Loading...
HomeMy WebLinkAbout26 Long Hill Road (2)28 03 03: 24p Galen Semprebon 860-291 -8757 p. 2 TSS: LL O DAWSON ARCHITECTURE ENGINEERING 330 ROBERTS STREET (EXIT 58.1-84)EAST HARTFORD,CONNECTICUT 061M3654 PHONE(860)289-1100 FAX(860)289-3272 July 28, 2003 John Collins, Bldg.Insp. Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: 26 Long Hill Road/Lot 1 South Windsor, CT Fite: 03.197 Dear Mr. Collins. During the construction of a residence at the above lot, the footing/foundation was over-excavated by 3 feet. T have been informed that the condition of excavated material is satisfactory fora residential foundation. The contractor asked for alternates to pouring the new footing at the lower elevation which would require considerably more concrete. 'lb accommodate the condition, the final fl(x)r elevation will be adjusted 1 foot lower which will require approximately 2 feet of fill material in the excavation. Two inch diameter crushed stone shall be placed in the over-excavated portion up to final bottom of footing elevation. The stone should be placed in approximately S" layers, Ughtly laniped. This will provide a satisfactory bearing condition for the building foundation. The foundations will be structurally satisfactory with the above work. Very truly yours, SS a ` D ON o t Dawson,III Consulting Engineer RAID/ri!a Cc: Peter DeMallie,Design professionals via fax and hand-delivery 291-8757 File: 03.197/072803L It DAN LYMAN RUSSELL.ARCHITECT ROBERT M.DAWSON,III,PROFESSIONAL ENGINEER•SUDHAKAR V.NAGARDEOLEKAR,ARCHITECT