Loading...
HomeMy WebLinkAbout26 Long Hill RoadRUSSELL O DAWSON ARCHITECTURE ENGINEERING 330 ROBERTS STREET (EXIT 58,1-84)EAST HARTFORD,CONNECTICUT 06108-3654 PHONE(860)289-1100 FAX(860)289-3272 July 28, 2003 John Collins, Bldg. Insp. Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06 74 f Re: p tie South Windsor, CT File: 03.197 Dear Mr. Collins: During the construction of a residence at the above lot, the footing/foundation was over-excavated by 3 feet. I have been informed that the condition of excavated material is satisfactory fora residential foundation. The contractor asked for alternates to pouring the new footing at the lower elevation which would require considerably more concrete. To accommodate the condition, the final floor elevation will be adjusted 1 foot lower which will require approximately 2 feet of fill material in the excavation. Two inch diameter crushed stone shall be placed in the over-excavated portion up to final bottom of footing elevation. The stone should be placed in approximately 8" layers, lightly tamped. This will provide a satisfactory bearing condition for the building foundation. The foundations will be structurally satisfactory with the above work. Very truly yours, a a O ONawac7_ son, III Consulting Engineer RMD/nla Cc: Peter DeMallie,Design Professionals via fax and hand-delivery 291-8757 File: 03.197/072803L DAN LYMAN RUSSELL,ARCHITECT• ROBERT M.DAWSON,III,PROFESSIONAL ENGINEER SUDHAKAR V.NAGARDEOLEKAR,ARCHITECT