HomeMy WebLinkAbout110 COUNTRY VIEW DR - DECK PERMIT BLDP-21-326Town of South Windsor Building Department
Building Permit: BLDP-21-326
APPLICANT
NAME: Kathleen Bardwell
EMAIL ADDRESS: carpentrybyjay72@gmail.com
ADDRESS: 25 Park ST
Manchester , Ct 06040
LOCATION
ADDRESS: 110 COUNTRY VIEW DR
South Windsor CT6074
OWNER: BRIGGS DANIELA C & NATHAN C
110 COUNTRY VIEW DRIVE
SOUTH WINDSOR CT 06074
DESCRIPTION OF WORK:
26'x 37' free standing PT wooden two level deck first level approx 24" from elevation second level approx 4'6"from elevation (division TBD).
Deck will be built around a portion of (see drawing)*1 existing above ground pool; a PT frame of 2"x8" will be built on PT 4x4 post that sit in
4"x4" strong tie brackets set on a 10"sonna tube that are dug below elevation no less than 42" and filled with quikrete ready mix concrete
mixed at 9 pt water per 80 lbs bag per quikrete recommendation. The frame will sit on PT 2"x8" and or 2x10 beams (see drawing)*2 that will be
constructed by nailing two together crown up with hot dipped galvanized 12 penny nails in a staggered pattern (see drawing)*3. A PT
2"x8"frame will be conventional frame at 12"oc joist will hang crown up from simpson strong tie specific for said lumber with strong tie nails 1
1/2" in ledger/rim joist and 2 1/2" through joist to ledger/rim joist. A composite deck and railing will be installed on siad frame. Decking will be 5
1/4 " wide in lengths appropriate to space applied with #9 grip rite screws 2 1/2" polymer plated specific to exposed fastener decking system.
two fasteners per joist at every joist. Railing system/kit will be in 6' or 8' sections 36"from decking to top of top rail. connected to PT 4"x4"in a
PVC sleeve. Spindles will be spaced at no more than 4". And finally stair and gate procedure. An up to 4' wide stair case will be built on first
level deck to reach second level (see drawing) *4 using PT 2"x12" stringer no more than 7 1/4"in rise and no less than 8 1/4 in run. Railing and
hand rail constructed in same fashion as common railings to add a grabbable hand rail on one side at 32". A second stair case will be built from
ground level to reach first level of deck placement TBD constructed in same fashion. A self latching gate will be installed at sole entrance to
deck specific location TBD.
May 5, 2021
_____________________________________________________
BUILDING OFFICIAL
_____________________________________________________
DATE SIGNED
***ALL WORK TO BE DONE IN ACCORDANCE WITH THE APPLICATION AND PLANS APPROVED BY THE BUILDING DEPARTMENT***
***PERMIT ONLY VALID IF SIGNED BY BUILDING OFFICIAL***