July 28, 2003
John Collins, Bldg.Insp.
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: 26 Long Hill Road/Lot 1
South Windsor, CT
Fite: 03.197
Dear Mr. Collins.
During the construction of a residence at the above lot, the footing/foundation was over-excavated
by 3 feet.
T have been informed that the condition of excavated material is satisfactory fora residential
foundation. The contractor asked for alternates to pouring the new footing at the lower elevation
which would require considerably more concrete. 'lb accommodate the condition, the final fl(x)r
elevation will be adjusted 1 foot lower which will require approximately 2 feet of fill material in
the excavation.
Two inch diameter crushed stone shall be placed in the over-excavated portion up to final bottom
of footing elevation. The stone should be placed in approximately S" layers, Ughtly laniped. This
will provide a satisfactory bearing condition for the building foundation.
The foundations will be structurally satisfactory with the above work.
Very truly yours,
SS a ` D ON
o t Dawson,III
Consulting Engineer
RAID/ri!a
Cc: Peter DeMallie,Design professionals via fax and hand-delivery 291-8757