Loading...
HomeMy WebLinkAbout21-43P Evergreen Walk Goddard School TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATION & PLANS 1. Consult Planning Department for fee schedule. This application must be submitted and signed by the applicant and owner of the property. If the owner is not available to sign the application a letter must be submitted by the owner granted permission to the applicant. 2. All maps (3 copies) and documents (3 copies) per the Planning Department Checklist are required at time of application for review. Plans must be submitted as complete plans - which include the application plus all required information contained on checklist. It is the applicant’s responsibility to ensure that all information required on the checklist is submitted in one package at the time of submission - including landscaping plans, architectural elevations, traffic report, etc. After review, Town staff will notify the applicant of requested/required modifications. If there are no plan revisions, an additional four (4) full size sets OR ten (10) 11”x17” size sets are required prior to the meeting day. If the applicant revises plans, seven (7) new full size sets OR three (3) full size and ten (10) 11”x17” size sets must be submitted. Revised plans should include all sheets and be complete packages (Applicant may disassemble previously submitted plans and reuse sheets if so desired). Plans are required to be submitted at least one (1) week prior to the day of the public hearing or meeting. Note: If the applicant is required to go in front of the Architectural Design Review Committee, it is imperative that the applicant fulfill the requirements on the ADRC checklist by the time of the meeting. 3. The applicant shall be responsible for displaying a sign on the property that states that an application is pending before the Commission. The sign shall be visible from a town street and shall be displayed for at least ten (10) days before the scheduled meeting. Signs are available in the Planning Department, South Windsor Town Hall. 4. For any application for a zone change, special exception use, open space subdivision/resubdivision, earth filling, detached in-law or accessory apartment, or major home occupation, the applicant shall notify abutting property owners in writing by certified mail or certificate of mailing within seven (7) calendar days of the time an application is submitted that an application is pending in front of the Commission. The applicant is required to provide a copy of the certified letter and to whom the letter was sent. The applicant may also be requested by the Commission to notify other property owners at the direction of the Commission. (If an application is submitted to the Planning and Zoning Commission and the Inland Wetlands Agency / Conservation Commission simultaneously, one letter addressing both applications can be sent.) 5. All prospective applicants are urged to confer with Planning Department and Engineering Department staff prior to submission of any application to the Commission. 6. Applications are officially received at regular meetings of the Planning & Zoning Commission which are generally held the 2nd and 4th Tuesday of the month. 7. Incomplete applications may result in rejection by the Planning and Zoning Commission. Revised 1/15/20 1 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS APPLICANT_____________________________________________________________ PROJECT NAME_________________________________________________________ This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. _____ 1. On each sheet for plans or maps, title block with the following information: _____ a. Name, address and telephone of applicant. _____ b. Name, address and telephone number of Land Surveyor or Professional Engineer. _____ c. Name of Development. _____ d. Date when drawings were made. _____ 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. _____ a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. _____ b. Outline of buildings. _____ c. Layout of streets. _____ d. Surrounding property boundaries within 500 feet. _____ e. Names of abutting property owners. _____ f. Proposed open spaces and recreation areas. _____ g. Driveway cuts on abutting properties and any properties across from proposed site. _____ h. Distance to and name of nearest intersection street. _____ 3. Architectural Elevations: See attached checklist for Architecture and Design Review. 2 _____ 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: _____ a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. _____ b. Proposed streets and street lines with center line station, curve data, and parking spaces. _____ c. Building lines in accordance with zoning regulations. _____ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). _____ e. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g. below Grantor Grantee Type of Easement Date Filed Vol/Pg _____ f. Names of abutting property owners. _____ g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. _____ h. All open space or other common or public land uses shall be indicated. _____ i. A-2 certification; P.E./L.S. Seal. _____ 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: _____ a. All existing and proposed buildings. _____ b. Curb Lines and pavement width, sidewalks. _____ c. Existing and proposed sanitary sewers. _____ d. Existing and proposed water and all existing utilities. 3 _____ e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. _____ f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. _____ g . Regulated wetlands and 100-year floodplain or note that none are present. _____ h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches, within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. _____ i. Connections of all springs into proposed storm drainage system as needed. _____ j. Location and indications of existing brook channels, and 100-year flood limits. _____ k. A-2 & T-2 Certification; P.E & L.S. Seals. _____ 6. Landscaping plan _____ 7. Drainage calculations: - Zero Runoff Increase per attached guidelines. _____ 8. Traffic Report _____ 9. Site Lighting Plan _____ 10. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: _____ a. Layout of streets in sections coordinated by stations with the profile. _____ b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes. _____ c. Sight line at driveway & street intersections. 4 _____ d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. _____ e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths and slopes of pipes. _____ f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. _____ g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. _____ h. Profiles shall show all sanitary sewer lines and manholes, including elevations, (inverts, top of frame) sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. _____ 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. _____ 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. _________________________ _____________________________ PLAN PREPARER (P.E./L.S.) DATE February 2002; Rev. 4-04 ARCHITECTURAL AND DESIGN REVIEW COMMITTEE CHECKLIST NAME: Evergreen Walk Lifestyle Center LLC C/O Karen Johnson LOCATION: 528 Evergreen Way TYPE OF PROJECT: Proposed modifications for school The following items must be submitted at the time of a site plan application for an industrial or commercial building, or high-density housing. X 1. Site plan of the property X 2. Architectural elevations of the proposed building(s) X 3. Types, styles and colors of building materials, exterior facades and facing, and fenestrations (samples suggested) NA 4. Special architectural features (if applicable) X 5. Colors, materials, and location of lighting X 6. Design of signs X 7. Mechanical hardware proposed on or around the building and roof, including trash compactor. and auxiliary storage areas X 8. Landscape plan indicating location,types, sizes, and quantities of proposed plant materials X 9. Lighting plans (including an isolux diagram) All of the above-required information/materials have been provided. Si tore i Date bt Prinf Name }}-,,�� delayiri ac ioa c �1it &(Oissi teefon�Aion ov.ia�on plete information may result in a August 14,2014 W/PlanningAdmin/Forms/CheckLists/Arch&DesignCheckList Date: 9/22/2021 Time: 17:00 User: jmontagno Style Table: Langan.stb Layout: CS001 Document Code:140222801-0508-CS001-0101 NUMBER DRAWING TITLE LAST REVISEDDATE MAP BLOCK PROPERTY LOCATIONPROPERTY OWNERLOT Filename: \\langan.com\data\NHV\data8\140222801\Project Data\_Discipline\Survey\CAD\Existing\140222801-V-PR0101-Unit 2.dwg Date: 8/25/2021 Time: 11:21 User: jstublic Style Table: Langan.stb Layout: VL101 © 2021 Langan555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 www.langan.com Langan CT, Inc. Filename: \\langan.com\data\NHV\data8\140222801\Project Data\_Discipline\Survey\CAD\Existing\140222801-V-PR0101-Unit 2.dwg Date: 8/25/2021 Time: 11:22 User: jstublic Style Table: Langan.stb Layout: VL102 © 2021 Langan555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 www.langan.com Langan CT, Inc. Filename: \\langan.com\data\NHV\data8\140222801\Project Data\_Discipline\Survey\CAD\Existing\140222801-V-PR0101-Unit 2.dwg Date: 8/25/2021 Time: 11:22 User: jstublic Style Table: Langan.stb Layout: VL103 © 2021 Langan555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 www.langan.com Langan CT, Inc. (NOT SHOWN TO SCALE) ” ” ” ” ” ” ” ” ” ” ” ” Date: 9/22/2021 Time: 17:03 User: jmontagno Style Table: Langan.stb Layout: CS002 Document Code:140222801-0508-CS002-0101 ©Langan2020www.langan.com 555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 Langan Engineering and Environmental Services, Inc. 80' R E G U L A T E D ACTI V I T Y L I N E80' REGUL ATE D ACTI VITY LI NE UNIT 12 RETAIL 161,144 SF Date: 9/22/2021 Time: 17:05 User: jmontagno Style Table: Langan.stb Layout: CS100 Document Code:140222801-0508-CS101-0102 ©Langan2020www.langan.com 555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 Langan Engineering and Environmental Services, Inc. Date: 9/22/2021 Time: 16:56 User: jmontagno Style Table: Langan.stb Layout: CS101 Document Code:140222801-0508-CS101-0101 ©Langan2020www.langan.com 555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 Langan Engineering and Environmental Services, Inc. “” “ ” ® SECTION NTS PLAN NTS NOTES: 1.ALL MATERIAL TO MEET SPECIFICATIONS. 2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS. 3. FILTER MEDIA TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. SiltSoxxTM for Sediment Control on Pavement NTS SiltSoxxTM (8" , 12", or 18" TYPICAL) AREA TO BE PROTECTEDWORK AREA WORK AREA AREA TO BE PROTECTED SiltSoxxTM (8", 12", 18" TYPICAL) WATER FLOW Pavement or Impervious Surface Concrete blocks or sand bags sized as needed (10' O.C.) Concrete blocks or sand bags sized as needed (10' O.C.) Date: 9/22/2021 Time: 17:08 User: jmontagno Style Table: Langan.stb Layout: CS501 Document Code:140222801-0508-CS501-0101 ©Langan2020www.langan.com 555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142 Langan Engineering and Environmental Services, Inc. PLANNING DEPARMENT IN—HOUSE REFERRAL FORM DATE:10/8/21 TO:Michael Maniscalco,Walter Summars,Jeff Doolittle,Molly Keays, Heather Oatis,Kevin Cooney,Tony Manfre,John Caldwell, Andrea Confrancesco,Vincent Stetson,Kenneth Rich,Mark Halibozek FROM:Michele Lipe,AICP,Director of Flaming The Flaming &Engineering Departments have received plans for the following proj ects: Appl 21-43P,Proposed School (Goddard) Location:528 Evergreen Way &Site Plan B Subdivision No.Acres Zone GD D Industrial &Commercial E Residential No.Lots/Units E new street(s)D new detention area D new open space/recreation area D active Dpassive Flaming Department notes: Demo part of existing building;facade changes and drop area on eastem side Please comment by 10/22/21 and retum to the Flaming Department. Water:%Public D Private Well Sewerage:@ Public D Septic System Project Description:Redevelopment of existing building for a 13,0005f Future Town-owned property involved?B Yes g NO '‘ EPARATEC VER VERGREEN W A HHIIII|I|llll|l|UHIll imnuwunnn EXISTING CONDITIONS AERIAL MAP LANEANTHEPROMENADESHOPSATEVERGREENWALK Ncw HLIVcn.CT 065 i ISOUTHWINDSOR,CONNECTICUT Zulsaz577l Fax:mum)5H: .. V£NUE E(MLOCK A. ‘a S gmh 'E AYw$ mf r"-‘ — ’I ”E :E'E?"§“3E an45 gé g2 J. §§ Tiaéh38$§ SHEET2 ’g §§ E §[z $qaa2a PROPOSED SCHOOL RENOVATION BUILDING 600 §a s5Eé § ‘ X_lé g z E“Lu <LU En:$(9 Lu01%LIJ n:>”>J UJ Lu g 2-3 zofa as“ win ‘\2 3 1 J w ”w .mm W N mm m;mm;ms.mu ms m m m mm am w “MW"W‘. WWWM m w m. WWWWW w w m u.m M mm” W WMW wM w mm5N g mMWWW marmmnm.2 a.mW.WmW mm ,V mrmM m M :zn aWWWwcmy 1 m.m .rm m m,M m s M m m m w"w M m .u m.M MMMM m m EM MMM M WM MMMymMMMMMMWMmMMMMMMM,M MM .M MMM M MM Mm M :mi wMcv Wu smaum mu (mug m nsvum umcmw Aw w wusw:mm gyms ‘munnww Ann wzvnm/Emmmw wu ;rMé2¢':i“ M PRWC'mum” 2°"Swm wm'm w” WM m” mcvmiwmm “my“:W‘M ‘m ‘Wmws $6M,“m M "mm ":MamumwwMsww gm 5E L's“ wagMMMMMM.m WM M r M M M M MM M MWM MM M MM,m M MM M $$Wu3mmw$wmmwwwww§~mww§£~W “W“mm““W““‘w 6 waxm5i.m‘ammmPA$wgmMwszwammgam?$m:.ge;$iu%zyxwmm z‘mmgmramMMMWM;MM “MW M WM;Mm3mmMMM5M3WMMMMMMMmMW.mm M M M wM M M mmM Mm MM W pm WMM MmMM mm“M mm.m M 7 M m,m,Hi W m,w m M WW;,M mm WW m M W m m WE .:MMMMMMm .wMm .M MMMMM,SM.M M Mm mmM M M WM M M WM w M MW M MM mm M m mms ma mammwMmMwusgamM‘gM mm WW5 w M W m ‘5 mm w M WM s“mu K M W My m m ML.WM M M m M M M my WM MM Mm Ma MM m Mm a mmm“W wmwwam “‘35n§mawm WgMmamiMnmmzwaywg“°" M M M Mm MM MM MMM .MM,MMMM M M MM M MM MM MM. M :MMM 51m MMMMM wgo‘eugiwuggg;MMM MMM MM MM MMMMMMMMy;wt§y;;“ugz%cg“§is*k MMMM M MMMM MM M M MMMMMMMM E:M WM»M W M MMm MMMMMM W MM, w MM WWWMMMMMMM “WE MMMm MWMMMMMM5 Mm "051$: MM . Mm Au mum M m 5m:w WM mums Mums mm w,mum my w MW uw-ww 9w M mm 1 mi ust w mmm Aw pgsmnis m mi wevww mnmw m:‘5 wouamu Nwmg uiAa:Im wu umm As NEa$snv rw M ‘u “3"“WC‘MS 5““K ”WM“”‘5"““m“m WWW““W""‘E w’EWW ‘7‘“‘E ”W‘C'W“””WSSW" Mm M MMM MM M MMMMM.MM;MM MMM MM M MW,M .M MMMM MW MM M M MM,M MM I ‘mm-magggg?wwa€w¢g§§Emgggmmmwem ‘gzcaméwigwxgv ‘mgcm mg M MM mm w M MMM MM .MM Mm a.Ms m MM MM .5 .mm Mum w M MMWMMM M MWMM MMMMMMMMM M M M MMMMMm WM M M MMs.M.MMMMM MMM M MMMMM M .MMM mMM.M M MMMM M MM M MM M MMMMMM M MM Mm MMMMM MM M MMM M M MMM MMMMM M M MM M MMM MMM MMMMMM MMMMM MM M M .M MMMM M MMMM M M MMMM MMM,M MM.MM MMMM MMM MMMMMMM;M M MMMMMMMMM MM MMMM WMMMMMM WM MMMMMMMM MM M MMMMMM MM MMMMM.MMMM MM MmM MM MMMM MMMMMMMMMMMMM M MMMMMM M MyM MM M,M .MMM. M MM;MM MMMM MM MMM .MMMM M MMM M MMMM M MM MMMMM WM MM MMM M'‘MMMMMMM MM.MM Mm.MMM MM MM MMMMMM .MMMMMMMM .MMMWM MM MMMMMMMM MMMMM M MMMM.M M MMMMM .M.MMMMMMMMM MMMMMMMMMM MMMMMM MM MMMMM MMM M MM M Mm MMMMMMMMM MMMM‘MMM M M MMMMM M WM MM M MMMMMMM MMMMMMM MM MM MMMMMM M M MMM M MM,MM MM M M MMMMMMMMMM MMMM MMMM M w wi¥i€£ufmF‘W?“‘mmmr'“wwwiw’”$3tm%%11 :?M;3“»2“imw’w'w‘a &2“%f¢“%&?w 'MWMMuMMWHMMKMMS‘mriwMMm EM?m»;MmwlMwWMM M w Mm WM NM“WWW WM,MM m mnvawucmiw w;WMMam-“MP .z:w:;w::m§éMWMGswMMWM MMzMiam-MwMMmMwMz‘Mmg Ma'M‘MmMMMMMM Mm‘mzM‘ma:mM‘MW m W55 z mzM.munM mum:MMsamsvM mamMM M rwM ws Mmww MM.umcmw MMMMm mmMMMM 9m;M a:unumM MM av mz mumMM‘MM cm M A :MMmm MMMa-sz.M 1 ;WMYW”“:fmafi gsg‘“m WWW““‘“a‘m‘m V M “EM”“WW ’Wv WWW WV ‘W‘S‘V‘“M “WW“W MMM M M MM MMMMMMM M M M MM MMM MMMM MM MMMMM MM Mm,MMMM MMMM MMMMMMMMM(MM M M MMMMMMMMMMMMMM M MMM MMMM MMM MM,MMMM MMMMMM M MMMMM MMMMMMMMM M MMMMM MMMMM MMMMMMM MMMMMM MM M MMMMM MMM MMMMM M 5m mm .5 M Mm.or mm:9mg mam MM MM 9mg mm Mama M MMMM Mm;Mm WM:MM M WM m rgwvggmi Wt ”Exam"“f ,z'ggémw F V D vmg w “mglgws‘v WWW S53“D,:Emmg;“gm:gm, MMMMM.M MMMMMM M MMMMMMMM Mm MMMMMM MM.MM MMMMMMM WM,MMMM .MM MM;MM M MMMMM MMMM MMM.MM M MMMM MMMM MMMM MM.MMMMMMMM M MM,MM MMMMMM MM MM M MMMMMMM MM,MM MM MMMMM MM M MM MMMMMMMMMMM MM WWWM,m gmwwMMWW “gawwww MWWWM W5 MMMWgiMr‘YMzE;m M Mum M ME W.M M M MMMW aMmMMwM E§<d §NN§ dZE"2‘ M E'5éM M MMMM MMMM MMMM \MMMMM MMMMMMMMMMMM M M MMMMMMM (MM) \ \ l wrmoa amwwc 1 MMMMMM .MM MM MMMS MM >\M MMMMMMMMMMMMMMMMuwrs\ \ \ \ \ M MMMMofsrREAM(m) MMMMMM MMMMM MM :MMM MMMMMM M Dme Descnptmn No. MMMMMMM I MMMMMMM MMMMMMMMM MM) MMMM MMMMMMMMMMMM MMMMMM MM MMM MMMM MM. g M /‘r0w coNswucnaN (VIP / PROPOSED SCHOOL RENOVATION MMMM MMMMM EMERM MMMMM an MMM‘M‘MXMMrREMEwauFfEF (Tw)M MMMMM MMMMMMMM MM Langan Engmunns and Envimmenul Sen/Hz;m: 555 Lani Wlur!Dnva New ’1mn‘CT 05511 T.203 552 5m F:2n:ms 5142 W mug“eon. M-BUILDING 600 :1 2,81 9 SF MMMMMMMM //MMMM MMM M MM M MMMMxMMM MMM ,MM NoM27 EL W No.l5 UNITNoJ518EVEG’RW WAV,BUILDING 5m SOUTH WINDSORWORDCOUNTV CONNECI’ICUI’ fMMMM MMfMMMM«MI MMMM MM MMMMMM M MMMMMM MM M MM MMMMM MMM MW MM MM MMM ...........M MM MMMMMM MMM MMMM MMMMMM MMM M MMM MM MMM MMMMMM MMFCRCDNSWUCI’IW (WFI MMMM MM MM M M M M M MMMM M M /M MOMS MM MMMM .MM orawmg weMMMMMMMMMMM.M M MINIMW Wow “Rn SEVBACK 65’”xxa5 Fr x505 VT 4253 MM MMM MMMM M M MMM M MM MM MINIWM Rem vmD SmAcx Ia rt :5’57 Ff 1567 usa m MMMM 2m FY K325 Fr'1125 FY :z SB My MMM 2m FY 2555 H1 2355 FT o 2 as NEIL I MM MMMM M M MMMMM MMMM MMMMMM MMMMM MMM M Mm MMM M M MMMM .MMMMMMM M MM (MM M MMMMMM MM M /pmasm wmcus covmcg -Is Inf/mm 9g 9x or,sr mmws Am / M MM MMM MM M MMMMM MM MMM M MMMMM MMMMMMM MM MM:MMM M M M MMMMM M MM M MMM MMM MMMMMM M 5 m 1n M.M MM Fmem No Ham”! Drawng Na Date Will/ml! Drawn ay IM MM Checkga Hy D'IG Dlae zozt 4 DriliescnonREV Schdleeu an EUDGET ESTIMATE 1 H. TI wsULArEDmacxv ALL Nzwm.WALL mumsm m. my ‘ummmm Wmnm am. iasgmn mm um) m amasmm ry RunvauwnnvmmREFmIsHEws.NEW COLOR 9n:- NEw wwooweumv svsTEwNEWOPEN‘NG ‘u //salt FACE cw (NLN‘HmammsuuvsuaLocK) GODDARD SCHOOL THE SHOPS AT EVERGREEN WALK. WINDSOR. CT OOSEDPRP EEVATNLIOS PROJECT NUMBER 2007100. DTEA 5/12/2021 JN TS 1/E" 1= DRAWN EV CHECKED BY SCALE A202 M Maw may 9mm (/Exmwe ro REMAIN ’I aswszn zLEvmoN nzv‘ssu asunm I oEMo to naas REHN‘SH EIFS NEW COLOR 0 l 7 I I usMo pawnoN owwg Am Raczsssn was wwm ‘wm omoFENmc mm umOPENING L _1 I New pm wwELzvmoNmom;Rams“auswa mom; I 15‘r :r ‘unn—a-ra-wua-mu-zv u-sua-Ems mm msa I.//////////AREA nusn I l mm wm rvp I@mmowmanwasI Ii a i NEW ALUMNzwALuMNswwmoowwmnow system Nsw sum Nsw wmaowwmnnw5mm5mmnouns3mm NEw REAR ELEVATION -souTH1/5“1‘4)‘ Demo I EXISTING /w.m~ mm Ems M11 m Hzng I m um; msnws.w I D E 6ma-I‘r gsgRE‘cFju xoam Nzw ms ovza cw(HIRVN KORFIL ‘msuwEu mocK) I Iu 21 -E'ars uvsn cm:mom(NIAR‘H KORF‘L INSULATED NEW spur FAcEucMu1mm:mamwsuwEn9mm New spm acso cMu(mm mam msuwa:mom NEW ALuM wmoowsvsramsmvms WALL Nsw a ‘55 mENLARGE)oPzNxNG WILL WALL wmmnDwsaNA'L mum NEW PLAY YARD ELEVATIDN >EAST1/8"1'—0'4 NEW PLAY YARD ELEVATION ‘SOUTH«Ia'-v—u" 965nm;mREMAINm NENE 7 4 3 2 News“ars PncN,NEw cuLcN,éTc.WP'Aw smnau AREA L — 4‘4r 5-z-//LNnLLwm mamMNAmNErSAREAS wmLL WALL m:n xNnLL :ouNmnoN/msa HATCHED Mia NORTH LNFLLL rouNnAmN/aass 1 NEW FRONT ELEVATION -NORTH 115‘='-' um mmnal GODDARD SCHOOL THE SHOPS AT EVERGREEN WALK,BUILDING 600 Rviiesan Sohdleua ndnuaunn Bunarr psnMA‘rEaacurgq scomemsnN AkcnITEcVsanMAINsmEEr‘5m nowWALTHAM.MA nausnum 1 :w w. um gm m M mm uwmwn m. m mm» m mu mum MAIN ENTRY PERSPECTIVE amw s.mvuommr C FRONT FACADE -STREET VIEW MAIN ENTRY ELEVATION GODDARD SCHOOL ME snaps n EVERGREEN WALK \MNDsoR‘ cr She$Lisl Shem Sheet IlsuaNumberSheetNameDaIB Ann‘.‘n‘rLE sHEET 4Q]2U21 A1E2 PROPOSED PLAN 4mm1A2D1EXISTINGELEVATIONS4r2/2021A202PROPOSEDELEVATIONS4R/2021A1DDSITEPLAN05l12f21LODTENANT2LEASEPLAN07/19I21A133EXISTINGROOFPLAN10/12/21 TITLE SHEET w ‘41 : 5112mm 29071 w JN sA302LONGITUDINALSECTIONS10/1 3/21A5n1WALLSECTIONS1M3121A6111vvINDOwsCHEDULES10/20I21 1.;1r '. II mymmamwummmm;namIi;f;g §§11 IE ig I‘I wEcKED av PRmEu NUMBER sen: §I a 1 i E i § >o o ALOCATORMAPaiawwuwummmMam _m._ 1:.1‘. '- HWELA w 4 l' I L9'30.5'32.7‘‘50.5'07 46 Ii goFE'smv /\ k {‘‘I J ;\4a 9’“‘'? /‘E“W x’ V \ i jO $6;E’r ‘V I Nd i ITi ©*§CURESIDE PICK-UP FORMOE‘S SOUTHWEST GRILL i égm‘ E'x ,WY‘m m*’%“4%\\\j '\R-\ 5,K 1 \\"\ §§§§§§§g é r §§u _lO g g é:a @E <1 % €§% y THE GODDARD SCHOOL~_¥ ! I A f l J 7.8‘02c -A$Qk ”>J §_(Dhy-a 8 <I— W ~ —*} 7L v ‘_v§Jyj/ PLAYYARD l a?Ng *— <E \g %5i _§ Ag::Q <-$‘—ao EKJ 8 *‘1 l u \f -\J \I ,,. / GODDARD////;ENTRYCANOPY Zé LIJ)—a F 8 P. H'— m 'mm "m ?iuii I?EV: ,gg:nA5:A2m<<“x02.—2m:«E4lama“zgnwga,zm<<w:w:N.a.ugnmnww:irx‘zxowzr_zm:§aoEng_n.qg.2Eu4.6,Nmrm<>dOzVr>((>mU_i;:m.u>2m<<E?mgz?Emxin.3zmsmamc<mx2:91xoxxr_zmc:amuurog;;ElrrE>F1n,3IlnxmuEm)—.203iNN)»mum/$102£53a3:»;“.7xmmzmxmumzms35».z:xmnmmmmuSim?ins?.mOCd.‘22E)25i;.xxoxzr_zm=§«mamSnx._.3Q__lvfl2::zmz§zuos®zmEmzi<$6}.3.a.)Ez.934m:ammzazmawv29.zm§noSu,m.«n..3v.3mime.iw.umxnif!mxaqinSxmxmS__.__zgégag,m<mam§1vEiluxqgm@ggmEm©3©©=2mE):.K.z3:E.21.?All_n_\//EE.xinxmunocxaZEzaEmm<max1r:a.mKEm.“mxmdzm3nmxzzaxmmm$3.22FoEavmzimnmsmmnwrmsiozRzmsig.$.13:im<m<maL,>432:zznx.i_zmimza<zms§zooiuoaxmm‘mam:enééggaE2?3.lwLvvmizmsnusxgums>nm>ééggamLu.115.<§F1v.aainozkx59aimQLJwménvgm<>mUmrm<>doz.mag-I“E:gum9E:2;.6»;_zm:r.:muuronamamo<mnQ5:....A‘mumxaaxmnmumzawondozoxmam.Em)aEz351m5?vgma%§m§n2mm.9i¥§E2(Eu...5/12/2D21DATEGODDARDSCHOOLPROPOSEDJ>NoNsmwRavisionScheduleELEVATIONSDasmnunnDaLJNDRAWNBYxmm"mummmauJEm‘mm...mammmmu...5mmm.ngmvsmvaowgmC.CHAR1ERTHESHOPSATEVERGREENWALK.WINDSOR,CT1aunGErEsYlMAT:412I2n21TSCHECKEDEVPROJECTNUMBER2m71.00SCALE im/LWP Family Arrival and Departure Policy Arrival and Departure Procedures 1.Parent(s)or legal guardian(s)should park in the designated parking spots (highlighted section on Exhibit 1)and turn off their car’s engine.2.Parent(s)or legal guardian(s)should walk their child or children into and out of the mainentrancetotheSchool,located along Cottonwood Lane.Parent(s)or legal guardian(s)shouldholdtheirchildorchildren’s hands while walking them through the parking lot at drop-off and pick-up times. 3.Parent(s)or legal guardian(s)must sign their child into and out electronically using the tablet or manually sign into and out of the log book each day at the drop-off and pick.up times.4.Parent(s)or legal guardian(s)will go to their child or children’s designated classroom(s)or assigned area(s).A system will be in place to communicate the location of the children in the School. Building Arrival Policy The parent(s)or legal guardian(s)will choose a drop-off time and consistently drop off their childrenatthistime.The parent(s)or legal guardian(s)should discuss changes to the drop—off time with thefranchiseeordirector.School staffing is based on the drop-off and pick-up times the parent(s)or legal guardian(s)choose; The parent(s),legal guardian(s),children and visitors will enter and exit the School through the mainentrance,located along Cottonwood Lane.The parent(s)or legal guardian(s)must not hold the frontdooropenforotherparent(s),legal guardian(s)or visitors.This controls access into the School and prevents unauthorized persons from entering; All visitors must sign The Goddard School Visitor Badge Sign-in Book and wear a name badge; The parent(s)or legal guardian(s)will accompany their children to their classroom(s).The children are required under law to be under adult supervision_at all times; The faculty members will work with parent(s)or legal guardian(s)to help the children get settled.This will help the children adjust to the morning routine. Building Departure Policy The parent(s)or legal guardian(s)should designate their pick-up times and try to adhere to this schedule.Changes to the pick-up time should be discussed with the franchisee or director since School staffing is based on the drop»off and pick-up times designated by the parent(s)or legal guardian(s); The parent(s)or legal guardian(s)will escort their child or children from the building before the School’s closing time. The faculty members will work with the parents or legal guardians to help the children get ready to gohome. Children are required by law to be under adult supervision at all times. PROPOSED SCHOOL RENOVA110N BUILDING 600 g1 9,SF Exhibit 1 /i1 2, mmzomumq>__.Smg2a."...c.y..u.vn...........gEN-ggdggaggagggga.sumEggggg..ggigggagggagn§En:1.v1.....n"‘l7-‘:'.5.‘‘_ro-uwuaoveaune..>s.mmwf? Appl 21-43P,Goddard Schoal (at Evergreen Walk) Dec 14,2021 Flaming Department Report .Request for a site plan modification for the re-development/construction of 12,819 sfeducationalbuilding,at 528 Evergreen Way,Buckland Gateway Development Zone.Theapplicantintendstouseexistingspaceforthisuse(previously Flatbread and CharmingCharliespace). .Minor changes proposed for the site include the removal of a portion of the exiting buildingtoaccommodateaplayareaandtheadditionofadropoffareaalongwhatwillbethefrontentrancetotheschool. .Exterior changes to the building include the addition of a new entrance on the back side oftheexistingbuildingincludingacanopyoverthedropoffarea;finishing the wall inside oftheplayareaandremovingtheexistingentranceinthefrontofthebuilding.A new sidewalkwillbeextendedtoconnecttotheexistingsidewalknetwork. .Building signage is proposed on both the sides of the building.The applicant has provided a graphic of the proposed signage with the materials provided. .There are regulated wetlands on site.IWA/CC approved the application on November 6 withabondintheamountof$2,000 to ensure compliance with the erosion and sediment control. .Public water and sewer currently service the site.Water Pollution Control Authority approval is not required for this change in use. .The Architecture and Design Review Board reviewed this proposal on October 21.Thecommitteewassatisfiedwiththeproposalaspresented.It was suggested that decorative treatment be used for the fencing around the play area rather than a solid 6—foot fence. If this site plan is approved,the Flaming Dept.has no modification to request. PLANNING DEPARTMENT December 16,2021 CERTIFIED MAIL 7019 2280 0001 51 19 0570 Kaxen Johnson AICPCharter75HollyRealtyH111Lane ’&DeveloSuite%05 ment Corporation Greenwich,CT 06830 Deal Ms.Johnson, Re:Appl.21-43P,Charter Realty on behalf of Evergreen Walk LLC—request for a site plan modification for the re—development/construction of 12,819 sf educational building,at 528 Evergreen Way7 Buckland Gateway Development Zone We are pleased to advise you that the Flaming &Zoning Commission voted on December 14,2021 to approve with modifications a site plan modification for the re- development/construction of 12,819 sf educational building,at 528 Evergreen Way, Buckland Gateway Development Zone.This approval is subject to the following modifications: l.Prior to commencement of any site work,a meeting must be held with Town Staff. 2.No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3‘This application is subect to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount 0f $2,000 to ensure compliance with the erosion and sediment control measures. 4.All bonds must be in one of the forms described in the enclosed Bond Policy. 5.An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 9.1 i3 of the Zoning Regulations 6.All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor, 7.This approval does not constitute approval 0f the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 8.NO building pennits will be issued until the Office of State Traffic Administration certificate has been issued (per CGS §14—311). 9.The building street number must be included on the final plan. 154D SuHivan Avenue,Snuth Windsur,CT GEU74 l Ta](EEU)644-2511 Ext 329 ;Planning@SuuthWindsur—Ci.guv £$ j 10.Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11.All free—standing signs and/or building signs require the issuance of a sign permit before they are erected. 12.Engineering comments dated 12/14/21 shall be incorporated into the final plans. 13.The fencing around the outside play area shall be decorative in nature and subject to staff approval. 14.The applicant shall provide a drop off plan that addressed drop off queues at different stages of capacity and timing of student drop off.It the plan shall include a contingency plan.This plan subject to staff approval. 15.Protective bollards shall be placed along the northeast frontage in nont of the fenced area.The location is subject to staff approval. Black and white mylars of Sheets #C8101 ,C6101,with this approval letter reproduced thereon,must be submitted.After the mylars have been endorsed by the Commission, they will be retumed to you for flling in the office of the Town Clerk.Three print copies of the entire set of plans must also be submitted. Sincerely,“am W Bart Pacekonis,Chairman PLANNING &ZONING COMMISSION BP/cgo CC:Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal ‘TEI (H60)644-2511 Ext 329 l P|anning@Snu1hWindsnr-ET.QOV1540SuHivanAvenue.Snuth Windsnr,CT D6074 >Eumo<m0mz._.W<mrm<>.:Oz“Am!anrvimmauTHESHOPSEVERGREENAT500EVERGREENWALK,WINDSOR,CTWAYELEVATIONREVISEDAWmSwmUm2#w(mrm<>dOZ4E.“arc:m|_m<‘0—27—2012DATEJNDRAWNEYTSCHECKEDEVPROJECTNUMBER2w57.00Us“:NT.SCALE2vu’RevisionSchadulenesmnuanDalezmiKc;052%3mmzzz3:24)nnmi86xEmxagmmamxmommmmuEzma2%?>4mouu§umaxoarm..m<>:oz.jAlE»:S»«mzz:2n:vwoSumzméEmuvygmaxm<amu2m:§zuu§Kzmfe;géosmém.mPmszazllzmEmEya>§=zovwaSummarsmraoézm_zSEEzFowmzimAOEIL21FoEmz><mx>amaEm;n22F9E.:inxgmzzmzggsaiém;zgmxaéga”EmmamE<§ozzmi2.?(:6mrm<>§zmmézaxam§E1mmm PLANNING DEPARTMENT February 26,2024 Karen Johnson.AICP Brand Street Properties 309 Greenwich Avenue Greenwich‘CT 06830 Dear Ms.Johnson: Re:App].21-43P Goddard School I am pleased to advise you that the South Windsor Planning and Zoning Commission,at its Regular Meeting on February l3.2024,voted t0 release the following bonds: Appl.21-43P Goddard School E &S Bond in the amount of $2,000 reduced by $1000 to leave a balance of—O—. Please pick up the check from the Finance office ofthe South Windsor Town Hall,1540 Sullivan Avenue.If you have any further questions.please contact the Planning Department at 860-644-251 l.ext.2329. Thank you. Very truly yours‘aw WA Stephen Wagner.Chairman PLANNING &ZONING COMMISSION SW/js 1540 Sullivan Avenue,Sauth Windsor,CT 06074 i Tel (860)644-2511 Ext 2329 1 Planning@SouthWindsnr»ET.gnv