Loading...
HomeMy WebLinkAboutZoning Letter RE: Pool Installation Dyr N Sf4 6z()• O 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSox co TELEPHONE (860) 644 2511 February 22, 2019 Mr. Tylur Craddock 210 Avery Street South Windsor, CT 06074 Re: Compliance with approved plans for pool installation Dear Mr. Craddock: Based on a complaint received by the Towns Engineering Department, it has come to our attention that you are not in compliance with the plan submitted for the installation of an in-ground pool. This plan was submitted June 5, 2018, and showed a silt fence was to be installed to the north, east and south of the proposed pool. To date, the silt fence has not been installed, and as a result water and silt have migrated off your property and onto the property to the rear of your yard. As soon as the weather allows, you must install the silt fencing and remove all silt and material that has accumulated on neighboring property. Please contact me verifying receipt of this letter and provide me with a schedule of when you propose to have this work done to avoid potential enforcement action. Once the silt fence is installed, please contact me so that we may perform an inspection. If this continues to be a problem, you may be required to provide an as-built plan demonstrating how the final grading does not cause discharge onto neighboring properties. Call me at (860) 644-251 1 , extension 251 if you have any questions. Thank you for your cooperation. Sincerely, Pamela A. Oliva, CZEO Zoning Enforcement Officer cc: Director of Planning Poolman Pools