOF CURB AND DUCTWORK.0G0 HR0G0 HR5Floor 04 (SIM.)LINEN CHUTE WITH 90 MIN. RATED OPENING, SEE PLANS & DETAILS2REFER TO DETAILS FOR CONTINUATION OF LAUNDRY CHUTE AND STAIR TOWER.WRAP EXPOSED JOIST WITH (2) LAYERS OF 5/8" TYPE 'X' GYPSUM BOARD TO CONTINUE 1-HOUR RATINGWALL TYPE 1S:SYSTEM A PER UL U415WALL TYPE 2S:SYSTEM B PER UL U4155INSTALL 2-HR SHAFT BASE ASSEMBLY AT BASE, VERIFY HEIGHT WITH OWNER IN THE FIELDPRIOR TO INSTALLATION COORDINATE WITH OWNERPROJECT NO.PROJECT INFORMATIONDATE: SHEET NAMESHEET NO.Fairlawn, OH 443333660 Embassy Parkwaywww.mpg-architects.com330.666.5770158152-HR LAUNDRY CHUTE &1-HR MECH SHAFT(REVISED)SK-13CAMBRIA SUITES HOTEL0 1'3/4" = 1'-0"2' 3'DECEMBER 14, 2021