Loading...
HomeMy WebLinkAboutBuilding 17 Arthur Drive (5)PERMIT Application For 6 617 6227 y DEPARTMENT DECISION Heating Permit d 3 APPLICATION Is HEREBY: DEPARTMENT OF LICENSES AND INSPECTIONS d Q) 3S APPROVED El DISAPPROVED c TOWN OF SOUTH WINDSOR do 8/23/85 Thomas P. D'Auria 00 DATE CHIEF INSPECTOR APPLICATIONS MUST BE PRINTED OR TYPED. BEGIN WITH NUMBER ONE BELOW O41 C 1. LOCATION OF JOB I.7Or eve G NO. STREET CL HI/f-S fTj te 0 LOT NO. FLOOR APT. NO. y ON d 2. OWNER 00 O S. ADDRESS - be y ; SO(Ant w/4 11 (IPe Cf-06aT/ 4.PHONE to rj2 S. APPLICANT V I /C N'TZ.hl4s/ di a0 1, s. ADDRESS 7 r9 •T/ F TG 1 /f A 4,14 JP/C-f 0 6 0"01 7.PHONE ra—yio s. LICENSE NO. 30I LO 3 0 ,+', B. EXPIRATION DATE OF LICENSE o/dl" c G 10. ESTIMATED COST ! ` Z6 r{ N4 /T v o bD t 1. IS THIS A CONTRACT COST?K YES 0 NO re-12. FEE ENCLOSED ! Fml i t 14535 x X vvi m Is. TYPE j] OOFF BUILDING: rn 3 BESIDEMTIAL COMMERCIAL O C CIS 3 14. TYPE OF B: INDUSTRIAL ORIGINAL ALTERATIONINSTALLATIONADDITION REPAIR APPLICATQION FOR HEATING PERMIT (Continu d/ it m Reverse Side) J. 11. LOCATION OF JOB v 14 ti 1 fo- //r yt fT ZAat 0. STREETS FLOOR AFT'NO. 112TYPE OF INSTALLATION: OIL BURNER MILECTRIC VENTILATION SPRINKLER 0--GASGAS BURNER L'S STACK INCINERATOR MISCELLANEOUS IDENTIFY SIZE LOCATION SIZE SIZE13. OF TANK OF TANK OF FILL OF VENT 14. B.T.U. EQUIP. AT REGISTER FURNACE MAKE AND NO. AT BONNET FIRING RATE BOILER OR FURNACE MAKE AND NO. B.T.U. OR SQ. FT. NET B.T.U. OR SQ. FT. GROSS FIRING RATE FLOORS TO BE HEATED NEW OR OLD BUILDING INSULATED — YES OR NO TYPE OF WALL INSULATION ROOF OR CEILING INSULATION AVG. SYSTEM WATER TEMP. B.T.U./SQ. FT./HR. EMISSION INDOOR-OUTDOOR TEMPERATURE DIFFERENCE FAHRENHEIT MAKE OF RADIATION: BASEBOARD, COPPER CONVECTORS, OR C.I. RADIATION. OUTPUT PER SECTION OR LINEAL OF RADIATION. SQ. FT. OR B.T.U. DESCRIPTION OF WORK•-, is. TO BE DONE: LA1 •(//1 « AAd /' I T //A O(7L1 lti o/,T r'cf.o- t; -4a 1s. HEAT LOSS SCHEDULE. (TO BE INCLUDED FOR ALL JOBS): ROOM SIZE AREA - SQUARE FEET O F OANDDoonaMINOOMSAE.T.U. e.T.U. VOLUME TOTAL TOTAL < I- DISTRIBUTION INSTALLED S,I ROOM NO. < GROSS OLAS! NET MALL CEILING FLOOR CU.FT. AT A•F CORRECTED J LL jU. REGISTER L M N AN D `W TEMP. TO Fhb f TYPE AND SIZE RAD. OR LEADER SIZE < MALL 10 INFILT.) DIFF. F F IS u0i 30. FT. FREE AREA TOTALS A. HEAT LOSS FROM BUILDING B.T.U./HR. B. DOMESTIC HOT WATER DEMAND B.T.U./HR. C. PIPING, OTHER THAN NORMAL B.T.U./HR. ALLOWANCE FOR HEAT VALVE OF FUEL (A B C) FACTOR 17. ELECTRICAL WORK BY: NAME ADDRESS SUBCONTRACTORS AND 1B. THEIR TRADES ALL WORK COVERED BY THIS APPLICATION HAS BEEN AUTHORIZED BY THE (OWNER) OR (AGENT) OF THIS PROPERTY AND WILL BE DONE IN STRICT ACCORDANCE WITH THE BUILDING CODE. APPLICATION TO BE COMPLETELY FILLED IN. k9 lyyr DATE SIGNATURE OF APPbffjANT vF ARTFORD CON.NECTICUT LAT = 42 ALT = 15 ST- 70W/46R/ 70B ID= 75 70 L COLOR: MEDIUM ROOF COLOR: MEDIUM SERI 60215831 . 6 D.B .TEMP TOTAL TONS R H TONS CFM JUN AT 9 A.M. 75. 6 1 . 56 1 . 27 692 JUL AT 9 A.M. 78 . 6 1 . 71 1 . 36 742 SEP AT 10 A.M. 75.4 1 . 76 1 . 49 811 OCT AT 2 P.M. 74 .0 1 .90 1 .67 908 SEP AT 3 P.M. 85.4 2.40 2 .02 1 , 102 JUL AT 4 P.M. 90.0 2 .56 vlJw_ 1 , 142 <- ZT s S r• JUN AT 4 P.M. 87 . 0 2 .42 2 .01 1 ,096 HEATI G--> 24, 295 W/INFIL- 30, 6 3 CFM -558 INPUTS ZENTATION OF BUILDING N S E W RF NSMISSION FACTORS 0. 08 0. 08 0. 08 0.00 0. 08 F- .55 IS LI-FLO Y SHADE FACT=0 63 NO. FLOORS 2 GTH - 24 WIDTH - 36 HEIGHT - 16 VA.= 7 OUTPUTS BER OF PEOPLE' S 4 SENSIBLE PE PLE LOAD 980 AL LIGHTS 2 , 160 LIGHTING LOAD 9 , 215 ER ELECTRICAL - 432 OTHER ELECTRICAL 1 ,474 A OF N. GLASS - 65 NORTH GLASS SOLAR 648 EA OF S. GLASS - 65 SOUTH GLASS SOLAR 1 ,305 EA OF E. GLASS 0 EAST GLASS ISOLAR 0 REA OF W. GLASS - 60 WEST GLASS ISOLAR 5 , 198 AL GLASS AREA -1.90 TOTAL GLASS SOLAR 7 , 152 TAL GLASS AREA - 190 TOTAL GLASS TRANS . =1 , 567 SEA OF N. WALL - 319 N. WALL LOA 217 XKA OF S . WALL - 319 S . WALL LOA 548 REA OF E. WALL - 576 E. WALL LOA 571 it EA OF W. WALL - 516 W. WALL LOA 0 TAL WALL AREA - 1 , 730 TOTAL WALL RANS . 1 , 336 A OF ROOF 864 ROOF LOAD 2 , 205 AFETY FACTOR 5% SAFETY B .T. .S 1 , 197 SUPPLY FAN H.P. -0. 33 FAN HEAT GA N - DT -1 ,003 ENTILATION CFM - 86 O.A. SENSIB E LOAD 1 ,48266 UMBER OF PEOPLE - 4 PEOPLE LATE T LOAD = ENTILATION CFM - 86 O. A. LATEN LOAD 2 , 379 QTAL CFM-STD AIR- 1 , 142 TOTAL LATEN LOAD 3 , 199 BOOM SENSIBLE 25 , 127 ROOM LATENT 820 FLATS 7> GRAND TOTAL LOAD -30, 754 BTU' S OR 56 TON <-- us LOAD RUN FOR # 6. JUL AT 4 P . cis AREA (SQ FT) 1 , 728 SQ FT/TON 674 OTAL CFM-STD AIR- 1 , 142 CFM/SQ FT 0 . 66 HEATING LOAD ENTILATION LOAD - 6, 368 ROOF HEATING LOAD 4 , 631 GLASS HEAT LOAD - 7 ,001 WALL HEATIN7 LOAD 6, 508 INFILTRATION LOAD- 6, 368 WARM UP LOA 748 LAB HEATING LOAD- 5 ,407 HEAT LOAD W TH VENT = 30 , 663 COIL SELECTION PARAMMERS TEMP ENT/LVG - 76 . 1 / 54 . 2 TOT SENSIBLE LOAD 27 , 555 B TEMP ENT/LVG - 62. 8 / 53 . 6 TOTAL COIL LOAD 30, 754 CIFIED ROOM RH- 55% RESULTING ROOM RH 47% MINAL AIR TEMP- 55 .00 / 120 DEGREES ROTA ED 0 PPLY FAN STATIC- 1 .00 NON-CEILING RETURN G. 'U' FACTOR-0. 10 CARRIER DEF ULTS r---------------------------------------- -----------------