Loading...
HomeMy WebLinkAbout160 Birch Hill Drive (8)TOFF E U 0 Y APPLICATITNVAC PERMIT DATE: 14153 TOWN OF SOUTH WINDSOR EST.COST:GaBLDG. PERMIT NO. f} 1540 SULLIVAN AVENUE FEE Q SOUR WIMSOR, CT 06074 FEES: 644-2511 - Ext. 230 0 - $1,000 - $10.00 1000 or fraction LOCATION OF BUILDING 1166 Z.,! thereof - $10.00 OWNER ADDRESS TOWN PHONE N0. a000,0L11 CZ i7 s 5T lJ q tCT4ZACCONTRACTORADDRESSTOWN..)- PHONE NO. TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL L A/C t COMMERCIAL _ VENTILATION BUSINESS INDUSTRIAL IF HEATING: STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. HYDRONI_ WARM AIR_ UNIT RADIANT HEATER (INCLUDING WOOD/CO BURNING STOVE) TYPE OF FUEL: OIL-GPM_ GAS IN-PUT ELECTRIC KW WOOD COAL OIL TANK - SIZE & LOCATION INSIDE OUTSIDE CAPACITY LPG TANK - CAPACITY EXISTING RADIATION_ ADDITIONAL RADIATION_ TOTAL RADIATION_ DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT LOSS (BTUH) HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.): GROSS HEATING CAPACITY (INPUT-BTUH) NET RATING (OUTPUT-BTUH) IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE C °F INSIDE°F DIFFERENCE Cd°F TOTAL HEAT GAIN (BTUH) HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) pDESCRIBEALLCOOLINGEQUIPMENT (INCLUDING MAKE 6 MODEL NO.): l s- CIO . " a CAN t- TONNAGE COOLING CAPACITY (BTUH) 3 0 6g& IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITCHEN EXHAUSE EQUIPMENT) : ti TOTAL SIZE OF SYSTEM (CFM) 1r C FRESH AIR INTAKE (CFM) p PLAN MUST ACCOMPANY APPLICATION) The undersigned hereby applies for a permit to perform the following work and is to complywithalllocalordinancesandStateofConn. Building Codes in the performance of such work. FURTHER DESCRIPTION OF WORK.- Z de STATE LICENSE-- NAME & TYPE #DATE IGNATURE 07 APPLICANT APPROVED EfATE I - B - R CALCULATION SHEET 1603 (Modern Method)Copyright 1977 by The Hydronlcs Institute OWNER ADDRESS DESIGN TEMPERATURE DIFFERENCE F. DATE COL A COL.B COL.C COL.D COL.E COL.F COL.G ROOM Q H L W H L W H L W N L W H L W Design Water Temp. O l- BTUH per F of of 2 ROOM DIMENSIONS, FT.U Radiation Selected 1 J3 LENGTH EXPOSED WALLS,FT. A 4 WINDOW AND OUTSIDE DOOR AREA IL BTUH STUN BTUH BTUH BTUH 5 WALL CONSTRUCTION ROOM LIN. FT.OF TOTALS RADIATION Table 9,Line 3 x H) FROM LINE 12 SELECTED 6 TYPE OF GLASS IB ttorn of table used for Lin*5) 7 CEILING CONSTRUCTION Table 9,L it W)O g FLOO CONSTRUCTIONtR E Table 9, L x W or Lin. F t)F 9 COLD PARTITION CONSTRUCTION Table 9, L x H)G 10 _ 0 1 Wail(With Openings)O H c: i Openin X ce 2 Wells(Wth 9s) aJ 1 3 Wells IWilh Openings)or Ent.Hall h- F TOTAL BTUH AT 70F TEMP DIFFERENCE' K TOTAL BTUH AT DESIGN TEMP DIFFERENCE L COL.A COL.ill COL.H COL.I COL.J COL.K COL.L TOTAL BTUH TOTAL OF •UILDING RADIATION 1 ROOM cc AT SELECTED O H L W H L W H L W H L W H L W DESIGN TEMP.' DIFFERENCE 2 ROOM DIMENSIONS, FT UU 3 LENGTH EXPOSED WALLS, FT. 4 WINDOW AND OUTSIDE DOOR AREA U. STUN BTUH BTUH BTUH BTUH 0114CREASE BATHROOM 5 WALL CONSTRUCTION TOTAL 20% iTable 9. Line 3 x HI 6 TYPE OF GLASS Bottom f table used for Line 51 1FOR CONCRETE FLOOR ON 7 CEILING CONSTRUCTION GROUND OR FILL AT GRADE LEVEL,USE LINEAR Table 9, L x W) FEET OF EXPOSED EDGE g FLOOR CONSTRUCTIONS IT able 9. L x W or Lin F t l 9 COLD PARTITION CONSTRUCTION Table 9,L x HI 10 c 1WelllWithOpenings) 0 2 WNIs(With Openings! D X - J 3 Wells(With Openings) or Ent Hall ice- 11 TOTAL BTUH AT 7 F TEMP DIFFERENCE' 12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE FORM 1503 This form is available from The Hydronlcs Institute,35 Russo Piece,Berkeley Heights,N J 07922 LOAD CALCULATION WORK SHEET Stuh MAIN j7S!EC07N0FACTORFLOOR RXHGLL - SQREFT,METER EINT AA LENGTH X WIDTH AREA PUA14W LENGTH X WIDTH AREA S AREA FACING...NORTH 5 EAST SOUTH Aa WEST 9- S3DING GLASS DOORS NUMBER OUTSIDE DOORS 320 r } NUMBER 400PEOPLELOAD FIREPLACES 715007 VENT FANS 1500 A PLIAN l AD 1$00 _ 1 6 FLOOR SUB TOTALS B) COOLING TOTALALLFLOORS(A) HEATING REQUIREMENTS REQUIREMENTS 10 '"-!,. HEATING REQUIREMENTS B.C00UNG REQUIREMENTS X DUCTWORK FACTOR DUCTWORK FACTOR HEAT PIRA. STANDARD) A,100°HEATING REQUIREMENTS B. 200 COOLING REQUIREMENTS LXDESIGNTEMPFACTORxDESIGNTEMPFACTOR MSI-ECTOR DATE ZJ TIME a 46 6,LLOCATIONJ//Jy/a/{a..///' INSPECTION: CODE: RESULT(D/A) : BUILDING: ELECTRICAL: p PLUMBING: N HVAC: YAP* OTHER: x y J