y iRI-STATE MAT I_,RIALS TESTING LAB INC..
CONNEC7ICUT DIVISION
1_1'?"NORTH PL.-UNS 1NDUSiRIAL ROAD - :VALLINGFORD.CONNECT ICUT 06492.1203)949-7733 FAX(203'i 949-7735
ON ENGt"
Client: Design Tec Report#: 014 Page 1 of 1
17 Sparks St. Date: 07/06/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C3 ,C143.C231,C173.C1064,C138.)
Truck Ticket Batch Disch. Samp. % Air Slump Conc.Unit WT Field Design
No. , No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
116 174552 11:50 12:30 12:45 6.5 4.5 84 1-4 3000
Location(s)of Pour: Pier footings on line 13 at B,C,D,E and F.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Jason Farr TSMTL
Weather: Clear Air Temp. 96 Total Yardage Placed: 12.5
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12"IT!
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1106- Lbs.)
1 72937 07/06/99 07/07/99 07/13/99 7 28.27 78,000 B 2760
2 72938 07/06/99 07/07/99 08/03/99 28 28.27 98,000 C 3470 Yes
3 72939 07/06/99 07/07/99 08/03/99 28 28.27 102,000 B 3610 Yes
4 72940 07/06/99 07/07/99 08/03/99 28 28.27 100,000 B 3540 Yes
t t
Reported To: Design Tec Inc.
A M Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear 5y
The above reported data is the property of the client. No reproduction of the
abov--eta without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White, P.E ti•v ;:':.`T '
yi ,
Tri• Materials Testing accepts no liability for work executed by others.
ab
NVLAP does not endorse the product of this report E• i7
1N
L
Q/ T -S T' E MATIRIAb.STESTING LAB INC..
CONNEL.IC'i DIVISION
l?!7"NORTH PL.=MS I:1fDUSTM L.ROAD • 'WALLINGFORD.CONNEt i ICUT 06492• 1203)949-"'== =nX(203)949-7i35
ua 2
Oiy `yu•
Client: Design Tec Report#: 008 Page 1 of 1
17 Sparks St. Date: 06/30/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231,C173.C1064.C138.,)
Truck Ticket Batch Disch. Samp. % Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
31 174507 3:25 3:35 3:40 3.5 3.5 76 1-4 3000
Location(s)of Pour: Footing on column line A from 11 to 13 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Jason Farr TSMTL
Weather: Clear Air Temp. 87 Total Yardage Placed: 20
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12"H)
eld# Seal# Date Date Date Age, Cross-Sect.,Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1050- Lbs.)
1 1 06/30/99 07/01/99 07/07/99 7 28.27 82,000 C 2900
2 2 06/30/99 07/01/99 07/28/99 28 28.27 106,000 B 3750 Yes
3 3 06/30/99 07/01/99 07/28/99 28 28.27 112,000 A 3960 Yes
4 4 06/30/99 07/01/99 07/28/99 28 28.27 110,000 A 3890 Yes
Reported To: Design Tec Inc.
A M
Submitted By Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear
p•.
00r,:;z•. •:;-
The above reported data is the property of the client. No reproduction of the
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,P.E
Tri-SlAe Materials Testing accepts no liability for work executed by others.
NVL... does not endorse the product ofthis report
NEW YORK C IV • LONG ISLAND • EDISON.N( • WALLI:NGFORD. CT • DOVER.DE
4P
e:RIALS TEST'S
iF l TRI-STATE MATERIALS TESTING LAB INC.
CONNECTICUT DIVISION
121'P"NORTH PLAINS INDUSTRIAL ROAD • INALLINGcORD"CONNECTICUT 06492• 1203)949-7733 FAX(203)949-7735
c
TioN ENG N(
G
AI
Client: Design Tec Report#: 012 Page 1 of 1
17 Sparks St. Date: 07/08/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173•C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
142 174599 1:15 1:25 1:45 2 4 90 1-4 3000
128 174600- 2:15 2:30 2:35 1.5 0 89 5-8 3000
Location(s)of Pour: Foundation wall on D.7 from 8 to 9 line inside and outside wall on column line D.8 from 9 to 11 line and on
9 from DA to D.9 line at existing loading dock area. Footing on column line 11.1 from D.9 to G line.
Remarks:First truck air content was 2%Harry called the plant.The second truck air content was 1.5%, Superintendent was notified.
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 87 Total Yardage Placed: 26
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1083- Lbs.)
1 33835 07/08/99 07/09/99 07/15/99 7 28.27 74,000 C 2620
2 33836 07/08/99 07/09/99 08/05/99 28 28.27 114,000 B 4030 Yes
3 33837 07/08/99 07/09/99 08/05/99 28 28.27 120,000 A 4240 Yes
4 33838 07/08/99 07/09/99 08/05/99 28 28.27 116,000 B 4100 Yes
Reported To: Design Tec Inc.
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear
The a-6—.reported data is the property of the client. No reproduction of the
abo .without the sole permission of Tri-State Materials Testing Lab.Inc. Neal J. White,P.E
Tri-State Materials Testing accepts no liability for work executed by others.
4
NVLAP does not endorse the product of this report
Ire H c-
w y,lawl
a1ea%ALs-r.3
c
A7 m
TRI-STATE MATERIALS TESTING LAB INC,.
CONNECTICUT DIVISION
12I"P"NORTH PLAINS INDUSTRIAL ROAD WALLIIVGFORD.CONNEC T ICUT 06492• (203)949-711 33 FAX(203)949-7,735
wu P`
2C?A
cT1GN ENG N
Client: Design Tec Report#: 013 Page 1 of 1
17 Sparks St. Date: 07/09/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump I Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
155 174610 1:30 5.5 3.75 87 0 3000
171611- 2:00 2:10 2:20 6.0 3.5 89 1-4 3000
Location(s)ofPour: Foundation wall on column line A from 11.1 to 13 line.
Remarks:On the first truck no samples were taken. On the second truck 35oz.of air was added in order to meet the required air content
Supplier: Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 94 Total Yardage Placed: 17.5
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1139- Lbs.)
1 33839 07/09/99 07/10/99 07/16/99 7 28.27 82,000 A 2900
2 33840 07/09/99 07/10/99 08/06/99 28 28.27 108,000 B 3820 Yes
3 33841 07/09/99 07/10/99 08/06/99 28 28.27 114,000 A 4030 Yes
4 33842 07/09/99 07/10/99 08/06/99 28 28.27 112,000 A 3960 Yes
Reported To: Design Tec Inc.
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear
The above reported data is the property of the client. No reproduction ofthe
abov,r.data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,RE
Tri- Materials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product ofthis report t
Vic-Y<
e*MALS iE^
4
T
R1-STAMAE MA ERIALS TI;SiING LAB INC..
CON1 E--=C:,7 DIVISION
121'7"`10RTH PLAINS iNDUSTRlAL ROAD :VAL.L.TNG70RD.CONNEL—. ICL7 06492-t2031 949-",33 • FAX i2031949--7:5
Client: Design Tec Report#: 015 Page 1 of 1
17 Sparks St. Date: 07/12/99
Plainville, CT. 06062
Project: GCR Truck Tire Cemer
CONCRETE FIELD DATA(ASTM C31.C143,C231.C173.C1064•C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No.No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
128 174627 12:37 1:10 1:30 5.7 4.5 71 1-4 3000
Location(s)of Pour: Foundation wall on line 13 from A to F.
Remarks:
Supplier: Aiudi Contractor: Design Tec Inspector: Joshua Tanner TSMTL
Weather: Clear Air Temp. 79 Total Yardage Placed: 14
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1134- 1 Lbs.)
1 72141 07/12/99 07/13/99 07/19/99 7 1 28.27 78,000 C 2760
2 72142 07/12/99 07/13/99 08/09/99 28 28.27 106,000 C 3750 Yes
3 72143 07/12/99 07/13/99 08/09/99 28 28.27 112,000 B 3960 Yes
4 72144 07/12/99 07/13/99 08/09/99 28 28.27 109,000 C 3860 Yes
Reported To: Design Tec Inc.
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear n.wtisce
The above reported data is the property ofthe client. No reproduction of the t t•
abov ata without the sole permission ofTri-State Materials Testing Lab,Inc. Neal J. White,RE i`ti', y ' '4`
J'
1.
Tri• Materials Testing accepts no liability for work executed by others.
ico
NVLAP does not endorse the product of this report CCi
3 ;14.
o .y No• O
X
tritAL TES}
Vr All
4
A RitI—STAG! W 5 ERIL S T1571NG L&_B INC.
CONNct—AC:•T DIVISION
I21"?"'NORMH PL4JNS iNDUS-17UAL ROAD :VALLMGFORD.CONNE.:1=06493 (293)949 949-77=5
Client: Design Tec Report#: 016 Page 1 of 1
17 Sparks St. Date: 07/13/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
156 174658 2:00 2:10 2:20 7 4 90 1-4 3000
Location(s)of Pour: Grade beam at existing building on column line 11.1 from A to D.8 line.
Remarks:
Supplier: Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 85 Total Yardage Placed: 21
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1138- Lbs.)
1 33847 07/13/99 07/14/99 07/20/99 7 28.27 78,000 C 2760
2 33848 07/13/99 07/14/99 08/10/99 28 28.27 102,000 C 3610 Yes
3 33849 07/13/99 07/14/99 08/10/99 28 28.27 106,000 B 3750 Yes
4 33850 07/13/99 07/14/99 08/10/99 28 28.27 104,000 C 3680 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
e'i.vrUlw
Split Shear
The above reported data is the property of the client No reproduction of the 6.
abov without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,RE
Tri- Materials Testing accepts no liability for work executed by others. k
NVLAP does not endorse the product of this report ry
a UN ,,
CONN—E=1 7 DIVISION
121'?"NORT-H PLANS iMUS iZt IAL ROAD :VA[..UNGrORD.CONNEt,::C'.i 06492 20:5 9:9-;_3 • F•'X 949-r5
3
CI• I
Client: Design Tee Report#: 017 Page 1 of 1
17 Sparks St. Date: 07/14/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.(:173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
161 174674 1:30 2:25 2:40 5.4 3.75 84 1-4 3000
Location(s)of Pour: Grade beam walls,starting 8ft.East of column E-13 to column I-13.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Sal Shreiteh TSMTL
Weather: Clear Air Temp. 85f Total Yardage Placed: 14.0
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1140- Lbs.)
1 1 72460 07/14/99 07/15/99 07/21/99 7 28.27 74,000 C 2620
2 72461 07/14/99 07/15/99 08/11/99 28 28.27 112,000 C 3960 Yes
3 72462 07/14/99 07/15/99 08/11/99 28 28.27 118,000 B 4170 Yes
4 72463 07/14/99 07/15/99 08/11/99 28 28.27 116,000 B 4100 Yes
Reported To: Design Tec Inc.
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear ter ' a
The above reported data is the property of the client. No reproduction of the G
abovp-Lata without the sole permission ofTri-State Materials Testing Lab,Inc. Neal J.White,P.$V)i
Tri-, Materials Testing accepts no liability for work executed by others.
L ,•=L s
NVLAP does not endorse the product ofthis report
tsi1AL Task
1.' 1
jv
r
CDNT,c:.:.C:JT DIVISION
I2?'?"NORTH PLAINS T IDUSirdAL°OAO :VA1.._MGFORD.CO fNEt--iCUT 06491•t?^:)
u• i
Client: Design Tec Report#: 019 Page 1 of 1
17 Sparks St. Date: 07/15/99
Plainville, CT. 06062-
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(AST1W C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. I % Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength (PSI)
160 174687 1:30 1:40 1:50 5.5 3.5 90 1-4 3000
Location(s)of Pour: Column footing on column line 11.1-H, 11.1-1, 11.1-J and 11.1-K and a grade beam on column line 13 from
I to K line.
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 85 Total Yardage Placed: 13
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1143- Lbs.)
1 33857 07/15/99 07/16/99 07/22/99 7 28.27 70,000 B 2480
2 33858 07/15/99 07/16/99 08/12/99 28 28.27 92,000 C 3250 Yes
3 33859 07/15/99 07/16/99 08/12/99 28 28.27 98,000 C 3470 Yes
4 33860 07/15/99 07/16/99 08/12/99 28 28.27 94,000 C 3320 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear 1 •„
y• u
The above reported data is the property of the client. No reproduction of the
abovy.data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White, RE A
Tri-, &terials Testing accepts no liability for work executed by others.S
4
XNVLAPdoesnotendorsetheproductofthisreportd;
lip 0 r
d NAL
IA;1ALZ 7r
CJ C7`x .`rT Tl5!i1liSi U NCr
b+
CON,IE:-iC'.j_ 'DIVISION
1_!"='`IOR:H PL.-.dNS-DM US 7RLAL.70AD .ALL:NGF0RD.76492• :23)949-77_3 FAX i203 i 949- ,1S
ua^
N a 11a•
w..
Client: DesignTec Inc. Report#: 019 Page 2 of 2
17 Sparks St. Date: 07/15/99
Plainville, CT. 06062 Inspector: Al Jimenez
Project: GCR Truck Tife Center Contractor: DesignTec
Sample: Soil Fill
Test: In Place Density Test- In Place Moisture Content
Method: ASTM D2922 - ASTM D3017
x......:.::::.::::•::•::••::::::::..:....%:•:....;:::::•:.;::::::•::.::::::::. ate iL •:::•:.::•::::•:.} •::::•::::•:: :::•::•:. ..:.::: ::
X.Ca r. :::::::::::.O'.•.::...............
Y.. .. ...:...... ....................... ...........A..::::.:...........::.:::::.::.::.:::::::::.:::.:...:..::..::::.::::.:..........•.::.::::::..::::.:::.:.:...::::::::.::::..=.::.:::.:.:::::.:.::
Outside of wall of columm line 13
15 2' South off column line 13 on D line 3' BTOW 4.5 1113 114.0 97.6
16 2' South off column line 13 on E line 5.5 112.7 114.0 98.9
2' South off column line 13 on F line 4.5 112.4 114.0 98.6
2' South off column line 13 on G line 4.8 111.6 114.0 97.9
19 2' South off column line 13 on H line 5.4 111.0 114.0 97.4
20 2' South off column line 13 on D line 2' BTOW 4.9 111.9 114.0 98.2
21 2' South off column line 13 on E line 5.0 112.3 114.0 98.5
22 2' South off column line 13 on F line 5.5 113.7 114.0 99.7
23 2' South off column line 13 on G line 5.8 110.8 114.0 97.2
24 2' South off column line 13 on H line 7.0 110.0 114.0 96.5
25 2' South off column line 13 on D line 10'BTOW 4.9 111.9 114.0 98.2
26 2' South off column line 13 on E line 5.4 111.0 114.0 97.3
27 2' South off column line 13 on F line 6.0 111.2 114.0 97.4
28 2' South off column line 13 on G line. 5.3 112.4 114.0 98.6
Remarks: BTW=Below top of wall
Material Type:Brown sand Proctor Dated: 06/04/99
Item # Max. Dry Density: 114.0
Min. Comp. Req. 95% Optimum Moisture: 7.5
Complies: Yes Reported To: DesignTec Inc.
Sove reported data is the property ofthe client. No reproducoon of the above data without the sole Submitted By: Tri-State Materials Testin b., Inc.ssion ofTri-State Matenals Testing Lab.,Inc. Tri-State Matenals Testing accepts no liability for work
executed by other
Neal J. White, P.E
DINISION
CRT-H PT-.d;1S i.ri)us I.;_ OAD - ,.;AL 7.Ic7:RD.=C. i 76 9?•,nz•a i 44 -9-9- -- -
V
Clie .,r''N n Tec Report#: 020 Page 1 of 2
17 Sparks St. Date: 07/19/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31,C143.C231 C173,C1064 C138)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
120 176643 9:30 9:40 10:00 2 4.5 90 1-4 4000
Location(s)of Pour: Slab on grade for loading dock area between column line 8 to 11 and C.2 to E line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 92 Total Yardage Placed: 20
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1184- Lbs.)
1 33865 07/19/99 07/20/99 07/26/99 7 28.27 96,000 C 3400
2 33866 07/19/99 07/20/99 08/16/99 28 28.27 132,000 C 4670 Yes
3 33867 07/19/99 07/20/99 08/16/99 28 28.27 136,000 C 4810 Yes
4 33868 07/19/99 07/20/99 08/16/99 28 28.27 134,000 C 4740 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear CC;° NAl,i
The above reported data is the property of the client. No reproduction of the gf4 33 :.
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,RE
Tri• :'Materials Testing accepts no liability for work executed by others. n#&0
NVLAP does not endorse the product of this report
1 C
iE: - 5 775siuC Ll-E INC
I CCYV'c—t:.:j DIVISION\
TO PL=.i,tS iMU=KL;L 0AD :,iAL":;cr.jisD._Y fE-C_--J6492•,'^_)949-=711 _...:.,^=i 949--•s
Clie n Tec Report#: 020 Page 2 of2
17 Sparks St. Date: 07/19/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143,C231.C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
152 176679 3:40 3:50 4:00 6.0 4 89 5-8 3000
Location(s)of Pour: Grade beam on column line 11 from G to K and column footing on column line K-11.5,K-12,and K-12.5
line.
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 95 Total Yardage Placed: 18
r COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1184- Lbs.)
5 33869 07/19/99 07/20/99 07/26/99 7 28.27 72,000 C 2550
6 33870 07/19/99 07/20/99 08/16/99 28 28.27 104,000 C 3680 Yes
7 33871 07/19/99 07/20/99 08/16/99 28 28.27 108,000 C 3820 Yes
8 33872 07/19/99 07/20/99 08/16/99 28 28.27 106,000 C 3750 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar sc,99anrrr, c,.
Split Shear c''i•.Nj`C-•'`p
The above reported data is the property of the client. No reproduction of the a,.C•."+ r
abovpAata without the sole permission of Tri-State Materials Testing Lab.Inc. Neai.1. White,RE
Tri- vlaterials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product of this report
y ZzJ
3 urrnat-
s M.A_ Z_::UA_i_ T-HETUNIC LE. INC.
OWTSION
Cc?Tri PL:.INS=US—,RL;L J,D • :1.K.!^.ICunD.+_=, 769?•f=^:i 9a9 • ....t.n_ ?9-=
Clie M Tec Report#: 027 Page 1 of 1
17 Sparks St. Date: 07/20/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31•C143.C231.C173.C1064•C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
155 176747 2:45 2:55 3:10 6.3 3.25 89 1-4 3000
Location(s)of Pour: Grade beam on column line K from 11 to 13 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 93 Total Yardage Placed: 13.5
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1251- Lbs.)
1 33873 07/20/99 07/21/99 07/27/99 7 28.27 80,000 C 2830
2 33874 07/20/99 07/21/99 08/17/99 28 28.27 89,000 C 3112 Yes
3 33875 07/20/99 07/21/99 08/17/99 28 28.27 96,000 C 3395 Yes
4 33876 07/20/99 07/21/99 08/17/99 28 28.27 94,000 C 3324 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear te ri+a a a
The above reported data is the property of the client. No reproduction of the Jl:foi•"'y -; }aboyLdata without the sole permission ofTri-State Materials Testing Lab,Inc. Neal J. White, RE
Tr: Materials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product of this report x
N 'r_
GK^AL iF
J
L MAT.6- it >1 11, . INC
l 0IViSiON
MU ,r1 a1. JAD ' kL 1GrvnD. _W:. i-1649 :) 49 -_ .:t =^:i 949-•,-,
Clie ''cN - _ Tec Report#: 026 Page 1 of 1
17 Sparks St. Date: 07/21/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173,C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
151 174734 1:20 1:30 1:40 5.8 3.75 88 1-4 3000
Location(s)ofPour: Footing for retaining wall on column line G from 8 to 11 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 93 Total Yardage Placed: 11
7r' COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1248- Lbs.)
1 1 33877 07/21/99 07/22/99 07/28/99 7 28.27 78,000 C 2760
2 33878 07/21/99 07/22/99 08/18/99 28 28.27 112,000 B 3961 Yes
3 33879 07/21/99 07/22/99 08/18/99 28 28.27 110,000 B 3890 Yes
4 33880 07/21/99 07/22/99 08/18/99 28 28.27 98,000 C 3466 Yes
Reported ToTo: Design Tec Inc.,Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear
The above reported data is the property ofthe client. No reproduction ofthe
above-jata without the sole permission ofTri-State Materials Testing Lab,Inc. Neal J. White,P.E a.":w =
Tri- Materials Testing accepts no liability for work executed by others.a cn, r
NVLAP does not endorse the product of this report
l7alaxi M"
v`,eVk%ALS TESTr
C
TRI-STATE MATERIALS TE5TING LAB INC.
CONNECT ICUT DIVISION
l21''c"NORTH PLAINS INDUSTRIAL RO.A.D WALLINGFORD.CONNEC TICUT 06492- (203)949 733 FAX(203)949-7735
ccT/O EyG,
4.
Client: Design Tee Report#: 021 Page 1 of 1
17 Sparks St. Date: 07/23/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
156 177054 1:30 1:40 1:50 5.8 4 89 1-4 3000
Location(s)of Pour: Retaining wall on column line G from 8 to 11 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 93 Total Yardage Placed: 13
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1207- Lbs.)
1 33884 07/23/99 07/24/99 07/30/99 7 28.27 68,000 C 2410
2 33885 07/23/99 07/24/99 08/20/99 28 28.27 94,000 C 3320 Yes
3 33886 07/23/99 07/24/99 08/20/99 28 28.27 98,000 C 3470 Yes
4 33887 07/23/99 07/24/99 08/20/99 28 28.27 96,000 C 3400 Yes
Reported To: Design Tec Inc. Salamone Associates
Submitted Bv: Tri-State Materials Inc.
Cone Cone& Cone& Shear Columnar
Split Shear Nil • 7Yip
The above reported data is the property of the client. No reproduction of the z
abovo-eta without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,RE
Tri• Materials Testing accepts no liability for work executed by others.
l •
NVLAP does not endorse the product of this report i„ ,; ,'
0
SERIALS TfS
A, C
A7 9
T RI-STATE MATERIALS TESTING LAB INC.
CONNEC:ICUT DIVISION
121"?"NORTH PLAINS I.DUSTRIAL QOAD • WALLINGFORD.CONNEC ICUT 06492.1,203)949-7733 • FAX(203)949-=735
wVa Ct
Q
Client: Design Tec Report If: 042 Page 1 of 1
17 Sparks St. Date: 08/03/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
163 174937 1:30 1:40 2:00 5.6 3.75 86 1-4 4000
Location(s)of Pour: Alignment pit slab between column line 11.5 to 12.2 and from J to J.8 line
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 93 Total Yardage Placed: 21
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12" H)
field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1328- Lbs.)
1 74004 08/03/99 08/04/99 08/10/99 7 28.27 107,000 B 3780
2 74005 08/03/99 08/04/99 08/31/99 28 28.27 130,000 B 4600 Yes
3 74006 08/03/99 08/04/99 08/31/99 28 28.27 134,000 A 4740 Yes
4 74007 08/03/99 08/04/99 08/31/99 28 28.27 132,000 B 4670 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear
4+ N rr /
r<,0,rv&v.:
The above reported data is the property of the client. No reproduction of the 4/!,.
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J. White,P.E
Tri-State Materials Testing accepts no liability for work executed by others.
NVLAV does not endorse the product of this report i 70:
Mr..ws d0
T/7
TRI-STATE MATE RLALS TE=TINE LAB INC.
CONNEC77= DIVISION
121"P"NORTH PLAINS INDUSTRIAL ROAD - WALUNGFORD.CONNEC:ICUT 06492-f1 203)949--733 - FAX(203)949-7735
A
1
C'
cc,T N Eau•
Client: Design Tec Report#: 043 Page 1 of 1
17 Sparks St. Date: 08/04/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE ]HELD DATA(ASTM C31.C143,C231.C173,C1064,C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Conc.Unit WT Field Design
No. , No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
168 177645 2:30 2:40 2:50 5.5 4 85 1-4 4000
Location(s)of Pour: Foundation wall for alignment pit between column line 11.5 to 12.2 and from J to J.8 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 94 Total Yardage Placed: 9
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12" H)
ield# Seal# Date Date Date Age, Cross-Sect,Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1333- Lbs.)
1 74008 08/04/99 08/05/99 08/11/99 7 28.27 86,000 C 3040
2 74009 08/04/99 08/05/99 09/01/99 28 28.27 122,000 C 4310 Yes
3 74010 08/04/99 08/05/99 09/01/99 28 28.27 128,000 B 4530 Yes
4 74011 08/04/99 08/05/99 09/01/99 28 28.27 126,000 B 4460 Yes
Reported To: Design Tec Inc., Salamone Associates
N M Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar r,,1#
Split Shear
The above reported data is the property ofthe client. No reproduction ofthe
i•;
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Neal J.White,P.E
Tri-S"te Materials Testing accepts no liability for work executed by others. 1
aJVJ
NVLAP does not endorse the product of this report
4 d IVr,L
esiALS;E
TRI-SKATE MATERIALS TESTING LAB INC.
CONWECTIC'JT DIVISION
121"?"NORTH PLAINS WDUSTRIAL ROAD - WALLINGFORD.CONNECTICUT 06492•t203)949-7733 FAX(203)949-7735
iAUA C'f
r^ rG
e•?.
IoN EN,tr'
Client: Design Tec Report#: 047 Page 1 of 2
17 Sparks St. Date: 08/07/99
Plainville, CT. 06062
Project: GCR Truck Tire Ceiiter
CONCRETE FIELD DATA(ASTM C31.C143.C2H. C173.C1064.C138.)
Truck Ticket Batch Disch. I Samp. %Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
155 1 177797 7:20 7:30 7:40 2 4 80 F4-7 4000
131 1 177803 8:30 8:40 ( 8:50 Pi.5 3.75 78 5-8 1 4000
143 177821 9:30 9:40 10:009 4 80 9-12 4000
Location(s)of Pour: Slab on grade from column line A to A.5 and from 11 to 11.5 line,from column line C to C.5 and from 11.5
to 12,from column line D to D.5 and from 12.5 to 13.
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 86 Total Yardage Placed: 170
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12" H)
field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1391- Lbs.)
1 74012 08/07/99 08/08/99 08/14/99 7 28.27 82,000 C 2900
2 74013 08/07/99 08/08/99 09/04/99 28 28.27 122,000 C 4310 Yes
3 74014 08/07/99 08/08/99 09/04/99 28 28.27 126,000 C 4460 Yes
4 74015 08/07/99 08/08/99 09/04/99 28 28.27 124,000 C 4390 Yes
5 74016 08/07/99 08/08/99 08/14/99 7 28.27 102,000 B 3610
6 74017 08/07/99 08/08/99 09/04/99 28 28.27 136,000 C 4810 Yes
7 74018 08/07/99 08/08/99 09/04/99 28 28.27 140,000 C 4950 Yes
8 74019 08/07/99 08/08/99 09/04/99 28 28.27 138,000 C 4880 Yes
9 74020 08/07/99 08/08/99 08/14/99 7 28.27 98,000 B 3470
10 74021 08/07/99 08/08/99 09/04/99 28 28.27 128,000 C 4530 Yes
11 74022 08/07/99 08/08/99 09/04/99 28 28.27 132,000 B 4670 Yes
12 74023 08/07/99 08/08/99 09/04/99 28 28.27 1 130,000 1 B 4600 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar aysam
Split Shear 0N ,t,` rs,
The above reported data is the property of the client. No reproduction of the L
p g Neal J. White,P.EabovedatawithoutthesolepermissionofTri-State Materials Testing Lab.Inc.
Tri-State Materials Testing accepts no liability for work executed by others.
yIle
N'_ does not endorse the product of this report
NEW YORK CITY LONG ISLAND EDISON,NJ • WALLINGFORD,CT • DOVER.DE
IF'r-/c -rn TVF --rc--
efuALS'r
iz
9
TRI-STAF E MATERIALS TESTING LAB INC.
CONNECTICUT DIVISION
I217-NORTH PL.UNS INDUSTRIAL ROAD • WALLINGFORD.CONNEC 7ICUT 06492•203)949-7,i33 FAX(203)949-7735
uA P
U
CT/pN ENG D
Client: Design Tec Report#: 047 Page 2 of 2
17 Sparks St. Date: 08/07/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31, C143.C231.C173.C1064•C138.)
Truck Ticket Batch Disch. Samp. % Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
151 177829 11:30 11:40 12:00 2 3.5 82 13-16 4000
Location(s)of Pour: Slab on grade from column line E.5 to F and from 11 to 11.5 line. Total area poured was from column line
11 to 13 and from A to F line.
Remarks: Truck#108 was rejected because of 5.5 slump and too much stone.
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 86 Total Yardage Placed: 170
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D r 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1391- Lbs.)
13 74024 08/07/99 08/08/99 08/14/99 7 28.27 104,000 B 3680
14 74025 08/07/99 08/08/99 09/04/99 28 28.27 138,000 B 4880 Yes
15 74026 08/07/99 08/08/99 09/04/99 28 28.27 144,000 A 5090 Yes
16 74027 08/07/99 08/08/99 09/04/99 28 28.27 142,000 A 5020 Yes
Reported To: Design Tec Inc., Salamone Associates
Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear ofCON .per
The above reported data is the property of the client. No reproduction of the i°°
f••.+'' ,
above data without the sole permission ofTri-State Materials Testing Lab,Inc. p Neal J. White,RE
Tri Materials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product of this report
1
NEW YORK CITY • LONG ISLAND • EDISON.NJ • WALLINGFORD, CT DOVER.DE
1'If7 ifr -n rF4F rrr--
INE 3 C r-,
jo
OA:r.rL=S:t5;fuUZ—niAL -.ti ':rL':C=vR^._ti'N i 06492• ?n=i u"_- - _ =i?4-
08/07/99 INSPECTOR: Salah Al-Bakri
CLIENT: DesignTec_ CONTRACTOR: DesignTec
PROJECT: GCR Truck Tire Center CONCRETE BATCH PLANT: A.Aiudi
REPORT: 0114
CONCRETE BATCH PLANT INSPECTION REPORT
BATCH PLANT LOCATION: Plainville
EQUIPMENT CONDITION:
SCALES GOOD(X) FAIR ( ) POOR( )
RECENTLY CALIBRATED YES ( ) NO (X)
CONVEYOR BELTS GOOD(X) FAIR ( ) POOR( )
MAIN MIXER GOOD(X) FAIR ( ) POOR( )
LOADING SHOOT GOOD(X) FAIR ( ) POOR( )
MIXER TRUCKS GOOD( ) FAIR (X)POOR( )
MATERIALS:
CEMENT TYPE: 1 ( ) 2(X) OTHER( )
SPECIFY: Blue Circle Cement
MILL TEST AVAILABLE YES(X) NO( )
MILL TEST IN COMPLIANCE WITH ASTM C 150 YES(X) NO( )
CONCRETE SAND
CONDITION GOOD(X ) FAIR( POOR( )
GRADATION TEST AVAILABLE YES (X ) NO ( )
IN COMPLIANCE WITH ASTM C 33 YES (X ) NO ( )
75 INCH AGGREGATE
CONDITION GOOD(X ) FAIR( POOR ( )
GRADATION TEST AVAILABLE YES (X ) NO ( )
IN COMPLIANCE WITH ASTM C 33 YES ( X) NO ( )
5 INCH AGGREGATE
CONDITION GOOD(X) FAIR ( ) POOR ( )
GRADATION TEST AVAILABLE YES (X) NO ( )
IN COMPLIANCE WITH ASTM C 33 YES (X) NO ( )
375 INCH AGGREGATE
CONDITION GOOD(X ) FAIR ( ) POOR ( )
GRADATION TEST AVAILABLE YES (X) NO ( )
IN COMPLIANCE WITH ASTM C 33 YES (X ) NO ( )
11
Ft1Al.S Tic„
1
TRI-STATE. MATERIALS TESTING LAB INC,.
CONNEC,ICUT DIVISION
121"P"NORTH PLAINS NDUSTRLAL ROAD - WALLNGrORD.CONNECT ICUT 06492- i203)949--733 FAX(203)949-7735
v?o
r
ripN ENGtN „
PAGE 2 OF 2
BATCH PLANT INSPECTION
ADMXTURES:
AIR ENTRAINING AGENT IN USE YES( ) NO(X)
MANUFACTURED BY: None
CERTIFICATES OR LITERATURE AVAILABLE YES( ) NO( )
IN COMPLIANCE WITH ASTM C 260 YES( )NO( )
WATER REDUCER YES( )NO(X )
MANUFACTURED BY: None
CERTIFICATES OR LITERATURE AVAILABLE YES( ) NO( )
IN COMPLIANCE WITH ASTM C 494 Type A( ) Other( ) Specify
OTHER ADMIXTURES: YES(X )NO ( )
SPECIFY: Polyheed 997-Master Builders
IN COMPLIANCE WITH ASTM STANDARDS YES(X) NO( )
6 X 12 SPECIMENS TAKEN YES( } NO(X )
IF YES COMPLETE THE FOLLOWING DATA:
TRUCK# TICKET# SLUMP AIR CONTENT% TEMP.DEG.F STRENGTH REQ.
CYLINDER# 7 DAY STRENGTH
CYLINDER# 1-8 DAY STRENGTH eA• 46. t-
4I
28 DAY STRENGTHCYLINDER#
t
CYLINDER# 28 DAY STRENGTH
y..,•.
1AL }
CONSTITUENT SAMPLES TAKEN YES( ) NO(X)
Remarks: No on-site lab gradation.
IF YES, SIEVE ANALYSIS TEST RESULTS FOR ALL CONSTITUENT SAMPLES TAKEN WILL
BE INCLUDED WITH THIS REPORT.
N`P
rt1AL TEST/
TRI-STATE MATERIALS TESTING LkB INC#
CONNE=CUT DIVISION
121"P••NORTH PLAINS INDUSTRIAL ROAD WALLINGFORD.CONNEC 7ICUT 06492• i 203)949-7733 FAX(203)949=735
1A
CT101V ENuN
Client: Design Tec Report#: 046 Page 1 of 1
17 Sparks St. Date: 08/10/99
Plainville, CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31.C143.C231.C173.C1064.C138.)
Truck Ticket Batch Disch. Samp. %Air Slump Cone.Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# Strength(PSI)
108 174993 2:30 2:40 2:50 2 3.75 84 1-4 4000
Location(s)of Pour: Footing for masonry wall inside ofbuilding between column line F.3 to G line and from 11 to 13 line.
Remarks:
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 84 Total Yardage Placed: 32
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12"H) _
eld# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1401- Lbs.)
1 74028 08/10/99 08/11/99 08/17/99 7 28.27 102,000 D 3610
2 74029 08/10/99 08/11/99 09/07/99 28 28.27 124,000 C 4390 Yes
3 74030 08/10/99 08/11/99 09/07/99 28 28.27 128,000 C 4530 Yes
4 74031 08/10/99 08/11/99 09/07/99 28 28.27 126,000 C 4460 Yes
Reported To: Design Tec Inc., Salamone Associates
n A M Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar
Split Shear t"
The above reported data is the property of the client. No reproduction ofthe
above data without the sole permission of Tri-State Materials Testing Lab.Inc. Neal J. White,P.E
Tri-S a Materials Testing accepts no liability for work executed by others.
NVL,.. does not endorse the product of this report
rNqCE;01101d
NEW YORK CITY • LONG ISLAND • EDISON.N1 • WALLINGFORD.C; • ROVER.DE
rr,r•rc —I— —.Jr
y
TRI-STATE MATIRIALS T155TiNG LAB INC.
CONNEC:ZCUT DIVISION
I21'-?"NORTH PLAINS INDUSTRIAL.ROAD - WALUNGrORD.CONNECTICUT 06492- '2031 949--733 F.A.X(203)949-7-735
U1a
c"10N
Client: Design Tec Report 4: 049 Page 1 of 1
17 Sparks St. Date: 08/14/99
Plainville. CT. 06062
Project: GCR Truck Tire Center
CONCRETE FIELD DATA(ASTM C31,C143.C231,C173.C1064. C13--"
Truck Ticket Batch Disch. Samp. %Air Slump I Conc.Unit WT Field T Design
No. No. Time Time Time Cont. (Inch) Temp,F (PCF) Set# I Strength(PSI)
131 1040 7:30 7:40 7:50 1 2 4 85 1-4 4000
148 1044 8:40 1 8:50 1 9:00 1 2.2 1 3.75 84 5-3 4000
148 1 104-9- 10:40 1 10:50 1 11:00 1.8 1 4 1 84 9-12 4000
Location(s)of Pour: Slab on grade from column line F.5 to G line and between 12.5 to 13 line. From column line G to G.5 and
between 12+ 12.5 line. From column line I to J and between 11 to 11.5. Poured from area column line F to K and from 11 to 13 line
Supplier: A Aiudi Contractor: Design Tec Inspector: Al Jimenez TSMTL
Weather: Clear Air Temp. 87 Total Yardage Placed: 150
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12" H)
field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1406- Lbs.)
1 74032 08/14/99 08/15/99 08/21/99 7 28.27 76,000 C 2690
2 74033 08/14/99 08/15/99 09/11/99 28 28.27 126,000 C 4460 Yes
3 74034 08/14/99 08/15/99 09/11/99 28 28.27 130,000 C 4600 Yes
4 74035 08/14/99 08/15/99 09/11/99 28 28.27 128,000 C 4530 Yes
5 74036 08/14/99 08/15/99 08/21/99 7 28.27 88,000 B 2940
6 74037 08/14/99 08/15/99 09/11/99 28 28.27 142,000 C 5020 Yes
7 74038 08/14/99 08/15/99 09/11/99 28 28.27 146,000 C 5160 Yes
8 74039 08/14/99 08/15/99 09/11/99 28 28.27 144,000 C 5090 Yes
9 74040 08/14/99 08/15/99 08/21/99 7 28.27 82,000 B 2900
10 74041 08/14/99 08/15/99 09/11/99 28 28.27 140,000 C 4950 Yes
11 74042 08/14/99 08/15/99 09/11/99 28 28.27 144,000 C 5090 Yes
12 74043 08/14/99 08/15/99 09/11/99 28 28.27 142,000 C 5020 Yes
Reported To: Design Tec Inc., Salamone Associates
N M Submitted Bv: Tri-State Materials Testing Lab,Inc.
Cone Cone& Cone& Shear Columnar 8-•,:
r
Split Shear
The above reported data is the property of the client. No reproduction of the
above data without the sole permission of Tri-State Materials Testing Lab,Inc.p Neal J. White,P.E
Tri-State Materials Testing accepts no liability for work executed by others.
NVL.__ does not endorse the product ofthis report r
s