HomeMy WebLinkAbout160 Birch Hill Drive (8)TOFF E U 0 Y APPLICATITNVAC PERMIT DATE:
14153 TOWN OF SOUTH WINDSOR EST.COST:GaBLDG. PERMIT NO. f} 1540 SULLIVAN AVENUE FEE Q
SOUR WIMSOR, CT 06074 FEES:
644-2511 - Ext. 230 0 - $1,000 - $10.00
1000 or fraction
LOCATION OF BUILDING 1166 Z.,! thereof - $10.00
OWNER ADDRESS TOWN PHONE N0.
a000,0L11 CZ i7
s 5T lJ q tCT4ZACCONTRACTORADDRESSTOWN..)- PHONE NO.
TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL L
A/C t COMMERCIAL _
VENTILATION BUSINESS
INDUSTRIAL
IF HEATING: STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS.
HYDRONI_ WARM AIR_
UNIT RADIANT HEATER (INCLUDING WOOD/CO BURNING STOVE)
TYPE OF FUEL: OIL-GPM_ GAS IN-PUT ELECTRIC KW
WOOD COAL
OIL TANK - SIZE & LOCATION INSIDE OUTSIDE CAPACITY
LPG TANK - CAPACITY
EXISTING RADIATION_ ADDITIONAL RADIATION_ TOTAL RADIATION_
DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF
TOTAL HEAT LOSS (BTUH) HEAT LOSS SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.):
GROSS HEATING CAPACITY (INPUT-BTUH) NET RATING (OUTPUT-BTUH)
IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE C °F INSIDE°F DIFFERENCE Cd°F
TOTAL HEAT GAIN (BTUH)
HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
pDESCRIBEALLCOOLINGEQUIPMENT (INCLUDING MAKE 6 MODEL NO.): l s- CIO . " a
CAN t-
TONNAGE COOLING CAPACITY (BTUH) 3 0 6g&
IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITCHEN EXHAUSE EQUIPMENT) :
ti
TOTAL SIZE OF SYSTEM (CFM) 1r C FRESH AIR INTAKE (CFM) p
PLAN MUST ACCOMPANY APPLICATION)
The undersigned hereby applies for a permit to perform the following work and is to complywithalllocalordinancesandStateofConn. Building Codes in the performance of such work.
FURTHER DESCRIPTION OF WORK.- Z de
STATE LICENSE-- NAME & TYPE #DATE IGNATURE 07 APPLICANT
APPROVED EfATE
I - B - R CALCULATION SHEET 1603 (Modern Method)Copyright 1977 by The Hydronlcs Institute
OWNER ADDRESS DESIGN TEMPERATURE DIFFERENCE F. DATE
COL A COL.B COL.C COL.D COL.E COL.F COL.G
ROOM Q
H L W H L W H L W N L W H L W Design Water Temp.
O
l- BTUH per F of of
2 ROOM DIMENSIONS, FT.U Radiation Selected
1
J3 LENGTH EXPOSED WALLS,FT. A
4 WINDOW AND OUTSIDE DOOR AREA
IL
BTUH STUN BTUH BTUH BTUH
5 WALL CONSTRUCTION
ROOM LIN. FT.OF
TOTALS RADIATION
Table 9,Line 3 x H) FROM LINE 12 SELECTED
6 TYPE OF GLASS
IB ttorn of table used for Lin*5)
7 CEILING CONSTRUCTION
Table 9,L it W)O
g FLOO CONSTRUCTIONtR E
Table 9, L x W or Lin. F t)F
9 COLD PARTITION CONSTRUCTION
Table 9, L x H)G
10 _
0
1 Wail(With Openings)O H
c: i Openin X
ce 2 Wells(Wth 9s) aJ
1
3 Wells IWilh Openings)or Ent.Hall h-
F TOTAL BTUH AT 70F TEMP DIFFERENCE' K
TOTAL BTUH AT DESIGN TEMP DIFFERENCE L
COL.A COL.ill COL.H COL.I COL.J COL.K COL.L TOTAL BTUH TOTAL
OF •UILDING RADIATION
1 ROOM cc
AT SELECTED
O H L W H L W H L W H L W H L W DESIGN TEMP.'
DIFFERENCE
2 ROOM DIMENSIONS, FT UU
3 LENGTH EXPOSED WALLS, FT.
4 WINDOW AND OUTSIDE DOOR AREA U.
STUN BTUH BTUH BTUH BTUH
0114CREASE BATHROOM
5 WALL CONSTRUCTION TOTAL 20%
iTable 9. Line 3 x HI
6 TYPE OF GLASS
Bottom f table used for Line 51 1FOR CONCRETE FLOOR ON
7 CEILING CONSTRUCTION GROUND OR FILL AT
GRADE LEVEL,USE LINEAR
Table 9, L x W) FEET OF EXPOSED EDGE
g FLOOR CONSTRUCTIONS
IT able 9. L x W or Lin F t l
9 COLD PARTITION CONSTRUCTION
Table 9,L x HI
10 c 1WelllWithOpenings)
0
2 WNIs(With Openings! D X - J
3 Wells(With Openings) or Ent Hall ice-
11 TOTAL BTUH AT 7 F TEMP DIFFERENCE'
12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE FORM 1503
This form is available from The Hydronlcs Institute,35 Russo Piece,Berkeley Heights,N J 07922
LOAD CALCULATION
WORK SHEET Stuh MAIN j7S!EC07N0FACTORFLOOR
RXHGLL - SQREFT,METER EINT AA
LENGTH X WIDTH AREA
PUA14W
LENGTH X WIDTH AREA
S
AREA
FACING...NORTH 5 EAST
SOUTH Aa
WEST 9-
S3DING GLASS DOORS
NUMBER
OUTSIDE DOORS 320 r }
NUMBER
400PEOPLELOAD
FIREPLACES 715007
VENT FANS 1500
A PLIAN l AD 1$00 _ 1 6
FLOOR SUB TOTALS B) COOLING
TOTALALLFLOORS(A) HEATING REQUIREMENTS REQUIREMENTS 10 '"-!,.
HEATING REQUIREMENTS B.C00UNG REQUIREMENTS
X DUCTWORK FACTOR DUCTWORK FACTOR
HEAT PIRA.
STANDARD)
A,100°HEATING REQUIREMENTS B. 200 COOLING REQUIREMENTS
LXDESIGNTEMPFACTORxDESIGNTEMPFACTOR
MSI-ECTOR DATE ZJ TIME
a
46 6,LLOCATIONJ//Jy/a/{a..///'
INSPECTION: CODE: RESULT(D/A) :
BUILDING:
ELECTRICAL:
p PLUMBING:
N
HVAC:
YAP*
OTHER:
x
y
J