HomeMy WebLinkAboutBuilding 19 Mill Pond Drive (18)10iO4/2002 16:27 FAX.$60 269 0138 ENV. SERVICES
semelces,nvirvninentbt In r
90 BftokfidWd Sh"t -South Wyndlor,Cr 06074-1262 ("0)528-"W (MM 280-01 s6(tax)
a ww-.cora
September 20,2002
Mr:Jeffrey Hamm
Eastland Clairn•Service.Inc.
101 Q Wethersfield Avrtnue
Hartford, CT 06114
RE: Demolition at MIII.Pond
E.S.1.'Quote No: 2002-342. '
Dear Mr.Hamm:
Environrrientar Services, is pleased to submit the following proposal •ior
Demolition of the remalninp seven (7) units of the Mill Pond/Sihrtswbtidg
Condomfnium rlrO site:
Environmental Services; Inc. is a quality provider of Comprehensive Environmental
Services. Our Hazardous Waste Management Services include the following'
24-Hour Emergency Response- Oil/Chemical
waste GasteDisposvl5eniround,Water Restoration
Waste Transportation Site Decontamination
Remediation Services Ucensed Asbestos Abaternent-
Licensed Engineering Services. Licensed Building Demolition
Underground/Aboveground Tank Services Industrial.Gleaning
All of these services 0 e available on a 24-hour Emergency basis-
E.S.I. has met'with the Condo Association representatives and has.been instructed
on the specifics of the demolition of the seven (7),units in 'regards to the point of
removal of sidewalks. E.S.I. understands thatseparationofexistingstructuresand
the foundation Is going to remain. Special care is to be given during demolition for
the potential recovery of Orsonal*property.
The Scope of Sendcfs to be4"vided Includes the foAowing:
1. Mobilize equipment to site.
2. Load and transport demo'debris from previous work.
3. Cornrnplet®the demo of structures still standing to the limits'defined.
4. Sweep out buildingibasements upon completion.
t
Service Cenh:rs I.ocaw Throughout Soutimrn New England
10/04/2002 16:28 FAX 860 289 0138 ENV SERVICES 2003
i
The cast br akdown for th propos d Scop of S$rvic s is its tollows:
1. Labor, Nlateriat,and Equipment...........:. ...,.., .. $ 29,000.00
It. Disposal..(all pricing pending approval):
Bulk Shciels...(Non-Asbestos Demo Debris)...... lnclUded In Item 1
This proposal makes the following assumptions and exclusions:
A signed Field Service Agreement or Purchase Order must be feGeiv6d prior
to the commencement of the project.
State and Federal Taxes will be'invoiced as applicable.
Client is to provide fret and clear occess to work area.
Client is to provide signature on all necessary shipping papers.'
No landscape restoration is included.
We would like to take this opportunity to thank you for allowing E.S.I. to quote
on.this project. We'd like to emphasize that E.S.I.-Is a dependable, cost effectiveandenvironmentallyresponsiblecompany, and has all appropriate licenses and
permits for this work.
E.S_I.. field personnel have received- OSHA 40-hour Hazardous Work Site OperationsandOSHA24-hour Hazardous Materials Technician Training and annual 8-hour
refreshers. All work will be performed in strict compliance with all Federal, State. and
E.S.I."standards.
Pricing is firrn for thirty days. E.S.1.'s standard payment terms are net fifteen {15) days
pending credit approval.
Should.you have any questions, or require additional information,please t0el free io
contact me at (860) 528-9500 or(800) 486-SPIL. .
Sincerely,
Bruce Davanney
Vice President