HomeMy WebLinkAboutZoning Enforcement Letter (7) s O.pN Sfq
O-P sioa�
O J
a `
m �
• �� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
soR cC° TELEPHONE (860) 644-2511
October 19 2018
Mr. Jay Haller
24 Seneca Road
West Hartford, CT 06117
Re: R013 John Fitch Boulevard
Dear Mr. Haller:
It has come to my attention that there are a number of tractor trailers and
other vehicles in various stages of disrepair on your property at R013 John
Fitch Boulevard.
Please be aware that the Town of South Windsor regulates the use of lots
within Town, and requires site plans before any activity begins. A review
of Town records does not reveal any site plan for the storage of vehicles
and parts of vehicles on that site. The condition of the vehicles being
stored on the property could render the site a motor vehicle junkyard
under the Town definitions. Such a use is not allowed in the industrial
zone. A copy of the relevant sections of the zoning regulations is
attached for your review.
Please remove the trailers and other vehicles, and if you wish to utilize this
site, submit a site plan for review by November 5, 2018 to avoid
enforcement action from this office. Call me at (860) 644-2511, ext. 251 if
you have any questions. Thank you for your cooperation.
Sincerely,
Pamela A. Oliva, CZEO
Zoning Enforcement Officer
cc: Director of Planning
ARTICLE 8—ZONE CHANGE,SPECIAL EXCEPTION,&SITE PLAN STANDARDS&PROCEDURES
ARTICLE 8 ZONE CHANGE, SPECIAL EXCEPTION,
AND SITE PLAN STANDARDS AND PROCEDURES
Section 8.1 Purpose
This article provides general criteria for judging the appropriateness of Zone.Changes and Special Excep-
tion uses, as well as specific standards for the form and content of Site Plans, General Plans, and Pre-
liminary Plans.
Section 8.2 General Application Standards and Procedures
A. Applications must be made by the property owner of record, or an individual having substantial in-
terest in the property or a duly authorized agent or attorney. Proof of ownership, or valid option to
buy the property, shall be submitted by the applicants,including parcel number and map numbers as
recorded in the Town Assessor's Office.
B. The applicant shall be responsible for displaying a sign on the property that states that an application
is pending before the Commission.The sign shall be visible from a town street and shall be displayed
for at.least 10 days before the scheduled meeting.
C. For any application for a zone change, special exception use, major home occupation, accessory
apartment or detached in-law apartment, the applicant shall also notify abutting property owners in
writing by mail within 7 calendar days of the time an application is submitted that an application is
pending in front of the Commission.The applicant shall provide written proof of mailing.Addition-
ally,the applicant is required to provide a copy of the letter and a list of the persons to whom the let-
ter was sent prior to the application being received by the Commission. The applicant may also be
requested by the Commission to notify other.property owners at the direction of the Commission.
D. All applications shall include the following:
1. Three copies of the completed application form signed by the applicant and the owner of the
property, and
2. A fee in the amount prescribed by the Commission or by ordinance.
Section 8.3 Zone Change Standards and Procedures
A. Application Submission Requirements
Applications for a Zone Change shall include the following:
1. A Class D survey for the property to be re-zoned;
2. A Key Map complying with Section 8.6.1 Standards for Key Maps;
3. . Acreage of all parcels (or part thereof) contained within the proposed zone change area, and
acreage of all parcels (or part thereof).located,within 500 feet(in all directions)of the proposed
zone change;and
4. The General Plan of.Development map complying with Section 8.6.3 Standards for General
Plans when required by the proposed zone.
Page 8-1
ARTICLE 8-ZONE CHANGE,SPECIAL EXCEPTION,&SITE PLAN STANDARDS&PROCEDURES
Section 8.5 Site Plan Standards and Procedures
A. Applicability
Site Plan approval shall be required for the following:
1. All special exception uses(excluding Accessory Apartments);
2. All uses in non-residential zones;
3. Other uses as specified in these regulations.
B. Application Submission Requirements
1. Applications for Site Plan approval shall include the following:
a. A Key Map complying with Section 8.6.1 Standards for Key Maps;
b. A Site Development Plan complying with Section 8.6.2 Standards for Site Plans;and
c. Plan and Profile Drawings (when streets are proposed) complying with the requirements of
the Town of South Windsor Public Improvement Specifications Manual.
2. Individual sanitary sewage disposal systems shall be subject to the review and approval of the
town's Environmental Health Officer.
3. Phasing: Insofar as the development of some sites may be best undertaken.in phases,applications
may be submitted for each individual phase or for the development in its entirety.Every phase
shall be capable of independent existence without the completion of additional phases.
C. Public Hearing
The Commission may hold a public hearing regarding any site proposal if, in its judgment, the specific
circumstances require such action. Notice of public hearings and procedures shall be as prescribed by
statute.
D. Approval of Site Plans
The Commission may approve, approve with modifications, or deny a site plan. Upon approval,the fol-
lowing procedures shall be followed:
1. The applicant shall file,at his expense,in the Office of the Town Clerk,one set of the plot plans
which have been approved by the Commission. No plan may be recorded or filed by the Town
Clerk until approval has been endorsed thereon by the Commission;and the filing or recording of
a plan without such approval shall be void.
2. Any substantial changes in facilities or uses to that approved in the Site Development Plan appli-
cation shall require additional approval of the Commission.
E. Minor Modifications to Site.Plans
Technical and minor revisions to an approved site plan, which do not substantially alter the approved
plan,at the direction of the PZC Chair,mayy be approved by the Director of Planning,with consultation
of other relevant Town staff,when proposed changes are limited to landscaping;parking;drainage;grad-
ing; erosion and sedimentation controls; signage; or building additions or additional structures that are
less than 25 percent of the floor area of the principal building not to exceed 5,000 square feet.
Page 8-4
(pW N sf4
AA <�
P' F
-1 U tin aleso� V&'d4't
9 ,r`
�J = 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
�osoR-C TELEPHONE (860) 644-2511
November 16, 2018
Mr. Michael Haller
P.O. Box 32
New Hartford, CT 06057
Re: R013 John Fitch Boulevard
Dear Mr. Haller:
I spoke with you on Wednesday, November 14, 2018 regarding the
number of tractor trailers and other vehicles in various stages of disrepair
on the property at R013 John Fitch Boulevard.
As we discussed, the Town of South Windsor regulates the use of lots within
Town, and requires site plans before any activity begins. A review of Town
records does not reveal any site plan for the storage of vehicles and parts
of vehicles on that site. The condition of the vehicles being stored on the
property could render the site a motor vehicle junkyard under the Town
definitions. Such a use is not allowed in the industrial zone. A copy of the
relevant sections of the zoning regulations is attached for your review.
Please remove the trailers and other vehicles, and if you wish to utilize this
site, submit a site plan for review by December 21, 2018 to avoid
enforcement action from this office. Call me at (860) 644-2511, ext. 251 if
you have any questions. Thank you for your cooperation.
Sincerely,
a Pamela A. Oliva, CZEO
Zoning Enforcement Officer
cc: Director of Planning