Mr. Chris Dougan P.C. South Windsor
Deputy Building Official BUILDING DEPARTMENT
1540 Sullivan Avenue
So. Windsor, Ct. 06074
Re: Strawbridge Condominium—Building#19
Mill Pond Drive
So. Windsor, CT
Dear Chris,
In response to your concern about the existence of structural concrete footings below the dwelling
separation walls and the concrete footing pads at the column locations, I offer the following
commentary.
At the time Associated Architects initiated the reconstruction drawings,the foundations walls,
slabs and footings were designated as existing to remain. No original drawings existed of this
building or any similar buildings in the development.The design of the new building wasundertakenwiththeunderstandingthatgeneralconstructionmethodsandmaterialswere utilized
at the time of original construction. No exploratory work or testing was requested or provided at
the design stage.
Upon your request, at the time when framing had been initiated,the Contractor had inspection
holes drilled in various locations.
On June 17, 2003,the Contractor(Construction Services) and I, reviewed the 2 inch diameter
drilled inspection holes along the centerlines and just outside the bottom plate lines of the
dwelling separation walls, as well as,those in the areas where lally columns were designated.At;
that time it was noted that generally 16 inches of concrete existed at the wall centerlines and 3-4
inches of concrete existed just outside the face of the walls. Similarly,there appeared to be
concrete pads at column locations at a depth of 16 inches. Due to the difficulty verifying the actual
extent of the footings the Contractor offered to have larger inspection holes cut(12"x 12") at
various places.
On June 23, 2003,the Contractor and I met you in the field to verify the conditions.At that time, it
appeared that typically at the dwelling separation walls that the wood framing was supported by
concrete 16 inch deep by 12 inch wide.There were no apparent signs of cracks in the slabs and
no signs of excessive settlement throughout the basement area. Combine these conditions with
the fact that the building had been standing for more than 15 years, one would feel confident that
the foundations, footings and slabs had been installed properly.
The dwelling separation wall consists of two rows of 2x4 wood studs @ 16,,oc with a 4"air space
between the two walls.The 2-hour separation wall, constructed of 2 layers of 1"gypsum shaftliner
in metal channels, is placed in the center of the 4"airspace. The overall width of the dwelling
separation assembly is 11 inches. Therefore the concrete footings are generally 1 inch wider than
the wall construction being supported. The walls are placed equally off the centerline of the
footings,therefore the load induced on the footings is balanced.The depth of the footings is
within generally accepted practice for this type of construction.
16 SPRING LANE FARMINGTON CT 06032
860) 677-2801 FAX (860) 676-0627
cnd d6associatedarchitects.com
An Equal Opportunity Employer
S
The footing pads supporting the lally columns in the Dorch ster units, appeared to be 16 inches
in depth and approximately 24 inches square. The final location of the new columns, in some
cases,will be within 3-4 inches from their original locations.The original column bases were set
on top of the concrete slab with 4"x 4" base plates, not within the slab has is generally done. The
slight movement of the new columns from the original centerpoints should not adversely affect the
capacity of the footings. The loads imposed on the new columns and the footings are the same
as they were in the original building.The new column base plates should be physically fastened
to the slab to reduce the chance of movement.
I hope the above commentary clarifies the acceptability of the existing foundation, footings, and
slabs, as part of the work required to reconstruct Building 19. If additional commentary is
required p ase do not hesitate to call.
Sincer
Robert Lohrmann, AIA
President
Associated Architects P.C.
Cc: Strawbridge, Construction Services
ASSOCIATM P.C. p w u.SING DLL
51o BRIDGE 5K4
CWZCWff oGWz DATE 5m=Tmf No. MTAIL ND.
TYPICAL DUMOR WALL:
VINYL CLAPBOARD 51DING
I' RIGID IN5ULATION
AIR INFILTRATION BARRIER
1/2' 055 5HEATHING
2X4 WD. FRAMING ® 16'OC
BATT IN5ULAT10N
VAPOR BARRIER
1/2' GYP. BD.
1/2'GYP. BD. 1/2'GYP. BD.
2X3 WD. FRAMING ® 16'OC 2X4 WD. FRAMING FLAT @ 12'OC
GP. BD.
MWEW
AIR 5PACE
NG 5EPAK TION WALL
30G8 ENTRY DOOR
3
2' 2'-7 3/43 22
1 13/16'
3 1/2'
OF
NOTE: ADJACENT STAIR CON5TRUCTION TO
BE COORDINATED WITH TH15 WALL CON5TRUCTION.