HomeMy WebLinkAbout22-32P Revolutions Bowling Outdoor Field Expansion TOWN OF SOUTH WINDSOR `'� ' '' PLANNING &s ZONING COMMISSION �AO spat APPLICATION FORM Application Number: Official Receipt .Date' �f � Munis Application #: SOR.G9' APPLICANT: 64±Lh 111441h2W &2 ' PROJECT NAME: COMPLETE LOCATION OF PROPERTY: 60ell OWNER OF RECORD ON LAND RECORDS: .m � OWNER ADDRESS: �Q � (•�-1��` ' /� GIS PIN # ZONE .1 NAME, ADDRESS, TELEPHONE & EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: � ^� 7' �sf� L Estimated presentation. time:, Jt� THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing and Certificate of Mailing Required) ❑ Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major ❑ Conditional Subdivision ❑ Special Exception to Table A x�-_ (Public Hearing and Certificate of Mailing Required) ❑ Site Plan of Development ❑ New ❑ Modification Building(s) Sq Ft ❑ General Plan of Development ❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision -Attach proposed amendment (Public Hearing Required) ❑ Temporary and Conditional Permit (Public Hearing Required) for -. ❑ Temporary and Conditional Permit Renewal for ❑ Detached In Law Apartment or ❑ Accessory Apartment (Public Hearing and Certificate of Mailing Required) ❑ Major Home Occupation (Certificate of Mailing Required) for ❑ Other (explain in detail) -- PLEASE NOTE: An Application Pending Sign is required to be posted on the property for all applications ten (10) day rior to being heard by the Commission. /,I I I — eV'4 �� Signature of Applicant Signature of Property Owner ,,rr��� ��11 of Property ok �C.�c/"f-1"�A�Ol�i'��� � � Pram N J� pp p ty Owner Revised 1/15/2020 SOUTH WINDSOR ENTERTAINMENT LLC PO BOX 375 100 BIDWELL ROAD EAST WINDSOR HILL, CT 06028 SOUTH WINDSOR, CT 06074 On October 1, 2021, planning and zoning approved Appl.21-47P, Revolutions Outdoor Field Expansion Temporary and Conditional Permit. At this time South Windsor Entertainment would like to have this accepted as a permanent use permit. Attached is a site plan which shows the removal of existing parking lot, and the recently installed recreational field. The site plan also shows the overflow parking on adjacent land which is located at 205 Governor’s Highway. Lighting plan for overflow parking, along with cut sheets has been submitted to the town. 1.) We removed approximately 2/3 of the bituminous pavement on the north parking lot and replaced with six inches of topsoil and seed to create a 400’ x 280’ playable field. There was little grading and a barrier fence was installed for safety around the field; 2.) Entertainment includes music and dancing; 3.) Serving, preparation, sales and consumption of food and beverages, including alcoholic beverages, (with an expanded patio, maximum of seating for 100); 4.) Areas primarily dedicated to outdoor recreational activities. There are 128 parking spaces that will remain to accommodate this new field. Staff size at present is 6 FT and 30 PT. With the additional outdoor use staffing is expected to increase to 42. Hours for the outdoor uses will vary, but could begin as early as 7 a.m. The closing time for the outdoor area will be at 10 p.m. Sunday, 11 p.m. Monday through Wednesday, 12 a.m. Thursday through Saturday. The turf field is away from any residential areas and will be illuminated. Thank you, Craig Nation Member This is a reminder of additional approval that are required prior to use ofthe fields this summer.We are already scheduling application into April —so i would suggest getting something sooner than later. 1.Parking for this use is allowed on—site only or in approved parking lots.During the one—year permit period,the applicant shall file site plans for approval for the proposed parking areas under Section 6.14 —Off -Site parking facilities as well as a special exception/site plan modification for the expansion of the outdoor recreation use associated with the existing revolutions approval. Michele Michele M.Lipe,AICP Director of Planning Town of South Windsor 1540 Sullivan Ave. South Windsor,CT 06074 (860)644-2511,ext .252 From:Lipe,Michele Sent:Monday,January 31,2022 10:53 AM To:'CRAIG NATION' Subject:reminder of additional approvals needed Attachments:21-47P Revoiutions Outdoor Field Expansion T&C.docx Hi Doug, CAUTION:This email originated from outside your organization.Exercise caution when opening attachments or on clicking Iinks from unknown senders. Good morning,building inspector said i couldn’t do anymore than putting in wire for the parking lots.Per your order.l would really like to put the bases in so i can finish grading around them .I’m ok not going any further l’ll just use portable lights for safety.I would think it would be fine to put the lights up and will provide a cut sheet for these lights but they came from the other lot and were already approved.Let me know your thoughts.Doug nation Sent from my iPhone From:CRAIG NATION <cnation521@ao|.com> Sent:Wednesday,August 24,2022 6:30 PM To:Lipe,Michele Subject:[External]Overflow parking area PIANNINE HEPAHTMENT CERTIFIED August 24,2022 2 >Mike DeBella 60 Bidwell Rd South Windsor,CT 06074 RE:Appl.#22-32P,Shepard —205 Governors Hwy,South Windsor,CT.I—lndustxial Zone Dear MI.DeBella: The Inland Wetlands Agency/Conservation Commission,through staff has approved minimal impact application Appl.#22-32P,Shepard —205 Governors Hwy,South Windsor -Inland Wetland/Conservation Commission minimal impact application for the removal of existing soil stockpiles and grading Within the upland review area at 205 Govemors Hwy (Assessor’s Map #59,lot #2).This approval is subject to the following conditions: l.The application shall indemnify and hold harmless the Town of South Windsor against any liability,which might result hom the proposed operation or use. 2.The permit is valid for five years and shall expire on August 24,2027.It is the landowner(s)/applicant(s)responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. Perimeter erosion controls must be installed prior to construction. 4.All additional approvals required must be obtained and submitted prior to any activity on the site. 5 .The applicant shall cause notice of the decision to be published in a daily newspaper having a general circulation in the Town.The notice must be published Within ten (10)days of receipt of the decision.The applicant must notify the Planning office of the date of publication and fax or mail a copy of the published legal notice.Appeal of this decision may be brought to the Agency within hfteen (l 5)days after the publication date of the notice. LN Ve truly yours, Jeffrey H.Fo ger,Environmental Planner INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION cc:Inland Wetland/Conservation Commission Director of Planning Chief Building Official 1540 Sullivan Avenue,South Windsnr,ET 06074 é Tel (860)644—2511 Ext 329 l Planning@SauthWindsor-CT.guv ‘n Page 1 of 2 i q Volume 177 Fae N9 49 t9 nommmu!LINE ncnswmrr AND mamm'r 00485 'nus Acmmmm‘,made thia q't’day of Nan"t 1974,by and between Shepard-Pola,1nc.,a Oonnectxcut Corporation I located in the Mn cf South Wmdsor,County of Hartford and Sum K‘d of Connecticut,The J.E.Shepard Company,a Connecticut corporatim located in said Town of South windsor,witlnn said County and State,Savings Bank of Rockville,a Connecticut corporation lo- cated in the C;ty of mckvilm,Town of Vernon.Comty of Tolland E and State of connecticut,and naxley &Burton Power Equxpmnt l Co..a Oonnecticut corporation located in said Mn of South Windsor.witiun aaxd County and State:t WITtlESSBTH: g. t". mw‘k b uvr~._w—u‘_f‘ MII"’ — m‘ “a". vv’V c ‘ K H‘ WHEREAS,Shepard-Palm Inc.1.5 the owner of certain land in the 'mwn of South Windsor,County of Hartford and state of {Connecticut on the southorly a1dc of Gowrnor's Highway:and l mIERImS,The J.E.Shepard Comm-1y is the minor of certain land in said Town of South windsor adjoining the said land of Shopard-Pola,Inc.on the south:and WHEREAs,Savings Bank of Rockville is tho holder of a mortgage on a portion of said promises of me J.n.Shepard Com- pany,uhich wrtgago in dated November 17,1965 and recorded in volurn 111 at page 523 of the South "indoor Land Record“and mmm‘ns,nexloy a Burton Power Equipmont Co.in tho lcnuoo of a portion of said pronioon of Tho J.1".shopard Comrany under a Ieaao dated April 1.1969 a notice of which Lease dated June 3f),1'160 is rowrded in volurn 129 at page ‘ma of the said I: iI - «a uwm,. »...vw..r‘_ W«‘~‘ 1".‘ ““a... .south “indoor Land Reoorda:and mmrmns,tho boundary line betveen mo mapoctive par- min of land of Shepard-Pole,Inc.and The J.E.Shepard Conrany. has not been definitely established and it is desired by the parties hereto to definitely establish aaid boundary line. NOW TnzmwRE,in consideration of One U.)wllar and other valuable considerations.and the mutual promises of the I1 a‘{## 'r-__ e Jana Wuum-—.. na. ‘?ti Book:177 Page Se 1 parties hereto,it ia hereby agreed that the boundary line between ue :1 I Page 2 of 2 I Volume 177 Page No 50 the respective premises of the parties of Shepard-Pola,lne. and - S s the J. E. Shepard Company shall be a line described as followaf Commencing at a point in the easterly lino of land now or formerly of Russell Lovack at al, six hundred thirty-sawn and eighty one-hundmdtha (677.00) fact southerly, measured at right angles, from the southerly line of said Governor's Highway, which ' point is seven and eighty one-hundredths (7.80) feet southerly from a monument set in said line (which line is also the westarly line of said lands of Shepard-Pola Inc. and the J. E. Shepard Company) r thence running easterly in a strait line parallel to and six hundred thirty-sewn and eighty one-hundredthe (637.00) foot southerly, measured at right angles, from said southerly line of Covernor'e Highway to U. S. Mute 5,also known as John Pitoh Boulevard. And the said Shepard-Pola,lnc.. does for itself, its successors and assigns, romise, release and forever quit-claim The unto the said/J. E. Shepard Company, its successors and assions, lall such right, title and Interest as it has or may haw in or to the land south of the boundary line above described. TO HAVE AND To HOLD the premises south of said boundary line unto the said/J. E. Shepard Company, its successors andhe ' assigns forever, no that it, the said Shepard-Pola,Inc., nor any tx other person or persons in its name or behalf shall or will claim or demand my right or title to the promisee on the south of said boundary line or any part thereof, but they and c every of them shall by these presents be excluded and forever barred. AND said the J. E. Shepard Company, Savings Bank of !� Rockville and Baxley i Burton Power Equipment Co. do for thorn- t Selves, their successors and assigns, remiss, release and forever quit-claim unto the said Shepard-Pola,ine., its successors and assigns, all such right, title and Interest as they haw or my have in or to the land north of said boundary lino above des- cribed. it To HAVE AND TO HOLD the premises north of said ! t boundary line unto the Said 9hapard-Po3a,Inc. , its successors and assigns forever so that neither they the said J. E. Shopard Company, savings Bank of Rockville fnd Baxley 6 Burton Power Equip went Co., nor any other person or persons in their name or be- 4 Boo age Sequence: 50 ‘ gu. Page 1 of 3 J Vclnme 177 Page N9 51 ‘t half.shall or will demand any right a:title to the premaea 1%north of said boundary line or any part themof.but tnoy mo L Ieveryofwornshallbythesepresentsbeexcludedandforever tL barred. it 'MID the said the J.E.Shepard Company does hemby 1 ¥‘gzva,grant.bargazn,sen and convey unto the and Shepard-Palm ‘ Inc..its successors and assigns forever,an easement for storm I‘ B water drainage 1n.over and through Lts said land lying southerly of said land ofS;Shepard-Pola,Ino.by moans of a pipe.ditch or\surface flowago and for such purpose the right to matall.main- ?QIi taxn,repair and replace a drunago pipe‘lor open d1tch on said land of mo J.E.Shepard Gompony runninqi southorly from thoi’southerly cnd of an existing 24 inch reinforced concrete pipe rx on said land of Shepard—Pola,Inc..any such pipe or ditch to<xi be in a location agreed upon or to he agreed upon bewecn the gramiEandthegrantoo.l\To HAVE MD To HOLD the above granted easemnt unto$ J the said Shepard-Pola.Inc.,its successors and assigns forever. f‘to its and their own proper use and behoof.‘i §IN Wlmss mmmor,the parties hereto have caused this {‘$ ‘inatrunent to be executed in their corporate names and their cor- potato seals to be hereto affixed as of this ‘3‘!day of arch .X974.1 ’Lulu...”\J ' \\\‘g\1\5ut/,",L’ Signed,sealed and delivered SHEPAWPOLAJNC.5:5;“w -in the presence of::.‘$ i mT‘”t we‘d D Nevs* r ore/(z.§Zr f “1Jh'te .'lf-ulfbn SAVINGS BANK OF Roavnom’’‘kf' .‘5‘¢ éh a ‘‘31”‘5“l rthat.r (“a ' v 1a Vice hesident S Treas d {6 N;‘ ""u. 'V/agji‘9 I i & k a.‘-14:”Iggsm Sheyard Conpany ''.991}- ‘a Anlimcc P #tw/‘q .O .H ‘n Q ii.r.t,_3 -.x F“I,0""unuu".‘"III J.’0‘; id "1 b;l ‘:t 3Book:177 Page Seque‘1e:51 Page 2 of 3 Volume 177 Page N9 52 ow-A aw- - M“- k~ “w é‘7:‘' iitxwuh~ MI fl W$WWaw§equencm 52 " e—en d~ w "" M Page 3 of 3 .«u ‘...K K “,r.7 r M-'.H ,_‘ ‘“wrry—~,‘--_—..w.ww v: .~.,. ~vv~r-w Kr” gpwv-r‘mw AF- rm», "m JW vx w Volume 177 Page N9 53 I-*‘Vyd — Personal”appeared’1 as aforesaid,signer and sealer of the £orcqa1ng instrument,ana v'}1 ’1';6nacknowledgedthesametohoLyfreeactanddeedan§"the‘ffé act and deed o!said Thu J.E.shcpatd Company,betora‘im I a f'u 711i W {#W [Wéa'vl 7‘STATE OP GO CUT) mm OP )as:[7W I '4'ti’h/ Personally appaared f as aforesaid.signer and saalar o£the £orego1ng instrmnt.and acknowledged the sum ta baa,free act and deed and the free Notary Public JV r"' ‘act and deed of and Eaxley &Burton Power Eduipmn:Co.. before m.Received for Record inane}:1h.1971;at 11:3O A.H.‘Haruyn H Burger.:Aut.Tom clerk )"Ilwl 71i aC5m%4‘‘nauxy panic ’$)‘k Ol'd ”K ‘x 2‘Il "I ‘J "l r § " I XT‘IW h" .sv m ~... \\}x v.~ “b:I n I 3‘.._..., A J d.\~~. A 8 ,v x «x \\r1. y” 'x n‘.;\: ...an -... /x ‘‘.d A r'. .v “it p‘r‘' w nus.''r:x :1 J .. ~. Aw AI-V Book'.177 Page Sequen _._._-_.. ,...“0 “.N e. .- . i» h’ b;v w-a w e53\-.....,mv m - ¢;«g ‘Lk‘fi‘b‘é y “W-,L I: "n "‘:um 19$‘Vlu‘“”x l SOUTH WINDSOR ENTERTAINMENT LLC PO BOX 375 100 BIDWELL ROAD EAST WINDSOR HILL, CT 06028 SOUTH WINDSOR, CT 06074 08/22/2022 Mazak Corporation 10 Bidwell Rd. South Windsor, CT 06074 In accordance with Section 8.7 of the Town of South Windsor Zoning Regulations, you are hereby notified that an application has been filed on the property abutting yours and is subject to a hearing by the Planning&Zoning Commission.The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments.You may also submit written comments regarding the application prior to the hearing if you so desire. For additional information regarding the specific date this application will be heard, please contact the South Windsor Planning Department(860)644-2511, ext.329 or visit:www.southwindsor- ct.gov/planning-department/pages/pending-and-recentlyapproved-applications Sincerely, Michael DeBella SOUTH WINDSOR ENTERTAINMENT LLC PO BOX 375 100 BIDWELL ROAD EAST WINDSOR HILL, CT 06028 SOUTH WINDSOR, CT 06074 08/22/2022 Nicholas Maraglino 20 Bidwell Rd. South Windsor, CT 06074 In accordance with Section 8.7 of the Town of South Windsor Zoning Regulations, you are hereby notified that an application has been filed on the property abutting yours and is subject to a hearing by the Planning&Zoning Commission.The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments.You may also submit written comments regarding the application prior to the hearing if you so desire. For additional information regarding the specific date this application will be heard, please contact the South Windsor Planning Department(860) 644-2511,ext. 329 or visit:www.southwindsor- ct.gov/planning-department/pages/pending-and-recentlyapproved-applications Sincerely, ZW-2 Michael DeBella Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only. Wind Design Criteria: ? Lighting Equipment APPROXIMATE DESIGN ID: DATED: FOOTCANDLE NA SVC-473878A U EL: 22/SEP/22 MAX.TO MIN. NA ORDER NUMBER: XXXXXX L� E RATIO NOT TO EXCEED: ELECTRICAL POLE LUMINAIRES LOAD p) POLE POLE MOUNTING POLE ELEV. LUMINAIRE LUMINAIRES KILOWATT - O p 50°R 40°R 22°R 12°L 27°L 47°L 46°R 27°R 16°R 18°L 36°L 51°L PER POLE CONSUMPTION 26•V 22°V 20•V 21•V 20•V 24•V 24°V 20°V 21°V 20•V 21°V 26•V QUANTITY LOCATION HEIGHT SIZE TYPE /UNIT TOTAL /UNIT TOTAL V 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 1 Al 52.0' -- 0' 150OW MH 11 11 17.60 17.60 O1 ( ( ( OS 6O 12 13 0 15 0 17 311S 3DS 3DS 3DS 3DS 3DS 3DS 3DS 3DS 3DS 3DS 3DS 1 A2 52.0' -- Q' 150OW MH 11 11 17.60 17.60 0 72°R 32°R 3°R 37°L 67°L 66°R 36°R 2°R 27°L 73°L 1 B1 52.0' -- 0' 150OW MH 13 13 20.80 20.80 •� 29°V 19°V 20°V 19°V 28°V 29°V 19°V 20°V 19°V 29°V O 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 15MH 1 g2 52.0' -- 0' 1500W MH 13 13 20.80 20.80 _ Q O7 O8 O9 10 11 18 19 20 21 22 � 3DS 4S 3DS 3DS 3DS 3DS 3DS 3DS 4S 3DS 4 TOTALS 48 76.80 O : Al A Overcurrent devices and conductors MUST be sized using the Manufacturer's > Q rated amperage draw per luminaire (kVA). Using the kW rating can result (D (� Al 01- -!L� A in undersized calculations. Refer to Musco's Control System Summary or u ® p Specification Chart (located below) for manufacturer's amperage draw. T 22 .90 Minimum BA Power BALLAST SPECIFICATIONS VOLTAGE: SINGLE PHASE VOLTAGE 208 220 230 240 277 347 380 400 415 480 11 (Also applicable to each single phase of a 3 phase system) N N LO 18 1500 WATT METAL HALIDE LAMP 8.6 8.3 7.7 7.5 6.5 5.1 4.7 4.4 4.2 3.7 Q �' Operating line amperage per fixture,mox.draw 1000 WATT METAL HALIDE LAMP 6.5 6.4 5.9 5.8 4.9 4.0 3.6 3.4 3.2 2.9 0 ()0c 0 N Operating line amperage per fixture,max.draw O 0-O 17 W CO > CID 1 6 If you have questions pertaining < o N o N 12 to this document, please contact a M- o 00 CAYDEN CARTER, your project engineer. W 0 o y o 2 Phone: 800-825-6025 ext: 2443 U CL-OaO 10 19 16 DATE: 09/22/22 r O O Os 13 This O This symbol represents the 0,0 point for locating poles. O20 1s 21 o 834 39 47 43 38 26 31 25 30 1 48 46 7 35 33 0 3 27 HE a, 40 24 0 32 42 45 29 .o 0 41 28 36 23 ti 0 N Z -165 -135 W ® -75 -45 -15 15 45 75 O1 135 165 N B1 � 89. 1 B2 is ag SO Slb SO Sb Slb Sb 8 Lb 9b S£ b£ ££ HWST HWST HWST HWST HWST HWST A.8I A.6T A.8I A.8T A.61 A.8T 1.£E 1.1 d.T£ 1.1£ d.T d.£E sac S96 sac S96 SQ£ SQ£ SQ£ SQ£ - Sb HWST HWST HWST HWST HWST HWST HWST HWST m A.92 A.61 A.02 A.£2 A.£2 A.02 A.61 A.92 1.L9 1.42 8.21 8.29 1.29 1.21 ?3.42 b.LS sac sac sac sac sac sac sac sac sac sac sac sac L2 92 S2 b2 £2 HWST HWST HWST HWST HWST HWST HWST HWST HWST HWST HWST HWST A.62 A.b2 A.12 A.02 A.02 A.92 A.92 A.02 A.02 A.12 A.b2 A.62 JOB NUMBER: 1.TL 1.£17 1.£1 8.172 &LE 8.£L 1.£L 1.L£ 1.b2 8.£1 d.£b d.TL SVC-473878 Y AIMING LEGEND DRAWN BY. CGrIer PROJECT ENGINEER: HORIZONTAL AIMING ANGLE C°CARTER VERTICAL AIMING ANGLE REPRESENTATIVE: X ONMAULS INDICATE SEPARATE CIRCUI FIXTURE 2B°R 2B°R FIXTURE TYPE SCALES.H E R R 0 50 100 25°v 25°v/ 15MZ 1 Z FIXTURE NUMBER 1 = 50 6 DATE: SCALE: 1 inch = 50' 09/22/22 4M 4M REFLECTOR NEMA TYPE DRAWING NUMBER: Information contained herein is the confidential property of Musco Sports Lighting, SVC-473878A1 LLC and/or its parent companies, affiliates, successors and assigns. Reproduction, distribution, or use of the information other than its limited, intended purpose OF 1 SHEETS without express written permission is prohibited. Generated by Foxit PDF Creator © Foxit Software http://www.foxitsoftware.com For evaluation only. PROJECT SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 NOTES:Light Levels not guaranteedMY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT Pole / Fixture Summary Pole ID Pole Height Fixture Qty Lamp Type Circuit A1 52'11 1500W MH A A2 52'11 1500W MH A B1 52'13 1500W MH A B2 52'13 1500W MH A 4 48 CalculaƟon Grid Summary Light Level UniformityGrid Name Calculation Metric Type Ave Min Max Max/Min Ave/Min Circuits Fixture Qty MUGA Spill Horizontal Illuminance Maintained 0.38 0.23 0.66 2.92 1.66 A 48 MUGA Spill Max Candela Metric Maintained 45900 32359 62473 1.93 1.42 A 48 MUGA Spill Max Vertical Illuminance Metric Maintained 2.47 1.79 3.56 1.99 1.38 A 48 MUGA Horizontal Illuminance Maintained 37.7 14 58 4.21 2.73 A 48 Circuit Summary Circuit Description Load Fixture Qty A MUGA 76.8 kW 48 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 44 43 28 17 14 18 30 38 42 49 54 39 28 19 26 36 51 43 52 57 44 29 21 27 37 44 46 52 58 46 30 21 27 37 40 41 40 55 46 33 23 28 39 48 39 48 50 41 31 25 30 40 46 40 48 50 41 31 25 31 41 45 40 40 55 47 34 24 32 43 50 40 52 58 46 31 22 28 39 42 42 52 57 44 29 20 25 36 44 46 49 54 39 28 20 25 36 46 41 44 43 28 17 14 18 24 36 42 B2B1 A2A1 143'89'143'89'143'89'143'89' SCALE IN FEET 1 : 40 0'40'80' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS2A1-A2 52'-52'1500W MH 11 11 0 2 B1-B2 52'-52'1500W MH 13 13 0 4 TOTALS 48 48 0 Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT GRID SUMMARY Name: MUGA Size: 358' x 270' Spacing: 30.0' x 30.0' Height: 3.0' above grade MAINTAINED ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES EnƟre Grid Scan Average:37.69 Maximum:58 Minimum:14 Avg / Min:2.73 Max / Min:4.21 UG (adjacent pts):1.70 CU:0.51 No. of Points:108 LUMINAIRE INFORMATION Luminaire Type: SC-2 / Design Usage Hours: 3,000 hours Design Lumens: Avg Tilt Factor: 0.818 Add'l Non-Rec LLF: 0.970 Recoverable LLF: 1.000 Total LLF: 0.794 No. of Luminaires: 48 Avg KW: 76.8 (76.8 max) Field Measurements:IlluminaƟon measured in accordance with the IESNA RP-6-15 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements:Refer to Amperage Draw Chart and/or the Musco Control System Summary for electrical sizing. InstallaƟon Requirements:Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. NOTES:Light Levels not guaranteed ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 B2B1 A2A1 0.32 0.29 0.23 0.25 0.33 0.38 0.38 0.36 0.26 0.24 0.29 0.29 0.31 0.31 0.30 0.29 0.30 0.31 0.34 0.38 0.44 0.52 0.57 0.64 0.64 0.62 0.57 0.52 0.45 0.39 0.35 0.33 0.30 0.30 0.30 0.310.330.330.330.280.300.340.370.370.330.290.280.330.320.32 0.31 0.31 0.31 0.32 0.33 0.35 0.40 0.47 0.55 0.60 0.65 0.66 0.65 0.58 0.53 0.44 0.38 0.34 0.31 0.30 0.29 0.30 0.30 0.31 SCALE IN FEET 1 : 80 0'80'160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS2A1-A2 52'-52'1500W MH 11 11 0 2 B1-B2 52'-52'1500W MH 13 13 0 4 TOTALS 48 48 0 Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT GRID SUMMARY Name: MUGA Spill Spacing: 30.0' Height: 3.0' above grade MAINTAINED ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES EnƟre Grid Scan Average:0.3773 Maximum:0.66 Minimum:0.23 No. of Points:74 LUMINAIRE INFORMATION Luminaire Type: SC-2 / Design Usage Hours: 3,000 hours Design Lumens: Avg Tilt Factor: 0.818 Add'l Non-Rec LLF: 0.970 Recoverable LLF: 1.000 Total LLF: 0.794 No. of Luminaires: 48 Avg KW: 76.8 (76.8 max) Field Measurements:IlluminaƟon measured in accordance with the IESNA RP-6-15 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements:Refer to Amperage Draw Chart and/or the Musco Control System Summary for electrical sizing. InstallaƟon Requirements:Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. NOTES:Light Levels not guaranteed ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 B2B1 A2A1 2.06 1.97 1.79 1.89 2.09 2.21 2.19 2.17 1.87 1.83 1.95 1.95 2.04 2.09 2.07 2.07 2.11 2.14 2.28 2.44 2.68 2.98 3.14 3.40 3.48 3.41 3.25 3.08 2.82 2.60 2.45 2.36 2.27 2.25 2.25 2.282.402.422.472.332.402.532.562.562.502.372.322.452.402.37 2.29 2.28 2.29 2.36 2.40 2.47 2.67 2.90 3.19 3.36 3.52 3.56 3.47 3.22 3.03 2.70 2.46 2.30 2.15 2.08 2.03 2.04 2.01 2.04 SCALE IN FEET 1 : 80 0'80'160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS2A1-A2 52'-52'1500W MH 11 11 0 2 B1-B2 52'-52'1500W MH 13 13 0 4 TOTALS 48 48 0 Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT GRID SUMMARY Name: MUGA Spill Spacing: 30.0' Height: 3.0' above grade MAINTAINED ILLUMINATION SUMMARY MAX VERTICAL FOOTCANDLES EnƟre Grid Scan Average:2.4702 Maximum:3.56 Minimum:1.79 No. of Points:74 LUMINAIRE INFORMATION Luminaire Type: SC-2 / Design Usage Hours: 3,000 hours Design Lumens: Avg Tilt Factor: 0.818 Add'l Non-Rec LLF: 0.970 Recoverable LLF: 1.000 Total LLF: 0.794 No. of Luminaires: 48 Avg KW: 76.8 (76.8 max) Field Measurements:IlluminaƟon measured in accordance with the IESNA RP-6-15 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements:Refer to Amperage Draw Chart and/or the Musco Control System Summary for electrical sizing. InstallaƟon Requirements:Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. NOTES:Light Levels not guaranteed ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 B2B1 A2A1 40883.79 39015.77 39430.07 39239.72 35641.97 36500.26 35276.17 37905.59 41003.50 40773.17 38750.96 38152.38 40554.40 42089.68 44922.23 52342.98 57009.31 52523.68 46849.03 44584.50 45000.63 40684.55 35047.18 32359.02 34621.33 39004.71 41819.99 45171.50 51190.02 56518.12 62162.86 61937.57 54602.39 51079.47 50215.85 44577.34 50339.7352097.1449523.4351894.6050607.3943232.5042698.7442652.3844091.9151328.3751650.1250088.5152192.9349710.68 45629.08 50432.91 51155.24 55979.48 62473.24 61627.79 55764.41 50521.90 44726.23 41423.43 38633.70 33910.46 35395.47 40116.21 43737.96 44063.90 48191.13 52610.24 54329.55 48958.28 41694.38 41261.92 41203.19 41240.84 SCALE IN FEET 1 : 80 0'80'160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE THIS GRID OTHER GRIDS2A1-A2 52'-52'1500W MH 11 11 0 2 B1-B2 52'-52'1500W MH 13 13 0 4 TOTALS 48 48 0 Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT GRID SUMMARY Name: MUGA Spill Spacing: 30.0' Height: 3.0' above grade MAINTAINED ILLUMINATION SUMMARY CANDELA (PER FIXTURE) EnƟre Grid Scan Average: 45900.4336 Maximum: 62473.24 Minimum: 32359.02 No. of Points:74 LUMINAIRE INFORMATION Luminaire Type: SC-2 / Design Usage Hours: 3,000 hours Design Lumens: Avg Tilt Factor: 0.818 Add'l Non-Rec LLF: 0.970 Recoverable LLF: 1.000 Total LLF: 0.794 No. of Luminaires: 48 Avg KW: 76.8 (76.8 max) Field Measurements:IlluminaƟon measured in accordance with the IESNA RP-6-15 and CIBSE LG4. Individual values may vary. See the Warranty document for details. Electrical System Requirements:Refer to Amperage Draw Chart and/or the Musco Control System Summary for electrical sizing. InstallaƟon Requirements:Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. NOTES:Light Levels not guaranteed EQUIPMENT LAYOUT Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2022 Musco Sports Lighting, LLC. ENGINEERED DESIGN By: C.Carter File # / Date: SVC-473878A 22-Sep-22 MUGA 358' x 270' B2B1 A2A1 SCALE IN FEET 1 : 80 0'80'160' Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) MY PROJECT Name:RevoluƟons PlayĮeld LocaƟon:South Windsor, CT EQUIPMENT LAYOUT INCLUDES: · MUGA Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume +/- 3% nominal voltage at line side of the ballast and structures located within 3 feet (1m) of design locaƟons. EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LAMP TYPE QTY / POLE2A1-A2 52'-52'1500W MH 11 2 B1-B2 52'-52'1500W MH 13 4 TOTALS 48 SINGLE LUMINAIRE AMPERAGE DRAW CHART Ballast SpeciĮcaƟons (.90 min power factor) Line Amperage Per Luminaire (max draw) Single Phase Voltage 208 (60) 220 (60) 240 (60) 277 (60) 347 (60) 380 (60) 480 (60) 1500 waƩ Metal Halide 8.1 7.7 7.1 6.1 4.8 4.4 3.5 NOTES:Light Levels not guaranteed "Ea—awSENROix:RE:.i.sea5&5“‘E“mi:Hiaz”55mzmuEuzE?mnmmuvu>m515:2mi938g3‘E3ad2.”Ema?sari“E:eEkgoEn‘nEEEm33w:2“is?»gen:2«WESEggEgg:SaEsaauE.2Essi39:29£2ax=meuADIdsuounIOASa‘JospulMi3HWOSww5maEuuuwplsu.xEuauguEum..2=§s§E§33“38a;E5SaaéamsSsEwExam3:55“3%:2:EQ2§§SENE“?s=3“:Eu9:3Ea5”can.,Qivsagsg“3:6wwEKEuEn.m.a3z§_§a:9E.EN;“g5::esgggEa“xivEssgg.2g.1we:2a;~2~2~m<a;amauzaam2$<as:rm<~2~2~2~3a1@®@.@E_a:angm2aua.3MEu:m_?nzz.3wexr.__,x.a:a;5.EmE.EaNE35@éE;114mawgégDn.Ndm.Nw:NdNna9v.v3ngm5v9n3*.m9vEm6m63NmNm.monKNm.nSNn‘mv63Nn6ilEltIiiy.556)mw<znEoz‘ml.i.Ea2mzozacamam35$wmiVS3323m:t§aun—1‘3335..4am:t§ga—S:3E3EoméNa:3E$.EEwE..§~muxazsag!m¢::aaa:u§§gx:;Se.3§9x:x85x:g3;All[w359l.IlugEuS3cm:3:usis:h.~w.nNa3n3w29523222a«m,,,,v(a Appl 22-32P, Revolutions Field Special Exception/Site Plan PH 9/13/22 1. Request for a Special Exception to Table 4.1.1A and site plan approval to make permanent the outdoor multi-purpose recreational fields 280’ X 400’, to accommodate league play on 195 Governor’s Highway with lit fields , and site plan approval for an off-site parking lot for overflow parking, on property located at 205 Governor’s Highway, I zone 2. Outdoor recreation is permitted by special exception in the Industrial zone. The Revolution site on Bidwell Road was previously approved for outdoor recreation. In September 2021, the PZC approved the conversion of the existing parking area of 195 Governor’s Highway, adjacent to the Revolutions building, to expand construct a field to expand outdoor sports activities. This expansion is for additional lit fields for adult leagues and is supported by the existing Revolutions operations. 3. Special Exception review criteria in Section 8.7 include:  The proposal is consistent with the goals and objectives of the Plan of Conservation and Development;  The application has met the requirements of the zoning regulations.  The land is physically suited to the proposed use.  Minimal, if any, adverse environmental impacts are created.  No traffic or other hazards will be created.  The impacts on the capacity of the present and proposed utilities, street, drainage systems, sidewalks, and other elements of the infrastructure will be minimal.  There will be minimal or no adverse effects on existing uses in the area.  Surrounding property values will be conserved.  The character of the neighborhood will be maintained or minimally disrupted.  The general welfare of the community will be served.  There is a balance between neighborhood acceptance and community needs.  Historic factors are adequately protected; or due consideration to preservation of historic factors has been demonstrated.  The overall physical appearance of the proposed development is compatible with surrounding development and the Commission’s goals for the neighborhood/corridor.  The architectural design is aesthetically pleasing and blends well into the surrounding area. The Commission may impose additional conditions in accordance with these regulations in order to ensure that all applicable criteria enumerated above and/or within a particular use category are satisfied. 4. To date the field has been established. Other improvements include minor grading and a barrier wall installed for safety around the field. The fields are proposed to be lit. The zoning regulations allow outdoor recreational lighting subject to the following criteria: 1  All fixtures used for event lighting will be fully shielded, or be designed to minimize up light, spill- light, and glare. The maximum height is 35 feet. The applicant must meet the guidelines established by the current Electrical Institute of Engineers for recreational lighting, and all the requirements of these regulations.  Poles are to be located a minimum of 100 feet from residential zones or property lines (where the residence is the primary use). A waiver may be granted if this Commission deems it justified due to adverse topographic or environmental conditions or difficult site configuration. Poles higher than 35 feet are permitted by Special Exception. An application for the special exception may be approved after the Commission considers the impact on the following:  Effects on the existing uses in the area;  Conservation of surrounding property values and the character of the neighborhood;  Impacts on the capacity of the present and proposed utilities, street, drainage systems, sidewalks, and other elements of the infrastructure;  Suitability of the land for the proposed use and any environmental impacts created by the proposal; and  Consistency with the goals and objectives of the Town Plan of Conservation and Development and/or Recreation Master Plan. To date, we have not received any information specifics to the recreation lighting. 5. The applicant’s narrative indicates they are requesting approval for outside entertainment including music and dancing, serving, preparation and sale of food and beverages (with expanded patio, maximum of seating for 100). Building, fire and health will need to be involved and permit any changes to the building and use. 6. Hours of operation are proposed to be as early as 7 am with the closing time for the outdoor are will be 10 Pm Sunday; 11 PM Monday through Wednesday and 12 am Thursday through Saturday. 7. The applicant has indicated there are 185 parking spaces to support the use. Additional parking is being added with an off-site gravel parking lot to the north of the fields on adjacent property owned by the applicant. Four light poles, similar to what is currently used around the parking area of 195 Governor’s Highway, will be added to light the lot at 205 Governor’s Highway. If this application is approved, we recommend an as-built be submitted of the field and new parking area; cutsheets and photometric diagram of all recreation lighting for compliance. 2 Appl 22-32P, Revolutions Field Special Exception/Site Plan PH 9/13/22; 9/27/22 continued 1. Request for a Special Exception to Table 4.1.1A and site plan approval to make permanent the outdoor multi-purpose recreational fields 280’ X 400’, to accommodate league play on 195 Governor’s Highway with lit fields , and site plan approval for an off-site parking lot for overflow parking, on property located at 205 Governor’s Highway, I zone 2. . The zoning regulations allow outdoor recreational lighting subject to the following criteria:  All fixtures used for event lighting will be fully shielded, or be designed to minimize up light, spill- light, and glare. The maximum height is 35 feet. The applicant must meet the guidelines established by the current Electrical Institute of Engineers for recreational lighting, and all the requirements of these regulations.  Poles are to be located a minimum of 100 feet from residential zones or property lines (where the residence is the primary use). A waiver may be granted if this Commission deems it justified due to adverse topographic or environmental conditions or difficult site configuration. Poles higher than 35 feet are permitted by Special Exception. An application for the special exception may be approved after the Commission considers the impact on the following:  Effects on the existing uses in the area;  Conservation of surrounding property values and the character of the neighborhood;  Impacts on the capacity of the present and proposed utilities, street, drainage systems, sidewalks, and other elements of the infrastructure;  Suitability of the land for the proposed use and any environmental impacts created by the proposal; and  Consistency with the goals and objectives of the Town Plan of Conservation and Development and/or Recreation Master Plan. The applicant has provided lighting cutsheets and isometric diagrams of the lighting. There are four poles, 52 feet in height proposed. 3. Hours of operation of the field are proposed to be as early as 7 am with the closing time for the outdoor are will be 10 Pm Sunday; 11 PM Monday through Wednesday and 12 am Thursday through Saturday. If this application is approved, the Commission may want to limit how late the lights can remain on. 1 PLANNING DEPARTMENT 06o � 5 u Rco4�2`V CERTIFIED MAIL 7022 2410 0000 6508 2575 September 29, 2022 Doug Nation Revolutions Bowling 60 Bidwell Road South Windsor, CT 06074 Dear Mr. Nation: Re: Appl. 22-32P, Revolutions Bowling Outdoor Field Expansion and Off-site Parking. We are pleased to advise you that the Planning & Zoning Commission voted on September 27, 2022 to approve with modifications the above referenced application for a request of a Special Exception to Table 4.1.1A and site plan approval to make permanent the outdoor multi-purpose recreational fields 280' X 400', to accommodate league play on 195 Governor's Highway with Special Exception to 6.3.4.3 for Recreational Lighting for the field and site plan approval for an off-site parking lot for overflow parking, on property located at 205 Governor's Highway, I zone as shown on plans prepared by Isherwood Civil Engineering as revised. This approval is subject to the following modifications: 1. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 2. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 3. The building street number must be included on the final plan. 4. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 5. All free-standing signs and/or building signs require the issuance of a sign permit before they are erected. 6. Food establishments must be incompliance with all Public Health Code requirements. Health Department must be consulted prior to the commencement of construction of any kitchen interior space and/or outdoor space to be used for food and beverage service. 7. The fire marshal's office and building department must consulted and appropriate permits obtained for changes to the exterior of the building and temporary tents for special events. 8. Activities that are permitted under this approval include: 1) entertainment including music; 2) a patio for sales of food and beverages with maximum seating of 100; and 3) areas primarily dedicated to outdoor recreational activities. 1540 Sullivan Avenue, South Windsor, CT 06074 1 Tel (860) 644-2511 Ext 329 1 Planning@SeuthWindsor-CT.gov 9. Hours of operation are limited to: as early as 7 am with the closing time for the outdoor are will be 10 Pm Sunday; 11 PM Monday through Wednesday and 12 am Thursday through Saturday. Outside field lighting shall be turned off by 10:30pm. 10. An as-built of the field and new parking area shall be submitted to planning and engineering for review. 11. Due to the seasonal use of the gravel parking lot, EV charging stations shall be deferred and not required at this time. Black and white transparent mylars of Sheets #1 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. The attached Special Exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Very truly yours, pow" Bart Pacekonis, Chairman Planning and Zoning Commission BP/cgo cc: Town Engineer Chief Building Official Assessor Fire Marshal 1540 Sullivan Avenue, South Windsor, CT 06074 Tel (860) 644-2511 Ezt 329 Planning@SouthWindsor-CT.gov The Special Exception will take effect upon filing of this form. I, Bart Pacekonis, Chairman of the South Windsor Planning &Zoning Commission, hereby certify that on September 27, 2022 the Planning and Zoning Commission granted a request for a Special Exception to Table 4.1.1A and site plan approval to make permanent the outdoor multi- purpose recreational fields 280' X 400', to accommodate league play on 195 Governor's Highway with Special Exception to 6.3.4.3 for Recreational Lighting for the field and site plan approval for an off-site parking lot for overflow parking, on property located at 205 Governor's Highway, I zone as shown on plans prepared by Isherwood Civil Engineering as revised. This approval is subject to the following modifications: 1. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 2. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 3. The building street number must be included on the final plan. 4. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 5. All free-standing signs and/or building signs require the issuance of a sign permit before they are erected. 6. Food establishments must be incompliance with all Public Health Code requirements. Health Department must be consulted prior to the commencement of construction of any kitchen interior space and/or outdoor space to be used for food and beverage service. 7. The fire marshal's office and building department must consulted and appropriate permits obtained for changes to the exterior of the building and temporary tents for special events. 8. Activities that are permitted under this approval include: 1) entertainment including music; 2) a patio for sales of food and beverages with maximum seating of 100; and 3) areas primarily dedicated to outdoor recreational activities. 9. Hours of operation are limited to: as early as 7 am with the closing time for the outdoor are will be 10 Pm Sunday; 11 PM Monday through Wednesday and 12 am Thursday through Saturday. Outside field lighting shall be turned off by 10:30pm. 10. An as-built of the field and new parking area shall be submitted to planning and engineering for review. 11. Due to the seasonal use of the gravel parking lot, EV charging stations shall be deferred and not required at this time. iq" C s °"` 1540 Sullivan Avenue, South Windsor, CT 06074 Tel (860) 644-2511 Ezt 329 Planning@SouthWindsor-CT.gov GIS PIN 36900205 Commoncing at a point in the easterly line of land now or formerly of Russell Lovack at al, six hundred thirty-sovan and eighty ono-hundredths (637.00) foot southerly, measured at right angles, from the southerly line of maid Governor's Highway, which point is seven and eighty one-hundredths (7.80) feet southerly from a monument set in said line (which line is also the westerly line of said lands of Shepard-Pola Tno. and the J. E. Shepard Company) ? thence running easterly in astra4t line parallel to and sLx hundred thirty-seven and eighty ono-hundredths (637.80) foot southarly, moasurod at right angl.on, from said southerly line of Governor'a highway to u. s. Route 5 ,alao hno9rn an John t:itall i lloulavard. OWNER OF RECORD: Shepard Pola Inc. Dated at South Windsor, Connecticut this 29th day of September, 2022. in accordancewith CGS Section 8-3d SgFl, I aLgi i o , Chairman Bart Pacekonis �� Planning &Zoning Commission Received for record this day of 20 , at South Windsor, Connecticut ATTEST: r "'�o °" 1540 Sullivan Avenue, South Windsor, CT 06074 Tel (660) 644-2511 Ezt 329 Planning@SauthWindsor-CT.gov ssl� LTE .., ..,,1" I IE S F i II Instructions ssl� LTE . ........... A LED41'78 USA pr ..... rim rew "J X, 41 M W, P`� MY Ol REVOLUTIONS VOLLEYBALL COURT LIGHTING EXISTING AND PROPOSED CREATED FOR J.E.SHEPARD COMPANIES BY WAITSAVER LIGHTING PRODUCTS,INC SD Em‘weIJ Rdw”